Item 6BAGENDA ITEM # 6B APRIL 27, 2009 RESOLUTION NO. 09-06 A RESOLUTION OF THE CITY OF ATLANTIC BEACH ADOPTING THE WATER FACILITIES PLAN UPDATE -WELL 2R REQUIRED BY THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION FOR THE DRINKING WATER STATE REVOLVING FUND PROGRAM WHEREAS, the City of Atlantic Beach completed the Water Master Plan in 2001, which included a recommendation to replace Well #2 for Water Plant No. 1, and WHEREAS, the City has completed design plans and specifications for the replacement We112R, and WHEREAS, the City has approved the Capital Improvement Plan and necessary water rates during the annual budget process to pay for the financing of the Well 2R Project, and WHEREAS, the City wishes to use the Department of Environmental Protection State Revolving Funds for construction of the We112R Project because they are at a lower interest cost than conventional financing, NOW, THEREFORE, be it resolved by the City Commission of the City of Atlantic Beach, that the Water Facilities Plan Update - We112R be approved and adopted, and staff is authorized to make application to the Florida Department of Environmental Protection to finance the project through the State Revolving Fund. This is to certify that the foregoing is a true and convect copy of a resolution duly and legally adopted by the Atlantic Beach City Commission at a legal meeting held on this day of 2009. JOHN S. MESERVE Mayor Approved as to form and correctness: ALAN C. JENSEN, ESQUIRE City Attorney ATTEST: DONNA L. BARTLE, CMC City Clerk AGENDA ITEM # 6B APRIL 27, 2009 WATER FACILITIES PLAN UPDATE- WELL 2R City of Atlantic Beach, Florida April, 2009 ~1. COLLINS ENGINEERING ASSOCIATES, LLC AGENDA ITEM # 6B APRIL 27.2009 Foreward This is a summary update to the Water Master Plan prepared in September 2001 by Camp, Dresser & Mckee, Inc. The Water Master Plan was a comprehensive document that addressed water supply; water demand; water treatment storage and water distribution. The purpose of this report, "WATER FACILITIES PLAN UPDATE- WELL 2R", is to address or update the water supply portion of the previous Water Master Plan. Those items are: - Facility planning per the Water Master Plan has been implemented per the document beginning with water distribution upgrades, pump upgrades over the years. While there are pressing issues to improve the water system through annual updated Capital Improvement Program, Well 2R is a required replacement of an older mod~ed supply well (Well 2). It is now a critical item in the Water System to install a new water supply well to ensure that the City has a stable water supply - Previous attempts to fund the replacement well have been delayed to lack of adequate funding. The praject is also a "shovel ready" since the design of the Well 2R is complete and an FDEP permit is in preparation. - The project has no environmental constraints. This report, Water Facilities Plan Update -Well 2R, is consistent with the adopted Comprehensive Plan for the City of Atlantic Beach. - Water supply or demand is not an issue since this is replacement or backup to the existing system - This document, "Water Facilities Plan Update -Well 2R" along with the existing Water Master Plan, is anticipated to meet or exceed the requirements of a comprehensive water plan. The original document is a very detail evaluation of the water system that has been implemented for many years through the Capital Improvement Program at the city. The city of Atlantic Beach is faced with a complex need to immediately replace a Raw Water Supply Well and this document provides the detail needed to meet the requirements for funding. John E. Collins, Jr. PE J. Collins Engineering Assoaates, LLC 11516-3 San Jose Blvd.. Jacksonville, FL 32223 Water Facilities Plan Update 2 J. Collins En~eineerinQ Associates, LLC AGENDA ITEM !k 6B APRIL 27, 2009 TABLE OF CONTENTS FOREWARD ................................................................................................................... 2 CHAPTER 1.0 -SUMMARY OF FINDINGS AND RECOMMENDATIONS ..................... 4 CHAPTER 2.0 -BACKGROUND OF WATER FACILITIES PLAN .................................. 4 CHAPTER 3.0 -ENVIRONMENTAL tMPACTS .............................................................. 4 CHAPTER 4.0 -WATER SYSTEM ................................................................................. 4 CHAPTER 5.0 -WATER SUPPLY WELL 2R ................................................................ 7 CHAPTER 6.0 -IMPLEMENTATION AND COMPLIANCE ............................................. 7 WELL 2R PLANS .............................................................................APPENDIX A WATER MASTER EXECUTIVE SUMMARY ..........................................APPENDIX B Water Facilities Plan Update 3 J. Collins Enstineerina Associates. LLC AGENDA ITEM # 6B APRIL 27, 2009 CHAPTER 1.0 -SUMMARY OF FINDINGS AND RECOMMENDATIONS 1.1 Purpose This update report was prepared by J. Collins Engineering Associates, LLG for the City of Atlantic Beach (COAB) to comply with the requirements for the city to have a Comprehensive Water Facilities Plan for possible funding of new Well 2R through the Florida State Revolving Loan Program (SRF) funded by the Federal Stimulus Program of 2009. The City of Atlantic Beach has a 'shovel ready" project in a new well for the Water Treatment Plant #1. This well was originally planned under the Water Master Plan of 2001 and is already designed by CH2MHill in 2004. The ongoing work is the preparation of FDEP permit applications for the construction permit and obtaining funding through the SRF stimulus funding program. Upon receipt of funding, the project will be publically advertised and construction could immediately begin. CHAPTER 2.0 -INTRODUCTION 2.1 General City of Atlantic Beach has a current Water Facilities Plan that was prepared as a comprehensive evaluation of the Water System Needs for at least a 10 Year Planning Period. The Water Master Plan was prepared in Year 2001 by .Camp, Dresser 8 Mckee, Inc. An executive summary is attached below: CHAPTER 3.0 -ENVIRONMENTAL IMPACTS The scope of work assoaated with the construction of the City of Atlantic Beach's NEW WELL 2R is not anticipated to have any environmental impacts. CHAPTER 4.0 -WATER SYSTEM The City of Atlantic Beach Water System is comprised of two service areas -the Atlantic Beach and Buccaneer Water Service Area. The two areas contain two water treatment plants each. The service areas and wells are shown in the following exhibit from the recent Consumptive Use Permit Renewal permitting process. The first system is the Atlantic Beach system. This system serves primarily customers within the City limits of Atlantic Beach. The Atlantic Beach water service area is serviced by Water Treatment Plants No. 1 and No. 2 (WTP No. 1 and No. 2). WTP No. 1 is centrally located within the City, close to the Public Works office and Wastewater Treatment Plant No. 1 (VWNTP No. 1). Well #2R is a replacement well for the existing Well *2 at WTP #'1. Water Facilities Plan Update 4 J. Collins En~ineerinu Associates, LLC AGENDA ITEM # 6B APRIL 27, 2009 The second plant, WTP No. 2, is located just north of the Selva Marina Golf Course. The second water system is the Buccaneer water service area. This system serves customers north of the City's limits excluding the customers served by the Mayport Water System (JEA} and those on the Mayport Naval Base. The Buccaneer system is provided its water by WTP's No. 3 and No. 4. Water Treatment Plant No. 3 provides the bulk of the system's water and is located off Assisi Road in close proximity to WTP No. 2. Water Treatment Plant No. 4 is located in the northern portion of the Buccaneer system and is primarily used as a re-chlorinatioNre-pump station due to limited well and treatment capacity. 4.1 Atlantic Beach Service Area Facilities -Water Treatment Plant No.1 The water supply system consists of two Upper Floridan Aquifer wells. Treatment consists of a tray aerator followed by disinfection in two identical 200,000-gallon storage tanks. From the ground storage tanks, water is pumped by a combination of four identical high service pumps. The water is pumped into a 100,000- gallon elevated storage tank or to the distribution system, based on distribution system pressure. The wells for the City of Atlantic Beach Water System is shown in the following exhibit. Well #2R will serve WTP#1. Water Facilities Plan Update 5 J. Collins Ens~ineerinlt Associates, LLC AGENDA ITEM # 6B APRIL 27, 2009 Attachment S ~ i :- tidy.' P• _ .. _I ~ r _ ,t_ ___ ~ "8U~ We l C:~1N 8JC N'e D: "S ~ . ~4` a r I - wr.-. r i -rr ~x ~ .. r• ' ! ~ ~f ~~.;,,_ ~ , ~, , ;~,r ~ to _ f ~ L:~~..,. ~:-, Legend ~ ~"~~I i ~ A3:~U^C3'Y~Ef ~~Cf+.r?,;5 1 ____ . ; i 6UC .~:II ID: 3 . ~r6'd~'e! ID: ?. ~ y: ~ r _, ~ ~ ~ sue;- --."~• •'Rz3L~elll] Prct~ase~ -T~I . Au~n~,~~ ; ~ ,. 1 ~ ~ r.aAi ' ' . . +-~ .. s - ~ ~ . _ s - ~--!! 1 . rm . ,•. r`' sue., ~ . ~ ~~ _ n - a' ~ i ;ya .. ~" ~'. ., ' ..~ - ~ ..{•.. ~ ' ' '7~ r~ !!45.`••s ate ii' ^ w cf,..,. N Y ~ ~'.1 City of Atlantic Beach ^ Consumptive Use Permit Application Well Locations &~ Service Areas ~ ~ ~ ~~ CHAPTER 5.0 -WATER SUPPLY WELL 2R Water Facilities Plan Update f) J. Collins EnQineerin>x Associates, LLC AGENDA ITEM # 6B APRIL 27, 2009 During the preparation of Water Master Plan and the St Johns River Water Management District (SJRWMD) Consumptive Use Permit (CUP) Renewal in late 1990s and early 2000s, the SJRWMD determined that a further analysis of the water supply wells would be required as part of the renewal process. Therefore a well inspection and rehabilitation work was implemented to determine the need for City of Atlantic Beach water system improvements to increase redundancy and reliability. Recommendations for improvements at W'TP No. 1 (served by proposed Well 2R)' consisted of projects to enhance facilities operation and maintenance. The SJRWMD required that the existing Well# 2 which was an artesian well (Wells that are artesian have characteristics of higher transmissivity and yield which translates into higher pressure when the zone is "punctured" by a well) be modified by backfilling which would reduce the well yield. Well #2 has now been backfilled and no longer is artesian flow which reduces the well yield. During the CUP renewal, the SJRWMD permitted the new "Well 2R". Currently the City of Atlantic Beach is renewing their SJRWMD CUP again and this well is on the permit for installation Therefore the installation of the New WELL 2R is driven by regulatory requirements and the need to ensure the city has a sufficient water supply. The WTP#1 has always been served by two wells. Well ~2 was modified and a new backup well is an immediate need. The plans for the new Welt #2R are complete and the project is ready for implementation and will mee# the "shovel ready" requirement of the SFR Stimulus Funding. Key sheets of the Well 2R plans are attached in Appendix A. CHAPTER 6.0 - IMPLEMENTATION ~ COMPLIANCE The City is ready to implement this project immediately and this report represents a completed Water Facilities Plan. In addition, the city has prepared under separate documents: - Facilities Plan Public Participation/Dedicated Revenue Public Meeting Documentation (Resolution No.09-06) - Florida Environmental Information Document - Business Plan Water Facilities Plan Update 7 J. Collins Engineering Associates. LLC AGENDA ITEM # 6B APRIL 27, 2009 APPENDIX A -WELL PLANS Water Facilities Plan Uvdate J. Collins En~ineerin~ Associates, LLC AGENDA ITEM # 6B APRIL 27, 2009 .w3wn~oa aie t ~ ~ ~ aaaza saaaaaa aas :s aas z W 'A ~ ~ ~~yy VI"", O Z LL C Z W N ~ ~ ~~~ . o ~ m ~ 1 p - ~~ w ~ ~ _~~ 2 Q z a ~ ~ ~ ~N~ ~o~J ~ _,~ U~UJ o J~~ O~ZW D0~ ~ o Z a~ ON ~~ ~z 3$ Y ~ a3 ~~n ~ ~~ ~~ d ~~ ~~ ~~ ~~~ """""' `TEM # 6B :7, 2009 AGENDA ITEM # 6B wrxl ~~ J ~ O ~ ~~ ~~ Z ~ ~ ~ ~ ,, ~~ ~° ~~ o ~ ~ ~ ~ ~ ~ Z ~ ~ ~ ~ ~ =d O o ~ ~ ~ ~ ~ ~ d ° ~ V ~ ~~~ ~~ m~ a ~$ ~ ~~ ~ ~ I ti ~ ~~~ ~~~ ~ ~~~ ~~ J ~ ~ fir, ~~ g~~~ `t ~~~ ~ ~ N d i d d n d ~Q r~ ~'+ g ~ ~ I ~ [4 25 99 m s I `a~ ~ a A b ti w '~ b ~ ~ h I ~ ~ e g ~ ~ Z ~ s j . J~ ~ ~~ ~ ~ k x; ' ~ a4 ! ~~ ~~ I ~~ ~ ~~f1f~fif " 8 F ~3 ~_ ~~ H I s~ y J S ®~`~~~ b a $ 4 3 'c i 'a~ ~~~s~L ~ ~ N ~ ~ ° ~ ~ ~ ~ ~ g ~ a ~ za - -~__._~._..-.~ -._ _____~_. ~_ o ~ ~- ----- - -- - - -- w - - - ----~ - rn [b o~ ~r 'b ~a F~ .~~ a ~ ~~ :.~ ~, ~. r m° ~ L 27, 2009 AGENDA ITEM # 6B APRIL 27, 2009 APPENDIX B -EXECUTIVE SUMMARY 2001 WATER FACILITIES MASTER PLAN Water Facilities Plan Update J. Collins Engineering Associates. LLC AGENDA ITEM # 6B APRIL 27, 2009 Executive Summary CDM was retained by the City of Atlantic Beach to update the City's Water Master flan as well as establish an initial City Geographic Information System (GIS) and update the Utility Department hydraulic model. The results of these activities are Provided herein. The prunary scope of services for the Water Master Plan update are a.s follows: ^ Review existing conditions including monthly operating reports; water quality data; water demand data; water supply, treatment, and distribution facility capacities; population data; and land use data. ^ Develop future population projections and water demands. ^ Evaluate current water supply, water treatment and water distribution systems. ^ Evaluate impacts to water quality resulting from interconnection between Atlantic Beach and Buccaneer Service areas. ^ Determine need and timing for new raw water supply and water treatment facilities including capacity expansions at the existing facilities. ^ Update existing hydraulic models; perform water transmission and distribution system modeling; and identify necessary storage, pumping and distribution system improvements. ^ Present findings in draft and final reports. Project Background In 2000, the City provided potable water to a total water service area population of approximately 24,508. Average daily flow (ADF) to this population was approximately 2.877 million gallons per day (mgd). The water service areas include areas within the corporate limits of the City (Atlantic Beach Service Area) as well as the populated areas north of the City corporate limits (Buccaneer Service Area). Atlantic Beach Service Area The City of Atlantic Beach encompasses 3.03 square miles. The City of Atlantic Beach is primarily a residential community with single and multi-family residences accounting for more than 70 percent of the total area. Additional land uses in the service area include commercial, institutional, light industrial, parks and opens space. l:t should be noted that approximately 90-percent of the service area has akeady been developed and the area is approaching build-out conditions. Land use by type is summarized in Table ES-1. CDM c~,p D~« & M~IC~ ice. ES-1 ~vonsvr~mstz~zo»ae~»eaw~wMr~T,a~aiw swrc~.iydoc AGENDA ITEM # 6B APRIL 27, 2009 Executive Summary i` J ~.J The Buccaneer Service Area encompasses 2.6 square miles. The Buccaneer service azea is primarily a residential community with single and multi family residences accounting for more than 50-percent of the azea that can be developed (excluding pazks and wetlands). It should be noted that approximately 95-percent of the service area has already been developed and the azea is approaching build-out conditions. Land use by type for the Buccaneer service area is summa*+~ed in Table FS-1. Buccaneer Service Area Table ES-1 Land Use by Type Description Atlantic Beach Buccaneer Service Area Service Area (Acres} (Acres) Residential Single Family 624.2 311.3 Duplex 39.0 -- Multi-family 42.4 89.9 Mobile Homes 5.3 198.0 Vacant 124.7 39.3 Commercial Office/Professional 3.3 3.4 Hotels 7.3 -- General 125.7 42.4 Vacant 18.8 48.9 Institutional Government 66.4 238.2 Educational 10.3 43.0 Religious 15.9 27.1 Cemetery 35.6 1.2 Vacant 6.7 11.1 Industrial Light Industrial 34.9 2.3 Utilities 21.6 12.3 Vacant 5.2 ---- Open Space Golf Course 19.9 177.1 Agriculture 14.8 146.32 Parks 15.3 14.2 Submerged Lands 55.8 --- Miscellaneous~ 643.8 274.7 Total Undeveloped 155.4 99.3 Total Developed 1936.9 1680.7 Total Area 2092.3 1780.0 ~ lnrJudes. n~ads. wasteland homeowners assoc. nrooerfv_ etr:_ Not zoned- Agricultural: Based on location, this land will most likely be zoned single family. CDM camp D~ & Mdcee tom. Es-2 ~w~a~~2~zas~~neowq_v~n.~r~ra~~maew. s~,wyaoo AGENDA ITEM # 6B APRIL 27, 2009 Facecufive Summary Population Data Iistorical population data for the City of Atlantic Beach and Buccaneer service area are shown in Table ES-2. The data was provided by the City of Atlantic Beach Department of Community Development. The average growth rate during the period 1.994 through 2000 is 1.&percent for the entire service area. The Atlantic Beach and Buccaneer service areas growth rates during this period were 1.6 and 2.1-percent, respectively. The population data confirms that the service areas are approaching guild-out conditions. 7"able ES-2 Historical Population llatai ', Year Population Water Demand (mgd) Atlantic Beach Buccaneer Total Increase Atlantic Beach Buccaneer '~ 1994 12,561 9,445 22,006 - -- 1995 12,802 9,457 22,259 1.1% 1996 13,202 9,655 22,857 2.7% 2.12 1.07 1997 13,650 9,795 23,445 2.6% 2.00 1.15 1998 13,562 10,204 23,766 1.4% 2.08 1.11 1999 13,619 10,247 23,866 0.4% 2.11 1.17 2000 13,836 10,672 24,508 2.7% 2.12 1.19 ~ City of Atlantic Beach Department of Community Development (2000) Service Area Facilities 7'he first service area is referred to as the Atlantic Beach system. This system serves customers within the City lunits of Atlantic Beach. The Atlantic Beach water service area is serviced by Water Treatment Plants No.1 and No. 2 (WTP No.1 and No. 2). ~'VTP No.1 is centrally located within the City, close to the Public Works office and ti'Vastewater Treatment Plant No.1(WWTP No. 1). The second plant, WTP No. 2, is located just north of the Selva Marina Golf Course. The Atlantic Beach facilities are summarized in Table ES-3. CDM Camp Dresser & McKee Inc ES-3 ~~aa~rae~x~ neov~vu~r~a~~ww. s~r.~ AGENDA ITEM # 6B APRIL 27, 2009 Executive summary C, gable ES-3 Summary of Atlantic Beach Service Area Facilities Location Item Quantity Description WTP No. 1 Production Wells* 2 Well No. 1: 12-inch casing; 950 gpm capacity; 450 ft casing depth; 1020 ft total depth Well No.2: 16-inch casing; 750 gpm capacity (artesian well); 450 ft casing depth; 1040 ft total depth High Service Pumps 4 Model No. 6AE14 (Peerless); 50 Hp motor rated at 1,000 gpm @ 120 TDH, 11-inch impeller Ground Storage Tanks 2 Two identical, baffled 200,000 gallon concrete tanks (dimensions 50' x 50'). Average water depth is 10 ft Elevated Storage Tank 1 100,000 steel tank WTP No. 2 Production Wells* 2 Well No. 3:16-inch casing; 1650 gpm capacity; 450 ft casing depth; 1080 ft total depth Well No.5: 16-inch casing; 1850 gpm capacity; 450 ft casing depth; 1000 ft total depth High Service Pumps 3 Model No. 6AE14 (Peerless); 50 Hp motor rated at 1,000 gpm @ 140 TDH, 12-inch impeller 2 Model No. 5AE12 (Peerless); 30 Hp motor rated at 500 gpm @ 140 TDH, 12-inch impeller Ground Storage Tanks 1 500,000 gallon baffled concrete tanks (dimensions 75' x 75'). Average water depth is 12ft "Well capacity based on current capacities of the water supply wells. 'The second water system is referred to as the Buccaneer water service azea. This .system serves customers north of the City's limits excluding the customers served by the Mayport Water System (JEA) and those on the Mayport Naval Base. The Buccaneer system is provided its water by WTP's No. 3 and No. 4. Water Treatment :Plant No. 3 provides the bulls of the system's water and is Located off Assisi Road in close proximity to WTP No. 2. Water Treatment Plant No. 4 is located in the northern :portion of the Buccaneer system and is primarily used as a re-chlorination/re-pump :station due to limited well and treatment capacity. The Buccaneer facilities are t3nmmarized 1x1 Table ES-4. CDM camp lhesur & Macre tnc. ES-4 ~wnsvma~stz~zo3-rranaweo~v~rb~reauw sumnwyaoc AGENDA ITEM # 6B APRIL 27, 2009 Executive Summary 7'able ES-4 tiummary of Buccaneer Service Area Facilities Location Item Quantity Description WTP No. 3 Production Wells 2 Well No. 3W: 12 x 8-inch casing; 1,400 gpm design capacity; 100 ft casing depth (12-inch); 300 ft casing depth (8-inch); 720 ft total depth Well No. 5N: 12 x 8-inch casing; 1,400 gpm design capacity; 100 ft casing depth (12-inch); 300 ft casing depth (8-inch); 720 ft total depth High Service Pumps 4 Model No. 4015-6 (Paco); 30 Hp motor rated at 750 gpm @ 116' TDH, 11-inch impeller. (Pump 4 has 15-inch impeller; design capacity of 1,000 gpm) Ground Storage Tanks 2 Two identical 150,000 gallon concrete tanks (dimension: 30' outside diameter). Average water depth is 34 ft Hydro-pneumatic Tanks 2 10,000 gallon, horizontal, steel tanks WTP No. 4 Production Wells 2 Well No. 1N: 6-inch casing; 350 gpm design capacity; 400 ft casing depth; 600 ft total depth Well No. 2S: 6-inch casing; 350 gpm design capacity; 400 ft casing depth; 600 ft total depth High Service Pumps 2 Model No. 820A (Peerless); 15 Hp motor rated at 250 gpm @ 150 ft TDH Ground Storage Tanks 1 Capacity of the vertical steel tank is approximately 80,500 gallons. Diameter is 16 ft from elevation 0' to 40'. Diameter is 8 ft from elevation 40' to 64' Hydro-pneumatic Tank 1 10,000 gallon, horizontal, steel tank I~isfiribution System Table ES-5 provides a summary of distribution system pipe diameters, lengths of f~ipe currently shown in the system distribution model, and typical materials of construction. Due to the relative age of the system, a significant amount of cast iron (:larger diameters) and galvanized steel (2-inch diameter) pipe is present in the system. There is also some transite pipe (asbestos concrete) still used in the distribution system, The City prefers to utilize polyvinyl chloride (PVC) and ductile iron (DI) pipe materials in new distribution system installations. Pipe material that could not be identified during the GIS data design for the City's distribution system were classified as "unknown". CDM c~-I, > ~ McKee I,x. ES-5 ROMvrl~dhlQ12pN8~117101RpLWMR7Sd~ExeaAhe Summ~rydoe AGENDA ITEM # 6B APRIL 27, 2009 Executive Summary ':Cable ES-5 Water Distribution System Summary Diameter (inches) Length (feet)' Materials of Construction2 1 1,140 PVC, Unknown 1.5 5,200 PVC 2 29,055 PVC, Transite, Unknown 3 2,418 PVC, Unknown 4 51,788 PVC, DI, Transite, Unknown 6 167,725 PVC, DI, Transite, Unknown 8 159,515 PVC, DI, Transite, Unknown 10 17,768 PVC, DI, Unknown 12 15,975 PVC, DI, Unknown 16 5,157 PVC, Unknown 18 75 PVC, Unknown 24 2,740 PVC, Unknown Lengths are approximate and do not represent all existing (in-ground) pipe lengths, especially in the lower diameters. ~--~ s PVC =Polyvinyl chloride, DI =Ductile Iron or Cast Iron L' ys$r ~'~ £'(~. ~~ ,ire,/PS . Future Land Use The City of Atlantic Beach and Buccaneer service areas are approaching build-out conditions. It is expected that the current mix of residential, commercial, and multi- family water demand classes will prevail, with minor percentage changes throughout the planning period. Because more than 90 percent of the available land has been developed within the service areas, typical population projections are not valid beyond build-out. A}1 vacant parcels and corresponding land use categories were identified to determine the number of potential unit connections in the service areas. Five categories were used to identify the key land uses within the service area: residential, commercial, institutional, industrial, and open space. The vacant parcels are summarized in Table }~S-ti. 'Cable ES-6 Summarv of Vacant Parcels Description Atlantic Beach Buccaneer Service Area Service Area (Acres) (Acres) Residential 124.6 185.6' Commercial 18.8 48.9 Institutional 6.7 11.1 Industrial 5.2 -- Total 155.3 245.6 . 'Includes 146.3 acres not zoned -agricultural. CDM cetttp >~~ ~ Macs ttt~. ES-6 t~o~,nz~ae,~z~zoa~euuetrr:~vynevman~a s~mnny.aoe AGENDA ITEM # 6B APRIL 27, 2009 Executive Summary .gtlantic Beach Service Area Residential Classifications :Residential classifications for the City of Atlantic Beach were further subdivided into :jingle family and multi family land use categories using the December 2000 Zoning :Ylap (City of Atlantic Beach Department of Community Development). Table ES-7 provides the assumptions for population densities. 'Table ES-7 Build-out Projections for the Atlantic Beach Service Area Potential No. Description Acres Density of Unit Population ConnectionsZ Projection Single Family RS-1 30.0 1 unit per 7500 sf 140 298 RS-2 52.4 1 unit per 5000 sf 366 778 PUD 1.0 1 unit per 5000 sf 5 11 Single Family/ Two-family RG-1 13.4 2 units per 5000 sf 188 400 RG-1A 16.4 2 units per 7500 sf 154 328 Single Family/Twafamily/Multi-family RG-2 9.7 3 units per 5000 sf 204 434 RG-3 1.7 3 units per 5000 sf 36 77 Commercial3 18.8 NA NA NA Industrial3 5.2 NA NA NA lnsfitutional3 6.7 NA NA NA Toga! 155.3 1093 2326 Assumed 20% of the available vacant property is designated for stormwater management and Infrastructure needs (utilityright-of-ways, roads, etc.). '' 2.124 persons per unit connection (City of Aflantic Beach, Summary of Water Usage 1994-2000). "Commercial, industrial and institutional land will not contribute to increased population within the service area. 'Buccaneer Service Area Residential Classifications ;[residential classifications for the Buccaneer service area were further subdivided into ].ow, medium and high density land use designations using the City of Jacksonville 'and use categories. Low and medium-density classifications were identified within the Buccaneer service area and aze defined by the City of Jacksonville as follows: ^ Low-Density Residential (LDR): developments in a gross density range of up to seven dwelling units per acre when full urban services are available. ^ Medium Density Residential (MDR): developments in a gross density range of up to 20 dwelling units per acre when full urban services are available. Table ES-8 provides build-out projections for this service area. CDM Camp Dresser & McKee Inc. ES-7 ~b~bvfl~k2~03~6~3t7e9utpLWMl~nrt~F~aecwn+a sumnary.aoe AGENDA ITEM # 6B APRIL 27, 2009 Executive Summary Table ES-8 Build-out Protections for the Buccaneer Service Area Description Acres' Population Potential No. of Unit Population Density Connections2 Projection Residential i_ow Density 164.1 7 units per acre 920 2149 Medium Density 21.5 20 units per acre 345 806 Commercials 48.9 NA NA NA institutional s 11.1 NA NA NA Total 245.6 1265 2955 'Assumed 20% of the available vacant property Is designated for stormwater management and infrastructum needs (utility right-0f-ways, roads, etc.}. z 2.124 persons per unit connection (City of Atlantic Beach, Summary of Weter Usage 1994-2000). ' Commercial, industrial and institutional land will not contribute to increased population within the service area. Projections Based on utility summaries provided by the City of Atlantic Beach, the current number of water customers per unit connection is approximately 2.12 and 2.33 for the Atlantic Beach and Buccaneer service areas, respectively. Using these ratios, population projections at build-out were determined for vacant residential parcels. 7'liese projections were added to Year 2000 populations for a combined service area guild-out population of 29,789. Atlantic Beach Service Area Population Projections 7'he population projections for the City of Atlantic Beach based on unit connection projections are suxrunarized in Table ES-9 I3uccaneer Service Area Population Projections 7'he population projections for the Buccaneer service area are summarized in Table ES-10. Potable Water Demand Projections 7'he demand values were based upon the following criteria and are provided in Table I'sS-11: ^ Per capita level of service of 153 gallons per capita per day (gpcd) for the Atlantic Beach service area ^ Per capita level of service of 111 gpcd for the Buccaneer service area ^ Maximum day flow to average daily flow ratio of 1.48 for the Atlantic Beach service area CDM Camp Aresser & McKee inc. ES-8 \YkbvftWbk2120~704v178iYtpLWMP\Tq~ExaeuUw Bumouy.doe AGENDA ITEM It 6B APRIL 27, 2009 Executive Summary . w Maximum day flaw to average daily flow ratio of 1.47 for the Buccaneer service area, and ^ Population projections as provided in Table ES-9 and Table ES-10. Table ES-9 (,itv of Atlantic Beach Population Proiectionsi Year Unit Connections Population Projections Single Unit Multi-Unit Single Un it Multi-Unit Total 1994 4,300 1,281 -- - 12,561 1995 4,345 1,287 -- '' - 12,802 1996 4,504 1,491 - - 13,202 1997 4,709 1,506 -- -- 13,650 1998 4,750 1,516 -- - 13,562 1999 4,829 1,516 - - 13,619 2000 4,956 1,560 - - 13,836 2001 5,062 1,583 10,749 3,361 14,110 2002 5,171 1,606 10,980 3,410 14,390 2003 5,282 1,629 11,216 3,459 14,675 2004 5,395 1,653 11,456 3,510 14,966 2005 5,467 1,677 11,610 3,561 15,172 2006 5,467 1,701 11,610 3,612 15,222 2007 5,467 1,726 11,610 3,665 15,276 2008 5,467 1,751 11,610 3,718 15,329 2009 5,467 1,776 11,610 3,771 15,382 2010 5,467 1,802 11,610 3,826 15,437 2011 5,467 1,828 11,610 3,882 15,492 2012 5,467 1,855 11,610 3,939 15,549 2013 5,467 1,882 11,610 3,996 15,607 2014 5,467 1,909 11,610 4,054 15,664 2015 5,467 1,937 11,610 4,113 15,724 2016 5,467 1,965 11,610 4,172 15,783 2017 5,467 1,994 11,610 4,234 15,845 2018 5,467 2,023 11,610 4,296 15,906 2019 5,467 2,052 11,610 4,357 15,968 2020 5,467 2,082 11,610 4,421 16,031 2021 5,467 2,112 11,610 4,485 16,095 2022 5,467 2,142 11,610 4,552 16,162 2023 5,467 2,173 11,610 4,552 16,162 2024 5,467 2,205 11,610 4,552 16,162 2025 5,467 2,237 11,610 4,552 16,162 ' Note: Population projections aye based on potential unft connections to the water distrlbutlon system. CDM Camp~resser & McKce Inc. ES-9 1WAsvTdWQ\2077M917601RpLW1dP1T~d1Ew~aAFw Summry.UOe AGENDA ITEM # 6B APRIL 27, 2009 Execufive Summary Table ES-10 tsuccaneer Service Area Population ProiecHonsi Year Unit Connections Population Projections Single Unit Multi-Unit Single Unit Multi-Unit Total 1994 2,063 1,287 - -- 9,445 1995 2,079 1,283 - - 9,457 1996 2,167 2,184 - - 9,655 1997 2,267 2,184 -- - 9,795 1998 2,280 2,184 - - 10,204 1999 2,270 2,184 - -- 10,247 2000 2,361 2,211 - - 10,672 2001 2,403 2,225 5,609 5,194 10,803 2002 2,446 2,239 5,710 5,226 10,936 2003 2,490 2,253 5,812 5,259 11,071 2004 2,534 2,267 5,915 5,292 11,207 2005 2,579 2,281 6,020 5,324 11,344 2006 2,625 2,295 6,127 5,357 11,485 2007 2,672 2,309 6,237 5,390 11,627 2008 2,720 2,323 6,349 5,422 11,772 2009 2,769 2,337 6,464 5,455 11,919 2010 2,818 2,351 6,578 5,488 12,066 2011 2,868 2,366 6,695 5,523 12,217 2012 2,919 2,381 6,814 5,558 12,372 2013 2;971 2,396 6,935 5,593 12,528 2014 3,024 2,411 7,059 5,628 12,687 2015 3,078 2,426 7,185 5,663 12,848 2016 3,133 2,441 7,313 5,698 13,011 2017 3,189 2,456 7,444 5,733 13,177 2018 3,246 2,471 7,577 5,768 13,345 2019 3,281 2,486 7,660 5,803 13,463 2020 3,281 2,501 7,660 5,838 13,498 2021 3,281 2,516 7,660 5,873 13,533 2022 3,281 2,532 7,660 5,910 13,570 2023 3,281 2,548 7,660 5,948 13,608 2024 3,281 2,556 7,660 5,967 13,627 2025 3,281 2,556 7,660 5,967 13,627 ~ Note: Population projections are based on potential unit connections to the water distribution system. CDM c~>~«&McKee inG ES-10 OOMVfttpi~k21203701~17081Rp~.VYMRiS7~F~maAM 8umury.doc AGENDA ITEM # 6B APRIL 2'7.2009 Executive Summary 'Cable ES-1Z Potable Water Demand Projectional Year Atlantic Beach Service Area Buccaneer Service Area Total Service Area Population ADF MDF Population ADF MDF Population ADF MDF (mgd) (mgd) (mgd) (mgd) (mgd) (mgd) 1996 13,202 2.118 3.132 9,655 1.065 1.567 22,857 3.184 4.700 1997 13,650 2.004 2.963 9,795 1.147 1.687 23,445 3.151 4.651 1998 13,562 2.084 3.082 10,204 1.112 1.637 23,766 3.196 4.718 1999 13,619 2.113 3.125 10,247 1.173 1.726 23,866 3.286 4.851 2000 13,836 2.120 3.135 10,672 1.191 1.753 24,508 3.312 4.888 2001 14,110 2.157 3.190 10,803 1.203 1.770 24,913 3.360 4.960 2002 14,390 2.200 3.253 10,936 1.218 1.792 25,326 3.418 5.045 2003 14,675 2.244 3.318 11,071 1.233 1.814 25,746 3.476 5.131 2004 14,966 2.288 3.383 11,207 1.248 1.836 26,172 3.536 5.219 2005 15,172 2.320 3.430 11,344 1.263 1.859 26,516 3.583 5.288 2006 15,222 2.327 3.441 11,485 1.279 1.882 26,707 3.606 5.323 2007 15,276 2.336 3.453 11,627 1.295 1.905 26,902 3.630 5.358 2008 15,329 2.344 3.465 11,772 1.311 1.929 27,100 3.654 5.394 2009 15,382 2.352 3.477 11,919 1.327 1.953 27,300 3.679 5.430 2010 15,437 2.360 3.490 12,066 1.344 1.977 27,503 3.704 5.467 2011 15,492 2.369 3.502 12,217 1.360 2.002 27,710 3.729 5.504 2012 15,549 2.377 3.515 12,372 1.378 2.027 27,921 3.755 5.542 2013 15,607 2.386 3.528 12,528 1.395 2.052 28,135 3.781 5.581 2014 15,664 2.395 3.541 12,687 1.413 2.078 28,351 3.808 5.620 2015 15,724 2.404 3.555 12,848 1.431 2.105 28,571 3.835 5.660 2016 15,783 2.413 3.568 13,011 1.449 2.132 28,794 3.862 5.700 2017 15,845 2.423 3.582 13,177 1.467 2.159 29,021 3.890 5.741 2018 15,906 2.432 3.596 13,345 1.486 2.186 29,251 3.918 5.782 2019 15,968 2.441 3.610 13,463 1.499 2.206 29,431 3.940 5.816 2020 16,031 2.451 3.624 13,498 1.503 2.211 29,530 3.954 5.836 2021 16,095 2.461 3.639 13,533 1.507 2.217 29,628 3.968 5.856 2022 16,162 2.471 3.654 13,570 1.511 2.223 29,733 3.982 5.877 2023 16,162 2.471 3.654 13,60$ 1.515 2.229 29,770 3.986 5.883 2024 16,162 2.471 3.654 13,627 1.517 2.233 29,789 3.988 5.886 2025 16,162 2.471 3.654 13,627 1.517 2.233 29,789 3.988 5.886 ' Note: Population projections aie based on potential unit connections fo the water distribution system. CDM Camp Dresser & McKee Inc. ES-11 iwnsoa~ssrecw~wMV~ra+~,awiw. su'nn.ryeoc AGENDA ITEM # 6B APRIL 27, 2009 Executive Summary Water Transmissiori/llistribution System bIydraulic Model Summary of Modeled Scenazios Demand Scenazios 'Cwo sets of demand scenarios were developed to analyze the City's potable water network. Since the service area is currently close to buildout, the two scenarios or ;study years selected for analysis were current (2000) demands and projected (2020) ciemands. Future projected flows indicated an additiona11.2 MGD average daily flow in the 'Year 2020. Peaking factors were then applied to obtain the MDD and PHD. Table ES-12 provides a summary of the potable water demands used in the hydraulic analysis of the existing and future potable water systems. 'Table ES-12 Summary of Hydraulic Scenarios City of Atlantic Beach Water Master Plan • Scenario Conditions Atlantic Beach Demands Buccaneer Demands Total Demand 1 Existing Max Day + Fire Flow 2,210 gpm 1,230 gpm 3,440 gpm + Fire Flow* 2 Existing Peak Hour 2,940 gpm 1,640 gpm 4,580 gpm 3 Future Max Day + Fire Flow 2,790 gpm 1,860 gpm 4,650 gpm + Fire Flow* 4 Future Peak Hour 3,800 gpm 2,400 gpm 6,200 gpm ' Fire Flows are equal to 500 gpm for single-family homes, 7,500 gpm for multi family anti z,ooo gpm for commercial properties. Before modeling the hydraulic scenarios described in Table ES-12, it was assumed that all of the existing 8-inch diameter piping on Sherry Drive (from Seminole Drive to Atlantic Boulevard) was replaced with 12 inch diameter pipe. This modification was made based on the City's current construction of this pipe replacement. Model Results Year 2000 Demands -Atlantic Beach Water System Maximum Day Demand and Peak Hour Demand. The MDD and PHD steady-state flow scenario was simulated in the model by setting the elevation in the elevated storage tank to 116 ft (corresponding to a 50 psi discharge pressure at WTP No. 1), operating the No. 4high-service pump at WTP No. 1, and utilizing pump controls based on system pressure to start and stop high-service pump No.1 at WTP No. 2, if necessary. Similar to the actual current system operation, no major areas of concern were evident for the MDD or PHD scenarios. The system contained saiisfactory reserve pumping and storage capacity for each of these scenarios. System pressures ranged from 43 to 55 psi for both the MDD and PHF flow conditions. ~i~M Camp Dresser & McKce Inc. ES-12 ~ar~vrna~z~xas7eN17E9VtPLYMAP1r~Q~oeanhe smmmyaoc AGENDA ITEM # 6B APRIL 27, 2009 Executive Summary Maximum Day Demand Plus Fire Flow. All fire flow scenarios were run concurrently with the MDD. Atlantic Beach Water System is currently largely residential in nature. Fire flows associated with residential dwellings are 500 gpm. Fire flows of 1,500 and 2,000 gpm were also included to reflect demands of multi family and commercial :properties. Residential, multi-family and commercial fire flows were assigned based ~~n meter size. Two areas of low pressure (less than 20 psi) were discovered for this .scenario. The areas of low pressure are located on 2, 3 and 4 inch pipe diameters in the south east corner of the Atlantic Beach Water System. These low pressure areas were solved by increasing the pipe diameters to 6 and 8 inch lines. 'Year 2000 Demands -Buccaneer Water System :lVlaxirnum Dav and Peak Hour Demands. The MDD and PHD steady-state flow :scenario was simulated in the model by setting the hydropnuematic tank pressures to 46 psi, for both WTP No. 3 and 4, and operating one high-service pump at each of the 'WTPs based on system pressure. No major areas of concern were evident for the :MDD or PHD scenarios, although the PHD scenario produced a few nodes with :pressures of 39 psi. These pressures were increased to greater than 40 by increasing •the pressure at the hydropneumatic tanks to 52 psi. Because the Buccaneer pumps :have sufficient capacity to meet MDD and PHD and fill the existing hydropneumatic tanks, instances of pressures below 40 psi would expect to be infrequent and of short duration. The system contained satisfactory reserve pumping and storage capacity :Eor each of these scenarios. System pressures ranged from 40 to 52 psi for both the :MDD and PHD flow conditions. Maximum Dav Demand Plus Fire Flow. All fire flow scenarios were run concurrently •with the MDD. The Buccaneer Water System is currently largely residential in nature. :Fire flows associated with residential dwellings are 500 gpm. The Buccaneer Water System showed several areas of low pressure (less than 20 psi) when the MDD plus :Eire flow scenario was operated. These areas of low pressure are almost exclusively ,associated with nodes on 2-inch lines or nodes serving multi-family or commercial :properties. As noted previously the fire flow assigned to multi-family and commercial property is 1,500 and 2,000 gpm, respectively. Commercial sites were :located by the meter size assigned to the node, as previously discussed in Section 7.2.2.4. This database does not subdivide commercial sites according to actual fire .flow requirements based on the structures served. Therefore, the assignment of fire .flows may not match the actual fire flow requirements. It is probable that the results of the fire flow requirements have identified potential system deficiencies where a site-specific calculation of fire flow needs would show lower flows and no need for improvements. The low pressure areas associated with nodes on 2-inch lines were solved by increasing the pipe diameter to 6 inch lines. The majority of the remaining Iow pressure areas were solved by opening the south interconnect between the Buccaneer Water System and the Atlantic Beach Water System. Any improvements identified in the 2000 scenarios were included in the future {2020) scenarios discussed below. Ci~M Camp Dresser & McKee Inc ES-13 ~ro~v~e~k2~xoa~eat~e~unanra~caant~e summ.n_eoe AGENDA ITEM # 6B APRIL 27, 2009 Executive Summary Year 2020 Demands -Atlantic Beach Water System Maximum Day and Peak Hour Demands. MDD and PHF scenarios were simulated the same as the Year 2000 scenazios, except future demands of undeveloped pazcels were included and additional controls were added to start additional pumps at WTP iJos.1 and 2, if necessary. No major areas of concern were evident for the MDD or I'HD scenarios. The system contained satisfactory reserve pumping and storage capacity for each of these scenarios. System pressures ranged from 43 to 55 psi for the MDD and the PHF flow conditions. P~Iaximum Dav Demand Plus Fire Flow. All fire flow scenarios were run concurrently with the future predicted MDD. After the 2, 3 and 4-inch lines were increased based the 2000 MDD plus Fire Flow scenario, all residual pressures were greater than 20 psi i:n the 2020 scenario. Year 2020 Demands -Buccaneer Water System r/Iaximum Dav and Peak Hour Demands. The MDD and PHD steady-state flow scenario was simulated in the model by including expected #uture demands and setting the hydropnuematic tank pressures to 52 psi, for both WTP No. 3 and 4, and operating all high-service pumps at each of the WTPs. No major areas of concern were evident for the MDD or PHD scenarios, although the PHD scenario produced a few nodes with pressures of 39 psi. System pressures ranged from 39 to 52 psi for both the MDD and PHD flow conditions. Maximum Dav Demand Plus Fire Flow. All fire flow scenarios were run concurrently with the MDD. The Buccaneer Water System showed several areas of low pressure (:less than 20 psi) when the MDD plus fire flow scenario was operated. After the 2- ' inch lines were increased based the 2000 MDD plus Fire Flow scenario, all residual pressures associated with these pipes were greater than 20 psi. The majority of the remaining Iow pressure areas were solved by opening the south interconnect between the Buccaneer Water System and the Atlantic Beach Water System. Interconnection to Neptune Beach 7'he City has expressed an interest in providing potable water to Neptune Beach. F;xisting connections between the Atlantic Beach and Neptune Beach system exist at the intersection of Sherry Drive and Atlantic Boulevard and at the intersection of Seminole Road and Atlantic Boulevard. Both of these connections are 6-inch diameter and there are questions regazding if the valuing is operational. Consideration of the capacity of these interconnections was included in the hydraulic modeling. A first step to this process was to calculate how much water a combined Atlantic F4each/Buccaneer water system might have available for use in Neptune Beach. This volume was determined by subtracting the current (firm) max day water production capacity of the combined Atlantic Beach/Buccaneer water system (5,829 gpm) from the expected 2020 max day demand of these systems (4,650 gpm) resulting in a potential flow of 1,179 gpm (1.7 mgd) to Neptune Beach. It should be noted, this CDM Camp Dresser & McKee Inc ES-14 UO~kM21dkk21203781'i 17aDV2p~VYMRT~I~EitldrlM Surtmuy.Ax AGENDA ITEM # 6B APRIL 27, 2009 Executive summary represents the maximum volume available and not necessarily the water required by Tdeptune Beach. For the purposes of hydraulic modeling, the maximum potential flow to Neptune Beach was divided between the two existing points of connection based on the relative delivery capacities at each point. Based on the cross sectional areas of Atlantic Beach pipes at the points of connection, 57 percent of the demand was assigned to the Sherry Drive location and 43 percent to the Seminole Road location. The 2020 fire flow scenario (as described above) was then run with the Neptune Beach demands. The results indicate that a combined Atlantic Beach/Buccaneer water system could provide up to 1,179 gpm to Neptune Beach. Recommendations The following recommendations are provided to identify the actions necessary to proceed with a timely implementation of the findings of the Water Master Plan: 1. This Water Master Plan be accepted by the City and adopted by the City Commission. 2. The water system improvements identified in Section 8.1 be implemented by the City in a programmed and systematic plan of capital improvements. . 3. The City establish renewal and replacement (R&R) funds for water valve, fire hydrant, and pipe replacement programs. 4. Population growth, flow demands, raw water quality, and finished water quality be reviewed on a yearly basis to determine necessary schedule or cost estimate modifications for the C]:P and Long-Term Improvements projects. 5. The GIS database should be continuously updated as new data from construction projects, point repairs, customer complaints, and operator input become available. 6. The water distribution system hydraulic model should be continually updated to reflect new construction and development. 7. The City should establish standard criteria for the location and spacing of water valves and fire hydrants as the City implements projects to replace older sections of the water distribution system. 8. Open valves interconnecting the Atlantic Beach and Buccaneer water distribution systems and develop plant operating protocol for the interconnected grid. 9. For aesthetic enhancement of potable water quality (i.e. taste, odors) consider additional specific investigation or pilot testing of treatment technologies for effectiveness and cost-benefit. CDM Camp Dresser & McKee Inc. ES-15 \10rbvf241bk212087E~i760Vtpt WMRT~d~E»oWFrs Summarydoe AGENDA TCEM # 6B APRIL 27, 2009 ExecuUVe summary :Recognizing the magnitude of the comprehensive list of capital improvement projects ~~or the City of Atlantic Beach, and the limitations of financial resources to fund this ~axtensive CIP, the recommended projects have been prioritized in a 10 year CIP. This "LO year plan integrates recommended projects with other needed projects previously identified and listed by the City in the C1P budget. 'I"he 10 year capital outlay for water production facilities is provided in Table ES-13. 'Che water distribution facilities 10 year capital outlay is provided in Table ES-14. The actual implementation schedule maybe adjusted depending on the Cit~s approach to iiznding the recommended capital improvements. CDM c~-„ I~~M~ca i~ ES-16 ~wm~kz~w~ev nesv~wtiwTm~oanws summaryax AGENDA ITEM # 6B APRIL 27, 2009 Table FS-13 WaterProducHon 400-5502-533 Schedule of Gp(tal Outlay -10 Year Financial Flan C""'°IW Outla' Desert tlon FY-02' FY•o3 EY-04i. <. :. FY-0S ' ' FY'-08:: ,. :: FY-07 ";': FY-08' y FY~09 WeII data collaGioNana is 570,000 , WeA ehan _ 580,000 580,000 580.000 Well Rshab or R ant at WP 3 $100,000 We% RehablliletiorYR lecement at 1NP 1 5100 000 5700,000 R air and Cosli of Eevated Tank at WP 1 S50 000 Tebm /Scads for water stem S25 000 525,000 S25 000 $25 000 Add st a tank at WP 2 Add elevated sto a tank at WP 2 $7000000 Genset lacements at water lama Elevated tank Idmeintenance S70 000 S70 000 H atk: tenlt fr/maintenance S50 000 S50 000 S70 000 S50 000 Well rehab or ro lacemant at WP 2 5100 000 Plant rodea or rohabifitetbn New well of WP 2 5100 000 Deoommiaaion WP 4 $250 000 5350 000 E 'I°msnt Post Chlorinator at Bus Water $2 000 Leb Chbrins meters-WP #1 $1 500 Co uteralSoRwaro Com er R lacemerrta St 500 32 000 ~,,, .. - , Tnxic ro laesment 530 000 330 000 ; 530,000 ToM1 tNafKProduefbn SI2a,600 5505,500 S236,000 376,000 5100,000 5472,000 51,030,000 S170,000 CDM o.~tx~a<t,~x~tK. • Tabk ES34 Water Dtstribntion - 400.55061-533 tieltedele of 6pih1 Ontlay - IO Yeu Finsncial Plan AGENDA ITEM # 6B APRIL 27, 2009 tai ' "° 0 _l>Idclf bon :; - FY-02, ; . F,Y,Q3 fY-Q4 . FY-03 p1'-0B' , : FY,-07.;, FY-Od.. Selva Strssb Water Lies RNocatlons S185,006 R 8Ce 2" -4" water main Oft Beach Ave. and 4" on AMm vt1Ut 8" FF and i vemMb) 5350,000 R ace 6" Watx Mekt on Ocean Blvd from Ahem to 8fh Street FF and kn rovamenb 5500,000 R aoa 4" AC main with e" On Sea Oab Drive AC 5175,000 Intereaatecllon Detwaen AB a Buo at CMsdt 3 Main Ci 520,000 R aos 2" water mdn with 8' on Msay SL Dudley St, Park St and extend Church St (undersized) 5182,000 R cos 2" 8 4" AC mein with 8" mein on Pack Terrece East AC) 525,000 5250,000 R as 4" AC mein with 8' mein on Park Terrace Weat AC 5154,000 R a water mNn on M Rd, naM of VYonderwood F and Improvements 5140,000 R acs wafer main from Ma Lsrtdin to Sh La 51 rup.ppp R cos 2" and 8" water mein with 12" on East Coast Ddve FF and im rovemenb ~ 5324,000 R 2-wata mein with 8" on Rlbualt Roed F 532,000 R scs Z" water main with 8' on RenaNt RoaO 539,000 Instefi fl' water main from rd Dr. across SR A1A end 8' water main from Nantucket to Me Landl FF 582,000 R ap 2" water main with 8' on Plne St and ad scent area undeniz 533,000 R sos 8' AC main on SeNa Marlns Dr, between Setudba and Seminote Roads AC Pi a Beach Irttsroortrtects at S Drive and Seminole Road 5150,000 R sa 8" AC mNn on Plate between M and SeiMah Roed C ' R aoerttertt of 2" water rtrolns wlth 8"mains ersiz 5215,000 5215,000 5215,000 5216,000 ~, t Rs ate easemblbs 51p,ppp ~ tod 516,000 Baddtos 550,000 merit ~ It ~: ,':} r _ '`C 5 _ GIS Haredlteld lhtlb IPA4~3870 Podret PCs 4 eafi 52,500 GPS M 330 flea ktto above 51,200 Prlyder for Servla Orden at 902 Assisi 55,000 Arc.Msw 8.1 Licertaa for GIS Tschnidan 51,200 tar GIS TerhMdan 53.500 17ihie5ii - ~ ~ ; ~ ~ . ~ ~. ~ ~ $ ..~ ..r .~; . ~ - ~, - ~~ ~:... Trudt aeerttent P3 520,000 Trtadt acertfeM P5 520.000 Trtack scert»rtt 530.000 To<NWatKDlsVibWon 5577,100 51,008,000 5639,1[00 5552,000 tt35,t100 3715,000 5245,1HI0 CDM ~t~at~t~ AGENDA ITEM # 6B APRIL 27, 2009 APPENDIX C -FULL COPY OF 2001 WATER FACILITIES MASTER PLAN (FOR REGULATORY AGENCY SUBMITTAL ONLY) Water Facilities Plan Update J. Collins Engineering Associates, LLC