Loading...
Item 6B AGENDA ITEM # 66 SEPTEMBER 27, 2010 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Wastewater and TMDL Compliance Program Funding with State Revolving Loan — Resolution No. 10 -14 SUBMITTED BY: Donna Kaluzniak, Utility Directo DATE: September 17, 2010 BACKGROUND: For several years, the City has been working with engineers to meet new, more stringent nitrogen limits for the City's wastewater treatment plants. The project began with an extensive preliminary study to determine the most cost effective means to meet the TMDL requirements. Options studied and analyzed for life cycle costs included constructing a reclaimed water system, upgrading both of the City's wastewater plants, sending the flow from Wastewater Plant #2 to JEA, and upgrading WWTP #1 while transferring flows from WWTP #2 to WWTP #1. HDR Engineering completed the preliminary study and presented the result to the City Commission in a Workshop on December 15, 2008. The most cost - effective way to meet the TMDL requirements includes • Upgrading the existing Wastewater Treatment Plant #1 (1100 Sandpiper Lane) to meet advanced treatment standards for nitrogen removal — Estimated cost of $5.7 Million • Phasing out the Buccaneer Plant (Wastewater Plant #2) and constructing a force main and flow - shedding of existing lift stations to transfer flow to Wastewater Treatment Plant #1 — Estimate Cost $3.62 Million Final design is nearly complete for the projects. Staff applied for a loan through the Department of Environmental Protection State Revolving Fund (SRF) for the TMDL upgrades to Wastewater Plant #1, construction of the force main, and phase -out of Wastewater Plant #2. The Commission passed Resolution 10 -10 on August 9, 2010, supporting the facilities plan — but that resolution only specified the wastewater treatment plant work. DEP informed staff that funding may be available for the entire project to include the pipeline. Resolution 10 -14 will meet DEP's requirement to provide an adopting resolution establishing a commitment to implement the entire facilities plan. BUDGET: The estimated cost of the total project is $9.6 Million. A 9% sewer rate increase is being requested in the FY11 budget to pay for all of the improvements, including the Buccaneer Plant Phaseout portion. RECOMMENDATION: Adopt Resolution 10 -14 establishing a commitment to implement the Facilities Plan for the Wastewater and TMDL Compliance Program to upgrade Wastewater Plant #1 to meet advanced treatment standards for nitrogen removal, construct the force main to pump flow from Wastewater Plant #2 to Wastewater Plant #1 and phase out Wastewater Plant #2. ATTACHMENTS: 1. Resolution No. 10 -14 REVIEWED BY CITY MANAGER: CY _ AGENDA ITEM # 6B SEPTEMBER 27, 2010 RESOLUTION NO. 10 -14 A RESOLUTION OF THE CITY OF ATLANTIC BEACH, FLORIDA, RELATING TO THE STATE REVOLVING FUND PROGRAM; ESTABLISHING A COMMITMENT TO IMPLEMENT THE FACILITIES PLAN TO UPGRADE WASTEWATER TREATMENT PLANT NO. 1 TO MEET ADVANCED TREATMENT STANDARDS FOR NITROGEN REMOVAL, CONSTRUCT A FORCE MAIN TO PUMP FLOW FROM WASTEWATER PLANT NO. 2 TO WASTEWATER PLANT NO. 1, AND PHASE OUT WASTEWATER PLANT NO. 2 TO MEET THE TOTAL MAXIMUM DAILY LOAD FOR NITROGEN WHEREAS, Florida Statutes provide for financial assistance to local government agencies to finance the construction of wastewater facilities; and WHEREAS, Florida Administrative Code rules require evidence of a commitment to implement wastewater facilities improvements funded by the State Revolving Fund; and WHEREAS, the State Revolving Fund allows that the City of Atlantic Beach Project Number WW16071 is possibly eligible for available funding; and NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Atlantic Beach, Florida, that SECTION I. The City of Atlantic Beach, Florida is authorized to apply for financial assistance to finance the project. SECTION II. The City of Atlantic Beach is committed to implementing the facilities plan to upgrade Wastewater Treatment Plant No. 1 to provide advanced treatment for removal of nitrogen removal, construct a force main to pump flow from Wastewater Treatment Plant No. 2 to Wastewater Treatment Plant No. 1 and Phase Out Wastewater Plant No. 2 to meet the Total Maximum Daily Load requirements. SECTION III. The City Manager is hereby designated as the authorized representative to provide the assurances and commitments required by the application. SECTION IV. The City Manager is hereby designated as the authorized representative to execute the agreement which will become a binding obligation in accordance with its terms when signed by both parties. SECTION V. The City Manager is authorized to represent the City of Atlantic Beach in carrying out responsibilities under the agreement. The City Manager is authorized to delegate responsibility to appropriate staff to carry out technical, financial, and administrative activities associated with the agreement. ADOPTED at a public meeting by the City Commission of the City of Atlantic Beach, Florida on the 27th Day of September, 2010. AGENDA ITEM # 6B SEPTEMBER 27, 2010 Mike Borno Mayor / Presiding Officer Approved as to form and correctness: Alan C. Jensen, Esquire City Attorney ATTEST: Donna L. Bartle City Clerk Resolution No. 10 -10