Loading...
Permit 709 Cavalla Road 5 MIN. PJTUPJI .NOTICE OF COMMENCEMENT PHONE# 0 State of Florida LU County of: U VA— The —The undersigned hereby informs all concerned that improvements will be made To certain real property, and in accordance with section 713-13 of the Florida Statutes(Revised 10-1-9 the following information is stated::cu Legal Description of Property:o�Q.\ r d��M S U2n 1 General Description of Improvements: Yl- _:V/4 S-114 tl-CPc oOwner Name:(Printed)�^ C-¢-- Q Address: �a'a'.3 *'r Owner's Interest in Property: ��-�— <<-- ti 0 Fee Simple Title Holder(if other than owner) rl V4 Y Name:(Printed) 0 Address: 0 Contractor(Printed) Patterson Home Improvements Address: 6967 Philips Highway Jacksonville FL 32216 Telephone: (904)296-0045 Fax: (904)296-6270 Surety(if any)(Printed): Amount of Bond$ Address: MM 05/13/2003 Oe:54 AMERICAN WHOLESALE 4 PATTERSON NO.372 901 I Certificate• a ConformanceSpecific • • PERFORMANCE SIDING All Vinyl Sidings by Crane Performance Siding APPROVED CITY OF ATLANTIC BEACH BUILDING OFFICE Market Square Vinyl Siding MAY 15 2003 By; �, 4S Market Square Siding by Crane is manufactured to meet or exceed ASTM D-3679,Standard Specification for Rigid Poly(Vinyl Chloride)(PVC)Siding(see United StatesTesdng Report 112251.1),and possess a 2223 cell classification-(See United States Testing Report 113889-1), Market Square Sidings meet or exceed Building Code requirements,i.e. See SOCA-ES Research report No.93-30 See ICOB-ES Evaluation report No.3378 See S6CC1 PST&ESI report No.93121 Market Square Siding Is Weather Tested employing ASTM D-1435 Standards in Hot Dry Climate(Phoi'nix, AZ), Hat Moist Climate (Miami, FL), and Northern Industrial Climate (Columt us, OH). Market Square Siding Isto be installed employing ASTM D-4756 application procedures. Market Square Siding is Wlnd-Load Tested employing ASTM D-5206,Procedure B.(See Professional Service Industries,PSI report No. 103.40022-5). Windload Rating 50 PSE Radlant Panel Test Method for Ignitlbility Characteristics of Exterior Wall Systems(See Test report from Southwest Research Institute,SWRI project No.01-4890-023), Rate of Burning via ASTM D-635(See United States Testing Report No, 112251-2). Smoke Density measured in accordance with ASTM D-2843(See United States Testing Report No. 093653). Flammability in accordance with ASTM E-84(modified for a 30 minute flarne exposure). (See United States Testing Report No.095053). Overall Wall Thickness Spedfications Market Square D4 .042 Nominal Market Square D4.SDL .042 Nominal Market Square D5 .042 Nominal All Compression Blended Weathershieid Capstockthickness ratio's areformulated at 2S%-30%to overall wall thickness. All foundation blends are formulated to Include proportionate weatherabil- Ity, MAY.15.2003 9:26AM PATTERSON HOME IMPRO NO.371 P.1/4 "SIDING INSTALLATION" 1. install insulation board 'or foil, to all flat well areas. Make s,xre to interlock all tongue and groove joints securely. Place insulation as close as possible to- openings and corners where air leaks are likely to occur. when 3/4" foam board is used, corner boards and window facings may be left on the house. When fold-a-foam is used, corners should be removed and the insulation should be wrapped around the corner. 2. Insulation and foil may be stapled if desired. Be sure that staples are firmly set so that insulation will remain in place until the siding is installed. 3. Install J channel around sides and tops of windows and doors, making certain that the channel is laying flat against the wall and straight. The corneas where J channel meets should be mitred by cutting the end of the horizontal Piece at a 45 degree angle and notching it to fit snugly against the vertical piea~e. window sill extensions and header extensions; on windows and doors should be cut off so J channel can be installed flush with the castings. Channel should be nailed in the factory slots every 12 inches. Do not nail tight. If window and/or door facings are to be covered with ooilstocc, this should be done before installing the J channel. 4. Install finish trim under all windows, nailing the slots every 12 inches. It may be necessary to furr out under the window to maintain proper slope of the panel. 5. Install outside corner poets on all outside corners, Making certain that the corner is plumb and that it is not twisted. The corner should be placed in Position allowing 1/4" clearance at the top. Nail at the top. of the upper slot. All other nails should be nailed in the center of the nailing slots. The corner should extend no more than 1/4" below the bottom of the siding. Corners may be extender] futher down until the siding is run and then cut off flush with the bottom of the siding. If the wall height requires the use of more than one corner, the shorter piece should be used at the top, and should be lapped over the bottom piece. Inside corners are made by using two pieces of 3/4" J channel. One piece should be placed squarely into the comer, and the second should fit flush against the first. 6. To establish the starting point for siding installation, locate the lowest corner • of the house. Measure dam from the save and/or windows to a point appr+cacimately 10" above the bottom of the existing siding, than measure an equal distance doom to the next ecrner on that wall. This insures that the siding appears level with the windows and/or eaves, regardless of any actual setting of the house. Stretch a chalk line between these two points, checking to besure that the line is taut and straight before popping a line. Repeat this p=aws all around the house, making necessary adjustments until all lines meet at every corner. In the case of extrema settling, "splittling the difference" miry be necessary to achieve proper alignment around the house. 7. Install starter strip using chalk lines as guides. If the bottom of the starter strip Extends more than two inches below the existing siding, use oedar shingles to start the siding ,in those places. Extreme care must be takers in using shingles not to lock panels too tightly,.thus making the shape of the shingle obvious after siding is installed. If the drop--exoeeds 6" xou:ebou].d rengve the bottom panel of the existing siding and rip 3/4" pl to fit the needed drop. I wood touches the ground, you mist tsae cssdar ' wolmanized pine. Starter strip can then be nailed to the plywood. ,MAY.15.2003 9:26AM PATTERSON HOME IMPRO NO.371 P.2i4 q o rto . :It is extremely important that the starter strip be straight and meet accurately at all oorners.This will insure that the siding panels will bang straight and that they will meet 'accurately at the corners. Nail :starter strip in center of nailing slots every 12". Keep ends of ,successive starter strips at least 1/4" apart to allow for expansion. Careful planning at the time of installing the starter strip can insure that the proper finish can be acaanplished at the top of the wall. The top panel should have at least a 1-3/4" allowance from the bottom or butt to the top. 8. The first siding panel is lacked on starter strip or cedar shingles, but should not be pulled up too tight. Panels should be hung in place by hailing into the center of the nailing slots at least every 18". Mails should always be driven str4ght and level, never slanted up or dawn. Never nail panels tight and never use staples on siding install- ation. Nails should be long enough to extend through the nailing flange and the insulation and have sufficient penetration into the wood siding below. When nailing into "soft" wood siding it will be necessary to locate the studs, and nail into those in order to ensure that the nails will not pull out. Do not force the panels up or down when nailing in position. The panels should not be under vertical tension or compression when nailed. Siding is hung on the wall, not nailed to the wall. 9. When cutting vinyl siding with a power saw, use a fine tooth blade mounted in reverse position or saw can be pulled backwards. NEVER use a power saw to cut steel siding, us snipe or a siding "chopper" only. 10. Allow for expansion and contraction by leaving 1/4" gap in all corner posts and channels. Overlap panels aln=x imatel<y cnehalf of the factory pre-notched ends. stagger and laps-at least 30" apart so that one is not directly above the other, unless separated by three Courses. Always overlap joints away from antranoes and from the point of the greatest traffic. Check every 3rd or 4th course for proper aligamt. Ares 12 feet and less should never have splices, and pieces less than 3 feet should never be used as'starters or finishers. Eq=w only the manufactured edges of panels. 11. Remove all objects that are attached to the well before installing siding. Re-install, these objects iimiadiately aitw covering the spat . were attached. Drill holes through the siding, using a larger bit than the screw or nail to be used so that it will not cause the panel to buckle when expansion and contraction occurs. 12. Wren fitting panels under windows, cut the section out for an accurate fit. F= under the window if needed to maintain proper alignment, and slide -top of cut into finish trim. Be aura to allow 1/4" on either We, of cut, to allow for expansion and contraction.. •c MAY.15.2003 9:27AM PATTERSON HOME IMPRO NO.371 P.3i4 12. When fitting panels under windows, cut the section out for an accurate fit. Purr under the window if needed to maintain proper alignment, and slide top of out into finish trim. Be sure to allow 1/4" on either side Of cut to allow for expansion and contraction. 13. To insure a _proper fit for the top course, cut the last page-1 so that it will cover the remaining open section. Use a snap lock punch to punch flaps 1/2" below top edge of the panel. Punch flaps every 1011: Install finish trim under the eave to receive the trimmed panel. It may be necessary to fury the finish trim slightly to maintain proper alignment and to insure a secure lock. slide the top panel into the finish trim soithat all flaps penetrate beyond the return lip on the finish trim. Never face nail through the vinyl siding panel to hold it in place because this will cause it to buckle when it expands-and contracts. Top panels that exceed 4 feet in length may be faced.faced nailed with one color matching trim nail. Use only one and place it in the center of the panel Do-not nail to tight. 14. When top finishing in a gable, install 3/4" J channel along the bottom of the rake board. The siding is cut at the appropriate angle and installed . in the channel, allowing 1/4" for expansio. The top-triangle in a gable-may be faced nailed 1" below the top point using a matching color trim nail. The nail should not be driven tight. 15. When a gable vent is to be covered, use matching color vented soffit material installed vertically. Channel around. the vent with 1/2" J channel and cut panels to fit accurately into-the configuration of- the vent. 16.When outside turners exist on tops of porches, use 3/4" J channel to receive the siding from each direction. Do not leave a gap betwean the two pieces of J channel. Do not use outside corner posts. 17. If the bottom of a panel has to be triamed for alignment before it is installed above a poach or on a gable end, use 3/4" J channel under the panel to give it a finished appearance. 18. Never use any siding panel that is less than 30" long unless it inside a smaller opening, 19. When installing siding ascend electrical be and meters, cut panels accurately for a snyg fit, allowing for expansion. Using color matched caulking, caulk the gap•neatly. Do not use J channel.. 20. Keep hands as clean as possible during application. To clean use a soft cloth or damp sponge dipped in mild detergent solution. T�g�hly clean the siding as it is installed and•check at the and of the job to be sura all dirt has been-removed. 21. Critical points to remember: --Nail panels to center of slot ` —Do not nail tight; let panel hang --louver use staples --Dc# not face nail -Neave 1/4" clearance to all openings and stop for expansion and contractions r CITY OF ATLANTIC BEACH APPLICATION FOR PLUMBING PERMIT JOB LOCATION: Cuv 1tw OWNER OF PROPERTY: TEL. aZ o- 7 0 93 PLUMBING CONTRACTOR: N "S �r �� l '� c` CONTRACTOR'S ADDRESS: / 2f�113 SAY" =�'�>`, 6'i, C, 3�a YO' STATE LICENSE NUMBER: TEL. C/7Vql HOW MANY OF THE FOLLOWING FIXTURES RE-PIPED OR NEW SINKS Z SHOWERS Z LAVATORY C WATER HEATERS I BATH TUBS DISHWASHERS URINALS DISPOSALS 2 CLOSETS 1 WASHING MACHINE FLOOR DRAINS SHOWER PANS SEWER WATER SZ_RE-PIPE(LIST FIXTURES BEING REPIPED) OTHER TOTAL FIXTURES: X $3.50+$15.00= MINIMUM PERMIT FEE: $25.00 SIGNATURE OF OWNER: SIGNATURE OF CONTRACTOR: INSTALLATION OF PLUMBING AND FIXTURES MUST BE IN ACCORDANCE WITH THE MOST RECENT EDITION OF THE SOUTHERN STANDARD PLUMBING CODE. CALL A DAY AHEAD TO SCHEDULE INSPECTIONS-(904)247-5826. PRE-SERVICE DIVISION JACKSONVILLE ELECTRIC AUTHORITY 233 WEST DUVAL STREET JACKSONVILLE, FLORIDA 32202 THE FOLLOWING FINAL INSPECTION(S) HAVE BEEN MADE AND ARE SATISFACTORY: -- ----------------- ------ ------------------------- ----------------------- ------ •------------------------------------------------- ------ ------------------------------------------------- ------ ------------------------------------------------- Enclosed are the blue copies of the permits. r S I NCE7Y, BUILDING INSPECTION DIVISION cc:FILE 1 1 tJ� n CITY OF ATLANTIC BEACH, FLORIDA Approv"by APPLICATION FOR ELECTRICAL PERMIT TO THE CHIEF ELECTRICAL INSPECTOR: DATE: IMPORTANT NOTICE: , IN CONSIDERATION OF PERMIT GIVEN FOR DOING THE WORK AS DESCRIBED IN THE FOLLOWING, WE HEREBY AGREE TO PERFORM SAID WORK IN ACCORDANCE WITH THE ATTACHED PLANS AND SPECIFICATIONS, WHICH ARE A PART HEREOF, AND IN ACCORDANCE WITH THE ELECTRICAL REGULATIONS, CODES AND CITY OF ATLANTIC BEACH ORDINANCES. G joulyq /-tel 4e c hl G ~' I �-- ELECTRICAL FIRM: MASTER ILE ICSIGNATUFfE' JOURNEYMAN NAME ADDRESS: 20g Ae�gdRFD BOX BLDG.SIZE BETWEEN: 54 L r"i $ RES.PO APT.I ) COMMA I PUBLIC( ) INDUS.( ) NEW( } OLD, ) REW.( } ADDITION ( ) TRAILER ( ) TEMP.( ) SIGNS ( ) SC.FT. SERVICE: NEW( ) INCREASE REPAIR ( ) FEE CONDUCTOR SIZE 0 AMPS ad 0 COPPER I I ALUM. SWITCH OR BREAKER PH I W VOLT A I wr, RACEWAY EXIST.SERV.SIZE /00 AMPS PH 3 W VOLT SG 11 RACEWAY FEEDERS NO. SIZE I NO. SIZE NO. SIZE LIGHTING OUTLETS CONCEALED OPEN I TOTAL RECEPTACLES CONCEALED1. OPEN I TOTAL 0•80 AMPi. 31•100 AMP{. SWITCHES INCANDESCENT FLUORESCENT&M.V. FIXED 0.100 AMPS. OVCR APPLIANCES I BELL TRANSF. AIR M.P.RATING H.P.RATING CONDITIONING COMP.MOTOR OTHER MOTORS AMPS CEIL HEAT: KW-HEAT a� MOTORS H.P. VOLTAGE PHS N0. INF. VOLTAGE PHS MISCELLANEOUS Nw- TRANSFORMERS: uaeFw Amu I I I .,.,tee • FOR OFFICE USE ONLY f- Date----- -� ..........19 61 GG 'JO Permit #�-•4�_f ---Fee$...I4...p............. � ,oa CITY OF ATLANTIC BEACH Valuation $-,6-4®0- 0=. FLORIDA House *-----74f-.. _____________________•-____. APPLICATION FOR BUILDING PERMIT .•••-...--••••••••-••••••••••----••-----•••.............................•--- .-•-----•-•---•--------------------------------•-----___----___.._.__.__--_- Application is hereby made for the approval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the City of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the City of Atlantic Beach and all rules and regulations of the Building Department of the City of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the City of Atlantic Beach,Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections itis s ested that a list of suontractors be submitted to this office so that licenses can be verified. 7•,= . , � 3 Date.._ ----- ------------------------------ Owner__ Ct .....do.2.r `.......(26..........----- ----Address_..-----•-•------••------••----•----------------------------Telephone No.-•---•--__---•-••-----•---- Architect-..---------••............... ............................................................Address............................................................Telephone No-__----_____------------- Contractor Builder_---- ( tt! 5.. .............•--•-••------••----....-----•-•..Address---•-----__-_____---____----•-•--//--�--_-__----__-_--------TTeelephone No-------- Lot No.................../..............................Block No------- ---•--------Sub DivisionX� C •=�---A........Zone------------- �j ® Sts. / 4�..Street------------------------'Side Between.--------•--•.--..-----_-----__-------•--•----and------------------•--------••--------- Valuation $____60100 ---7-------ForRwhat purpose will building be used-------------------__--___---._-..._-Type of construction---._-__..-_____-__-__-.----------_ � �yyyy�� Dimensions of Building- 7!-�-X..39 •-----Dimensions of Lotg - ,' /�-` 7;i. i �. maize of Footings- 0! ----r_--_____------ Size of Piers-----------------------------------Size of Sills-...-.--- .-___-Greatest Sill Span in ft-----_.-_----_--_-_--------Type RoofZ?e�'t__. How will Building be HeatedL � --yfcalfWill Building be on Solid or Filled Ground?-. ............ t Size of Ceiling Joists_l.LLt4W1__------------------- Distance on Centers-_�_4................................_ , Greatest Span.....................--------------__---__ " Size of Floor Joists-----_-----•--_---------------------------Distance on Centers........... ------•----•---•-••----•-------, Greatest Span_-----------•-----•-----------------•--- " Size of Rafters---------------•----------------------------------- Distance on Centers........ ........-----•--------......--- Greatest Span------------------_-----------•--------- This rectangle is to represent the lot. Locate the building or buildings in the right position. Give distance in feet from all lot-linea and existing buildings. REAR LOT LINE Two copies of plans and specifications shall be submitted with application. Inspections required. 1. When steel is in place and ready to pour footing. W W 2. When steel is in place and ready to pour columns and/or lintel. 3. When steel is in place and ready to pour beam. `� a 4. When framing is completed. ra S 5. When rough plumbing is completed,'and ready to cover up. 6. When septic tank drain field or sewer is laid but before it is covered. A A 7. Electrical inspection by City of Jacksonville. 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called for after corrections are made. FRONT OF LOT In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with th attached plans and specifications, which are a part hereof, and in accordance with the building regulations of the City47ach. Signatureof Builder. ••-• ....................................... Address........................---------------------------------------------------------------...... Signature of Owner--..-..... ..:.. ..........._ Address.._..•••.___.-_-..__..._...__.._.._.._..-_..........__..._.__._....--•-•---..-_............._----.-- DEPARTMT OF �U�11� FOR OPPICE UW ONLY-,,.- j' 19 73 ITY ,OF ATDA*IC'8Z►C F 1khA Date P �__... ...._ �«. Permit #___,,, Fee � , _Application foretuit Valuation, tor Misc. Al + ra ion* Howe and Repairs i DESCRIBE: w (state 'if to-repair, alter, a. o of move building, erect awnings o� signs, ' etc Building on: Lot Ido. sA No. Su .Div. Ae Address Valuation Owner's Name BUILDINGS & bCNCY Building Use Residential or Busine*s What Plumbing work to be done? Size of Preaent Bldg. Size * Elena on Lot size Material °'of Roof No. of stories ,now , after altered Material of Present Building Materia. >of Extension LIMS1 MUST BE J 1 11" Now 106A S Z Gla Size Classification (state whether ground, hoof, wall:, projecting banner? Material of construeti ft Illum nated? a of iiiutitlaktiow State whether l(ji�s or neon} Will sign.be ovbr Publio prc�pert�r? ; SUBMIT'D9AWING SHOWING COD'STAUtTION OF SIGN ALD XM6D OF WWGING WRITE ADDITIONAL INFORMATION BELOW (For canvas awnings provide dimensioned drawing on reserve side) IMPOkwaT NOTICE.- In OTICE:In conei:deration of permit given fob doing the work as described in the above statement, we hereby agree to perforin said work in accordance with the attached Plans and specifications, which aro. -A part hereof, and in accordance with the building regulations of the City of.Atlantic Be6oho South tandard Suli de) Signature of Buil r er Zdl Address, Phone �. D. H. STEWART, INC. Real Estate Investors Bus: (904) 743-1678 David H. Stewart, President Post Office Box 8515 Caroline K. Stewart, Secretary/ Treasurer Jacksonville, Florida 32211 C oe& r.. /7.,2 j l� H. STEWART, INC. D. Real Estate Investors Bus: (904) 724-7371 David H. Stewart, President 103 Century 21 Drive, Suite 116 Caroline K. Stewart, Secretary / Treasurer Jacksonville, Florida 32216 March 24, 1981 ATTN: Ronnie Vista Dear Ronnie: Enclosed is the check for the water meters. S* cpre f 1 i.H:"S President. DAVID STEWART,INC 103 Century 21 Drive, Suit 116 Jacksonville,Fla 32216 (904) 724-7371 Paid for 20 water meters at the cost of $85.00 Per Meter. ($1700.00 Paid) Owes for 20 Yokes at the cost of $24. 13 per Yoke. $482.60 Owes for 20 Meter Box's at the cost of $11.00 per Meter Box. $220.00 (Balance$702.60) Paid for 8 Water Meters at the cost of $85.00 Per Meter. ($680.00) March 24,1981 Paid Owes for 8 Yokes at the cost of $24. 13 Per Yoke. $193.04 Owes for 8 Meter Box's at the cost of $11.00 Per Meter Box. $88.00 (Balance $281.04) C TY C.�__ �. � moo. a?58$ --.---------FLORIDA May 41 1981 D. F. STD', ART I11C. NAME-- - ------- ADDRESS--_---_-103 C.L 'I'UkY 21 D1,UVE, SUIT✓ 116 CITY______-- jt.Ci-O Z`ILLL,1"L0RID1� 32216 £'.;id cue balance of $90-3.64 for 28 yokes 22 meter ?pox's $4347.28 (Paid) aid 1/4/81 for 28 water deters, 28 yokes & 23 uaeter box's $3363.64 4 347.28 TL 4 347.28CKT0 67 1A 5/04/81 588 *00CACG 67 IA 5/04/81 10001 When Signed, Dated and Numbered, This Becomes an Official Receipt MAKE CHECKS ECKS PAYABLE TO Received Payment wAW OF A t LA 1 IC LEACH, � ,_O IDA TREASURER k _ -21 ✓ I1tr 7(X# Ila Pn tc# 6.00 9.W 1.5 170063 // 706;�lla M-- jd 6.00 9.on 7.50 170064: 8 70 valla Road 6,00 9,00 7,50 170065 710 ; ..valla Road 6.00 9.00 7.50 170066 ✓ 712wCavalla Road 6.00 9.00 7.50 170067► 714wavalla Road 6.00 9.00 7.50 170068✓ 716-6avalla Road 6.00 9.00 7.50 170069 718eCravalla Road 6.00 9.00 7.50 170070✓ 720 walla Road 6.00 9.00 7.50 170071✓ 722v6avalla Road 6.00 9.00 7.50 170072,/ 724#eavalla Road 6.00 9.00 7.50 170073✓ 72alfa Road 6.00 9.00 7.50 170074✓ 728<w�. alla Road 6.00 9.00 7.50 170075✓ 730rCavalla Road 6.00 9.00 7.50 170076✓/ 736:'alla Road 6.00 9.00 7.50 170077✓ 738r�ayyalla Road 6.00 9.00 7.50 170078✓ 740�avalla Road 6.00 9.00 7.50 170079✓ 742✓G<a alla Read 6.00 9.00 7.50 170080!" 744avalla Road 6.00 9.00 7.50 170081 746 'Cavalla Road 6.00 9.00 7.50 170082750.,C'avalla Road 6.00 9.00 7.50 170083✓ 752-,Cavalla Road 6.00 9.00 7.50 170084✓ 754�avalla Road 6.00 9.00 7.50 170085 v 756rCavalla Road 6.00 9.00 7.50 170086✓ 7581e--avalla Road 6.00 9.00 7.50 170087✓ 760se'avalla Road 6.00 9.00 7.50 170088 ✓ 762Kavalla Road 6.00 9.00 7.50 170089,,,-' 800•<avalla Road 6.00 9.00 7.50 170090 ,/ 802ieavalla Road 6.00 9.00 7.50 170091✓ 804*ea'valla Road 6.00 9.00 7.50 170092808 walla Road 6.00 9.00 7.50 1700931-1" 810se-=valla Road 6.00 9.00 7.50 170094 812,<a-valla Road 6.00 9.00 7.50 170095✓ 81.4 =ai valla Road 6.00 9.00 7.50 170096✓ 816 lla Road 6.00 9.00 7.50 170097! 818'Cavalla Road 6.00 9.00 7.50 170098 ✓ 820L�avalla Road 6.00 9.00 7.50 170099 ✓ 822oCa-valla Road 6.00 9.00 7.50 ] 10100✓ 824&,C"avalla Road 6.00 9.00 7.50 110101✓ 826&-ea-valla Road 6.00 9.00 7.50