Loading...
Linkside Drive 1495 E3(( N lla-rva ed" f7.P., Q -7 a G 0- if" :2. MA,�RTF-0-BQZZ:20 Ir St- 411 210 M 0,46 cut. s F.,P. As eN C 7- LA —4 2�-2 41 rj 0 019 1 J 7. -ci �Le r 71 W-wa. lu L �j C) \�illl -411 . '. .- - , AA iwsig-rv6 ­%�4 41(Z L P .7, 4� L r 4, 7 b 5-0 12 0 cl-f-- -f 74- of k T- I 0 0 T 'Por- -7 13 9L T7 tZ C10Jwt-j-- Sr �cl r 5L -- 7-7 F--Ir 43 f 1- 4-11 111,11, 41 7f Tu 5 9 -12=��0. 0 v 5 0 CITY O�. ATLA10C BEACH —fir tri ict F UU114DING OFFICE AUG Mow, j P E5 V.,q Building and Zoni LOT tl(p IJQrr ;2 e-;,SLVA UQY-Sl�>S DRAWN REVISION DATE 7 Now w1up. vim. I -joq) ntexHomes DATE: REVISION DATE NORTH FLORIDA DIVISION REVISION DATE I CO 4-1 S F.LnnNG AREA CKED BY: - J T T rF-�-"B /54q1S,F.GARAGE 0 S.F.COVERED PATIO SHEET OF REVISION DATE COPYRIGHT'SeFr- a 19q0 S.F.COVERED ENTRY L T/ It 11711 Lu I qr':�r c -t4 -MQ -T I t7- rz. .A.- is I P -.1 li4 I t EEU . .............. -IF=— T —i L -V I D �"cZ 20. t-4 'A T y L4=5-rsL-o iJQ17 2- SELVA, NO. DRAWN BY: REVISION DATE ntexHomes c DATE. REVISION. DATE NORTH FLORIDA DIVISION S.F.LIVING AREA CKED BY: i/s REVISION DATE S.F.GARAGE -5w& SON rw eo 10 S.F.COVERED PATIO SHEET OF REVISION DATE COPYRIGKr 019- S.F.COVERED ENTRY I-01 ot, ................. 1 1. r Ito LF 4- Li \5\ %J I Ae, \J\ F0 9, I-oil L II Jq 44 IF- L FOUNDATION PLAN ' 1/43 L-crr ali UQ I-r Z SELII&- PLAN NO. DRAWN BY: REVISION DATE Ontex Homes wr C) e$ DATE: REVISION DATE NORTH FLORIDA DIVISION S.F.LMNQ ARr-A GKED BY: REVISION DATE S.F.GARAGE S.F.COVERED PATIO SHEET OF ' REVISION DATE COPYRIGHT 019— S.F.COVERED ENTRY Centex Homes flberglass 8"n4 on felt WIMCQUE CON5TRUQIIQN REQUIREMENIS over 1 & hoothing roof on i ongl t pn moles 0 W o.c. Studs: Rafter Ties 0 4'-(f o.c. and at each side of all openings, Ivories varfes r-30 Insulation top and bottom plates: —cardboard Insulation baffies T" r- I It ceiling board Top Plate: Hughes (RT241 8) Bottom Plate: Hughes (RT1818) (ries good for 865 lbs.) 1. hughes hd 2x aluminum so" drip 1. hughn 4d 2x Trusses: Minimum strap at each truss-Hughes Hold Down Strap hold down strope I x2 p.t. hold down Amps (True Tie). Trusses and lacks with less than a 10' 2. double 20 top plate 2. double 2x4 top plate Ujhan r"8,� span to have (1) hurricane hc clip. 3. radar tin (h 2xG P.t. fascia —3. rafter ties (hughes 011318) 0 4"-U* o.c. nd 0 OaC soffit 0 V-Cr o.c. and 0 each [leaders: To conform with SBCCI section 1707.3 wl applicable charts. side of an opening side of an opening vent Wall studs to meet section 1707.3.2 for header support 2x4 and cripples. vw*lo or horizontal 22 goge ties lar 0.0.v. sidin? approved for A X frieze 22 goge ties V o.c.h. mure Ired ivind shear mil. support for each tie Gable Ends: See details provided on the plans for special 0 ibe l/f min.) Yom barrier not to exceed 3 sq. ft. (4 framing requirements. or better) of. *all alga 1/2r drywall (Note: 1 st truss must be dropped so that outlooker siding over can be framed from 2nd truss back. appr6v*d sheathing for brick or stucco r-11 Insulation rs' [red wind shear Sheathing: Sheathing to be comparable to 7/16r o.s.b. with Munimurn 200 lbs l/f min.) drywall g)14 rebor vertical '6r nailing on edges and 112� interior to obtain Wy�,Y minimum bond top and ir bottorni­ 1. lltxlCr anchor bolts 0 30r o.c. r-11 Insulation a minimum. of 210 lbs. per I/f of shear. 2. 2x4 p.t. We plate set rebar vertical concrete stab wl In contInuous bead of sealant o.c.2v/ minimum Girder Trusses: Trusses with an uplift of between 1000- 1800 lbs. ,BxS 10/10 w.w.m. over bond of I top and Irbodom shall have continuous connectors from top plate to f concrete slab wl ex? 10 10 w.w.1n. over 4 bottom plate. np I=o Vh a used Top Plate rt24 ( Hughes Manufacturing) 'tic to W-W-. Wup-raro'EAR perimeter.) Bottom Plate- wal 50 Hughes Manufacturing) shod floor finished floor waterproof membrane E ar concrete LPI S' =LLj=j I Er concrete block W\ all Coll filled w\ all calls filled NOTE: '�J. C' m fill Ic . i - compacted fill ALL EXTERIOR WALLS ARE com finished FF�Lfinlahod grade \1 V- 7r W- USED AS S Fi W. WALLS tuaLIS'I- i�L 1 N T­ 1(rx ir concrete footer Note; 1. (1)#4 robar at oil con""' 2(fx 1Cr cone. footer INCLUDING ALL HEADERS AND W/(2) J4 reborn Z top of block to top of footin w/(3) J4 reborn OPENINGS WHERE PROPER *hall not exceed f-ar 3. if sternwall to low than 31 FASTENERS ARE PROVIDED. 41 o ,.Penlng 5' opening then footing must be 1(f x 2T. or 0 or mory NOTE: Stemwall Footer with Standard Wall Section ANCHOR BOLTS MUST BE USED WITHIN 0' OF ANY BREAKS Scale: I/r- V-1f (WINDOWS,DOORS) IN ALL I SHEAR WALLS. Header Clipping Placement —r&x111r washer p.t. bottom plate i/2rx1(r anchor bolts 0 30r o.c. block! d11518 or ual top plate exe 10/10 w.wj. or fibermosh 2x4 blocking 0 sheathing joint hurricane clip H-25 or better t-45-j-exe 20 barge rafter cont. 7/1(r' structural roof shoothlnsll--� 2x4 a 2ro.c. 7.7. flln E act .-"n.grado ? " compacted fl '9 r top chord of end a 0 Q;' F bfies dro IT? garago door hea x1ped . and cont. 2 scab from top 12" story) 2x4 X 0 m ch x-brac g 7/lor o.s.b. wIT "a 9 adddNono 2x4's nailing on ad :PA1 Plar 16 (2) J4 rebor around orlmoter, m vertical If higlior than both aides wy42x6 studs around perimeter bond outside robar 21T at comer 2x4 scab cont. top to bottom ho t a to form an shape) (two story Note. for a two story use chord 0 W-If from gable Note:For garage retums low Not#: 1fr minimum width -lCr, use 19/32r (3) # 4 robare on garage return, than V o.s.b. wl 10d. none. Monolithic Footer Scale: I/r- 1,-Gr 4, U _---bottom chord of gable end truss apa2a w/(20)16d 20 scab If vert. web Is not present 2x4 top plate —\,s �� p.t. bottom plate x d anchor cont. 2x4x8 112 J 20 "a 0 1 Or o.c. garage fipor I�/— hurticane dip :fwcshsr laiteral brace 0 47 o.c. 2x4 blocklno 0 4T o.c. between 1 a' anchor bolt as mquired L p.t.20 (2)ho clips 0 Or o.c gable and W truss footor 4, E Garage Door Return fig Platform Framing Gable End, scale: T/r. I.—Cr vapor banior (2) #4 reborn male: 1/r.0 1'-(r Interior Bearing Wall, FILE: HURCDETI.DWO PLDT-. 1/4�-V-Cr REV. 4/20/95