Loading...
482 Stewart Street (Fire Dept) 2010 613 N.W.MERCANTILE PLACE 3226 CHERRY PALM DRIVE PORT ST.LUCIE,FL 34986 TAMPA,FL 336109 ,a,7�72.5. 8-3350•FAX.772-878-5967 "ArWAY 81 3-630-0303•FAX:81 3-630.0312 t NIE 11326 DISTRIBUTION AVENUE WEST Automatic Fire Sprinklers. Inc 4683 LAREDO AVENUE JACKSONVILLE,FLORIDA 32256-2745 FORT MYERS,FLORIDA 33905 904-268-3030-FAX:904-268-0724 222 CAPITOL CT. 239-433-3030-FAX:239-433-3263 4370 MOTORSPORT DRIVE OCOEE, FL 34761-3033 3121 NW 16TH TERRACE CONCORD,NORTH CAROLINA 28027 407-656-3030 -407-656-8026 POMPANO BEACH,FLORIDA 33064 704-782-3032-FAX:704-795-6838 954-917-3030-FAX:954-917-9424 NFPA-25 Inspection, Testing and Maintenance of Dry-Pipe Fire Sprinkler Systems Information on this form covers the minimum requirements of NFPA 25-2002 for fire sprinkler systems connected to distribution systems without supplemental tanks or fire pumps.Separate forms are available to inspect,test,and maintain fire pumps,water tanks and other fire protection systems. More frequent inspection,testing and maintenance may be necessary depending on the conditions of the occupancy and the water supply. Owner: BBT Investors LLC ISC#: J00776 Report#: Owner's Address: 2251 St.Johns Bluff Road S. Jacksonville,FL. 33246 Owner's Phone Number: 904-645-0003 Property Being Evaluated: Dresser Rand Property Address: 482-482B Stewart St. Atlantic Beach, FL. 32232 Date of Work: Jun 9,2011 All responses refer to the current work(inspection,testing and maintenance)performed on this date. This work is(check one): O Monthly 0 Quarterly 0 Annual O Third Year O Fifth Year Part I-Owner's Section A.Is the building occupied? OYes ONo g Testing B.Has the occupancy classification and hazard of contents remained the same operating properly and automatic drain valve in place and since the last inspection? OYes ONo C.Are all fire protection systems in service? OYes ONo operating properly? QYes ONo ONiA D.Has the system remained in service without modification since the last inspection? OYes ONo 4.Ann( plugsnual Inspection caps are not i(place,inspect interior for obstructions.) pection Items(in addition to above items) E. Was the system free of actuation of devices or alarms since the last y OYes ONo A.Proper number and type of spare sprinklers? OYes No (E)N/Ainspection? F.Weekly logs of inspections required by NFPA#25 on file? OYes ONo B.Visible spinklers: G.All deficiencies reported at last inspection corrected? OYes ONo 1.Free of corrosion and physical damage? O Yes ONo ON/A H.I know the location and understand the operation of all control valves. Oyes O No 2.Free of obstructions to spray patterns? O Yes ONo ON/A J.I would like to have a copy of NFPA#25 @ an extra charge of$50.00. OYes ONo 3.Free of foreign materials including paint? O Yes ONo ON/A K.Owner or rep.requests WAFS to release information from 4.Liquid in all glass bulb sprinklers? OYes ONo (E)N/A inspections to the underwriters of my insurance company. Oyes ONo C.Visible pipe: 1.In good condition/no external corrosion? QYes ONo ON/A 2.No mechanical damage and no leaks? OYes ONo ON/A Jun 9,2011 3.Properly aligned and no external loads? OYes ONo (E)N/A Owner or representative(print name) Signature Date D.Visible pipe hangers and seismic braces not damaged or loose? ()Yes ONo ON/A Part II-Inspector's Section ❑Owner or Owner rep.not on site. E.Dry-pipe valves passed internal inspection? O Yes ONo (E)N/A A.Inspections F.Must be done before cold weather 1.Adequate heat in areas with wet piping? OYes ONo ON/A 1.Daily and Weekly Items A.Control valves supervised with seals in correct(open or closed) 2.Low temperature alarms functioning? O Yes ONo ON/A position? Q Yes ONo ON/A 3.Interior of pipe that passes through freezers free of ice B.Dry-Pipe valves:Enclosures around valves maintaining a blockage? ONIC OYes ONo ON/A minimum of 40 F and gauges in good condition showing normal G.Has an internal inspection of the pipe been performed by air and water pressure? (E)Yes ()No ON/A removing the flushing connection and one sprinkler near the C.Back Flow Preventers end of a branch line within the last 5 years? ONIC QYes ONo &/A 1.Valves in correct(open or closed)position? O Yes ONo ()N/A (if the answer was"No",conduct an internal inspection.) 2.Sealed,locked or supervised&accessible? O Yes ONo ON/A 5.Fifth Year Inspection Items(in addition to above items) 3.Relief port on RPZ device not discharging? O Yes ONo (E)NIA A.Check valves internally inspected and all parts operate properly, D.For freezer systems,is the gauge near the compressor reading move freely and are in good condition? O NIC O Yes ONo ON/A the same as the gauge near the dry-pipe valve? O Yes ONo ON/A B.Strainers,filters,restricted orifices and diaphragm chambers on 2.Monthly Inspection Items(in addition to above Items) dry-pipe valves passed internal inspection? ONIC QYes ONo ON/A A.Control valves with locks or electrical supervision in correct B.Testing (open or closed)position? Q Yes ONo ON/A The following tests are to be performed at the noted intervals.Report any failures on B.Dry-Pipe Valves: Part 111 of this form. Free from physical damage,trim valves in appropriate(open or 1.Quarterly Tests closed)position,and no leakage from intermediate chamber? Q Yes ONo ON/A A.Mechanical water flow alarm devices passed tests by opening C.Sprinkler wrench with spare sprinklers? O Yes ONo ON/A the inspector's test connection or bypass connection with alarms 3.Quartlery Inspection Items(in addition to above items) actuating and flow observed? QYes ONo ONIA A.Pressure Reducing Valve:In open position,not leaking, ()Yes ONo B.Post indicating valves opened until spring or torsion is felt in the maintaining downstream pressure per design criteria,and in 0 Not installed. rod,then closed back one-quarter turn? OYes ONo O�N�/A cri good condition with handwheels not broken? O Design teria is not available. C.Is the priming level correct? QV,, Yes ONo `/A B.Hydraulic nameplate(calculated systems)securely attached to D.Has low air signal passed its test? OYes ONo (E)N/A riser and legible? ()Yes .ONo E.Quick opening devices passed test?OProvisions not provided.()Yes ONo QN/A C.Fire Department Connections: F.Main drain test for system downstream of backflow,or pressure reducing valve: Visible,accessible,couplings and swivels not damaged and 1.Record Static Pressure 55 psi and Residual Pressure 40 psi. rotate smoothly,plugs or caps in place and undamaged, gaskets in place and in good condition,identification sign(s) [] See comments-on page 2 in place,check valve is not leaking,clapper is in place and 2.Was flow observed? Q Yes O No ON/A 3.Are results comparable to previous test? Q Yes 0 No ON/A 2.Semlannual Test(in addition to previous items) 2.Annual Maintenance Items(in addition to previous items) A valve c'Wervisory switches indicate movement? OYes ONO (E)N/A A.Operating stem of all OS&Y valves lubricated,completely closed, 4,9Iearical water flow alarm devices passed test by opening the and reopened? OYes ONO (E)N/A inspector's test connection or bypass connection with alarms B.Interior of dry-pipe valves cleaned? O Yes O No Or NIA actuating and flow observed? OYes ONO ( N/A C.Low points drained prior to the onset of freezing weather? O Yes O No (S)N/A 3.Annual Test(in addition to previous items) D.Sprinklers and spray nozzles protecting commercial cooking A,Main drain test: equipment and ventilating systems replaced except for bulb-type 1.Record Static Pressure psi and Residual Pressure psi. which show no signs of grease buildup? OYes ONO QN/A © See comments 2.Was flow observed? OYes 0N (j)N/A Part 111-Comment(any"No"answers,test failures or other problems found 3.Are results comparable to previous test? OYes ONO N/A with the sprinkler system must be explained here.Also,note here any B.Are all sprinklers dated 1920 or later? O Unable to determine.0'Yes ()NO products noticed on the system that have been the subject of a recall or a C.Fast response sprinklers 20 or more years old replaced or replacement program.)All items that need repaired or replaced are the successfully sample tested within last 10 years? ONIC OYes ONO owners responsibility and are not included in the price of inspection. D.Standard response sprinklers 50 or more years old replaced or successfully sample tested within last 10 years? (DNIC Oyes ONO E.Standard response sprinklers 75 or more years old replaced or successfully sample tested within last 5 years? (j)NIC OYes ONO red tag from last insp F.Dry-type sprinklers replaced or successfully sample tested within last 10 years? O Unable to determine.OYes ONO QN/A G.All control valves operated through full range and returned to normal position? O Yes O No Oi N/A H.Low temperature alarms passed test? OYes ONO QN/A 1.Dry-pipe valve partial flow trip test: 1.Record initial air pressure psi and water pressure psi 2.Record tripping air pressure psi and tripping time (sec.). 3.Above results comparable to previous tests? O Yes O No ON/A J.Automatic air maintenance devices passed test? OYes ONO (E)N/A K.Backflow devices passed backflow test? OYes ONO (j)N/A L.Backflow devices passed full flow test?OProvisions are not provided.0 Yes O No QN/A M.Pressure reducing valves passed partial flow test? OProvisions are not provided.0 Yes O No (E)N/A 4.Test to be done every third year: Dry-pipe full flow trip test: 1.Record initial air pressure psi and water pressure psi 2.Record tripping air pressure psi and tripping time (sec.). 3.Record water delivery time (sec.). (min.). Water delivery time not required to be 60 sec.per NFPA 25 4.Above results comparable to previous tests? O Yes ONO Oi N/A 5.Test to be done every fifth year: A.Sprinklers rated above High temperature tested?ONIC OYes ONo QNIA B.Gauges checked by calibrated gauge or replaced? OYes (E)No C.Pressure reducing valves passed full flow test? ONIC OYes ONO ON/A C.Maintenance 1.Regular Maintenance Items A.If sprinklers have been replaced,were they proper O Yes ONO replacements? Ocannot be determined. B.Air leaks in dry-pipe system resulting in air pressure loss more than 10 psi/week repaired? O Yes ONO ON/A C.Dry-pipe systems maintained in dry condition? OYes (E)No D.Have low point drains been emptied? OYes ONO QN/A E.If any of the following were discovered,was an Part IV-Observations:Not a part of the NFPA#25 inspection,the obstruction investigation conducted? ONIC OYes ONO Q)N/A F.Alarm panel clear? Q Yes ONO ON/q following items may need to be reviewed by a fire protection engineer. G,System left in service? (D Yes ONO ON/A valve seals 0258668-0426314 Explain reason(s)and obstruction investigation findings in Part/if. 1.Defective intake screen on pump with suction from open sources. 2.Obstructive material discharged during water flow tests. 3.Foreign materials found in dry-pipe valves,check vavles or pumps. 4.Foreign material in water during drain test or plugging of inspector's test connection. 5.Plugging of pipe or sprinklers found during activation or alteration. 6.Failure to flush yard piping or surrounding public mains following new installation/repairs. 7.Record of broken mains in the vacinity, 8.Abnormally frequent false-tripping of dry-pipe valves. 9.System is returned to service after an extended period out of service(more than one year). 10.There is reason to believe the system contains sodium silicate or its derivatives or highly corrosive fluxes in copper pipe systems. J.If conditions were found that required flushing,was flushing of system conducted? ONIC es ONo • /A Part Y-Inspector's Information ` Date: Jun 9,2011 Signature of Inspector: Print Name: Isaiah Weln erg License or Certification Number(if applicable):79261400012006 1 state that the information on this form is correct at the time and Color of tag placed on system: place of my inspection and that all equipment tested at this time was left in operational condition upon completion of my inspection ®Red except as noted in Part III above. ❑Green I I I I 6 i 5TEWART 5TREET (50' RlW) I I c:' STORAGE ROOM I 3,_12, -----------------------`---L-1--------------- I 8' CLG HT ----------------------- ------------- I d- ---,---------------,- 1 1 � a f ��� PER NFPA 25,2( \ I F= _ — i '�� i �O FOR PROPERLY (NTS) 0"WPP �\ ASPHALT I — 10-0 -10 f . '-' I SYSTEM SHA 0„W � DRIVE I � t\ 2,+ �, ►� o S88 43 0 cpvc 217.35' 4"WPP ` I N88°43'00"E 217.34' I 3 I N -----------------------------�----------1- ------------- 0 ------- ' 0-9 --- ---------------------�r------I I � � - �T�CTI�K ® FIRE SPRiNaER PIF 3 3 RN IN NEW 3 AF'PLICATTaS nuE � nl sow VIRES, njA PEM 170 0 -6 �_ 7'to SPCAN x DAMAGED By a SMAT X I I 3'x 1' MECH �_ -10 p ^ \\ Lr) TEE AT TOP �t I U-) 3x13 -MICR - CZJIn ° I I TEE AT TOP I I 1 I \ + Lr-) ALL Emwon Dau1- ON pulumnm a a MENS 8' CLG HT IMPORTANT OWNI WAIM awo Fm mwnz ml I a a i ii I \\ 1 ,KL.�„�IF*W 0.3 I EX. Co*.COPARKING 1-101 Imr�WmM� 9-10 WATER ILI EXISTING o I , I I I 2 1— STATIC PRESSURE SPRINKLER RISER New fir ' I ROOM � I .� I � RESIDUAL PRESSURE d a ° Ext ingul herd I ► FLOW IN GPM Iti _- , i i � -< - - .� __ �- -� PITUT READING ' I I I - TEST PROVIDED BY I - CONIC. ; i I 1 1 _ HYDRANT LOCATION EXISTING FI „ I - HIR NUMBER i OPf-ICE EXISTING OFFICE �.J ? I I I I I I ' ^ - ,• o ( i i I to SYSTEM / AffREA t 1 U .p I I o 0 o HAZARD CLASS O O � E o , O 'x EXISTING WOMEN5 O c ' NI ff SPRINKLERS New fire � �I r ' II J i i I IN DESIGN AREA v, r e RESTROOM ! II I I I I MINIMUM DENSITY O ' - Extl n g u I s h e r I� I DESIGN AREA S.F. w ELECTRICAL PANEL I� EXISTING I,I ; � i ,l .� ,` PSI REIi'D a BOR a, X 55 LF Egress I''� ' ` GPM REND t3 BOR x Path j PSI REWD Q TEST GPM REWD @ TEST Ir a> u--1 EX 15T I N G U� ARE H O U 5 E ( � ; I �8T�SPReINICLl7t c I Cz Ex I stn g Door \; ; I o o O INSIDE/OUTSIDE x with ' ; I o .� o .--I O DOMESTIC DEMAND � � Enver enc EX15TING WAREHOUSE z g ySPI F- Exit Light \ \ ', ; I ORB 6087, SYMBOL MAXIMUM X \\ i PG 2052 l l l O T.'IRD I 6' C HAI \\ LINK x FENCE \ i o o O QUANTITY- �' I I SYMB. IST 2ND 3RD ` I / TOP OF \ ,\ x BANK OF DITCH I I I °I I o 0 2.9 1 .2' i Q i 0.2 to Ho to lc:> LL ---"------ X x_ -X------ ------- ------- -------�_---- —x- - - -------- ---- S88043'00'W 217.34' ( I I 4 - - " ; 6' CHAIN _ LINK , l SCALE 1/4'=1'-0' ORB 7357, PG 1504 FENCE 4 DATE FIRE SPRINKLER PLAN XX/XX/XX -- XPIPE SIZES SHALL MATCH EXISTING ALL MATERIAL APPLICABLE TO THIS PROJECT WLL TDP BEAM CLAMP �' FOR �' TO 4' PIPE CITY OF ATLANTIC BEACH REVIFWF BE N�DICATED WITH A (. ) ' FOR 5' TO 8' PIPE BUILDING OFFICE Jac ksonviiieFirePreventionDiv. NO. DATE • DESIOI AND NSTALLATION TO E N ACCORDANCE WITH 20012 EOTOd OF NFPA M DEC 0 2 2010 1 XX/XX/XX - • ERIN AND NBTALLATQI TO E N ACCORDANCE WITH ALL APPLICABLE LOCAL AND STATE CODES DEC 01. 20�0 ALL PLASTIC PPE �4 TIHROLlFIH ' SHALL E LL LJST® E FM APPROVED CPUC 0 F USN, ALL PLASTIC PPE 3'4 THROUGH B SHALL IE LL LISTED OR FM APPROVED CPVC MMEFACTU ED N E � MANFAC71RE0 N ACCORDANCE MIITRI ASTM F448. ACCORDANCE rR1TtH ASTM F44e sY.� �I EXCEPTI • F USED. ALL PLASTIC RTTINSS Stall E LL LISTED OR FM APPROVED CPVC MANFACTUR® N SHEET�ONSASNOT}EC ALL PLASTIC FRTIEB BHWl E LL LIST® OR RN APPROVED CPUC MANFACTIiEo N ACCORDANCE WITH ASTM F431L ASTM F430 OR Asm F167CC ACCORDANCE WITH ASTM F431L ASTM F430 E ASTM FI670. • ALL T To L' TH EADED SLACK STEEL PPE SHALL E' UL LISTED OR FM APPROVED AND MANFACTURBED N D i,� --�--o ACCORDANCE WITH ASTM A-1E OR A-79L ACCEPTABLE PPE BRANDS ARE WIEATLAND 'I�ATHREAW �i '#/ ALL CPVC PPE ANO FITTI SIS SHALL BE ASSEMBLED USING G TIE STEP 600 CEMENT. ALL® MYNATHEW BILL MOON TUE 'EDDYTH EAD”. AND YOU GSTOWN 'ED--TREAD: 0ETAL VEW #,�� • F LOU ALL GALVAN® STI$ PPE WILL BE 8CI®ILE 40 OR SCHEDULE o HOT DIPPED GALVAN® 'Jac ksonvilleFir Pr U ' CPVC PPE SHALL BE AUMM TO BE USED N ORDINARY HAZARID ROOMS OF 400 SQUARE MANFACTUFIED N ACCORDANCE WITH ASTM A70 a3 ASTM A-3. ALL THREAD RDD FEET OR LEGS OF OTIEIWE LINT HAZARD GTCCLPANCES O"A D SECTION 63AM • ALL 09 TO 4 BROOVEO BLACK STEEL PPE SHALL N' LL LISTED OR FM APPROVED AND MANSFACTtI� h' FOR -' TO 4' IPE COPY entlon�i N ACCORDANCE WITH ASTM A-79a ACCEPTABLE EMDB ARE BULL MOON TSOIYFLOw'. YOLNBBTOWN �' FOR 5' TO 8' PIPE r ALL T TO E• TIHREA= BL= ST®. PPE SHALL E LL L.ISTED/F61 APPROVED ANO 79*-FLCr. WIEATLAND 'ISA-FLOW' AND ALL® MYNA-FLDW. • ALL STEEL. WE S' AND LARGER SHALL E UL LIST®I OR FM APPROVED SCHEDULE 10 AND MANFACTIOIO ��X�Iw �,,�,� MANFACTUE� N ACCORDANCE LIED ASTM A136 OR 0 AB 6ACCEPTABLEILLOOPPE SANDS N ACCORDANCE WITH ASM A-1E W ASTM A-7115. Qty #Q� s ARE WHEATLAND TrEBATHEAD'. ALL® 'DYNATREAD' A87. BLL MOOSE TUN • ALL STEEL PPE SHALL HAVE A CORROSION RESISTANCE RATIO (M OF NOT LESS THAN LO: ' SIYMEr EDDY IHFEAEr YOUNBSTOMN IM-TFIEAD' AND WELDED TUBE-�CELEY STEADY-TREAD: • ALL BLACK TREAD® FTTTM SHALL E ML11LE R)N CLASS ISO OR 300 AM 816.3. CAST IRON MASS HANGER RING 126 OR 860 AM 01104 OR MALLEABLE E LION CLAW 160 OR 300 AM SIM (SIZED TO PIPE) ALL THREADED SALVM® PPE WILL E SOLE 40 HDT OPPED MVANN® • ALL WELDED OUTLETS BHWl E LL LISTED OR FM A14MM AND MANUFACTURED N ACCORDANCE WITH MANUFACTURW N ACCORDANCE WITH ASTM A71a OI ASTM Asa AMS Haan . AUt01'Yl • ALL GROOVED Rrrnm SHALL E LIL LISTED OR FM AIPPROVEO AND MAN FACTLI ED N ACCORDANCE WITH ALL T To 2" THEAm BLACI( STS PPE SHALL E scHsxxE 40 m- fi AFS ASTM A-686 FOR OJCTLE M OR ASTM A-"47 FOR MALLEABLE EABE IO4 AND MANUFACTURERED N ACCORDANCE WITH ASTM AM ACCEPTABLE WE • ALL BNOOV® BLACK STEEL PPE SHALL E ROLL Sf1 am PER MANUFAcruiim REQU/IeAmTs ASWaPACUSAM MAIN OFF ARE WHEATLANIL ALL® GND AS-7;BULL 1►OD��UJBE YOLNBSTOWK • ALL 1HANBeH6 AND ANY REHi1sED BRACING Su11.L E DESIGNED AND INSTALLED IN ACCORDANCE MIRni NSA LDC�UT (INCLUDED - 22'2 CAPRI N!>FTTtIMIwT ARCO W8® 13. MANFACTURIBI S Pors TIONB AND THOS LBTNL W/ LAMP) • ALL PENETRATIONS THIOLM RATED BLUM ASSE IlLIEB SWI E SEALED WITH RITE CAIN IN HAS iOi PHONE (407 ACCORDANCE WITH DETAILS PROVO®. WAFS POLICY IS TO USE ROTI Ps ONE OR IM La ALL tr4 TO 4• AOOV® BACK STEEL PPE SHALL E LL US7'ED/FAII APPROVED AND �7 FDA �41 TO � PPE ®� .�M it MANLFACTI�E11 N ACCORDANCE WITH ASTM AM ACCEPTABLE WANDS ARE BULL MOOSE • MANS AND LEAD-NB Sall E RSH®AND 58140 TOT CERFCATES ROVED BEFORE A JAGCSONVILLE FL CONNECTION IS MADE TO THE SYSTEM. �DGUM i ON AVE WEE JALICSWVL.LE FL 3i�-27. . WHEA TnESA�R.01Lr, 'DYNA-GLOMI' AND • ALL PIPING Sall E NBPECTIO AND APPROVED BY I�ROPei AUTIDRITES PF= TO COVWIrB WITH DRYWALL. SCALE: NONE PKM(sa)B98-3030 �� ��. COPIes OF sBN® TEST CEI>rrET.A1TEB ARE To E FORWAIO® To THE RIOPER RecPlalrrs A"i°°"tb�'' �'°� 00198N FAX(904)288-0724 • ALL SYSTEMS Sall E TESTED FOR 2 HOLM AT BIO PSI OR ED PBI SEATER THAN MAXW.IiA SYSTEM FT. MY6HS. FL ALL IN TO V OCIOVED B.Aa( ST®. PPE Sall E SCt®u.E 10.LL LJSTED/PM APPROVED WORICIIS PRESSURE WHOEVER B SREATeL AAD MANFACTUFE N ACCORDANCE WITH ASTM AM ACCEPTABLE MANFACTURERS • ALL SOFRTS REMARED TO CONCEAL SRNIGM PPlIB ARE BY OTHERS. %` TYPICAL CEILING 4m 1�� AVE 4 ARE BULL MOOSE. YOU NGSTOWN. WMATLAW ALL® AND WELDED 1!�-EACB.EY. • ALL WIRING OF DEVICE ORLON SWRIri� TAWS R SWITCHES, COINE MM ETCt B BY GTIERHL DIFFUSER • CONNECTION OF SPNO.BI DEMES TO THE BUILDNS ,UJM OR MONTIORNS SYSTEM B BY OTHERI ALL GROOVED STEEL PPE d• AND LARGER SHALL E LL LI ITTO/FM APPROVED SCHEDULE 10 • ALL PANTING OF PPE AS REMIED 0 BY WHOM l'-0' FAX 0W 433-3M AND MANUFACTURED N ACCORDANCE WITH ASTM AIM • ALL NBLLATDN FIGUI ED FOR FREEZE PROTECTION a= 64WOM H SYSTEM IS BY OTHERS. TYP, Rl'-0' • HEATING OF ROOIIIB TO MAINTAIN TEPeIA11RE8 OF 410 DEGREES OR GREATER IS BY OTHMIL TYP, ALL �® STEEL PPE 1�'4 AND LARGER SHALL E SCRHED)<LE O IDT DPP® GALVANIZED • PIE DEPARTiA@Tr CDN�TO46 STALL E LOCATED RIOT LESS THAN 18' ANO NOT 110E THAN 4@' ABOVE - Wig;=°: _ - A �( : . B THE LEVE. OF THE AD HACBNIr GRADE - „` AND MANLF N ACTLEED ACCORDANCE WITH ASTM A7B6. • MIO( RESPONIBE SPNMERB SHALL E U8®N ALL LIGHT HAZARD AREAS. _. 'INTERMEDIATE' • SPARE OF EACH TYPE MCLLDNS DRY) SHALL E PROVIDED ON TIME --I C TYP. tir :;:_ 482 PFOB AS F- SPRINKLER SPRINKLER A ALL STEEL PPE SHALL HAVE A tDRHRHDSION RESIST HE D MICE RANO (RING OF NOT LOS THAN LO tiF'y`- o LESS THAN 300 - B �.eIS - '••.*`'{•yry rt: :1_= TEMPERATURE ATLANTA( ITER NAPS STANDARDS 0 300 TO 1000 - I2 SPNa M . e o OVER 100D 24 SRI IO.ERB `~ +? CLASSIFICATION �® . ALL BACK TIfEAO® FITTIES SHALL E OJL"TLE ION G1AE 160 DR 300 ANN 8153. CAST r RH3EI TO BPACRNIS NOTES ON PLANIS FOR MAXIMUM CALCULATED SPACING ALLOWANCES. STEEL PIPE _ IDN CLASS 12Ei OR 260 AM Bao OR IIAALLEAB.F IRON Cl AN BD OR 300 ANSI 8153 • SPRNIMER6 Sall E INSTALLED N ALL AREAS EKOFT AS FOLLOWS: SPRINKLER H 'ORDINARY' o ANY PORCHES. BALCONIES OR OV MANS THAT ARE AND ARE NOT USED FOR STORAGE. HEAD HANGER RING TEMPERATURE � � THE GALLATI ALL WELDED OWLETS SHALL E LL US71O OR F111 APPROVED AND MANFACTUBED N o CO I=RS THAT ARE N COWL LICTIO N AND AT LEAST 60% O1e�L CLASSIFICATION � 1515 #B PENS ACCORDANCE wrrH ANSI BIH�n o AT THE TDP OF ALL e.EVATOH SHAM wIHERE THe CAR 94CLOBLIE MEETS THE REouIlBll�NTs OF ASMI 2'-0' JACKSONVIL Afl1 TABLE 3 - MAXIMUM SUPPORT SPACING 8001IED F1TTI�DB SHALL E LL LISTED OR FM APPROVED AND MANFACTU RED N o AT THE BOTTOM OF ENCLOSED NON COMBUSTIBLE ELEVATOR SHAFTS THAT DO NOT COWAN COMBUSTIBLE TYP. ACCORDANCE WITH ASTM A636 FOR OLCTILE � OR ASTM A47 FOR MALLEABLE E � HYORALLC FLUID. SIZE A B* C R2'-0' NOM. PIPE; =• � ,. ' • • • WAFS TO PROVIDE ALL R� SIGNAGE PER NFA 13 MIMING BUT NOT LUTED TO VALVES. HYDRAULIC TYP. 2'-p� SHEET TITLEI FIRE ALL GROOVED BAQ( STEEL PPE SHALL E ROLL GROOVED PER MANLFACT� PLACARDS AND I4ePECTDN TAGS AS REI=ED BY PC 01 i• 3'-0' MAC. 121-0' MAX. 3' MIN TYP. DRAVN BYI JOSHI IY4' 4'-0' MAX 12'-V MAX. 3' MIN. TOTAL ANSI 4 NOTE] SPRINKLERS MUST BE LOCATED IW TO 13'•` 5'-0' MAX 15'-0' MAX. 3' MIN. OUTSIDE OF SHADED AREA DATE, NOVEI PPE AND ATTI�aS �� NOTES NFPA p �' �� EMAXIMUM SUPPORT SPACING FOR STEEL PIPE TYPLCAL � �1'ED FST � ' CITY C SCALE= NONE SCALE NONE STEEL PPE HANIGEI� SPACING OFFU.SER Sswillu t NIM" CONTRACT t JA Ar�x..e4s PF.�•� �b A.�� Sp*ddwv6 km IS THIS A CENTER ff TILE SCALE= NONE � SCALE. NONE 00593N 00328N A F�. sem. rx 00588N Fes. 00533N SHEET NI