Item 8IAGENDA ITEM # 8I APRIL 12, 2010 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Proposed Change Order to Royal Palms Drainage Rehabilitation Project (PW0905) SUBMITTED BY: Rick Carper, P.E., Public Works Director /`~` DATE: April 2, 2010 BACKGROUND: At the July 27~' meeting, the Commission approved the award of a contract to R.B. Baker Construction, Inc. for construction of the Royal Palms Drainage Rehabilitation Project (PW0905) in the amount of $3,180,703 for the base bid and selected additive alternates. Based on more in-depth investigation of field conditions, Staff proposes the following modification to the authorized Royal Palms Project: Revoke authorization for Additive Alternative A -Cavalla Ditch Easement RCP - $65,282, and redirect this funding to authorize completion of Additive Alternates B (Triton Road Easement CIPP - $17,280) and C (Sabalo Road Easement CIPP - $45,312) and allocating the remaining $2690 to contingency. Justification: Field verification of conditions reveals that several of the houses along the Triton and Sabalo side yard easements would be in danger of damage resulting from the vibratory compacting required to install new storm piping by direct bury techniques. Because of placement of houses on lots, the contractor is very concerned that construction of either option will have significant potential for foundation damage to the adjacent homes. Some of the houses show cracks in the block foundations already. In addition to minimizing or eliminating risk of damage to these homes, lining the pipes will save a significant number of mature trees, including hardwoods and Sabal palms. The Triton Road Additive Alternative will line 184 LF of existing 24"x38" pipe in four side yards rather than digging it up and installing new 24" pipe. Lining the existing pipe will substantially reduce construction impacts to these residents. Sabalo Easement - as designed (zig-zag, see plans), construction requires obtaining revised easements from eight homeowners. Lining the existing 29"x45" pipe in these side yards rather than digging it up and installing new 36" pipe will substantially reduce impacts to eight residents. R.B. Baker is currently pursuing a less expensive procedure for lining these pipes; if successful, the costs for substituting these Additive Alternatives could be reduced further. The Additive Alternate A pipe in the Cavalla easement is corrugated metal pipe (CMP); however video of the pipe shows most of it to be in good shape, with two joint leaks that may need repaired in the future. Because of its isolation from the rest of the Royal Palms drainage system, the repairs, when done, will make a good stand alone project. AGENDA ITEM # 81 APRIL 12, 2010 RECOMMENDATION: Authorize the City Manager to execute a new Change Order including the recommended changes to the R.B. Baker Construction contract. BUDGET: This project is funded from the Stormwater Fund, Account No. 470-0000-538-6300 -with $257,067 encumbered as contingency funds in the Royal Palms Drainage Rehabilitation Project (PW0905) budget. The total contract price with this change order will remain $3,214,121.54, including contingency. ATTACHMENT: (1) Proposed Change Order REVIEWED BY CITY MANAGER: AGENDA ITEM # 8I APRIL 12, 2010 CHANGE ORDER N0.7 Contractor: R.B. Baker Construction, Inc. Owner: City of Atlantic Beach 125 International Golf Parkway St. Augustine, FL 32095 Date: Apri12, 2010 Attention: Chuck Chaon City Bid No.: 0809-08 Project: Royal Palms Drainage Rehabilitation Project You are hereby requested to comply with the following changes in the Contract Documents: 1. Revised Scope of Work DECREASE INCREASE IN IN ITEM UNIT CONTRACT CONTRACT NO. DESCRIPTION QTY UNIT PRICE $ PRICE $ PRICE $ Revoke authorization for 1 Additive Alternate A 1 LS ~ 6,282 ($65,282) (Cavalla Ditch Easemetn RCP) 2 Authorize Additive Alternate B (Triton Road Easement CIPP) 1 LS $17,280 $17,280 3 Additive Alternate C (Sabalo Road Easement CIPP) 1 LS $45,312 $45,312 4 Allocate remaining $2,690 to contingency. 1 LS $2,690 $2,690 TOTAL 0 NET CHANGE IN CONTRACT PRICE 0 The above Revised Scope of Work will be added to the existing Purchase Order for the project. No days will be added to the Contract Completion Date. Completion Date remains September 3, 2010. Accepted By: Contractor Approved By: Owner Date: Date: