Loading...
Permit 1135 Atlantic Blvd DEP 11 wlt rum T ',Abt;l��:611susftmi- m1Q,"I, undersigmd INV ding on %tt-- ''Ad "y WOW 0 -------- -Jialwot, 77: X bar bistoi$0.: WO, ukta,id Of- XAA" of, A A 4.'A ZA. Ir by� 'Or, 1 G *boo* b"nor, on on_ -�7 A SIT Mult - -—------- Wperfoo lor -"'As V&' allj�6 with p 0 I'C4 flow th i* d P Pit, 't' ng;i . ...... NO G R 4 FOR OFFICEAJSE ONLY Date----------!F11>2-1 ............. ...194,. CITY OF ATLANTIC BEACI-fl, Permit .......Fee 160, 0 6 Valuation $ FLORIDA House # APPLICATION FOR BUILDING PERMIT ...............I...................................................... ............................................................................ Application is hereby made for the -approval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the City of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the City of Atlantic Beach and all rules and regulations of the Building Department of the City of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the City of Atlaniic Beach,Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that-a list of sub-contractors be submitted to this office so that licenses can be verified. Date .0---------- --- ----------/---------- --------I ------------ Owner---- -—-----------------------_------..Address.__//171S- --- ---------- Z/,-/ _ .. 19 ­­------ ------------Telephone No----------------_---------- Architect.......----------------------------------....................................................Address--------_------------------------------------------------Telephone No---------------------...... 15�7_V19 ---- --- --- --­--------------------------------- Contractor Builder 00/_5 f2:.— ----Address................... - --------5---Z__;.-Telephone No-............------------- Lot No------------------ -Z---------------Block No--------_------------------- Sub Division............ -------------t7------------------------------ ---------Zone----------- -------------------------------------------------------.--.Street----------------- ...iSide Between---........---------------------------------------and-------_-------------------__------ ......�Sts. 0 'o), Valuation $-------C-0 ---)Por what purpose will building be used.---- --------Type of construction--- ---------- Dimensions of 9 X-1 ....Dimensions of Lot..----------------------------------------------------Size of Footings---- K -------------------------- Size of Piers..-------�/ 2-r _1 ----------Size of Sills-.------------=­---------GTeatest Sill Span in ------Type Roof.------------- ........... How will Building be Heated?-.-_----------------------------------__--------------_Will Building be on Solid or Filled Ground?.... Size of Ceiling Joists----------------------------------------- Distance on Centers_.........­..............--------------- Greatest Span-------------------------.................. Size of Floor Joists---------------------------------------_---- Distance on Centers-,....--- --------------------------------- Greatest Span----------- ................__..... Size of Rafters----------------------------_-------------------., Distance on Centers ...... -_------------------------ Greatest Span..... ------------------------------ This rectangle is to represent the lot. Locate the building or buildings in the right Position. Give distance in feet from all lot-lines and existing buildings. REAR LOT LINE Two copies of plans and specifications shall be submitted with application. Inspections required. 1. When steel is in place and ready to pour footing. 2. When steel is in place and ready to pour columns and/or lintel. Z 3. When steel is in place and ready to pour beam. 4. When framing is completed. E-( E-1 5. When rough plumbing is completed,-and ready to cover up. S 3 6. When septic tank drain field or sewer is laid but before it is covered. W 7. Electrical inspection by City of Jacksonville. 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called forafter corrections are made. FRONT 0 LOT In consideration of permit given fo d ing the w/r'k_i)s described in the above statement, we hereby agree to perform said work in accordance with the at che an and �eoicatlons, which are a part hereof, and in accordance with the building regulations of the City of Atlantic e Signatureof Builder--X\------------------I. . ............. .. ................. ... Address----_------------_------............ -------__....... ------------_--_---- I Signatureof Owner....... ................................---------------------------------------- Address