Loading...
Permit 2343 Beachcomber Trail CITY OF pNl 'C �iGQ�s Rai" �r�tt�#mrnt n� �iixilding Jns�rrriinn This Certificate issued pursuant to the requirements of Section 109 of the Southern Standard Building Code certifying that at the time of issuance this structure was in compliance with the various ordinances regulating building construction or use. For the following. Use Classification Bldg.Permit No. Group Type Construction Fire District_ -- Owner of Building Address Building Address Locality '-�?_ ti. By: --- Building Official Date:.—_ .– P"T IN A CONf►ICUOUG /LACI BUILDING, PLANNING AND ZONING INSPECTION DEPARTMENT CITY OF ATLANTIC BEACH, FLORIDA CERTIFICATE OF OCCUPANCY WORK SHEET Date Requested: Building Contractor: G;�� /'f,.�/ ✓ Building Permit Number: ? 773 Address: ..? 3 (113 Legal Description: Improvements to the above described property have been completed in accordance with the terms of the permit and is certified to be ready for occupancy as _ -_ --- Lowest Floor Elevation: - _/ �000'** required as built n/a Sales Tax Certificate: ----da e^ submitted -� BEFORE ISSUING CERTIFICATE OF OCCUPANCY THE FOLLOWING MUST BE COMPLETE DEPARTMENT DATE NOTIFIED: DATE APPROVED: BY: Fire Chief a J Public Works Planning Director j --------------- --� f-- ------- Building Inspector OMB 3067-0077 GAY MA y� Expires:Feb.1987 FEDERAL EMERGENCY MANAGEMENT AGENCY �.. NATIONAL FLOOD INSURANCE PROGRAM ELEVATION CERTIFICATE This form is to be used for: 1) New/Emergency Program construction in Special Flood Hazard Areas;2) Pre-FIRM construction after September 30, 1982;3) Post-FIRM construction;and,4) Other buildings rated as Post-FIRM rules. Richard Noble 2343 Beachcomber Trail BUILDING OWNER'S ADDRESS NAME Lot 70 Oceanwalk Unit One, Plat Book 42, pages 1A-1F, Duval County, Fla. PROPERTY LOCATION (Lot and Block numbers and address if available) I certify that the information on this certificate represents my best efforts to interpret the data available. 1 understand that any false statement may be punishable by fine or imprisonment under 18 U.S. code, Section 1001. SECTION I ELIGIBILITY CERTIFICATION (C Local Community Permit Official or a Registered Professional Engineer, rchitect, or Sury r) COMMUNITY NO. PANEL NO. SUFFIX D E OFF FIRM ZONE DAT F CONSTR. BASE FLOOD ELEV. BUILDING IS (In AO Zone,use depth) ❑ New/Emergency ❑ Pre-FIRM Reg. 120077 0265 D 12/ 5/83 A ❑ Post-FIRM Reg. YES NO It is intended that the building described above will be co tructed in compliance with the community's flood plain ❑ ❑ ordinance. The certifier may rel on community records. he lowest floor(including basement) will be at an elevation of ft, NGVD. Failure construct the buil ' g at this elevation may place the building in violation of the community's flood plain manageiltent ordinance,. YES NO The building described above has been constructed in compliance with the community's flood plain management ❑ ❑ ordinance based on elevation data and visual inspection or other reasonable means. If NO is checked, attach copy of variance issued by the community. YES No The mobile home located at the address described above has been tied down (anchored) in compliance with the ❑ ❑ community's flood plain management ordinance, or in compliance with the NFIP Specifications. MOBILE HOME MAKE MODEL YR. OF MANUFAET7 SERIAL NO. DIMENSIONS X (Community Permit Official or Registered Professional Engineer, Architect, or Surveyor) NAME ADDRESS TITLE CITY STATE ZIP SIGNATURE DATE PHONE SECTION II ELEVATION CERTIFICATION (Certified by a Local Community Permit Official or a Registered Professional Engineer, Architect, or Surveyor.) FIRM ZONE Al-A30: I certify that the building at the property location described above has the lowest floor(including basement) at an elevation of feet, NGVD (mean sea level) and the average grade at the building site is at an elevation of feet, NGVD. FIRM ZONES V, V1430: I certify that the building at the property location described above has the bottom of the lowest floor beam at an elevation of feet, NGVD (mean sea level), and the average grade at the building site is at an elevation of feet, NGVD. —CRGENCY PROGRAM:I certify that the building at the property location described itbove has the lowest *&1D.The elevation of the highest adjacent grade next to the building is 9.—1feet,NGVD. V'N- Y*/ 'UOIJen913 pooh a. ° `-noerty location described above has the lowest floor elevation of Ipp algellEne fo u'a 9FAGqq spAp��/, J-qxt to the building is feet, NGVD. -woo @141 SeaaV p.ae `7eH I- qC tiC /P 9j QUO " and uo unn Ot}s aye uoljenal� Fs� Fq ai0c 6 p ,ministered Professional Engineer or Architect) °i aaanas 6ui inp uoiloc ar,enn of;�8 �.-o9�r`s' A%��0�lj �d so that the building is watertight, with satlS 6u P*, 'b� qy �'�00, 0 tiP capability of resisting hydrostatic jai G9 /oe�b/�f�Ql -e5 velocities, impact and uplift yo OF a�A°f o� �F 981? /*Aoy� sj fh^O few9TH9s �/ y��0 ,�� °°yo y°° ., v'���.�,/� OJ OMB 3067-0077 6 M Expires:Feb.1987 FEDERAL EMERGENCY MANAGEMENT AGENCY NATIONAL FLOOD INSURANCE PROGRAM ELEVATION CERTIFICATE This form is to be used for: 1) New/Emergency Program construction in Special Flood Hazard Areas;2) Pre-FIRM construction after September 30, 1982;3) Post-FIRM construction;and,4) Other buildings rated as Post-FIRM rules. Richard Noble 2343 llackl �cxtber Frail BUILDING OWNER'S ADDRESS NAME Lot 70 Oceanwalk Unit one, Plat Sock 42, mges M--IF, DUVal. County, Fla. PROPERTY LOCATION (Lot and Block numbers and address if available) I certify that the information on this certificate represents my best efforts to interpret the data available. 1 understand that any false statement may be punishable by fine or imprisonment under 18 U.S.code, Section 1001. SECTION I ELIGIBILITY CERTIF16ATION (Completed by Local Community Permit Official or a Registered Professional Engineer, Architect,or Surveyor) COMMUNITY NO PANEL IVO. SUFFIX DATE OF IRM FIRM ZONE DATE OF CONSTR. BASE FLOOD ELEV. BUILDING IS 4 (In AO Zone,use depth) ❑ New/Emergency ❑ Pre-FIRM Reg. 120077 0265 D 12/15/83 A ❑ Post-FIRM Reg. YES NO It is intended that the building described above will be constructed in compliance with the community's flood plain ❑ ❑ ordinance. The certifier may rely on community records.The lowest floor(including basement)will be at an elevation of ft, NGVD. Failure to construct the building at this elevation may place the building in violation of the community's flood plain management ordinance. YES NO The building described above has been constructed in compliance with the community's flood plain management ❑ ❑ ordinance based on elevation data and visual inspection or other reasonable means. If NO is checked, attach copy of variance issued by the community. YES NO The mobile home located at the address described above has been tied down (anchored) in compliance with the ❑ ❑ community's flood plain management ordinance, or in compliance with the NFIP Specifications. MOBILE NOME MAKE MODEL YR. OF MANUFACTURE SERIAL NO. DIMENSIONS X (Community Permit Official or Registered Professional Engineer,Architect, or Surveyor) NAME ADDRESS TITLE CITY STATE ZIP SIGNATURE DATE PHONE SECTION 11 ELEVATION CERTIFICATION (Certified by a Local Community Permit Official or a Registered Professional Engineer, Architect,or Surveyor.) FIRM ZONE Al-A30: I certify that the building at the property location described above has the lowest floor(including basement) at an elevation of feet, NGVD (mean sea level) and the average grade at the building site is at an elevation of feet, NGVD. FIRM ZONES V, V1-V30: I certify that the building at the property location described above has the bottom of the lowest floor beam at an elevation of feet, NGVD (mean sea level), and the average grade at the building site is at an elevation of feet, NGVD. FIRM ZONES A,A99,AH and EMERGENCY PROGRAM:I certify that the building at the property location described pbove has the lowest floor elevation of l0.5l feet,NGVD.The elevation of the highest adjacent grade next to the building is--%--1feet,NGVD. FIRM ZONE AO: I certify that the building at the property location described above has the lowest floor elevation of feet,NGVD.The elevation of the highest adjacent grade next to the building is feet, NGVD. SECTION III FLOODPROOFING CERTIFICATION (Certification by a Registered Professional Engineer or Architect) I certify to the best of my knowledge, information, and belief, that the building is designed so that the building is watertight, with walls substantially impermeable to the passage of water and structural components having the capability of resisting hydrostatic and hydrodynamic loads and effects of buoyancy that would be caused by the flood depths, pressures velocities, impact and uplift forces associated with the base flood. YES ❑ NO ❑ In the event of flooding, will this degree of floodproofing be achieved with human intervention? (Human intervention means that water will enter the building when floods up to the base flood level oc- cur unless measures are taken prior to the flood to prevent entry of water(e.g., bolting metal shields over doors and windows), vGc n NO 0 Will the building be occupied as a residence? CITY OF ,4�lart�e f�eac�c-�G' l Office of Building Official REQUEST FOR INSPECTION Date O Permit No. � Time A.M. Received P.M. District No. Job Addressz2 Lo tY Owner's Name Contractor BUILDING _ CONCRETE ELECTRICALPLUMBING MECHANICAL P/ Framing .�k Footing ❑ Rough Wiring Rough ❑_ 1 Air.Cond.& Gldr- Re Roofing ❑ Slab ❑ Temp Pole ❑ Top Out Heating Lintel ❑ Final ❑ Sewer ❑ Fire Place READY FOR INSPECTION Pre Fab Mon. Tues. Wed. Thurs. Friday P. A.M. Inspection Made P.M. Inspector Final Inspection❑ Certificate of Occupancy Date CITY OF 4j 1 Office of Building Official / VVV REQUEST FOR INSPECTION Date [ Permit No. Time A.M. Received P.M. District o. 3�3 5z Ch. CC rn Job Address Locality Owner's Name Contractor BUILDING CONCRETE ELECTRICAL / PLUMBING MECHANICAL Framing ❑ Footing El Wiring �/ Rough ❑ Air.Cond.& ❑ Re Roofing ❑ Slab ❑ Temp Pole ❑ Top Out ❑ Heating Lintel ❑ Final ❑ Sewer C Fire Place ❑ READY FOR INSPECTION Pre Fab A.M. Mon. Tues. Wed. A+N��_ Thurs. Friday P.M. A.M. Inspection Made P.M. Inspector Final Inspection❑ Certificate of Occupancy Date CITY OF 1' Ktic �►'eac�-�� ` Office of Building Official REQUEST FOR INSPECTION Date..,-? r Permit No. dc f Time A.M. Raceiv P.M. District No. ' F Job Address ,Qty Owner's Name Contractor BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing ❑ Footing ❑ Rough Wiring ❑ Rough ❑ Air.Cond.& ❑ Re Roofing ❑ Stab ❑ Temp Pole ❑ Top Out ED Heating Lintel ❑ Final ❑ Sewer &P-1-' Fire Place ❑ READY FOR INSPECTION Pre Fab A.M. Mon. Tues. Wed. Thurs. P.M. A.M. Inspection Made P.M. Inspector Final Inspection❑ Certificate of Occupancy Date CITY OF 4&404.6_d- Office of Building Official REQUEST FOR INSPECTION Date �� �� Permit No. �41 Time A.M. Received P.M. District No. Job Address Locality Name s " 1� contractor BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing ❑ Footing ❑ Rough Wiring ❑ Rough ❑ Air.Cond.& ❑ Re Roofing ❑ Slab ❑ Temp Pole ❑ Top Out ❑ Heating Lintel ❑ Final Sewer ❑ Fire Place ❑ READY FOR INSPECTION Pre Fab a;M. Mon. Tues. Wed. Thurs. CrFriday� A.M. Inspection Made P.M. Inspector Final Inspection❑ a' Certificate of Occupancy Date CITY OF r�tla�tic �eaek-j�anlda Office of Building Official REQUEST FOR INSPECTION «'7 Date �h � Permit No. Time A.M. Received P.M. District No. Job Address Locality Owner's Name Contractor �6 BUILDING CONCRETE ELECTRICAL PLUMBING MECH Framing ❑ Footing ❑ Rough Wiring ❑ Rough ❑ Air.Cond.& ❑ Re Roofing ❑ Slab ❑ Temp Pale ❑ Top Out ❑ Heating Lintel ❑ Final i?"� Sewer ❑ Fire Place Cl READY FOR INSPECTION Pre Fab A:M Mon. ues Wed. Thurs. Friday A.M. Inspection Made P.M. inspector Final Inspection qv Certificate of Occupancy Date ADDRESS_-- --� --- -------------- //��'' ------ ------- --------------- COHTRACTOR�%-�___ OWNER-- -- ----------------------- BUILDING_ MECHANICAL�2 PLUMBING �� ELECTRICAL Z`Y �- - TEMP POLE--------- MISC----------- ELECTRICIAN---- ----------ELECTRICIAN____ __ --------- DATE FAILED DATE PASSED TEMP POLE JEA ----------- ----------- 1-1FOOTING & ,qq rl ` 1 ' Sg ROUGH PLUMBING ----------- --�-------- 2-0 SLAB ----------- - - FRAMING MECHANICAL/FIREPLACE _ ---- ---- TOP OUT PLUMBING ___-_______ �o ROUGH ELECTRIC ------ ----------- FINAL _____F NAL EL FINAL BUILDING ----------- --- ©- � ELEVATION SUBMITTED CERTIFICATE OF OCCUPANCY ----------- DATE ORDERED ----------- DATE ISSUED ----------- r� ��FN D. 1/2" 1 P � �r A pp g�C No. 3398 FND. V2" I. J TO �h' No. 3634 P Op �0 p�ha 84hK C2 aolb 1) BEARINGS AS PER PLAT 2) NO B.R.L. AS PER PLAT . SET 1/2" LP. 3) THIS IS A BOUNDARY SURVEY . APPROX. EDGE OF No. 3672—+- WATER gam` 0 20 U T I L I T Y Ek ------ — S.WiO2i'W, DRAINAGE EASEMENT 2.5.00 L 0 T 6 8 L LOT 66 OT 67 I HEREBY CERTIFY TO GBN CONSTRUCTION THAT I HAVE SURVEYED THE LANDS AS SHOWN IN THE ABOVE CAPTION AND THAT THIS MAP IS A TRUE AND CORRECT REPRESENTATION OF THAT SURVEY AND THAT THE SURVEY REPRESENTED HEREON MEETS THE MINIMUM TECHNICAL STANDARDS OF THE FLORIDA ADMINISTRATIVE CODE CHAPTER 21-HH- EEREBY CERTIFY THAT THE PROPERTY SHOWN 6 AND THE FLORIDA LAND TITLE ASSOCIATION. EON LIES IN FLOOD ZONE "A" AS SHOWN ON FLOOD HAZARD BOUNDARY MAP FOR JACKSOTnfILLE, iRIDA. i SURVEY NOT VALID UNLESS `I►r.3 b�. 't..�, LED VATH AN EMBOSSED SEAL DONN W. BOATWRIG"T, L.S. 3URVEYOR SIGNED HEREON FLORIDA RES. LAND SURVEYM No 3295 NN BOATWRIGHT LAND SURVEYORS, INC. �TE SIGNED: �: S: D. H. J U L Y 7 1988 9250 1PFWAN RAO[)_ SIIITF n- JOCKgONVII IF RFAru 9:1 f%D,nA )A.I_fMRA SC�FT I t�F MAP 70, OCEANWALK UNIT ONE AS P RECORDED IN T BROOK 42 SHOWING PAGES 1 IAA, 1B,1C, 1D, 1E, AND 1F OF THE CURRENT PUBLIC RECORDS UVAL COUNTY, FLORIDA. BEqCH � -0/1-7W--M----l8' M 5 O' R/ W (P B E R TRA RAIL FND 1/2" 1. P No. 3398 IV• 07 . 361 2011 E. (90.05' MEAS.) 10'xi0' J.E.A. i i 3 0946 04 = 528 75 0.00 , `. __F No. 33980 -d 90.00 's A= 90.11 T=4516 68.5p N • N . f m � N ��. 21.2 nj 19.2' �?t O ti r; 2 6.3' N L 0 T 71 _ sM 6.0' 5.9' �• N 4 6.0 ds� 13.5 M 16.2 9.0' 40 L 0 T 6 9 M CITY OF 716 OCEAN BOULEVARD P.O.BOX 25 ATLANTIC BEACH,FLORIDA 32233 TELEPHONE(904)249-2395 THE MINIMUM LOWEST FLOOR ELEVATION FOR LOT IS1__ T'o A SURVEY INDICATING THE "LOWEST FLOOR ELEVATION" SHALL BE SUBMIT"ED TO THE BUILDING DEPARTMENT IMMEDIATELY AFTER THE SLAB HAS BEEN POURED. NO FINAL INSPECTION WILL BE MADE AND NO CERTIFICATE OF OCCUPANCY WILL BE ISSUED UNTIL SAID REQUIREMENTS ARE MET. L -/ RENE' AERS �' COMMUNITY FLOP N DIRECTOR w - � &aw O . � _ _. _� _3 g� , , . a ., , OCEANWALK PROFESSIONAL ADVISOR'S REVIEW LOT NO. 70 UNIT NO. i OWNER NOBEL PHONE NO. 285-4345 ARCHITECT LARRY WILLIS PHONE N0.724-3944 CONTRACTOR BRAD NEGAARD PHONE N0725-3338 ITEM FOR REVIEW RECOMMENDATION TOPOGRAPHIC SURVEY OK r TREE SURVEY OK DRAINAGE PLAN RK r SITE PLAN FLOOR PLAN AK BUILDING ELEVATIONS OK LANDSCAPE PLAN / COST FINAL REVIEW OK SWIMMING POOL NOT APPLICABLE WINDOWS / DOORS OK COLOR SELECTIONS nK MATERIAL SAMPLES .^.F.E PPI ow t COMMENTS . MATERIAL SAMPLES - PROVIDE 300# SHINGLES (MINIMUM) RECOMMEND APPROVAL SUBJECT TO ABOVE COMMENTS r L3 L X-k-1 XIV -0� cy ' ar APPROVED 'JUN i OCFA ALK ASSOCIATION,INC Ll PR FESSIONAL ADVIS T CITY OF ' 4rtc'a Ve4d—9 Office of Building Official REQUEST FOR INSPECTION Date ! Ire Permit No. Time -� A.M. Received (� / �PM. �District No. Jbb Add Owner' 7) Locality Name Contractor BUILDING CONCRETE ELECTRICAL PLUMBING / MECHANICA Framing ❑ Footing ❑ Rough Wiring ❑ Rough Air.Cond.& ❑ Re Roofing ❑ Slab ❑ Temp Pole ❑ Top Out ❑ Heating Lintel ❑ Final ❑ Sewer ❑ Fire Place ❑ Y FOR INSPECTION Pre Fab Mon. Tues. Thurs. Friday 7Wd. A.M. P.M. Inspection Made A.M. P. Inspector Final Inspection❑ Certificate of Occupancy Date CITY OF A&AtlC Seam- Office of Building Official REQUEST FOR INSPECTION Date ,1 Permit No, Time A.M. Received P.M. District No. Job Address Locality Owner's .L Name ContractorY BUILDING CONCRETE ELECTRICAL PLUMBING ,r� MECHANICAL Framing 11Footing 11 Rough Wiring ❑ Rough $/ Air.Cond.& ❑ Re Roofing 11 Slab ❑ Temp Pole 11 Top Out ❑ Heating Lintel ❑ Final ❑ Sewer ❑ Fire Place ❑ READY FOR INSPECTIOPre Fab A.M. Mon. Tues. Wed. Friday P.M. Inspection Made M. Inspector Final Inspection❑ Certificate of Occupancy Date CITY OF , ��vuda Office of Building Officiate. /1 REQUEST FOR INSPECTION Date �� / Permit No. 73 Time A.M. Received P.M. District No. Job Address Locality Owner's rz 8N Name Contractor BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing ❑ Footing ❑ Rough Wiring ❑ Rough 71 Air.Cond.& F-1Re Roofing El Slab CY Temp Pole ❑ Top Out ❑ Heating Lintel ❑ Final ❑ Sewer C Fire Place ❑ READY FOR INSPECTION Pre Fab A.M. Mon. Tues. Wed. Thurs./�j Friday P.M. Inspection Made P. Inspector _ Final Inspection❑ Certificate of Occupancy Date CITY OF ,r�xa�'c �'eactc-j�onic�'a Office of Building Official REQUEST FOR INSPECTION tf Permit No. / Ti A.M. A' " ed P.M. ? District No. Y 6' (, Job Address Locality Owner's Name Contractor BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing ❑ Footing ❑ Rough Wiring ❑ Rough Air.Cond.& ❑ Re Roofing ❑ Slab ❑ Temp Pole ❑ Top Out ❑ Heating Lintel ❑ Final ❑ Sewer C' Fire Place ❑ READY FOR INSPECTION Pre Fab A.M. Mon. Wed Wed. Thurs. Friday P.M. CA.M. Inspection Made _ ____ P.M. Inspector r Final Inspection❑ Certificate of Occupancy Date �V CITY OF l � rte �eac!-j�o�cida 1 � Office of Building Official REQUEST FOR INSPECTION Date �" Permit No. 777 Time Received �P.M. District No. -15 Job Address Locality Owner's Name Contractor BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing ❑ Footing V/ Rough Wiring ❑ Rough ❑ Air.Cond.& ❑ Re Roofing ❑ Slab ❑ Temp Pole ❑ Top Out ❑ Heating Lintel ❑ Final ❑ Sewer ❑ Fire Place ❑ READY FOR INSPECTION Pri Fab Mon. Tues. Wed. Thurs. Friday r/s A.M. Inspection Made P.M. Inspector // Final Inspection❑ n rt 1 L s� A, f,� • �, Certificate of Occupancy Date 9774 PERMIT NO. XON JOB July 28.-_19__B �f Fee$—4$ ° — e i a until above fee has.ban paid to City Treasurer,and is2356 3 5 ' h 7 f i-C, '" I revocation for violation of applicable provisions of law. C This is to certify that Air F'ngingj&TS �4F; °- 7` r` � r I has permission to Mid INSTALL HEAT AC Classification $,ESIDENTTIAt Zone Owned by NOBEL Lot Block S/DD 2 34 3 BEAC EOMBER TRAI L i House No. According to approved plans which are part of this permit I NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. PERMIT VOID SIX MONTHS -n AFTER DATE OF ISSUE O Building material,rubbish and debris z from this work must not be placed in public space, and must be cleared up and hauled away by either con- iWtor or owner. Nilding Official. FOR OFFICE PERMIT DATE CONTRACTO t USE ONLY NUMBER f PLUMBING 1+ ELECTRICAL -- SEWER i WATER i BUILDING AND ZONING INSPECTION DIVISION CITY OF ATLANTIC BEACH ATLANTIC BEACH, FLORIDA 8°2288 APPLICATION FOR MECHANICAL PERMIT CALL-IN NUMBER IMPORTANT - Applicant to complete all items in sections 1, 11, 111, and IV. LOCATION Street Address: OF BUILDING Intersecting Streeter Between ---And– Sub-division nd ' O Sub-division II. IDENTIFICATION - To be completed by all applicants. In consideration of permit given for doing the work as described in the above statement we hereby agree to perform said work in accordance with the attacllgd plans and specifications which are a part hereof and in accordance with the City of Jacksonville ordinances and standards of good practice listed therein. None of Mechanical Contractor Contractor (Print) Master y Name of IV hoarly Owner . Siynstara of Owner Signature, of or Aufhoriied Agent Architect or Engineer Ili. GENERAL INFORMATION A. Type of betting fuel: B+ IS OTHER CONSTRUCTION BEING DONE ON �Elaetsie THIS BUILDSNG OR SITE? 44W L ❑ roes-❑ LP ❑: Natural ❑ Central Utility 97 IF YES, GIVE NUMBER OF CONSTRUCTION C3 �,� OS PERMIT Other— Specify IV. MICHMICAL NWIPM INT TO K INSTALLED NATURE OF WORM (Provide complete list of compow is oa back of this fens) 9;'�Resldentlal or ❑ Commercial Q.,-*,"*at ❑ Space ❑ Recesses! 9-1Cantral o Hoo► 5;"ew Building Air Candrfitsnie9: ❑ Room teateal ❑ Existing Building k ❑ Replacement of existing system �Ouet System: Materia' TMietwaa.. Maximum capacity efm. 9--"New installation(No system previously installed) - ❑ Extension or add-on to existing system 13 ttafrigoation ❑ Other-- Specify (� Coaling tower: Gps�ity 9� , Q lira sprinters: Number of a Ewntar Q Manlift D Escalator Iaumber1 THIS SPACE IIOR'Of= USE ONLY ❑. Gasoline pumps.__._ (number) ( �) 13. 0 (number) Remarks Q LK ooniainart _ (number) Q Uwfirw pressure Vessel Permit Approved by C3 — specify Permit Fra PST ALL EQUIPMENT AIR CONDTPtOMG AND REFRIGERATION EQUIPMENT Nuelbsar Tlalts DII�slptLon Ii[odN Nhssniistr i+[srsutBalutwr C�� ��►f 7225 , , � ,gym_ j CITY OF 4x4Nft &ad-R"4* Office of Building Official REQUEST FOR INSPECTION Data — C Permit No. Time A.M. Receive P.M. District No. f Job Address Locality Owner's s ( Contractor BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing ❑ Footing ❑ Rough Wiring ❑ Rough Pr' Air.Cond.& ❑ Re Roofing ❑ Slab ❑ Temp Pole ❑ Top Out ❑ Heating Lintel ❑ Final ❑ Sewer ❑ Fire Place ❑ READY FOR INSPECTION Pre Fab Mon. Tues. Wed. Thurs.c;—_, Friday A;M. Inspection Made P.M. Inspector Final Inspection❑ Certificate of Occupancy Date CITY OF �r �"' r'�.tfa.rtlC �eae�-j�aalda Office of Building Official / EQUEST FOR INSPECTION Date —r Permit No. Time A.M. Received P.M. District No. -- 3 Lo lit y¢- Job Add ass Owner's Name Contractor .BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing 11Footing E3Rough Wiring ❑/ Rough El Air.Cond.& ED Roofing El Slab ❑ Temp Pole �1 Top Out ❑ Heating Lintel ❑ Final ❑ Sewer ❑ Fire Place ❑ READY FOR INSPECTION Pre Fab A.M. Mon. Tues. Wed. Thurs. Friday P.M. /�A.M. Inspection Made P.M. Inspector Final Inspection❑ Certificate of Occupancy Date "ITY Or A"I"LANTIC BEACH,[ FLORIDA ADP•� .dby APPLIC.A1TIO&H FOR ELFCTRICAL PERMIT C)lgle TO THE Chi"F ELECTRICAL INSPECTOR: DATE: to IMPORTANT NOTICE: I IN CONSIDERATION OF PERMIT GIVEN FOR DOING THE WORK AS DESCRIBED IN THE FOLLOWING, WE HEREBY AGREE TO PERFORM SAID WORK IN ACCORDANCE WITH THE ATTACHED PLANS AND SPECIFICATIONS, WHICH i.RE A PART HEREOF, AND IN ACCORDANCE WITH THE ELECTRICAL REGULATIONS, CODES AND CITY OF ATLANTIC [TEACH ORDINANCES. ELECTRICAL FIRM: MASTER ELECTRICIAN SIGNATURE i - �U._Bl�.�.Y.h!AY ADORESS: I Pa..C�COE- RFD BOX_.--,-- BLDG.SIZE BETWEEN: RES.C 1 APT. ( ) COMM. ( ) PUBLIC( ) INDUS. ( ) NEW( OLD ( ► REW. ( ) AODITION ( ) TRAILER( 1 TEMP.(X SIGNS ( ) SO. FT. SERVICE: NEW( 1 INCREASE ( ) REPAIR ( ) FEE CONDUCTOR SIZE ANIPS 6 COPPER ( I ALUM SWITCH OR LC-.EAKER AMPS _ PH Wo VOLT n RACEWAY EXIST.SERV.SIZE AMPS PH W VOLT RACEWAY FEEDERS NO. SIZE NO. _ SIZE NO. SIZE LIGHTING OUTLETS CONCEALED OPEN TOTAL _ RECEPTACLES CONCEALED _ OPEN I TOTAL ; 0.90 AMPS. - 51-100 AMPS. SWITCHES INCANDESCENT FLUORESCENT&M.V. ; r FIXED --- --- 0-100 AMPS.' OVER _ ---r BELL TRANSF. —_��—..----- AIR H.P. RATING T H.P. RATING CONDITIONING C(s.` ?,MOTOR OTHER MOTORS I AMPS IdElL HEAT: KW-H-AT a-1 OVER f MOTORS H.P VOLTAGE pHs NO. 1 H.P. VOLTAGE PHS j c .ti,• i MIQCELL!kNEOUS .......,..�...........,.. .,..«:• :_.....ter. _ .. . .. ......,.....»..._..............�.....�..... . T'ANSFORNTERS: UNDER SOO V " j I OVE;i coo V. . CITY Or A"I'LANYIC BEACH, FLORIDA 09 Q APP•^�.dby APPLICATION FGR ELECTRICAL PERMIT TO THE Ctii-F ELECTRICAL INSPECTOR: DATE: IMPORTANT NOTICE: ! IN CC's SIDERATION OF PERMIT GIVEN FOR DOING THE WORK AS DESCRIBED IN THE FOLLOWIN WE HEREBY f-GREE TO PERFORM SAID WORK IN ACCORDANCE WITH THE ATTACHED PLANS AND SPECIFICATIONS, WHICH i.RE A PART HEREOF, AND IN ACCORDANCE WITH THE ELECTRICAL REGULATIONS, CODES AND CITY OF ATLANTIC [TEACH ORDINANCES. � ELECTRICAL FIRM: \\S , i \o�� . MASTER ELECTRICIAN SIGNATURE Jpu lb.af N P ME G�_N ADDRESS: �34 3 'Yle<� Ipq er��c�;� RFD BOX .--'-- BLDG.SIZE • BETWEEN:C4Cea►,�i,�ca.� RES.(`�1 APT. ( ) COMM. ( ) PUBLIC( ) INDUS. ( ) NEW( OLD ( ) REW. ( ) AODIYION ( ) TRAILER( ) TEMP. ( ) SIGNS ( ) SO. FT. SERVICE: NEW(A INCREASE ( ) REPAIR ( ) .: FEE CONDUCTOR SIZE AMPS COPPER ( ALUM. SWITCH OR L3-.EAKER DC:Q AMPS � _ PH W �4�VOLT RACEWAY EXIST.SERV.SIZE AMPS PH W VOLT RACEWAY FEEDERS NO. SIZE IND. _ SIZE NO. SIZE _ LIGHTING OUTLETS CONCEALED OPEN TOTAL RECEPTACLES I CONCEALED OPEN VTOTAL I O.90 AMPS. 31-100 AMPS. - SWITCHES INCANDESCENT FLUORESCENT&M.V. ! • :� FIXED0-100 AMPS.' OVER , - .._ APPt-!ANr,Es _ --- BELL TRANSF. — — — — AIR H.P. RATING H.P. RATING CONDITIONING _ COMI?.MOTOR _ OTHER MOTORS AMPS ° CEIL HEAT: KW-HcAT �•� OVER MOTORS H.P. VOLTAGE pHs NO. 1 N.P. VOLTAGE PHS MISCELL!1.N NOUS T"ANSFORNrIERS: UNDER 300 V " jj _OVE; 03v. --- - - - - 1 CITY OF 716 OCEAN BOULEVARD P.O.BOX 26 ATLANTIC BEACH,FLORIDA 32233 TELEPHONE(904)249-2395 DATE PRE-SERVICE DIVISION JACKSONVILLE ELECTRIC: AUTHORITY 233 WEST DUVAL STREET JACKSONVILLE, }FLORIDA 32202 THE FOLLOWING FINAL INSPECTIONS) HAVE 13EEN MADE AND ARE SATISFACTORY : �v�3��1� --��=�___Ccs e.C��__ c��:�-�-�_���.c_•�, __�2�-�,��_ ---------------------------------------- ----------------------------------------------------- SINCERELY, BUILDING INSPECTION DIVISION cc: FILE DEPARTMENT OF BUILDING ��� CITY OF ATLANTIC BEACH,FLORIDA PERMIT NO. V 1 PERMIT T4 BUILD THIS PERMIT MUST BE POSTED ON JOB l Date June 30 Valuation$ 106,179.70 Fee$ 382.88 i This perrnit not valid until above fa has been paid to City Treasurer,and is subject to revocation for violation of applicable provisions of law. This is to certify that GBN Construction CO CGCA12061 6054-8 Arlingtonxpresssay, Jacksonville has permission to build Sinizle Family Dwelling 32211 Classification Residential Zone Its Owned by Nobel Lot 70 BlockkQRi I S/D iceanwalk r House No. 2343 RFACHCONUR TRAIL 382.RA Y According to approved plans which are part of this permit 32.86CK7 7'5 10 1 A 6/117/0 NOTICE—AI9762)NCRETE AND FOOX,*gS M4JW SPECTED BEFORE POURING. qDD PERMIT VOID SIX MONTHS „ AFTER DATE OF,ISSUE j4 —0 4---0 O Building material, rubbish and debris Izi from this work must not be placed in public space, and must be cleared up and hauled away by either con- tract ar owner., Btu'1�Jing Official. FOR OFFICE PERMIT DATE CONTRACTOR USE ONLY NUMBER I I j PLUMBING If ELECTRICAL SEWER WATER 1 �U —per sq ft V rr ersgft • i�i�.r 1 @ $_ per sq ft = $ l • t�5� @ $ Persgft = $ 1 t3 • G t� : /I <i @ $_ �f per sq ft TOTAL VALUATION: 9 �2UX �`�' • �,r1 ,� 1st z /.2fper th sand or i > > c5rtion thereof �f r ,f • �'rl 1 ------------p---------- Total Building Fee $ ad/or FEES REQUIRED + Jk Filing Fee $ Mechanicai ; Fireplaces @ 15.00 $ pS Pltunbi' i BUILDING'PERMIT FEE $ Electric/New i ------------------------------------------------- Electric/Temp '!�? -�O- ? Septic Tank BUILDING PERMIT $ -'Ile 2- . Well WATER METER CHARGE $ �S�', Swhmiing Pool SEWER IMPACT FEE $ � c7 Sign WATER IMPACT FEE $ bc� c) . Water Connection MISCELLANEOUS $ Sewer Cormection $ Water Meter $ Elevation Certificate GRAND TOTAL DUE $ ---------------------------------------------------------------------------------------------- CALC[3LATIONS and/or NOTES "y City of Atlantic Beach Fixture Unit Worksheet for Water Impact Fee II i IXTURE UNITS ARE ESTABLISHED AS THE MEASUREMENT OF WATER DEMAND OR EACH WATER FIXTURE UNIT INSTALLED AND CONNECTED TO THE CITY )WATER SYSTEM. THE WATER SUPPLY CHARGE IS HEREBY FIXEDAT TWENTY OLLARS PER FIXTURE UNIT CONNECTED TO THE CITY WATER SYSTEM. A i IjABATHROOM GROUP CONSISTING OF _____SERVICE SINK TRAP STAND WATER CLOSET, LAVATORY & BATH (8) TUB OR SHOWER STALL (6) -----WATER CLOSET VALVE _____WATER CLOSET, TANK OPERATED (4) VALVE OPERATED (8) ___ I_BATHTUB/SHOWER (2) Z, ___ URINALiWALL LIP (4) _____SHOWER GROUP PER HEAD (3) _____FLOOR DRAIN ( 1 ) 1 _____SHOWER STALL DOMESTIC (2) __LAUNDRY TRAY (2) I __II_LAVATORY ( 1 ) _____COMBINITION SINK AND TRAY (3) I I _WASHING MACHINE (3) ____ '_POT, SCULLERY SINK (4) __DISHWASHER (2) 4-WASH SINK EACH SET OF FAUCETS (2) ____KITCHEN SINK (2) ✓� _____DENTALILAVATORY ( 1 ) 1KITCHEN SINK WITH WASTE 'GRINDER (3) ' DENTAL UNIT OR CUSPIDOR (1) ----- -----BIDGET (3) _____URINAL , STALL, WASHOUT (4) _ FLUSHING RIM SINK (8) COMBINATION SINK AND TRAY WITH +rr FOOD DISPOS. (4) _____URINAL, PEDESTAL, SYPHON JET I BLOWOUT (8) DRINKING FOUNTAIN (1/2) __-__LAVATORY, BARBER/BEAUTY 1 SHOP (2) _____LAVATORY, SURGEONS (2) SURGEONS SINK (3) ICE MAKER ( 1/2) -----WET BARj (2) I TOTAL FIXTURE UNITS__________ @ $20. 00 EACH $______ w JOB INFORMATION ------------------------------- l I w f a CITY OF ATLANTIC BEACH APPLICATION FOR BUILDING PERMIT Owner--�sLE1------- -------Address--------------------zip------phone Architect_,� ��L��� Address_ ' ��_(L 114 L ____zip :�a)Lphone DD :.014q Contractor ) CVS� t Address �1�P hone_ _33 --- 13CL� P _ Contractor's License number GL�}� �1expira on_�A.LC , 0:_L!�� Lot Block or Section Subdivision -_A __� Zoning________ Streetv�kc tA Ca L,�tt��betweenbLbI C _�6 L_side Type Construction 1-r4LL,yq (SL ._No. Units___ ------No. Fireplaces__,_ Purpose of Building_ Est. Valuation 8c a Utility Method - Water ------==---- Sever------------ Dimension wer------------ Dimensions - Buildings_ __ _Lot_L j# C,,r/t JZ�)5 Size Footings_c- Sz. Piers --- Sz. Si ls_____________Greatest Span Sills_______________ Sz. Ceiling Joists---------Distance on Centers---------Greatest Span_______ Sz. Floor Joists _________Distance on Centers---------Greatest Span_______ Sz. Rafters _________Distance on Centers---------Greatest Span_______ Method of HeatingL� 0 r 4t�l�'•t EVjCtl_�___Solid or Filled Ground Roof 3c- � ------- ---------- Flood Zone_LU�__If located within a FLOOD HAZARD ZONE complete page 3 In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with the attached plans and specifications, which are a part hereof, and in accordance with the building regulations of Atlantic Beach. The contractor agrees at its expense to provide the necessary access to the properties being developed over dedicated City rights-of-way and to clear, clean, grade, and drain said right-of-way to City specifications. Signature Owner _ ___-- - -_-- _ --Date----------------- Signature Cont r ctor_ Date /V e 2 APPROVED page CITY OF ATLANTIC BEACH BUILDING OFFICE t h FLOODPLAIN DEVELOPMENT INFORMATION Type of Development: -------------------------------------------- Flood Zone: ----------------------- Required Lowest Floor Elevation: If building is located within a flood hazard zone (Zone A), a survey must be made AFTER THE SLAB HAS BEEN POURED, certifying that the LOWEST FLOOR ELEVATION is equal to or above the base flood elevation established for that zone. No final inspection will be made and no certificate of occupancy will be issued until the survey is on file with the Building Department. COMMENTS: Applicant Acknowledgement: I understand that the issuance of this permit is contingent upon the above information being correct and that the plans and supporting data have been or shall be provided as required. I agree to comply with all applicable provisions of Ordinance No. 25-7-11 and all other laws or ordinances effecting the proposed development. Date..............Applicant's Signature__________________________ ---------------------------------------------------- Department Use Required Lowest Floor Elevation As Built Lowest Floor Elevation Survey Filed with Building Department ___________ ----------------------------------- Building Department Representative page 3 i APPLICATION FOR WATER METER / J DAT CONTRACTOR---- ------+ ------------------- -�.N._�----- BILLING ADDRESS:�J Q _ -_ w �. , --- ------ / SERVICE ADDRESS: `-'� LOT:,�v---BLOCK:�_--UNIT ---------SUBDIVISION -- ACCOUNT NUMBER:_____________________ METER SIZE: -- �i I HEREBY REQUEST THAT A WATER METER BE SET AT THE:, ABOVE SERVICE ADDRESS. I UNDERSTAND THAT I WILL BE BILLED - FOR TEMPORARY CONSTRUCTION WATER UPON SETTING OF THE METER. I FURTHER UNDERSTAND THAT I AM RESPONSIBLE FOR ANY AND ALL DAMAGES TO THE METER, BOXES, VALVES, LINES, AND ANY PARTS THEREOF, UNTIL PERMANENT WATER SERVICE HAS BEEN ESTABLISHED BY THE CUSTOMER. -�j7p-oa ---------------- O CONTRACTR � I I I -_ ..__ _�_ ^ -- ----- -_.------ CITY_ O ATL-A-NTIC-__ _B H I. I i ! i nn __ �__����� //CITY OF /� ri&G�f 4a /3�-"f Office of Building Official L"'I REQUEST FOR INSPECTION Date Permit No. Time A.M. � Received P.M. Czzz� Job Addre Local,y Owner's * �i'L Name ContractorBUILDING CONCRETE CONCRETE ELECTRICAL PLUMBING CHANICAL Framing ❑ Footing ❑ Rough Wiring ❑ Rough ❑ Air Cond. ❑ Re Roofing ❑ Slab ❑ Temp Pole ❑ Top Out ❑ Heating Insulation ❑ Lintel ❑ Final ❑ Sewer ❑ Fire Place �❑ Pre Fab � AA READY FOR INSPECTION Mon. Tues. Wed. FridayP.M. 2 7� A.M. Inspection Made P.M. Inspector Final Inspection ❑ Certificate of Occupancy ❑ G Date �,,,c MENT OF BUILDING Q L dfY OF ATLANTIC BEACH,FLORIDA PERMIT NO. PERMIT TO BUILD { ' THIS PERMIT MUST BE POSTED ON JOB ! / f8 . f3Ct3 Date Junr 28 19 88 t Valuation$ Fee$ 62.SO This permit not valid until above fee has been paid to City Treasurer,and is subject to revocation for violation of applicable provisions of law. This is to certify that B&G PLUMBING has permission to bi& INSTALL RI t1MRTN G, Classification RESIDENTIAL Zone Owned by NOBEL Lot Block S/D House No. 2343 BEACHCOMBER TRAIL According to approved plans which are part of this permit NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. PERMIT VOID SIX MONTHS AFTER DATE OF ISSUE Q . 4 i O Building material,rubbish and debris Zi from this work must not be placed in public space, and must be cleared I up and hauled away by either con- tructor or owner.. l Build in Official. FOR OFFICE PERMIT DATE CONTRACTOR USE ONLY NUMBER PLUMBING ELECTRICAL SEWER WATER 4A - %. . A06k , 6Hr, 977, CITY OF ATLANTIC BEACH , APPLICATION FOR PLUMBING PERMIT JOB LOCATION L Q� 70 ( ' tool L J _5 PLUMBING CONTRACTOR_��-� ' ,L LICENSE NUMBERS CF�'02.25?'-?? 'i OWNER (�,P.X t), Com r 4— C_1, BUILDING CONTRACTOR s TYPE OF BUILDING e_s ),t7) � SINKS I _SHOWERS LAVATORY WATER HEATERS BATH TUBS 1 DISHWASHERS URINALS DISPOSALS CLOSETS WASHING MACHINE FLOOR DRAINS OTHER I TOTAL FIXTURE COUNT INSTALLATION OF PLUMBING AND FIXTURES MUST BE IN ACCORDANCE WITH THE MOST RECENT EDITION OF THE SOUTHERN STANDARD PLUMBING CODE. UTILITY SERVICE AGREEMENT (Water and Sewer) �.d THIS AGREEMENT entered into this day of , 198 e, between the City of Atlantic Beach a Municipal corporation, hereinafter called "City", and a corporation, its successors and assigns, hereinafter called 'Developer". W I T N E S S E T 1-1 WHEREAS, Developer owns land in Duval County, Florida, more particularly described as refer to acre e, plat engineering draw�ings, or legal description as Exhibit A L and WHEREAS, Developer planes to develop said land by constructing ' buildings,* / residences and/or other improvements thereon consisting of ' and WHEREAS, City is the owner of water and sewage treatment plants and water distribution and sewage collection systems in the vicinity of the property described above; and WHEREAS, Developer desires that City provide water and sewage collection service to said property and City desires to furnish same; and to them and to their occupants water and sewer service subject to all terms and conditions of this Agreement; and WHEREAS, in order to provide water and sewer services to Developer it has been or will be necessary- for City -to enlarge and expand its offsite water and sewer plants and facilities and it is the desire and intent of Developer to contribute financially to the costs of building such additional offsite water and sewer plants and facilities and to reserve capacity in City's water and sewage treatment plants so that City can provide service to .the Development without imposing a burden on its existing customers; NOW, THEREFORE, in consideration of the premises and other good and . valuable considerations and in consideration of the mutual covenants and conditions hereinafter contained, subject to any necessary approval by other governmental agencies having jurisdiction, it is .agreed by the parties hereto as follows: 1. Developer agrees that City shall have the exclusive right to furnish water and sewer service to the real property described above and hereby grants to City. this exclusive right..to provide water and sewer service for all uses within all structures now or hereafter constructed on the real property described above. 2. City agrees that after Developer has connected to the systems of City, City will provide at its own cost and expense, water and sewer service to Developer's property in a manner conforming to the reasonable requirements of public or governmental agencies or parties having jurisdiction over City's water and sewer operations; provided, however, that such service shall be in accordance with other provisions of this Agreement, including City's rules and regulations and rate schedules. 3. In the event that Developer or assigns fails to complete construction of all improvements required to be built by Developer and Agreement under this provision, City reserves the right to negotiate with Developer a new agreement for any additional sums to be paid by Developer to City as plant capacity and service availability charges, fees or other charges based upon increases in the cost of living and/or such other factors as relate to the cost of supplying water and sewer service. 4. All taxes or charges imposed upon the property described above by any governmental entity or agency shall be paid by Developer except such part thereof that has been deeded to the City in accordance with tho terms of this agreement. 5. The rates charged by City for water and sewer service shall be in accordance with its rate schedule which shall be subject to change . from time to time. City shall have the right to determine reasonable meter size and location. 6. Developer will grant to the City, at Developer's expense, adequate easements for water and sewer lines, for access to lift stations and water stations and related appurtenances. Said easements shall be transferable. Developer will also furnish title evidence satisfactory to the City that said easements are superior to mortgages or other interest in the land, and Developer shall cause any such mortgages to be released or subordinated to said easements. Easements will also be furnished to provide for onsite water distribution lines, including meters and sewage collection lines. Sites for lift stations and water stations and related appurtenances shall be conveyed by warranty deed in fee simple by Developer • to City. Developer will furnish City a warranty deed, title evidence satisfactory to City and any releases from lien holders for any sewage pumping station and water r to said state road right-of-way. Developer shall further grant to the City, its successors and assigns, the exclusive, perpetual right, privilege and easement to construct, reconstruct, operate, maintain, repair, replace, improve, alter, remove, relocate and inspect water transmissions and distribution mains, sewer collection mains, sewer lift stations, pipe lines, lateral lines, valves, connections and appurtenant equipment over, across and under the Developer's property, including the right to ingress and egress to eac(i of the building sites on Developer's property which are served* by City. All such easements shall have a .width which is acceptable to the City. 7. City does not guarantee an uninterrupted supply of water, or water at any particular pressure, and reserves the right to shut off the water in its main at any time for the purpose of making repairs or extensions of for providing temporary or emergency water supply. City will not be responsible for any damage caused by low pressure or interruption of service. Neither Developer nor any of its successors or purchasers shall discharge into the sanitary sewer system water from "non-domestic" drains including without limitation swimming pools, air conditioning condensation lines, cooling lines or other discharge from any type of equipment. City shall not be obligated to furnish any water or sewer service to any building which is built on Developer's property to which the City does not have access. The Developer hereby agrees and warrants that the City will not be held responsible for flooding problems which may result from the failure of sewer line back flow preventor valves on Developer's property. The Developer hereby agrees to hold harmless and indemnify City for all costs and damages resulting from flooding due to .back flow preventor valve failure. B. The construction and design of all facilities to be trnncfnrro.l t., ar.,► 4— t.,. ,...... ._t ..._t Developer or its contractor. Developer will pay the cost of all such construction. The Developer's engineer shall incorporate into the Developer's engineering design, plans and specifications the applicable standards and specifications of the City. 9. A. If the Developer modifies his development plans for Developer's property which would require greater water usage, greater fire flows, additional water facilities, greater sewage flows, or additional sewage facilities than the water and sewer demands previously approved by the City, then the Developer must obtain approval by the City for the construction of such additional water or sewer facilities which shall meet all City and governmental design requirements. The Developer shall pay all additional contributions and fees as may be authorized by the City's, service availability policy which is in effect on the date said new agreement is executed. B. In addition to paragraph 9A above, any other change order between Developer and its utility contractor issued after City approval of original plans must be approved by the City before the change order is put into effect. C. City shall have the right to review the systems design drawing and specifications to ensure that they meet the requirements of the City. The systems design drawing and specifications are to be in accordance with the City of Atlantic Beach requirements unless otherwise .specified by City or its engineer. D. The City also reserves the right to approve the utility contractors to which construction bids are sent by Developer as well as the contractor to which the award is made. C. A representative of City or its engineers will be the inspector of the project along with the Developer's engineer, but City absolute and exclusive owner of the facilities of said water and sewer systems whether located on, under, above or outside of the property described and regardless of who may have installed or constructed same to the extent described below: A. All water mains, pipes, valves and fittings and appurtenances up to and including all meters shall be dedicated to and will be owned, operated and maintained by City,. All water pipes on the customer's side of the meter shall be owned, operated and maintained by the customer or its assigns. B. All sewer mains, manholes, pumping stations, force mains and appurtenances, including service pipes in public right of ways and dedicated easements, shall be owned, operated and maintained by the City. Except as provided in paragraph 9C, all sewer lines on the customer's side of the property line shall be owned, operated and maintained by the customer or its assigns. C. With reference to any blanket easements for multi-family projects such as apartments, mobile home developments, condominiums and PUD's or for commercial developments, all water mains to and including the water meter, all sewer mains, force mains and manholes in such blanket easements over private property allowing utility operations shall be dedicated to and shall be owned, operated and maintained by the City except that the full length of sewer services from the sewer main or manhole shall be owned and maintained by the customer. All such City lines shall terminate with a manhole. D. By these presents, Developer hereby transfers to the City, the title to the water distribution and sewer collection systems to be installed pursuant to this Agreement, such conveyance to take effect without further action upon the completion and acceptance by City e -- _ f _ ---i-I I -.1 e- t.—1.-- —..,-1—"_- -c --0 1 I - . 11. Developer shall pay the City upon, execution of this Agreement the sum of 10¢ per water connection per equivalent residential connection (ERC) as an advanced deposit to cover engineering, plan review, inspection, test, legal and administrative expenses of City in connection with this Agreement. Developer shall also pay to City upon execution of this Agreement the sum of , 10 per sewer connection per ERC as an advanced deposit to cover engineering, plan review, inspection, tests, legal and administrative expenses of City in connection with this Agreement. The charges for engineering and legal expenses and for engineer's inspection and plan review. fee for non-residential units shall be based upon estimated cost to City: Actual cost will be determined and a refund or additional charge will be made for the difference between the advanced deposit as calculated above and actual costs. City agrees to . provide water and sewer service . to the Developer's property in consideration for plant capacity charges, fees and other charges to be paid by Developer as follows: ' A. A water plant capacity charge at the rate of $20.00 per fixture unit. Such charges shall be due and payable as provided in paragraph 12. B. A sewer plant capacity charge at. the rate of onethousand thi:rtyfive dollars ($ 1,035.00 ) per single family unit. Such charges shall be due and payable as provided in paragraph 12. C. A sewer plant capacity charge for any commercial customers on the land as described above at the rate of s 1 D. A meter installation fee to cover meter cost and meter installation (but not including curb stop or meter box) according to the City's service availability policy at the time of installation which currently is $85.00 Der 3/4" x 5/8" meter E. If available, construction ,water will be charged to building based on metered usage in accordance with current rates. F. Hydraulic share of main extensions - payment or refund. 1. developer recognizes that water or sewer utility service to the Developer's property.. is prqvided by the use of a mein a extension and other improvements constructed by a prior developer and that Developer is obligated to refund a said prior developer'Developer's share of the cost of said main extension or other improvements. Accordingly, Developer shall pay its pro rata share of the cost of said' main extension or other improvements to City. Said pro, rata share shall be based on Developer's percentage of the hydraulic capacity of said extension or other improvements. For the purpose of this Agreement, the cost of Developer's said hydraulic share shall be $ payable upon execution*of this Agreement. 2. With respect to utility facilities installed by Developer to which future developers connect directly, and .in consideration for monies expended by Developer toward said facilities, City shall refund to Developer, or Developer's successors or assigns, solely from monies collected from said future developers, said future developer's pro rata share of the cost of said facilities. Said refunds shall be calculated on the basis of the liydraulic capacity and demand of said future developer whenever feasible. The refund obligation of City hereunder and the benefits to Developer related thereto shall expire at a cost of $ 12. All charges to Developer shall be paid by Developer to the City in accordance with the following formula and procedures: A. The advance deposit for engineering, administrative and legal fees and the inspection and plan review fee upon the execution of this Agreement, a total of and B. Water plant capacity charge upon the execution of this Agreement, a total of $6 to a and C. Sewer plant capacity charge upon the execution of this Agreement, a total of 1.035 ; and D. Meter installation fee according to the City's service availability policy at time of installation which currently is gr'sr D d' • upon application for hook-up of individual lots, apartments, multi-family lots or units; and E. Construction water based on meter readings in accordance with City's rate schedule; and F. llydraulic share payment, in accordance with paragraph 11F-1 of this Agreement upon execution of this Agreement, in a total amount of $ ,4 . . . . " ' . . . . and G. Service availability charges and other additional aids in construction in accordance with paragraph 11G of this Agreement in a total amount of payable . . . . . . . . . 13. City agrees to connect individual buildings and structures on the developed property upon application by the builders, plumbers or individual owners subject to the operating rules and regulations of the City and payment of all fees and charges in effect on date of application and compliance by Developer with all provisions of this Agreement. 14. The charges, costs and fees for any separate emergency fire protection water systems. for subject project will be subject to negotiations between City and Developer. If buildings of more than two stories are a part of the project, Developer shall furnish at its expense water pumps and other appurtenances as necessary for pumping water above. 15. All plant capacity and service availability charges, fees and other charges as outlined above are based on normal domestic sewage defined herein as containing not more than three hundred (300) parts per million biochemical oxygen demand or three hundred (300) parts per million suspended solids. Whenever water which contains more than these amounts is to be admitted to the sewers, both the City and the pollution control agencies must specifically agree to the connection. An additional charge will be calculated in direct proportion to strength at seventy-five cents ($0.75) for each part per million of either biochemical oxygen demand or suspended solids over three hundred (300) parts per million. All such connections shall provide for a suitable point for the waste to be sampled by the City or the regulatory agencies. An additional charge equal to the pro rata share of any additional sewage treatment plant costs above ninety percent (900) treatment, and of the cost of any additional required outfall pipes to Qi may be required by City, subordinated to the terms of the Agreement and easements required herein prior to any acceptance of the facilities by the City'. 17. Upon application by owners, builders or their authorized representatives, the City agrees to connect the requested dwellings or structures on the said property at no additional connection fee (i.e. , in addition to those provided for above in this Agreement) , but subject to the continuing operating rules and regulations of the City including, without limitation, the periodic payment of the water usage and sewer usage charges in effect on the date of such application or thereafter reflected in the City's rate schedule. 18. This Agreement shall be binding upon and shall inure to the benefit of the Developer, City and their successors and assigns. However, in the event the Developer has not paid and delivered to the City the plant capacity and service availability charges, fees and other charges provided to be paid to the City by Developer under the terms of ,this Agreement, and all easement and conveyances required by this Agreement, then this Agreement shall not inure to the benefit of the successors or assigns of the Developer. 19. It shall be the responsibility of Developer to locate for builders any water and sewer taps or lines necessary in conjunction with residential or commercial construction. ' 20. Unless the damage to any onsite improvements are the result of the negligence or willful act of the City, its officers, or employees or authorized agents, the owner or Developer .of such property upon which the damage occurs shall be responsible for the payment to the City of such damage to City's property including all necessary and reasonable repairs which must be made by the City or independent contractors engaged by the City to effect such repairs. if the owner nr .dorm.,.— ~ prior hereto, for the payment of such necessary and reasonable costs and expenses for effecting such repairs and restoration to such onsite facilities located upon the owner's or Developer's property. Notice of such lien or claim on lien describing the real property and the amount owed may be filed within ninety (90) days of the date from the last date upon which any such repairs or restoration were made by the City or its authorized representatives. Thereafter, the City shall be entitled to bring an action for the foreclosed under the laws of Florida. 21. Prior to final acceptance of the utility and other public facilities improvements by the City the following requirements must be met at Developer's expense: A. If the property is platted, one copy of t)ie recorded plat shall be furnished to the City. B. "As built" drawings of utility improvement shall be furnished one week prior to final inspection. "As built" drawings shall be certified by a registered engineer with the cost being borne by the Developer. Two mylar and three printed copies of said drawing shall be furnished to City. C. All lot corners shall be properly marked so that utility company or its engineer can, upon receipt of "as built" drawings, verify the marked water and/or sewer services as to location and depth. In addition, for purposes of locating and protecting installed service lines and valves Developer or his contractor shall mark each service line and all valves with an eight (8) foot pressure treated wooden post . in the manner as shown on the design drawings and specifications. Developer's contractor is required to install curb stop, meter box and valve box on each water service and valve as shown on design drawings, D. All water and sewer services and valves shall be marked irrevocable letter of credit, the terms of which will indemnify and save harmless the City from any loss, damages, costs, claims, suits, debts or demands by reason of defects in the•workmanship or materials used in the facilities discovered within a period of one year from and after the date of acceptance by the City of the facilities. , C. A Bill of Sale for facilities from the Developer to City. , G. Conveyance of easements as required under this Agreement. If. A deed for .any and all land on which lift stations or water stations or other improvements if required by City. 1. The title evidence, mortgage . releases and mortgage subordinations as required in this Agreement. . J. For onsite and offsite co►}struction provide City an accounting of the actual costs (schedule of values) and releases of liens from utility contractors in such detail as the City requires. K. City shall have the right to refuse to accept title to Developer's construction until Developer's construction has passed certain tests, including, without limitation, closed circuit television inspection of the gravity sewer lines, witnessed by a City representative, to determine whether the Developer's construction is constructed in accordance with the approved engineering plans and specifications. Said tests may be performed at -least three (3) times: the first test upon completion of the system; the second test upon completion of all building, roads, paving, drainage, and all construction within the right-of-way easement area of adjacent areas. A third test shall be required if the City deems it necessary within a one (1) year period after acceptance. L. Letters of acceptance from the appropriate regulatory agency for the water and/or sewer system, are required prior to final '1 22. All notices that may or must be given under this Agreement shall be in writing and shall be valid if mailed by United States registered or certified mail, postage and charges prepaid from addressed as follows: To Developer,: To City of Atlantic Beach City Manager 716 Ocean Boulevard Post Office Box-25 Atlantic Beach, Florida 32233 IN WITNESS WHEREOF, the parties hereto have executed this Utility Agreement the day and year first written above. Signed, sealed and delivered in the presence of: D eloper Witness City o Be c i . Wztness f