Loading...
Permit C/O Documents 2010 CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH FL 32233 C E R T I F I C A T E O F O C C U P A N C Y P E R M A N E N T Issue Date 10/28/10 Parcel Number 169398 -0200- - Property Address . . 2405 MAYPORT RD AB ATLANTIC BEACH FL 32233 Subdivision Name . . . SECTION LAND Legal Description . . . Property Zoning . . . COM GENERAL DISTRICT Owner ADAMS, FRED Contractor EC KENYON 904 389 -2353 Application number . . 09- 00002045 000 000 Description of Work . . COMMERCIAL NEW CONSTRUCTION Construction type . . . TYPE 5 -B Occupancy type . . . BUSINESS Flood Zone ZONE X Special conditions . 2007 FLORIDA BUILDING CODE WITH 2009 REVISIONS Approved �L Bui di 0 ficial VOID UNLESS SIGNED BY BUILDING OFFICIAL ajAteiet*/°5 CITY OF ATLANTIC BEACH CERTIFICATE OF OCCUPANCY WORKSHEET Date Requested: - z‘ -/o Contract or Name: • .. erm Permit #: _ 0 9- Ze)017 Property Address: Z Oar AlAyotwe ��C • Legal Description: Improvements to the above- described property have been completed in accordance with the terms of the permit and are certified to be ready for occupancy as: ❑ Single- Family Residence l ie Commercial ❑ Other: iii s Lowest Floor Elevation: Required As Built FFE The following must be completed before issuing Certificate of Occupancy: Department Date Notified Date Approved Approved By Fire Dept. /2 Z6 "/j w 14./# Public Works Public Utilities /v G •/O /0 • Z 7• ' • C W • Building to 44-- 0 ( to 146*-- Planning Tree Mitigation o ) ?/' Satisfied Final Survey with FFE Yes No All Re- Inspect Fees Paid V Yes No Termite Treatment Yes No BP500U04 CITY OF ATLANTIC BEACH 10/26/10 Request For Inspection - Inspection History 12:29:28 Application number : 09 00002045 000 000 Application type . : COMMERCIAL NEW CONSTRUCTION Tenant number, name : Permit type /seq /VRU : MCHF 03 000187740 MECHANICAL FIRE PERMIT Property address . : 2405 MAYPORT RD AB Type options, press Enter. 2= Change 4= Delete 5 =View Status Inspector Request Results Opt Date Inspection Description ID Date Time Stat Date 10/26/10 FD FIRE HYDROSTATIC TEST FD 10/26/10 AP 10/26/10 10/26/10 FD FIRE HYDROSTATIC TEST MG 9/01/10 CA 9/07/10 Bottom F3 =Exit F6 =Add inspection F12 =Cancel White, Debbie From: Walker, Chris Sent: Wednesday, October 27, 2010 7:45 AM To: White, Debbie Subject: RE: Request for CO approval Everything good on our side ! From: White, Debbie Sent: Tuesday, October 26, 2010 3:00 PM To: Carper, Rick; Walker, Chris; Nodine, Phil; Clemons, Malcolm; Kaluzniak, Donna; Hall, Erika Cc: Graham Shirley; Lanier, Joyce; Matthews, Carlene Subject: FW: Request for CO approval To All: Walgreens has requested their C /O. Please let me know via email if their inspections pass or fail with comments if needed. Thanks, Debbie Address 2045 Mayport Road, Permit #09 -2054 Debbie White CITY OF ATLANTIC BEACH BUILDING DEPARTMENT (904) 247 -5826 (904) 247 -5845 FAX From: Griffin, Michael Sent: Tuesday, October 26, 2010 1:53 PM To: White, Debbie Subject: Request for CO approval Debbie, would you please send out an email requesting comments for a CO for Walgreen's . They are wanting to open this Monday. Mike G. 1 White, Debbie From: White, Debbie Sent: Tuesday, October 26, 2010 3:07 PM To: 'bnix @eckenyon.com' Subject: FW: Request for CO approval Brian, First comments on your C /O.. Rick Carpers phone number is 247 -5834 or 247 -5833. Debbie White CITY OF ATLANTIC BEACH BUILDING DEPARTMENT (904) 247 -5826 (904) 247 -5845 FAX From: Carper, Rick Sent: Tuesday, October 26, 2010 3:02 PM To: White, Debbie; Nodine, Phil; Kaluzniak, Donna; Hall, Erika Cc: Graham Shirley Subject: RE: Request for CO approval Debbie, I have not received any of the stormwater documents requested, so have not done any on -site inspections. Rick From: White, Debbie Sent: Tuesday, October 26, 2010 3:00 PM To: Carper, Rick; Walker, Chris; Nodine, Phil; Clemons, Malcolm; Kaluzniak, Donna; Hall, Erika Cc: Graham Shirley; Lanier, Joyce; Matthews, Carlene Subject: FW: Request for CO approval To All: Walgreens has requested their C /O. Please let me know via email if their inspections pass or fail with comments if needed. Thanks, Debbie Address 2045 Mayport Road, Permit #09 -2054 Debbie White CITY OF ATLANTIC BEACH BUILDING DEPARTMENT (904) 247 -5826 (904) 247 -5845 FAX From: Griffin, Michael Sent: Tuesday, October 26, 2010 1:53 PM To: White, Debbie Subject: Request for CO approval Debbie, would you please send out an email requesting comments for a CO for Walgreen's . They are wanting to open this Monday. Mike G. 1 BP501UO2 CITY OF ATLANTIC BEACH 10/27/10 Inspection Results Entry 11:03:05 Application number, type 09 00002045 COMMERCIAL NEW CONSTRUCTION Structure, permit • 000 000 BLDG 00 Inspection type, sequence : 97 0001 BD CERTIFICATE OF OCCUPANCY Property address 2405 MAYPORT RD AB Request date, time, by . : 10/27/10 DW Type information, press Enter. Inspector ID (F4) MG Results date 102710 Results status (F4) Final insp - flag (F4) N Edit comments Y Y =Yes Display inspection penalties . Y =Yes Point value - 1 F3 =Exit F4= Prompt F9= Standard comments F11= Delete F12= Cancel ' A:1 co 7? 044 ij ., Itt1 ' -J. jc tit (%L txt, , ___ White, Debbie From: Hall, Erika Sent: Wednesday, October 27, 2010 10:23 AM To: White, Debbie Subject: RE: Request for CO approval Tree mitigation & landscaping are done. Thanks, Erika From: White, Debbie Sent: Tuesday, October 26, 2010 3:00 PM To: Carper, Rick; Walker, Chris; Nodine, Phil; Clemons, Malcolm; Kaluzniak, Donna; Hall, Erika Cc: Graham Shirley; Lanier, Joyce; Matthews, Carlene Subject: FW: Request for CO approval To All: Walgreens has requested their C /O. Please let me know via email if their inspections pass or fail with comments if needed. Thanks, Debbie Address 2045 Mayport Road, Permit #09 -2054 Debbie White CITY OF ATLANTIC BEACH BUILDING DEPARTMENT (904) 247 -5826 (904) 247 -5845 FAX From: Griffin, Michael Sent: Tuesday, October 26, 2010 1:53 PM To: White, Debbie Subject: Request for CO approval Debbie, would you please send out an email requesting comments for a CO for Walgreen's . They are wanting to open this Monday. Mike G. 1 White, Debbie From: Clemons, Malcolm Sent: Wednesday, October 27, 2010 11:27 AM To: White, Debbie Subject: RE: Request for CO approval Backflow OK, Malcolm From: White, Debbie Sent: Tuesday, October 26, 2010 3:00 PM To: Carper, Rick; Walker, Chris; Nodine, Phil; Clemons, Malcolm; Kaluzniak, Donna; Hall, Erika Cc: Graham Shirley; Lanier, Joyce; Matthews, Carlene Subject: FW: Request for CO approval To All: Walgreens has requested their C /O. Please let me know via email if their inspections pass or fail with comments if needed. Thanks, Debbie Address 2045 Mayport Road, Permit #09 -2054 Debbie White CITY OF ATLANTIC BEACH BUILDING DEPARTMENT (904) 247 -5826 (904) 247 -5845 FAX From: Griffin, Michael Sent: Tuesday, October 26, 2010 1:53 PM To: White, Debbie Subject: Request for CO approval Debbie, would you please send out an email requesting comments for a CO for Walgreen's . They are wanting to open this Monday. Mike G. 1 White, Debbie From: Escanio, Rey [REscanio @coj.net] Sent: Wednesday, October 27, 2010 2:50 PM To: White, Debbie Cc: Ratliff, Bob Subject: Walgreens @ Mayport Rd. Debbie, All inspections conducted at 2405 Mayport Rd.(Walgreens) by the JFRD fire marshal's office have been completed, including the Fire Safety Final. Rey Escanio CFPE Fire Safety Inspector Fire Prevention Division 214 North Hogan, #281 Jacksonville, FI. 32202 Phone:(904)255 -8561 Fax:(904)255 -8559 Cell: (904)981 -7232 Email: rescanio(coj.net 1 White, Debbie From: Carper, Rick Sent: Thursday, October 28, 2010 10:32 AM To: White, Debbie Subject: RE: Request for CO approval Approval for TCO if requested. Only need the Certification of As -built condition from the Engineer for final CO approval. Supposed to be delivered later today. Rick From: White, Debbie Sent: Thursday, October 28, 2010 10:30 AM To: Carper, Rick Subject: RE: Request for CO approval Rick, Is this approved for the CO to be issued? Debbie White CITY OF ATLANTIC BEACH BUILDING DEPARTMENT (904) 247 -5826 (904) 247 -5845 FAX From: Carper, Rick Sent: Thursday, October 28, 2010 10:25 AM To: Brian Nix Cc: Griffin, Michael; White, Debbie Subject: RE: Request for CO approval Brian, the sign is not my issue and will not impact CO approval from PW. Assuming erosion control issues corrected as stated in your email, PW is good to go on this. Rick From: Brian Nix [mailto:bnix @eckenyon.com] Sent: Thursday, October 28, 2010 10:11 AM To: Carper, Rick Cc: Griffin, Michael; Doerr, Sonya; Hall, Erika; Michael Fitzgerald; Doug A. Herring; Mike Bowles Subject: RE: Request for CO approval Rick, Mike Bowles has sent you an email in response to your first questions. I am assuming based on his response this item is ok. Let us know. Mike is also scheduled to bring the remaining paperwork to your office today. Construction roll -off container is scheduled to be picked up no later than 8am tomorrow; hopefully they will get it today! Walgreens called in for the pick up this morning. Porto -let has been removed from the site according to my site superintendent. The rip rap and additional sod will be installed before the end of the day today. The sod in the retention pond was staked during the installation. The site superintendent will have all debris removed from structures and along bulkhead today. We will address the erosion on the north end of the wall today as well. 1 I am assuming the comment regarding the sign is referencing the monument sign. The sign was built according to the plans that were permitted and we had an inspection on the signage last Friday. Walgreens contracts directly with the sign installer (ICON) and they also handle the permitting. What do we need to do to resolve this? Would you be able to make another site visit late this afternoon or first thing tomorrow to review the issues for the TCO? Thanks, Brian Brian Nix, LEED AP 1 Project Manager E.C. Kenyon Construction Co., Inc. 10028 San Jose Blvd. Jacksonville, Fl 32257 904 - 389 -2353 904 - 389 -2395 (fax) 904- 509 -1500 (cell) Original Message From: Carper, Rick [mailto:rcarper @coab.us] Sent: Wednesday, October 27, 2010 5:17 PM To: Brian Nix; Mike Bowles Cc: Griffin, Michael; Doerr, Sonya; Hall, Erika Subject: RE: Request for CO approval Brian, just got back. Several minor issues — one major question for Mike: Why is there standing water in all inlets, when we have not had significant rainfall in weeks? Will percolation trenches work when we have rain and ground water level approaches normal values? What value was used for draw down calculations? Other issues: Before issuing TCO - Construction rolloff and porto -let must be removed from site. Additional rip -rap needed at pond outfall into canal Bare earth between sod and existing vegetation along canal bank between southern end of bulkhead and pond Minor: Is sod on retention pond banks staked in place? Steep bank, if significant rain comes it will fall, if not. Debris in catch basins (long rod / wood scrap in S -1 B) Debris along canal face of bulkhead. North end of wall — erosion point where bare earth /wall and mulch meet. Other issue: Business sign — measured at 14' 5" long — max size by code is 12' (Code 17 -29 (4) (c)). Rick Ricky L. Carper, P.E. Public Works Director /City Engineer City of Atlantic Beach 1200 Sandpiper Lane Atlantic Beach, FL 32233 rcarper @coab.us PH: (904) 247 -5834 Fax: (904) 247 -5843 2 From: Brian Nix [mailto:bnix @eckenyon.com] Sent: Wednesday, October 27, 2010 4:04 PM To: Carper, Rick Subject: RE: Request for CO approval Rick, Were you able to make a site visit this afternoon? I just wanted to check and see if there were any issues I needed to get working on right away. Thanks, Brian Brian Nix, LEED AP I Project Manager E.C. Kenyon Construction Co., Inc. 10028 San Jose Blvd. Jacksonville, Fl 32257 904- 389 -2353 904 - 389 -2395 (fax) 904- 509 -1500 (cell) Original Message From: Carper, Rick [mailto:rcarper @coab.us] Sent: Wednesday, October 27, 2010 11:22 AM To: Mike Bowles; Brian Nix Subject: RE: Request for CO approval Mike, quick scan of drawings Brian forwarded and I didn't see anything that calls out pipe in the exfiltration trenches as perf. Pipe — just ADS callout and Builders Certification that materials are in accordance with plans. Calling out on EN -45 would probably suffice. Rick From: Mike Bowles [mailto:mbowles @dom - eng.com] Sent: Wednesday, October 27, 2010 10:58 AM To: Carper, Rick; 'Brian Nix' Cc: White, Debbie; Griffin, Michael; 'Michael Fitzgerald' Subject: RE: Request for CO approval Rick I will have the SJRWMD certification to you in the morning. Sincerely, Mike Bowles Dominion Engineering Group, Inc. 904 - 854 -4500 ofc 904- 854 -4505 fax Mbowles @dom - eng.com Veteran Owned Small Business Jacksonville Small and Emerging Business Notice: The information contained in this electronic mail transmission is intended by Dominion Engineering Group, Inc. for the use of the named individual or entity to which it is directed and may contain information that is privileged or otherwise confidential. It is not intended for transmission to, or receipt by, anyone other than the named addressee (or a person authorized to deliver it to the named addressee). It should not be copied or forwarded to any unauthorized persons. If you have received this electronic mail transmission in error, please delete it from your system without copying or forwarding it, and notify the sender of the error 3 by reply email or by calling Dominion Engineering Group, Inc. at 904 - 854 -4500, so that our address record can be corrected. From: Carper, Rick [mailto:rcarper @coab.us] Sent: Wednesday, October 27, 2010 10:48 AM To: Brian Nix; Mike Bowles Cc: White, Debbie; Griffin, Michael Subject: RE: Request for CO approval Brian, drawings received, under review. Assuming this is satisfactory, the only thing additional needed is a copy of the EN -45 Certification of As -Built Construction as submitted to the SJRWMD. I can do the site inspection with the drawings here and sign off on a TCO, but will need the WMD certification for final. Rick From: Brian Nix [mailto:bnix @eckenyon.com] Sent: Wednesday, October 27, 2010 10:24 AM To: Carper, Rick Cc: White, Debbie; Griffin, Michael Subject: RE: Request for CO approval Rick, Attached are the as -built drawings for the site. We should have all the required copies to Dominion Engineering today and Mike Bowles is working hard for us to get them turned around and the final documents submitted tomorrow morning. Will these electronic copies allow you to do a site inspection? As you are aware by the email below we are trying to open this store for business next Monday November 1 and will need at least a TCO to do that! Any help would be much appreciated or anything I can do to make this happen let me know. The owner has also asked me to inquire if the City will allow us to submit a bond or letter of guarantee to obtain a TCO in the event we can not get all the paperwork submitted. They are looking at any and all options to get open on Monday. I left a message with on your voicemail this morning if you get a chance today call me so that we can further discuss. I realize we are behind on getting this information to you and if we are unable to get a TCO for Monday morning I need to let Walgreens know ASAP. Once again I appreciate your time and help with this. Thanks, Brian Brian Nix, LEED AP 1 Project Manager E.C. Kenyon Construction Co., Inc. 10028 San Jose Blvd. Jacksonville, Fl 32257 904- 389 -2353 904 - 389 -2395 (fax) 904- 509 -1500 (cell) Original Message From: White, Debbie [mailto:dwhite @coab.us] Sent: Tuesday, October 26, 2010 3:07 PM To: Brian Nix Subject: FW: Request for CO approval Brian, First comments on your C /O.. Rick Carpers phone number is 247 -5834 or 247 -5833. 4 Debbie White CITY OF ATLANTIC BEACH BUILDING DEPARTMENT (904) 247 -5826 (904) 247 -5845 FAX From: Carper, Rick Sent: Tuesday, October 26, 2010 3:02 PM To: White, Debbie; Nodine, Phil; Kaluzniak, Donna; Hall, Erika Cc: Graham Shirley Subject: RE: Request for CO approval Debbie, I have not received any of the stormwater documents requested, so have not done any on -site inspections. Rick From: White, Debbie Sent: Tuesday, October 26, 2010 3:00 PM To: Carper, Rick; Walker, Chris; Nodine, Phil; Clemons, Malcolm; Kaluzniak, Donna; Hall, Erika Cc: Graham Shirley; Lanier, Joyce; Matthews, Carlene Subject: FW: Request for CO approval To All: Walgreens has requested their C/0. Please let me know via email if their inspections pass or fail with comments if needed. Thanks, Debbie Address 2045 Mayport Road, Permit #09 -2054 Debbie White CITY OF ATLANTIC BEACH BUILDING DEPARTMENT (904) 247 -5826 (904) 247 -5845 FAX From: Griffin, Michael Sent: Tuesday, October 26, 2010 1:53 PM To: White, Debbie Subject: Request for CO approval Debbie, would you please send out an email requesting comments for a CO for Walgreen's . They are wanting to open this Monday. Mike G. 5 White, Debbie From: Carper, Rick Sent: Thursday, October 28, 2010 2:33 PM To: Griffin, Michael; Brian Nix Cc: White, Debbie Subject: RE: Request for CO approval Mike, as -built certifications were waiting for me as expected. This email serves as Final CO approval for PW. Rick From: Griffin, Michael Sent: Thursday, October 28, 2010 10:53 AM To: Carper, Rick; Brian Nix Cc: White, Debbie Subject: RE: Request for CO approval Rick, Does your email indicate that you are ok with the issuance of a CO ? Mike G. From: Carper, Rick Sent: Thursday, October 28, 2010 10:25 AM To: Brian Nix Cc: Griffin, Michael; White, Debbie Subject: RE: Request for CO approval Brian, the sign is not my issue and will not impact CO approval from PW. Assuming erosion control issues corrected as stated in your email, PW is good to go on this. Rick From: Brian Nix [mailto:bnix @eckenyon.com] Sent: Thursday, October 28, 2010 10:11 AM To: Carper, Rick Cc: Griffin, Michael; Doerr, Sonya; Hall, Erika; Michael Fitzgerald; Doug A. Herring; Mike Bowles Subject: RE: Request for CO approval Rick, Mike Bowles has sent you an email in response to your first questions. I am assuming based on his response this item is ok. Let us know. Mike is also scheduled to bring the remaining paperwork to your office today. Construction roll -off container is scheduled to be picked up no later than 8am tomorrow; hopefully they will get it today! Walgreens called in for the pick up this morning. Porto -let has been removed from the site according to my site superintendent. The rip rap and additional sod will be installed before the end of the day today. The sod in the retention pond was staked during the installation. The site superintendent will have all debris removed from structures and along bulkhead today. We will address the erosion on the north end of the wall today as well. I am assuming the comment regarding the sign is referencing the monument sign. The sign was built according to the plans that were permitted and we had an inspection on the signage last Friday. Walgreens contracts directly with the sign installer (ICON) and they also handle the permitting. What do we need to do to resolve this? 1 Would you be able to make another site visit late this afternoon or first thing tomorrow to review the issues for the TCO? Thanks, Brian Brian Nix, LEED AP I Project Manager E.C. Kenyon Construction Co., Inc. 10028 San Jose Blvd. Jacksonville, Fl 32257 904- 389 -2353 904 - 389 -2395 (fax) 904- 509 -1500 (cell) Original Message From: Carper, Rick [mailto:rcarper @coab.us] Sent: Wednesday, October 27, 2010 5:17 PM To: Brian Nix; Mike Bowles Cc: Griffin, Michael; Doerr, Sonya; Hall, Erika Subject: RE: Request for CO approval Brian, just got back. Several minor issues — one major question for Mike: Why is there standing water in all inlets, when we have not had significant rainfall in weeks? Will percolation trenches work when we have rain and ground water level approaches normal values? What value was used for draw down calculations? Other issues: Before issuing TCO - Construction rolloff and porto -let must be removed from site. Additional rip -rap needed at pond outfall into canal Bare earth between sod and existing vegetation along canal bank between southern end of bulkhead and pond Minor: Is sod on retention pond banks staked in place? Steep bank, if significant rain comes it will fall, if not. Debris in catch basins (long rod / wood scrap in S -1 B) Debris along canal face of bulkhead. North end of wall — erosion point where bare earth /wall and mulch meet. Other issue: Business sign — measured at 14' 5" long — max size by code is 12' (Code 17 -29 (4) (c)). Rick Ricky L. Carper, P.E. Public Works Director /City Engineer City of Atlantic Beach 1200 Sandpiper Lane Atlantic Beach, FL 32233 rcarper @coab.us PH: (904) 247 -5834 Fax: (904) 247 -5843 From: Brian Nix [mailto:bnix @eckenyon.com] Sent: Wednesday, October 27, 2010 4:04 PM To: Carper, Rick Subject: RE: Request for CO approval 2 Rick, Were you able to make a site visit this afternoon? I just wanted to check and see if there were any issues I needed to get working on right away. Thanks, Brian Brian Nix, LEED AP 1 Project Manager E.C. Kenyon Construction Co., Inc. 10028 San Jose Blvd. Jacksonville, Fl 32257 904- 389 -2353 904 - 389 -2395 (fax) 904- 509 -1500 (cell) Original Message From: Carper, Rick [mailto:rcarper @coab.us] Sent: Wednesday, October 27, 2010 11:22 AM To: Mike Bowles; Brian Nix Subject: RE: Request for CO approval Mike, quick scan of drawings Brian forwarded and I didn't see anything that calls out pipe in the exfiltration trenches as pert. Pipe — just ADS callout and Builders Certification that materials are in accordance with plans. Calling out on EN -45 would probably suffice. Rick From: Mike Bowles [mailto:mbowles @dom- eng.com] Sent: Wednesday, October 27, 2010 10:58 AM To: Carper, Rick; 'Brian Nix' Cc: White, Debbie; Griffin, Michael; 'Michael Fitzgerald' Subject: RE: Request for CO approval Rick I will have the SJRWMD certification to you in the morning. Sincerely, Mike Bowles Dominion Engineering Group, Inc. 904 - 854 -4500 ofc 904- 854 -4505 fax Mbowles @dom - eng.com Veteran Owned Small Business Jacksonville Small and Emerging Business Notice: The information contained in this electronic mail transmission is intended by Dominion Engineering Group, Inc. for the use of the named individual or entity to which it is directed and may contain information that is privileged or otherwise confidential. It is not intended for transmission to, or receipt by, anyone other than the named addressee (or a person authorized to deliver it to the named addressee). It should not be copied or forwarded to any unauthorized persons. If you have received this electronic mail transmission in error, please delete it from your system without copying or forwarding it, and notify the sender of the error by reply email or by calling Dominion Engineering Group, Inc. at 904 - 854 -4500, so that our address record can be corrected. 3 From: Carper, Rick [mailto:rcarper @coab.us] Sent: Wednesday, October 27, 2010 10:48 AM To: Brian Nix; Mike Bowles Cc: White, Debbie; Griffin, Michael Subject: RE: Request for CO approval Brian, drawings received, under review. Assuming this is satisfactory, the only thing additional needed is a copy of the EN -45 Certification of As -Built Construction as submitted to the SJRWMD. I can do the site inspection with the drawings here and sign off on a TCO, but will need the WMD certification for final. Rick From: Brian Nix [mailto:bnix @eckenyon.com] Sent: Wednesday, October 27, 2010 10:24 AM To: Carper, Rick Cc: White, Debbie; Griffin, Michael Subject: RE: Request for CO approval Rick, Attached are the as -built drawings for the site. We should have all the required copies to Dominion Engineering today and Mike Bowles is working hard for us to get them turned around and the final documents submitted tomorrow morning. Will these electronic copies allow you to do a site inspection? As you are aware by the email below we are trying to open this store for business next Monday November 1 and will need at least a TCO to do that! Any help would be much appreciated or anything I can do to make this happen let me know. The owner has also asked me to inquire if the City will allow us to submit a bond or letter of guarantee to obtain a TCO in the event we can not get all the paperwork submitted. They are looking at any and all options to get open on Monday. 1 left a message with on your voicemail this morning if you get a chance today call me so that we can further discuss. I realize we are behind on getting this information to you and if we are unable to get a TCO for Monday morning I need to let Walgreens know ASAP. Once again I appreciate your time and help with this. Thanks, Brian Brian Nix, LEED AP 1 Project Manager E.C. Kenyon Construction Co., Inc. 10028 San Jose Blvd. Jacksonville, Fl 32257 904- 389 -2353 904 -389 -2395 (fax) 904- 509 -1500 (cell) Original Message From: White, Debbie [mailto:dwhite @coab.us] Sent: Tuesday, October 26, 2010 3:07 PM To: Brian Nix Subject: FW: Request for CO approval Brian, First comments on your C /O.. Rick Carpers phone number is 247 -5834 or 247 -5833. Debbie White CITY OF ATLANTIC BEACH BUILDING DEPARTMENT 4 (904) 247 -5826 (904) 247 -5845 FAX From: Carper, Rick Sent: Tuesday, October 26, 2010 3:02 PM To: White, Debbie; Nodine, Phil; Kaluzniak, Donna; Hall, Erika Cc: Graham Shirley Subject: RE: Request for CO approval Debbie, I have not received any of the stormwater documents requested, so have not done any on -site inspections. Rick From: White, Debbie Sent: Tuesday, October 26, 2010 3:00 PM To: Carper, Rick; Walker, Chris; Nodine, Phil; Clemons, Malcolm; Kaluzniak, Donna; Hall, Erika Cc: Graham Shirley; Lanier, Joyce; Matthews, Carlene Subject: FW: Request for CO approval To All: Walgreens has requested their C /O. Please let me know via email if their inspections pass or fail with comments if needed. Thanks, Debbie Address 2045 Mayport Road, Permit #09 -2054 Debbie White CITY OF ATLANTIC BEACH BUILDING DEPARTMENT (904) 247 -5826 (904) 247 -5845 FAX From: Griffin, Michael Sent: Tuesday, October 26, 2010 1:53 PM To: White, Debbie Subject: Request for CO approval Debbie, would you please send out an email requesting comments for a CO for Walgreen's . They are wanting to open this Monday. Mike G. 5