Loading...
Item 8GAGENDA ITEM # 8G NOVEMBER 23, 2009 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Proposed Change Order No. 1 to Royal Palms Drainage Rehabilitation Project (PW0905) SUBMITTED BY: Rick Carper, P.E., Public Works Director~t DATE: November 16, 2009 BACKGROUND: At the July 27`~ meeting, the Commission approved the award of a contract to R.B. Baker Construction, Inc. for construction of the Royal Palms Drainage Rehabilitation Project (PW0905) in the amount of $3,180,703 for the base bid and selected additive alternates. A field change to the plans to use elliptical pipe rather than the round pipe in the bid plans was required because there would have been insufficient cover over the round pipe for long term system reliability. Additionally, two curb inlets that were to be refurbished were found to be in such poor condition that complete replacement was the preferred option. Change Order 1 is attached documenting an additional cost of $16,298.08 and requests reimbursement via this change order. RECOMMENDATION: Authorize the City Manager to execute Change Order No. 1 to the R.B. Baker Construction contract. The total contract price with this change order will be $3,214,121.54, including contingency. BUDGET: This project is funded from the Stormwater Fund, Account No. 470-0000-538-6300 -with $257,067 encumbered as contingency funds in the Royal Palms Drainage Rehabilitation Project (PW0905) budget. ATTACHMENT: (1) Proposed Change Order No. 1 REVIEWED BY CITY November 16"', 2009 Regular Meeting AGENDA ITEM # 8G NOVEMBER 23, 2009 CHANGE ORDER NO. 1 Contractor: RB. Baker Construction, Inc. Owner: City of Atlantic Beach 125 International Golf Parkway St. Augustine, FL 32095 Date: November 3, 2009 Attention: Rick Carper City Bid No.: 0809-08 Project: Royal Palms Drainage Rehabilitation Project You are hereby requested to comply with the following changes in the Contract Documents: 1. Revised Scope of Work ITEM NO. ESCRIPTION TY NTi' UNIT PRICE $ DECREASE IlY CONTRACT PRICE $ INCREA5E IN CONTRACT PRICE $ 1 42" RCP (Delete) 250 LF $89.41 {~~2:352.50 j 2 34 x 53"RCP 260 LF $127.19 $33,069.40 3 Install New Curb Inlet 5-232 and 5-224 2 EA $2,790.59 $5,581.18 TOTAL ($?~;`352.50) ' $38,650.58 NET CHANGE IN CONTRACT PRICE $16,298.08 The above Revised Scope of Work will be added to the existing Purchase Uxder fox the project. 12 days will be added to the Contract Completion Date. Revised Completion Date for the project is 2010. Accepted By: Contractor Date: Approved By: Date: Owner