Agenda Item 8CAGENDA ITEM # 8C JANUARY 24, 2011 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Award of Additive Alternate #2 for Bid 1011 -01— Slide Gate Replacements SUBMITTED BY: Donna Kaluzniak, Utility Directop� f DATE: January 14, 2011 BACKGROUND: On December 13, 2010, the City Commission awarded the contract for Bid No. 1011 -01 Wastewater Treatment Plant #1 Improvements to WPC Industrial Contractors, LLC. At that time, staff recommended deferring Additive Alternate #2 — Slide Gates pending a determination of whether repair of the gate seals would be adequate. The additive alternate involves 18 large slide gates that are used to isolate tanks or sections of tanks to change flow patterns or to allow for maintenance and repair of a tank and its equipment. Staff met on -site with the contractor, engineer and plant operators and determined that repairing the gate seals would still not allow for proper tank isolation due to deterioration and corrosion of the gates. In addition, some of the gates have broken operators and valve stems and staff was not able to obtain replacement parts from the manufacturer. Some of the gates will need replacement before the contractor can proceed with construction in certain tanks. BUDGET: The bid price for Additive Alternate #2 — Slide Gates was $245,000. Funds are available in the Sewer Fund under account number 410 - 5508 -535 -6300, as Bid No. 1011 -01 came in well under budget. RECOMMENDATION: Award Additive Alternate #2 for Bid No. 1011 -01— Slide Gates to WPC Industrial Contractors, LLC in the amount of $245,000. ATTACHMENTS: REVIEWED BY CITY