Loading...
Permit 1872 Beachside Court c"n o G/.D Lot r LOT 3 P,Pv�'as,�D REsi©ENG.E o. CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH,FL 32233 INSPECTION PHONE LINE 247-5826 09-00000727 Date 5/27/09 Application Number 1872 BEACHSIDE CT Property Address . . . • Application type description MECHANICAL HVAC ONLY TO BE UPDATED Property Zoning . • • 0 Application valuation . . . ------------------------ Application desc 1 cu 1 ahu -------------------------- SHL(F) U.S.DEPAPTMENT OF H(kl 4 A.ND LiRBAN DEVELOPMENT . • FEDERAL HOUS7',Ir ADMINISTRATION FHA Form 2005 For accurate register e: carbon copies, form. Form Approved VA Form 26-1852 may be separated along above fold. Staple. OMB No. 63—R0055 Rev, 2/75 completed sheets together in original order. ❑ Proposed Construction DESCRIPTION OF MATERIALS No. (To be inserted by FHA or VA) ❑ Under Construction Property address City State Mortgagor or Sponsor (Name) (Address) Contractor or Builder (:Name) (Address) INSTRUCTIONS 1. For additional information on how this form is to be submitted, number required,then the minimum acceptable will be assumed. Work exceeding of copies,etc., see the instructions applicable to the FHA Application for minimum reyuirementa cannot be considered unless specifically described. Mortgage Insurance or VA Request for Determination of Reasonable Value, as 4. Include no alternates,"ar equal" phrases, or contradictory items. the ease may be. (Consideration of a request for acceptance of substitute materials or equip 2. Describe all materials and equipment to be used, whether or not shown ment is not thereby precluded.) on the drawings, by marking an X in each appropriate check-box and entering 5. Include signatures required at the end of this form. the information called for in each space. If space is inadequate, en.er 6. The construction shall.be completed-in compliance with the related See mist, and describe under item 27 or on an attached sheet. THE USE drawings and•spruc icn sho,.aa amended during processing. 7ha-specifi• LE PAINT CONTAINING MORE THAN ONE HALF OF ONE PERCENT cations include this`Description of Materials and the applicable Minimum LEAD BY WEIGHT IS PROHIBITED. 3. Work not specifically described or shown will not be considered unless Property Standards. 1. EXCAVATION: Bearing soil, type Sandy Clay Loam 2. FOUNDATIONS: Footings: concrete mix 2500 Pe S e I• strength psi Reinforcing 2 -3* Dia; :st. Rods Foundation wall: material Reinforcing _Where Required Interior foundation wall: material Party foundation wall Columns: material and sizes Piers: material and reinforcing Girders: material and sizes Sills: material Basement entrance areaway Window areaways Waterproofing Footing drains Termite protection 5 Year Bond— Soil Poisoning Basementless space: ground cover ; insulation_ ; foundation vents Special foundations Additional information: Concrete Slab Reinforced with 6"X6_" #10 wire Mesh (3000 # P.S.I. Concrete See Plan) 3. CHIMNEYS: Material Prefabricated(maks and rite) Flue lining: material Heater flue cize Fireplace flue size _ Vents (material and site): gas or oil heater ; water heater Additional information: _ 4. FIREPLACES: Type: ❑ solid fuel; ❑ gas-burning; ❑ circulator(make and site) Ash dump and clean-out Fireplace: facing ; lining ; hearth mantel Additional information: See Fireplace Detnll & Floor Plan S. EXTERIOR WALLS: Wood frame: wood grade, and species 2nx4w Fir Const, Gr E] Corner bracing. Building paper or felt Sheathing QYDlaD ; thickness a rt width 4t ❑ solid- spaced " o. c.; ❑ diagonal.al; C,yPa�ss sidingHarrboard Lapgrade s n A types Read, size _ ; exposure fastening Shingle grade type_ size ; exposure "; fastening Stucco thickness Lath ; weight lb. Masonry veneer A-110W- -1.115_ o GG Sills Lintels Base flashing Masonry: ❑ solid ❑ faced ❑ stuccoed; total wall thickness _ "; facing thickness "; facing material Backup material thickness "; bonding Door sills Window sills lintels Base flashing Interior surfaces: dampproofing, coats of furring Additional information: Exterior painting: material number of coats Gable wall construction: ❑ same as main walls; ❑ other construction 6. FLOOR FRAMING: r Joists: wood, grade, and species �-X f0 ; other ; bridging —� ; anchors Concrete slab: [LJ"basrmeynt floor; ❑ first floor; ❑ ground supported; 0 self-supporting; mix thickness DESCRIPTION OF MATERIALS 9. PARTITION FRAMING: Studs: wood, grade, and species Fir CnnatrUctinn GRaand spacing "=4"@ 1.6" G•Csother Additional information: 10. CEILING FRAMING: Joists: wood, grade, and species S- #2 12 00 Other Bridging Additional information: 2"X 8Is 01 ~ 0.C 11. ROOF FRAMING: Rafters: wood, grade, and species _ Roof trusses (see detail): grade and species Additional information: 2„ rg,' a " a.C. 12. ROOFING: to Sheathing: wood, grade, and species Shpath i ng argde Plywood ; ® solid; ❑spaced--_:"oc. RoofingAsrlhalt ; grade 15 Year ; size 1 "Y36"type -Comnonition, Sealtab Underlay As;halt TMDT-@$nRt#'cl Ft' 1 t weight or thickness____; size 36" fastening Ga1Y, Na 11 Built-up rooftng number of Flies ; surfacing material Flashing: "terial Sia'l.T. ; gage or weight 26 00, - ; ❑ gravel stops; ❑ snow guards Additional information: 13. GUTTERS AND DOWNSPOUTS: Gutters: material gage or weight ; size ;shape Downspouts: Material ; gage or weight ; size ; shape ; number Downspouts connected to: ❑ Storm sewer; ❑ sanitary sewer; ❑ dry-well. ❑ Splash blocks: material and size Additional information: C-8-"lWorlized Rain nef3 ectart At All F.ntri ett 14. LATH AND PLASTER Lath ❑walls, ❑ ceilings: material ; weight or thickness Plaster: coats ; finish Dry-wall Id walls,(2 ceilings: material ; thickness---i" ; finish PA i n t Wort 1 1 a & Te 7 t- CL6 Joint treatment g " Soeetrock_S2n Ceilimgm--`t'o Re Tilown ) 15. DECORATING: (Point, wallpaper, ek.) r ROOVS WALL FINISH MATERIAL AND AnUCATION CEiuNc FINISH MATERIAL AND AnUCATION Kitchen a 11paper Installed TextureA--RI own Bath Other Fntru „ „ r, " .. Other 1i Onat Size 2 Coats tOX Additional information:_PA Mob l Family Rnnm $ Per Shiest 16. INTERIOR DOORS AND TRIM: Doors: t ype _ material Fir ; thickness 1e+ Door trim: type ; material Fi r Base: type : material Fir ; size-- Finish: doors y f_0AtAi 7r Rr 2 Cnatm Varnish mm2 r t,_% 011 Raeg Other trim (iteral,ape and location) Additional information: 17. WINDOWS: urt~ Windows: type nplybl ►x$1117$_; ma�rA WWT StL� C r_ ; material I V*A I IJ%JVIA ; sash thickness 1. 3/8" Class: grade q_RP=NSQkA".iCb : ❑ sash weights;X) balances, type S rel i ng & S i res l ; head flashing Vinyl Trim: tym material Fir Paint 2 Griatm TA teY ; number coat 2 Weatherstripping: type Tn.tinn ; material Alumin Um Storm sash, number Screens: (j full; ❑ half; type number ; screen cloth material_A112mi num Basement windows: type material - ; screens, number ;Storm sash, number Special windows Additional information: 18. ENTRANCES AND EXTERIOR DETAIL: //ll,, 0 Main entrance door: material Fi r width " ; thickness 1--�`/4 Frame: material Fir thickness 1-3,/4 Frame: material Fir ; thickness�rr " ; Other entrance door: material F'_] 1"' ' width'-"32" 'thickness_'�' -5Z4- Head flashing Weatherstripping: type�to1n1 _!ts StcCl ; saddles Alum, 8Vll � Screen doors: thickness "; number screen cloth material Storm doors: thickness ";number Combination storm and screen doors: thickness number ; screen cloth material Shutters: ❑ hinged; M fixed. Railings ,Attic louvers Exterior millwork: grade and specie+) 1 Fir Paint G1 t t A i d e O i l Rase ; number coats 2 Additional information:8",r16" Hama in_#A1, Fi16 CarniMh, Vent-; @ 81 on Centel 19. CABINETS AND INTERIOR DETAIL: See lineal feet of shelves : shelf width LL" ch 1 Ri �(�d l_1� Kitchen cabinets, wall units: material � T.--l.— Raw units: material RIli" Rir h Pl�mnn.d counter top,r+minstLd Plattif` ; edgingT•Ami_nated Plastic Back and end splash s" Tam- P1 :I s t i r+ Finish of cabinet Stain Varnish number coats 3 Medicine cabinets: makeMiltmi Crghy Wal l h1irrnr ; model ?1 04 TYP, huilt.:n furniture VA n i tRr T13 Ra th Sec mr A, K i t('h!°n .Stell)1 ne is _. SC LA 21. SPECIAL FLOORS AND WAINSCOT: L4)cAT10N MATERLAL, COLOR, BORDER, SIZES, QAGE, ';Tc. THReeHOLv LL WABASE UNDERFLOOR MATERIAL MATERIAL MArtRIAL Kitchen Vinyl $8,50 S. .Yd . Install-e-(.- Aluminum Wood Bath Ceramin ' or �- Entry Vin S „ All 0th r- Carpet So . Yd. Installed Wood I " I.00ATtoN MATERIAL, COLOR, BORDER, CAP.SIZES, LACE, ETc. HEIGHT HEIGHT HEIGHT IN SHOwER1 AVER Tus (FROa,I FLOOR) Bath Ceramin Tile Around Tub r 72" 3 Famil aom " Panel Allow 9 " Bathroom accessories: ❑ Recessed; material number 6 ; E]Attached; material Chrome numbcr3 Per Bt Additional information: 22 PWIIABING: FtxruRE NuwszR Locwnorr MARE MM'S FIXTURE IDENTIrIGATIoN No. SIZE COLOR Sink K t hen American Stand7018-013 2"x21" alar Lavatory Baths to It Cr lin 1811 Shite Water closet Baths of of 22122-037 Cadet " Bathtub Baths to " Bildor 0"x 0" " Shower over tubes Stall shower& See Plan Laundry trays Notes 0 t IFiberglass Shu er See lan Where Used A29 Curtain rod A Door ❑ Shower pan: material Water supply: [ :public; ❑ community system; ❑ individual (private) system.* Sewage disposal: [t public; ❑ community system; ❑ individual (private) system.* *Sham and describe individual system in complete detail in separate drawings and specifications according to requirements. House drain (inside): ❑ cast iron; ❑ tile;'C other P.V.C• House sewer (outside): ❑ cast iron; ❑ tile; [�J outer P•V•C• Water piping: ❑ galvanized steel; [copper tubing; ❑ other. Sill cocks, number Domestic water heater: type ; make and model Rheem ; heating capacityDouble Ele-men .Q tinkk e4 gph. 100' rise. Storage tank: material GalVanized Iron Glass LipaAcity - '57. gallons. Gas service: ❑ utility company; ❑ liq. pet. gas; ❑ other_ Gas piping: ❑ cooking; ❑*house heating. Footing drains connected to: ❑ storm sewer; ❑ sanitary sewer; ❑ dry well. Sump pump; make and model capacity discharges into 23. HEATING: ❑ Hot water. ❑ Steam. ❑ Vapor. ❑ One-pipe system. ❑ Two-pipe system. ❑ Radiators. ❑ Convectors. ❑ Baseboard radiation. Make and model Radiant panel: ❑ floor; ❑ wall; ❑ ceiling. Panel coil: material ❑ Circulator. ❑ Return pump. Make and model capacity gpm. Boiler: make and model Output Btuh.; net rating Btuh. Additional information: Warm air: ❑ Gravity. ❑ Forced. Type of system E l e C tr i C Warm A i r Duct material: supply GalYanized: retumgallranized InsulationVap• Harthickness 2/r ❑ Outside air intake. Furnace: make and model See Heating Plan Input_ Btuh.; output Btuh. Additional information: 0 Space heater; ❑ floor furnace; ❑ wall heater. Input Btuh.; output Btuh.; number units Make, model Additional information: Controls: make and typeSAutomatic Electric Thermostat Additional information: Fuel: ❑ Coal; ❑ oil; ❑ gas; ❑ liq. pet. gas; ❑ electric; ❑other_ storage capacity Additional information: Firing equipment furnished separately: ❑ Gas burner, conversion type. ❑ Stoker: hopper feed ❑; bin feed ❑ Oil burner; ❑ pressure atomizing; ❑ vaporizing Make and model Control Additional information: Electric heating system: type__ Input watts; @ volts; output Btuh. S DESCRIPTION OF MATERIALS 26. INSULATION: LocATIoN THImmms MATLRIAL, TYr6, AND MEMOD Or INSTAII.ATION VAPOR BARRILR Roof Ceiling •• er a s Batts Between Ceiling Joilt Wall 31 " // Studs R- 1 Floor 27.. MISCELLANEOUS: (Describe any main dwelling materials, equipment, or construction items not shown elsewhere;or use to provide additional information where the space provided was inadequate. Always reference by item number to correspond to numbering used on this form.) A. ( Item 24 ns a ryes onnec ion en C. Install Recessed Washer & Dryer Connection HARDWARE: (make, material, and finish.)—Kwill Set I is n n r Tire Po 1 ; e- h.ri Armg,4R I f4erit ' Hinges & Pulls nn u; tch.n rah. a t4 1D4*i'' + ' HiTll ecz i P11113 Cln Rnth C:ahin&tn SPECIAL EQUIPMENT: (Stall material or make, model and quantity. Include only equipment and appliances which are accept- able by local low, custom and applicable FHA standards. Do not include items which, by established custom, are supplied by occupant and removed when he vacates premises or chattles prohibited by low from becoming realty.) - -�, UL 16?Smoko Deteoto r-In lull cu fedreunms PORCHES: P1nor 1 4" Concrete Slab On Fill itnnfI Same As House TERRACES: C:tai l ince: 3/8" Exterior Ci ad . P1=00d > GARAGES: 6 ;1 i 1. Poly F'1nor s 4" Concrete Slab On Grade And/ Or Fill (IY"embrane Under) Roofs .Same a4 House C:P tlings 5/' Sheetrock ( Tex meed_ Blown) WALKS AND DRIVEWAYS: Driveway: width_; base material thickness "; surfacing material Concrete ; thickness 4 Front walk: width 31 materia1QQnCrett* ; thickness J ". Service walk: width ; material ; thickness " Steps: materWRri t,k ; treads 1 1 ; risers 71 Cheek walls OTHER ONSITE IMPROVEMENTS: (Speriy all exterior onsite improveinents not described elstwhere, including iernu Duck as unusual grading, drainage structures, retaining tvalls,Jena,railings, and armory structures.) _(',rade_ & Generally Smooth Off Entire Lot, Removing All Debris & Forieapn I. atter - LANDSCAPING, PLANTING, AND FINISH GRADING:Allow $285. 00 Topsoil " thick: ❑ front yard; ❑ side yards; ❑ rear yard to feet behind main building. Lawns (seeded,sodded,or sprigged):$] front yard_S ted__; ® side yards S te d ] rear yard_Seed Plantine: (1 as stxcified and shown on drawintrs: rl as follows: MAX.OVERAIL SPANS SPECIES 3 GRADE MAX OVERALL SPANS NOTE (with 4"biewine) BASED ON THE 1970 (with 4" bearing) OVERALL SPANS SHOWN ARE 4ASED 2x4 TOP 2xsE^ 4 81M. GRADING RULES 2x4 TOP 2x4 STM, o►. USE or A 4"NOMINAL wtoTN OF BEARING. UNLESS OTHERWISE SHOWN, "tc CHORD L CHORD}L 1 w W ?A , S r It 1 CHORD,� CHORD$, UP TO B" OF REARING MAY of USED 172 -372 Ilh,x 3� IV%3Sfa, 1%-3`,a' 4 THWHICHE ASAz OVERALL SPANCOFAR`. �95� '8 1.33' -4 3S' - 6 lot Fir-torch Solea Structural 3 5'- 7 38'-0 " 44�-�6 32'-4 32' -10bsFir-lord+ No. 1 34'-6 " 35'-10 " �— . _ �� �� + 101.641.29 3 28 -9 fir-lords Na 2 31 9 31 -3 31'-§ - Fir-South Select Struchrol 3 •-7 •' 381-0 " ° 2 0'- 1' Fir SOUR N 1 32'-7 " 34 -6 " FORCE DIAGRAM 289- 1 " 281- 2 Fir SouM Pio.2 301-6 " 301-9 of 30'-)0 " '- 4 e--Fir Select Structural '_10 " 34 — 2 " TIGHT FIT 28'-11 " 28' -2 6-Fi No. 1 31 '-5 30'-9 " 35'-4 " 4'- No. 2 7'- 7 " 26' - 10" 5x6 Alt to{ 30' -4 32'-2HvinlockSElect StnwNml 32 -3 " 35'- 0 " splice 9'-4 " 9'-0H"lock No. 1 31 - 3 " 31 '- 8 " 25 -9 2 5 -b Hemlock Na 2 27'-10 27'- 11 301 -0 " 31'-4 " M lunldn HO-606 Now-Fir SA 32'- 0 " 34' - 2 " 29'-11 " 281- 2 " owdow Hemlock HB*-Fir No. 1 3 0'-10 " 30' -9 " 25'-2 " 24'-8 " . Hemlock fleiw.Fir Nat 27'- 3 " 26'-10" POPjO9are 3x 24'-3 " 3 ' Pine Salvo Structural KD 36'- 6 " 38'- ° 35'- 8 " 35 - 8 " So.Pine Dense Select Structural KD 38 -0 " 38'- 0 " 2 x 2 to 32'- 3 3'-2 " 34'_2 Pne No. 1 K D S - 4 " 37' - 3 " 2 x3 to 39-0" 34'- " $a.Pine M i Dense K D 360-1014 3 " 28' -5 " 27' - 4 " So.Pine No. 2 KD 30'-10 " 29'-10" 31'-0 " 30'- 4 " So.PiweNo. 2 MG KD 33'- 2 " 33' - 0 " 12 32'-8 " 33'- 6 " So Pine No. 2 Dense KD 34' -10" 36' - S " 4 EQUAL AREAS 1„(� 33' -4 " 35'-$ So Pine_ elect Structural AD 35'- 8 " 38' - 0 " EAUAS AREAS L� 34'-9 " 3 S'- 8 " So.Pins Dense Sol.Strut. A D 137'- 0 " 380- 0 12 \\ 2 1 32'-2 2'-3 " So.Petr No. 1 AD 34'- 4 " 35' - 2 " 33' - 7 35'-8 " So.Pine L4o. 1 Don" AD 35'-10" 38'- 0 " 26'= 9 " 26'-2 ISa, Pine No. 2 A D 29' - 0 -1 28$- 6 " - 2x 4 1" 29'- 4 "123'-10 " So.Pine 2 MG AD 31'-10" 1'- " 31 '-B 31' -11 " So.Pine Na 2 Dene A '- 9 " 3A'- 8 '• F/4 2.S x 5 to 26'-0" 2. 5 x 6 to 31' -0" 3 x 2.5 x 7 to 35' -6" t M 2.S x 8 to 36' -0" W E d E M d E R S :� o�f the obove listed gradin rear be used for web members includin8 Construction f*mlock, Douglas Fir or Na 3 So. Pine. Alt. bottt N O T E All lumber shall be culled to eiiminoMpitces with excessively large or O veroll Spon loose knots, or which have a slope of grain steeper than i in 6. THE SAAITH-OAIP CONNECTOR PLATE {S T C A BEARS NO RESPONSIBILITY FOR THE MAX. TRUSS SPACING 2'-I]"4 c. � COAAM, MADE FROM 18 a 20 GAUGE, A GRADE, ERECTION OF TRUSSES IN ACCORDANCE WITH NOT DIPPED GALV. STEEL. PAIRS OF 1/8" THIS DESIGN. PERSONS USING SUCH TRUSSES LIVE LOAD 33 33 PS F (*. 46 Ot �4 4 wloE TJtt" LONG INTEGRAL CRIMPED MUST PROVIDE ADEQUATE $RACING WHICH IS DEAD LOAO�— - tTEE iN ARE ►UNCH(D PROM THE ►LATE IN ALWAYS REQUIRED TO PREVENT TOPPLING A CEILING ',OAD 13.33 P S P Den 12-19-7DROWS WHICH ARE 3/1S" APART ACROSS TILE "00MINOING". CARE SHOULD R[ EXERCISEDPypWIDTH OF THE PLATE. THE ►AIRS ARE SPACED AT All TIMES TO AVOID DAMAGE THROUGH 331/3 -/. UNIT STRESS INCREASE Dsdpn�J by T A 1 t/Vio.c. IN LONGITUDINAL ROWS. THERE CARELESS HANDLING DURING UNLOADING THIS 1RUS1 HAS $FEN DESIGNED TO MEET - ARE SIX TEETH PER SQUARE INCH OF ►t ATE, STORING AND !RECTION. AP►LICABIE PROVISIONS OF THE " NAT'L sTA of ARE \� jq USS �AND THE $ASIC DESIGN VALUE IS 205 f CUTTING AND FABRICATION SHALL BE DESIGN SPECIFICATION FOP STRESS C/•- P• ►Ee SQUARE INCH OF NET AREA. ��'Z,Q �� '`' t— ACCCM►IISHEO USING EQUIPMENT WHICH WILL ORADE LUM$ER i ITS FASrENINGI^ ���"t-••• ChG I{)�, :6TS 1 .WHERE DIMENSIONS ARE NOT SHOWN ►ROCUC! SNVG FITTING iOINTS AND PLATES. {NF►AI AND ":DESIGN SPFCIFICA(iON1 .C. CD t I�:ACE PLATES SYMMETRICALIY ASCJT )DINT CAM6ER t/60" ,L•SPAN IN FEET) AT FOR JIG it METAL PLATE CONNlCTEC WO( .42—"1' l U U lftl I POR AS INDICATED BY CIRCLES W CENTERLINE , .iR AS REQUIRED. TRUSSES" {T/I - 70) 5 Elev A. Asphalt Shingles #235� - -15 L B Asphalt Fel T 2+ C/D Ext. Plywood 6 Raf + See jP 6 REle2' 6 v Hurricane Strap d��Pf e 2x6 Strcngback Strongback CJ 2 x 6" C J See Spec's , I/2 Gyplap I'x6 Facia 518 Siding -W A/C Ext. Plywood E xl6 Scr Alum Vents SECTION "A cog G, cc II'x B"Freeze Board See I Ele—�I 2x4" Stud See Spec's j 312 Insulation 5/8 Partical Bd I12'Gyplap —5/8 Siding Treated 2"x4' Shoe 1�L2• Gypiap V2 CID Ex t.Ply woo f See Spec's W/ I/Z• A B �- 6' O o.c. +--5r2S" Siding 1/2 Exp Joint I 312 Insulation 2 x8"FJ n° 16"ac Rolcck 8� Header Block Rclock Brick See Specs 4'Cap Block Brick 8"n16" Found Vents 4 GRAVEL ——— pal 4 1ihod Gf. 8Bloc h G Mill Visqueen Treated Soil Vapor Barrier ► �' ;'.1 4'Conc Slab Reinf •`♦ W/ 6'x6" x"10WM A -.a A 3/8Dia Rods SECTION D" _ SFCTION T PICAL WALL SFC:T inNS SAF FOIINDAT ION,�,F I F VAT Inh # SP FIC AT 1;4N5_ 9" RUN 2'�4 ly NOSING 712 RISE ao WOOD HANDRAIL O (3) 2"x 12 STRINGERS '1 AD Arnhr smfi^ res d-4 and ' MaM ant ... •..t���bc+�.uda r4+► mcnn xa er ens-d cmKmry a•rA lY JA sW IMA A- i_.eny F-Wu- 14—Lk 1 KID—" A J paidenne I:.qw STAIRWAY DETAIL 3/4'- 1'-0' -- CITY OF ATLANTIC BEACH MECHANICAL PERMIT I800 SEMINOLE ROAD-ATLANTIC BEACH,FL 32233-TEL: 247-5826-FAX: 247-5877 PERMIT INFORMATIONLOCATION INFORMATION Permit Number: 22935 Address: 1930 BEACHSlDE COURT Permit Type: MECHANICAL ATLANTIC BEACH, FLORIDA 32233 Class of Work: ALTERATION Township: 0 Range: 0 Book: I Proposed Use: Lot(s): 28 Block: Section:0 Square Feet: Subdivision: BEACHSIDE Est. Value: Parcel Number: _ Improv. Cost: OWNER INFORMATION -- --- Date Issued: 1 O 29/2001 Name: KLACIS HIRSEHLER Total Fees: 25.00 Address: COURT1930 BEACHSIDE ATLANTIC BEAGH, FLORIDA 32233 Amount Paid: 25.00 Date Paid: 10/29/2001 (904)249-3719_ Work Desc: REPLACE AIR HANDLH�� CONTRACTORS) ry` § PLICATION FEES_ bON_OVAN HEATING AND Al �"- ^ ';''' ��: , xe ,'"xr c's^-n�.ewTa'+g ,«. +� 4°-• 1 it ys ' ` a w � .4 x `�j. c^ 1 iE `kL,•alalTx � n � u J J. FINALx x i 14 £ A D � ti NOTICE- ISPECTI ST l E REt"�UESTED AT L, T HO TO IN ECTION`—� C BUILDING MATERIAL, IJ;BBiSH AIS aEBRIS FROM'PHIS WORK MUST NOT=- ER CED IN )BL1C SPACE,AND MUST BE CLEARED UP�l tD HAULE WAY BY EITHER C6WNTRACTE?R OR "FAILURE TO COMPLYWITH T "� RE LT IN THE PROPERTY OWNER PAYi VAC ' OR t L i P i ISSUED ACCORDING TO APPROVED Pmt , NIR PiTF� MIT AND SUBJECT TO REVOCATION FOR VIOLATION OF APPLICABLE PROVISIO i I ATLANTIC BEACH BUILDING DEPT. Dates 16V29191 61 Receipts: B i� ONfl68T5A6 I �189M32�1i� CITY OF ATLANTIC BEACH DEPARTMENT OF BUILDING 800 SEMINOLE ROAD-ATLANTIC BEACH,FL 32233-TEL: 247-5826—FAX: 247-5877 PERMIT 1 FpR11AT1>`3N - - — --- L CAt10N tNPORN1ATjgN Permit Number: 21848 Address: 1872 BEACHSIDE COURT Permit Type: BUILDING ATLANTIC BEACH, FL 32233 I Class of Work: ADDITION Township: Range: Book: Proposed Use: SINGLE FAMILY Lot(s): Black: Section: Square Feet: Subdivision: Est. Value: Parcel Number: _ Improv. Cost: 1,656.00 SER 1NFC?RtTItN' ,� Date Issued: 4/30/2001 Name: RICHARD THOMAS Total Fees: 30.00 Address: 1872 BEACHSIDE COURT Amount Paid: ATLANTIC BEACH, FL 32233 Date Paid: 4130/2001 Phone: (904)241-4787 -- Work Desc: STORAGE SHED CdN IAG 'f - - ILIATi 1V FEE ;PROPERTY OWNER IT 30.00 MC 1 " e FRAMING i r, i r x c g q i J NOTICE-*SPECTIOl51 ST BE REQUESTED AT LEAST 24 HOURS PR R TO INSOECTION BUILDING MATERIAL, RU A►�A.AEBRIS FROM THIS WORK MUST NOT BEAACED IN FIBLIC SPACE,AND MUST BE CLEARED UP D HAULEC4WAY BY EITHER CONTRACTOR OR OWNER "FAILURE TO COMPLYiNITH T, C, ,CT10N WPM RE IT IN THE PROPERTY OWNER PAYIVV1 EOR , D IIfP Nom' ISSUED ACCORDING TO APPROVED S 1/ R P T.,t F �S IT AND SUBJECT TO REVOCATION FOR VIOLATION OF APPLICABLE PROVISIO j f ..f_=TLAI�TIC B CH BUILDING DEPT. Date: 5!81/81 81 Receipt: 8853f65 , 5401 CHECKS i _� — 89100003221000 t CITY OF ATLANTIC BEACH PERMIT CALCULATION SHEET Address -- Date Heated Square Footage @ $ per sq ft = $ Garag he $ c!� 0'D per sq ft = $ Carport/Porch @ $ per sq ft = $ Deck @ $ per sq ft = $ Patio @ $ per sq ft = $ TOTAL VALUATION: $ Total Valuation 1st $ 6s � 1 $ Remaining Value $— per thousand o portion thereof TOTAL BUILDING FEE $ 2 + 1/2 Filing Fee $ ( ) Fireplaces @ $15. 00 $ — 0 — BUILDING 0 —BUILDING PERMIT FEE $ 3O •© O WATER IMPACT FEE $ SEWER IMPACT FEE $ WATER METER/TAP $ CAPITAL IMPROVEMENT $ SEWER TAP $ ( . ) RADON (HRS) .0050 $ SECTION H PAVING ( ) $ HYDRAULIC SHARES $ CROSS CONNECTION $ ( ) SURCHARGE . 0050 $ OTHER $ GRAND TOTAL DUE $ ©• 6 ADDITIONAL PERMITS OR FEES: Mechanical Plumbing Electric/New Electric/Temp ; SwimmingPool Septic Tank ; Well Sign Finish Floor Elevation Survey ; Other CALCULATIONS and/or NOTES : RECEIVED ADR 2 4 '601 City of Atlantic Beach B CITY OF ATLANTIC BEACHuilding and 'oning PERMIT APPLICATION RM'1IODEL, ADDITIONS, OR ALTERATIONS MOVING, DEMOLITIONS Owner(s) : Job address: L oAuk&tJe cr Phone: Z_+ q Lot # 4 _ Block or Unit _( Subdivision: .ArCaFS/i�� Contractor: v?,' State License = Gc_ _ccress: /K?L�I�iFn__,�t:y►yU �' C-� Phonetic: C_-v Q- .�a-1 c'A�:il� State Z_ _o da_�27 __esen_ use 6 =_opcsec Cons__uct_�r prsccse'd _se STbrf.9t� r� Is this an ad-tic-ion? If Vires, what are the d_mens_cns of the added space: jla =t. X //, 5J -_. 7114-11 the added area be Heated and coda ? 10 New e'_ect=:ca'_ ;or li crease) ?� New piumbli^g =_:c=u_es? �6 New --='^sacs? p New Heat/.aC? P SUBMIT THR= XCM&MCIrU) TWO (F4.SZ.0MjT A L) CCMd'LET-_' S:TS OF PLANS, ZNC:C,"J_T.N SZT- PLAN, SURVEY, MVE.RGY CODE FORMS, NOTZ= OF CCI�Y STT, LU OWNERICCNIVACTOR AFFIDAVIT, ZF OWNER IS CONTRACTOR. STAB gF r-l-op t>r9; cpvnrTy 8r Dc/'v/)L. S/_c�3o-0 P2 Esc �,nn- �� 063,6-7�' Signature OWTIER: Y( � Date: 7,4-0/ Signature CONTRACTOR: Date: AS TO OWNER: /J Sworn to and subscribed before me this day of NOTARY PUBLIC AS TO CONTRACTOR: Sworn to and subscribed before me this day of , 19_ NOTARY PUBLIC +1 Sio2�GE 4, LDI L6- s I ' A ��Z- �ktfSrcT Lo I APPROVED CITY OF ATLANTIC BEACH PLANNING & ZONING OFFICE A P p1 f r CI� Av `�LH PR 2 5 001 Bu,LDCG oF� EaCjI yy --- - ----------- --- — . I I -�5�vy�•f=tJ � � cr �St� 4 v o� � s . ;.•�of —.����, S;.,�. Z� ------------ LWA t 73 oil I s mill .... / w w - r �': I I I�■ i N i ■i i �,,_ ■°�' �, w CITY OF 4&44d / eacA-4ku..:& Office of Building Official REQUEST FOR INSPECTION Date 7 - 3 - 0 / Permit No. Time A.M. Received P.M. Job ddress Locality Owner's Namf A� Name Contractor f� -f 2� \. BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing 7 � Rough Wiring ❑ Rough ❑ Air Cond. & ❑ Re Hoofing C? Slab fFK Temp Pole ❑ Top Out ❑ Heating Insulation ❑ Lintel ❑ Final ❑ Sewer ❑ Fire Place ❑ Pre Fab READY FOR INSPECTION A.M. Mon. Tues. /� Wed. Thurs. Friday RM. A.M. Inspection Made rz PM, Inspector Final Inspection ❑ Certificate of Occupancy ❑ Date _ CITY OF retic Excel - 9&u�a - 716 OCEAN BOULEVARD P.O.BOX 25 --�"- ATLANTIC BEACH,FLORIDA 32233 TELEPHONE(904)249-2395 DATE: _ __ PRE-SERVICE DIVISION JACKSONVILLE ELECTRIC AUTHORITY 233 WEST DUVAL STREET JACKSONVILLE, FLORIDA 32202 THE FOLLOWING FINAL INSPECTION(S) HAVE BEEN MADE AND ARE SATISFACTORY : � � - - '2 - ----- �---------- ------ ------------------------------------------------- ------ ------------------------------------------------- ------ ------------------------------------------------- ------ ------------------------------------------------- SINCERELY, BUILDI G INSPECTION DIVISION cc:FILE DEPARTMENT OF BUILDING 9752 CITY OF ATLANTIC BEACH.FLORIDA PERMIT NO. 1 J PERMIT TO BUILD THIS PERMIT MUST BE POSTED ON JOB Date Ma- 23, lg_&&_ Valuation$ Fee$ 66.00 This permit not valid until above fee has been paid to City Treasurer,and is subject to revocation for violation of applicable provisions of law. i This is to certify that 1 has permission to by# Classification RESIRRhMAT, Zone Owned by CARTER Lot Block S/D House No. 872 REACHSTM r.01IRT W 6}6' —T jAccording to approved plans which are part of this permit 45• (IM ' NOTICE—k"" .QNCTEWN 'j AND FOO }} MUST SPECTED B4WRE PO INC/. 10/9 PERMIT VOID SIX MONT11000 „ AFTER DATE OF ISSUE 4---► 4 •= O Building material, rubbish and debris z from this work must not be placed in public space, and must be cleared up and hauled away by either con- tr cto or owner. ui ing Official. FOR OFFICE PERMIT DATE CONTRACTOR USE ONLY NUMBER PLUMBING ELECTRICAL SEWER WATER CITY OF ATLANTIC BEACH APPLICATION FOR PLUMBING_PERMIT JOB LOCATION Jg ;7Z 6 CZ PLUMBING CONTRACTOR Ccs A.)y LICENSE NUMBERS �-- OWNER BUILDING CONTRACTOR C/jj A v TYPE OF BUILDING .� SINKS j- SHOWERS LAVATORY -.j- -WATER HEATERS _ �LBATH TUBS -1- -DISHWASHERS © URINALS -j—, DISPOSALS CLOSETS _j-WASHING MACHINE FLOOR DRAINS OTHER ,A/e—TOTAL FIXTURE COUNT . INSTALLATION OF PLUMBING AND FIXTURES MUST BE IN ACCORDANCE WITH THE MOST RECENT EDITION OF THE SOUTHERN STANDARD PLUMBING CODE. UTILITY SERVICE AGREEMENT (Water and Sewer) THIS AGREEMENT entered into this �<2 qday of 198 Q , between the City of Atlantic Beach , a Municipal corporation, hereinafter called "City", and a K- , corporation, its successors and assigns, hereinafter called "Developer". W I T N E S S E T 11 WHEREAS, Developer owns land in Duval , County, Florida, more particularly described as � � 4 A�- — refer to acreage, plat engineering drawings, or legal description as Exhibit A and WHEREAS, Developer plans to develop said land by constructing ' l buildings,' residences and/or other improvements thereon consisting of" and WHEREAS, City is the owner of water and sewage treatment plants and water distribution and sewage collection systems in the vicinity of the property described above; and " WHEREAS, Developer desires that City provide water and sewage collection service to said property and City desires to furnish same; and to them and to their occupants water and sewer service subject to all terms and conditions of this Agreement; and WHEREAS, in order to provide water and sewer services to Developer it has been or will be necessary for City to enlarge and expand its offsite water and sewer plants and facilities and it is the desire and intent of Developer to contribute financially to the costs of building such additional offsite water and sewer plants and facilities and to reserve capacity in City's water and sewage treatment plants so that City can provide service to the Development without imposing a burden on its existing customers; NOW, THEREFORE, in consideration of the premises and other good and . valuable considerations and in consideration of the mutual covenants and conditions hereinafter contained, subject to any necessary approval by other governmental agencies having jurisdiction, it is .agreed by the parties hereto as follows: I. Developer agrees that City shall have the exclusive right to furnish water and sewer service to the real property described above and hereby grants to City . this exclusive right..to provide water and sewer service for all uses within all structures now or hereafter constructed on the real property described above. 2. City agrees that after Developer has connected to the systems of City, City will provide at its own cost and expense, water and sewer service to Developer's property in a manner conforming to the reasonable requirements of public or governmental agencies or parties having jurisdiction over City's water and sewer operations; provided, however, that such service shall be in accordance with other provisions of this Agreement, including City's rules and regulations and rate schedules. 3. In the event that Developer or assigns fails to complete construction of all improvements required to be built by Developer and Agreement under this provision, City reserves the right to negotiate with Developer a new agreement for any additional sums to be paid by Developer to City as plant capacity and service availability charges, fees or other charges based upon increases in the cost of living and/or such other factors as relate to the cost of supplying water and sewer service. 4. All taxes or charges imposed upon the property described above by any governmental entity or agency shall be paid by Developer except such part thereof that has been deeded to the City in accordance with tho terms of this agreement•. S. The rates charged by City for water and sewer service shall be in accordance with its rate schedule which shall be subject to change , from time to time. City shall have the right to determine reasonable meter size and location. G. Developer will grant to the City, at Developer's expense, adequate easements for water and sewer lines, for access to lift stations and water stations and related appurtenances. Said easements ' shall be transferable. Developer will also furnish title evidence satisfactory to the City that said easements are superior to mortgages or other interest in the laird, and Developer shall cause any such mortgages to be released or subordinated to said easements. Easements will also be furnished to provide for onsite water distribution lines, including meters and sewage collection lines. Sites for lift stations and water stations and related appurtenances shall be conveyed by warranty deed in fee simple by Developer • to City. Developer will furnish City a warranty deed, title evidence satisfactory to City and any releases from lien holders for any sewage pumping station and water to said state road right-of-way. Developer shall further grant to the City, its successors and assigns, the exclusive, perpetual right, privilege and easement to construct, reconstruct, operate, maintain, repair, replace, improve, alter, remove, relocate and inspect water transmissions and distribution mains, sewer collection mains, sewer lift stations, pipe lines, lateral lines, valves, connections and appurtenant equipment over, across and under the Developer's property, including the right to ingress and.egress to eacfi of the building sites on Developer's property which are served* by City. All such easements shall have a .width which is acceptable to the City. 7. City does not guarantee an uninterrupted supply of water, or water at any particular pressure, and reserves the right to shut off the water in its main at any time for the purpose of making repairs or extensions of for providing temporary or emergency water supply. City will not be responsible for any damage caused by low pressure or interruption of service. Neither Developer nor any of its successors or purchasers shall discharge into the sanitary sewer system water from "non-domestic" drains including without limitation swimming pools, air conditioning condensation lines, cooling lines or other discharge from any type of equipment. City shall not be obligated to furnish any water or sewer service to any building which is built on Developer's property to which the City does not have access. The Developer hereby agrees and warrants that the City will not be held responsible for flooding problems which may result from the failure of sewer line back flow preventor valves on Developer's property. The Developer hereby agrees to hold harmless and indemnify City for all costs and damages resulting from flooding due to .back flow preventor valve failure. 8. The construction and design of all facilities to be Developer or its contractor. Developer will pay the cost of all such construction. The Developer's engineer shall incorporate into the Developer's engineering design, plans and specifications the applicable standards and specifications of the City. 9. A. If the Developer modifies his development plans for Developer's property which would require greater water usage, greater fire flows, additional water facilities, greater sewage flows, or additional sewage facilities than the water and sewer demands previously approved by the City, then the Developer must obtain approval by the City for the construction of such additional water or sewer facilities which shall meet all City and governmental design requirements. The Developer shall pay all additional contributions and fees as may be authorized by the City's- service availability policy which is in effect on the date said new agreement is executed. B. In addition to paragraph 9A above, any other change order between Developer and its utility contractor issued after City approval of original plans must be approved by the City before the change order is put into effect. C. City shall have the right to review the systems design drawing and specifications to ensure that they meet the requirements of the City. The systems design drawing and specifications are to be in accordance with the City of Atlantic Beach requirements unless otherwise •specified by City or its engineer. D. The City also reserves the right to approve the utility contractors to which construction bids are sent by Developer as well as the contractor to which the award is made. E. A representative of City or its engineers will be the .inspector of the project along with the Developer's engineer, but City absolute and exclusive owner of the facilities of said water and sewer systems whether located on, under, above or outside of the property described and regardless of who may have installed or constructed same to the extent described below: A. All water mains, pipes, valves and fittings and appurtenances up to and including all meters shall be dedicated to and will be owned, operated and maintained by City.. All water pipes on the customer's side of the meter shall be owned, operated and maintained by the customer or its assigns. , B. All sewer mains, manholes, pumping stations, force mains and appurtenances, including service pipes in public right of ways and dedicated easements, shall be owned, operated and maintained by the City. Except as provided in paragraph 9C, all sewer lines on the customer's side of the property line shall be owned, operated and maintained by the customer or its assigns. C. With reference to any blanket easements for multi-family projects such as apartments, mobile home developments, condominiums and PUD's or for commercial developments, all water mains to and including the water meter, all sewer mains, force mains and manholes in such blanket easements over private property allowing utility operations shall be dedicated to and shall be owned, operated and maintained by thb City except that the full length of sewer services from the sewer main or manhole shall be owned and maintained by the customer. All such City lines shall terminate with a manhole. U. By these presents, Developer hereby transfers to the City, the title to the water distribution and sewer collection systems to be installed pursuant to this Agreement, such . conveyance to take effect without further action upon the completion and acceptance by City 11. Developer shall pay the City upon, execution of this Agreement the sum of 10¢ per water connection per equivalent residential connection (ERC) as an advanced deposit to cover engineering, plan review, inspection, test, legal and administrative expenses of City in connection with this Agreement. Developer shall also pay to City upon execution of this Agreement the sum of ,10� per sewer connection per ERC as an advanced deposit to cover engineering, plan review, inspection, tests, legal and administrative expenses of City in connection with this Agreement. The charges for engineering and legal expenses and for engineer's inspection and plan review. fee for non-residential units shall be based upon estimated cost to City: Actual cost will be determined and a refund or additional charge will be made for the difference between the advanced deposit as calculated above and actual costs. City agrees to . provide water and sewer service to the Developer's property in consideration for plant capacity charges, fees and other charges to be paid by Developer as follows: A. A water plant capacity charge at the rate of $20.00 per fixture unit. Such charges shall be due and payable as provided in paragraph 12. B. A sewer plant capacity charge at the rate of onethousand thirtr five dollars ( 1,035.00 per single family unit. Such charges shall be due and payable as provided in paragraph 12. C. A sewer plant capacity charge for any commercial customers on the land as described above at. the rate of 0 . ) ' • I r f D. A meter installation fee to cover meter cost and meter installation (but not including curb stop or meter box) according to the City's service availability policy at the time of installation which currently is $85.00 per 3/4" x 5/8" meter G. If available, construction .water will be charged to building based on metered usage in accordance with current rates. F. Hydraulic share of main extensions - payment or refund, 1. Developer recognizes that water or sewer utility service to the Developer's property.. is provided by the use of a mein extension and other improvements constructed by a prior developer and that Developer is obligated to refund a said prior developer Developer's share of the cost of said main extension or other improvements. Accordingly, Developer shall pay its pro rata share of the cost of said' main extension or other improvements to City. Said pro, rata share shall be based on Developer's percentage of the hydraulic capacity of said extension or other improvements. For the purpose of this Agreement, the cost of Developer's said hydraulic share shall be $ payable upon execution' of this Agreement. 2. With respect to utility facilities installed by Developer to which future developers connect directly, and in consideration for monies expended by Developer toward said facilities, City shall refund to Developer, or Developer's successors or assigns, solely from monies collected from said future developers, said future developer's pro rata share of the cost of said facilities. Said refunds shall be calculated on the basis of the Hydraulic capacity and demand of said future developer whenever .feasible. The refund obligation of City hereunder and the benefits to Developer related thereto shall expire- at a cost of $ 12. All charges to Developer shall be paid by Developer to the City in accordance with the following formula and procedures: A. The advance deposit for engineering, administrative and legal fees and the inspection and plan review fee upon the execution of this Agreement, a total of and B. Water plant capacity charge upon the execution of this dp Agreement, a total of and C. Sewer plant capacity charge upon the execution of this Agreement, a total of Sr ; and D. Meter installation fee according to the City's service availability policy at time of installation which currently is 10 upon application for hook-up of individual lots, apartments, multi-family lots or units; and E. Construction water based on meter readings in accordance with City's rate schedule; and F. Hydraulic share payment, in accordance with paragraph 11F-1 of this Agreement upon execution of this Agreement, in a total amount of'$ A_; . . . ' . ' . . . . and G. Service availability charges and other additional aids in construction in accordance with paragraph 11G of this Agreement in a total amount of . . . . . . . . . . . . . . . . . . . . . . . 13. City agrees to connect individual buildings and structures on the developed property upon application by the builders, plumbers or individual owners subject to the operating rules and regulations of the City and payment of all fees and charges in effect on date of application and compliance by Developer with all provisions of this Agreement. 14. The charges, costs and fees for any separate emergency fire protection water systems. for subject project will be subject to negotiations between City and Developer. if buildings of more than two stories are a part ofthe project, Developer shall furnish at its expense water pumps and other appurtenances as necessary for pumping water above. 15. All plant capacity and service availability charges, fees and other charges as outlined above are based on normal domestic sewage defined herein as containing not more than three hundred (300) parts per million biochemical oxygen demand or three hundred (300) parts per million suspended solids. Whenever water which contains more than these amounts is to be admitted to the sewers, both the City and the pollution control agencies must specifically agree to the connection. An additional charge will be calculated in direct proportion to strength at seventy-five cents ($0.75) for each part per million of either biochemical oxygen demand or suspended solids over three hundred (300) parts per million. All such connections shall provide for a suitable point for the waste to be sampled by the City or the regulatory agencies. An additional charge equal to the pro rata share of any additional sewage treatment plant costs above ninety percent (900) treatment, and of the cost of any additional required outfall pipes to �/� " may be required by City. subordinated to the terms of the Agreement and easements required herein prior to any acceptance of the facilities by the City. 17. Upon application by owners, builders or their authorized representatives, the City agrees to conpect the requested dwellings or structures on the said property at no additional connection fee (i.e. , in addition to those provided for above in this Agreement) , but subject to the continuing operating rules and regulations of the City including, without limitation, the periodic payment of the water usage and sewer usage charges in effect on the date of such application or thereafter reflected in the City's rate schedule. 18. This Agreement shall be binding upon and shall Inure to the benefit of the Developer, City and their successors and assigns. However, in the event the Developer has not paid and delivered to the City the plant capacity and service availability charges, fees and other charges provided to be paid to tl►e City by Developer wider the terms of ..this Agreement, and all easement and conveyances required by this Agreement, then this Agreement shall not inure to the benefit of the successors or assigns of the Developer. 19. It shall be .'the responsibility of Developer to locate for builders any water and sewer taps or lines necessary in conjunction with residential or commercial construction. ' 20. Unless the damage to any onsite improvements are the result of the negligence or willful act of the City, its officers, or employees or authorized agents, the owner or Developer .of such property upon which the damage occurs shall be responsible for the payment to the City of such damage to City's property including all necessary and reasonable repairs which must be. made by the City or independent contractors engaged by the City to pffc+.•t ct,l+ prior hereto, for the payment of such necessary and reasonable costs and expenses for effecting such repairs and restoration to such onsite facilities located upon the owner's or Developer's property. Notice of such lien or claim on lien describing the real property and the amount owed may be filed within ninety (90) days of the date from the last date upon which any such repairs or restoration were made by the City or its authorized representatives. Thereafter, the City shall be entitled to bring an action for the foreclosed under the laws of Florida. 21. Prior to final acceptance of the utility and other public facilities improvements by the City the following requirements must be met at Developer's expense: A. if the property is platted, one copy of the recorded plat shall be furnished to the City. • B. "As built" drawings of utility improvement shall be furnished one week prior to final inspection. "As built" drawings shall be certified by a registered engineer with the cost being borne by the Developer. Two mylar and three printed copies of said drawing shall be furnished to City. C. All lot corners shall be properly marked so that utility company or its engineer can, upon receipt of "as built" drawings, verify the marked water and/or sewer services as to location and depth. Iit addition, for purposes of locating and protecting installed service lines and valves Developer or his contractor shall mark each service line and all valves with an eight (8) foot pressure treated wooden post in the manner as shown on the design drawings and specifications. Developer's contractor is required to install curb stop, meter box and valve box on each water service and valve as shown on design drawings. D. All water and sewer servicps At,,, .-1 ­_. . irrevocable letter of credit, the terms of which will indemnify and save harmless the City from any loss, damages, costs, claims, suits, debts or demands by reason of defects in the workmanship or materials used ill the facilities discovered within a period of one year from and after the date of acceptance by the City of the facilities. , F. A gill of Sale for facilities from the Developer to City. G. Conveyance of easements as required under this Agreement. 11. A deed for .any and all land on which lift stations or water stations or other improvements if required by City. I. The title evidence, mortgage • releases and mortgage subordinations as required in this Agreement. J. For onsite and offsite construction provide City an ' accounting of the actual costs (schedule of values) and releases of liens from utility contractors in such detail as the City requires. K. City shall have the right to refuse to accept title to Developer's construction until Developer's construction has passed certain tests, including, without limitation, closed circuit television inspection of the gravity sewer lines, witnessed by a City representative, to determine whether tlxe Developer's construction is constructed in accordance with the approved engineering plans and specifications. Said tests may be performed at •least three (3) times: the first test upon completion of the system; the second test upon completion of all building, roads, paving, drainage, and all construction within the right-of-way easement area of adjacent areas. A third test shall be required if the City deems it necessary within a one (1) year period after acceptance. L. Letters of acceptance from' the appropriate regulatory agency for the water, and/or sewer system. are reouiretl nr;nr fn F,.•�t M 22. All notices that may or must be given under this Agreement shall be in writing and shall be valid if mailed by United States ; registered or certified mail, postage and charges prepaid from addressed ; as follows: To Developer•: To City of Atlantic Beach City Manager 716 Ocean Boulevard Post Office Box-25 Atlantic Beach, Florida 32233 IN WITNESS WHEREOF, the parties hereto have executed this Utility Agreement the day and year first written above. Signed, sealed and delivered in the presence of: Developer Witness City of lantic B ci Witness CITY OF Office of Building Official / `� /_ 9) REQUEST FOR INSPECTION lI LL ( J Date �% w /`� Permit No.�� ✓ ) Time A.M. Received P.M. District No. Job Address Locality f Owner's Contractd[ ,f BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing ❑ Footing ❑ Rough Wiring ❑ Rough IK Air.Cond.& ❑ Re Roofing ❑ Slab ❑ Temp Pole %2-, Top Out ❑ Heating Lintel ❑ Final ❑ Sewer ❑ Fire Place ❑ FOR INSPECTION Pre Fab ) Mon. Tues. We `f Friday QPM./ Inspection Made Inspector Final Inspection❑ Certificate of Occupancy Date �r CITY OF ATLANTIC BEACH, FLORIDA App.Owd by APPLICATION FOR ELECTRICAL. PERMIT TO THE CHIEF ELECTRICAL INSPECTOR: DATE. i Ole 13 19 od' IMPORTANT NOTICE: IN CONSIDERATION OF PERMIT GIVEN FOR DOING THE WORK AS DESCRIBED IN THE FOLLOWING, WE HEREBY AGREE TO PERFORM SAID WORK IN ACCORDANCE WITH THE ATTACHED PLANS AND SPECIFICATIONS, pW�H�IpCHTAcREE ApPAAROTRHEREOF, AND IN ACCORDANCE WITH THE ELECTRICAL REGULATIONS,CODES�AjND CITY OF t31LL"�H(�I�P�UNCECECTRICNCONCIE4C� " '�ZSd P. 0. SOX 50398 ( 000 JACKSONVILLE BEACH, FL 32240-0398 ELECTRICAL FIRM: MASTIiR ELE T IC AN ANATURE NAME('dYkr Utl.� �5 ADDRESS: �5 i C' aRFD BOX BLDG.SIZE BETWEEN: REST APT.( 1 COMM.( 1 PUBLIC( 1 INDUS.1 ) NEW( 1 OLD( 1 REW.i ) ADDITION ( ) TRAILER ( ► TEMP.K SIGNS ( ) SO. FT. SERVICE: NEW( 1 INCREASE( 1 REPAIR ( 1 FEE CONDUCTOR SIZE AMPS WCOPPER I ALUM. SINITCH OR BREAKER AMPS PH OLT RACEWAY $XIST.SERV.SIZE AMPS PH W VOLT RACEWAY FEEDERS NO. SIZE IND. SIZE NO. SIZE LIGHTING OUTLETS CONCEALED OPEN TOTAL RECEPTACLES CONCEALED OPEN TOTAL 0.30 AMPS. 31.100 AMPS. SWITCHES INCANDESCENT FLUORESCENT&M.V. FIXED 0.100 AMPS. OVER APPLIANCES BELL TRANSF. AIR H.P.RATING H.P.RATING CONDITIONING COMP.MOTOR OTHER MOTORS AMPS CEIL HEAT: KW-HEAT 0.1 OVER MOTORS H.P. VOLTAGE PMS NO. 1 N.P. VOLTAGE PHS MI;CfUJEtXEOUS CITY OF 4&49 is Feat!-9&%,d4 Office of Building Official s REQUEST FOR INSPECTION Date ` Permit No. Time A.M. Received_ _ _P.M. District No. Job Address C/Locality Owner's Name Contractor BUILDING CONCRETE ELECTRICALPLUMBING MECHANICAL L Framing LY Footing ❑ Rough Wiring V/, Rough ❑ / Air.Cond.& E� Re Roofing ❑ Slab ❑ Temp Pole ❑ Top Out Y Heating Lintel ❑ Final ❑ Sewer ❑ Fire Place IT— READY FOR INSPECTION Pre Fab A.M. Tues. Wed, Thurs. Friday P.M. Inspection Made z ��'��! Inspector_ Final Inspection❑ Certificate of Occupancy Date CITY OF 4&4W -C Seacilt-944a4 C01W, Office of Building Official REQUEST FOR INSPECTION q7EX Date Permit No. Time A.I . Received PDistrict No. S _7a Job Address Loca'ty Owner's Y Name Contractor BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL/ Framing Footing 1-1Rough Waring Rough ❑T/ Air.Cond.& f7 Re Roofing ❑ Slab El Temp Pole ❑ Top Out �i/ Heating Lintel ❑ Final ❑ Sewer ❑ Fire Place READY FOR INSPECTION Pre Fab Mon. Tues. Wed. A Thurs. Friday P.M. A.M. Inspection Made P.M. Inspector Final Inspection❑ \ Certificate of Occupancy Date CITY OF J fit- sem-7t! Office of Building Official REQUEST FOR INSPECTION Date / Permit No. 750 Time P1CI , Received PNr District No. Job ress (,,,Locality Owner's �h Name Contractor BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL 1:1 _ Framing Footing �7/ Rough Wiring ❑ Rough ❑ Air.Cond.& ❑ Re Roofing ❑ Slab ❑ Temp Pole ❑ Top Out ❑ Heating Lintel ❑ Final ❑ Sewer ❑ Fire Place ❑ READY FOR INSPECTION Pre Fab Mon. Tues. Wed. Trs. Friday A.M. Inspection Made /C PM• Inspector Final Inspection❑ Certificate of Occupancy Date CITY OF -� Office of Building Official EQUEST FOR INSPECTION Date isJ r� Permit No. Time f A.M. Rec iv _ P.M. District No Job Address ✓9`� ` /�cality Owner's / /J - Name Contractor (( hL BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing ❑ Footing ❑ Rough Wiring ❑ Rough ❑ Air.Cond.& ❑ Re Roofing ❑ Slab Temp Pole ❑ Top Out ❑ Heating Lintel ❑ Final ❑ Sewer C Fire Place ❑ READY FOR INSPECre Fab A.M. Mon. Tues. Wed. Thurs. Friday Inspection Made .M. Inspector Final Inspection❑ Certificate of Occupancy Date DEPARTMENT OF BUILDING C.*'YOF ATLANTIC BEACH,FLORIDA PERMIT NO-9751 PERMIT TO BUILD THIS PERMIT MUST BE POSTED ON JOB 46.00 T 4t 00CI(T Date May is, 19 2 7/0/81 Fee$ &�•Q© Cl!)CRC Valuation$ 90 19 1 A 7tS i Cll7f3 This permit not valid until above fee has been paid to City Treasurer,and is subject to revocation for violation of applicable provisions of law. This is to certify that AIR ENGINEERS j has permission to bWd INSTALL HEAT 6 AC I Classification RESIDENTIAL Zone Owned by CARTFR Lot Block S/D jHouse No. 18921 BEMISIDE MU -------- IAccording to approved plans which are part of t�iis permit NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. PERMIT VOID SIX MONTHS AFTER DATE OF ISSUE 4 1 �--� O 1Building material, rubbish and debris 34 from this work must not be placed in public space, and must be cleared up and hauled away by either con- tracto r owner. ']_ B]21 Official. FOR OFFICE PERMIT DATE CONTRACTOR USE ONLY NUMBER PLUMBING ELECTRICAL SEWER WATER BUILDING AND ZONING INSPECTION DIVISION .....- CITY OF ATLANTIC BEACH ' f ATLANTIC BEACH, FLORIDA 32238 1 APPLICATION FOR MECHANICAL PERMIT CALL-IN NUMBER IMPORTANT - Applicant to complete all items in sections 1, II, III, and IV. 1. LOCATION Street Address: OF Intersecting Streets: Between a"jya A / t BUILDING Sub-division dT II. IDENTIFICATION - To be completed by all applicants'. In consideration of permit given for doing the work as described in the above statement we hereby agree to perform said work in accordance with the attacil„ed plans and specifications which are a part hereof and in accordance with the City of Jacksonville ordinances and standards of good..practice listed therein. Name of Mechanical ContractorsI_Vlr ' Contractor (Print) Mester No,"of Property Owner Signature of Owner Signature of or Authorized Agent Architect or Engineer 111. 'GENERAL INFORMATION A, hype of heating fuel: B. IS OTHER CONSTRUCTION BEING GONE ON ❑ EWCWC THIS BUILDING OR SITE? ❑ Gas--❑ LP ❑ Natural ❑ Control Utility _ IF YES, GIVE NUMBER OF CONSTRUCTION ❑ on PERMIT 0 Other.— Sp {y IV. WICHAW AL IWIFWNT TO EE INWALLED NATURE OF WORK (Provide oomphth list of componMta on back of this form) P-Residential or ❑ Commercial W Ho It ❑ SpeceO Recessed B' Gntrrl O -Floor Q-�Sw Building Air Cond1Kaliny: ❑ Room O Existing Bultding, cf Stratem: Ma/wial. f Thieknen lReplacement of existing system f Maximum capacity ef.m. ( ®(� New installation(No system previously Installed) Q Rehigbrofio„ ❑ Extension or add-on to existing system ❑ Other- Specify ❑ Cooling tower: Capseity q.p.m. Q Fire gWrilders: Number of hoes 0 Elwofor Q Manlift ❑ Escalator (number) THIS SPACE POR ORWA USE ONLY C1 . Gosoliee pumps (number) �Reeeiwd} 13. Taakt (number) Remark Q U*oontainare.._ (number) O Unfirw Pressure vefMi Q lagers Permit Approved by es. r...– 0 011W Specify Permit Fee ,IST ALL EQMPMENT AIR t ONMONING AND REFRIGERATION EQUIPMENT Xnniibstr Uniti berCriptlft Marti Number KanufarsbMW CITY OF ATLANTIC BEACH, FLORIDA Approved by APPLICATION FOR ELECTRICAL PERMIT ! 17� TO THE CHIEF ELECTRICAL INSPECTOR: DATE: jLar--( .�► IMPORTANT NOTICE: IN CONSIDERATION OF PERMIT GIVEN FOR DOING THE WORK AS DESCRIBED IN THE FOLLOWING, WE HEREBY AGREE TO PERFORM SAID WORK IN ACCORDANCE WITH THE ATTACHED PLANS AND SPECIFICATIONS, WHICH ARE A PART HEREOF, AND IN ACCORDANCE WITH THE ELECTRICAL REGULATIONS, CODES AND CITY OF ATLANTIC BEACH ORDINANCES. 2S� BILL THOMPSO,N ELECTRIC CO., INC. P. 0. BOX 50398 JACKSONVILLE BEACH, FL 32240-0398 ELECTRICAL FIRM: MASTER &ECTRICI AZI SIGNATURE NAN 0A V4fy- k- ADDRESS' 1` , Q� FD BOX e![��: BLDG.SIZE + tl 14--lIETWEEN: RES. APT.( ► COMM.( I PUBLIC( 1 INDUS.1 1 NEW( 1 OLD( 1 AEW.( ► ADDITION ( ) TRAILER ( ► TEMP.( 1 SIGNS ( 1 SO.FT. SERVICE: NEWL 1 INCREASE ( ► REPAIR l ) FEE CONDUCTOR SIZE � AMPS COPPERA ALUM. NOTCH OR BREAKER AMPS PH T RACEWAY EXIST.SERV.SIZE AMPS PH W VOLT RACEWAY FEEDERS NO. SIZE NO. SIZE NO. SIZE LIGHTING OtIETS CONCEALED OPEN TOTAL RECEPTACLES CONCEALED OPEN TOTAL 0.30 kmPs 1 31-100 AMPS. SWITCHES INCANDESCENT FLUORESCENT&M.V. FIXED 0.100 AMPS. OVER APPLIANCES BELL TRANSF. AIR H.P.RATING H.P.RATING CONDITIONING COMP.MOTOR OTHER MOTORS AMPS CEIL HEAT: KW-HEAT Orf OVER MOTORS` H.P. I VOLTAGE PHS NO. I H.P. VOLTAGE PHS MISCEL E U MAP SHOWING SURVEY OF LOT 4 1 BLOCK � ACCORDING TO MAP RECORDED IN PLAT BOOK 4Z-ME 44,4-c- OF TME CURRENT PUISLIC RECOIlOi OF IDWAQ COUNTY. fl. SCALE: I"s ZO' FOR DP. A. Dq,fG/^./G-7 DATE 3-/5-86 T'1e7- 1. . Z(A'Z •(PAT) S� 050Q 5. 07 •• ,A SI v � � O o rn o � o al o o r N J p � •1• 1 � �r5' p¢i✓ArFFbM'r _-__ kp r 000 O©•. 00 q 8 DEPARTMENT OF BUILDING 9750 F CITY OF ATLANTIC BEACH,FLORIDA PERMIT NO. �7 a.T lJ PERMIT TO BUILD THIS PERMIT MUST BE POSTED ON JOB Date May �3, 19_$,$_ Valuation$ 83,831.25 $ 300.75 This permit not valid until above fee has been paid to City Treasurer,and is subject to revocation for violation of applicable provisions of law. This is to certify that RICHARD F. CARTER 245 Glen Abbey, St. John's Island, SC 29455 has permission to build Single Fatttily Dwhllkft i Classification "1;jdMf; a Zone .+..!! Owned by Richard F. Carter 3f15„75CW 6 1A S/ /B Lot 4 Block �S/D_ft!m House No. 1872 IREACUSUDS COWT 5794 1A 5/25/5 According to approved plans which are part of this permit 1 am NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. PERMIT VOID SIX MONTHS A AFTER DATE OF ISSUE —� O Building material, rubbish and debris i from this work must not be placed in public space, and must be cleared up and hauled away by either con- tr or owner.. 741 in Official. FOR OFFICE PERMIT D USE ONLY NUMBER ATE CONTRACTOR PLUMBING ELECTRICAL SEWER WATER .aAlllM4;. City of Atlantic Beach Fixture Unit Worksheet for Water Impact Fee FIXTURE UNITS ARE ESTABLISHED AS THE MEASUREMENT OF WATER DEMAND FOR EACH WATER FIXTURE UNIT INSTALLED AND CONNECTED TO THE CITY WATER SYSTEM. THE WATER SUPPLY CHARGE IS HEREBY FIXED AT TWENTY DOLLARS PER FIXTURE UNIT CONNECTED TO THE CITY WATER SYSTEM. j /LL-BATHROOM GROUP CONSISTING OF _-___SERVICE SINK TRAP STAND WATER CLOSET, LAVATORY & BATH ( (8) TUB OR SHOWER STALL (6) -----WATER CLOSET VALVE _____WATER CLOSET, TANK OPERATED (4) VALVE OPERATED (8) BATHTUB/SHOWER (2) , URINAL WALL LIP (4) _____SHOWER GROUP PER HEAD (3) _____FLOOR DRAIN ( 1 ) SHOWER STALL DOMESTIC (2) _ _LAUNDRY TRAY (2) i -____LAVATORY ( 1 ) _____COMBINlTION SINK AND TRAY (3) I _____WASHING MACHINE (3) _____POT, SCULLERY SINK (4) _DISHWASHER (2) Z- _WASH SINK EACH SET OF FAUCET1 (2) __ __KITCHEN SINK t2) _ DENTALILAVATORY ( 1 ) ___KITCHEN SINK WITH WASTE GRINDER (3) DENTAL 'IUNIT OR CUSPIDOR (1) _____BIDGET (3) _____URINAL i STALL, WASHOUT (4) i _-___FLUSHING RIM SINK (8) _____COMBINATION SINK AND TRAY WITH FOOD DISPOS. (4) _____URINAL, PEDESTAL, SYPHON JET BLOWOUT (8) _____DRINKING FOUNTAIN (1/2> _____LAVATORY, BARBER/BEAUTY SHOP (2) LAVATORY, SURGEONS (2) SURGEONS SINK (3) /!� _ ICE MAKER ( 1/2) I WET BART (2) I G� TOTAL FIXTURE UNITS__ -2: — @ $20. 00 EACH JOB INFORMATION I I i i Address G 0 � 1 fIeated Square Footage er sq ft = $ �` ---- Garage/Shed @ $ per sq ft = $ Carport/Porch @ $ ` -= per sq ft - $ U Deck. @ $ per sq ft = $ Patio @ $ per sq ft = $ TOTAL VALUATION: I Total Valuation 1st $ Remainder Valuation per thousand or portion thereof a -------------------------------------------- Total Building Fee $ ADDITIONAL PERMITS and/or FEES REQUIRED ; + k Filing Fee $ �S Mechanical Fireplaces @ 15.00 $ / �. Pluming ' BUILDING IPERMIT FEE $ � Electric/New ✓ ----- -- -------------- �- - - Electric/Temp Septic Tank BUILDING PERMIT $ Well WATER METER CHARGE $ S Swinrdng Pool SEWER IMPACT FEE $ Sign WATER IMPACT FEE $ / lJ Water Connection MISCELLANEOUS $ Sewer Connection $ Water Meter $ Elevation Certificate GRAND TOTAL DUE $ ---- ----------------------------------------------------------------------------------------- CALCULATIONS and/or NOTES CITY OF ATLAN 1C BEACH' APPLICATION FOR BUILDING PERMIT Required Submittals: 1. Two complete sets of plans 2. Detailed site plan including setbacks and utilities 3. Recent survey 4. Florida. Energy Efficiency Code Sheets 5. Contractor's license on file REMOVE NO TREE OUTSIDE THE BUILDING LINE THAT IS LARGER THAN SIX INCHES IN DIAMETER UNLESS A TREE REMOVAL PERMIT HAS BEEN ISSUED. Inspection Schedule: 1. Footing 2. Rough Plumbing 3. Slab 4. Framing, rough electric, mechanical., top out plumbing, fireplace 5. Final inspection G. Certificate of Occupancy inopection Requests for inspections will be accepted Fromm 8:00 am until 4:00 pm. All inspections will be made the following. working day between 8:00 am and 4:00 pm. In Esse of rejection, re-inspection must be called for after corrections are made. There will be a $10. 00 charge for all re-inspections, paid prior to the request for re-inspection. Pour no concrete or cove.- up any work until the building card is signed by the inspector. You will be required to uncover any work that has not been inspected. BUILDING CARD MUST BE POSTED OR NO INSPECTIOM WILL BE MADE Building Department 716 Ocean Boulevard Atlantic Beach, Florida 32233 249-2395 page 1 a q CITY OF ATLANTIC BEACH APPLICATION FOR BUILDING PERMIT Ownerj IGt�4 � lLTL2_ Addrevs_ ,4��� 1-5kQvs 7_ zipW4S5-_phonet3 167_�11 LW • b41 S4-. �NA�ews . Architect t i,J { eves �e�s, ddress_ } Ta�3t - -----zip�`�v1--phone5ZZ,-5M-?W,5- Contractor 0tv_ --Address___'________________zip____-_phone Contractor's License number -----------------expiration ------- Lot--4 _-_Block or Section1Subdivision '/-2z5C Zonin SG� �4na�1 ----- g- �----- 1�je�c�gip Street_ between / and _side4c ± �y Type Construction_/A:t�-_____No. Units---L------No. Fireplaces Purpose of Building 5/Ajc-/27ari��Ix_ ----------Est. Valuation Sb aa-c, l ---�---------- Utility Method - Water_CI%4________ Sewer_CI:%] Dimensions - Building q{z�2'_,� 3g E"__Lot—&I �($,65 ( .Z�Size Foot �C/Z-"- - - ------ Sz. Piers _ _-Sz. Sills-------------Greatest Span Sills_________ ____ Sz. Ceiling Joists-il ----- _---Distance on Centers__/b" ----Greatest Span_/b'/� '� Sz. Floor Joists �y Distance on Centers_ /&"""__ Greatest Span_13' '(V Sz. Rafters _Z-$6_--_Distance on Centers-K{` Grp>atest Span 13 '0" _ tib er�I�ss Method of Heatingh��4T' ;?Ofri.77 _Solid or Filled Ground�l D ___---Roof 51nitzcrie-s _ Flood Zone.......If located within a FLOOD HAZARD ZONE complete page 3 In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with the attached plans and specifications, which are a part hereof, and in accordance with the building regulations of Atlantic Beach. The contractor agrees at its expense to provide the necessary access to the properties being developed over dedicated City rights-of-way and to clear, clean, grade, and drain said right-of-way to City specifications. Signature Owner ;, e--t-- Date ���� e� '}' -- ------------------ ----------- Signature Contractor Date ------------------------- ----------------- APPROVEp CITY OF ATLANTIC BEACH BUILDING OFFICE D CIE �� page e? MA 31 MIAY 1 'i 1988 By Building and Zoning ~ FLOODPLAIN DEVELOPMENT INFORMATION Type of Development : ____________________________________________ Flood 2ooe:_______________________ Required Lowest Floor Elevation:_______________ If building As located within m flood bersrc6 zone (Zone A), a survey must be made AFTER THE SLAB HAS BEEN POURED, certifying that the LOWEST FLOOR ELEVATION is equal to or above the base flood elevation established for that zone. No final inspection will be made and no certificate of occupancy will be issued until the survey is on file with the Building Departmeot, COMMENTS: Applicant Acknowledgement : I understand that the iooueuoe of this permit is contingent upon the above information being correct and that the plans and supporting data have been or shall be provided as required. I agree to comply with all applicable provisions of Ordinance 0o. 25-7-11 and all other laws or ordinances effecting the proposed development. Date..............Applicant's Signature__________________________ ____________________________________________________ Departmeot Use Required Lowest Floor Elevation _________________ As Built Lowest Floor Elevation _________________ Survey Filed with Building Department ___________ ----------------------------------- Building Department Representative page 3 ` ` a APPLICATION FOR WATER METER �1 DATE,.WI -- - ALJ J �' ----I CONTRACTOR:_ - -G2%�' `�=----=----------- ,--------------- BILLING ADDRESS: ------_'_ ---------------- --1 1 _ SERVICE ADDRESS: / ________ __ -- ------------- LOT:_-__BLOCK:_ `----UNIT:---------SUBDIVISION _______ ACCOUNT NUMBER: METER SIZE:_-�M�_______ I HEREBY REQUEST THAT A WATER METER BE SET AT THEiABOVE SERVICE ADDRESS. I UNDERSTAND THAT I WILL BE BILLED ' FOR TEMPORARY CONSTRUCTION WATER UPON SETTING OF THE METER: I FURTHER UNDERSTAND THAT I AM RESPONSIBLE FOR ANY AND ALL DAMAGES TO THE METER, BOXES, VALVES, LINES, AND ANY PARTS THEREOF, UNTIL PERMANENT WATER SERVICE HAS BEEN ESTABLISHED BY THE CUSTOMER. i =---------------------- i CONTRAC TOR i ---- -_�-- -- --------- CITY OF ATLANTIC B H :r I i i CITrruf tratr of (Orravattry CITY OF �QI�C �iQ�l►- �'`A+u�i �r�ttr#mrnf of �ixit�ing Jtts�rrr�inn This Certificate issued pursuant to the requirements of Section 109 of the Southern Standard Building Code certifying that at the time of issuance this structure was in compliance with the various ordinances regulating building construction or use. For the following. Use Classification_ - _ _ t£1 Bldg.Permit No._ •�' Group Type Construction Fire District. Owner of Building r a Address l (y. I T"•, Building Address ' Locality_ __ building Official Date:_,...._ .._.._ POST IN A GONU'IOUOUS FLACK Y BUILDING, PLANNING AND ZONING INSPECTION DEPARTMENT CITY OF ATLANTIC BEACH, FLORIDA CERTIFICATE OF OCCUPANCY WORK SHEET Date Requested: Building Contractor: v r Building Permit Number: -7 •7S Q Address: / Legal Description: Improvements to the above described property have been completed in accordance with the terms of the permit and is certified to be ready for occupancy as Lowest Floor Elevation: ---------- ---------- ---------- required as built n/a Sales Tax Certificate: -- -- ----------------- ate submitted BEFORE ISSUING CERTIFICATE OF OCCUPANCY THE FOLLOWING MUST BE COMPLETE DEPARTMENT DATE NOTIFIED: DATE APPROVED: BY: Fire Chief /v Public Works --------------- --- -- �----1-- - - --------------- --- ------ -- � _ GI Planning Director --------------- Building ___Building Inspectort � �� J ADDRESS pp � -- 1 S>_� -- -r =----- -- ---- - ------------------ " W CONTRACTO OWNER GCS. -------- --------_- �---- ------------------------------ BUILDIHG � D _ MECHANICAL________ PLUMBING_______ ELECTRICAL�J?a - TEMP POLE �� __ MISC ----------- ELECTRICIAN / - �J--- DATE FAILED DATE PASSED TEMP POLE JEA �-S _Cs 6 FOOTINGV �00 ------ ��J_------ ROUGH PLUMBING ----------- ----------- SLAB --------Q-- ----------- FRAMING O ----------- ---a-------- MECHANICALJFIREPLACE ----------- ----------- TOP OUT PLUMBING ROUGH ELECTRIC FINAL ELECTRIC FINAL BUILDING ELEVATION SUBMITTED ----------- ----------- CERTIFICATE OF OCCUPANCY 131----------- -- DATE ORDERED DATE ISSUED CITY OF �� e rtlt E�eaelc-j�o�lala #� Office of Building Official c 1 v REQUEST FOR INSPECTION 4Date � fir' Permit No. �3 Dime A.M. Received P.M. District No. Job Ad as Locality Owner's �� Contractor ) Name BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing ❑ Footing ❑ Rough Wiring ❑ Rough ❑ Air.Cond.& ❑ Re Roofing ❑ Slab ❑ Temp Pole ❑ / Top Out ❑ Heating Lintel 11 Final �' Sewer ❑ Fire Place ❑ READY FOR INSPECTION Pre Fab Mon. Tues. Wed. Thurs. ridayV' A.M. Inspection Made P.M. Inspector Final Inspection❑ Certificate of Occupancy Date CITY OF Office of Building Official REQUEST FOR INSPECTION Date 2 Permit No. ` `✓ 12— Time A.M. Received P.M. District No. Job A dress Locality Owner's �lS !/4 � Name Contractor BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing ❑ Footing ❑ Rough Wiring ❑ Rough ❑ Air.Cond.& ❑ Re Roofing ❑ Slab ❑ Temp Pole ❑ Top Out ❑ Heating Lintel ❑ Fire Place ❑ Pre Fab READY FOR INSPECTION Mon. Tues. Wed. Thurs. F/ riday 1 P:1�7� -3— a-1-fl? P.M. Inspection Made Inspector ��1� �f._i Final Inspectional t� Certificate of Occupancy Date �... • r.:';. r 1...;•.4 .;..,-. ._ " ,yq�',�,�.�Y�•r+ < .X. d 4. a�t���.rt i t5r".{� �'^3'r.��-A'tl�"�'+r. 't 1�' 'r'r�l'ia F ����'�'* . _A�'•,rY�j�^,�taFd' $�:��s�-�k' r,"... ..� Ali RNM EO )NOATI S.,,%Mv.let . -Fit rtlay 1we linitl1 t�4'll krme►e nr,,�rtJ� ` 1{' T_ Sto e( I'loDt.in 1y1FTt{QI) FOR EA(?T►I(1�)A h' t\ 7 �—T.+o'�'I Oat1 � Ctillry Jobl Bon/ Btarn FirttNfFluc Liner Arxhoraje _L14 Tara. �4Nr �Normal Bric1) /E24 S;jcin9 PLAN eCEILING , PArSt Smoker Ch3mter With .', Ad.ustaSlr Dam;tj 1yMortu �•: I 1�2, pea Rod 6'z..ztG�Cc�c s 1 t cc: Ir Iron_ file _ Vertical R",..r. P • - � r,' C ri u,n -- --- - , +� I Tr,o V Hearth SJ0 R.;I)f. vicL FLutp CJtinO Cccr Finished Gra:r �w� F Z_ .,, ��Ccrttc"r ajin7 2 55: 1=15_ c. iV - 1 sear u—� . Nai �rV 1 F IRF PI ACF f)=TA.II RFI^:FI^•R('F1.FNT AISDAN i ALL—i P MIC ZONES 2 te� e P IN SEIS1IIC ZONES 2 431AASCNARY,CHIUSEYS IN WOOD FkAWCS BUILDINGS SHOULD BE AUCHCRED AT EACH FLOOR AND ROOF LINE HCRE THANG'ABOVE I YPI( AI �F� GRAOE FOR A lam. HORIZONTAL FORCE OF 900 LBS. IS ANY DIRECTIOt1.2.STE;L STRAPS SECURED TO CHIMNEY VERT. REINFORC.ANDFASTCNED TO THE STRUCTURAL FRANEWORK Of TrtC BUILDINC, IN ACCOHCANCE WITH THE ILLUSTRATIOMS NAY BE CONSIDERED ADCOUAIE ANCHORAGE ACIVIOCO THE UNSUPPORT(D HEIGHT URI 1,1" WALL•ICC.SLDLOCK FI OF CH+NN[ ABCs[ THE I.OF POST ANCHCk DOES NOT EXCEED 3F(CT• Jltf INTRIC AiC UNIT OYBONDn+I (I);ECURL II STEL ANCHOR STRAP TO 7r<4'TIESOf SUFFICE NTLLhC,11( -MASONRY IS DUNGINstt LL( TO.SPAtt3CEILING JOISTS WIT01Z DOLTS Oil WITH011AILS .-_- SOARC BOLI 2 �'If Q UU (!)AOOIIIOr1ALF[IHFOhC(MCt1 NAY 0C1.(QUITICOASIr+01CA1LDDYR1GlM[CR1NG PLUMB A LILLWITHAl/2'eAt,(MGRBOL ANALYSIS. .CON[RC1[ Af TIP r.1-iCtu(rt CITY OF 4tl4^& &404 Ilo"* Office of Building Official '* 'h REQUEST FOR INSPECTION Date ` 0 / PermitNo. Time /. A. Received ow, Job Addres Locali Owner's �BUIL�DliNG Contractor CONCRETE ELECTRICAL PLUMBING MECHANICAL ❑ Footing ❑ Rough Wiring ❑ Rough ❑ Air Cond. & ❑ Re Roofing ❑ Slab ❑ Temp Pole ❑ Top Out ❑ Heating Insulation ❑ Lintel ' ❑ Final ❑ Sewer ❑ Fire Place ❑ �f Pre Fab f/ i G�`•�READY FOR INSPECTION / 1 GZSC� 6) A.M. Mon. Tues. cc �}`� Wed. Thurs. Friday L�"\W` A.M. r Inspection Made P.M. � Inspector Final Inspection ❑ / Certificate of Occupancy ❑ a �NA(0 Date /A�ss��a a�,� /CITY OF 99&% /r - _ Office of Building Official REQUEST FOR INSPECTIO Date / Permit o. Time A.M. Received M. r _ `" Job A dress � 2,v9---31?/ � Locality Owner's Name t...., Contractor BUILDING CONCRETE ELECTRICAL PLUMBING ECHANIC Framing ❑ Footing ❑ Rough Wiring ❑ Rough � -&— Re Roofing ❑ Slab ❑ Temp Pole [7, Out O Heating Insulation C.7 Lintel ❑ Final ❑ Sewer G Fire Place ❑ Pre Fab READY FOR INSPECTION Mon. Tues. Wed. Thurs. Frida y� r A.M. Inspection Made 11! C� PM. Inspector Final Inspection C Certificate of Occupancy 0- Date Date