Loading...
Item 8CAGENDA ITEM # 8C MAY 24, 2010 STAFF REPORT City of Atlantic Beach Commission Meeting AGENDA ITEM: Presentation of Plan for Tideviews Preserve DATE: May 17, 2010 ,~ SUBMITTED BY: David E. Thompson, Asst. City Manager BACKGROUND: The City Commission authorized Bowen Civil Engineering (BCE) to proceed with the design and permitting of a boardwalk extension and kayak launch facility at the Tideviews Preserve. On Thursday, April 22, 2010, Randy Downing with BCE held a meeting to take public comments and input into the design of the project. At the May 24, 2010 City Commission meeting, Mr. Downing will be presenting a conceptual design for the Tideviews Preserve for City Commission review and approval. With Commission approval on the design, Mr. Downing will apply for permits necessary for Florida Inland Navigation District funding for this project. BUDGET: The City Commission already approved a contract with BCE for design and permitting of the project. The approval of the conceptual design will not obligate any additional funding at this time. RECOMMENDATIONS: To review the proposed conceptual design, to provide input/suggestions if so desired, and to approve the conceptual design. ATTACHMENTS: Proposed Design from BCE REVIEWED BY CITY MANAG AG A ITEM NUMBER: AGENDA IT MAY 24, _ _. w 1 N 1 1 f a ~. w 1 w I ~ 1 N 'v 6 ~ o~ ~ ~~ ~ ~ a ~ w ~ / ~~A pC~~~ ~ i O ~ / 1 ~ N / ~ ~ N ~ / ~ N~ ~ ~ ~ ~'~ i_ b ~ i ~,~ / ~ ~ ~~ ~ i ~ ~i ~~ / V A \ ~~ N d,~ N ~i a i l ' %~ ~ d~ ~ii~~ ~ ~ ~~~ , ~ ~ ~ ~~ i a O a co ~ w ~^ _~ ._ ~ ~ 2 ~. "~ I 3 f F_ Y[ U~Tf fE5GIF11M '~ ~N/rI~IG A~ E^~ f ®WI~NI VI~~ ~.N. ~ - {1 aon~ceN Pars ~~ y Weeny+il)Nee fl~erimf~ytyl e6.. I"11.1\ ~ ~~ucenr rb. Oo0OM0 nryp EM # 8C 2010