Item 8H AGENDA ITEM # 8H OCTOBER 11, 2010 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Proposed Change Order No. 11 to Royal Palms Drainage Rehabilitation Project (PW0905) SUBMITTED BY: Rick Carper, P.E., Public Works Director DATE: October 5, 2010 BACKGROUND: At the July 27 2009 meeting, the Commission approved the award of a contract to R.B. Baker Construction, Inc. for construction of the Royal Palms Drainage Rehabilitation Project (PW0905) in the amount of $3,197,823.46 for the base bid and selected additive alternates and a contingency of 10% of the base bid. Change Order No. 10, approved for $128,888 at the August 23rd Commission meeting, included several design changes: Additive Alternate G2, additional resurfacing in Royal Palms (Redfin Drive, remainder of Bonita Road and sections of Plaza Drive) and the remainder required to add additional site preparation funds for removal of asphalt, curb and gutter and driveway concrete beyond that covered in the Bid documents, as well as addition of milling and resurfacing approximately 335 feet of Plaza Drive from the City Hall entrance to the 5 Points crosswalk. . This revised Change order removes the previously approved allocation of $83,640 from the new Fiscal Year's Gas Tax Resurfacing budget to the Royal Palms Project. In a separate Staff Report, Staff is proposing to resurface these streets by piggybacking on the COJ annual resurfacing contract at an estimated cost savings of $30,000. At R.B. Baker's request, the approved Change Order 10 was cancelled and a reduced scale $18,280 dollar change order was substituted to cover increased quantities of asphalt and curb & gutter removal. This revised Change Order #10 was approved by the City Manager. Change Order 11 corrects the previously approved Change Order 10 items that were not included in the revision and includes additional field changes accomplished since that time for a total change of $43,724.83. The project contingency amount at inception was $257,067; $66,564 has been added from deletion of Cutlass Drive and Wahoo Drive (Add. Alt K) segments and deletion of replacement of a portion of the AC water main on Plaza Drive (Add. Alt J). Contingency balance after processing this change order will be $51,376. RECOMMENDATION: Authorize the City Manager to execute Change Order No. 11 to the R.B. Baker Construction contract. BUDGET: This project is funded from the Stormwater Fund, Account No. 470 - 0000 - 538 -6300. The total contract price with this change order will remain $3,197,823.46, including contingency. ATTACHMENT: (1) Proposed Change Order No. 11 REVIEWED BY CITY MANAGER C7LIIII AGENDA ITEM # 8H OCTOBER 11, 2010 CHANGE ORDER NO. 11 Contractor: R.B. Baker Construction, Inc. Owner: City of Atlantic Beach 249 Industry Place St. Augustine, FL 32095 32095 Date: October 1, 2010 Attention: Chuck Chaon City Bid No.: 0809 -08 Project: Royal Palms Drainage Rehabilitation Project You are hereby requested to comply with the following changes in the Contract Documents: 1. Revised Scope of Work - LIKKtASk IN INLI*ASt IN UNIT PRICE CONTRACT PRICE CONTRACT PRICE ITEM NO. DESCRIPTION QTY UNIT $ $ $ 1 Concrete D/W 5" demo & dispose 400 SY $16.00 $6,400.00 2 Case X demo & dispose 2250 SY $10.61 $23,872.50 3 Miami C &G demo & dispose 1000 LF $7.67 $7,670.00 4 Sod 3,113 SY $2.77 $8,623.01 Delete Add Alt 1(Plaza WM) 5 PVC DR25 Water Main (8 ") - 560 LF $22.00 -$12,320.00 6 Gate Valve, Box & Cover (8 ") - 1 EA $1,665.13 -$1,665.13 7 45 Degree Bend (8 ") -4 EA $311.60 - $1,246.40 8 Pipe Restraints (8 ") - 8 EA $164.71 - $1,317.68 9 Cap /Plug (8 ") - EA $242.02 - $484.04 10 Temp. Sample Taps (2 ") (JEA W -25) -1 EA $558.86 - $558.86 11 Modify Existing Structure (5432, 5433) 2 EA $2,165.59 $4,331.18 12 Curb Inlet 3x3 (S -410, 415, 416, 451, 452) 5 EA $1,821.08 $9,105.40 13 Curb Inlet 4x4 (S -408) 1 EA $2,612.22 $2,612.22 14 Curb Inlet 3x7 (S -441) 1 EA - $3,783.25 $3,783.25 15 Curb Inlet 5x5 (S -407) 1 EA $3,832.10 $3,832.10 16 1 -1 MH 4x4 (S -419A) 1 EA $2,537.02 $2,537.02 17 1 -2 MH 3x5 (S418A) 1 EA $2,537.02 $2,537.02 18 15" RCP 88 LF $39.39 $3,466.32 ' 18 18" RCP 112 LF $42.44 $4,753.28 19 30 " RCP 184 LF $59.74 $10,992.16 20 19x30 RCP 80 LF $61.84 $4,947.20 21 Delete 18" RCP (Redfin) -39 LF $42.44 - $1,655.16 22 Delete 36" RCP (Cutlass) -200 LF $68.85 -$13,770.00 23 Delete 24" RCP (Cutlass) -194 LF $49.93 - $9,686.42 24 Delete Conn. To Ex. Structure -9 EA $1,392.07 - $12,528.63 25 Delete 24" RCP (Add. Alt K) -400 LF $49.87 419,948.00 26 Crew Day Pipe Restraints 1 DY ' $3,273.00 $3,273.00 27 Materials 1 LS 613.95 $613.95 28 Crew Day Pipe Restraints 1 DY $3,273.00 $3,273.00 2 9 Materials 1 LS $419.54 $419.54 30 24" RCP (Redfin Easement) -106 LF $50.25 -$5,326.50 31 24 "x 38" CIPP (Redfin Easement) 106 LF $179.50 $19,027.00 32 5' Block Wall (Redfin Easement) -70 LF $26.25 - $1,837.50 TOTAL - $82,344.32 $126,069.15 NET CHANGE IN CONTRACT PRICE $43,724.83 The above Revised Scope of Work will be added to the existing Purchase Order for the project. 18 days will be added to the Contract Completion Date. Revised Project Completion Date is November 23rd, 2010. Accepted By: Date: Contractor Approved By: Date: Owner