Item 8AAGENDA ITEM # SA MARCH 9, 2009 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Professional Engineering Services Permitting, Bidding and Construction Engineering Services for We112R SUBMITTED BY: Donna Kaluzniak, CEP, Utility Director DATE: March 2, 2009 BACKGROUND: The City's 2001 Water Master Plan included a recommendation to replace Well No. 2, located at the Wastewater Treatment Plant at 1100 Sandpiper Lane. Geophysical and video inspection in 2001 showed the well to be in very poor condition. Request for Proposals No. 0203-2 was issued in 2003 to complete site selection, design and permitting of this well (We112R), and the top-ranked firm was CH2M Hill. CH2M Hill completed the design of the new well and associated pipe work in 2004. However, we asked the engineer to delay the permitting and construction engineering work, as funding for the well's construction was not available. Staff verbally negotiated with CH2M Hill to perform the permitting, bidding and construction engineering work, but could not reach an agreement, as their proposal was for approximately $100,000. Therefore staff requested a proposal from the City's General Engineering Consultant, Bowen Civil Engineering, the only one of the City's annual contract engineers that included this type of work in their scope. Staff has reached an agreement on the Scope of Services and Fee Proposal attached to this staff report. The Scope of Services includes preparing the permit applications for the Florida Department of Environmental Protection (FDEP) and assisting with the permit application for the St. Johns River Water Management District (SJRWMD). Also included are bidding assistance, construction engineering and inspection services, Certification of Construction Completion for FDEP, and the Construction Report and Aquifer Performance Testing Report for SJRWMD. The fee proposal is $41,775. BUDGET: Funds for the construction of We112R, including these engineering services, are budgeted in the Water Fund in the amount of $800,000 under account number 480-0000-533-63-00. AGENDA ITEM # 8A MARCH 9, 2009 RECOMMENDATION: Staff recommends Commission approval of the Scope of Services and Fee Proposal for Permitting, Bidding and Construction Engineering Services for We112R in the amount of $41,775, and to authorize the City Manager to sign the contract with Bowen Civil Engineering, Inc. ATTACHMENTS: 1. Scope of Work for Permitting, Bidding and Construction Engineering Services for We112R 2. Engineering Proposal for Permitting, Bidding and Construction Services for We112R. REVIEWED BY CITY MANAGER: 2 AGENDA ITEM # 8A MARCH 9, 2009 CITY OF ATLANTIC BEACH NEW WELL 2R PERMITTING, BIDDING AND CONSTRUCTION PHASE ENGINEERING SCOPE OF WORK I. PROJECT DESCRIPTION: A. The project consists of permitting, construction engineering, and certification of a new 16-inch diameter Floridan Aquifer well cased to approximately 490 feet below land surface. Well will be constructed with open-hole construction to approximately 900 feet below land surface. Design pumping rate of the well is 1,SOq gallons per minute. Also included is approximately 9131inear feet of 16-inch transmission main. II. PERMITTING: A. Engineer's responsibilities will include 1. Preparing and submitting the permit applications for construction of the wellhead and transmission main to the Florida Department of Environmental Protection (FDEP) as required. All permit application fees will be paid by the City. 2. Draft and final APT testing plan submittal to the St Johns River Water Management District (SJRWMD). 3. Assisting the contractor in securing the well construction permit as necessary. III. BIDDING AND CONSTRUCTION ENGINEERING A. Coordinate bidding and award of the project. Engineer shall be responsible for answering questions that may arise during the advertisement period, attending the pre-bid meeting, and issuing addenda as needed. The Owner shall be responsible for advertising the project in a local newspaper and providing bid sets to prospective bidders via the Internet or paper copies. The Owner shall maintain the plan holder list. After the bid opening, the Engineer shall review the bids and provide the Owner with a recommendation for award not more than five 5 working days after the bid opening. AGENDA ITEM # 8A MARCH 9, 2009 B. Provide construction phase services including: (1) Prepare Contract Documents (2) Attend Preconstruction conference (3) Review and process Shop Drawings and 0&M Manuals (4) Review and process Pay requests (5) Conduct regular site visits to review the work progress. The City's Public Work Inspector will perform daily inspection on the transmission main portion of the project. (6) Provide oversight of construction of the well by the hydro-geologist to include field inspections during drilling and testing to assure compliance with the project technical specifications. Hydro-geologist shall compile the hydrogeologic report, construction and testing report on the well. City will pay costs for all laboratory analyses required by the SJRWMD. (7) Answer Contractor or Owner questions (8) Review Change Order requests and prepare Change Order(s) if required (9) Conduct Pre-final and final inspections and generate punch lists (10) Review As-built drawings and Record Drawings obtained from contractor (11) Certify project completion and prepare FDEP Certification of Completion forms. AGENDA ITEM # 8A MARCH 9, 2009 sowl:~ Ctvl~. ;~v ~tN::l:~t~v ~, IPic, 8075 Gate Parkway W, Suite 204 Jacksonville, Florida 32216 Telephone: 904-737-0090 Fax: 904-737-0040 E-mail: cbeng~boweneng.com February 27, 2009 Donna Kaluzniak, CEP Utility Director City of Atlantic Beach 1200 Sandpiper Lane Atlantic Beach, FL 32233-4318 Re: Proposal for Engineering Services for the City of Atlantic Beach -Permitting, Bidding Services and Construction Administration Services for New Well Dear Ms. Kaluzniak: Bowen Civil Engineering, Inc. (BCE) is pleased to submit our fee proposal to continue to provide assistance to the city in the area of public works/utility projects. This project is Permitting, Bidding and Construction Administration Services for a new well. The project to be permitted, bid and constructed was designed by Ch2M Hill -Project #184483 dated October 2004. Bowen Civil Engineering, Inc will be performing the Permitting, Bidding and Construction Administration Services for a new well designed by others and will not be responsible for the design. All services will be based on the current plans and specifications provided by the city. The scope of work provided by the city is detailed below Scope of Work CITY OF ATLANTIC BEACH NEW WELL 2R PERMITTING AND CONSTRUCTION PHASE ENGINEERING SCOPE OF WORK PROJECT DESCRIPTION: The project consists of permitting, construction engineering, and certification of a new 16-inch diameter Floridan Aquifer well cased to approximately 490 feet below land surface. Well will be constructed with open-hole construction to approximately 900 feet below land surface. Design pumping rate of the well is 1,500 gallons per minute. Also included is approximately 913 linear feet of 16-inch transmission main. PERMITTING: Engineer's responsibilities will include: • Preparing and submitting the permit applications for construction of the wellhead and transmission main to the Florida Department of Environmental Protection (FDEP) as required. All permit application fees will be paid by the City. Roadway & Drainage Environmental Permitting Land Development Ms. Kaluzniak February 27, 2009 Page 2 AGENDA ITEM # 8A MARCH 9, 2009 Draft and final APT testing plan submittal to the St. Johns River Water Management District (SJRWMD). Assisting the contractor in securing the well construction permit as necessary. BIDDING AND CONSTRUCTION ENGINEERING Coordinate bidding and award of the project. Engineer shall be responsible for preparing bid documents for prospective bidders, answering questions that may arise during the advertisement period, attending the pre-bid meeting, and issuing addenda as needed. The Owner shall be responsible for advertising the project in a local newspaper and providing bid sets to prospective bidders via the Internet or paper copies. The Owner shall maintain the plan holder list. After the bid opening, the Engineer shall review the bids and provide the Owner with a recommendation for award not more than five 5 working days after the bid opening. Provide construction phase services including: • Incorporate contract documents prepared by CH2M Hill. • Attend Preconstruction conference • Review and process Shop Drawings and O&M Manuals • Review and process Pay requests • Conduct regular site visits to review the work progress. The City's Public Work Inspector will perform daily inspection on the transmission main portion of the project. • Provide oversight of construction of the well by the hydro-geologist to include field inspections during drilling and testing to assure compliance with the project technical specifications. Hydro-geologist shall compile the hydrogeologic report, construction and testing report on the well. City will pay costs for all laboratory analyses required by the SJRWMD. • Answer Contractor or Owner questions • Review Change Order requests and prepare Change Order(s) if required • Conduct Pre-final and final inspections and generate punch lists • Review As-built drawings and Record Drawings obtained from contractor • Certify project completion and prepare FDEP Certification of Completion forms. BCE and our sub consultants, J. Collins Engineering Associates, LLC and Douglas J. Hearn, P.G. of Yovaish Engineering Sciences, Inc. will perform this work for the City. Fee Proposal The fee or the scope of work is $41,775. If you have any questions about the fee proposal, please contact me at (904) 737-0090. Sincerely, Randy Do~lvni g Vice President Bowen Civil Engineerin ,Inc. AGENDA ITEM # 8A MARCH 9, 2009 MANHOUR & REIMBURSEABLES BREAKDOWN February 12, 2009, Rev February 24, 2009 City of AtlauHc Beacb. Fi. _ WyMr w.u v......:.s:..- n:.,.,:_,. n_ ..___~ '-'' . ui~ Y~ ii3 LABOR COSTS WORK BREAKD Man Hours/L,abor Rates OWN Hou Rate PM S40.00 ENG 534.55 SEN ENG $40.00 PG 530.91 DES/CAD 527.30 Clerical 513.00 TOTAL Task I -Well Permitting FDEP Permit Draft 8 Final APT 1 6 2 0 0 I $340.30 Assist Well Drifter wMleli Construction Pe it 1 0 2 50 0 1 $1,678.50 rm 0 0 1 2 0 0 $101.82 Task II -Well Bidding Coordinate Bidding 8 Award dress Contractor Questions 2 6 8 0 0 1 $620.30 Issue up to (2) Addendums 0 12 8 0 0 I $747.60 Review Bids 8 Prepare Recommend ti 2 t6 8 0 0 1 $965.80 a on 1 8 5 2 0 1 $591.22 Task III-Construction Administrati S i on erv ces Proparo Contract Documents Attend Preconatruction coherence 1 8 6 4 2 4 $786.64 Shop Drawings Review 8 08M Manual 0 0 3 3 0 1 5225.73 s Review and process Pa re uests 1 IS 6 12 0 1 $1,285.82 y q Conduct ate visits to roview the work r l 4 10 4 0 1 $714.84 p ogress Oversight of well wnstruct b h d l i /E 1 8 24 8 0 1 $1,536.68 . y y ro-geo a og ngineer Hydro-geologist com ile the well & h d l t 0 I 85 0 1 $2,720.35 p y rogeo ogic reports Answer Contractor or Owner uesti 0 0 1 18 0 1 $609.38 q ons Review 8 Praceas Chan e Orders 1 2 8 2 0 1 $503,92 g Conduct Pro-finai and final ins ecti 1 2 4 4 0 4 $444.74 p ons Review Aa-built drawin s obtained fi t 0 0 6 6 0 I 5438.46 g rm con ractor Certifications 8 Prepare FDEP Certa ti f C 1 3 3 4 0 1 5400.29 ca on o ompletion 1 3 3 4 0 1 5400.29 Totals 16 96 109 208 2 24 $15,112.68 Project Manager Engineer Senior Engineer Professional Geologist/I-Iydrogeologist Senior Designer/CAD Technician Clerical 5640 ~ $3,316.80 $4,360.00 56,429.28 $54.60 $312.00 SUBTOTAL DIRECT LABOR COSTS OVERHEAD at 2.5 PROFIT ON OH/DL - 10% TOTAL LABOR FEE _+$15,112.68 $37,781.70 $3,778.17 541,559.87 REIMBURSABLE COSTS Quantity Unit Price Mileage Courier & Postage Copying 300 1 250 MI LS SHTS 50.50 $40.00 $0.10 $150.00 $40.0p $25.00 SUBTOTAL REIMBURSABLE COSTS 521500 TOTAL ENGINEERING COST S41,775