Loading...
Permit 2269 Fairway Villas Ln t X�V` CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD j r ATLANTIC BEACH, FLORIDA 32233 INSPECTION PHONE LINE 247-5826 t Application Number . . . . . 02-00025207 Date 11/21/02 Property Address . . . . . . 2269 FAIRWAY VILLAS LN Tenant nbr, name . . . . . . SIDING & REPLC 2 WINDOWS Application description . . . RESIDENTIAL ADD/RENOVATE/ALTER Property Zoning . . . . . . . TO BE UPDATED Application valuation . . . . 20000 Owner Contractor ------------------------ ------------------------ SCHLOBOHM, JOHN HOME DEPOT INSTALLED SALES 1212 39TH ST. N ATLANTIC BEACH FL 32233 TAMPA FL 33604 (8 13) 247-1300 ---------------------------------------------------------------------------- Permit . . . . . . BUILDING PERMIT Additional desc . . Permit Fee . . . . 130 . 00 Plan Check Fee 65 . 00 Issue Date . . . . Valuation . . . . 20000 Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 130 . 00 130 . 00 . 00 . 00 Plan Check Total 65 . 00 65 . 00 . 00 . 00 Grand Total 195 . 00 195 . 00 . 00 . 00 x BUILDING MATERIAL,RUBBISH AND DEBRIS FROM TI-HS WORK MUST NOT BE PLACED 1N PUBLIC SPACE,AND MUST BE CLEARED UP AND HAULED AWAY BY EITHER CONTRACTOR OR OWNER. —FAILURE TO COMPLY WITH THE CONSTRUCTION LIEN LAW CAN RESULT IN THE PROPERTY OWNER PAYING TWICE FOR BUILDING IMPROVEMENTS"ISSUED ACCORDING TO APPROVED PLANS WH�GH ARE PART OF THIS PERJ41T AID SUBJECT TO REVOCATION FOR VIOLATION OF APPLICABLE PROVISIONS OF LAW. _� 1�) —._ c BUILDING OFFICIAL CITY OF ATLANTIC BEACH PERMIT . CALrCULATION SHEET Address2 Date Heated Square Footage @1$ per sq ft = $ Garage/Shed ._@ $ per sq ft = $ Carport/Porch @ $ ger sq ft = $ Deck @ $-p e r sq ft = $ Patio @ $ per sq ft = $ TOTAL VALUATION : S o e 3 5 $ .Total Valuation 1st $ lCc,C) C 00C $ S Remai ing Value $ S. oUper thousand or ,portion thereof TOTAL BUILDING FEE S SSG + 1/2 Filing Fee ( ) Fireplaces @ . $15 .00 $. E6 BUILDING PERMIT FEE WATER IMPACT FEE $ SEWER IMPACT FEE $ WATER METER/TAP $ CAPITAL IMPROVEMENT. $ SEWER TAP $ ( ) RADON (HRS) .0050. $ SECTION H PAVING ( ) $ HYDRAULIC SHARES $ CROSS CONNECTION $ SURCHARGE . 0050 $ OTHER $ GRAND .TOTAL DUE ADDITIONAL PERMITS OR FEES : Mechanical ..Plumbing Electric/New Electric/Temp ; SwimmingPool Septic Tank ; Well Sign Finish Floor Elevation Survey Other CALCULATIONS and/or NOTES : Received Event (Event Succeeded) Date: 11/6/02 Time: 2:23 PM Pages: 3 Duration: 1 min 5 sec Sender: +6309635058 Company: Fax Number: Subject: Type: Fax RECEINTF-; NOV 1 9 2002 BY: 9� NOV-06-2002 14:30 FROM-RMA CHICAGO +8300635058 T-V3 P-002/003 F-806 1-106 9 City of Arlanrie Beach*800 S=auola Road-Adiaaxie Beac$,Flc4da 32x3-5445 FhonG:(904)247-5300-FAX(904)247-5$4a•h :// rinn 'e- kis Mb=APPLICATMIY FOR RXY1+ACEMENT OF W NDO WS,S,KYLtGRTS AND GA.RA.CE DOORS OF SINGLE-FAMLY OR TWO-FAMMY Y(DUPLF)n CONSTRUCTION Address whom work is to be performed Z z L'i w� W s V;t Appiiaaoc _Yy f+J',3 SCAkL-?T3C� Address P-lut, L�; ( - Pboac: L%•al Deacripcion: Block li=b IO I- C Loz Nwnber t45 zoning District Coatractar � �U soul. s StaW Lice Number t,.``-yl.s ,, oQ Phone city m ..i..S..r--C V. Fox SI 3-ag7-/313 Describe Proposed Um and Work to be Done Soo�S i i✓13 ._`4" Re PLce , 1 C,)(AdO�yf LE. � e-r i n �it 5�� ; -s 1'M64tGr) Present Use of L,and or BWlding(s)' Valua4o*of Proposed Consnueaon Building Date; 1 Me=Roof Hci M) Buil. i.9 idth���t). Sanding I.e'x► 7 j A�aaf Slope ! `_Wiridow Elev. Window Kcighr 5 ! ft) Window Width Jft) . Mewurameat fmm corner of building to window Received Event (Event Succeeded) Date: 11/6/02 Time: 2:23 PM Pages: 3 Duration: 1 min 5 sec Sender: +6309635058 Company: Fax Number: Subject: Type: Fax NOV-06-2002 14:39 FROM-RMA CHICAGO +6308835058 T-863 P.003/003 F-986 In addition to the Building Data the following informatlon is required: Manufactutxs Test Report . Installation Procedures Win&)w Descripdon/Type Garage Door DescriptiorVfype Skylights Drsoreption Type » Elevation View of Window Locations I HEREBY C6RT1FY HAT O TION PROVIDED WITH THIS APPLICATION IS CORRECT. Signature oFOWn r Date I HEREBY CER Y THAT I HAVE READ AND FJCAMINF..13 TKIIS APPLICKnON AND KNOW TRB SAME TO S TRUE AND CORRECT. ALL PROVISIONS OF THE LAWS AND ORDINANCE GOVERNING THIS TYPE OF WORK WILL BE COMPLMD WITH, WRMT'HER SPECrFJED HEREIN OR NOT. THE ORANTWO OF A PERMIT DOES NOT PRESUME TO CAVE AUTHORITY TO VIOLATE OP.CANCEL THE PROVISIONS OF ANY FEDEPAL, STATE OR LOCAL RULES, REGULATIONS, ORDIN.ANCF.S. OR LAWS IN ANY MANNER,INCLUDING THE GOVE WWCj OF CONSTRUCTION OF THE PERFORMANCE OF CONSTRUCTION OF THE PROPERTY. I UNDERSTAND THAT THE ISSUANCE OF TIUS PERMIT 1S CONTINGENT UPON THE ABOVE INFORMATION BEING TRUE AND CORRECT AND THAT TlM PLANS AND SUPPORTING -DA"TA HAVE BEEN OR SHALL HE PROVIDED AS REQUIRED. Signature of contractor Daze Address and contact information of Parsaa to reoeive all coexespondamce regarding this application (Pleast Print) Name S I'✓L 'S ak"✓Vvf Mailing Addrns 3(o T��i G•c�- o �. a T�-I.0 lS`��� �QS��j Moine b'�.S�Z7�'�o�` FAX,pi�'2,73—3117 E-=a SCJq es Sworn and Subscribed Before me thls /o?`� ,pay of_1Jo%ern �a6oa State of Florida,County of Duval Nowy's Sigztature KATHLEEN M.SWEENEY AS 10 OWnn Notary Public,State of New York / No.4y4.a>fi35 Wj�erso�y know Qualified in Putnam county Certificate Filed in vvestchester County ❑ Produced idet►tsFcatian rr,..,,mission Ext)ires -0-1.,-01 Type of idemifeu.tion produced Return to: Name:RMA Home Services of Book 10774 Page 2433 Delaware,Inc. Address:3200 Cobb Galleria Pky.Ste. 200,Atlanta,GA 30339 RET This Instrument Prepared By: P�+�At � / r Lo h�OQ330$31 Name:Peggy Payne #- � L Pale.- 24334 Address:3200 Cobb Galleria Pky.Ste. Filed a Recorded 200,Atlanta,GA 30339 Jim 11/F�/2002 08:29:12 AM LER Property Appraisers Parcel CCLERK CIRCUIT COURT Identification: NOTICE OF COMMENCEMENT RECO DINS f i. 0 COPY t 1.00 Permit No. Folio No. 9-3q /(3 9(3CRTIF STATE OF FLORIDA r COUNTY OF Vl / The undersigned gives notice that improveoent will be made to certain real property,and in accordance with Chapter 713,Florida Statutes, the following information is provided in th's NOTICE OF COMMENCEMENT. t` Legal description of property(include streot address,if available: v?o2 (J/[/,1 S 140 , lN, d%i8`3` •rte r h Wit 8K General description of improvement: / )Pn!��12�nlaee.mrn 4-W 2-Anc j% (o101-Ql i Owner�Info-mation—name and address: K/ 07dt�r f-rliswayVi las }kctnvtc &-ya . F>! M34 Interest in Property: _ &A)WEAL I -_ Name and address of fee simple titleholder'(if other than Owner): I Contractor—name and address: The Home Depot Installed Sales 1212 North Wh Street,Suite 402,Tampa,FL 33605 Phone Number: 813-247-1300 Fax Number: 813-247-1313 Surety—name and address: i Lender—name and address: Phone Fax Number: Amount of Number: Bond: $ Persons within the State of Florida designated by Owner whom notices of other documents may be served as provided by Section 713.13(1)(a)7.,Florida Statues: Name and address: -T-,tf N ,Te,(,t Phone Number: Fax Number: In addition to himself,Owner designates of to receive a copy of the Lienor's Notice as-provided in Section 713.13(1)(b),Florida Statures.(Fill in at Owner's option) Phone Number: Fax Number: i ation Z=:mm=ent(the expiration date is 1 year from the date of recording unless a different date is specified). ZiSigature of Owner naturer of Owner V,Jrated Name of Owner Printed Name of Owner Sworn to and subscribed before me by�D� n who is personally known to me or produced as identification,and w o did take an oath,t ' h day of�"20Q2�. KATHLEEN M.SWEENEY Signature of Notary M Notary PublicNo,4946638hew York State of Qualified in Putnam County N Certificate Filed in Westchester County Printed Name of Notary: y Commission Expires o1-/P�0 Commission No./Expiration: ` d tS33U 4bb Sllb Ni I MCi NUNS UNNIC� ulruaruc ul . uf C.uU61UU6 C E k T IFIC AT E O F C O N F O R M A N C E Woodsman Select Woodsman Select Vinyl Sung panels are manufactured to the Id wing spec ions. MATERIAL SPECIFICATIONS PROFILES COLORS All products meet or exceed the Standard Specification for Rigid PVC D/4,01410L . Me Siding(ASTM D-3679)and b referenced documents. An independent 24"Exposurea5 laboratory through unannounced inspeebon of a0 manufacturing facAles 176'length . crew certllfes the conformance to this specification. ASTM 0-3679 is the 2 Swares/Carton . pray specification used by building code authorlUes. Where not defined In • 015,DIML . Wheat : ASTM 0-3679,products also meet Norandex Stringent Quality Coritiol 2a"Exposure • Sliver Standards. 12'Length 2 Squares/Car m Clay PHYSICAL DATA Tan • e • Z ApPR��EpE;�CF1 Panel Thickness:.042(+/.001) L,�.�t • Sand Panel Projection: (D14,D/4/DL,D/5):5/8" CmwY N�,*ac- rr,cE Sierra Cactus (D/5/DL):h' � �� Linen Color.Uniformity is spectmphotometdcaily controlled. Linen Texture:Embossed with a woodgrain pattern. Lock:Optically measured and controlled. a Gloss:Uniform low gloss maintained with an integrating 7FI PRODUCT TEST DATA Heat Shrinkage 3%at 160"F Impact Resistance: Mean Failure Energy>60 in.lb. Design Windtoad- 145 MPH• Surface Distortion: None at 120'F Squareness: <1/8`of square Length: Within-1/4"of specification Warp/Chamber. <1/8' Flame Spread index <25 Smoke Density Index <450 Fuel Contribution 0 Self Ignition Temp: 780'F - . 'The MPH windspeed reported above is calculated using lie VSI Wiindspeed Calculation Guidelines.It is an estimate of windspeed resistance given one uniform set of assumptions. Please note that vinyl siding is a dworative covering that is not intended to provide structural reinforcement to a wall. The wind resistance of a wail systern may be less _-�--- than the maximum wind speed rating for a siding product and will not be Increased as a result of Installing vinyl siding. COMPOUND TEST DATA AU Norandex Vinyl Siding is manufactured from PVC compound that meets or exceeds all specifications of Da79 for either Class 1,2 or 3 compounds. Tensile SUengft 61909 4 Modules of Bub ly(psr�: 391,999 tmd Impact Strength a n4'F(IL x Iblin of notch): 3.51 hod inpad Strength Q 37F(R x ibfin of notch): 211 Dea fon Tempera m at M psc VF CoefScient of Linear Expansion(initn/•F) 3.16x1 . Ali Siding,soffit and accessories manufactured by Noraedex have a.dass A lire rating based on ASTM E-84 results A ITOaa 401 1110 It K@I t U I I UFfICE U (/ U3/U2 15 : 03 P , OO1/011 N 0 R A N D X SOLID VINYL SIDING F` application instructions : _ r-- R NORANDEX/REYNni n-; - >rs�u 4 0� 611 l) 01/03/OZ 15 : 04 P . 002IOIB FOREWORD This manual is published by This manual is intended to provide tf you have an installation Issue i hat is Norandex/Reynolds as a guide to generally acceptable standards,and is not covered within this manual,and basic installation techniques that are not intended to coverall application have any questions as to the generally actepted for the application possibilities.For example.there may appropriate way to proceed,you ofi inyl siding,soffit and accessories , be regional or local installation may contact the Product Services throughout the vinyl siding industry. preferences thatarenoteovered Departmental:l-800-528.0942 As such,Norandex/Reynolds strongly within this manual.Generally,it is forassistance. recommends that you thoroughly acceptable to follow any such review these instructions priorto preferences,so long as they are Itmayalso appropriate renewall proceeding with any installation,and accepted by the local building trades pertinent local any in codes before a that the instructions be followed as as standard procedures,and do notgo Proceeding with any installation. closely as possible.Failure to follow contrary to the basic tenets of vinyl siding as to the appropriateness t makes , c/aims or the installation techniques and application that should be followed in all as a the appropriateness of,re procedures outlined in this manual applications.Most of these basic acceptability by,any local or regional could veate a circumstance that tenets will appear in bold type in this building Codes of the following causes the siding to fail to perform as manual for easy reference. installation techniques intended.Such a circumstance could i conceivably be cause to invalidate your Norandex/Reynoldswarranty. CONTENTS SECTION PAGE Foreword........................................................................... ....2 Norandex/Reynolds Vinyl Sding Profiles and Accessories.............................................................. Vinyl Siding Planning Guide................................................................... EstimatingGuide.................................................................................................. ...5 Basic Rules ofApplication for Norandex/Reynolds Solid Vinyl Siding................................................ ...6 Sheathing/Backerboard........................................................................................... ...6 Toolsand Equipment................................................................:............................. ...6�e Special Tools Designed for Vinyl Siding Applications ............................................................... ...6 Fasteners..............................................................................................................7 ChoosingStaples..........................................................sL..........................................7 General Procedures for Nailing and Stapling....................................................._......................7 Cutting Norandex/Reynolds Vinyl.....................................................................................8 Surface Preparation .._............................................................................. .......8 Installation Procedures................................................................................................9 The Norandex/Reynolds Wide Comer/Window and Door Surround System............................................11 Instalring Norandex/Reynolds Horizontal Siding.......................................................•................12 Installing Norandex/Reynolds Vertical Siding .......................... .............................. ........... .13 Installing Norandex/Reynolds Vinyl Soffit..............................................................................14 (nstaUng Cedar Rounds,Cedar Shakes and Cedar Split.................................................................16 Replacing a Damaged Outside Corner Post............................................................................18 Repairing Budded Siding atthe joint.............................................................................. ....1 8 UN 4 b 4 411b Ni I Nil ME MICE 01/03/02 15: 04 P. 003/018 NORANDEVREYNOLDS VINYL SIDING PROFILES AND ACCESSORIES Norandex/Reynolds offers a variety of siding and soffit panels to match any architectural style or design purpose. UtilltyTrim OutsidkomerPost Deluxe Gown orSoMtCovcMolding StarterStrip Fasda vertical Sid'uir or Soffit Inside Comer Post ti e F or)Channel H-Trim �1- Window and Door Casing orSurround HORIZONTAL SIDING VERTICAL SIDING AND SOFFIT Horizontal siding panels are available in a variety of face Vertical siding panels are available in Board&Batten.and widths,including Triple 3'.Double 4",Double 4-1/2', D/S Premium,which may also be used in soffit appric.itions. Double S',6-1/2",and a full 8 .Finishes include brushed, Other Norandex/Reynolds soffit styles includeTA Matte, or authentic woodgtains,in traditional Clapboard.Beaded, D/S Select Matte,and T/3 Beaded Porch Panel,all in solid cr Outchlap styles- orventilate�styles. ACCESSORIES A broad range of accessoryitems is available to help complete any siding or soffit installation. Appropriate use ofthe various types of Norandex/Reynolds accessories is explained in this manual. Q71: � Inside Comer Post stutvstrip Outs+deComerPost UnTayTrim iChi nnol DuWUt,TityTrim Drip Cap Window and DoorCasuig F Channel H-Trim Fasda Soffit Cove Molding Deluxe Croon Moidng WIDE OUTSIDE CORNER/WINDOW AND DOOR SURROUND SYSTEM MCtlnaf%l aald NtadCDmulSurroued Lmd4dCMI IMM CevaCeMW"ri 5unsund5leeber �resarras.sirvoma LU @330 468 8116 NI / REI 60RE OFFICE 07/03/02 15 F. 004/018 VINYL SIDING PLANNING GUIDE Vinyl siding is easy to work with.and STEP 4 requires only a few basic tools. Take the total area from Step One and But prior to installing Two and add them together.Then, `T Norandex/Reynolds Vinyl Siding,you subtract total of Step Three from total. C need to determine how much product Always add 10%for waste and/or is needed to complete the job- miscalculation of material. --+ Vinyl Sidingis measured in squares STEP 5 (100 Sq.Ft.),and several accessories To determine the amount of siding SotrttT are necessary for a good instapation. squares needed,rememberthat 100 Mato N Solid and ventilated soffits are used to square feet of surface area equals one I cover under the eaves. square,so divide your footage from Follow the steps below and use the Step Four by 100. Estimating Guide on the facing page to STs,S record your measurements. Measure under eve areas.Multiply STEP y length by width for each overhang Make sketches of the home showing ail (see steps 1 &2):add together. sides.Measure the height(H)of each STEP 7 side 2 t the corner and multiply that b y To determine the number ofsquares of the width(W)to attain the surface soffit material required,divide footage area ofthatside. requirements from Step 6 by 100. J AL SM 2 STEPS Measuregables,dormers and any Familiarize yourself with the accessory other area notincluded by the sides. items and how they are used.Measure For each triangular shaped area the total lineal feet required for each measure from base to the top(q, item. then multiply by 1 R the base (V)length.Then add together. STEP 9 STFP 3 Mark all your measurements on the Measure the windows or doors,or any diagram you first did ofyour home. law •—.� other area that will not be courted with Record yourfinal measurements. —W siding.Multiply width x height for each You're all set With your calculations area and add togethm and measurements complete,you are ` ready to order the materials yak need to complete the installation. X330 X68 8116 RI / REI ROPE OFFICE 01103!02 15: 05 PAW018 ESTIMATING GUIDE 1.Surface areas of sides 4.Add Step 1 and Step 2 together Inside Comer Post sq.ft sq.ft lineal ft sq k, Subtract Step 3 from Total oFStep 1 Outside Comer' and Step 2 C sq.{}, Gneal ft sq.ft. sq.ft Window/Door Casing" sq.ft. S.To determine number of squares lineal R Subtotalq needed,divide footage by 100. Drip Cap Subtotalsq. Example:1,281 sq.ft-divided by 100=12.8 or 13 squares lineal ft. 2.Surface areas of dormer, gables,etc 6.To determine number of squares 8_Measure the total lineal feet of sq.ft. ofsof6tneeded,divide by100. each soffit accessoryneeded — Example:267 square feet Divide by sq.ft. 100-2.67 or 3 squares(Remember 1/2_ Channel to use ventilated soffitwhere lineal V sq.ft ventilation is needed). sq.ft 7.Measure total lineal feet ofeach FChannel Subtotal sq.ft siding accessory needed lineal ft' Starter strip Utility Trim 3.Surface areas (Not to be covered) lineal ft � linea)Ft. Windows_ sq.ft. Channel Soffit Cove or Doors sq.FL lineal ft' Deluxe Crown Molding -- Chimneys sq.ft. Utility Trim lineal ft Other sq•fL lineal ft.' H-Trim < Subtotal sq.I}, Dual Utility Trim lineal fL (Not to be covered) lineal ft. Fascia Cover fineal ft. 'Always add 10%to your mea=ram,ints of these accessories for possible wes to If NorandmAteynoids Vde Conus/ Window and DoorSurround System is to be used,meawry 6nws1 R req,ired andyxe Norandsr/Rgnolds Dealerw0l help determine quantlty'of various lincals, cornerinserts or starter needed. l YVVV I V V V + + V AII t nu t +1 VA1, V{ ( I VL V ( f VVI V& + V YV I VYYf Y(V BASK RULES OF SHEATHING/ SPECIALTOOLS APPLICATION FOR BACKERSOARD DESIGNED ESS SIDING FORVINYL NORANDEX/REYNOLDS SOLID ViNYL SIDING Norandex/Reynolds recommends that you use a weather-resistant sheathing Where area few tools that have been 1.Always fasten approximately in the or foam insulation that is at lease 1/4" designed especlally for the instillation center ofthe nail slob thick A high-quality rigid insulation of vinyl siding.These tools can lie real 2.Vinyl Siding maybe applied board should provide a smooth, time-savers in certain situation:.,so it s manually with nails,or"power- consistent and stable surface foryour always a good idea to have them in fastened'with staples.Power-driven siding application.it may also provide your toot box. application involves additional care added insulation properties. to insure proper installation.See p.7 The use of unapproved"drop-in4 for recommended power-driven backerboards is not recommended. fastening procedures. Some of these materials may cause �o 3.Neverfasten too tightly.As restriction which could result in temperatures change,vinyl siding oil-canning.Use of any such expands and contracts as much as materials could invalidate your SNAPLOCKPUNCH 1/4'over a 12'6"length.Proper Norandex/Reynolds warranty. Used to punch lugs into the cut edges installationwill permit the siding to To make sure thatthe backerboard of siding,to help lock panels at the top expand and contract without materials you use are approved.contact or finishing course.The punched lugs restriction.Siding should"hang'on yourlocal Norandex/Reynolds branch. engage and lock into the installed trim the nail or staples.Try to leave a They carry full sheet.fanfuldand accessory. clearance of at least 1/16"of an inch, drop-in backerboard materials tha t 4.Do NOT face nail or staple through are approved for use under the panel. Norandex/Reynolds vinyl siding. 0 �0 , S.Leave a minimum of 1/4*clearance TOOLS AND EQUIPMENT at all openings and stops(n Corner Posts or)Channels,for example). NAILHOLEPUNCH This will allow normal expansion and HAND TOOLS This tool is used to punch a n-ril hole in contraction.When installing in Common hand tools needed for the cut edge of a panel.Like temperatures below 32'F,leave a proper installation include:hammer, manufactured nail slots,the hole is minimum clearance of 3/8". fine-tooth saw,measuring tape,level, elongated to allow for expan!ion and 6.Never force siding panels up or square,carpenters pencil,and a contraction. down when installing.Allow them to chalkline. "hang"without strain. 7.Make sure that any installed panel can move easily from side to side without restriction. (`lI 8.Never caulk vinyl siding.r Cauluking ZIP TOOL inJ Channels or corners will cause off-canning, Used to remove orreplace a specific siding panel.The curved end of the 9.It is essential that the surface that Vinym and tool slides under the end of the panel. will receive the vinyl siding is properly cut ulsin is as heavysy cdu,tutility knife. and hooks onto the back rip of the butt prepared.In remodeling situations, g duty y lock.Pull downward and slide along the furring or removal of uneven siding Good quality tin snips oraviation-type full length of the panel to di'mngagc may be necessary.in new snips will help in the cutting and the lock Reverse the procetfure to construction,don't use green lumber shaping of vinyl. install a new panel into a finished that can warp as a substrate.Your course ofs1 ft siding installation will only be asr� strai t and as stable as the materials The toots required to Install vinyl siding are generally available through to which it's applied. A bent,radial arm oM 11lI1d-held your local Norandex/Reynblds branch,can speed cuttingand rtoht'Rsron�teowe�ros S1D0'� instillation.Use a fine tooth blade— a " comacaINappr p&ftmbod a ww"e taa'a 12 to 16 teeth per inch—ins%Ded in alrye eontect the appropriate cnYiro+v++enbl ajency pnortort mg over anyasbuto*-based product, the reverse direction.This will give you the cleanest cut through vinyl. X330 468 8116 X1 / REI HOPE OFFICE ul� usiuc la : ua r .uulrula FASTENERS GENERALPROCEDURES 6.Lack each course ofsiding!ndo FORNAILINGAND the course below by pulling up until CW)OSWG NAMS STAPLING the butt snaps into the top lodc- Always use aluminum,galvanized but be careful not to pull the panels steel,or other corrosion-resistant 1.Fasten only through manufactured too tightly togetherbyfisteningat nails to install Norandex/Reynolds slots,orslots thatyou've ma de with an angle that pulls the courses Vinyl Siding, a nail hole punch.Never"face nail" together. through vinyl.Face nailing restricts Nails must be long enough to allow a 7_Fasteners should be spaced no I-penetration into the surface,which expansion/contraction,and will cause more that 16"apart on horizontal should be stable and severe.Nal your siding to oil-can. siding panels,12"on center for heads should beat least S/16'in vertical siding,and between 6"and diameter,and shanks should be 2 NO! YES! 12"apart for accessories. 1/8-in diameter. 8.Whenever possible,nail orstople directly into a stud to insuresecure 4 application. 2• NOTE:When using Pneumatic —i��• 2.Remember siding should hang on Staplers,be sure to set air pressure the nails or staples.Never drive a nail accordingtothe tool manufacturer's s or staple home.Leave at least 1/16' recommendations.Many of an inch clearance between the nail manufacturers provide special guide _ head or staple crown and the vinyl. attachments to permit easy use of theirtools forvinyl siding applications. Ing NO! YES! /�; Consult manufacturers spedfications for the safe and proper use of power-driven tools. Nail lengths should be chosen as follows: INSTALLING NORANDEX/REYNOLDS General Use-1-1/2" 3.Always try to fasten in the center SUPER PREMIUM PANELS Residing-2" ofthe nail slots to permit Siding with Backerboard-2-1/Z" expansion/contraction. Norandex/Reynolds has made nailing Trim Nails-1 to 1-1/2" and stapling even easierwith a patented YES! NOr design on the nail hem of Crossroads' Your local Norandex/Reynolds Branch �j � C� �� has a complete selection of nails for and Sagebrush'Super Premium sid mg every siding or trim application. panels.Crossroads and Sagebrush have a staple guide that permits the 4.Don'tdrive the nails or staples uQ gun head to fit into the nail hem ` CHOOSING STAPLES or down atan angle-that can cause channel.Slide the gun along the the panel to buckle or distort Nail channel and Staples must be cadmium-coated, straight and level through the center of shoot staples galvanized steel or aluminum,or other the nail slot,at least 1"into the surface. into the .r corrosion-resistant material.They When stapling,it inessential that the center ofthe should be no less than 16 gauge, stapler be held parallel to the siding dual parallel semi-flattened to an elliptical Qoss- panels to insure staples are straight nailing slots. section. NO! YESI When nailing,the channel ads as a Staples should be long enough to `hammerstop' When the hammer penetrate into the surface at least 1', head touches the nail hem,the nails with a staple crown that is at least have been 7/16-wide, driven to the appropriate S.In most stapling applications,the depth. bottom leg of the staple should bo through the center of the nail slot, with the top leg going over the top of the nal hem into the wall. �s1u !01 11116 HI / LEI 80IE OFFICE 01/03/02 15 : 06 P . OD81018 CUTTING 4.Check the walls for evenness NORANDEX/REYNOL.DS The fastest easiestway to insure an VINYL. even,nailable surface is to apply �. weather-nesistantsheathing ov,;rthe 1.Always wearprotective safety ' old siding.(See manufacturers glasses when instructions for proper installa pion cutting or ® of rhea thing). nailing vinyl . slding. S.To use a utility knife,mark your lines then score on the face side using a 2.For best results,use a square as your guide.Use a moderate circular sawwith a fine-toothed blade amount ofpressure,then bend and Installed BACKWARDS.This will snap along the line.Itis not necessary provide the smoothest,cleanest cuts to cut through the vinyl with the knife. in your vinyl,especially in cold weather. SURFACE PREPARATION IFI Your vinyl siding application will only be as straight and secure as the surface over which you install the vinyl. Itis absolutely essential that i S.If not using sheathing,use furring or you pay close attention to the strapping on any uneven walls Strap at proper preparation ofyour all windows,doors and cornea.Shim installation surface,especially in out furring at low spots to get a reside applications. surface as flat and even as possible,but do not FuroUt any farther than RESIDEAPPLICATIONS necessary—this could make it difficult 3.Do NOT attempt to cut any 1-If there are any loose boards,nail to align sidingatwindows and door& materials other than vinyl siding with them down tightly.if boards are too NEW CaN5 ucnON a backwards-installed blade.When rotten to nail,remove them and APPUCAnONS cutting wood,backerboar>d,or replace with new boards to provide a nailable surface. 1.Make sure that framing studs are anything other than vinyl,be sure to plumb and positioned unifornily, reinstall yoursaw blade in the proper __ ` providing a flat,even surface for forward direction. sheathing. O2.Norandex/Reynolds recommends that weather-protective bafTier,such . as house wrap or felt paper,be applied to the house prior to vinyl siding application. O 3.All drywall should be place d within the house,on the floor(s)where it is 4.When usingtin oraVation snips,try C Scrape away any loose alg. going to be applied,prior to not to dose the blades completely at Completely all installation ofthevinylsldinj�This will the end of each stroke.This will windows,doors and other provide a more accurate structural provide a cleaner,neater cut appropriate arras,andsral anyeadcs weight distribution to each floor,and In the existing walls,to protect will reduce the possibility of aga'uutAir and Water penetration. compression ofthe floor plate(s). 3.Remove any wall fixtures.such as Floor plate compression can result in gutters,downspouts,shutters,or right budded siding at the interser6on of f ctures.Tie back any shrubbery to the floor and the wall, allow plenty of working space around the home. ff's'su 4tiB Sllti NI / REI HHE OFFICE 01/03/H 15 :06 PAH/011 INSTALLATION Bc sur,not to nail outside corner PROCEDURES past too tightly.Use same nailing t 718■ ti procedures as siding. 90" Nowthatyouhave the propertools, SPUCINGOUTSIDE CORNERS - you've measured and ordered the 1.Norandex/Reynolds Outside r\ proper quantities ofvmyfsidingand12' y ~7�• Col nen cone in 10'and lengths accessories,and you've prepared the (Thc Norandex/Reynolds 3-Piece wall insuring a flat,even installation, Corner System and 1-Piece Premium 4.Bend the Channel at center,and you're readyto apply noted Comercomeinstandard 20' fasten to each comer oftriehouse. Norandex/Reynolds Vinyl Siding. lengths.See page 11 for instructions). 5.lnsertyour Outside Comerinto In any vinyl siding application,most When the wall is O Q this cap,leaving 1/4"between the accessories are installed first, taller than bottom of the Corner and the cap, preparing the building to receive the 10'.and it's 0 0 then install as normal. vinyl panels. necessary to use 1. IW STAWNG more than one 1 AN ALTERNATE METHOD FOR WSTANDEX/REYNOLDS Corner,mike sure CAPPING THE OUTSIDE CORNERS IS: ACtESSOR1ts to install tile !01 eQ 1.Make a 4-inch bol tom Corner cut downthe CHALKLINE first,then install the top Comer so that center ofthe OCP, 1.Find the lowest corner of the it overlaps the top of the bottom creating 2bps house.Drive a nail part way into the Cartier.This will inhibit any wa ter From which should fold old siding orsheathing,1-3/4"higher running down into the bo ttom Corner. over each other as p •z` than the lowest comer.Stretch a chalk shown. rine from this nail to another nail in the 2.Splice alae Z Corners by cutting 1" opposite comer. ofror the nailing hem from the bottorrh4 2.Dn71 a 1/8"hole in the center oftlie par t of the upper corner.leaving the overlap,through both piens ofvinyl, ou w r face intact Lap 3/4"of the and install a pop rivet to hold them in upper Comer over the lower Corner, place.Cut a notch in both layers to leavingal/4'gapbetween the nailing allow clearance forthecorner. hems for expansion. CAPPING OUT Sl DE CORNEAS Wkinga cap that covers the bottom oryour Ou tside Corners can make fora 2.Snap a level chalk line,then repeat much more attractive finished look.If this procedure on all sides ofthe house- you decide to cap your Ou tside INSTALLING OUTSIDE Corners.you need to take the C STALUN OU following steps prior to installingyour Outside Corners. INSIDE CORNIER POSTS { 1.Place in position,allowing at Ieast 1.Inside Comers install exactly like 1/4"at top for expansion.(When Outside Corners—see steps 1-2 above- Soffit is to be installed,make sure to To spficetwo Inside Corners,cut 1 allowan additional 1/2'attop for " Soffit j or F Channel—See'Soffit off everything but the ou ter face from Irutallation"p.14) x` the upper part of the bottom comer. Lap 3/4'of the upper Corner over the bottom Comer,leaving a 1/4*gap 8 between nailing hems for expansion. 8 1.Use a piece of 1-1/4'j Channel, 7'long(twice as long as the Comer Post race). Q� Ll 2.From the center of the Channel,merit a 90'angle,and cut away that material 3.Cut 7/8'orthe face and bottom I n X. l<I, nl _jI Z Hold in place by nailing at the top of away from each end,leaving the nailing the uppermost nail slat Balance of hem intact 3.Make certain that all Inside and nailing should be in centers of slots, outside Comers are plumb before between 6'and 12"on center. proceeding with installation. IF;au 400 0116 NI / REI 80YE OFFICE or�o3iva �� :or r. oiu�uis HONZONTn1.STARTERSTRIP "Surface Freparation,"youshould MMERCOVIMINSTALLATION 1.install siding starter strip along the caulk around the entire perimeter 1.Cutthe top J Channel orWindow bottom ofthabuildmg.Usedxchalkline oFall windows and doors before and DoorCasing as a guide,placingthetop ofthe Installing Channels or Casings. approximately starteralonb the line. Second,it's a good idea to cut a piece { 1.1/2'longer —of Bashing out of coil stock and slide it than the window under the bottom of both side pieces ordoorwidth. j of Channel or Casing so that it will lap over the top lock of the siding panel 2.Miter cut the below.Ice Gua rd is also a product that face of both left maybe used to flash around windows. and right ends at 45'and remove �_410 DRIP CAP INSTALLATION face material only. Drip Cap is used at the top of all 3.Cut inside bottom of both left and 2.Leave a trip and 1/4"space between starter windows and doors,including garage right ends to same distance as mit:r doors.It supplies a natural runoffthat out,creating tabs at either end. 3.Keep at least 1/4*between starter keeps water away from the home. 4.Bend down the tabs to Form strip pieces to allowforexpansion/ contraction. 1.Cut Drip Cap to exact width of the flanges thatwill slide over the side window or door opening. Channels or Casings,providing 2.Install Drip Cap flush against the top flashing that will help prohibit water window or door casing. penetration. ® _ 3.Over garage doors,when more than one piece of Drip Cap is needed,be sure to overlap the pieces 2 by I"to allow for expansion/ I contraction, � 4.When using sheathing, SQUARE CORN shimshim whenever necessary to accommodate for extra thickness. 1.Cut and install y; the side Channels _ © S.Cut J Channel or Window and Door WINDOW&DOORTRIM or Casings so they Casings to be applied to the sides of Norandex/Reynolds permits the use are flush with the b windows or doors approximately of)Channel,Drip Cap,3/4"Window top and bottom of '` 3/4'longer than window or door and Door Casing,or Flat and Fluted the window or door. height. Window&Door Surrounds as 2.Cut the top O 6.Cut 3/4"away from the inside cop trim around windows and doors. Channel or Casing of both side pieces,forming a notch J Channel and Window installation Door 1-1/Z"longerthan that will accept the flanges from top procedure follow the window or door width. Channel or Casing. proces,which are listed p immediately below.lfyou've chosen to 3.Create a 3/4"notch in the bottom CABLETRtM use FlatorFlutedSurrounds,please see of both the left and right ends of the UsaJChanneltoreceive siding zit the section entitled~Window and Door top piece. gable ends. ni 1)nd Installation"for instructions 4.Bend the notched ends down to 1.Butt either left or right Channel create flanges that slide into the into the top of the gable peak and You may choose to finish your window Installed side Channels or Casings, fasten in place. trim with either square or mitered creating flashing that inhibits water comers.This Is a matter of preference, penetration. and Q1 not affect the performance o f the siding in any way.Following are 5,Fasten the top piece a s normal,i Instructions for both options, laying it directly on top of the previously installed drip cap. , Note:it's importantto take special precautions around windows and doors to inhibit alr and water infiltration.First,as noted above in 2.Miter cut the second piece of Channel,and slide the cut face over the first piece of Channel fora dean appearance. ,�� v ► � � ea nci nu>!I Urr16C UI/U3/Ul ID : U1 P. 011/019 TpJM UNDER EAVES ON Hw ROOF (see installing Outside Corners,p.9), 2.Place two Corner Block Mounts with 1.Use Utility Trim(or Dual Utility Trim leaving 1/4'at the top.Position nail at the squared comers of the mount,to when installing Dutchlap-type panels) the top of the upper slot,and then in the top comers of the window,and under the eaves of a hip roof the center of the slots coming down screw or nail in place as you would the corner at 6"and 12'centers.This siding.Be sure to use the Comer Slock allows for expansion/contraction to Mount marked"R'on the right side of occuratthe bottom.(Note:Lineals and the window,and the Comer Block inserts come in 20-foot sections to Mount marked"L"on the left side of facilitate simple 2-story apprications) the window.(Illustration#1) (C) Snap the lineals into the receptor leg 3 place the two Corner Block Mounts ofthe comer,and nail in lineal nail slots with the squared corners of the ' as specified above. mounts on the bottom comers of the Siding panels can then be installed into window.Screw or nail these in to place 2-Install with receiving channel the corner lineals_ tike you downward.Leave 1/4'clearance would between Trim and Comers. WINDOW AND DOOR SURROUND siding-Make INSTALLATION sure the - When usingthe system as aWrindowand Comer Door Surround,first install the surround Block Mount starter completely around the window marked'117 frame.The surround starter nailing is on the tib§, lr slots should be away from the window, right side of with the opposite edge flush with the the window, frame.You can then install the leftand and the 3.if morethan one UtrlityTrim is rightvertial surround lineals(also with Corner required,splice the Trim by cutting nailingslots away from window)flush Block Mount Illustration#2 back 1-1/4"on one end,then slide with frame in the groove created marked'L'is on the left side of the that end overthe otherTrim piece. between the starter and the frame. window.(Illustration#2) Leave atleast 1/4'space between the nalinghem bf the 2 spliced pieces. You may install the lineals in three ways: 4.Take one of the side extrusions cut 1.Using the square comer installation in(Illustration#1)(A)and position it method;2.Usingthe miter comer so that the installation method;or 3.Using �_ vertical leg Norandex/Reynolds comer blocks. of the ® for methods 1 or 2,please see , , Corner ® instructions an page i0 under Block Window&.DoorTrim.When using Mount fits ` Comer Blocks,see following ": bo" 3 inside the instructions. I Channel of the extrusion(illustration' #3).This allows the water to be THE NORANDEX/REYNOLDS pll.'Draw mba diverted in front of the siding and not WiDECORNER/WINDOW level lines B I/� behind the siding. AND DOOR continuin S.The SURROUND SYSTEM g at least 3' bottom Lj/ from all of the TheNorardex/Reyn ildsWiideOutside sides of theA extrusion Comer/WindowandDoor Surround window. should now System is a five piece system made up of Measure the lay over the a specially designed surround starter, distance bottom two lineals(fluted orplain)and one between the ^� I+ Corner conwinsert(beaded or cove). horizontal Block Mount Uru7tra0on al WIDE CORNERBrlSTA11AT10N level lines and again Olustiation#{ For a wide wrnerappliation.use one (Illustration#1) (A)and cert two trim drain over the extrusions to Dimension(A)less 3/81; siding(Illustration#4).Screw or nal cif I3tn wm%rbntl rtl w jvrd9 l Measure tke 1EA Mtt 151AWMil W into PUCE 7s you would Sidiny, with eitherplain or fluted lineals.The vertical plumb fines(B)and cut the comerinsert is installed in the same other two extrusions to Dimension(B) manner as the regularoutside comer less 3/8'Set all the cut extrusions aside until Step 4. X330. 468 8116 NX / REI 80YE OFFICE 01/03/01 15: 10 ? .011/018 STEP 5: STtP 6: 1NSTAWNGREMAINING PANELS- THE PEAK-The last ro und may I-e Cedar Rounds are designed to stack face-nailed using only one color- Trim coil goes under iris on top oFone another.(Illustration matched trim nal,and a pre-dralecl 1/2' *8)Working from left to right, 1/8'hole.Do NOT drive the nail holest continue to install the remaining tightly.Leave approldmately1/16- I .stdins pan.l panels.Staggerthe panels,so that at clearance fornonnal expansion/ ��+J least two Rounds overlap when locking contraction.(Illustration#11) the courses vertically.(Illustration#9) Musrntion S6 n underneath the trimmed siding panel about 3/4'.Use trim nails driven through the pre-drilled holes,through �\' the trim sheet;and into the studs `\\\ ulusrraton#I t before the Rounds are installed. \ (&o NOT drive nails tightly.Leave .� CEDAR SHAKES AND/OR appFroximately 1/1 6'clearance forSPLIT INSTALLATION expansion/contraction). Iuustradon#s I STEP 1: Overlap the first course of Rounds I INSTALLATION FURRING-Fur overthe top ofthe last course of I uneven walls,as noted in Cedar siding.Thecolor-matchedtrim sheet - I - - Rounds instructions. will insure a good appearance in the gaps between the Rounds.(illustration STEP2: #7)When using this alternate INSTALLING J CHANNEL-Line the method of.installa tion in a gable,the entire border area with 3/4'j Channel. following formula will insure that the final course will consist of one Round Illustration nf9 S7EP2A: at the peak:Height of gable in inches OUTSIDE CORNER INSTALLATION divided by 625'-Number of courses. At gable ends,trim each pa:el to the STEP 1'ALICN WITH 1 ST COURSE OF proper angle,allowing 1/4 clearance in the)Channel for expansion. SIDING-Locate the first course of siding.The bottom of the outside ccin�c�i1 In order to help cut panels to the corner should be aligned with the r - proper angle,make a pattern that bottom ofthis piece of siding Due to duplicates the gable slope.Lock a varying shake lengths.the comer!.will �- short panel into the starter.Hold a not align with each course. piece of sing into the)Channel on arse of flu`s the gable slope,and run a pencil line STFP 2:INSTALL 15TOUTSiDE r tastc0 f�� along the edge of the siding onto the CORNMSECTION-After the short Round panel.Cut along the alignment in Step 1 is completed, pencil line,and use this Round as the level the outside corner and nail the pattern to cut succeeding panels. comer post to the wall using the dustration#7 (Illustration#10) centerof the prepunched nail sloe s. Str1myour vertical plumb line from the I STEP 3:INSTALIINGMORE CIORNLR peak.Mark a level line 9-1/4'above t SECTIONS ASOVETHEFIRST CORNER- the edge where the bottom of the first I To install a corner on top ofanoti►er course will begin.Hang the first pand cornersection,grasp the now corner atthe intersection of these 2 lines— r at the bottom and pull on the)Channels If an even number of courses.anter to spread them open.Then set this on the separator space between Rounds. top of the already installed corner. If an odd number,center the point of overlappingthe smooth section at the a Round top of the installed comer post Level '""�""'°""`° the comer postand nail in ft miter Panels should be cut with a radial saw ofthe prepunched nail slots. for cleanest appearance. ` ••r • ••r • r.4 r Y 1 1 1 Y r 1 6.Take the top and bottom extrusions USING WIDE CORNER LINEALS ! (Illustration#1)(B)and place the ASA STARTER STRi P r extrusions in between the vertical Wide Comer Uneals can make an plum lines „a,1e„sa,„MA1" attractive and unique starting piece for with ASUCIUM asidingjob,orfor Cedar Shakes or J Channel in r _ •: Split When used in this manner,we the trough Z t I of the recommend that a standard horizontal 5.To start the second course,use die siding starter strip be installed first,as Comer described on page 10.The Wide Corner end cut piece from the last panel you Block Mount Lineal should then be locked into this used on the first course.This will (illustration r starterto assure a firm,straight line. a staggerthe end laps so thatonc is not #5).Screw directly above the other,and provide a or nail in i much cleaner overall appearance. place as6.Install Following courses in the sane you would LA siring. tnustntion ass manner,making sure that no end bps are d`ueCtly above each other. 7.Finish the siding around the window as if it were a standard)Channel. 7.Check alignment of the siding every 5th course. S.After siding is complete,place the I N STALLI N G Corner block Covers on the bosses of NORANDEX/REYNOLDS ENDIAPS the Corner Block Mounts,aligning the HORIZONTAL SIDING 1.Remember that vinyl siding notches with will expand and contract as the the comers of temperature changes,so it's Now that Starter Strips,Comers. the window. important to overlap the end jai tits of Channels and/orCasings are appGed.you Screw the may start to install Norandex/Reynolds Your siding panels by 1"to 1-1/�1"to !T/ _1 Comer-Block �nyt Siding.In Horizontal insure a g°°d installation appearance. Covers into a lications, 'l!startatthe bottom z.Fora ceanerPP youYllaok, our last nail or tthee mcr of the house and work up.Generally, staple should be a minimum of 10"from Block Mounts you'll install the siding one wall ata the ends of the panels. (illustration time,completingone wall before 3.Always overlap factory endowith #6) moving onto the next. factory ends.Field cuts should only 9.When 1.placethe firstpanel into the Starter be used in Comers and Channels, ttlustratianaKb installingthe Strip and pull up until it locks into place. and never in overlap situations. Screw Covers there are two slots in the 4.For the best finished appearance, Corner Block Cover.The narrow slot is d , - always overlap joints away from high- dosestto traffic areas like entrances. 1 the window,andthewide iNSTAWNG SiDiNG AROUND slot is WINDOWS AND DOORS closest to f When you've worked your courses the siding. ~ up to the bottom of a window,you'll insertthe mu■tratron 97A Z.Fasten the panel by nailing probably need to cuts sidingpanel to tab end of 10or stapling at leastevey161 fitunderthatwindow.Thesameistrue the Screw Remember to fasten in the center at the tops of windows and doors,when Cover into of the nail slot,and try to hit a stud it's highly unblCely thatyou'll be able the wide wheneverpossible. to fit a full panel of siding.Here's what slot.Then,securely to do, sear3.Asyou proceed,check the siding snap ly tip course for proper alignment with side of the adjacent walls,windows,and eaves. u t Screw Cover r" '�On*� 4.Don't place siding flush into intoplace. GhprnnelsorComer!Leave (Illustrations approximately 1/4"to allow for 1l4• t/4r #7A,7B. expansion/contractiorL and 7C) rtluAmfon,v7C �339 4b6 6110 H( / RC( dUMlr UhFiGE UiIUJIUl I�: U6 Y. Ui1/G(S FnTiNG UNDERWINDOWS Note.Use the same procedures to 6.Do NOT face pall this panel! 1.Make sure the panel to go under the measure and cut panels thatwill goat ONGABLEROOFS window extends past both sides of the the tops of windows and doors.In these window.You don't want to have a lap circumstances,the panels will install Use 2 scrap pieces of siding to mal e a under Your window, into the j Channel or Casing previously pattern to cut the panels on agable installed a t the top of the window or roof to the proper angle. 2.Hold the panel in proper position door,so there's no need to install Utility under the window and mark the width Trim,nor is there any need to punch any of the window on the face of the panel, lugs with the snaplock punch.Make sun; adding T/4'to each side for clearance. you leave 1/4'clearance at both sides i and at the bottom for clearance. '/4.1 ---- ❑ 1.Lode a scrap piece into the siding —— panel below.Hold a second scop piece flush against the gable,and 711H u sing the bottom of that piece as.i guide,mark the cut angle onto the 3.Locks small scrap piece ofsiding Note_When applying Shutters to locked piece. into the course below the window,and your finished vinyl siding job,make 2.Use this same procedure to make mark the height of the cut on that sure to drillour installation holes panel,deducting 1/4"for dearance. y l/4,. a pattern for the opposite side of in the vinyl wider thanthe thegable. 4.Place the saap piece overyourgood Shutter installation screws to allow panel and mark the height of the cut on for expansion/contraction! 3.Use the patterns to make and the panel, FlN15H1NGTHETOPCOURSE cut the panels that will fit into the jChannelsyoupreviouslyinstalledin S.MaketheverticalartsonthepaneJwith OF SIDING the gables,making sure-to leave 1/4" snips,and score the horizontal cut with ON HIP ROOFS gap between the siding and the a utility knife,then bend and snap the away. for expansion. piece 1.Measure from the top of the p installed Utility Trim or Dual Utility INSTAWNGTMMATROOFUNE INSTAWNG UNDERWWDOWS Trim,to the bottom of the lock on the At points where Vinyl Siding and 1.Install a piece of UtilityTrim under panel below. Accessories will me tats of lam; the window that is flush with the side 2.Deduct 1/4",then cut the panel to such as areas where a gable dormeror Channels or Casings. this measurement i a second-story side wall intersect wit4 2.If it appears thatyou need to fur out 3.Since this panel will no longer have a the roof,its best to position the theTnm to maintain Proper hailing hem,it's necessary to punch j Channel so it's 3/4"to l'away from` siding,Nonndex/Reynolds recommends lugs using the snaplock punch. the roof line_Placing the j Channel thatyou use Dual UtilityTrim instead. directly on the roof line would subject (chis circumstance usually arises when 4.Punch every 6',making sure that it to a build-up of heat,which could you're installing a Dutchlap-type panel). the raised lugs are on the outside face result in excessive expansion.To ofthe panel. prevent water infiltration along the 3.Use a snaplock punch to punch the intersection of roof and wall,install panel every 6'along the horizontal cut flashing before installing]Channel. edge,l/4"below the edge-This creates lugs which face outward,and will engage and lockinto the UtifityTrim. j INSTALLING NORANDEX/R OLDS VERTICAL SIDING a The same basic rules that apply io the •� `' installation of horizontal vinyl siding also apply to vertical siding.Following are specil9c steps 1:na1 need to be S.lock the bottom of this panel into followed for vertical siding the panel below.then push the top applications only. into the Utility Trim or Dual Utility Trim until the lugs engage and locki in+n As Trim. >7aau loo allo Ad ! itI1 11UII UrPILC Ul/U3/U'l I� : Utl P. 0141018 1.Snap a level chalk line around all INSTALLING 3.Install the F Channel along this line, sides of the house.l'higher than the NORANDEX/REYNOLDS with the top edge of the trim's nailing lowest corner of the house. VINYL SOFFIT hem to be even with the line. 4.Nail or staple every 16'.Try to Wit a Norandex/Reynolds Vinyl Soffit stud whenever possible. Systems are designed for use in either new construction or remodeling S.Measure the distance between the applications,Installation procedures fasda board and the receivingtriin on are the same for eitherappGcation. the wall although in remodeling jobs it may be 6.Deduct 1/4"for expansion/ necessary to remove any old trim from contraction,then cut Soffit panels 2.Install 1/2'JChannel,receiving side the eaves area before proceeding. to this length.(For panels over 3 6' up,with the top edge of the J nailing There are basically two kinds of long,allow 1/2!) hem aligned with the chalkline. overhangs:those with open eaves,and 7.Insert one end of the cut paned into 3.After installing all Comers,Trims those with dosed eaves.Preparing the receiving trim on the wall. around windows and doors, 1/2' these different kinds of overhangsto J ChanneJ in gables and 1/2" receive Soffit requires different 8.Nailthrough the slot inthe nailing hem J Channel underhip roof eaves, installation procedures,so please on the opposite end ofthe panel into you're ready to begin installing follow the instructions that are the bottom of the fascia board—as vertical siding panels, appropriate for your particularjob. always do not nail too tightly. 4.Install furring strips in to the full 9.Once the first panel is installed,insert length of the receiving channels of all ---� thetongueofthesecondpanelintuthe Inside and Outside Comers. nailinghem of thefirstpanel.Lode the panels together snugly the full length of the Soffittoassure properalignment. Use the same nailing and locking; procedures for all following panels. OPEN EAVES INSTAL.L4'nON For open overhangs,you need to create a channel on the wall to receive S.Install Utility Trim over furring and support the vinyl Soffit You may strips into all Corners,leaving 1/4- use either F Channel,1/2' gap for expansion/contraction attop )Channel,Soffit Cove Molding,or and bottom,and between Utility Trim Deluxe Crown Molding for this and inside of Comers. purpose,depending on the look Note#1:When the overhang is more You wantto achieve.For ease of i then IS-wide,install a nail support` 6.Remove the bottom lock(opposite installation,Norandex/Reynolds down from the rafterto a line parallel nailing hem)from your first vertical recommends you use F Channel on to the bottom of the fascia board and panel.Use a snaplock tool,and punch open eaves.because its vertical nailing the receiving trim on the wall.Soffit lugs every 6',1/4'below the cut hem makes secure installation to the should be nailed to this support board edge.Raised lugs should be on the wall simple(See Note#2 below). through the nailing hems to prevent front of the panel. sagging. Since there is no existing overhang in 7.Snap the panel into the UtilityTrim an open eave installation.it will Note#2:IFyou choose 1/2'J Channel, in the Outside Corner,leaving l/4"at be necessary to nail your Soffit to the SoffitCove Molding orDeluxeCrown top and bad=of J Channels for bottom ofthe fascia board for Moldingasthe receivingtrimonthe expansion,then fasten to the support walls on open eaves,it wll be "I through the naTt mg hem.Make on necessary to install a wood support cat in thisfirstparWbpk�before 1.Use level tmark a pend)line hc ((2y.2)to the wall,'then apply the trim proceed'mtwhh additional panels. the walll parallel l to the bottom oFthto the support. existing wood fascia board on either . 8.Atlast panel for each wall,remove side of the wall. the bop loci and nailing heM,Oell 2.Measure up 7/8-of an inch from the Punch lugs in the same manner as you fines,and snap a chalk fine across entire did the first panel,and snap into Utility Trim Do NOT face nail this panel! width oFthe wall. 1t33U 406 611D M1 t MCl 1fU1C UI'FIGC UItU31UL IU : U9 P . 015/D18 CLOSED EAVES INSTALLATION TOTURN CORNE115 CAPPING FASaA CORNERS On overhangs with dosed eaves. At Comers,use H-Trim to create You an make a corner cap out of Vinyl Norandex/Reynolds recommends that a dean,mitered look.Miter-cvtyour Fascia that will provide a nest finished you use either 1/2*)Channel,Soffit Soffit panels at the proper angleand look to yourinstallation.Here's hrrar Cove Molding or Deluxe Crown instalinto H-Trkn,kaving 1/4"space for 1.Cut s piece of Fascia S-1/2'in Moldingas the receiving channel on expansion/contraction. length. the wall.Since there is existing Soffit on dosed eaves,you will nail the new 2.Mark a vertical line down the center Soffit directly to the overhang. of the back of the Fascia. 1.Install receiving trim to the overhang against the wall,flush with the exi sting soffit 2.Measure the distance between the , fascia board,and the receivingtrim on the wall. 90' Note:Ventilated panels may be used as necessary to achieve the proper vnraA ror amount of attic ventilation.Consult 3.Cut a 90'section away from Vie expansion local building codes for ventilation centerof the bottom channel,leaving requirements. 45-on both sides. 3.Deduct 1/4"for expansion/ INSTALLING VINYL FASCIA COVER 4.Bend along the center line(use a contraction,then cut your Soffit panels to this length.(Forpanels 1•Install a Utility Trim cut to the length metal square or straightedge to help panels to this lenges.(For ofthe woodfasda atthe top of the insure a straight bend),forming a over 3 fasciaboard. right-angle comer. 4.Insert one end of the cut panel into the receiving trim against the wall. 2.Using a snaplock punch tool,punch S.Punch lugs at the top,hook the raised lugs on the top of the Fascia Cap bottom ends over the bottom of the S.Nail the Saffitto the existing every 6',then slide into the Utility wood fascia board,and snap the top overhang through the slot in the nailing Trim until the lugs engage and the Cap into the UtlityTrim attop offascia hem,driving a nail approximately every is held firmly in place board. 16".Do not nail too tightly. 3.Hook the bottom edge of the Vinyl Fascia Cap underthe bottom of the wood fascia board. 4.Do NOT face nail the Fascia Cap. This can cause unsightly buckling and waviness. Nota:Use a level and chalkline to Insure that all Channels and Trans art installed straight. CLOSINGTHEENDS 6.Once the first panel is installed, Cut a 1/2"j Channel the width of insert the tongue of the second panel the overhang and install atthe ends irrto the naliinghem to the first panel. by nailing into the overhang,and Lodkthe panels together snugly the fittingone and into the receiving trim full length of the Soffit to assure on the wall. properaPgnment;and nail to existing overhan&Use same procedures for all following panels. ��30 466 61 ( 6 �� / KFC HOYE OFFICE U"1I03IO2 15 . 09 P,016/Ol6 I NST Seri is a ROUNDS CEDAR ROUNDS � verba)plumb CEDAR SHAKES AND �..-'�"- line from the R / CEDASPLIT peak This line will allow the STANDARDINSTALLAMON "`-f �--- firstStarter I.Always mail in center ofnaiGnb ---""' Strip panel to ,�:a�: •� slots Nail every 16', be properly pwr: 2.Do not nail tightly.Allow m"`r"°O" centered —==—==z.� clearance of a ro�amatel 1/16',so Next.a level pP Y to line should bethat the panels move unrestricted left left of the wall by placing a Starter into marked to right. the left)Channel,and slidingdown 3-3/4-above 3.Do not face nail excep t as noted in into the bottom].(illustration#1) the,edge Leave approximately 1/4'clearance where the ' Step 6:The Peak(p.17). between the Rounds Starter and the bottom of the 4.Leave a minimum clearance of 1/4' j Channel for expansion.Proceed to Starter Strip betweenpanelsand)Channel,toallow the right by butting additional course will -°0°'"•' fornomul ansion/contraction, arcuw,.,; exp Starters until the entire bottom row is begin.The covered.Then proceed up the wall by intersection of L� S.White product may be painted installing CedarRounds panels from ff using a high quality,exterioracryUc g p the vertical t l latex paint eft to right plumb line and Finish off at the to using the same the horizontal L� TOOLS REQUiRJ<D P g face-nailing technique outlined in level line is the A bench orradial arm saw should be Step 6:The Peak(p.17). i starting point for i —. used to cutpaneLs.A fine tooth blade hanging the first ; (12 to 16 teeth per inch)should be ST>p 3: Starter Strip_ used,with the blade installed in the GABLE APPLICATIONS-Line (Illustration#3) reverse direction for a cleaner cut the entire gable perimeter with 3/4If the number of I s� •- coursesl. Standard tools,including a hammer, Channecalculated in the tin snips,square,chalk line,level,rule, it is generally desirablcto finish a ofrmula above is and safety glasses,will also be gable wall with one round in the peak. odd number. required. Therefore,it is necessaryto position an the Cedar Rounds StarterStripand the separator CE13ARROUNDS INS171LLAllON space between There is a special Cedar Rounds the first course of Rounds to ensure the Rounds that the final course will consistof one starter strip,but Rounds may also be Round at the peak StarterSbip should'e,r•-; v i,3;rile started with 3/4'j Channel and/or intersection point(I If custom brake work with aluminum First,calculate the number of rows of an even number of cc:r>es flashing.No starter is requimd for Rounds it will take to cover the gable. calculated,a Round: CedarShakes. When using the Cedar Rounds Starter, point should be cen;erei., tlu:,;t�ation use the following formula:Height of #S) Be sure to nail;-:pa. STEP I= gable in inches,minus 2-1/?-'divided 16'on center. ' INSTALLATION FURMC-On by 6.2 S'-Number of Courses. STEP 4: uneven walls,furring should be used (illustration#2) INSTALLING ROUNDSN% --goU-r to provide an even and nailable base. STARTER Sip-I.cress .r Shim out the furring at the high and .rt+it is low spots togeta final even surface. t i impossible or uncles: !e .Cedar Furring should be run vertically, i Rounds StarterStrip._::: V r•,Ilowing 16'on center.Accessories should be i alternate method or -s:2•1 1,-,.%n. attached over the furring when needed. i The top lock of the ;;��,-1;-k of gable j sidingshould betrir—:,::,•-. %trasure height t A-21/="+625 1/4'down from the,::,- -V 57 RAK.lI`TWALLAPPUGA"0N- jNumbetof trimmed siding Pane ar: .7t 1/8' Lina the entire border area with 3/4' Cm, rses J Channd.Whenever possible.itis holes atstuds.even (illustration r-6) bestto use Cedar Rounds StarterStrip A 3'wide strip of alu -:c--_-jm ghee: �uiL10o^ua (color matchsd to t-*C,< 'Nound: color)may then be:'; 4a30 468 S ( (o N1 / REI HIE OFFICE 01/03/01 15 : 10 P. 018/018 STEP 3: 3.Lap partial receiving channel of new INSTAt11NG THE FIRST COURSE» i post over partial channel on remaining The primary consideration when nail flange.Pop rivet the two receiving channel legs togetheras needed. installing Cedar Shakes or 5prrt is to stagger the panels to ensure that vertical separations never rime up �•, directly with the separations in the •:�,; .�� � � course above or below.(Illustration '•.� #12)Always start from the left,and worktoward the right On the first ILLUSTRATION r17 panel of the first course,cut the Shake wider than your original starter,begin U-M t 1 11 at the pre-printed cut line marked the second course with a full panel. either"A",W,or"C.(Illustntion 13) Continue to stagger each succeeding install this cut Shake,then proceed course as you work up the wall, REPAIRING BUCKLED down the row with full panels.Cut the beginning each row eitherwith a cut SIDING AT THE JOi MT final panel to size and install. panel from a previous course,orwith Ifyou are installing in a sable,trim a full panel,depending on the visual Vinyl siding sometimes becomes each piece with a radial saw to the appearance. unlocked between the firstand proper angle,allowing 1/4-clearanceSTPD 5, second floors of a newly built siding in the Channel for expansion. installation due to settling and THE PEAK-The Is st Shake may shrinkage of wet lumber.This can be be faced-nailed using only one corrected by using a piece of color-matched trim nail,and a aluminum starter strip. pre-dulled 1/8`hole.Do NOT drive the nail tightly.Leave approximately 1,Insert inverted 1/T6'dearancefornormal ��'• scrap piece oFstarter expansion/contraction, strip into the exposed receiving lock of the lower panel, REPAIRINGA DAMAGED PANEL; 2.With the;crap piece inserted into To repair a the lock,lay the damaged upper panel over the WFH 1 - 11 t 1-1 starterstri The panel,insert p I LLi1iYRAT10N�►12 the hook end .• starter strip should of a zip toot be visible behind the Note:There are 6 each A,B and C into the lock ! upper pane-Marks panels packaged in a carton of Cedar between the line of the scrap Oiece Shakes.A,B and C panels are dams ed anal where the retumJcg aesthetxallydifferentfromadepth g p of the upper panel perspective,butthere are no and the panel meets the.-crap above.Pull differences among them from an downward. piece. - • installation standpoint You may begin This will allow 3. thefirst row with any panel,regardless st Trim the of its marici so Ion as you cut it at access to the damaged panel's nail ,• staffer on:his the cut a&so longa #u c You may flange.Remove the nails securing the line,savini;the also use n B or(Illustration panels in any random panel.Replace the damaged panel and portion with the Install a new panel,then use the zip locking ed,e. oiler asyou work up the wall,as long as tool to t you continue to stagger the vertical o e new panel into the ve.e.fi Note:It is acceptable separation lines between the Shakes. panelabove. to cut the starter STEP 4.- REPLACING A DAMAGED P in shorter `lengths to ease WSTALUNGREMAWLNGCOURSES OUTSIDE CORNER POST . e n thst Ind -Startthe second course with the renl3indet ofthe IZSt and that Yf�s portion of lama •relocldng P I.Cutout lock Installed on the first course,at long as Post by scoring along outside corner 4.Insert the trimmed�dCe into t114 thatpiece is at feast one shake wider of receiving channel with a utility kn& ofthe lower panel.Begin a t one end than the starting Piece of the first and,using iip-lock tool.pull the course.If this piece is not one shake 2.Cut off the nailing flanges return leg of the upper panel down to from the new comer post by scoring engage the upper panel with the and bending until the flanges snap off. aluminum starter strip. u � 44b bttb S ) I N G ir+strutt=��s SOLID i h R�, n� Noir `Nom M ZIiF I C E 01/03/02 15 . 04 P . 0021018 FOREWORD This manual is published by This manual is intended to provide If you have an installation Issue that is Norandex/iteynolds as a guide to generally acceptable standards,and is not covered within this manual,and basic installation techniques that are not intended to coverall application have any questions as to the generally accepted for the application possrbilities.For example.there may appropriate way to proceed,you ofi it yl siding soffit and accessories , be regional or local installation may contact the Product Services throughout the vinyl siding industry. preferencesthatarenoteovered Departmental:l-800-528-0942 As such,Norandex/Reynolds strongly within this manual.Generally,it is forassistance. A rnmends that you thoroughly acceptable to follow any such It may also be appropriate to review all review these instructions priorto preferences,so long as they are pertinent local building codes before proceeding with any installation,and accepted by the local building trades proceeding with any installation. that the instructions be followed as as standard procedures,and do notgo Norandex/Reynolds makes no c laims closely as possible.Failure to follow contrary to the basic tenets of vinyl riding as to the appropriateness of,or the installation techniques and application that should be followed in all acceptability by,any local or regional procedures outrned in this manual applications.Most ofthese basic building codes of the following could create a circumstance that tenets will appearin bold type in this installation techniques. causes the siding to fail to perform as manual for easy reference. intended.Such a circumstance could conceivably be cause to invalidate your Norandex/Reynolds warranty. CONTENTS SECTION PAGE Foreword..............................................................................................................2 Norandex/Reynolds Vinyl Siding Profiles and Accessories..............................................................3 VinylSiding Planning Guide............................................................................................4 EstimatingGuide.................................................................................................. ...5 Basic Rules ofApplication for Norandex/Reynolds Solid Vinyl Siding................................................ ...6 Sheathing/Backerboard........................................................................................... ...b Tools and Equipment................................................ ............. ................................ ...6� Special Tools Designed forYinyl Siding Applications ............................................................... ...6 Fasteners. ............................................................................................I...............7 ChoosingStaples..........................................................iL..........................................7 General Procedures for Nailing and Stapring............................................................................7 Cutting Norandex/Reynolds Vinyl.....................................................................................8 Surface Preparation ...................................................................................................8 Installation Procedures................................................................................................9 Tho Norandex/Reynolds Wide Comer/Window and Door Surround System............................................11 InstaQingNorandex/Reynolds Horizontal Siding.......................................................:...............12 Installing Norandex/Reynolds Vertical Siding........................................................... ..............13 inst IIIngNorandex/Reynolds Vinyl Soffit..............................................................................14 Installing Cedar Rounds,Cedar Shakes and Cedar Split.................................................................16 Replacinga Damaged Outside Comer Post............................................................................18 Raring Budded Siding at the Joint.....................................................--•...................... ....18 Vi3u Boa � Ilb NII W NOME OFFICE 01/03/02 15: 04 P.003/OfB NORANDEVREYNOLDS VINYL SIDING PROFILES AND ACCESSORIES Norandex/Reynolds offers a variety of siding and soffit panels to match any architectural style ordesign purpose. Utility Trim OutsidkomerPoit Deluxe Gown orSollitCovcMolding Starter5trip Fascia vertical Sidint or Soffit Inside Comer Post F or J Channel H-Trim Window and Door Casing or Surround HORIZONTAL SIDING VERTICAL SIDING AND SOFFIT Horizontal siding panels are available in a variety of face Vertical siding panels are available in Board$8atten.and widths,including Triple 3',Double 4",Double 4-1/2'. D/5 Premium,which may also be used in soffit applications. Double 5'.6-1/2",and a full 8 .Finishes include brushed, Other Norandex/Reynolds soffit styles indudeT/4 Matte, orauthentic woodgrains,in traditional Clapboard,Beaded, 0/5 Select Matte,and T/3 Beaded Porch Panel,an in solid or Outchlap styles- orventilate4-styles. ACCESSORIES A broad range ofaccessary items is available to help complete any siding or soffit installation. Appropriate use ofthe various types of Norandex/Reynolds accessories is explained in this manual. - a Inside Corner Post StartorSbip Outside Gomer Post Vary Trim i Gunnel Dual Vt,Tty Trim Drip Cap r,r [Drj 4 Windaw and Door Casing F Channal H-Trim Fula Soffit Cove Melding Defuse Crown Molting WIDE OUTSIDE CORNER/WINDOW AND DOOR SURROUND SYSTEM fiilGOrYilsl5ttrt W %tad CtuiW/Sutrousd W411 Cerear W&rt Cepa Comer loon 5ummnd Verb •waNtsr>rvras.srrrrrrrt LU X330 468 8116 R3 / REI EOYE OFFICE 07/03/02 15: 04 P . 004/018 VINYL SIDING PLANNING GUIDE vinyl siding is easy to work with.and STEP 4 requires only a few basic tools. Take the total area from Step One and But prior to installing Two and add them together.Then, —� NorandvJReynolds Yinyl Siding.you subtract total ofStep Three from total. C need to determine how much product Always add 10%for waste and/or is needed to complete the job. miscalculation of material. Vinyl Siding is measured in squares STEP 5 I (100 Sq.Ft),and several accessories To determine the amount of siding SoFnT are necessary fora good installation, squares needed,rememberthat 100 VAD+ H Solid and ventilated soffits are used to square feet of surface area equals one I cover under the eaves. square,so divide your footage from Follow the steps below and use the Step Four by 100. i Estimating Guide on the facing pageto STr,6 record your measurements. Measure under e2ve areas.Multiply STEP 1 length by width for each overhang Make sketches of the home showing all (see steps 1 &2):add together. sides.Measure the height(H)of each S-MP 7 side at the corner and multiplythat by To determine the number of squares of the width(W)to attain the surface soffit materwl required,divide footage area of that side. requirements from Step 6 by 100. STEP 2 STEPS Measuregables,dormers and any Familiarize yourself with the accessory otherarea notincluded by the sides. items and how they are used.Measure Foreach triangular shaped area the total lineal feet required for each measure from base to the top(q, item. then multiply by 1/2 the base (1)length.Then add together. STEP 9 STEP 3 Mark all your measurements on the Measure the windows or doors,or any diagram you first did ofyour home. %aW —I other area that will not be covered with Recordyourfinal measurements. -W -----I siding.Multiply width x height for each You're all set With your calculations area and add together. and measurements complete,you are ready to order the materials yok need to complete the installation. X380 X68 8116 III / RET 80YE OFFICE 01/03/02 15: 05 P .0051011 ESTIMATING GUIDE 1.Surface areas of sides 4.Add Step 1 and Step 2 together Inside Comer Post sq.ft sq,ft lineal Ft. sq ft. Subtract Step 3 from Total ofStep 1 Outside Comer' fL and Step Z sq lineal r2 sq.ft sq.ft. Window/Door C2 sing" sq.ft- S.To determine number of squares lineal R needed,divide footage by 100. Drip Cap Subtotal sq.ft' Example:1,281 sq.ft.divided by 100-12.8 or 13 squares lineal ft. 2.Surface areas of dormer, gables,etc 6.To determine number of squares 8.Measure the total lineal feet of sq.ft. of soffit needed,divide by 100. each soffitaceessoryneeded Example:267 square feet Divide by 112.'j Channel sq.Ft. 100-2.67 or 3 squares(Remember to use ventilated soffit where lineal V sq•ft• ventilation is needed). sq.ft 7.Measuretotal lineal feet oFeach FChannel siding accessory needed lineal ft' Subtotal sq-ft. Starter strip Utility Trim 3.Surface areas (Not to be covered) lineal ft.4 lineal ft. Windows sq,ft„ 1 Channel Soffit Cove or Doors sq-ft• lineal ft' Deluxe Crown Molding Chimneys sq,ft. UtilityTrim lineal ft. lineal ft' H-Trim < Other sq.ft. Subtotal sq.FL Dual Utility Trim lineal ft. (Not to be covered) lineal ft. Fascia Cover lineal ft 'Always add 10%to your measurem-ruts of these accessories for possible+westo If NorandaJReynoldi; Wide Comvr/ Window and Door Surround System Is to be used,me.wn.6uil R regLired andywr Nora dexAcynolds Detlerwlil help determine quantity of various 6ne.ds, corner inserts or starter needed. 1 VVVV 1V V V 11 V pp ! ItV I "Vn0 V1 1 1 V1, V I/ VV( V4 1V . VV I . VVVV V IV BASIC RULES OF SHEATHING/ SPECIAL.TOOLS APPLICATION FOR BACKERBOARD DESIGNED EISIDING ED FORVINYL ATION NORANDEX/REYNOLDS SOLID VINYL SIDING Norandex/Reynolds recommends that you use a weather-resistant sheathing There are a few tools that have been 1.Always fasten approximately in the or foam insulation that is at lease 1/4' designed especially for the installation center of the nail slot. thick.A high-quality rigid insulation of vinyl sidins.These tools can he real 2.Vinyl Siding may be applied board should provide a smooth, time-savers in certain situation:.,so it's manually with nails,or"power- consistent and stable surface foryour always a good idea to have them in fastened"with staples.Power-driven siding application.it may also provide your tool box. application involves additional care added insulation properties. to insure proper installation.See p.7 The use of unapproved"drop-in4 for recommended power-driven backerboards is not recommended. fastening procedures. Some of these materials may cause �o 3.Neverfas ten too tightly.As restriction which could result in temperatures change,vinyl siding oil-canning.Use of any such expands and contracts as much as materials could invalidate your SNAPLOCKPUNCH 1%4"over a 12'6"length.Proper Norandex/Reynolds warranty. Used to punch lugs into the cut edges installation will permit the siding to To make sure thatthebackerboard of siding,to help lock panels at the top expand and contract without materials you use are approved,contact or finishing course.The punched lugs restriction.Siding should"hang"on yourlocal Norandex/Reynolds branch. engage and lock into the installed trim th e na il or sta p I as.Try to leave a They carry full sheet.fanfold and accessory. clearance of at least 1/16"of an inch. drop-in backerboard materials that 4.Do NOT face nail or staple through are approved foruse under Norandex/Reynolds vinyl siding. !- the panel. 00 , S.Leave a minimum of 1/4"clearance TOOLS AND EQUIPMENT at all openings and stops(n Corner Posts or)Channels,for example). NAILHOLE PUNCH This will allow normal expansion and HAND TOOLS This tool is used to punch a nail hole in contraction.When installing in Common hand tools needed for the cut edge of a panel.Like temperatures below 32'F,leave a proper installation include hammer, manufactured nail slots,the hole is minimum clearance of 3/8'. fine-tooth saw,measuring tape,level, elongated to allow for expan!ion and 6.Never force siding panels up or square,carpenters pencil,and i contraction. down when installing.Allow them to chalkline. "hang"without strain. 7.Make sure that any installed panel. . can move easily from side to side without restriction. 8.Never caulk vinyl siding!Caulking 21PTOOL in j Channels or corners will cause +: Used to remove or replace a specific oa-canning, siding panel.The curved end of the 9.It is essential that the surface that Vinym and tool slides under the end of the panel. will receive the vinyl siding is properly cut ulsin a heavy is easy cdu t futility knife. and hooks onto the back rip of the butt prepared.ln remodeling situations, 6 duty y lock.Pull downward and slidealong the uneven furring or removal of siding Good quality tin snips tonor g and aviation-type full length of the panel to d•lengage maybe necessary.in new snips will help to the cutting the lock.Reverse the procedure to construction,don't use green lumber shaping of vinyl install anew panel into a finished that can warp as a substrate-Your course ofsldi;* siding installation arili only be as The tools required to instar vinyl strai6ht and as stable as the materials siding are generally available through to which Ws applied. A bench,radiad arm oy hind-held b your local NoranaexJReynd��l: 170Cht powersaw can speed c rttingand N0n'��Ot���S� installation.Use rfine tooth blade— Asb-tassldinLis a mgwaW matreaLYou st,«dd hraysmeuctdwapp,»pr;au«Wsa flV1Wasono, 12 to 16 teeth per inch—insi led in prior toresi&gover any asbestorbuedprodum the reverse direction.This will eve you the cleanest cut through vinyl. Q380 468 Sll6 KI / REI HH E OFFICE uflu I/ ui II : ua r. (Juliulo FASTENERS GENERALPROCEDURES 6.Locceachcourse ofs!dinginto FORNAILINGAND the course Wow by pulling up until cw)oswG NAMS STAPLING the butt snaps into the top lock- Always use aluminum,galvanized but be carful not to pull the panels steel,or other contusion-resistant 1.Fasten only through manufactured too tightlytogfoarbyfisteningat nails to install Norandex/Reynolds slots,orslotsthatyou've made With an angle thatpults the courses Vinyl Sidin& a nail hole punch.Never"face nail" together. through vinyl.Face nailing restricts Nails must be long enough to allow a expansion/contractionand will cause 7-Fasteners should be spaced no , 1-penetra tion into the surface,which more that 16"apart on horizontal should be stable and secure.Nail your siding to oil-can. siding panels,12"on center for heads should be at least S/16'in vertical siding,and between 6"and diameter,and shanks should be NO! J YES! 12"apart foraccessories. 1/8-in diameter. C 8.Whenever possible,nail orstaple directly into a stud to insure secure `2��2� i application. r NOTE:When using Pneumatic —Illy 2.Remember.siding should hangon Staplers,be sure to setairpressure the nails orstaples.Never drive a nail according to the tool manufacturer's t or staple home.Leave at least 1/15' recommendations.Many of an inch clearance between the nail manufacturers provide special guide head orstaple crown and the vinyl. attachments to permit easy use of T their tools for vinyl siding applications. --�'� NO! YES! /1; Consult manufacturer'sspecifications for the safe and proper use of power-driven tools. Nail lengths should be chosen as follows: • INSTALLING General Use-1-1/2" NORAN D EX/REYNOLDS Residing " 2 3.Always by to fasten in the center SUPER PREMIUM PANELS ofthe nail slots to permit Siding with B o 1-1/21/2"- -2-1/2" expansion/contraction. Norandex/Reynolds has made nailing Trim Nails-Itto 1- YES! NO! and stapling even easier with a patented Your local Norandex/Reynolds Brands C� CC= =0 0= design on the nail hem of Crossroads' has a complete selection of nails for and Sagebrush"Super Premium sid,ng every siding or vim application. panels.Crossroads and Sagebrush have a staple guide that permits the 4.Don'tdrive the nails or staples uq gun head to fit into the nail hem ` CHOOSING STAPLES ordown atanangle-thatcan cause channel.Slide the gun along the the panel to buckle or distort.Nail channel and Staples must becadmium-coated, straight and level through the center of shoot staples galvanized steel or aluminum,or other the nail slot,at least 1'into the surface. into the `- corrosion-resistant material.They When stapling,it is essential that the center ofthe should be no less than 16 gauge, stapler be held parallel to the siding dual parallel semi-flattened to an elllptical cross- panels to insure staples are straight nailing slots. section NO! YES1 When nailing,the channel ads as a Staples should be long enough to `hammerstop: When the hammer penetrate into the surface at least 1', head touches the nail hem,the nails with a staple crown that is at least have been 7/16-wide. driven to the appropriate S.In most stapling applications,the depth. bottom ley of the staple should go through the center of the nail slot with the top leg going over the top of the nail hem into the wall. v��u ao� n116 R1 ! REI 801E OFFICE 0'I/03102 15 : 06 P . ODB/D18 CUTTING 4-Check the walls for evenness NORANDEX/REYNOLDS The fastest easiest way to insure an VINYL. even,nailable surface is to apply �. weather-resistant sheathingov.:r the 1.Always wearprotective safety • old siding.(See manufacturer's glasses when instructions for proper installa 1 ion artting or ® of sheathing). nailing vinyl 5.To use a utility knife,mark your lines siding. then score on the face side using a Z.For best results,use a square as your guide.Use a moderate circular sawwitfi a fine-toothed blade amount of pressure,then bend and instalied BACKWARDS.This will snap along the lin e.ltisnotnecessary provide the smoothest,cleanest cuts to cutthrough the vinyl with the knife. in your vinyl,especially in cold _ weather. SURFACE PREPARATION Yourvinyl siding applicationwill only be as straight and secure as the surface over which you install the vinyl. Itis absolutely essential that 4 S.If not using sheathing,use furring or you pay close attention to the strapping on any uneven walls Strap at proper preparation ofyour all windows,doors and corners.Shim Installation surface,especially in out furring at low spots to get a reside applications. surface as flat and even as possible,but do not furout any farther than RESIDEAPPLICATiONS necessary—this could make it difficult 3.Do NOT attempt to cut any 1.If there are any loose boards,nail to align sidingatwindows and doors materials other than vinyl siding with them down tightly.if boards are too NEW CONSTRUCTION a backwards-installed blade.When rotten to nail,remove them and APPUCATIONS cutting wood,backerboard,or replace with new boards to provide a nailable surface. 1.Make sure that framing studs are anything other tha n vir yl,be sure to plumb and positioned unifornily. reinstall yoursaw blade in the proper providing a flat,even surface for forward direction. sheathing. O Z.Norandex/Reynolds recommends thata weather-protective barrier,such Q . as house wrap orfelt paper,be applied to the house prior to vinyl siding application. ® 3.All drywall should be placed within the house,on the floor(s)where it is 4.When usin tin oraviation snips, 2.Scrape away anyloose caul AS. to be applied, nor to g p ' Completely recaulk around all going ft p not to dose the blades completely at p y installation of the vinyl sidin&This will the end of each stroke.This will windows,doors and other provide a more accurate structural provide a cleaner,neater cut appropriate areas,and seal anyc adks weight distribution to each floor,and In the existing wails,to protect will reduce the possibility of against air and water penetration. compression ofthefloor plate(s). 3.Remove any wall fixtum such as Floor plate compression can result in gutters,downspouts,shutters,or fight budded siding at the intersection of fodures.Tie back any shrubberyto the floor and the wall. allow plenty of working space around the home. >�3�u 4tis tlll6 M� l REI HHE OFFICE 07/03/02 15 :06 P .001 11 INSTALLATION S.se sun not to nail outside comer PROCEDURES post too tightly.Use same railing t 7/8� procedures as siding. 90" Nowthatyou have the propertools, SPUaNGOUTSIDECORNERS you've measured and ordered ther\ �7rp• 1.Norondex/Reynolds Outside y proper quantities of vinyl sidinband Col nersconte in10-and 12'lengths accessories,and you've prepared the (Tlic Norandex/Reynolds 3-Piece wall insuring a flat,even installation, Corner System and 1-Piece Premium 4.Bend the Channel at center,and you're readyto apply notedComercomeinstandard 20' fasten to each comeroftfehouse. Norandex/Reynolds Vinyl Siding. lengths.See page 11 for instructions). S.Insert your Outride Comer into In any vinyl siding application,most When the wall is () this cap,leaving 1/4'between the accessories are installed first, taller than Q bottom of the Comerand the cap, preparing the building to receive the 10'.and it's Q then install as normal. vinyl panels. necessary to use 1. more thin onei AN ALTERNATE METHOD FOR WS'TALUNG Corner,nwke sure CAPPWGTHE OUTSIDE CORNERS IS: NORANDEX/REYNOLDS to install the 1.Make a 4-inch ACCESSORIES bol tom Corner tut down the CHALKLINE first,then install the top Comer so that center of the OCP, 1.Find the lowest corner of the it overlaps the top of the bottom creating 2 Raps house.Drive a nail part way into the Comer.This will inhibit any wa ter from which should fold • old siding or sheathing,/-3/4'higher running down into the bottom Corner. over each other as p "X i than the lowest comer.Stretch a chalkshown. fine from this Waif to another nail in the 2.Splice the Z Corners by cutting 1" Opposite comer off of the nailing hem from the bottom' 2.Drill a 1/8"hole in the center ofthe pal L of the upper Corner.leaving the overlap,through both pieces ofvinyl, outer(ace intact.Lap 3/4'of the and install a pop rivet to hold them in upper Comer over the lower Corner, place.Cut notch in both layers to leaving 1/4'gap between the nailing allow clearance forthe corner. a hems for expansion. CAPPING OUTSIDE CORN Making a cap thatcovers the bottom -4__ ofyourOutsideCorners can make for a 2.Snap a level chalk line,then repeat much more attractive finished Iook.If this procedure on all sides ofthe house you decide to cap your Outside INSTALLING OUTSIDE Corners.you need to take the CORNER POSTS Outside Corners.following s teps prior to ins to lling your INSIDE CORNER POSTS 1.Place in position,allowing at least 1.Inside Comers install exactly fike 1/4*2t top for expansion.(When Outride Corners—see steps 1-2 above- Soffit is to be installed,make sure to -'"lr �; .a „y- ' 2.To splice two Inside Comers,cut 1" allow an additional 1/2"attop for I off everything but the ou ter face from Soffit j or Channef—See'So ffit / the upperpart of the bottom Corn(a. Installation"p.14) �� i lap 3/4'of the upper Corner over the bottom Comer,leaving a l/4'gap 8 between nailing hems for expansion. 1.Use a piece of 1-1/4'j Channel, 7"long(twice as long as the Comer Post face). I 2.From the centerof the Channel,mark 1" a Wangle,and cutaway that material. 3.Cut 7/8'of the face and bottom I 2.Hold in place by miring atthe top of away from each end,leaving the nailing the uppermost nail slot.Balance of hem intact. 3.Make certain that all Inside and nailing should be in centers of slots, Outride Comers are plumb before between 6'and 12"on center. proceeding with installation. �33D 463 3( (6 Y1 I REt HOYE OFFICE ➢'103101 I� :UI P.01U/013 HoRMONTALSTARTER STRIP 'Surface Preparation,"youshould MrrERCORNERINSTAiJ.A'f10N 1.install siding starter strip along the caulk around the entire perimeter 1.Cutthe top)Channel or Window bottom offtbwlding.Use the chalkline ofallwindows and doors before and Door Casing as a guide,placingthe top of the installing Channels or Casings. approximately starter along the line. Second,it's a good idea to cut a piece 1.1/2"longer of Hashing out of coil stock and slide it than th*window under the bottom of both side pieces ordoorwidth. of Channel or Casing so that it will lap j over the top lock of the siding panel 2.Miter cut the i below.Ice Guard is also a product that face of both left may be used to flash around windows. and right ends at 45'and remove DRIP CAP INSfA J.ATION fa ce ma terial o nly. Drip Cap is used at the top of all 3.Cut inside bottom of both left and 2.Leave 1/4"space between starter windows and doors,includinggarage right ends to same distance as miter strip and comers. doors.It supplies a natural runoffthat cart creating tabs at either end 3.Keep at least 1/4'between starter keeps wateraway from the home: 4. strip pieces to allowfor expansion/ 1.CutDriCa to exactwidth of the angel down the tabs r form contraction. p p flanges that will slide over the side window or door opening. Channels or Casings,providing 2.Install Drip Cap flush against the top flashing that will help prohibit water window ordoorcasing. penetration. _ 3.Over garage doors,when more than one piece of Drip Cap is -•� needed,be sure to overlap the pieces ' by I"to allow for expansion/ 1 contraction. � 4.When using sheathing, SQUARE CORNER iNSPA[L4TiON shim whenever necessary to 1,Cut and install accommodate for extra thickness, yr the side Channels _ S.CutJ Channel or Window and Door WINDOW&DOORTRIM or Casings so they o Casings to be applied to the sides of Norandex/Reynolds permits the use are flush with the windows or doors approximately of)Channel,Drip Cap,3/4'Window top and bottom of `� 3/4"longer than window or door and Door Casing,or Flat and Fluted the window or door. height. Window&Door Surrounds as i:.Cutthe top �. 6.Cut 3/4'away from the inside Cap trim around windows and doors. )Channel and Window&poor Channel or Casing of both side pieces.Farming a notch Chan ell and eimiladinstallDooation 1-1/2'longer than that wilaccept the flanges from topCasing 1 the window or door width. Channel or Casing. procedures,which are listed immediately below.Ifyou've chosen to 3.Create a 3/4'notch in the bottom CABLETRIM use FlatorFlutedSurounds,please see of both the left and right ends of the Use)Channel to receive siding of the section entitled`Window and Door top piece. gable ends. Surround Installation'for instructions 4.Bend the notched ends down to 1.Butt either left or right Charnel (p.l 1). create flanges that slide into the into the top of the gable peak and You may choose to finish yourwindow installed side Channels or Casings, fasten in place. trim with either square or mitered creating flashing that inhibits water comers.Thisisamatterofprefemnce, penetration. and will not affect the performance o f $_Fasten the top piece as normal,i the siding in any way_Following are laying it directly on top of the Instructions for both options. previously installed drip cap. , N o#e:it's importantto take special precautions around windows and ' doors to inhibit airand water infiltration.First,as noted above in 2.Miter cut the second piece of Channel,and slide the cut face over the first piece of Channel for a dean appearance. YVV V. 1VV V ► IV s! I A C 1 0 V A I Ur? 11,1 UI/ UsiUI 15 : Ul P . OII/OIB Timm UNDER EAvEs ON Hip ROOF' (see installing Outside Corners,p.9), 2.Place two Corner Block Mounts with 1.Use Utility Trim(or Dual Utility Trim leaving 1/4'at the top.Position nail at the squaned comers of the mount,to when installing Dutchfap-type panels) the top of the upper slot,and then in the top comers of the window,anti under the eaves of a hip roof. tha center of the slots coming down screw or nail in place as you would the comer at 6"and 12'centers.This siding.Be sure to use the Comer Block allows for expanslon/contractionto Mount marked'R'onthe right side of occuratthe bottom.(Note:Uneals and the window,and the Comer Block inserts come in 20-foot sections to ' Mount marked V on the left side of facilitate simple 2-story applications) the window.(Illustration#1) (C) Snap the lineals into the receptor leg 3.Placethe two Corner Block Mounts ofthe comer,and nail in lineal nail slots with the squared corners of the as specified above. � mounts on the bottom comers of the Sidingpanels can then be installed into window.Screw or nail these in to puce 2.Install with receiving channel the corner lineals. tike you downward.Leave 1/4'clearance would between Trim and Comers. WINDOW AND DOOR SURROUND siding.Make INSTALLATION sure the When usingthesystem asaW"indowand Comer Door Surround,first install the surround Block Mount starter completely around the window marked*R* frame-The surround starter nailing is on the 11/4" f•-- slots should be away from the window, right side of with the opposite edge flush with the the window, frame.You can then install the left and and the 3.If more than one Utility Trim is right vertical surround lineals(also with Corner required,splice the Trim by cutting nailingslots away from window)flush Block Mount Iuustrntion#Z back 1-1/4'on one end,then slide with frame in the groove created marked'I:is on the left side ofthe that end overthe otherTrim piece. between the starter and the frame. window.(illustration#2) Leave atleast 1/4-space between the naitnghem bf the 2 spliced pieces. You may install the lineals in three ways: 4.Take one of the side extrusions cut 1.Usinbthe square comerinstallatia�n in(Illustration#1)(A) and position it method;2.Usingthe mitercomer so that the installation method;or 3.Using . vertical leg Norandex/Reynolds comer blocks. ofthe ® For methods 1 or 2,pleasesee w�_ , Corner I� instructions on page 10 under Block 1/4" Window&DoorTrim.When using Mount fits Comer Blocks,see following Ifl"stnt o"&3 inside the` instructions. )Channel of the extrusion(Illustrltiorte THE #3).This allows the water to be NORANDEVREYNOLDS plumb and diverted in front of the siding and not WIDE CORNER/WINDOW lumbaB I/� behind the siding. AND DOOR level lines _ SURROUND SYSTEM continuing S.The at least 3' bottom from TheNorandei/ReynoldsWideOutside sides A ofthe COmer/WindowandDoorSurround window. o. extrusion System is a five piece window. should now p system made up of Measure the lay over the a specally designed surround starter, distancebottom two lineals(fluted orplain)and one between the ^I I Comer comerinsert(beaded orcove). horizontal B1ockMount ►w,ftrallon 171WIDECORN mrisTAuAmON level fines and again 6ustration V4 Fora aide comerappliation.use one (Illustration#1) (A)and cut two trim drain over the extrusions to Dimension(A)less 3/8t siding VIlustration#4).Screw or nail with it either ln�m weals. -he Measure Ce&AIA6a b8tWL4M W into pike ji you would siding, with eitherplain or Ruted lineals.The vertical plumb fines(B)and cut the comerinsertis installed in the same other two extrusions to Dimension(B) mannerasthe regular outside comer less 3/8'Set all the cut extrusions aside until Step 4. X330. 468 8116 NI 1 REI ME OFFICE 01/03/02 15: 10 P.O111018 STEP 5: STEP 6: INSTALLINGREMAINWGPANELS- THE FM-The last round mayt•e Cedar Rounds are designed to stack face-nailed using only one color. Trim col Soes undersidins on top oFone another.(illustration t crotched trim nail,and a pre-dnllerl 1/2' #8)Working from left to right, 1/8'hole.Do NOTdrive the nail continue to insta 11 the remaining tightly.Leave appro:dmately l/16' f sidinsp.,nel panels.Stagger the panels,so that at clearance for normal expansion/ - /4.- least two Rounds overlap when locking contraction.(Illustration#11) the courses vertically.(Illustration#9) Isustation&6 ' underneath the trimmed siding panel about 3/4'.Use trim nails driven through the pre-drilled holes.through the trim sheet,and into the studs �' ulustration#I t before the Rounds are installed. (Clo NOT drive nails tightly.Leave ��� CEDARSHAKESAND/OR aP1fro)dma tely 1/1 6'clearance for �' SPI1T INSTALLATION expansion/contraction). luustntioe#8 I STEP 1: Overlap the first course of Rounds I INSTALLATION F UIRJUNG-Fur overthe top ofthe last course of I uneven wafts,as noted in Cedar siding.The color-matched trim sheet - I_ - - Rounds instructions. will insure a good appearance in the gaps between the Rounds.(Illustration STEP 2: #7)When using this al ternateINSTALLING J CRANI M I.-Line the method ofinstallation in a gable,the entire border area with 3/4'1 Channel. following formula will insure that the final course will consist of one Round Illusb�tion rf 9 S71�ZA: atthe peak Heightofgable in inches OL TSIDECORNERINSTAUATION divided by 62proper angle,allowing 1/4 5'-Number of courses. At opera ends,trim each pa,el cleaa therance STEP 1:AuCN wrrH 1 ST COURSE OF in the I Channel for expansion. SIONG-Locate the first course of siding.The bottom of the outside triol cO`i In order to help cutpanels to the corner should be aligned with the proper angle,make a pattern that bottom ofthis piece of siding.Due to duplicates the gable slope.Lock a varying shake lengths.the comer:.will J- short panel into the starter.Hold a not align with each course. piece ofsiding into theJ Channel on °f s,dia6STEP Z:INSTALL 1 ST OUTSIDE ustc°urse `r the gableslope,and run a pencil line along the edge of the siding onto the CORNERSECT1oN-After the short Round panel.Cut along the alignment in Step 1 is completed, pencil line,and use this Round as the level the outside corner and nail the pattern to art succeeding panels. comer post to the wall using the Ilustr+tboe#7 (Illustration#10) centerofthe prepunched nal slots. Strikeyourvertical plumb line from the I STEP 3:INSTALLING MORE CORNIR peak Mark level line 9-1/4"above I SECiIONSABOVE THE FIRST CORNER- the edge where the bottom of the first To install a corn oron top ofanotlter course will begin.Hangthe first paneli comer section,grasp the new corner atthe intersection of these 2 lines-- I ; at the bottom and pull on the]Channels If an even number of courses.center to spree d them open.Them set this on thesepar atorspace between Rounds. top of the already installed comer, If an odd number,centerthe point of overlappingthe smooth section atthe a Round. top of the installed comerpost Level tAi�""°""`° the comer postand ltiill in ft crrltu Panels should be cut with a radial saw of the prepunched nal slots. for cleanest appearance. 6.Take the top and bottom extrusions USiNC WiDE CORNER UNEALS (Illustration#1)(B)and place the AS A STARTER STRIP ' extrusions in between the vertical Wide Comer Uneals can make an plum lines attractive and unique starting piece for with d1Q a siding job,or for Cedar Shakes or I Channel in 17-1 Split Split,When used in this manner,we the trough —r--,�I II ofthe �•; / recommend that a standard horizontal Comer " --='' siding starter strip be installed first,as S.To start the second course,use the Block Mount described on page 10.The Wide Comer end curt piece from the last panel you Lineal should then be locked into this ; used on the first course.This will (Illustration starterto assure a firm.straight line, staggwthe end laps so that one is not #S).Screw �- directly above the other,and provide a or nail in I much cleaner overall appearance. place as I �t you would Il Il I 6.Instal!Fallowing courses in the same siding. Illustration#56 ! manner,making sure that no end taps are directly above each other. 7.Finish the siding around the window as if it were a standard)Channel. 7.Check alignment of the siding every Sth course. 8.After siding is complete,place the Corner Block Covers on the bossesoF INSTALLING NO LDS 04D LAPS the Corner Block Mounts,aligning the HORIZONTAL SIDING 1.Remember er that vinyl g notches with will expand and contract as the the comers of temperature changes,so it's Now aarerrip ,Comers,the window. that Stt5tsCimportantto overlap the end joints of Channels and/or Casings are applied.you M1 Screw the may start to install Norandex/Reynolds Your siding panels by 1^to 1-1/4"to r Comer-Block vinyl Siding.In Horizontal insure good installation appearance. Covers into the Corner applications,you'll start at the bottom Z.Fora cleanerlook.your last nail or ` Block of the house and work up.Generally, staple should be a minimum of 10"from Mounts you'll install the siding one wall ata the ends of the panels. ' Illustration time,completing one wall before ( moving onto the next 3.Always overlap factory endti with l #6) factory ends.Field cuts should only 9.When 1.place the first panel into the 5 tarter be used in Corners and Channels, I�ustratian#�6 installing the Strip and pull up until it locks into place. and never in overlap situations_ ScrewCovers there are two slots in the 4.For the best finished appearcince, Comer Block Cover.The narrow riot is Q ��� always overlapjoints away from high- dosestto traffic areas like entrances. the window, and the wide ` INSTAWNC SrDINC AROUND slot is ® WWDOWS AND DOOR5 closest to f When you've worked your courses the siding. up to the bottom of a window,you'll insert the mu:bat+on#7A Z.Fasten the panel by nailing probably need to cuta siding panel to tab end of or stapling at least every 16". fit under thatwindow-The same istrue the Screw Remember to fasten in the center at the tops of windows and doors,when Cover into "'"' of the nail slot.and try to hit a stud it's highly unlikely that you'll be able the wide whenever possible, tofit a full panel of siding.Here's what slot.Thea, Segel 3.As you proceed,check the siding to do: y snap the dip course for proper alignmen t wi th side of the adjacent walls,windows•and eaves. 11 Saiw Cover K"sb'tkO1#78 4.Don't place siding flush into , intoplace. '"" QjnrnelsorComer!Leave (illustrations approximately 1/4"to allow for #7A 78, expansion/contraction. 41 � and 7C) Mustrudon#7C �33U 41)0 611 b N6 i XtI HUNS 0 1 C t r. u ► U I I F1171T7NG UNDERWINDOWS Note:Use the same procedures to 6.Do NOT face nail this panel! 1.Make sure the panel to go under the measure and cut panels that will go at ON GABLE ROOFS window extends past both sides of the the tops of windows and doors.In these window.You don't want to have a lap circumstances,the panels will install Use Z scrap pieces of siding to male a underyour window, into the]Channel or Casing previously pattern to cut the panels on agable installed a t the top of the window or roof to the proper angle. 2.Hold the panel in proper position door,so there's no need to install Utility under the window and mark the width Trim,nor is there any need to punch any of the window on the face of the panel, lugs with the snaplock punch.Make sure adding 1/4'to each side for clearance. you leave 1/4"clearance at both sides n and at the bottom for clearance. H + 1j j 11� — -- ❑ 1.Lode a scrap piece into the siding /4Tt panel below.Hold a second scop piece flush against the gable,and HHH using the bottom oFthat piece as.n guide,mark the cut angle onto the 3.Locka small scrap piece ofsiding Note:When applyiingShuttersto locked piece_ into the course below the window,and your finished vinyl sidingiob,make 2.Use this same procedure to make mark the height of the cut on that sure to drill your installation holes a pattern for the opposite side of panel,deducting 1/4"for dearance. in the vinyl 1/4"wider than the thcgable. 4.Place the soap piece overyourgood Shutter installation screws to allow panel and markthe heightof the cut on for expansion/contraction! 3.Use the patterns make and the panel. FINISHING THETOP,COURSE cutthepanelsthatwitlfitintothe OF SIDING 1 Channels you previously installed in S.Make thevertical cuts on the panelwith the gables,making sure to leave 1/4' snips,and score the horizontal cutwi th ON HIP ROOFS gap between the siding and the a utility knife.then bend and snap the 1.Measure from the top of the Channel for expansion. piece away. installed Utility Trim orDual Utility INSTAWNGTRIM ATROOFL.INE INSTALUNG UNDERWWDOWS Trim,to the bottom of the lockon the At points where Vinyl Siding and 1.Install a piece of UtilityTrim under panel below. Accessories will meet ata roof 11m;, the window that is flush with the side 2.Deduct 1/4',then cut the panel to such as areas where a gable dormer or Channels or Casings. this measurement. i a second-story side wall intersect wit}} Z If it appears thatyou need to furout 3.Since this panel will no longer have a the roof,its best to position the 1 the Trim to maintain Properly ofthe hailing hem,it's necessary to punch j Channel so its 3/4"to 1 away from siding,Norandex/Reynddsrecammends lugs using the snaplock punch. the roof line.Placnng the)Channel that you use Dual Utility Trim instead. directly on the roof line would subject (This circumstance usually arises when 4.Punch every 6',making sure that it to a build-up of heat,which could you're installing a Dutchlap-type panel), the raised lugs are on the outside face result in excessive expansion.To of the panel. prevent water infiltration along the 3.Use a snaplock punch to punch the intersection of roof and wall,install panel every 6"along the horizontal cut flashing before installing)Channel. edge,l/4'below the edge.This creates lugs which face outward,and will engage and lodcintothe UtiGtyTrim. � � INSTALLING N ORAN DEX/REYNO L.DS VERTICAL SIDING o The same basic rules that applyio the `, Q t installation of horizontal vinyl siccing also apply to vertical sidling,Following are speclflc steps that need to b,, S.Lock the bottom of this panel into followed for vertical siding the panel below.then push the top applications only. into the Utility Tran or Dual Utility Trim until the lugs engage and lock 41 r..+�+hw Trim. valla goo ollu At IICI gUII UrNICC Uiiu3/ Ul latus P.01�/019 I.Snap a level chalk line around all INSTALLING 3.Install the F Channel along this line, sides of the house.I'higher than the NORANDEX/REYNOLDS with the top edge of the trim's nailing lowest corner of the house. VINYL S O FF1T hem to be even with the line. 4.Nail orstaple every 16'.Tryto Wt a 1' Norandex/Reynolds Vinyl Soffit stud whenever possible. Systems are designed for use in either �0 new construction or remodeling 5.Measure the distance betwear the applications.Installation procedures Nsda board and the receivingtriin on ----)"r7 are the same for either apprication, the wall. although in remodeling jobs it may be 6.Deduct 1/4"for expansion/ necessary to remove any old trim from contraction,then cut Soffitpaneis 2.Inst2111/2'j Channel,receiving side the eaves area before proceeding. to this length.(For panels over 36' up,with the top edge ofthe J nailing There are basically two kinds of long,allow 1/2") hem aligned with the chalk line. overhangs!those with open eaves,and 7.Insertone end of the cut panel into 3.After installing all Corners.Trims those with dosed eaves.Preparing the receiving trim on the wall. around windows and doors, 1/2' these different kinds of overhangsto J Channel in gables and 1/2' receive Soffit requires different 8.Nail through the slot in the naiTinghem )Channel under hip roof eaves, installation procedures,so please on the opposite end of the panel into you're ready to begin installing follow the instructions that are the bottom of the fascia board-as vertical siding panels. appropriate for your particularjob. always do not nail too tightly. 4.Install furring strips into the full 9.Once the first panel is installed,insert length of the receiving channels of all --� the tongue of the second panel intu the Inside and Outside Comers. nailinghemofthe first panel.Lode the panels together snugly the full length of ~ the Soffit to assure proper alignment Use the same nailingand locking procedures for all following panels. Rr..aanM OPEN EAVES INSTALLATION For open overhangs,you need to create a channel on the wall to receive 5.Install Utility Trim over furring and support the vinyl Soffit You may strips into all Corners,leaving 1/4" use either F Channel,1/2" gap for expansion/contraction attop j Channel,Soffit Cove Molding,or and bottom,and between Utility Trim Deluxe Crown Molding for this and inside of Comers. purpose,depending on the look Note#1:When the overhang is more You wantto achieve.For ease of 4 then 18"wide,install a nail support` 6.Remove the bottom lock(opposite installation,Norandex/Reynolds down from the rafterto a line parallel nali nihem)from your first vertical recommends you use F Channel on to the bottom of the fascia bo.rrd and panel.Use a snaplock tool,and punch open eaves.because its vertical nailing the receiving trim on the wall.Soffit lugs every 6",1/4"below the cut hem makes secure Installation to the should be nailed to this support board edge.Raised lugs should be on the wall simple(See Note#2 below). through the nailing hems to prevent front of the panel. sagging. Since there is no existing overhang in 7.Snap the panel into the UtilityTeim an open eave installation.it will Note#2:Ifyou choose 1/2"J Channel, in the Outside Comer,leaving 1/4!*at be necessary to nail your Soffit to the Soffit Cove Molding or Deluxe Gown top and bottom ofJChwinelsfor bottom of the fascia board for Molding as the receiving trimon the expansion,then fasten to the support walls on open eaves,it will be wall through the naTmg hem.Make necessary to install a wood support certain thisfirstpatiel is pig before 1.Use a level t l mark a pen ('ane on (W)to the wall.,then apply the trim proceedmgwith addMoml panels. the wall parallel to the bottom the to the support existing wood fascia board on either . 8.Atlaat panel for each wall,remove side of the wall. the bop lock and naliaghenl,then 2.Meas parade lugs in the same manneras you Measure up 7/8"of an inch from t}re did the first panel,and snap into Utility Pnes,and snap a chalkline across entire Trim.Do NOT face nail this panel! width of the wall. ffs�u aoo 8110 Ma KCl fluIC urri �c ul�u�iui ia: u9 P .ol51018 CLOSED EAVES INSTALLATION TO TURN CORNW CAPPING FASCIA CORNERS On overhangs with dosed eaves. At comers,use H-Trim to create You can make a corner cap out of Vinyl Norandex/itaynolds recommends that a dean,mitered look.Miter-cutyour Fascia that will provide a nest,Rnished you use either 1/2")Channel,Soffit Soffit panels at the proper angleand look to yourinstanation.Here's hirer. Cove Molding or Deluxe Gown instalinto H-Trim,leaving 1/4"space for Moldingas the receiving channel on expansion/contracdon. 1_Cut a piece of fascia 5-1/Z'in length. the wall.Since there is existing Soffit on dosed eaves,you will nail the new 2.Mark a vertical line down the center Soffit directly to the overhanr, ofthe back of the Fascia. 1.Install receiving trim to the ,. overhang against the wall,flush with the existing Soffit 2.Measure the distance between the fascia board,and the receiving trim on the wall. 90' 1 Note:Ventilated panels may be used h All VA' as necessary to achieve the proper mraA ror amount of attic ventilation.Consult 3.Cut a 90'section away from ti ie 0 pension local building codes for ventilation center of the bottom channel,IGiving requirements. 45*on both sides. 3.Deduct 1/4"for expansion/ INSTALLING VINYL FASCIA COVER 4.Bend along the center line(use a contraction,then cutyour Soffit panels to this length.(Forpanels 1.Install a Utility Trim grttothe length metal square or straightedge to help panels to *long,ength.(For ofthe wood fascia atthe top ofthe insure a straight bend),forming a over 3 fascia board. right-angle comer. 4.Insert one end ofthe cut panel into the receiving trim against the wall. 2.Using a snaplodc punch tool,punch S.Punch lugs at the top,hookthe raised lugs on the top ofthe Fascia Cap bottom ends over the bottom of the S.Nal the Soffitto the existing every 6',then slide into the Utility wood fascia board,and snap the top overhangthrough the slot in the nailing Trim until the lugs engage and the Cap into the Utility Trim at top offascia hem,driving a nail approximately every is held firmly in place board. 16'.Do not nail too tightly. 3.Hook the bottom edge of the Vinyl Fascia Cap under the bottom of the ` wood fascia board. 4.Do NOT face nail the Fascia Cap. This can cause unsightly budding and waviness. Zzz INote:Use a level and chalkGne to insuro that all Channels and Trims are installed straight. CLOSINGTHE ENDS 6.Once the first panel is installed, Cut a 1/2")Channel the width of insert the tongue of the second panel the overhang and install atthe ends irtto the nailing hem to the first panel. by nailing into the overhang.and Lode the panels together snugly the fitting one and into the receiving trim full length of the Soffit to assure on the wall. properalignment,and nail to existing overhangs Use same procedures for all following panels. X330. 46B X116 �I / Kit EOYE OFFICE U1/03102 15 . 09 INSTAWNG Strikes / -��- CEDAR ROUNDS i venial plumb \ CEDARSHAKESANDline from the R ' CEDASPLIT �--'J! / peakThislinc , will allow the STANDARD INSrI►LLATION �'f f -- first Starter i.Alwaysnail incenter ofnailing --� '" ^- Strip panel to slots.Nail every 16'. be properly per: 2.Do not nail tightly.Allow illustration s<i centered Next a level clearance of approximately 1/16'.so to begin your installation.Startat the line should be =~ that the panels move unrestricted left left of the wall by plating a Starter in to marked m"•t "'"'' to right_ the left)Channel,and sliding down 3-3/4'above 3.Do notface nal except as noted in into the bottom J.(illustration#1) the edge Step 6:The Peak(p.l leave approximately I/+*clearance where the �• between the Rounds Starter and the bottom of the 4.leave a minimum cic•2ranceof1/4' JChannel For expansion,Proceed to Starter Strip .v•, between panels and J Channel,to allow the right by butting additional course will for normal expansion/contraction. Starters until the entire bottom row is begi ne covered.Then proceed up the wall by intersection of 5_Waite product may be painted � using a high quality,exterioracryl'ic installing CedarRounds panels from -the vertical latex paint. lento right plumb rine and �---- TOOLS REQI111t� Finish offal the top using the same thehorizontal level line is the A bench or ra dial arm saw should be lace-nailing technique outlined in starting point for Step 6;The Peak(p.17). i g used to cut panels.A fine tooth blade hangingthe First ( ; (12 to 16 teeth per inch)should be STEP3: Starter Strip. 1 used.with the blade installed in the GABLEAPpucA 10N5-Line (illustration#3) reverse direction fora cleaner cut the entire Sable perimeterwith 3/4' If the number of MA—.1 Standard tools,including a hammer, 1 Channel. courses I..,��:;, Us snips,square,chalk line,level,rule, itis generally desirable to finish a Calculated in the �- and safety glasses,will also be gable wall with one round in the peak. formula above is required. Therefore,itis necessary to position an odd number. the CedarRounds Starter Strip and the separator i- =u CEDARROUNDS INS U ATION space between the first course of Rounds to ensure the Rounds There is a special Cedar Rounds that the final course will consistof one starter strip,but Rounds may also be StarterSb Round at the peak ip should'-;I ct^: .:•�j a;Tilt. started with 3/4'J Channel and/or intersection point(I _gra• "n cT1 If custom brake work wiith aluminum Fust,calculate the number of rows of an even number of cc:rs et j Rashing.No starter is required for Rounds it will take to cover the gable. calculated,a Round,::sre CedarShakes. When using Cedar Starter, point should be cen:e-ei., tip-:;t+ation use the following formula:Height of #5) Be sure to nail pa. a Slip y: gable in inches,minus 2-1/2'divided 16'on center, IiNSTAWITION FURRWG-On by 6.2 S'-Number of Courses. STEP 4• uneven wafts,furring should be used (illustration#Z) 1NSTAIUNC ROUNDS\%---40UT to provide an even and nalable base. STARTER STRIP_I.arez .Yin it is Shim out the furring at the high and impossible or under: 'e;; ;e Cedar low spots togeta final even surface. Furring should be run vertically, i Rounds$tarttrStriF._j:: r�llowing 16w on center.Accessories should be i alternate method or' -s:a 1 Y,--,:%n. attached over the when needed i furring i The top lock of the:.::.% �.�2-- gable j sidingshoufd betri, -%:N: Measure height I A-2'A"+6.25 1/4"down fro�th i:::% -� STRAK24TWALLAPPUCA11 _ON j Nuvdwof trimmed siding pant.sr: Line the entire border area with 3/4' Courses holes atstuds.even '6':- enter. J flannel.Whenever possible,It is (Illustration;:;6) bestto use Cedar Rounds StarterStrip y A 3'wide strip of alu-::•Lt--_jm sheet (color matched to tl.-*C;-._ -Nounds color)may then be Qa30 468 Sllo liI ! REI HOVE OFFICE 01/03/02 15 : 10 P.OIB/011 STEP 3• 3.Lap partial receiving channel of new IrISTAilWGTNEFIRSTCOUKSE- �. i post overpartial channel onremaining v nal flange.Pop rivet the two receiving The primary consideration when channel legs together as needed. installing Cedar Shakes or Spirt is to stagger the panels to ensure that vertical separations never tine up •, `• , directly with the separations in the �� ,• i , course above or below.(Illustration '•.�, - #12)Always start from the left,and work toward the right On the first iLLV ST*ATiON rf= panel of the first course,cut the Shake wider than your original starter.begin at the pre-printed cut line marked the second course-with a full panel. either"A%'B',or'C".(illustration 13) Continue to stagger each succeeding REPAIRING BUCKLED install this cut Shake,then proceed course as you work up the wall, SIDING AT THE)OI NT down the row with full panels.Cut the beginning each row eitherwith a cut final panel to size and install. panel from a previous course,or with a full panel,depending on the visual Yinyl siding sometimes becomes ifyou are installing in a gable.trim unlocked between the firstand each piecewith a radial sawto the appearance. second floors of newly built siding proper angle;allowing 1/4-clearance yip 5: installation due to settling and in the)Channelforexpansion. THE PEAK.The last Shake may shrinkage ofwetlumber.Thiscan be be faced-nailed using only one corrected by using a piece of color-matched trim nail,and a aluminum starterstrip. pre-drilled 1/a,hole.Do NOT drive 1.Insert an inverted the nail tightly.Leave approximately scrap piece of starter 1/16'clearance for normal strip into the exposed expansion/contraction. receiving lock of the lower panel. REPAIRING A Z•With the;cra DAMAGED PANEL; p piece inserted into To repair a the lock,lay the damaged upper panel over the La starter strip The panel,insert ld ILLuiYRAT10N#1 a: the hook end •• be visiblerters trip ind th of a zip tool � •� be visible behind the Note:There are 6 each A,B and C into the lock I upper pane.Marks panels packaged in a carton of Cedar between the line of the scrap Piece Shakes.A,B and C panels are damaged panel where the returnkg of aesthetk2Vy differentfrom a depth and the panel meet upper panel m perspective,butthere are no above-Pull meetupper the:crap differences among them from andownward. piece. • installation standpoint You may begin A This will allow 3.Trim the the first row with any panel,regardless access to the damaged panel's nail starter on this of its mariong,so long as you cut it at flange.Remove the nails securing theIVI fine,savint,thethe cut line.(illustration#13)You may panel.Replace the damaged panel andportion with the also use A.B or C panels in any randominstall anew panel,thrtrl use the zip lacking edie. order asyou work up the wall,as long as tool to lock the new panel into the you continue to stagger the vertical panel above. Note:It is acceptable separation lines between the Shakes. to cut the starter strip in shorter STIEP4: REPLACING A DAMAGED lengths to ease WSTALUNGRMMiNINGCOURSES OUTSIDE CORNER POST handling.lnd -Startthe second course with the ill reloddng r:4nhu of the list panel that MS 1.CUtout the fel►peon of damaged 4.hod the trimmed tdtc into th;lock installed on thefirst course,as long as Post by scoring along outside corner that piece is at feast one share wider of receiving channel with a u GTrty knife. of the lower panel.Begin a t one end than the starting piece of tine fust and,using a zip-lock tool•pull the course.If this piece is not one shake 2.Cut off the nailing flanges return leg of the upper panel down to from the new comer postby scoring engage the upper panel with the and bending until the flanges snap off. aluminum starter strip. no uua6 9I ► ► 4c utiu�iuc ul : uo r,uut/uui CERTIFICATE OF CONFORMANCE Great Barrier Great Barrier Premium Vinyl S'idng panels are manufactured to the following spaificadom. MATERIAL SPECIFICATIONS PROFILES All products meet or exceed the Standard Specifications 1br Rigid PVC D/4 Siding(ASTM D-3679)and irs referenced documents. An independent 2�'Exposure laboratory through unannounced inspections of all manufacaufrhg faa'Sties 176'Length cedfles the conformance to this specification. ASTM D-3679 is the 2 Squares/Cartm specification used by building code aulhorttles. When not defined in . DW ASTM 0.3679,our products also meet Norandex stringent Quality Control 2-'Exposure Standards. 12 Length 2 Squares/Cartan PHYSICAL DATA Panel Thickness:.044(+/-.001) Panel Projection:3/4' Color.Uniformity is spectrophotometricagy controlled. Texture:Embossed with a woodgrain padem Lock:Optically measured and controged 'Premium Colors featuring TufcoatN cap Gloss:Uniform low gloss maintained with an integrating 75'glossmeter. resins,a UV-Stable acrylic polymer. k J PRODUCT TEST DATA Heat Shrinkage: 3%at 160'F Impact Resistance: Mean Failure Energy>60 in-lb `�— Design Windload: 210 MPH Surface Distortion: None at 120*F ~ Squareness: <1/8'of square Length: Within—1/4'of specification Warp/Chamber. <1/8' Flame Spread Index Q5 Smoke Density Index <450 Fuel Contribution: 0 ► Self Ignition Temp.: 780'F *The MPH windspeed reported above is calculated using the VS]W►ndspeed Calculation Guidelirn3s.Itis an estimate i - of windspeed resistance given one uniform set of assumptions. Please note that vinyl siding is a decorative covering thatis not intended to provide structural reinforcement to a wall. The wind resistance of a wag system may be less than the maximum wind speed rating for a siding product and will not be increased as a result of installing vinyl siding. COMPOUND TEST DATA All Norandex Vinyl Siding is manufactured from PVC compound that meets or exceeds all specifications of D-3679 for e Class 1,2 or 3 compounds. - . Tensile Strength: 6,909 Modules of Elasticity(psi): 391,999 tzod Impact Strw4lh @ 73.4'F(ft.x IMn of notch): 3.81 taod impact Strength @ 327 ft x b 1n of notch): 211 �I�I Deflection Temperature at 264 psi: 73'F Coefficient of Linear Mansion(MN's 3.15x10-6 All Sidling,soffit and accessories manufactured by Noma dlex have a dans Afire rating based on ASTM E-94 results. u1.1 uvec urrI �G UIIVI/ V6 UI : U0 r ,UUIlUU6 AM- CERTIFICATE OF CONFORMANCp Great Barrier Great Barrier Premium Vinyl Siding panels are manufactured to the folowing sparfica6=. MATERIAL SPECIFICATIONS PROFILES All products meet or exceed the Standard Speafica6ons for Rigid PVC D14 Siding(ASTM D-3619)and it's referenced documents. An Independent 2-4'Exposure laboratory through unannounced inspections of all manufacturing facilities 176'length certifies the conformance to this spedlicagon. ASTM D-3679 is the 2 Squares/Cartm specification used by building code authortdes. Where not defined in . D15/0 ASTM D-3679,our products also meet Norandex stringent Quality Control 2-'Exposure Standards. 12'Length PHYSICAL DATA 2 Squares/Camixm Panel Thickness:.044(+1--.001) Panel Projection:3/4' Color.Uniformity is spectrophotometrically controlled. Texture:Embossed with a woodgrain pattern Lock:Optically measured and controlled 'Premium Colors featuring TufCoat'v cap k - Gloss:Uniform low gloss maintained with an integrating 750 glossmeter. resins,a UV-Stable acrylic polymer. PRODUCT TEST DATA Heat Shrinkage: 3%at 1607 Impact Resistance: Mean Failure Energy>60 inJb Design Wndload: 210 MPH' Surface Distortion: None at 120°F Squareness: <11W of square Length: Within—11,V of specification Warp/Chamber. <11F Flame Spread Index <25 Smoke Density Index <450 Fuel Contribution: 0 Self Ignition Temp.: 780OF 'Time MPH windspeed reported above is calculated using the VSI Windspeed Calculation Guidelirn3s.It is an estimate I - of windspeed resistance given one uniform set of assumptions. Please note that vin sidmn is a decorative covering thatis not intended to provide structural reinforcement to a wall. The wind resistance of a wag syslem may be less than the maximum wind speed rating for a siding product and will not be increased as a result of installing vinyl siding. ~—� COMPOUND TEST DATA I All Norandex Vinyl Siding Is manufactured from PVC compound that meets or exceeds all spemdficallons of D-3679 for E Class 1,2 or 3 compounds. Tensile SbwQlh: 6,909 Modules of Elasdcity(psmi: 391,999 �'• Izod Impact SbwVb @ 73.40F(R x iWn of notch): 3.81 tzlod Impact Strength @ 32'F(fl x @afro of notch): 2.11 I I Deffeetion Terperatum at 264 psi: 73•F Coefficient of Linear Expansion(Wriff) 3.15x104 All Siding,soffit and accessories manufactured by Norandex have a class A ire maing based on ASTM E-84 results. tt330 4btl 611b NI 1 llCl aUl� UNN1G� ulrulrUG UI : UI r .UulrUul C E k T Y FIC AT E O F CONFORM ANC E Woodsman Select Woodsman Select Vinyl Siding panels are manufactured to the Idloring spKffic* s. MATERIAL SPECIFICATIONS PROFILES COLORS All products meet or exceed the Standard Specification for Wgtd PVC D/4,D/4IOL . White Siding(ASTM D-3679)and its referenced documents. An independent 2-C Exposureamrtmpag laboratory through unannounced inspection of all manufacturing faaTities 176-length certifies the conformance to this specification. ASTM D-3679 is the 2 Squates'Cftn . specification used by building code authorities. Where not defined in . D/5,D/51DL 0 � ASTM D-3679,products also meet Norandex Stringent Quality Cwitrol 2a"Exposure • Wheat Standards. 12'Length 2 Squares/Carton Clay Tan PHYSICAL DATA i Meige Panel Thickness-.042(+1-.001) Sand Slerra Panel Projection: (D14,D/4/DL,D/5):518" (0/5rDL):W • Cactus Color.Uniformity is spectrophotometrically controlled. Linen Texture:Embossed with a woodgrain pattern. Lock:Optically measured and controlled. Gloss:Uniform low gloss maintained with an integrating 75°F PRODUCT TEST DATA Heat Shrinkage 3%at 160'F Impact Resistance: Mean Failure Energy>60 in.Ib. Design Windload.- 145 MPH' Surface Distortion. None at 120"F Squareness: <118`of square Length: Within—1/4"of specification Warp/Chamber. <1/8' Flame Spread Index <25 Smoke Density Index: <450 Fuel Contribution 0 Self Ignition Temp: 780OF 'The MPH windspeed reported above is calculated using the VSI Windspeed Calculation Guidelines.it is an estimate of windspeed resistance given one uniform set of assumptions. Please note that vinyl siding is a decorative covering that is not intended to provide structural reinfonmment to a wag. The wind resistance of a wall systerrh may be less =----� than the maximum wind speed rating for a siding product and will not be Increased as a result of Installing vinyl siding. - COMPOUND TEST DATA Ag Norandex Vinyl Siding is manufactured from PVC compound that meets or exceeds all spedfications of 0-3679 for either Class 1,2 or 3 compounds. Tensile Strength: 6.909 1� Modules of ElasBa'q►(pa': 391,999 tzod Urhpact Strength Q 73.47(IL x Ibrin of notch): 3.131 tzod impact Strength®32"F(R x hon of notch): 2.11 Defle*n Temper M at2m g 7XF Coefficient of Linea t.xpw*n(inAnNF) &IW041 • All Siding,soffit and accessories manufactured by Norandex have a.dass Afire rating based on ASTM E-84 rwults Nov 01 02 12: 14P Broward Hurricane Panel 954 947 3494 p. 2 MIAMfDAt7E MIAMI-DAPI:COUNTY,FLORIDA METRO-DAIX FLAGLFR BUILO NG BUILDING CODE COMPLIANCE OFFICE(0 :CO) �y 1� ,yr 140 WEST FLACLER STRZET,SUITE 1603 PRODUCT CON'rROL DIVISION ^' i° TN MIAMI,FLORIDA 33130-1563 + �uut (305)375-37111 FAX(305)375-290S NOTICE OF ACCEPTANCE MA) All Broward Hurricane Partel, Inc. 450 W. McNab Road Ft Lauderdale, FL 33309 SCOPE; This NOA is being issued under the applies ble rules and regulations governing the use of c:onstructiun materials. The documentation submitted has been rev ewed by Miami-Dade County Product Control Division and accepted by the Board of Rules and Appeals(BORA) to be used in Miami Dade County and other areas where ullowcd by the Authority having Jurisdiction (ARI). This NOA shall not be valid after the ex'oration date stated below. The Miami-Dade County Product Control Division (In Miami Dade County) and/or i lee AW (in areas other than Miami.Duda County) reserve the right to have this product or material tested for qu: lity assurance purposes. if this product or material fails to perform in the: acceptcd manner, the manufacturer w 11 incur the expense of such testing and the AH] may immediately revoke, modify, or suspend the use of such product or material within their jurisdiction. BORA reserves the right to revoke this acceptance, if it is de:tenrinei.by Miami-Dadc County Product Control Division that this product or material fails to meet the requirements of th:applicable building code. This product is approved as described hereit ,and has bccn designed to comply with the High Velocity Ifurricane Zone of the Florida Building Code. Dr=Kirnom 20 ga.Steel Storm Pawl APPROVAL DOCUMENT: Drawing No. 98-129, titled "20 go. Steel Storm Panel",shct:ts I through 7, Prepared, signed and seated by V,J. ICneaovi:h, P.L.,dated 5/10/02, bearing the Miami-Daae County Product Control Revision stamp with the Notice of 0 cceptance number and expiration date by the Miami-Dadc County Product Control Division. MISSILE IrvIrACT RATING: Large an 1 Small Missile Impact LABELING: Each unit shall bear a penman mt label with the manufacturer's name or logo, city,state and following statement: "Miami-Dido County I roduct Control Approved unless otherwise noted herein. RENEWAL of this NOA shall be eonside"J after a renewal application has been filed and there has been no change in the applicable building code negat vely affecting the performance of this product. TEttml[NATION of this NOA will occur a1 ter the expiration date or if then:has been a revision or change in the materials, use,and/or manufacture of the pro iuct or process. Misusc of this NOA as an endorsement orany product, for sales, advertising or any other Fe rposcs shall automatically tcmiinatc this NOA. f=ailure to comply with any section of this NOA shall be:cause 1:)r termination and removal of NOA. ADVERTISEMENT: The NOA number pi ecedcd by the: words Miami-Dadc County, Florida, and followed by the cxpiration Jute may be displayed in adve using literature. If any portion of the NOA is displayed, then it shall be done in its entirety. INSPECTION: A copy of this entire NOA s gall he.provided to the user by the manufacturer or its distribututs and shall be available for inspection nt the jot site ut the request of the Building Official This NOA revises NOA #00-0426.06 and,ci nsists of this page l as well as approval document mentioned above. The:submitted cinrumentntion was reviewed t y Raul Rodriguez. NOA Net 07.-0530.01 W J hxpiratinu Date: July 31,2003 ._ Approval Date: July 11,2002 Paan i n , a PSA - ✓'taw � i � ' DEPARTMENT+OF BUILDING CITY.OF ATLANTIC BEACH ? , .� PE" !I` INFORMATION ------ ------- LOCATION ispoRmATtON hermit Number; 14061 Address : 2269 FAIRWAY VILLAS LANE NOR? Permit Typt:RE'-ROUP' ATLANTIC BRACH . FLORIDA 32233' glass of wor)o-ALTERAT I ON - LEGAL DESCRIPTION I. 4nstr} Ty :iNf1OU FRAME H1tck: Lot: Twp: Proposed Use:SINGLE FAMILY Section= 0 Buba: Rnq: 0 Dwellings : 0 Subdivisipn.,FAIRWA'Y VILLAS Est . Value: 0.00 Improv. Cost: 2 , 499. 00 Total' Fe 25.00 Aoun te"F 25.00 ;Oate1,19 97 Worn � _ q � ION APPLICATION PEES [ Name• ,� �g �g ' T �25� : 04 R 1LLAS LADE NORTH :Adds� � E� FLORIDA` , C A ' R ' ORMA#'T I g Name �.. CHA Aft� rI . COPA � _..,.. ' JACKSON FL 32211 Lig 1C,, Exp f t if "g4 NOTES: C� 1 NOTICE--ALL CONCRETE FORMS ANt>.hOOTINGS MOST BE 1,N$PECTED BEFORE POURING PERMIT VOID SIX MONTHS AFTER DATE OF ISSUE BUILDING MATERIAL,RUBBISH AND DEBRIS FROM,THIS WORK MUST NbT BE PLACE1j IN PUBLIC SPACE,AND MUST BE CLEARED UP AND HAULED AWAY BY EITHER CONTRACTOR OR OWNER i f`F-ILUR� TQ Ct�MIP#.Y 1NITH THE MECMANiC3 l.,IN�LAW CA141 ,,, ULT N t THE PR PERTY'OW` E I`PAYt 0 TWICE FOR BUILiNG iMPROV.0 �NTS F i I r., , 14: V, I ISSUED ACCORDING TO APPROVED PLANS WHICH ARE PART OF THI5 PERMIT AND Stt k` RE VIOLATION OF APPLICABLE PROVISIONS OF LAW. ° " ATLANTIC BEACH BUILDING DEPARTMENT A By: � CITY OF ALANTIC BEACH A ROOFING PERMIT APPLICATION owner(s) : At tj �c,��obo k M Address: -AA&9 F 191 R.w-tj u I l as L,j. Al. Phone: Lot # Block or Unit # Subdivision: Contractor: GAA4AnY 20C'41)u� Address : 953E City, State and Zip ar,u,1Id �a 1 ? Phone 448'.3646 State License #S C -V1917 Db 4548' Describe work to be performed: 11 E Mby-[ SLAJg R63r Aar D R6DIscb Valuation of Proposed Construction:?4 1. Materials to be used: 5— 5" Signature of Owner; C--\4k Signature of Contrac r: er Liability Insurance Supplied Workers Compensation Insurance Supplied License Information DEPARTMENT OF BUILDING 6802 CITY OF ATLANTIC BEACH,FLORIDA PERMIT NO. PERMIT TO BUILD THIS PERMIT MUST BE POSTED ON JOB Date 5-20-85 19 PUMIM 00 1~;r 011 T Valuation$ Fee$ 52• 2*0 C C9 T R9 72 1 A This permit not valid until above fee has been paid to City Treasurer,and is 4 `1 r CCAC subject to revocation for violation of applicable provisions of law. 2 7 r '1 2 /85 This is to certify that BW PLU4BIX COdFMY 1000 has permission to ba& IWrATI- PLT.�Su1TC Classification Zone Owned by STM Lot 45 Block S/D House No. 22bg FAIMY VIUAS LACE NOM According to approved plans which are part of this permit NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. PERMIT VOID SIX MONTHS AFTER DATE OF ISSUE 4--10 4- 1-10 0 Building material, rubbish and debris -zi from this work must not be placed in public space, and must be cleared up and hauled away by either con- ow�ner/. Building Official. FOR OFFICE PERMIT DATE USE ONLY NUMBER CONTRACTOR I PLUMBING ELECTRICAL � f SEWER I WATER h AOW 1 wwwavO ©F P 4, i,` U446.0 Standard ra�mY�, 0� tion l�� °f the SouthernLc luith the uirem ents of Sec was iii curnfthart to the req structure ursuant this issued p e of issuance olloivitt,. Certificate the tim For the This that at or USCI. certifying o cortstructiott Building butldin, t gtdg permiNn ordinances regulatt'rb various �c (,- t UseGlusificatiW' -type C�,stnrio } ` Address i .. a.'<tiT I f $gilding finer g4 Bgitdins Address —w-I �/`ggildinB �� ,N A LONfTICUOUf N.�C6 fa \._ ' � ELECTRICAL FIRM: MASTER ELECTRICIAN SIGNATURE Z:�/ JOURNEYMAN NAME ADDRE ? RFD-BOX- X6,0_ FD BOX BLDG.SIZE BETWEEN: RES. RES.( APT. ( ) COMM.( ) PUBLIC ( 1 INDUS. ( 1 NEW ( OLD ( 1 REW. ( 1 ADDITION ( ) TRAILER ( 1 TEMP.( ) SIGNS ( 1 SO. FT. SERVICE: NEW( 1 INCREASE ( 1 REPAIR ( 1 FEE CONDUCTOR SIZE gz AMPS COPPER ( 1 ALUM, SWITCH OR BREAKER AMPS PH W )3( )VOLT 9 _RACEWAY EXIST.SERV.SIZE AMPS PH W VOLT RACEWAY FEEDERS NO. SIZE NO. SIZE NO. SIZE LIGHTING OUTLETS CONCEALED OPEN TOTAL RECEPTACLES CONCEALED OPEN TOTAL 0.30 AMPS, 31.100 AMPS, SWITCHES INCANDESCENT FLUORESCENT&M.V. FIXED 0.100 AMPS. OVER APPLIANCES BELL TRANSF. AIR H.P. RATING H.P. RATING CONDITIONING COMP.MOTOR OTHER MOTORS AMPS CEIL HEAT: KW-HEAT 0.1 OVER MOTORS H.P. VOLTAGE PHS NO. 1 H.P. VOLTAGE PHS MISCELLANEOUS TRANSFORMERS: UNDER 600 V. OVER 600 V. NO. KVA NO. lKVA NO.NEON TRANSF. NO. VA. MA. MOTOR SIZE SWITCH FLASHER EACH SIGN i FORWARDED TOTAL FEES U V CITY OF ATLANTIC BEACH APPLIC N FOR PLUMBING PERMIT OWNER'S NAME ku F4 LOCATION MASTER PLUMBER nn n STATE/COUNTY OCCUPATIONAL LICENSE N0. (_.► /DCJ�� QQ/ CERTIFICATE - CONTRACTOR ERTIFICATE •CONTRACTOR TYPE OF BUILDING SINKS SHOWERS A.,_LAVATORY WATER HEATERS BATH TUBS DISHWASHERS URINALS _Z_DISPOSALS CLOSETSWASHING MACHINE FLOOR DRAINS OTHER A-i �s-Q-�' ZzTOTAL FIXTURE COUNT INSTALLATION OF PLUMBING AND FIXTURES MUST BE IN ACCORDANCE WITH THE MOST RECENT EDITION OF THE SOUTHERN STANDARD PLUMBING CODE. MECHANICAL PERMIT# ADDRESS PLUMBING PERMIT BUILDING PERMIT WORKSHEET ELECTRIC PERMIT � TEMPORARY ELECT. }heated Square Footage @ $-3�) per sq ft = $ ��� 0 • O-Z) Garage/Shed X36 @ $ / 6 O J —e'er sq ft = $ Carport @ $ per sq ft = $ Porches @ $ per sq ft = $ Deck $ (4r-, 4 d per sq ft = $ Y Patio /-3d @ $ per sq ft = $ 41 Q TOTAL VALUATION $ U�p� • �� Tota Valuation Data lst $ ��d Remainder Valuation @ $ ,,2 :56 per thousand or portion thereof TOTAL BUILDING FEE $ + k FILING FEE $ FIREPLACE @15 .00 $ TOTAL BUILDING PERMIT -------------------------------------------------------------------------------- PLUMBING' PERMIT FEE$ MECHANICAL PERMIT FEE$ ELECT. TEMPORARY $ ELECTRICAL PERMIT $ WATER METER SIZE $ ACCOUNT NUMBER SEWER IMPACT FEE $ WATER CONNECTION $ (@10. 00 per fixture unit) APPROVED BY: TOTAL BUILDING/PLAN FILING FEE $ / TOTAL WATER METER CHARGE TOTAL SEWER IMPACT FEES $ /D A PP R O V E D TOTAL WATER CONNECTION CHARGE $ � C'rl MISCELLANEOUS CHARGES $ � // GRAND TOTAL DUE: $ FOR OFFICE USE ONLY Date...........................------..19 ...... Permit *........................Fee$..._................... CITY OF ATLANTIC BEACH Valuation $................_.................................... FLORIDAHouse *..................................._...................... APPLICATION FOR BUILDING PERMIT Application Is hereby made for the approval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the City of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the City of Atlantic Beach and all rules and regulations of the Building Department of the City of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the City of Atlantic Beach,Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub-contractors be submitted to this office so that licenses can be verified. ( p Date.......... ......[..4............................�...,� 18.` Owner........... ..._.. ..1-2✓ ,!Address O i �. t`'�� `�` ^X Telephone No- �.',A..- .� Architect �G��...;..... �./���t�--.............................•-••---..Address.�..CI�V.� ...... _R_C!...•--....Telephone No. ?�--.. Contractor Bccu'ild��er. ..............�^C, �... :.�-: ..�.� .......Addree !s�` � ` phronne Not .a�_:;if)� c wt o........." s. ...._....- Block No................................Sub Division 4, � ..........L�.�. X. Zone....... 6cG u.?`_.'C&4?.......... ...........u.........................Side Between................................. ..... and.----._.................. ...................Sts. Valuation ejr what purpose will building be u ll`1��k.f�, (�44 of construction-. r..:Q Dimensions of Buildin ... . _ 1 An..Dimensions of Lot.C��,.�� �.�.............Size of Footings... I.�.�..01�...... Size of Piers...........^-':::..............Si of Sills.. .. _......._.....p...�_,:�..G(r�eatest Sill Span in ft............=-......Type Roof..-.---......:........................ How will Building be Heated?..,;- [Vt.J.CK ill-Building be on Solid or Filled Ground 1 :� ....... g .......... Distance on Centers..L-_.....t?......................... Greatest Span............... " Size of Ceiling Joists........` ...�.Q^:.... ......................... Size of Floor Joists..............._=....................... .,Distance on Centers.......... ..... Greatest Span......'' .................... " Size of Rafters........tz::D.-X....•A....................Distance on Centers. ...... ... ......_..........._..., Greatest Span............................................ This rectangle is to represent the lot. r „ r .ocate the building or buildings in the i r Hgbt position. Give distance in feet from �tll.lot-lines and existing buildings. REAR LOT LINE Two copies of plans and specifications shall be submitted with application. Inspections required. 1. When steel is in place and ready to pour footing. 2. When steel is in place and ready to pour columns and/or 1 x x 3. When steel is in place and ready to pour beam. 4. When framing is completed �3 When rough plumbing is completed,and ready to cover up. � 6. When septic tank drain field or sewer is laid but before it is covered. 7. Electrical inspection by City of Jacksorville. 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called for after corrections are made. FRONT OF LOT In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance wi the attached plans and specifications, which are a part hereof, and in accordance with the building regulations of Atla ach. Signature o Buil r.._ ..... ...... ... . ..... ...... Address .. '. �- .i!1L.A. Signatureof Owner................ .............................................................._ Address.................................................................................................... ENERGY DATA SHEET NAME: F�-� �� DATE: JOB ADDRESS m 47;� t EPI: 1. Type Insulation in Walls �a ` �� '� R- II 2. Type Insulation in Ceilings R- 3. -3. Type Insulation for Wood Floors C G ? R- I 4. Concrete Slab Edge Insulation ) E; R- 5. Insulation Around Ducts In Condit. Space 6. Type Heating System COP 7. Type Cooling System J_4 �' EER , 8. Type Hot Water Heater to - il T ,%- % �r 9. Type Glass in Windows and Doors: Double Glazed Tinted Single Glazed �; Tinted 10. Type Exterior Doorst 11. Fireplace? t ;` w/Inside Combustion Air w/Outside Combustion Air 12. Woodstove? 13. Are the dimensions of all windows and doors shown? If not, this is required 'either on floor plan, elevations or in a schedu e. 14. Size of Roof Overhang? / 1 -0 15. Are the washer and dryer located on floor plan? 16. Any ceiling fans? /:; If so, identify on floor plan. 17. Is a multi-zone A/C system to be used? n 18. Is the building oriented on plot plan with compass directions? 19. Is there a whole house fan (attic-type fan with 1.5 CEM/SF)? r I certify that the above is the correct data used to calculate the EPI on the energy form submitted, and willbe incorporated in the subject job. �� - - ; C f ) PLUMBING WORKSHEET SINKS SHOWERS DISHWASHERS CLOSETS BATH TUBS FLOOR DRAINS WASHING IIACHINE WATER HEATERS DISPOSALS LAVATORY URINALS OTHER TOTAL FIXTURE COUNT 3,5-6 FIXTURE LTNIT BREAKDOWN FIXTURE UNITS ARE ESTABLISHED AS THE MEASUREMENT OF WATER DEMAND FOR EACH WATER FIXTURE UNIT INSTALLED AND CONNECTED TO THE CITY [WATER SYSTEM. THE WATER SUPPLY CHARGE 1S HEREBY FIXED AT $10.00 PER FIXTURE UNIT CONNECTED TO THE CITY WATER SYSTEM. /v2 BATHROOM GROUP CONSISTING OF LAVATORY (1 UNIT) WATER CLOSET, LAVATORY, AND BATH TUB OR SHOWER STALL SERVICE SINK TRAP STAND (6 UNITS) (3 UNITS) DRINKING FOUNTAIN (11 UNIT) URINAL, WALL LIP (4 UNITS) FLOOR DRAIN Cl UNIT) CWASHING MACHINE RES. URINAL, PEDESTAL, SYPHON (3 UNITS) JET BLOWOUT (8 UNITS) WATER CLOSETS, VALVE OPERATED WATER CLOSETS, TANK-OPERATED (8 UNITS) (4UNITS) SHOWER STALL, D024ESTIC BATHTUB (W/OR W/O OVERHEAD (2 UNITS) SHOWER) (2UNITS) LAUNDRY TRAY BIDGET (3 UNITS) (2 UNITS) DISHWASHER (2 UNITS) KITCHEN SINK (2 UNITS) KITCHEN SINK/,WASTE GRINDER (3 UNITS) TOTAL FIXTURE UNITS @ $10.,00 EACH d`�` /t�'Oo ��� DC) I DEPARTMENT OF BUILDING 6804 CITY OF ATLANTIC BEACH,FLORIDA PERMIT NO. ` PERMIT TO BUILD !QI oklu 7 THIS PERMIT MUST BE POSTED ON JOB aU} . QrKT YkTJ Ii ! ^, Fj/c 9/r Date 20, 19 85 U%iw •00CAC f Valuation$ 4$,$12.60 Fee$ 201.00 193 1 A i/09/ This permit not valid until above fee has been paid to City Treasurer,and is 1 subject to revocation for violation of applicable provisions of law. Stllu�s This is to certify that 9000 Cypress 06eM Drive has permission to build 1q1ing1P FWrTrlly Name Classification I1P3idmtial Zone IOW ` Owned by Std? w — C011iT* Lot 45 Block SID House No. 2269 FAIRWAY VIAS IAM NORM According to approved plans which are part of this permit NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. PERMIT VOID SIX MONTHS „ AFTER DATE OF ISSUE �— 10 , 10 O Building material,rubbish and debris z from this work must not be placed in public space, and must be cleared up and hauled away by either con- ner. t {4Z I f Building Official, FOR OFFICE PERMIT DATE CONTRACTOR USE ONLY NUMBER PLUMBING ELECTRICAL SEWER WATER FLORIDA ENERGY EFFICIENCY CODE 14/1 /03 4 FOR BUILDING CONSTRUCTION u � SECTION 9—RESIDENTIAL POINT SYSTEM METHOD CLIMATE ZONES FORM 900-A-84 DEPARTMENT OF COMMUNITY AFFAIRS NORTH 1 2 3 This form may be used to demonstrate compliance with the Energy Code for new single-family detached or multifamily attached dwellings under Section 9 of the Energy Code. An alternative to this method for single-family detached dwellings, and multifamily attached dwellings of three stories or less, is provided in Section 10 of this Code.Only dwellings which are above ground frame(wood siding,brick veneer,etc.)or concrete wall type construction may be calculated using Sections 9 and 10.Other types of construction must comply under Section 4 or Section 5 of this Code.Additions to existing residential buildings shall comply with the requirements of Section 10 of this Code.Detailed information on how to complete this form may be obtained from your local building department or the Department of Community Affairs,Energy Code Program,2571 Executive Center Circle East,Tallahassee,Florida 32301. PROJECT NAME PERMITTING OFFICE: zltD( AND ADDRESS: CIRCLE CLIMATE ZONE: 1 2 BUILDER: Ipj PERMIT NO.: OWNER: P.d 1J05 e�% J 4 Ft, 3 as Y5' JURISDICTION NO.: 0 d nDETACHED IF MULTIFAMILY, NO.OF UNITS GLASS AREA AND TYPE i COVERED BY THIS CALCULATION: CLEAR TINT,FILM,SOLAR SCREEN SEPARATE CALCULATIONS ARE REQUIRED / 17ESGL SGL FOR EACH WORST CASE UNIT TYPE.CHECK IF ❑ ❑ ATTACHED THIS CALCULATION REPRESENTS A WORST CASE CONDITION. DBL DBL El I I NET WALL AREA AND INSULATION CONDITIONED CEILING INSULATION CBS R= FRAME R= FLOOR AREA UNDER ATTIC SGL.ASSEMBLY m:❑ I I I 1 `l� [E.11.❑ H R= /�.❑ R= ❑.❑ COOLING SYSTEM PRIMARY HEATING SYSTEM PRIMARY HOT WATER SYSTEM ®CENTRAL ❑NONE ❑ ELECTRIC STRIP ❑GAS ❑ NONE 21 ELECTRIC RESISTANCE ❑ SOLAR ❑ROOM ❑ OIL ❑ SOLAR ❑ HEAT RECOVERY ❑ GAS ❑ PACKAGE TERMINAL AC n HEAT PUMP:COP = ® ® ❑ DED. HEAT PUMP:COP = ❑ m EER/SEER= ® 1a ❑OTHER: ❑OTHER: CALCULATED E.P.I.: I I R.[�J CALCULATED E.P.I.MUST NOT EXCEED 100 POINTS In accordance with Section 553.907 F.S., I hereby certify that the plans Review of the plans and specifications covered by this calculation indi- and specifications covered by this calculation are in compliance with the cates compliance with the Florida Energy Code. Before construction is Florida Energy Code. completed, this building will be inspected for compliance in accordance with Section 553.908, F.S. OWNER/AGENT BUILDING OFFICIAL: DATE: DATE: 9A I PRESCRIPTIVE MEASURES Must be met or exceeded by all residences. MINIMUM REQUIREMENTS CHECK TO INDICATE COMPONENTS REQUIREMENTS COMPLIANCE WINDOWS 903.1 MAXIMUM OF 0.5 CFM per LINEAR FOOT OF OPERABLE SASH CRACK. DOORS 903.1 MAXIMUM OF 0.5 CFM PER SQUARE FOOT OF DOOR AREA.INCLUDES SLIDING GLASS DOORS. EXT.JOINTS&CRACKS 903.1 TO BE CAULKED,GASKETED,WEATHER-STRIPPED OR OTHERWISE SEALED. ✓ CEILING INSULATION(903.9) MINIMUM OF R-19. ✓ WATER HEATERS(903.2) MUST BEAR ASHRAE STANDARD 90-80 LABEL OR A MAX.4 WATT/SO.FT.STAND-BY LOSS.SWITCH OR CLEARLY MARKED CIRCUIT BREAKER(ELECTRIC)OR CUT-OFF VALVE(GAS)MUST BE PROVIDED, SWIMMING POOLS(903.3) IF HEATED BY OTHER THAN SOLAR,MUST HAVE POOL COVER DESIGNED TO MINIMIZE HEAT LOSS. ALL NON-COMMERCIAL POOLS MUST BE EQUIPPED WITH A POOL PUMP TIMER. HOT WATER PIPES(903.4) INSULATION IS REQUIRED ONLY FOR RECIRCULATING SYSTEMS. IN SUCH CASES,PIPING HEAT LOSS SHALL BE LIMITED TO A MAX.OF 17.5 BTU /H PER LINEAR FOOT OF PIPE(SEE 504.4). SHOWER HEADS 903.5 WATER FLOW MUST BE RESTRICTED TO NO MORE THAN 3 GALLONS PER MINUTE. MVAC DUCT CONSTRUCTION CONSTRUCTED IN ACCORDANCE WITH INDUSTRY STANDARDS AND LOCAL MECHANICAL CODE. / 903.6 DUCTS IN UNCONDITIONED SPACE MUST BE INSULATED TO A MINIMUM R-4.2. V HVAC CONTROLS 903.7 A SEPARATE,READILY ACCESSIBLE MANUAL OR AUTOMATIC THERMOSTAT FOR EACH SYSTEM. 1 FORM 900-M84 CLIMATE ZONES 1 2 S 9C I DESIGN CREDIT POINTS CP 9D HEATING SYSTEM CREDIT POINTS CEILING FAN IN COND.SPACE(max 5 CP) 1 NATURAL GAS/PROPANE HEATING 16.0 MULTIZONE A/C SEPARATED BY DOOR 5 OIL HEATING 12.8 CROSS VENTILATION(1 CP per room) 1 WHOLE HOUSE FAN(min.1.5 cfm/s.f.) 5 WOOD STOVE 7 9E DESIGN PENALTY POINTS FIREPLACE WITH OUTSIDE COMBUSTION AIR 2 WASHER AND DRYER IN COND SPACE TOTAL GLASS OPENS LESS THAN 40% 5 9C TOTAL(not to exceed 12 points) FIREPLACE WITH INSIDE COMBUSTION AIR 5 9F WINTER OVERHANG FACTOR(WOF) 9F SUMMER OVERHANG FACTOR SOF FEET N NE E SE S SW W NW FEET N NE E SE S SW W NW 0-0.9 1.00 0.98 0.99 0.74 0.71 0.82 0.93 1.00 0-0.9 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1-1.9 1.00 0.98 0.99 0.75 0.73 0.83 0.93 1.00 1-1.9 1.00 1.00 0.99 0.98 0.97 0.98 0.99 1.00 2-2.9 1.00 0.98 0.99 0.77 0.76 0.84 0.94 1.00 2-2.9 1.00 0.98 0.94 0.92 0.91 0.92 0.94 0.98 3-3.9 1.00 0.98 0.99 0.81 0.79 0.87 0.94 1.00 3-3.9 1.00 0.95 0.89 0.86 0.85 0.86 0.89 0.95 4-4.9 1.00 0.98 0.99 0.84 0.83 0.89 0.94 1.00 4-4.9 1.00 0.91 0.84 0.80 0.82 0.80 0.84 0.91 5-5.9 1.00 0.99 1.00 0.87 0.87 0.92 0.95 1.00 5-5.9 0.99 0.88 0.79 0.76 0.79 0.76 0.79 0.88 6-6.9 1.00 0.99 1.00 0.90 0.90 0.93 0.96 1.00 6-6.9 0.99 0.85 0.75 0.73 0.78 0.73 0.75 0.85 7-7.9 1.00 0.99 1.00 0.93 0.94 0.96 0.97 1.00 7-7.9 0.99 0.83 0.72 0.70 0.77 0.70 0.72 0.83 8-8.9 1.00 0.99 1.00 0.95 0.96 0.97 0.98 1.00 8-8.9 0.99 0.81 0.70 0.68 0.77 0.68 0.70 0.81 9-9.9 1.00 1.00 1.00 0.97 0.98 0.98 0.98 1.00 9-9.9 0.98 0.79 0.68 0.67 0.76 0.67 0.68 0.79 10-10.9 1.00 1.00 1.00 0.99 0.99 0.99 0.99 1.00 10-10.9 0.98 0.77 0.66 0.66 0.76 0.66 0.66 0.77 11-11.9 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 11-11.9 0.97 0.76 0.64 0.64 0.76 0.64 0.64 0.76 12 UP 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 12 UP 0.97 0.75 0.63 0.64 0.76 0.64 0.63 0.75 9G I HEATING SYSTEM MULTIPLIER HSM COP 2.5-2.6 2.7-2.8 2.9-3.0 3.1-3.2 3.3-3.4 3.5&UP HEAT PUMP HSM .40 .37 .34 .32 .30 .29 SOLAR HEATING SYSTEM (BACKUP SYSTEM FRACTION) x (BACKUP SYSTEM HSM) ELECTRIC STRIP HEAT 1.0 NATURAL GAS/PROPANE/OIL 1.0(SEE TABLE 9D FOR CREDITS) PTAC&ROOM HEAT PUMPS MINIMUM COP 2.2.HSM FOR COP 2.2-2.4= .45. SEE TABLE ABOVE FOR COP>2.4 9H COOLING SYSTEM MULTIPLIER(CSM) ELECTRIC EER/SEER 7.8-7.9 8.0-8.4 1 8.5-8.9 1 9.0-9.4 9.5-9.9 10.0-10.4 10.5-10.9 11.0-11.9 12.0-UP CSM .83 .81 0.76 0.72 0.68 0.65 0.62 0.59 0.54 GAS COP 0.40-0.44 0.45-0.49 0.50-0.54 0.55-0.59 0.60-0.64 0.65-0.69 0.70&UP CSM 1.50 1.25 1.20 1.09 1.00 0.92 0.89 MINIMUM SEER/EER LEVEL 7.8 FOR STRAIGHT COOL OR HEAT PUMPS;MINIMUM OF 7.5 EER FOR ROOM UNITS AND PTAC. FOR ROOM UNITS AND PTAC CSM FOR EER 7.5-7.7= .87.SEE TABLE ABOVE FOR EER>7.7. 91 1 HOT WATER CREDIT POINTS(HWCP) ELECTRIC RESISTANCE WATER HEATER 0 GAS WATER HEATER 10 INSTANTANEOUS WATER ELECTRIC 4.5 HEATER GAS 12.6 HRU(A/C)WATER HEATER ELECTRIC BACKUP 6.7 GAS BACKUP 13.9 ELECTRIC BACKUP 9.7 HRU(HP)WATER HEATER GAS BACKUP 14.5 HEAT PUMP WATER HEATER COP 1.60-1.89 1.90-2.19 2.20-2.49 2.50-2.79 2.80-3.00 (DEDICATED HEAT PUMP) CREDIT POINTS 9.0 11.4 13.1 14.4 15.4 OVERALL SOLAR FRACTION* 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 SOLAR W= ELECTRIC BACKUP 2.4 4.8 7.2 9.6 12.0 14.4 16.8 19.2 21.6 t24.HOT WATER 5g GAS BACKUP 11.4 12.8 14.2 15.6 17.0 18.8 19.8 21.2 22.6 *PERCENT OF ANNUAL HOT WATER PROVIDED BY SOLAR SYSTEM_10o=OVERALL SOLAR FRACTION 4 CITY OF dead - �?&UW4 716 OCEAN BOULEVARD P.O.BOX 25 ATLANTIC BEACH,FLORIDA 32233 TELEPHONE(904)249-2395 September 18, 1985 Pre-Service Section 3rd Floor Jacksonville Electric Authority 233 West Duval Street Jacksonville, Florida 32233 The following final inspection has been made and is satisfactory Permit IX796 - 2221 Fairway Villas Lane north Permit ?,4286 - 2269 Fairway Villas Lane North Permits issued to EG-7 Electric Company Permit #4311 - 354 Aquatic Drive Permit 1,14310 - 360 Aquatic Drive Permit #4309 - 366 Aquatic Drive Permit 14303 - 372 Aquatic Drive Permits issued to Allstate Electrical Contractors Sincerely, Joan M. Widdows � Building Inspection Supervisor JI,W:ra 4 ' INSPECTION LOG t JOB ADDRESS 6 9 CONTRACTOR � r�a OWNER BUILDING PERMIT ELECTRICAL PERMIT ' PLUMBING PERMIT TEMPORARY POLE PERMIT MECHANICAL PERMIT MISCELLANEOUS PERMIT FLOOD ZONE DATE SURVEY FILED Called-In Approved J .E.A. Temp Pole Footing Slab f /7,-q Framing ' Plumbing (R) Electrical (R) Mechanical Fireplace Top out Other - Electrical (F) 9'/7 FINAL INSPECTION z- 11 Certificate of Occupancy Issued L� COMMENTS : BUILDING AND ZONING INSPECTION DIVISION CITY OF ATLANTIC BEACH ATLANTIC BEACH, FLORIDA 52228 APPLICATION FOR MECHANICAL PERMIT CALL-1N NUMBER IMPORTANT — Applicant to complete all items in sections 1, II, 111, and IV. I. LOCATION Street Address: ( OF Intersecting Streets: Between_ rntwoo isaRip And CA3 BUILDINGt4t2 W Sub-division C C,.L,aAr- 11. IDENTIFICATION — To be completed by all applicants In consideration of permit given for doing the work as described in the above statement we hereby agree to perform said work in accordance with the attached plans and specifications which are a part hereof and in accordance with the City of Jacksonville ordinances and standards of good.prectice listed therein. Name of Mechanical Contractors Contractor IPrint) Master Nana of Property Owner CLt Ili s Signetun of Owher signature of or Aut hed Age Architect or Engineer III. 01ER& ON A, Type of Mating E3. X IS OTHER CONSTRUCTION BEING DONE ON Electric THIS BUILDING OR SITE t C1 Cm-Q LP ❑ Natural (Q Control Utility IF YES, GIVE NUMBER OF CONSTRUCTION 0 OS PERMIT _t I Other — S CI pacify 1V. MECPIANIM WU"IINT TO K INSTAUM NATURE OF WORK (Prowda complete list of conmpanents on beck of this form) Residential or ❑ Commercial Heat ❑, Space Q RecomW X Central O poor New Building Air Conditioning. ❑ Room X Control , h ❑ Existing Building XDuct Materia[bos=c1niQ'I Thickaest i ❑ Replacement of existing aystem Maximum capacity New Installation(No system previously,Inslpited) 0 ROW"rotioa ❑ Extension or add-onto existing system ❑ Other-Specify' © Cooling towed. Copecstt' p faro .:mors: Nvmber of Meds__ Q Ekiveter Q Menlift ❑, Ewalotor�,_..__�(numba) THIS SPACE POR OPPOM USE ONLY D, 6eeoline pumps (number) (fit 13 7ee1114 —(number) Rom rks 0 us coabiflors Inumberl Q Unfired pmavr*vewr Q Perth Approved by es. Q Other — Specify Permit AI+A CONDITIONING AND REFRIGERATION EQUIPMENT NtavloibW umu Deect:iptbn X0"Number SRaazutaoturar calpalelity ('lbatl) A i DEPARTMENT OF BUILDING CITY OF ATLANTIC BEACH,FLORIDA PERMIT NO. T PERMIT TO BUILD �;I `/1-36/t THIS PERMIT MUST BE POSTED ON JOB 6'3U sI�OC�iC Date 5-24-85 19- 4973 1 A 7/2S/3 1�C�tA>ltICAI, 13C+� R Valuation$ Fee$ 4o'w I This permit not valid until above fee has been paid to City Treasurer,and is subject to revocation for violation of applicable provisions of law. This is to certify that �S HM.MG & has permission to Md 324SEAM HEAT & AIR i Classification Zone Owned by ST3Ms Lot 65 BlockS/D 2269 F'AnMY V11W !A_M NNM House No. According to approved plans which are part of this permit NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. PERMIT VOID SIX MONTHS AFTER DATE OF ISSUE zBuilding material, rubbish and debris -i from this work must not be placed in public space, and must be cleared up and hauled away by either con- c b ow,n�er.J Building Official. FOR OFFICE PERMIT DATE CONTRACTOR USE ONLY NUMBER PLUMBING ELECTRICAL SEWER WATER