Loading...
Item 4D AGENDA ITEM # 4D NOVEMBER 22, 2010 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Annual Contract for Welding Troubleshooting and Repair Bid No. 1011 -04 c&.. SUBMITTED BY: Donna Kaluzniak, CEP, Utility Direct DATE: November 10, 2010 BACKGROUND: The Public Utilities Department at times requires the services of certified welders and metal fabricators. Bids were advertised and two bids were received on November 10, 2010. Description Ace FabTech Fabrications, Industrial LLC Services, Inc. Hourly Rate Hourly Rate Journeyman Structural $41.50 $50.00 Worker 1 Class Pipefitter $39.00 $50.00 2 °d Class Pipefitter $28.50 $40.00 Helper $25.00 $30.00 Subtotal $134.00 $170.00 Profit & Overhead 20% 25% Profit & Overhead $26.80 $42.50 Amount Total $160.80 $212.50 The responsive low bidder was Ace Fabrications, LLC. BUDGET: Funds for Welding Troubleshooting and Repair were budgeted in the Water and Sewer Treatment and Sewer Collection funds in the amount of $25,000 under account nos. 400 - 5502 -533 -3400, 410 - 5508 -535 -3400, and 410 - 5506 -535 -3400. RECOMMENDATION: Award the annual contract for Welding Troubleshooting and Repair to Ace Fabrications, LLC at the prices submitted in Bid No. 1011 -04. ATTACH1VIENTS: 1. Bid tabulation for Bid No. 1011 -04. ■---____----Z., City of Atlantic Beach Welding Troubleshooting and Repair for Public Utilities November 10, 2010 BID 1011 -04 3:00 PM Ace Fabrications FABTECH Industrial Services, Inc. Required Documents Submission in Triplicate - All Documents X X Document Requirements Checklist X X Bid Form X X Insurance Certificate X X References - Three (3) X X Business Tax Receipt X X Welding Certificates X X Drug Free Workplace X X Public Entity Crimes Statement X X W -9 Form X X Documentation of Any Addenda: N/A N/A Hourly Rates: Journeyman Structural Worker $41.50 $50.00 1st Class Pipefitter $39.00 $50.00 2nd Class Pipefitter $28.50 $40.00 Helper $25.00 $30.00 SUBTOTAL $134.00 $170.00 Overhead & Profit % (% applied to Total Labor & Materials) 20% 25% a Overhead and Profit Amount $26.80 $42.50 m TOTAL H OURLY COST (LABOR + O 8� P) $160 $212 N N � ,p d Award of Bid based on Department Analysis and Commission Approval