Loading...
Item 8C AGENDA ITEM # 8C AUGUST 23, 2010 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Agreement with St. Johns River Water Management District for Grant Funds for TMDL Improvements SUBMITTED BY: Donna Kaluzniak, Utility Director DATE: August 11, 2010 BACKGROUND: As part of the Lower St. Johns River Funding Initiative to restore and enhance the river, the St. Johns River Water Management District (SJRWMD) has authority to allocate grant funding for projects to upgrade wastewater facilities to meet or exceed the Total Maximum Daily Load (TMDL). A grant of $1,000,000 is allocated for the City of Atlantic Beach TMDL Project, and a signed agreement must be sent to the SJRWMD prior to August 30, 2010 to meet their funding deadline. The grant is for the project to phase out the Buccaneer WWTP, construct the force main and upgrade WWTP #1 to meet advanced treatment standards for nitrogen. BUDGET: Construction costs for the Buccaneer Phaseout and WWTP #1 Upgrade are estimated at $9.4 million. The grant will reduce the City's costs by $1,000,000. RECOMMENDATION: Approve the Agreement with the St. Johns River Water Management District for the $1,000,000 grant for the Atlantic Beach TMDL Project and authorize the City Manager to sign the Agreement. ATTACHMENTS: 1. Agreement from St. Johns River Water Management District REVIEWED BY CITY MANAGER: AGENDA ITEM # 8C AUGUST 23, 2010 Contract #26664 Encumbrance #S004798 COST - SHARING AGREEMENT BETWEEN THE ST. JOHNS RIVER WATER MANAGEMENT DISTRICT AND CITY OF ATLANTIC BEACH PUBLIC WORKS DEPARTMENT FOR THE LOWER ST. JOHNS RIVER BASIN REUSE AND TREATMENT PROGRAM THIS AGREEMENT is entered into by and between the GOVERNING BOARD of the ST. JOHNS RIVER WATER MANAGEMENT DISTRICT ( "the District "), whose address is 4049 Reid Street, Palatka, Florida 32177, and CITY OF ATLANTIC BEACH PUBLIC WORKS DEPARTMENT ( "Recipient "), whose address is 1220 Sandpiper Lane, Atlantic Beach, Florida 32233. All references to the parties hereto include the parties, their officers, employees, agents, successors, and assigns. WHEREAS, the waters of the state of Florida are among its basic resources and it has been declared to be the policy of the Legislature to promote the conservation, development, and proper utilization of surface and ground water; and WHEREAS, pursuant to chapter 373, Fla. Stat., the District is responsible for the management of water resources within its geographical area; and WHEREAS, the District's Governing Board has established the Lower St. Johns River (LSJR) Basin Reuse and Treatment Program ( "the Program ") to support efforts that contribute toward the improvement of water quality by achieving pollutant load reduction goals (PLRGs) or total maximum daily load (TMDL) allocations for identified priority pollutants; and WHEREAS, the District may also consider projects that protect or preserve water quality in designated Surface Water Improvement and Management water bodies; and WHEREAS, wastewater reuse reduces the flow of wastewater effluent into the St. Johns River, while also meeting the District's water supply planning objectives relating to the development of alternative water supplies that reduce the need for groundwater withdrawals; and WHEREAS, the Florida Legislature has provided additional funding support for the Program through the District's "Lower St. Johns River Basin Initiative," which are disbursed by the State of Florida Department of Environmental Protection from the Ecosystem Management and Restoration Trust Fund; and WHEREAS, the parties have agreed to jointly fund the following project to benefit the water resources in accordance with the funding formula further described in the Statement of Work, Attachment A (hereafter "the Project "): The Project consists of constructing wastewater treatment upgrades to Wastewater Treatment Plant (WWTP) No. 1 to advanced wastewater treatment standards to remove nitrogen, phase out of WWTP No. 2, and construction of a force main to pump wastewater from WWTP No. 2 to WWTP No. 1. After the Project is complete the nitrogen concentration in wastewater discharged from the plant will be significantly reduced. The performance -based goal of this project is to meet and exceed the Recipient's TMDL requirements (a reduction of at least 61,791 lbs /yr nitrogen) through treatment plant upgrades to include advanced nutrient removal. Page 1 of 15 AGENDA ITEM # 8C AUGUST 23, 2010 Contract #26664 Encumbrance #S004798 NOW, THEREFORE, in consideration of the aforesaid premises, and the funding assistance hereinafter specified, Recipient agrees to perform and complete the activities provided for in the Statement of Work, Attachment A. Recipient shall complete the Project in conformity with the contract documents and all attachments and other items incorporated by reference herein. This Agreement consists of all of the following documents: (1) Agreement, (2) Attachment A- Statement of Work; and (3) Attachment B - Funded Projects and Expected Performance; (4) all attachments, if any. The parties hereby agree to the following terms and conditions. 1. .TERM; WITHDRAWAL OF OFFER .(a) The term of this Agreement is from the date upon which the last party has dated and executed the same ( "Effective Date ") until September 30, 2014 ( "Completion Date "). Recipient shall not commence the Project until any required submittals are received and approved. Recipient shall commence performance within fifteen (15) days after the Effective Date and shall complete performance in accordance with the time for completion stated in the Statement of Work. Time is of the essence for every aspect of this Agreement, including any time extensions. All provisions of this Agreement that by their nature extend beyond the Completion Date shall survive the termination or expiration of this Agreement. (b) This Agreement constitutes an offer until authorized, signed and returned to the District by Recipient. This offer terminates sixty (60) days after receipt by Recipient. 2. DELIVERABLES. Recipient shall fully implement the Project, as described the Statement of Work, Attachment A. Recipient is responsible for the professional quality, technical accuracy, and timely completion of the Project. Both workmanship and materials shall be of good quality. Unless otherwise specifically provided for herein, Recipient shall provide and pay for all materials, labor, and other facilities and equipment necessary to complete the Project. The District's Project Manager shall make a final acceptance inspection of the Project when completed and finished in all respects. Upon satisfactory completion of the Project, the District will provide Recipient a written statement indicating that the Project has been completed in accordance with this Agreement. Acceptance of the final payment by Recipient shall constitute a release in full of all claims against the District arising from or by reason of this Agreement. 3. OWNERSHIP OF DELIVERABLES. Unless otherwise provided herein, the District does not assert an ownership interest in any of the deliverables under this Agreement. 4. AMOUNT OF FUNDING. (a) For satisfactory completion of the Project, the District shall pay Recipient no more than fifty percent (50 %) of the total cost of the Project, but in no event shall the District cost - share exceed $1,000,000.00. The District cost -share is not subject to modification based upon price escalation in implementing the Project during the term of this Agreement. Recipient shall be responsible for payment of all costs necessary to ensure completion of the Project. If Recipient's cost for the Work exceeds the estimated cost, Recipient may elect to complete the Project at its expense or discontinue the Project and return all funds provided hereunder to the District. Recipient shall notify the District's Project Manager in writing upon receipt of any additional external funding for the Project not disclosed prior to execution of this Agreement. Page 2 of 15 AGENDA ITEM # 8C AUGUST 23, 2010 Contract #26664 Encumbrance #S004798 (b) Funding may be only used for construction costs associated with the Project. It may not be used for the research, design, engineering, and permitting aspects of the Project. 5. PAYMENT OF INVOICES (a) Recipient shall submit quarterly itemized invoices based upon the actual percentage of the work performed by one of the following two methods: (1) by mail to the St. Johns River Water Management District, Director, Division of Financial Management, 4049 Reid Street, Palatka, Florida 32177, or (2) by e -mail to .acctpay @sjrwmd.com.. The invoice shall be submitted in detail sufficient for proper pre -audit and post -audit review. Recipient shall be reimbursed for _one hundred_ percent (100 %) of approved costs until the not -to- exceed amount of the District's cost -share has been expended. Approved costs are those costs that do not exceed 50% of actual allowable expenditures for the Project. If necessary for audit purposes, Recipient shall provide additional supporting information as required to document invoices. (b) End of District Fiscal Year Reporting. The District's fiscal year ends on September 30. Irrespective of the invoicing frequency, the District is required to account for all encumbered funds at that time. When authorized under the Agreement, submittal of an invoice as of September 30 satisfies this requirement. The invoice shall be submitted no later than October 30. If the Agreement does not authorize submittal of an invoice as of September 30, Recipient shall submit, prior to October 30, a description of the additional work on the Project completed between the last invoice and September 30, and an estimate of the additional amount due as of September 30 for such Work. If there have been no prior invoices, Recipient shall submit a description of the work completed on the Project through September 30 and a statement estimating the dollar value of that work as of September 30. (c) Final Invoice. The final invoice must be submitted no later than 45 days after the Completion Date; provided, however, that when the Completion Date corresponds with the end of the District's fiscal year (September 30), the final invoice must be submitted no later than 30 days after the Completion Date. Final invoices that are submitted after the requisite date shall be subject to a penalty of 10 percent of the invoice. This penalty may be waived by the District, in its sole judgment and discretion, upon a showing of special circumstances that prevent the timely submittal of the final invoice. Recipient must request approval for delayed submittal of the final invoice not later than ten (10) days prior to the due date and state the basis for the delay. .(d) All invoices shall include the following information: (1) District contract number; (2) District encumbrance number; (3) Recipient's name and address (include remit address, if necessary); (4) Recipient's invoice number and date of invoice; (5) District Project Manager; (6) Recipient's Project Manager; (7) supporting documentation as to cost and /or Project completion (as per the cost schedule and other requirements of the Statement of Work; (8) Progress Report (if required); (9) Diversity Report (if otherwise required herein). Invoices that do not correspond with this paragraph shall be returned without action within twenty (20) business days of receipt, stating the basis for rejection. Payments shall be made within forty -five (45) days of receipt of an approved invoice. Page 3 of 15 AGENDA ITEM # 8C AUGUST 23, 2010 Contract #26664 Encumbrance #S004798 .(e) Travel expenses. If the cost schedule for this Agreement includes a line item for travel expenses, travel expenses shall be drawn from the project budget and are not otherwise compensable. If travel expenses are not included in the cost schedule, they are a cost of providing the service that is borne by Recipient and are only compensable when specifically approved by the District as an authorized District traveler. In such instance, .travel expenses must be submitted on District or State of Florida travel forms and shall be paid pursuant to District Administrative Directive 2000 -02. (f) Payments withheld. The District may withhold or, on account of subsequently discovered evidence, nullify, in whole or in part, any payment to such an extent as may be necessary to protect the District from loss as a result of: (1) defective work not remedied; (2) failure to maintain adequate progress in the Project; (3) any other material breach of this Agreement. Amounts withheld shall not be considered due and shall not be paid until the ground(s) for withholding payment have been remedied. 6. LIABILITY AND INSURANCE. Each party is responsible for all personal injury and property damage attributable to the negligent acts or omissions of that party, its officers, employees and agents. Nothing contained herein shall be construed or interpreted as denying to any party any remedy or defense available under the laws of the state of Florida, nor as a waiver of sovereign immunity of the state of Florida beyond the waiver provided for in section 768.28, Fla. Stat., as amended. Each party shall acquire and maintain throughout the term of this Agreement such liability, workers' compensation, and automobile insurance as required by their current rules and regulations. 7. FUNDING CONTINGENCY. This Agreement is contingent upon funding availability, which may include a single source or multiple sources, including, but not limited to: (1) ad valorem tax revenues appropriated by the District's Governing Board; (2) annual appropriations by the Florida Legislature, or (3) appropriations from other agencies or funding sources. Agreements that extend for a period of more than one Fiscal Year are subject to annual appropriation of funds in the sole discretion and judgment of the District's Governing Board for each succeeding Fiscal Year. Should the Project not be funded, in whole or in part, in succeeding Fiscal Years, the District shall so notify Recipient and this Agreement shall be deemed terminated for convenience five (5) days after receipt of such notice, or within such additional time as the District may allow. For the purpose of this Agreement, "Fiscal Year" is defined as the period beginning on October 1 and ending on September 30. 8. PROJECT MANAGEMENT (a) The Project Managers listed below shall be responsible for overall coordination and management of the Project. Either party may change its Project Manager upon three (3) business days prior written notice to the other party. Written notice of change of address shall be provided within five (5) business days. All notices shall be in writing to the Project Managers at the addresses below and shall be sent by one of the following methods: (1) hand delivery; (2) U.S. certified mail; (3) national overnight courier; (4) e- mail or, (5) fax. Notices via certified mail are deemed delivered upon receipt. Notices via overnight courier are deemed delivered one (1) business day after having been deposited with the courier. Notices via e -mail or fax are deemed delivered on the date transmitted and received. Page 4 of 15 AGENDA ITEM if 8C AUGUST 23, 2010 Contract #26664 Encumbrance #S004798 DISTRICT. RECIPIENT Derek Busby, Project Manager Donna Kaluzniak, Project Manager St. Johns River Water Management District City of Atlantic Beach Public Works 4049 Reid Street Dept. Palatka, Florida 32177 1220 Sandpiper Lane Phone: (386) 329 -4459 Atlantic Beach, Florida 32233 E- mail:.dbusby @sjwmd.com. Phone: (904) 270 -2535 E- mail:.dkaluzniak @coab.us. (b) The District's Project Manager shall have sole responsibility for transmitting instructions, receiving information, and communicating District policies and decisions regarding all matters pertinent to performance of the Project, and may approve minor deviations in the Project that do not affect the District cost -share or Completion Date or otherwise significantly modify the terms of the Agreement. 9. PROGRESS REPORTS AND PERFORMANCE MONITORING (a) Progress Reports. Recipient shall provide to the District quarterly project update /status reports by September 1 December 1"; March 1s and June 1s of each year. Reports will provide detail on progress of the Project and outline any potential issues affecting completion or the overall schedule. Reports may be submitted in any form agreed to by District's Project Manager and Recipient, and may include emails, memos, and letters. In addition to quarterly reports, Recipient shall provide the District an annual report regarding the efforts being made and accomplishments in obtaining customer agreements to accept reclaimed water. The report shall include, at a minimum: (1) an overview of the status of the connection of new customers to the reclaimed water system being constructed as part of the Work; (2) the capacity of those connections; (3) the estimated amount of reclaimed water use by these customers; (4) the amount of nitrogen reduction accomplished as a result of this reclaimed water use; (5) any problems or issues encountered and what Recipient plans to do to resolve them; and (6) any significant changes in the Work as originally planned. (b) Performance Monitoring. For as long as the Project is operational, the District shall have the right to inspect the operation of the Project during normal business hours upon reasonable prior notice. Recipient shall make available to the District any data that is requested pertaining to performance of the Project. 10. FAILURE TO COMPLETE PROJECT. (a) Should Recipient fail to complete the Project, Recipient shall refund to the District all of the funds provided to Recipient pursuant to this Agreement. However, the District, in its sole judgment and discretion, may determine that Recipient has failed to complete the Project due to circumstances that are beyond Recipient's control, or due to a good faith determination that the Project is no longer environmentally or economically feasible. In such event, the District may excuse Recipient from the obligation to return funds provided hereunder. If the Project has not been completed within 30 days after the Completion Date, Recipient shall provide the District with notice regarding its intention as to completion of the Project. The parties shall discuss the status of the Project and may mutually agree to revise the Completion Date or the scope of the Project. Failure to Page 5 of 15 AGENDA ITEM # 8C AUGUST 23, 2010 Contract #26664 Encumbrance #S004798 complete the Project within 90 days after the Completion Date shall be deemed to constitute failure to complete the Project for the purposes of this provision. (b) In the event the Project constitutes a portion of the total functional project, this paragraph shall apply in the event the total functional project is not completed. In such event, the 90 -day timeframe provided herein shall commence upon the date scheduled for completion of the total functional project at the time of execution of this Agreement, unless extended by mutual agreement of the parties. (c) This paragraph shall survive the termination or expiration of this Agreement. 11. TERMINATION (a) Termination for Default. If Recipient materially fails to fulfill its obligations under this Agreement, including any specific milestones established herein, the District shall provide Recipient written notice of the deficiency by forwarding a Notice to Cure, citing the specific nature of the breach. Recipient shall have thirty (30) days to cure the breach. If Recipient fails to cure the breach within the thirty (30) day period, the District shall issue a Termination for Default Notice and this Agreement shall be terminated upon receipt or said notice. In such event, Recipient shall refund to the District all funds provided to Recipient pursuant to this Agreement within thirty (30) days of such termination. The District may also terminate this Agreement upon ten (10) days written notice in the event any of material misrepresentations in the Project Proposal. (b) Termination for Convenience. The District may terminate this Agreement at any time for convenience upon sixty (60) calendar days prior written notice to Recipient. Upon receipt of notice, Recipient shall place no further orders for materials, equipment, services, or facilities, for which reimbursement would otherwise be sought. Recipient shall also make every reasonable effort to cancel, upon terms satisfactory to the District, all orders or subcontracts related to the Project for which reimbursement would otherwise be sought. In the event of such termination, Recipient shall be compensated for all work performed pursuant to this Agreement prior to the effective date of termination. ADDITIONAL PROVISIONS (Alphabetical) 12. ASSIGNMENT. Recipient shall not assign this Agreement, or any monies due hereunder, without the District's prior written consent. Recipient is solely responsible for fulfilling all work elements in any contracts awarded by Recipient and payment of all monies due. No provision of this Agreement shall create a contractual relationship between the District and any of Recipient's contractors or subcontractors. 13. AUDIT; ACCESS TO RECORDS; REPAYMENT OF FUNDS. (a) Maintenance of Records. Recipient shall maintain its books and records such that receipt and expenditure of the funds provided hereunder are shown separately from other expenditures in a format that can be easily reviewed. Recipient shall keep the records of receipts and expenditures, copies of all reports submitted to the District, and copies of all invoices and supporting documentation for at least three (3) years after expiration of this Agreement. In accordance with generally accepted governmental auditing standards, the District shall have access to and the right to examine any directly pertinent books and other Page 6 of 15 AGENDA ITEM # 8C AUGUST 23, 2010 Contract #26664 Encumbrance #S004798 records involving transactions related to this Agreement. In the event of an audit, Recipient shall maintain all required records until the audit is completed and all questions are resolved. Recipient will provide proper facilities for access to and inspection of all required records. (b) Repayment of Funds. District funding shall be subject to repayment after expiration of this Agreement if, upon audit examination, the District finds any of the following: (1) Recipient has spent funds for purposes other than as provided for herein; (2) Recipient has failed to perform a continuing obligation of this Agreement; (3) Recipient has received duplicate funds from the District for the same purpose; and/or (4) Recipient has received more than 100% contributions through cumulative public agency cost -share funding. 14. CIVIL RIGHTS. Pursuant to chapter 760, Fla. Stat., Recipient shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin, age, handicap, or marital status. 15. DISPUTE RESOLUTION. Recipient is under a duty to seek clarification and resolution of any issue, discrepancy, or dispute involving performance of this Agreement by submitting a written statement to the District's Project Manager no later than ten business (10) days after the precipitating event. If not resolved by the Project Manager, the Project Manager shall forward the request to the District's Office of General Counsel, which shall issue a written decision within ten (10) business days of receipt. This determination shall constitute final action of the District and shall then be subject to judicial review upon completion of the Project. 16. DIVERSITY REPORTING. The District is committed to the opportunity for diversity in the performance of all cost - sharing agreements, and encourages Recipient to make a good faith effort to ensure that women and minority -owned business enterprises (W/MBE) are given the opportunity for maximum participation as contractors. The District will assist Recipient by sharing information on W /MBEs. Recipient shall provide with each invoice a report describing: (1) the company names for all W /MBEs; (2) the type of minority, and (3) the amounts spent with each during the invoicing period. The report will also denote if there were no W /MBE expenditures. 17. FLORIDA SINGLE AUDIT ACT (a) Applicability. The Florida Single Audit Act (FSAA), section 215.97, Fla. Stat., applies to all sub - recipients of state financial assistance, as defined in section 215.97(1)(q), Fla. Stat., awarded by the District through a project or program that is funded, in whole or in part, through state financial assistance to the District. In the event Recipient expends a total amount of state financial assistance equal to or in excess of $500,000 in any fiscal year of such Recipient, Recipient must have a state single or project - specific audit for such fiscal year in accordance with section 215.97, Fla. Stat.; applicable rules of the Department of Financial Services; and Chapters 10.550 (local governmental entities) or 10.650 (nonprofit and for - profit organizations), Rules of the Auditor General. In determining the state financial assistance expended in its fiscal year, Recipient shall consider all sources of state financial assistance, including state financial assistance received from the District, other state agencies, and other non -state entities. State financial assistance does not include Federal direct or pass- through awards and resources received by a non -state entity for Federal program matching requirements. Recipient is solely responsible for complying with the FSAA. If Recipient expends less than $500,000 Page 7 of 15 AGENDA ITEM # 8C AUGUST 23, 2010 Contract #26664 Encumbrance #S004798 in state financial assistance in its fiscal year, an audit conducted in accordance with the provisions of section 215.97, Fla. Stat., is not required. In such event, should Recipient elect to have an audit conducted in accordance with section 215.97, Fla. Stat., the cost of the audit must be paid from the non -state entity's resources (i.e., Recipient's resources obtained from other than State entities). (b) Program Information. This Agreement involves the disbursement of state funding by the Florida Department of Environmental Protection in the amount of $1,000,000. Funding is provided under the State — Ecosystems Management Trust Fund. The Florida Catalog of Financial Assistance (CSFA) number for this program is CFSA No. 37.039. The District is providing a funding match of $1,000,000.00. (c) Additional Information. For information regarding the state program under the above CSFA number, Recipient should access the Florida Single Audit Act website located at https:// apps.fldfs.com/fsaa/catalog.aspx for assistance. The following websites may be accessed for additional information: Legislature's Website at .http: / /www.leg.state.fl.us /., State of Florida's website at .http: / /myflorida.com, District of Financial Services' Website at http: / /www.fldfs.com/ and the Auditor General's Website at http://www.myflorida.com/audgen/. (d) Allowable Costs. Recipient may only charge allowable costs to this Agreement, as otherwise provided herein. Any balance of unobligated cash that have been advanced or paid that is not authorized to be retained for direct program costs in a subsequent period must be returned to the District. (e) Audit Requirements. Recipient shall ensure that the audit complies with the requirements of section 215.97(7), Fla. Stat. This includes submission of a financial reporting package as defined by section 215.97(2), Fla. Stat., and Chapters 10.550 (local governmental entities) or 10.650 (nonprofit and for - profit organizations), Rules of the Auditor General. Recipient shall comply with the program requirements described in the Florida Catalog of State Financial Assistance (CSFA) [https: // apps .fldfs.com /fsaa/catalog.aspx]. The services /purposes for which the funds are to be used are included in the Statement of Work. (f) Financial Reporting. Recipient shall provide the District with a copy of any reports, management letters, or other information required to be submitted in accordance with Chapters 10.550 (local governmental entities) or 10.650 (nonprofit and for - profit organizations), Rules of the Auditor General, as applicable, no more than 20 days after its preparation. Recipient shall indicate the date the reporting package was delivered to Recipient in correspondence accompanying the reporting package. This information shall be directed to: St. Johns River Water Management District, Mr. Greg Rockwell, Director, Division of Financial Management, 4049 Reid Street, Palatka, FL 32177. A copy of the report shall also be provided to the Auditor General's Office at the following address: State of Florida Auditor General, Room 401, Claude Pepper Building, 111 West Madison Street, Tallahassee, Florida 32399 -1450. (g) Monitoring. In addition to reviews of audits conducted in accordance with section 215.97, Fla. Stat., as revised, monitoring procedures may include, but not be limited to, on -site visits by District staff, limited scope audits, and /or other procedures. Recipient agrees to comply and cooperate with any monitoring procedures /processes deemed appropriate by the District. In the event the District determines that a limited scope audit of Recipient is appropriate, Recipient agrees to comply with any additional instructions Page 8 of 15 AGENDA ITEM # 8C AUGUST 23, 2010 Contract #26664 Encumbrance #S004798 provided by the District to Recipient regarding such audit. Recipient agrees to comply and cooperate with any inspections, reviews, investigations, or audits deemed necessary by the District's Inspector General or the state Chief Financial Officer or Auditor General. (h) Examination of Records. In addition to the District's audit rights otherwise provided for herein, Recipient shall permit the District or its designated agent, the state awarding agency, the Department of Financial Services, the state's Chief Financial Officer and the state's Auditor General to examine Recipient's financial and non - financial records to the extent necessary to monitor Recipient's use of state financial assistance and to determine whether timely and appropriate corrective actions have been taken with respect to audit findings and recommendations, which may include onsite visits and limited scope audits. (i) Records Retention. Notwithstanding any other provision of this Agreement to the contrary, Recipient shall retain sufficient records demonstrating its compliance with the terms of this Agreement for a period of five (5) years from the date the audit report is issued, and shall allow the District, or its designee, state Chief Financial Officer, or Auditor General access to such records upon request. Recipient shall ensure that audit working papers are made available for such access for a period of three years from the date the audit report is issued, unless extended in writing by the District. 18. GOVERNING LAW, VENUE, ATTORNEY'S FEES, WAIVER OF RIGHT TO JURY TRIAL. This Agreement shall be construed according to the laws of Florida and shall not be construed more strictly against one party than against the other because it may have been drafted by one of the parties. As used herein, "shall" is always mandatory. In the event of any legal proceedings arising from or related to this Agreement: (1) venue for any state or federal legal proceedings shall be in Duval County; (2) each party shall bear its own attorney's fees, including appeals; (3) for civil proceedings, the parties hereby consent to trial by the court and waive the right to jury trial. 19. INDEPENDENT ENTITIES. The parties to this Agreement, their employees and agents, are independent entities and not employees or agents of each other. Nothing in this Agreement shall be interpreted to establish any relationship other than that of independent entities during and after the term of this Agreement. Recipient is not a contractor of the District. The District is providing cost -share funding as a cooperating governmental entity to assist Recipient in accomplishing the Project. Recipient is solely responsible for accomplishing the Project and directs the means and methods by which the Project is accomplished. Recipient is solely responsible for compliance with all labor and tax laws pertaining to Recipient, its officers, agents, and employees. 20. INTEREST OF RECIPIENT. Recipient certifies that no officer, agent, or employee of the District has any material interest, as defined in chapter 112, Fla. Stat., either directly or indirectly, in the business of Recipient to be conducted hereby, and that no such person shall have any such interest at any time during the term of this Agreement. 21. NON - LOBBYING. Pursuant to section 216.347, Fla. Stat., as amended, Recipient agrees that funds received from the District under this Agreement shall not be used for the purpose of lobbying the Legislature or any other state agency. 22. PERMITS. Recipient shall comply with all applicable federal, state and local laws and regulations in implementing the Project and shall include this requirement in all subcontracts pertaining to the Project. Recipient shall obtain any and all governmental permits necessary to Page 9 of 15 AGENDA ITEM # 8C AUGUST 23, 2010 Contract #26664 Encumbrance #S004798 23. implement the Project. Any activities not properly permitted prior to implementation or completed without proper permits does not comply with this Agreement and shall not be approved for cost - share funding. 24. PUBLIC RECORDS. Records of Recipient that are made or received in the course of performance of the Project may be public records that are subject to the requirements of chapter 119, Fla. Stat. If Recipient receives a public records request, Recipient shall promptly notify the District's Project Manager. Each party reserves the right to cancel this Agreement for refusal by the other party to allow public access to all documents, papers, letters, or other material related hereto and subject to the provisions of chapter 119, Fla. Stat., as amended. 25. RESERVATION OF REDUCTION CREDITS AND INELIGIBILITY FOR MEETING BASIN MANAGEMENT ACTION PLAN (BMAP) ALLOCATION(S) (a) When District ad valorem funds are provided, it is understood that the District intends to reserve a percentage of the total Water Quality Trading Credits ( WQTCs) achieved through efforts funded under this Agreement based on its prorated share of the project costs in order to further accomplish its objectives in improving the water quality of the Lower St. Johns River. The calculation of the District's share of the reduction amount is based on the District's relative ad valorem contribution to the total project cost. Total project costs include the sum of total construction and non - construction capital costs. Construction costs are the sum of construction costs, land or right -of -way acquisition costs, and excludes operation and maintenance costs. Non - construction capital costs include contingency, engineering design, permitting, and administration directly associated with the construction of the facilities. (b) The WQTC reservation applies only to ad valorem funds. Such reduction credits will not accrue to the Recipient and shall not be available for TMDL compliance or for sale as water quality credits to other entities. Credits generated by portions of the Work supported by other state funds, e.g. legislative funding, shall be available to the Recipient according to conditions established by the Florida Department of Environmental Protection. (c) Arbitration. The parties shall negotiate in good faith to develop a methodology for allocating WQTCs between the parties pursuant to the general principles described above. In the event the parties are unable to reach agreement within 90 days after a WQTC program becomes effective, the parties may elect to submit the matter to arbitration before the American Arbitration Association by a group of three arbitrators. Each party shall select one arbitrator and shall mutually agree upon a third arbitrator. In the event the parties cannot so agree, the arbitrators selected by the parties shall select the third arbitrator. The parties shall share equally in the costs of arbitration. The decision reached by the arbitrators shall be binding upon the parties and shall be enforceable in accordance with Florida law. 26. ROYALTIES AND PATENTS. Recipient certifies that the Project does not, to the best of its information and belief, infringe on any patent rights. Recipient shall pay all royalties and patent and license fees necessary for performance of the Project and shall defend all suits or claims for infringement of any patent rights and save and hold the District harmless from loss to the extent allowed by Florida law. Page l0 of 15 AGENDA ITEM # 8C AUGUST 23, 2010 Contract #26664 Encumbrance #S004798 27. WATER CONSERVATION (a) Water Conserving Rate Structure. A Recipient receiving funding through this Agreement that operates a public water supply utility must develop a rate structure for water customers in its service area that will: (1) promote the conservation of water; and (2) promote the use of water from available alternative water supplies. Recipient, if operating a public water supply utility, acknowledges that it either has a water conserving rate structure in effect or will implement a water conserving rate structure within nine months after the Effective Date. Failure to comply with this paragraph constitutes a material breach that shall constitute a failure to complete the Project. (b) Landscape Irrigation. Within 180 days of the effective date of this Agreement, Recipient shall enact a landscape irrigation ordinance that fully implements the landscape irrigation provisions in District Rule 40C- 2.042(2), Florida Administrative Code, including adequate enforcement mechanisms, and that does not in any other manner regulate the consumptive use of water. Within 270 days of the effective date of this Agreement, Recipient shall rescind any other ordinance provision that regulates or purports to regulate the consumptive use of water. The District may extend the applicable time periods upon a showing of good cause, which determination shall be made by the District in its sole discretion and judgment. In order to ensure that Recipient meets the requirements of this paragraph, Recipient shall submit the draft ordinance to the District's Project Manager for the District's review not less than 30 days prior to the first reading of the ordinance, with a copy to the District's Governmental Affairs Manager, Office of Communications and Governmental Affairs, 4049 Reid Street, Palatka, FL 32177 -2529. Failure to comply with this provision shall constitute a material breach of this Agreement. The rest of this page was intentionally left blank. Page 11 of 15 AGENDA ITEM # 8C AUGUST 23, 2010 Contract #26664 Encumbrance #S004798 IN WITNESS WHEREOF, the St. Johns River Water Management District has caused this Agreement to be executed on the day and year written below in its name by its Executive Director, and Recipient has caused this Agreement to be executed on the day and year written below in its name by its duly authorized representatives, and, if appropriate, has caused the seal of the corporation to be attached. This Agreement may be executed in separate counterparts, which shall not affect its validity. Upon execution, this Agreement constitutes the entire agreement of the parties, notwithstanding any stipulations, representations, agreements, or promises, oral or otherwise, not printed or inserted herein. This Agreement cannot be changed by any means other than written amendments referencing this Agreement and signed by all parties. ST. JOHNS RIVER WATER CITY OF ATLANTIC BEACH PUBLIC WORKS MANAGEMENT DISTRICT DEPARTMENT By: By: Kirby B. Green III, Executive Director Typed Name and Title Date: Date: APPROVED BY THE OFFICE OF GENERAL COUNSEL Attest: Stanley J. Niego, Sr. Assistant General Counsel Typed Name and Title ATTACHMENTS Attachment A - Statement of Work Attachment B - Funded Projects and Expected Performance Page 12 of 15 AGENDA ITEM # 8C AUGUST 23, 2010 Contract #26664 Encumbrance #S004798 ATTACHMENT A - STATEMENT OF WORK (SOW) City of Atlantic Beach Wastewater Treatment Project I. Introduction/Background The District has established Lower St. Johns River (LSJR) pollutant load reduction goals and the Florida Department of Environmental Protection has adopted the nutrient Total Maximum Daily Loads (TMDLs). In response to these regulatory initiatives, the District has been working toward facilitating efficient and cost effective efforts to exceed the minimum nutrient reductions required by the TMDL allocations. Reducing nutrient discharges to below TMDL levels will help assure the sustainable future health of the LSJR. During project evaluations, the District established the LSJR Reuse and Treatment Program to create additional opportunities to significantly reduce nutrient loading to the LSJR from treated wastewater through District -based cost -share agreements to increase the reuse of reclaimed water. This Project shall reduce nitrogen loading to the LSJR while helping to meet long -term water supply needs. II. Objective The objective is to reduce wastewater effluent discharges to the Lower St. Johns River, which shall reduce nutrient loadings in excess of the TMDL allocations. III. Scope of Work Recipient shall manage the engineering and construction of a wastewater treatment project scheduled for construction in FY10 through FY12 (Exhibit B). The Project consists of constructing wastewater treatment upgrades to Wastewater Treatment Plant (WWTP) No. 1 to advanced wastewater treatment standardsto remove nitrogen, phase out WWTP No. 2, and construction of a force main to pump wastewater from WWTP No. 2 to WWTP No. 1. After the Project is complete, the nitrogen concentration in wastewater discharged from the plant will be significantly reduced. The performance -based goal of this project is to meet and exceed the Recipient's TMDL requirements (a reduction of at least 61,791 lbs /yr nitrogen) through treatment plant upgrades to include advanced nutrient removal. IV. Task Identification Recipient shall be responsible for the following: • Obtaining project final design, construction plans and specifications • Providing a copy of Recipient's executed construction contract documents to the District's Project Manager • Scheduling construction implementation of the project described in this statement of work • Providing copies of any subsequent change orders to the contract to the District's Project Manager • Obtaining all required permits, including right of access to the project sites, related to project construction and subsequent operation of the systems • Complying with all permits • Procuring project construction • Supervising and inspecting construction • Administering construction contract(s) Page 13 of 15 AGENDA ITEM # 8C AUGUST 23, 2010 Contract #26664 Encumbrance #S004798 • Submit invoices in a timely manner in accordance with this Agreement to enable proper review by the District's Project Manager prior to payment authorization. • Certifying completion of construction by a Professional Engineer registered in the State of Florida • Complying with cost accounting practices and procedures required for reimbursement of funds expended for the Project. V. Timeframe and Deliverables Deliverables Quarterly progress reports shall be submitted to the District's Project Manager, identifying project progress to date, key milestones reached, overall project schedule versus time for project completion, key issues to be resolved, project time and projected costs versus actual cost to date. Projected Milestones Progress shall be measured by the percent of construction completed for: Milestone 1: Final Plans and Specifications Complete — October 1, 2010 Milestone 2: Begin Construction — April 30, 2011 Milestone 3: 50% of the Project construction complete — February 30, 2012 Milestone 4: Construction Complete — December 31, 2012 Milestone 5: Begin Operation — March 31, 2013 Milestone 6: 100% Operational Level Attained — October 1, 2013 Milestone 7: Atlantic Beach Meeting or Exceeding TMDL Requirements — October 1, 2014 VI. Project Budget Total Project cost is estimated to be $9.4 million. The District's contribution shall not exceed $1,000,000. Recipient shall submit documentation of Project expenditures with each invoice. The District will reimburse Recipient for 50% of their properly documented allowable expenditures. Page 14 of 15 AGENDA ITEM # 8C AUGUST 23, 2010 Contract #26664 Encumbrance #S004798 Attachment B - Funded Projects and Expected Performance TMDL Approximate Starting TN Nitrogen Capacity Construction District Concentration Removed Project Name Description (mgd) Cost Cost Share' (mg /L) (Ibs /yr) (FY10) _ _ (FY12) City of Atlantic Phase out WWTF 2.2 $9,400,000 $1,000,000 11.35 76.900 Beach Wastewater No. 2, transfer flow Treatment Project from WWTF No. 2 to WWTF No. 1, and upgrade existing WWTF No 1 to an advanced wastewater treatment system capable of reducing nitrogen to a level of 3 mg/L utilizing biological nutrient removal. 1 Cost share portion is subject to conditions in this Agreement. Page 15 of 15