Loading...
Plaza 371 (2) I � REVISIONS Qm7-26-04 RESIDE IH GA7F JNVA7i NC 371 PLAZA ATLANTIC BEACH ,, FLORIDA r-- -- -�-- _— _- - _ - --� � - - - r _ ..EX16TING 3'-0" HIGHFENCE TO REMAIN _ � - - - - - _—�-_ - - REVI LAOIS S� ROOM FINISH SCHEDULE ROOM FINISH SCHEDULE I.� G�fi��C,41 � �� Q 01-28-04 ROOM BASE FLOOR WALLS CEILING NOTES: ROOM BASE FLOOR WALLS CEILING NOTES: $ SWITCH TV CABLE TV OUTLET MATERIAL FINISH MATERIAL FINISH MATERIAL FIN151-1 CEILING HEIGHT MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH CEILING HEIGHT WORK SHOP NONE GONG STAIN CMU/GW5 PAINT GW5 PAINT 8'-9" - STAIR WOOD PLYWOOD - GWB FAINT GWB PAINT g.m THREE-WAY SWITCH Z TWO CAR GARAGE NONE CONC STAIN CMU/GWB PAINT GUe PAINT 8'-9" I A/C WOOD PLYWOOD GWS FAINT GWS PAINT g'-0" - $4 FOUR WAY SIUITCI4 \ 54" CEILING FAN ENTRY WOOD CONG STAIN GWB PAINT GWB PAINT al.CY - STORAGE WOOD PLYWOOD - GWB PAINT GWB PAINT 9'-0" - I w/LIGHT STAIR WOOD WOOD - GWB PAINT GWB PAINT VARIES - MASTER BEDROOM WOOD PLYWOOD - GWB PAINT GWB PAINT g'-m" - R RHEOSTAT SWITCH ELEVATOR - _ - - DECK NONE PLYWOOD EPDXY VINYL SHINGLE'S NONE NONE MASTER BATH TILE PLYWOOD TILE WRGWB FAINT WRGWB PAINT llmV DUPLEX OUTLET t J OFFICE WOOD CONIC STAIN GWB PAINT GWB PAINT 8'-g" - - -- COVERED PATIO NONE PAVERS - STUCCO - VINYL - - ~ WALK-IN CLOSET WOOD PLYWOOD - GW5PAINT GWS PAINT 9'-0" - Q 4 IIOV ❑UPLEX OUTLET w/ MOUNTING HEIGHT / \ oBEDROOM Na, I WOOD CONC STAIN GWB PAINT GWB PAINT LL BEDROOM No.2 WOOD CONIC STAIN GWB PAINT GWB PAINT 8'-g" - F IIOV DUPLEX OUTLET a FLOOR \ w/of LIGHT FAN BATH No. I TILE CONIC TILE WRGWB PAINT WRGWB PAINT 8'-9" - NOTES. POWDER ROOM TILE CONC TILE WRGW6 PAINT WRGWB PAINT 8'-9" - 1. CEILING To BE 2 LAYERS ®" FIRE-CODE GWB.SIDE WALLS TO BE QDwPATERPROOF 110V DUPLEX OUTLET COVERED PORCH NONE PLYWOOD EPDXY VINYL SHINGLES NONE VINYL - I0'-0" - SIDE WALLS TO BE N6" FIRE-COD GWB OVER V2" SHEAR WALL SHEATHING IIOV DUPLEX OUTLET KALI= SWITCHED / OFFICE No, 2 WOOD TILE - GWB PAINT GW5 PAINT Im'-0" - ON 2x6 STUDS 16" O.G. -- FOYER WOOD TILE - GWB PAINT GWB PAINT 10'-0" - 2. ELEVATOR GAB FINISHES TO BE SELECTED BY OWNER Cil 110V GFI DUPLEX OUTLET STAIR WOOD WOOD - GWB PAINT GWB PAINT VARIES - 3. CLOSETS AND W.I.C. TO BE FINISHED TO MATCH THE ROOM THEY SERVE. 220V OUTLETFAMILY ROOM WOOD TILE - GWB PAINT GWB PAINT [DECK NONE PLYWOOD EPDXY VINYL SHINGLES NOME VINYL - - - WALL MOUNTED FIXTURE SCREENED PORCH NONE PLYWOOD EPDXY VINYL SHINGLES NOME VINYL - - DINING WOOD TILE - GWB PAINT GWB PAINT 10'-0" - CEILING MOUNTED FIXTURE KITCHEN WOOD TILE - GWB PAINT GWB PAINT PANTRY WOOD TILE - GW5 PAINT GWS PAINT Im'-m" - O JUNCTION BOX 0 BATH No.2 WOOD TILE NONE WRGWB PAINT WRGWB PAINT 10'-m" - �' ELECTRICAL DISCONNECT GUEST WOOD TILE - GWB PAINT GWB PAINT Im'-m" - �..ELECTRICAL PANEL (� Q PHONE OUTLET U W � A Q 65'-4" 0 22'-8" 5,1 13'-4" 3'-4" 7'-4" 3'-4" 9'-m" 2'-0" 5'-4" 3'-4" N PROPERTY LINE �•I•� U � a w WA MO JNTED GAS _ 2 IMFIA'T WATER HEATER 3 STUCGO ON 12" SQ. Ice ING FIRST 4 SECOND FLOOR < CMU POST, TTP, U I 5' SIDE YARD SETBACK LINE 5I 5 JJ C SET BACK LINE a No u Pff j2ROO`"i No. 1 2'-5 1/2" ,2'-� 1/2" Ob'-6 1k, METER 1EOROO"( No. 2 CIA Qa z'-m" Ib'-r' HONE \ I I Q I TWO GAR GARAGE � A_g WP SHOWERI C4 v, I I la —� QT v E I I GARAGE DOOR HONB 13 QTvL� OPERATOR Ow ES IRK 44" ` w,..,.. 1'4 1/21, 5 " 4'-2° a' m 1/2" Z4' 51 COVERED PATIO I ( � �� J r N TRI' o Q rn 9. UJ `� `� OFFICE — - - - - - - 0 a Z � Orr :a ' _ a A-� o ELEV. Nt *4 � tF EQUIP. 2 lb OTT `_ co _ ua / LINE OF DECK ABOVE O N — STAIR FIREPLACE ABOVE EDGE OF DRIVEWAY A-8 __. 10' 51DE YARD SETBACK LINE SET BACK LINE L m -RI VEl1J,4Y DATE OF tt cq ISSLTF. 5'-8" 22'-m" 13'-6 1/2" 4'-5 I/2" 12'-8" 12'-0" . 06-29-m4 DRAWN BY: FIR5`7 FLOOR FLAN HSP - SCALE4SHEET NO. I NORTH A/C AREA = 910 SF. 04018 EDGE OF DRIVEWAY NON-A/G COVERED AREA = 1,054 �.F. _ _ _-_ All PROPERTY LINE — — — — — — — - — _ w PROPERTY LINE REVISIONS Q01-28-04 DOOR SCHEDULE DOOR SCHEDULE DOOR FRAME DOOR FRAME MARK ROOM FROM: ROOM TO: SIZE MATERIAL TYPE MATERIAL RATING NOTES MARK ROOM FROM: ROOM TO: 51ZE MATERIAL TYPE MATERIAL RATNG NOTES 1 EXTERIOR ENTRY 3'-01x6'-81x1 3/4" WOOD SC WOOD - - 18 ELEVATOR FAMILY ROOM 2'-81x6'-8"xly" WOOD $C UJOOD - - 2 ENTRY OFFICE 2'-8"x6'-811xi %41 WOOD HC WOOD - - IS FAMILY ROOM DECK PR 3'-01x6'-8"X1 3/4" WOOD HC WOOD - - --------------- 3 �3 ENTRY BEDROOM No. 1 2'-81X6'-81x1 4" WOOD - WOOD - - 20 DINING SCREENED PORCH PR 3'-0"x6'-8"xl 3/4' WOOD - WOOD - - 4 ENTRY ELEVATOR 2'-8"xb'-a°xl 3a" WOOD - WOOD - - 21 SCREENED PORCH DECK 2'-8'xb'-a"xl �'a" WOOD SCREENED WOOD - 5 ENTRY POUVER ROOM 2'-61x6'-811x1 fib" WOOD POCKET WOOD - - 22 DINING PANTRY 2'-Wx6'-8"xl 3811 WOOD POCKET WOOD - - 6 ENTRY ELEVATOR EQUIP 2'-8"x6'-8"xl 3/a" WOOD - - - - 23 FOYER BATH No.2 2'-8'x6'-8"xl %II WOOD - - - 1 GARAGE ENTRY 2'-8'x6'-8"xl 3/a" WOOD - - 20 MIN. - 24 GUEST BATH No.2 2'-6"xb'-8"x1 %11 WOOD POCKET 8 EXTERIOR GARAGE 16'-011x8'-0" - OVER1-iEAD WOOD - - 25 GUEST W.I.C. 2'-0"x6'-81x1 %. - POCKET - - - S OFFICE CLOSET 2'-b"xb'-81x1 34" WOOD - - - - 26 FOYER GUEST 2'-6"xb'-8"xI %" WOOD SC - - - 10 EXTERIOR OFFICE PR 2'-6"x6'-8"x1 3/4" - - - - - 21 FOYER OFFICE 2'-6"x6'-81x1 34" WOOD 5C - - - 11 EXTERIOR BEDROOM Not PR 2'-61x6'-81x1 3/4" - - - - - 28 OFFICE CL96ET 6'-V"x6'-8"xl '/8" - BIFOLD - - 12 BEDROOM Na 1 ENTRY 2'-8"xb'-8"xl 3/e" - - - - - LL 19 NOT USED I L I 13 BEDROOM No. 1 W.I.C. .I.C. 2'-6" 6.4.1XI 411 WOOD POCKET - - - 30 COVERED PORCH FOYER PR UJOOD - - - 14 BEDROOM Na 1 BATH Mo.l 2'-61x6'-8"xI -8" WOOD POCKET - - - 31 COVERED PORCH FOYER PR 3'-0"x6'-8"xl 3/4" WOOD - - - - 15 EXTERIOR GARAGE 3'-0"x6'-a"XI 3/4" WOOD 5C - - - 32 COVERED PORCH FOYER PR 3'-0"x6'-8"xl 3/4" WOOD - - - - ,1i 16 GARAGE wow SHOP PR 3'-0"xb'-8"x1 3/4' WOOD - - - - 33 NOT USED 11 BEDROOM No. 1 BATH No.] 2'-61x6'-81x1 3/4" WOOD POCKET - - - 34 HALL A/C 2'-6"xb'-8"x1 34" WOOD POCKET - - - " - - - - 35 HALL STORAGE BIFOLD 36 HALL MASTER BEDROOM 2'-61x6'-81x1 " WOOD SC - - - �pp 31 MASTER BEDROOM MASTER BATW 2'-611x6'-81x1 341, WOOD POCKET - - - 8` 38 MASTER BATH W.I.C. 21_66x6'-8"X1 fie" - POCKET - - - `- 39 MASTER BEDROOM DECK 2'-81x1'-0"x1 3/4" WOOD SC - - - I I u z 1 I I d �1 Q I � dw l3'-61 W N 8'-0" 11'-81/2" 5'-1" 11'-3" 13'-0" 12'-21/2" 12'-31/2 d U 2'-0" 10-10" L ll'-0" W 3 � 2 A-1 Q A-, 01 0 --------[ O �, ►--, e TVQ� I O 0 LTV Q ------ - ---- j n = WRAPPED 4x4 POST, TI'P. SCREEN 5Y5TEM, TY`P. d OFFICE No. 2 ,� T Ir 02s28 Q UST A1C CLOSET SCREENED PORCH a 4-2x4 POST 2 2 < } - m A-9 ' N 44 I MI 44111 HONE -- -�f _ ----� D NINCx KITCHEN SLOPE DOWN,SEE SECTION 1 42" H.RAIL ATHo. 2 , > . w Z ----- ----- ---- C 1 o o DW -- � 1 v o ;;' dY ------- ------- L----- ---------1------ N. 32' 32' 32' rq - v F01r TO WALL 5 OPE DOUN j LIGHT J DIE 9 SLOPE DOUN,SEE SECTION _ 42" HIGH RAIL Q m _ FAMILY ROOM 2 fL EL E n V p 4'-2112" o o 14 a t7 N M COVERED PORCH HEARTH o U 4'-8 1,2" 3 II 3'11811 �r v 42" H.RAIL 42" HIGH RAIL 1 M O u eJ'TAIL ¢ Fw 04-8 a 11' 4" 13'-b 131" 61-31/211 4'-4" 6'-8 1/2" 12'-01/2" DATE OF 13'-6 1/2" ISSUE .•~` QF• r. �;�'� I`r�i�i DRAWN BY: _. �G, ,• v* �j. HCsP &A/C; ECOND FLOOR PLAN - ALE ��4" 11-011 .: SHEET NO. NORTH AREA 1,129 S.P. `, r 9 •/�f = @4018 A-3 I REVISIONS Q01-28-04 WINDOW SCHEDULE WINDOW MARK ROOM FROM: SIZE MATERIAL TYPE NOTES A NOT USED B NOT USED - G Not USED r. - D FOYER 4'-0"x6' 6" VINYL D,H./TRAN. - E FOYER 1'-6"x5'-O" VINYL FIXED - F FOYER 1'-6"x5'-0" VINYL FIXED G 5TAIR 3'-6"x5'-4" VINYL FIXED - H DINING 3'-0"x6'-6" VINYL D.H./TRAN. - J DINING 3'-O"x6'-6" VINYL D.H./TRAN. - K DINING 24-6"x6'-6" VINYL DA./TRAN, - L GUE:5T 3'-0"x6'-6" VINYL D.H-/TRAN. Q M OFFIICE Y-0"x6'40" VINYL DA./TRAN. N OFFIICE 3'411x6'40" VINYL D.H./TRAN. P OFFIICE 3'-O"x6'40" VINYL D.N./TRAN, - Q NOT' USED - - - R MA6TER BEDROOM 3'4"6'40" VINYL D.H./TRAN, - 6 MA6TER BEDROOPI 3'-O"x5'-6" VINYL D.N./TRAN, - T MAaTER BEDROOM Y-ON3'-0" VINYL AWNING - U MASTER BEDROOM Y-ONY-0" VINYL AWNING - V MAOTER BEDROOM 3'-0"x3'-0" VINYL ALNING - W MASTER BEDROOM 3'-0"x3'-0" VINYL AILNING - X STAIR 3'-6"6'4" VINYL FIXED - Y W.I.G• 3'-0"x1'-0" VINYL AWNING - Z W.I.O. 3'-0"4'-0" VINYL AWNING - AA MA6TER BATH 3'-0"x3'-O" VINYL AWNING 55 MASTER BEDROOM 3'-0"x3'-O" VINYL AWNING - CG MA6TER BEDROOM 314"x3'-0" VINYL AWNING ~ DD MATER 5EDROOM Y-0"x3'-0" VINYL ALNING - EE OFFICE Y-4"x5'-0" VINYL D.H./TRAN. - W FF C FIIGE 3'-4"x5'-0" VINYL D.H./TRAN. Q ami CG BEDROOM No.2 3'-4'x4'-0" VINYL D.H. - HN 5EpROOM No,1 3'-4'x4'-O" VINYL D.H. - `� JJ BATH No.I 2'-0"x3'-4" VINYL D.H. Q 53'-11/2" ¢, w 22'-5 1/2" 13'-6 I/2" 8'-3 I/z" U way 2 3 ar w A-7 A-1 Pq t � \ _.... - - - - -- - - - - - - - - - - - - - - � - - - - - - - - - _ - _ _ - - - - z MASTER 5,41H \ WHIRL COL \ O / TUB \ \ I `\ 51-IOUJER17 I — . - - - - - - - - - �1 I 5TOR GE 42"45H WALLCA \ r '_ w•r c DECK •_ ANO / 1 Q A/C I I I _ 1 MASTER 5EDROO'1 Il4ALL ^2 42" HIGH WALL Tv I A-9 z (DQ 1l. Q I M � N � U / 3'-8 3 4'41 3 3'-8" ( p4 WALL LINE BELOW - Z ROOF LINE BELOW STAIR O w A-S 2 \A-8 8'-011 22'-6 1/2" 13-6 I/2" 8'-3 I/2" 8'-1" DATE OF ISSUE Oro-29-04 DRAWN BY: I i--f ( D FLOOR PLAN SHEET NO. SCALE 1/4 11 1'-0" 04018 A/C AREA = 1,0ro4 5.1r. g A-4 NORTH �,•. -�, C, c�. REVISIONS Q0-1-28-04 i i I ROOF BEARING LEVEL - - - - - - - - - - 17��- - - - - - - - - -- - - - - - -- VINYL SHINGLE SYST€M METAL ROOF IL-Li I THIRD FLOOR LEVEL _ _ _ _ _ T RD LO R L EVE -T - Q -- -- iFW 5 ENED ENCLC UE I T I I I I F I I oil Firs U SECOND FLOOR LEVEL STUCCO ON CMU WALL W ►.� Q FIRST FLOOR LEVEL -- - - - - - - - - - - - - - - . _ - - - - - - - -- - - - - - - – – - - — �. � - - - - - - - - - --.... — — — - — — �_ - - - - C` U E-•+ z 0 WF-5T ELEVATION -el SCAL.1E 1/4" I._ 0.4 0„ W I ROOF SEARING LEVEL -I' VINYL SHINGLE 5Y5TEM ___..4"E II - - -171111 111 IILIHI I NI FL OR LE L I YT-Y ii-L_:�7 I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 1 -1 17 1 1#- O 4-1111 111111111111 1 1 H1111. 11111 1111111111111 1111 1111111111111111111 - fsieec) ENGL Q 11 TRE IL SYSTEM a+ U cn W a H w SECOND FLOOR LEVEL cn _ ---- GANtIvEVERED 4 �• BEAMu •- STUCCO ON I(o'-0" x 8'-m"GARAGE DOOR / \ -_ CMU WALL -� STUCCO ON STUCCO ON FRAME CONSTRUCTION CMU WALL OPEN ' DKrE OF - \ ISSUE Ll 06-2'3-04 FIRST FLOOR LEVEL - _ - __ - - - - .._.. __ - - - - - ._ .. _ - - - - - - - - - - _ -- - - - - - - - - - _ - - - - - _ - - - - - -_ _ - - - - r`QF �� '�,� D Y. RAWN 13 D . ` WGP SHEH'P NO. ' 04018 5T ELEVATIONo A-5 SCALE i/4 = V-m" Is ® / REVISIONS Q07-28-04 ROOF SEARING LEVEL TTQ THIRD FLOOR LEVEL ooC� C� 00 / INSECT ENING / Iq ALUM IFSTEM V F'E'ED 44 OST,TYF' SECOND FLOOR LEVEL A A lul � STUCCO ON CONCRETE BLOCK Q FIRST FLOOR LEVEL r- V M � F z d NORTH ELEVATION 5CAL.E 114" ROOF BEARING LEVEL — — — — — _ — — — — — _.._ — ____ ____ _" — — VINYL SHINGLES THIRD FLOOR LEVEL VINYL SHINGLES pOUBLE HUNCs VINYL WINDOWS M ,' A. U SECOND FLOOR LEVEL Z pq14 W � W STUCCO ON CONCRETE BLOCK pU� DATE OF ISSUE Oro-29-04 FIRST FLOOR LEVEL T — — — - r T — _ — — — — _ _ _._. . ►~ ` F f '" DRAWN BY: WSP �/) F t • -- SHEET NO. 04018 V � I DN '2 r, A-6 SCALE /4n n I1-011 ,I'��l�l:,. @ / REVISIONS Qm�-28-04 METAL ROOF ON GRACE ICE AND WATER SHIELD ON Vz" �- METAL ROOF ON GRACE ICE PLYWOOD SHEATHING ON TRUSSES � 24" O.C. AND WATER SHIELD ON 112' �^ - PLYWOOD S '�HEAWING ON I JOISTS TRU85 SEARING r m 24"O.G. VERIFY ELEVATOR HEADROOM REOUIREMENt - ALUM,DRIP OVER P.T. Ix2 OVER P.T.2x& FASCIA,TYP. , N 2x8 CEILING JOISTS VINYL SOFFIT VENT SYSTEM SLOPED w/ROOF MASTER_PEDta+ OOM W 1IN r A 3/4" PLYWOOD DECK GLUED ANp ~ 3/4" PLYWOOD DECK GLUED AND NAILED TO JOISTS NAILED TO JOISTS METAL ROOF ON GRACE ICE O AND WATER SHIELD ON 1/2" THIRD FLOOR PLYWOOD SHEATHING ON 0-� JACK TRUSSES a 24" D.C. w 14" TJI JOISTS L___L14" TJI JOISTS VINYL SOFFIT SYSTEM _ N x VINYL SOFFIT SYSTEM R-13 ACOUSTIC L__ R-13 ACOUSTIC U BATT INSULATION BATT INSULATION i7: L__ a„1 W viz"GWB GWB L___� L U M w� JL l _ E...1 m � — N � 0 ty 0 ___LANDING __ _____ VINYL SIDING SYSTEM X ON 1/1" SHEATHING ON �++ 3V2" WOOD STUDS 0 Ib" O.C- ELEV. 6HAE-1 5--- J 1/2"GWS OVER R-13 BATT INSULATION FOYE GOVEREP. PORCH r ——J "TREK" RAIL SYSTEM 5 �r _ J DECK CONSTRUCTION: EPDXY iii" PLYWOOD DECK GLUED AND _T COATING ON PREPARED 3a" NAILED TO JOISTS ——J SLOPED PLYWOOD DECK SECOND FLOOR 2x8 0 i'4" O.C. m 12" TJI JOISTS I w HANGERS BOTH 2-115"x14" LVL m END R-13 ACOUSTIC k L___ VINYL SOFFIT SYSTEM BATT INSULATION l CAST-CRETE BEAM of SPLICE OUTSIDE .1 _ LSTUDS * WINDOW SILL LEVELS — - NOT —3/4" SYNTHETIC FINISHED STUCCO GAA I�l ON BLOCK w W SHOLUN — LANDING — — — a C,4RACE a r , m z SPLICE SIDEWALL 2x6 V N wJ STUDS 6 LANDING LEVELS N 11 K, (� x U 4" 3000 P51 FIBER REINFORCED _— _m x 6 H CONCRETE SLAB ON 6 MIL PVC — Z VAPOR BARRIER ON 959. MODIFIED PROCTOR COMPACTED FILL,w/ _ —J 2+ H TERMITE TREATMENT,TYP.11 N FIRST FLOOR _ 5 — w �. .p n > .n .. ELEVATOR PIT o D , A /.j /- /../ , GRADE DRIVEWAY a j\j vp \\�\\/\\/\\/\\ .. Q / / \/\/\ / / / / ° ° p \ \ � \\ a a \\ \\ /\/\\/ //\\//\\//\\//\\//\\ //\/�\\ /\\�\ —TYPICAL FOOTING,24"xl2" �i\�% %\\\%\�% j\\\j/ /\\\/ DATE OF 8 \\%\\/\\/�\\ = 77, �\ w/3-YO BARS CONT. t ISSi]E 05 TIES m 48 O.G. Orb-2'9-04 / DRAWN BY: Al fir �(V 2 WALL SECTION 1 WALL !BEC I I01 V •..� �r SHEET NO. `' 04010 A-8 SCALE: �/2" - 1'-m" A-8 5GALE: I/2" = I'-o" A-8 REVISIONS Q0-1-28-04 CAST-IN-PLACE 3000 P51 GON ______ ______ __ -_----__ ____ ____-- _ _______ 2-05 BARS CONT FROM --- ------------------- - -�� - -- --- ------ -- -------------------- --------------- BONA BEAM 111 I I I II If II II II 11 II II II it II II 11 II II II _-___-_ _-__LL..___ _____SJ__________11________________________________ ______ 11LL �1_-_---,-__,--_„_.-.--____.___________ II II II FACE OF BEAM BEYOND I I II II II 11 II II 11 II II ' CMU II BENT DOUJELS FROM FILLED CORES 1 , ,I II II ,I I, 11 II „ �I II II II II it II 11 II II II II II II II g-1 SCALE.- P = 1'-m'1 V z W � A Q o 81-/h II651-411 22'.811 � V 2 3 r� A-7 < a-1 W --- -� a . - - M ---------------- ------- -I---I- ---------------------------- ----------T--r ------------------- 1/1 -------------- I I I ' r1 I I I I I I I I I I I I I I I II I III I I I I I I I III o I I I I THICKENED SLAB,2'-0"x2'-0" x 8" I I I I THICK w/3-4`5 BARS E.W. ------- -----J I I 4 11/2"x8" ANCHOR BOLTS TO SIMP50N ASU44 I III � I I I I i I I I I I I I I III N I I I I I I I I I I I I ' --- _�-I___I� I I u I I Q I -_-- --I--- THICKENED SLAB, 1'-4 LUIDE x 8 I I I I j l THICK w/3-05 BARS CONT. 415 I I I i L-- _J I I L j I TIES 0 32" O.C.,TYP. 4 v2"x811 ANCHOR.5OLT5 I I 1 32" O.C.,TYP. I I I I 1 1 I I I I I I I I I I j I 1 THICKENED SLAB, 1'-4" U OE x 8" I I j CAST-CRETE BEAM THICK w/3-05 BARS CONI. 4 05 I I I I I ABOVE TIE$ o 3211 O.C., TYP. 4 112"xW ANCHOR BOLTS I I I I I I I ® 32" O.C.,TYP. CMU POST j l I 4" F18ER REINF.CONC.SLABw l j j « I I /2- 5 BARS VERT TO BEAM I I ON VAPOR BARRIER I I I ( I I I ON COMPACTED FILL,TYP. I I 3-0'x3-0 xl-0„ FOOTING ' 1 I I I I I j j I I TOP 1'-4” BELOW FIN.FLOOR j 1 I I 1 j I w/3-05 BARS Eb. 4 2-05 DOWELS UP IN FILLED I I I j I I j CELLS,TYP. I I 1 I I I I I r---------- -- I I I I I I r I l__ -- - - — ..- -.. — - - +- 1 1 I I I I I I I I I L___ __J «5 VERTI VAL ROD IN CELL I h-I -� J 1 Z F ILLEDw/ 3000 P51 GONG I N - / — — — — __ _ — I i A-1 7 PI ATMAX. 32" O.C. AND AS SHOWN, LEVIII iIIII L-III L---_--- PROVIDE "a HOOK BAR (INTO CAST-CRETE BEAM all BOND BEAM. I -- --_-J � JI F - JIIIII A-9 / ai V�N mNNm¢ O -- ---- - � L--- - ----- _ _---- LINE OF DECK ABOVE - ___ _ -_---_ L- ------- -------..--_ ---- ats7 rr� oil Oil � Q CANTILEVERED GAST-IN-PLACE I 2 S%"4, x8" ANCHOR BOLTS CONCRETE BEAM ABOVE SET IN GONC f> MAX 32" O.C. DATE OF ISSUE 06-213-04 DRAWN BY: FOUNFDATION PLAN- SCALE I% I'-0" r� .•e.. '� SHEET NO. NORTH 04018 04m18 S REVISIONS Q0-1-28-04 V z W � A A o � Qw Ir-21/2" 12'-011 N x 3 � Q V a 2 12" RIM JOIST, TYP, r-, FRIO IL m O O Ln to Z x N 12" RIM JOIST,TTF. 4-9 4ST-ORET15 15EAWBEL� 1 WI/5 TJI TOP v2" B LOIU LOOF JOIS N ELEV. ` N 5LOD 2.6 1' 4" 0. .ON ANGE m 3 STRING 5 I liz JL, JL H FROM 2x12 2x8 A 16" 0. . 2x8 Is 16" O.C. � d b 3 14" LVL LINE OF DECK ABOVE rip- C.4z \ O U CANTILEVER CONC BEAM 5 TO CORNER 5EE DETAIL 1/5-3 1 A-8 3-2x8/ � Q 2 U A-8 DATE OF r-*N\ &EC0N[) FLOOR FRAMING FLAN ISSUE Oro-29-04 SEE HOLD DOU1N ELEVATION AT SHEETS 5-4 AND 5-5 DRAWN BY: NORTH OF ......; •f `,`4. 1141y SHEET NO. :c r,A 04018 x .. S -2 REVISIONS Q01-28-04 2-2x6/1 2 A-1 z-2x6 2 x6/I 2-2x6 I B-1 I - 14" L L \ 2-2x6/2 / � 0*1- \ 2- 8/2 ` / 11 � 2 �--' //�/2- 8/2 0 2-2x61 2 x6/I 2-2x6 I 2 x6/I 2- 8/I 2- 8/I 2-2x8/2 d 1 N ►r FA_a 00F FfRAt'-IING PLAN � w E SCALE /a" z i'-0"Ll U M �-•1 NORTH TRUSS TO TRU55 CONNECTORS TO 5E DESIGNED AND F'ROvIpED � 5Y THE TRUSS PROVIDER 04 2 At A-8 a 2 � � —..._ A2� r o JACK I RUSSEB 24" O.C. \\ MOOPx36 w/ , \\ LV. SEAM, Z11 28 0d N--LTRUSS LL ABJ A-9 2 - 18" LVL 2 - 14' LV 2-81 P C 6,66-- - _-- RIDGE_ W/ 31, O R TOP ` LV1. BE 411, o 28- d AIL5 DTA OVER PLYWOO DECK \ \ a \ ss \ \ \ I6' 3/4" - 2x6 ROOF FRAMING 14" Vi/550 I IZ 1 ca 6" O. 14" LVL w/ TAPEREDCA p 2- I P C&66 w/ ' OVERT LV BEAM, x <n 28-I d AILS OTAj[' - -- � `\+s A-9 v 2" HIGH LUALL I " RIM J015T.TVP. _.•_ 2 - 14" LVL \ 2 ' N n TRU55 \ W N ELE 7C ` A 1 / CK T SES 2 " O.C. m m JOCK TRU ES :O.C,3 STRING 52 - 14" LvL - FROM 2x122 ` 2X6 -0 \ DATE OF ` ISSUE 2-2x8/2 c� ` 08-29-04 L ri _,PRAWN BY: 3-2x8/201 G OF •PNCP �a • r [.J) - SHEET NO. rOA9SO 04018 THIRD FLOOR 4 PARTIAL ROOF FRA�IING fz�.AN-" fill, $GALE 1/4 = 1'-0" .. G S3 _ SEE HOLD DOU.N ELEVATION AT SHEETS 5-4 AND 6-5 NORTH �` I � REVISIONS Qm7-26-04 RESIDE IH GA7F JNVA7i NC 371 PLAZA ATLANTIC BEACH ,, FLORIDA r-- -- -�-- _— _- - _ - --� � - - - r _ ..EX16TING 3'-0" HIGHFENCE TO REMAIN _ � - - - - - _—�-_ - - REVI LAOIS S� ROOM FINISH SCHEDULE ROOM FINISH SCHEDULE I.� G�fi��C,41 � �� Q 01-28-04 ROOM BASE FLOOR WALLS CEILING NOTES: ROOM BASE FLOOR WALLS CEILING NOTES: $ SWITCH TV CABLE TV OUTLET MATERIAL FINISH MATERIAL FINISH MATERIAL FIN151-1 CEILING HEIGHT MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH CEILING HEIGHT WORK SHOP NONE GONG STAIN CMU/GW5 PAINT GW5 PAINT 8'-9" - STAIR WOOD PLYWOOD - GWB FAINT GWB PAINT g.m THREE-WAY SWITCH Z TWO CAR GARAGE NONE CONC STAIN CMU/GWB PAINT GUe PAINT 8'-9" I A/C WOOD PLYWOOD GWS FAINT GWS PAINT g'-0" - $4 FOUR WAY SIUITCI4 \ 54" CEILING FAN ENTRY WOOD CONG STAIN GWB PAINT GWB PAINT al.CY - STORAGE WOOD PLYWOOD - GWB PAINT GWB PAINT 9'-0" - I w/LIGHT STAIR WOOD WOOD - GWB PAINT GWB PAINT VARIES - MASTER BEDROOM WOOD PLYWOOD - GWB PAINT GWB PAINT g'-m" - R RHEOSTAT SWITCH ELEVATOR - _ - - DECK NONE PLYWOOD EPDXY VINYL SHINGLE'S NONE NONE MASTER BATH TILE PLYWOOD TILE WRGWB FAINT WRGWB PAINT llmV DUPLEX OUTLET t J OFFICE WOOD CONIC STAIN GWB PAINT GWB PAINT 8'-g" - - -- COVERED PATIO NONE PAVERS - STUCCO - VINYL - - ~ WALK-IN CLOSET WOOD PLYWOOD - GW5PAINT GWS PAINT 9'-0" - Q 4 IIOV ❑UPLEX OUTLET w/ MOUNTING HEIGHT / \ oBEDROOM Na, I WOOD CONC STAIN GWB PAINT GWB PAINT LL BEDROOM No.2 WOOD CONIC STAIN GWB PAINT GWB PAINT 8'-g" - F IIOV DUPLEX OUTLET a FLOOR \ w/of LIGHT FAN BATH No. I TILE CONIC TILE WRGWB PAINT WRGWB PAINT 8'-9" - NOTES. POWDER ROOM TILE CONC TILE WRGW6 PAINT WRGWB PAINT 8'-9" - 1. CEILING To BE 2 LAYERS ®" FIRE-CODE GWB.SIDE WALLS TO BE QDwPATERPROOF 110V DUPLEX OUTLET COVERED PORCH NONE PLYWOOD EPDXY VINYL SHINGLES NONE VINYL - I0'-0" - SIDE WALLS TO BE N6" FIRE-COD GWB OVER V2" SHEAR WALL SHEATHING IIOV DUPLEX OUTLET KALI= SWITCHED / OFFICE No, 2 WOOD TILE - GWB PAINT GW5 PAINT Im'-0" - ON 2x6 STUDS 16" O.G. -- FOYER WOOD TILE - GWB PAINT GWB PAINT 10'-0" - 2. ELEVATOR GAB FINISHES TO BE SELECTED BY OWNER Cil 110V GFI DUPLEX OUTLET STAIR WOOD WOOD - GWB PAINT GWB PAINT VARIES - 3. CLOSETS AND W.I.C. TO BE FINISHED TO MATCH THE ROOM THEY SERVE. 220V OUTLETFAMILY ROOM WOOD TILE - GWB PAINT GWB PAINT [DECK NONE PLYWOOD EPDXY VINYL SHINGLES NOME VINYL - - - WALL MOUNTED FIXTURE SCREENED PORCH NONE PLYWOOD EPDXY VINYL SHINGLES NOME VINYL - - DINING WOOD TILE - GWB PAINT GWB PAINT 10'-0" - CEILING MOUNTED FIXTURE KITCHEN WOOD TILE - GWB PAINT GWB PAINT PANTRY WOOD TILE - GW5 PAINT GWS PAINT Im'-m" - O JUNCTION BOX 0 BATH No.2 WOOD TILE NONE WRGWB PAINT WRGWB PAINT 10'-m" - �' ELECTRICAL DISCONNECT GUEST WOOD TILE - GWB PAINT GWB PAINT Im'-m" - �..ELECTRICAL PANEL (� Q PHONE OUTLET U W � A Q 65'-4" 0 22'-8" 5,1 13'-4" 3'-4" 7'-4" 3'-4" 9'-m" 2'-0" 5'-4" 3'-4" N PROPERTY LINE �•I•� U � a w WA MO JNTED GAS _ 2 IMFIA'T WATER HEATER 3 STUCGO ON 12" SQ. Ice ING FIRST 4 SECOND FLOOR < CMU POST, TTP, U I 5' SIDE YARD SETBACK LINE 5I 5 JJ C SET BACK LINE a No u Pff j2ROO`"i No. 1 2'-5 1/2" ,2'-� 1/2" Ob'-6 1k, METER 1EOROO"( No. 2 CIA Qa z'-m" Ib'-r' HONE \ I I Q I TWO GAR GARAGE � A_g WP SHOWERI C4 v, I I la —� QT v E I I GARAGE DOOR HONB 13 QTvL� OPERATOR Ow ES IRK 44" ` w,..,.. 1'4 1/21, 5 " 4'-2° a' m 1/2" Z4' 51 COVERED PATIO I ( � �� J r N TRI' o Q rn 9. UJ `� `� OFFICE — - - - - - - 0 a Z � Orr :a ' _ a A-� o ELEV. Nt *4 � tF EQUIP. 2 lb OTT `_ co _ ua / LINE OF DECK ABOVE O N — STAIR FIREPLACE ABOVE EDGE OF DRIVEWAY A-8 __. 10' 51DE YARD SETBACK LINE SET BACK LINE L m -RI VEl1J,4Y DATE OF tt cq ISSLTF. 5'-8" 22'-m" 13'-6 1/2" 4'-5 I/2" 12'-8" 12'-0" . 06-29-m4 DRAWN BY: FIR5`7 FLOOR FLAN HSP - SCALE4SHEET NO. I NORTH A/C AREA = 910 SF. 04018 EDGE OF DRIVEWAY NON-A/G COVERED AREA = 1,054 �.F. _ _ _-_ All PROPERTY LINE — — — — — — — - — _ w PROPERTY LINE REVISIONS Q01-28-04 DOOR SCHEDULE DOOR SCHEDULE DOOR FRAME DOOR FRAME MARK ROOM FROM: ROOM TO: SIZE MATERIAL TYPE MATERIAL RATING NOTES MARK ROOM FROM: ROOM TO: 51ZE MATERIAL TYPE MATERIAL RATNG NOTES 1 EXTERIOR ENTRY 3'-01x6'-81x1 3/4" WOOD SC WOOD - - 18 ELEVATOR FAMILY ROOM 2'-81x6'-8"xly" WOOD $C UJOOD - - 2 ENTRY OFFICE 2'-8"x6'-811xi %41 WOOD HC WOOD - - IS FAMILY ROOM DECK PR 3'-01x6'-8"X1 3/4" WOOD HC WOOD - - --------------- 3 �3 ENTRY BEDROOM No. 1 2'-81X6'-81x1 4" WOOD - WOOD - - 20 DINING SCREENED PORCH PR 3'-0"x6'-8"xl 3/4' WOOD - WOOD - - 4 ENTRY ELEVATOR 2'-8"xb'-a°xl 3a" WOOD - WOOD - - 21 SCREENED PORCH DECK 2'-8'xb'-a"xl �'a" WOOD SCREENED WOOD - 5 ENTRY POUVER ROOM 2'-61x6'-811x1 fib" WOOD POCKET WOOD - - 22 DINING PANTRY 2'-Wx6'-8"xl 3811 WOOD POCKET WOOD - - 6 ENTRY ELEVATOR EQUIP 2'-8"x6'-8"xl 3/a" WOOD - - - - 23 FOYER BATH No.2 2'-8'x6'-8"xl %II WOOD - - - 1 GARAGE ENTRY 2'-8'x6'-8"xl 3/a" WOOD - - 20 MIN. - 24 GUEST BATH No.2 2'-6"xb'-8"x1 %11 WOOD POCKET 8 EXTERIOR GARAGE 16'-011x8'-0" - OVER1-iEAD WOOD - - 25 GUEST W.I.C. 2'-0"x6'-81x1 %. - POCKET - - - S OFFICE CLOSET 2'-b"xb'-81x1 34" WOOD - - - - 26 FOYER GUEST 2'-6"xb'-8"xI %" WOOD SC - - - 10 EXTERIOR OFFICE PR 2'-6"x6'-8"x1 3/4" - - - - - 21 FOYER OFFICE 2'-6"x6'-81x1 34" WOOD 5C - - - 11 EXTERIOR BEDROOM Not PR 2'-61x6'-81x1 3/4" - - - - - 28 OFFICE CL96ET 6'-V"x6'-8"xl '/8" - BIFOLD - - 12 BEDROOM Na 1 ENTRY 2'-8"xb'-8"xl 3/e" - - - - - LL 19 NOT USED I L I 13 BEDROOM No. 1 W.I.C. .I.C. 2'-6" 6.4.1XI 411 WOOD POCKET - - - 30 COVERED PORCH FOYER PR UJOOD - - - 14 BEDROOM Na 1 BATH Mo.l 2'-61x6'-8"xI -8" WOOD POCKET - - - 31 COVERED PORCH FOYER PR 3'-0"x6'-8"xl 3/4" WOOD - - - - 15 EXTERIOR GARAGE 3'-0"x6'-a"XI 3/4" WOOD 5C - - - 32 COVERED PORCH FOYER PR 3'-0"x6'-8"xl 3/4" WOOD - - - - ,1i 16 GARAGE wow SHOP PR 3'-0"xb'-8"x1 3/4' WOOD - - - - 33 NOT USED 11 BEDROOM No. 1 BATH No.] 2'-61x6'-81x1 3/4" WOOD POCKET - - - 34 HALL A/C 2'-6"xb'-8"x1 34" WOOD POCKET - - - " - - - - 35 HALL STORAGE BIFOLD 36 HALL MASTER BEDROOM 2'-61x6'-81x1 " WOOD SC - - - �pp 31 MASTER BEDROOM MASTER BATW 2'-611x6'-81x1 341, WOOD POCKET - - - 8` 38 MASTER BATH W.I.C. 21_66x6'-8"X1 fie" - POCKET - - - `- 39 MASTER BEDROOM DECK 2'-81x1'-0"x1 3/4" WOOD SC - - - I I u z 1 I I d �1 Q I � dw l3'-61 W N 8'-0" 11'-81/2" 5'-1" 11'-3" 13'-0" 12'-21/2" 12'-31/2 d U 2'-0" 10-10" L ll'-0" W 3 � 2 A-1 Q A-, 01 0 --------[ O �, ►--, e TVQ� I O 0 LTV Q ------ - ---- j n = WRAPPED 4x4 POST, TI'P. SCREEN 5Y5TEM, TY`P. d OFFICE No. 2 ,� T Ir 02s28 Q UST A1C CLOSET SCREENED PORCH a 4-2x4 POST 2 2 < } - m A-9 ' N 44 I MI 44111 HONE -- -�f _ ----� D NINCx KITCHEN SLOPE DOWN,SEE SECTION 1 42" H.RAIL ATHo. 2 , > . w Z ----- ----- ---- C 1 o o DW -- � 1 v o ;;' dY ------- ------- L----- ---------1------ N. 32' 32' 32' rq - v F01r TO WALL 5 OPE DOUN j LIGHT J DIE 9 SLOPE DOUN,SEE SECTION _ 42" HIGH RAIL Q m _ FAMILY ROOM 2 fL EL E n V p 4'-2112" o o 14 a t7 N M COVERED PORCH HEARTH o U 4'-8 1,2" 3 II 3'11811 �r v 42" H.RAIL 42" HIGH RAIL 1 M O u eJ'TAIL ¢ Fw 04-8 a 11' 4" 13'-b 131" 61-31/211 4'-4" 6'-8 1/2" 12'-01/2" DATE OF 13'-6 1/2" ISSUE .•~` QF• r. �;�'� I`r�i�i DRAWN BY: _. �G, ,• v* �j. HCsP &A/C; ECOND FLOOR PLAN - ALE ��4" 11-011 .: SHEET NO. NORTH AREA 1,129 S.P. `, r 9 •/�f = @4018 A-3 I REVISIONS Q01-28-04 WINDOW SCHEDULE WINDOW MARK ROOM FROM: SIZE MATERIAL TYPE NOTES A NOT USED B NOT USED - G Not USED r. - D FOYER 4'-0"x6' 6" VINYL D,H./TRAN. - E FOYER 1'-6"x5'-O" VINYL FIXED - F FOYER 1'-6"x5'-0" VINYL FIXED G 5TAIR 3'-6"x5'-4" VINYL FIXED - H DINING 3'-0"x6'-6" VINYL D.H./TRAN. - J DINING 3'-O"x6'-6" VINYL D.H./TRAN. - K DINING 24-6"x6'-6" VINYL DA./TRAN, - L GUE:5T 3'-0"x6'-6" VINYL D.H-/TRAN. Q M OFFIICE Y-0"x6'40" VINYL DA./TRAN. N OFFIICE 3'411x6'40" VINYL D.H./TRAN. P OFFIICE 3'-O"x6'40" VINYL D.N./TRAN, - Q NOT' USED - - - R MA6TER BEDROOM 3'4"6'40" VINYL D.H./TRAN, - 6 MA6TER BEDROOPI 3'-O"x5'-6" VINYL D.N./TRAN, - T MAaTER BEDROOM Y-ON3'-0" VINYL AWNING - U MASTER BEDROOM Y-ONY-0" VINYL AWNING - V MAOTER BEDROOM 3'-0"x3'-0" VINYL ALNING - W MASTER BEDROOM 3'-0"x3'-0" VINYL AILNING - X STAIR 3'-6"6'4" VINYL FIXED - Y W.I.G• 3'-0"x1'-0" VINYL AWNING - Z W.I.O. 3'-0"4'-0" VINYL AWNING - AA MA6TER BATH 3'-0"x3'-O" VINYL AWNING 55 MASTER BEDROOM 3'-0"x3'-O" VINYL AWNING - CG MA6TER BEDROOM 314"x3'-0" VINYL AWNING ~ DD MATER 5EDROOM Y-0"x3'-0" VINYL ALNING - EE OFFICE Y-4"x5'-0" VINYL D.H./TRAN. - W FF C FIIGE 3'-4"x5'-0" VINYL D.H./TRAN. Q ami CG BEDROOM No.2 3'-4'x4'-0" VINYL D.H. - HN 5EpROOM No,1 3'-4'x4'-O" VINYL D.H. - `� JJ BATH No.I 2'-0"x3'-4" VINYL D.H. Q 53'-11/2" ¢, w 22'-5 1/2" 13'-6 I/2" 8'-3 I/z" U way 2 3 ar w A-7 A-1 Pq t � \ _.... - - - - -- - - - - - - - - - - - - - - � - - - - - - - - - _ - _ _ - - - - z MASTER 5,41H \ WHIRL COL \ O / TUB \ \ I `\ 51-IOUJER17 I — . - - - - - - - - - �1 I 5TOR GE 42"45H WALLCA \ r '_ w•r c DECK •_ ANO / 1 Q A/C I I I _ 1 MASTER 5EDROO'1 Il4ALL ^2 42" HIGH WALL Tv I A-9 z (DQ 1l. Q I M � N � U / 3'-8 3 4'41 3 3'-8" ( p4 WALL LINE BELOW - Z ROOF LINE BELOW STAIR O w A-S 2 \A-8 8'-011 22'-6 1/2" 13-6 I/2" 8'-3 I/2" 8'-1" DATE OF ISSUE Oro-29-04 DRAWN BY: I i--f ( D FLOOR PLAN SHEET NO. SCALE 1/4 11 1'-0" 04018 A/C AREA = 1,0ro4 5.1r. g A-4 NORTH �,•. -�, C, c�. REVISIONS Q0-1-28-04 i i I ROOF BEARING LEVEL - - - - - - - - - - 17��- - - - - - - - - -- - - - - - -- VINYL SHINGLE SYST€M METAL ROOF IL-Li I THIRD FLOOR LEVEL _ _ _ _ _ T RD LO R L EVE -T - Q -- -- iFW 5 ENED ENCLC UE I T I I I I F I I oil Firs U SECOND FLOOR LEVEL STUCCO ON CMU WALL W ►.� Q FIRST FLOOR LEVEL -- - - - - - - - - - - - - - - . _ - - - - - - - -- - - - - - - – – - - — �. � - - - - - - - - - --.... — — — - — — �_ - - - - C` U E-•+ z 0 WF-5T ELEVATION -el SCAL.1E 1/4" I._ 0.4 0„ W I ROOF SEARING LEVEL -I' VINYL SHINGLE 5Y5TEM ___..4"E II - - -171111 111 IILIHI I NI FL OR LE L I YT-Y ii-L_:�7 I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 1 -1 17 1 1#- O 4-1111 111111111111 1 1 H1111. 11111 1111111111111 1111 1111111111111111111 - fsieec) ENGL Q 11 TRE IL SYSTEM a+ U cn W a H w SECOND FLOOR LEVEL cn _ ---- GANtIvEVERED 4 �• BEAMu •- STUCCO ON I(o'-0" x 8'-m"GARAGE DOOR / \ -_ CMU WALL -� STUCCO ON STUCCO ON FRAME CONSTRUCTION CMU WALL OPEN ' DKrE OF - \ ISSUE Ll 06-2'3-04 FIRST FLOOR LEVEL - _ - __ - - - - .._.. __ - - - - - ._ .. _ - - - - - - - - - - _ -- - - - - - - - - - _ - - - - - _ - - - - - -_ _ - - - - r`QF �� '�,� D Y. RAWN 13 D . ` WGP SHEH'P NO. ' 04018 5T ELEVATIONo A-5 SCALE i/4 = V-m" Is ® / REVISIONS Q07-28-04 ROOF SEARING LEVEL TTQ THIRD FLOOR LEVEL ooC� C� 00 / INSECT ENING / Iq ALUM IFSTEM V F'E'ED 44 OST,TYF' SECOND FLOOR LEVEL A A lul � STUCCO ON CONCRETE BLOCK Q FIRST FLOOR LEVEL r- V M � F z d NORTH ELEVATION 5CAL.E 114" ROOF BEARING LEVEL — — — — — _ — — — — — _.._ — ____ ____ _" — — VINYL SHINGLES THIRD FLOOR LEVEL VINYL SHINGLES pOUBLE HUNCs VINYL WINDOWS M ,' A. U SECOND FLOOR LEVEL Z pq14 W � W STUCCO ON CONCRETE BLOCK pU� DATE OF ISSUE Oro-29-04 FIRST FLOOR LEVEL T — — — - r T — _ — — — — _ _ _._. . ►~ ` F f '" DRAWN BY: WSP �/) F t • -- SHEET NO. 04018 V � I DN '2 r, A-6 SCALE /4n n I1-011 ,I'��l�l:,. @ / REVISIONS Qm�-28-04 METAL ROOF ON GRACE ICE AND WATER SHIELD ON Vz" �- METAL ROOF ON GRACE ICE PLYWOOD SHEATHING ON TRUSSES � 24" O.C. AND WATER SHIELD ON 112' �^ - PLYWOOD S '�HEAWING ON I JOISTS TRU85 SEARING r m 24"O.G. VERIFY ELEVATOR HEADROOM REOUIREMENt - ALUM,DRIP OVER P.T. Ix2 OVER P.T.2x& FASCIA,TYP. , N 2x8 CEILING JOISTS VINYL SOFFIT VENT SYSTEM SLOPED w/ROOF MASTER_PEDta+ OOM W 1IN r A 3/4" PLYWOOD DECK GLUED ANp ~ 3/4" PLYWOOD DECK GLUED AND NAILED TO JOISTS NAILED TO JOISTS METAL ROOF ON GRACE ICE O AND WATER SHIELD ON 1/2" THIRD FLOOR PLYWOOD SHEATHING ON 0-� JACK TRUSSES a 24" D.C. w 14" TJI JOISTS L___L14" TJI JOISTS VINYL SOFFIT SYSTEM _ N x VINYL SOFFIT SYSTEM R-13 ACOUSTIC L__ R-13 ACOUSTIC U BATT INSULATION BATT INSULATION i7: L__ a„1 W viz"GWB GWB L___� L U M w� JL l _ E...1 m � — N � 0 ty 0 ___LANDING __ _____ VINYL SIDING SYSTEM X ON 1/1" SHEATHING ON �++ 3V2" WOOD STUDS 0 Ib" O.C- ELEV. 6HAE-1 5--- J 1/2"GWS OVER R-13 BATT INSULATION FOYE GOVEREP. PORCH r ——J "TREK" RAIL SYSTEM 5 �r _ J DECK CONSTRUCTION: EPDXY iii" PLYWOOD DECK GLUED AND _T COATING ON PREPARED 3a" NAILED TO JOISTS ——J SLOPED PLYWOOD DECK SECOND FLOOR 2x8 0 i'4" O.C. m 12" TJI JOISTS I w HANGERS BOTH 2-115"x14" LVL m END R-13 ACOUSTIC k L___ VINYL SOFFIT SYSTEM BATT INSULATION l CAST-CRETE BEAM of SPLICE OUTSIDE .1 _ LSTUDS * WINDOW SILL LEVELS — - NOT —3/4" SYNTHETIC FINISHED STUCCO GAA I�l ON BLOCK w W SHOLUN — LANDING — — — a C,4RACE a r , m z SPLICE SIDEWALL 2x6 V N wJ STUDS 6 LANDING LEVELS N 11 K, (� x U 4" 3000 P51 FIBER REINFORCED _— _m x 6 H CONCRETE SLAB ON 6 MIL PVC — Z VAPOR BARRIER ON 959. MODIFIED PROCTOR COMPACTED FILL,w/ _ —J 2+ H TERMITE TREATMENT,TYP.11 N FIRST FLOOR _ 5 — w �. .p n > .n .. ELEVATOR PIT o D , A /.j /- /../ , GRADE DRIVEWAY a j\j vp \\�\\/\\/\\/\\ .. Q / / \/\/\ / / / / ° ° p \ \ � \\ a a \\ \\ /\/\\/ //\\//\\//\\//\\//\\ //\/�\\ /\\�\ —TYPICAL FOOTING,24"xl2" �i\�% %\\\%\�% j\\\j/ /\\\/ DATE OF 8 \\%\\/\\/�\\ = 77, �\ w/3-YO BARS CONT. t ISSi]E 05 TIES m 48 O.G. Orb-2'9-04 / DRAWN BY: Al fir �(V 2 WALL SECTION 1 WALL !BEC I I01 V •..� �r SHEET NO. `' 04010 A-8 SCALE: �/2" - 1'-m" A-8 5GALE: I/2" = I'-o" A-8 REVISIONS Q0-1-28-04 CAST-IN-PLACE 3000 P51 GON ______ ______ __ -_----__ ____ ____-- _ _______ 2-05 BARS CONT FROM --- ------------------- - -�� - -- --- ------ -- -------------------- --------------- BONA BEAM 111 I I I II If II II II 11 II II II it II II 11 II II II _-___-_ _-__LL..___ _____SJ__________11________________________________ ______ 11LL �1_-_---,-__,--_„_.-.--____.___________ II II II FACE OF BEAM BEYOND I I II II II 11 II II 11 II II ' CMU II BENT DOUJELS FROM FILLED CORES 1 , ,I II II ,I I, 11 II „ �I II II II II it II 11 II II II II II II II g-1 SCALE.- P = 1'-m'1 V z W � A Q o 81-/h II651-411 22'.811 � V 2 3 r� A-7 < a-1 W --- -� a . - - M ---------------- ------- -I---I- ---------------------------- ----------T--r ------------------- 1/1 -------------- I I I ' r1 I I I I I I I I I I I I I I I II I III I I I I I I I III o I I I I THICKENED SLAB,2'-0"x2'-0" x 8" I I I I THICK w/3-4`5 BARS E.W. ------- -----J I I 4 11/2"x8" ANCHOR BOLTS TO SIMP50N ASU44 I III � I I I I i I I I I I I I I III N I I I I I I I I I I I I ' --- _�-I___I� I I u I I Q I -_-- --I--- THICKENED SLAB, 1'-4 LUIDE x 8 I I I I j l THICK w/3-05 BARS CONT. 415 I I I i L-- _J I I L j I TIES 0 32" O.C.,TYP. 4 v2"x811 ANCHOR.5OLT5 I I 1 32" O.C.,TYP. I I I I 1 1 I I I I I I I I I I j I 1 THICKENED SLAB, 1'-4" U OE x 8" I I j CAST-CRETE BEAM THICK w/3-05 BARS CONI. 4 05 I I I I I ABOVE TIE$ o 3211 O.C., TYP. 4 112"xW ANCHOR BOLTS I I I I I I I ® 32" O.C.,TYP. CMU POST j l I 4" F18ER REINF.CONC.SLABw l j j « I I /2- 5 BARS VERT TO BEAM I I ON VAPOR BARRIER I I I ( I I I ON COMPACTED FILL,TYP. I I 3-0'x3-0 xl-0„ FOOTING ' 1 I I I I I j j I I TOP 1'-4” BELOW FIN.FLOOR j 1 I I 1 j I w/3-05 BARS Eb. 4 2-05 DOWELS UP IN FILLED I I I j I I j CELLS,TYP. I I 1 I I I I I r---------- -- I I I I I I r I l__ -- - - — ..- -.. — - - +- 1 1 I I I I I I I I I L___ __J «5 VERTI VAL ROD IN CELL I h-I -� J 1 Z F ILLEDw/ 3000 P51 GONG I N - / — — — — __ _ — I i A-1 7 PI ATMAX. 32" O.C. AND AS SHOWN, LEVIII iIIII L-III L---_--- PROVIDE "a HOOK BAR (INTO CAST-CRETE BEAM all BOND BEAM. I -- --_-J � JI F - JIIIII A-9 / ai V�N mNNm¢ O -- ---- - � L--- - ----- _ _---- LINE OF DECK ABOVE - ___ _ -_---_ L- ------- -------..--_ ---- ats7 rr� oil Oil � Q CANTILEVERED GAST-IN-PLACE I 2 S%"4, x8" ANCHOR BOLTS CONCRETE BEAM ABOVE SET IN GONC f> MAX 32" O.C. DATE OF ISSUE 06-213-04 DRAWN BY: FOUNFDATION PLAN- SCALE I% I'-0" r� .•e.. '� SHEET NO. NORTH 04018 04m18 S REVISIONS Q0-1-28-04 V z W � A A o � Qw Ir-21/2" 12'-011 N x 3 � Q V a 2 12" RIM JOIST, TYP, r-, FRIO IL m O O Ln to Z x N 12" RIM JOIST,TTF. 4-9 4ST-ORET15 15EAWBEL� 1 WI/5 TJI TOP v2" B LOIU LOOF JOIS N ELEV. ` N 5LOD 2.6 1' 4" 0. .ON ANGE m 3 STRING 5 I liz JL, JL H FROM 2x12 2x8 A 16" 0. . 2x8 Is 16" O.C. � d b 3 14" LVL LINE OF DECK ABOVE rip- C.4z \ O U CANTILEVER CONC BEAM 5 TO CORNER 5EE DETAIL 1/5-3 1 A-8 3-2x8/ � Q 2 U A-8 DATE OF r-*N\ &EC0N[) FLOOR FRAMING FLAN ISSUE Oro-29-04 SEE HOLD DOU1N ELEVATION AT SHEETS 5-4 AND 5-5 DRAWN BY: NORTH OF ......; •f `,`4. 1141y SHEET NO. :c r,A 04018 x .. S -2 REVISIONS Q01-28-04 2-2x6/1 2 A-1 z-2x6 2 x6/I 2-2x6 I B-1 I - 14" L L \ 2-2x6/2 / � 0*1- \ 2- 8/2 ` / 11 � 2 �--' //�/2- 8/2 0 2-2x61 2 x6/I 2-2x6 I 2 x6/I 2- 8/I 2- 8/I 2-2x8/2 d 1 N ►r FA_a 00F FfRAt'-IING PLAN � w E SCALE /a" z i'-0"Ll U M �-•1 NORTH TRUSS TO TRU55 CONNECTORS TO 5E DESIGNED AND F'ROvIpED � 5Y THE TRUSS PROVIDER 04 2 At A-8 a 2 � � —..._ A2� r o JACK I RUSSEB 24" O.C. \\ MOOPx36 w/ , \\ LV. SEAM, Z11 28 0d N--LTRUSS LL ABJ A-9 2 - 18" LVL 2 - 14' LV 2-81 P C 6,66-- - _-- RIDGE_ W/ 31, O R TOP ` LV1. BE 411, o 28- d AIL5 DTA OVER PLYWOO DECK \ \ a \ ss \ \ \ I6' 3/4" - 2x6 ROOF FRAMING 14" Vi/550 I IZ 1 ca 6" O. 14" LVL w/ TAPEREDCA p 2- I P C&66 w/ ' OVERT LV BEAM, x <n 28-I d AILS OTAj[' - -- � `\+s A-9 v 2" HIGH LUALL I " RIM J015T.TVP. _.•_ 2 - 14" LVL \ 2 ' N n TRU55 \ W N ELE 7C ` A 1 / CK T SES 2 " O.C. m m JOCK TRU ES :O.C,3 STRING 52 - 14" LvL - FROM 2x122 ` 2X6 -0 \ DATE OF ` ISSUE 2-2x8/2 c� ` 08-29-04 L ri _,PRAWN BY: 3-2x8/201 G OF •PNCP �a • r [.J) - SHEET NO. rOA9SO 04018 THIRD FLOOR 4 PARTIAL ROOF FRA�IING fz�.AN-" fill, $GALE 1/4 = 1'-0" .. G S3 _ SEE HOLD DOU.N ELEVATION AT SHEETS 5-4 AND 6-5 NORTH �` I � REVISIONS Qm7-26-04 RESIDE IH GA7F JNVA7i NC 371 PLAZA ATLANTIC BEACH ,, FLORIDA r-- -- -�-- _— _- - _ - --� � - - - r _ ..EX16TING 3'-0" HIGHFENCE TO REMAIN _ � - - - - - _—�-_ - - REVI LAOIS S� ROOM FINISH SCHEDULE ROOM FINISH SCHEDULE I.� G�fi��C,41 � �� Q 01-28-04 ROOM BASE FLOOR WALLS CEILING NOTES: ROOM BASE FLOOR WALLS CEILING NOTES: $ SWITCH TV CABLE TV OUTLET MATERIAL FINISH MATERIAL FINISH MATERIAL FIN151-1 CEILING HEIGHT MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH CEILING HEIGHT WORK SHOP NONE GONG STAIN CMU/GW5 PAINT GW5 PAINT 8'-9" - STAIR WOOD PLYWOOD - GWB FAINT GWB PAINT g.m THREE-WAY SWITCH Z TWO CAR GARAGE NONE CONC STAIN CMU/GWB PAINT GUe PAINT 8'-9" I A/C WOOD PLYWOOD GWS FAINT GWS PAINT g'-0" - $4 FOUR WAY SIUITCI4 \ 54" CEILING FAN ENTRY WOOD CONG STAIN GWB PAINT GWB PAINT al.CY - STORAGE WOOD PLYWOOD - GWB PAINT GWB PAINT 9'-0" - I w/LIGHT STAIR WOOD WOOD - GWB PAINT GWB PAINT VARIES - MASTER BEDROOM WOOD PLYWOOD - GWB PAINT GWB PAINT g'-m" - R RHEOSTAT SWITCH ELEVATOR - _ - - DECK NONE PLYWOOD EPDXY VINYL SHINGLE'S NONE NONE MASTER BATH TILE PLYWOOD TILE WRGWB FAINT WRGWB PAINT llmV DUPLEX OUTLET t J OFFICE WOOD CONIC STAIN GWB PAINT GWB PAINT 8'-g" - - -- COVERED PATIO NONE PAVERS - STUCCO - VINYL - - ~ WALK-IN CLOSET WOOD PLYWOOD - GW5PAINT GWS PAINT 9'-0" - Q 4 IIOV ❑UPLEX OUTLET w/ MOUNTING HEIGHT / \ oBEDROOM Na, I WOOD CONC STAIN GWB PAINT GWB PAINT LL BEDROOM No.2 WOOD CONIC STAIN GWB PAINT GWB PAINT 8'-g" - F IIOV DUPLEX OUTLET a FLOOR \ w/of LIGHT FAN BATH No. I TILE CONIC TILE WRGWB PAINT WRGWB PAINT 8'-9" - NOTES. POWDER ROOM TILE CONC TILE WRGW6 PAINT WRGWB PAINT 8'-9" - 1. CEILING To BE 2 LAYERS ®" FIRE-CODE GWB.SIDE WALLS TO BE QDwPATERPROOF 110V DUPLEX OUTLET COVERED PORCH NONE PLYWOOD EPDXY VINYL SHINGLES NONE VINYL - I0'-0" - SIDE WALLS TO BE N6" FIRE-COD GWB OVER V2" SHEAR WALL SHEATHING IIOV DUPLEX OUTLET KALI= SWITCHED / OFFICE No, 2 WOOD TILE - GWB PAINT GW5 PAINT Im'-0" - ON 2x6 STUDS 16" O.G. -- FOYER WOOD TILE - GWB PAINT GWB PAINT 10'-0" - 2. ELEVATOR GAB FINISHES TO BE SELECTED BY OWNER Cil 110V GFI DUPLEX OUTLET STAIR WOOD WOOD - GWB PAINT GWB PAINT VARIES - 3. CLOSETS AND W.I.C. TO BE FINISHED TO MATCH THE ROOM THEY SERVE. 220V OUTLETFAMILY ROOM WOOD TILE - GWB PAINT GWB PAINT [DECK NONE PLYWOOD EPDXY VINYL SHINGLES NOME VINYL - - - WALL MOUNTED FIXTURE SCREENED PORCH NONE PLYWOOD EPDXY VINYL SHINGLES NOME VINYL - - DINING WOOD TILE - GWB PAINT GWB PAINT 10'-0" - CEILING MOUNTED FIXTURE KITCHEN WOOD TILE - GWB PAINT GWB PAINT PANTRY WOOD TILE - GW5 PAINT GWS PAINT Im'-m" - O JUNCTION BOX 0 BATH No.2 WOOD TILE NONE WRGWB PAINT WRGWB PAINT 10'-m" - �' ELECTRICAL DISCONNECT GUEST WOOD TILE - GWB PAINT GWB PAINT Im'-m" - �..ELECTRICAL PANEL (� Q PHONE OUTLET U W � A Q 65'-4" 0 22'-8" 5,1 13'-4" 3'-4" 7'-4" 3'-4" 9'-m" 2'-0" 5'-4" 3'-4" N PROPERTY LINE �•I•� U � a w WA MO JNTED GAS _ 2 IMFIA'T WATER HEATER 3 STUCGO ON 12" SQ. Ice ING FIRST 4 SECOND FLOOR < CMU POST, TTP, U I 5' SIDE YARD SETBACK LINE 5I 5 JJ C SET BACK LINE a No u Pff j2ROO`"i No. 1 2'-5 1/2" ,2'-� 1/2" Ob'-6 1k, METER 1EOROO"( No. 2 CIA Qa z'-m" Ib'-r' HONE \ I I Q I TWO GAR GARAGE � A_g WP SHOWERI C4 v, I I la —� QT v E I I GARAGE DOOR HONB 13 QTvL� OPERATOR Ow ES IRK 44" ` w,..,.. 1'4 1/21, 5 " 4'-2° a' m 1/2" Z4' 51 COVERED PATIO I ( � �� J r N TRI' o Q rn 9. UJ `� `� OFFICE — - - - - - - 0 a Z � Orr :a ' _ a A-� o ELEV. Nt *4 � tF EQUIP. 2 lb OTT `_ co _ ua / LINE OF DECK ABOVE O N — STAIR FIREPLACE ABOVE EDGE OF DRIVEWAY A-8 __. 10' 51DE YARD SETBACK LINE SET BACK LINE L m -RI VEl1J,4Y DATE OF tt cq ISSLTF. 5'-8" 22'-m" 13'-6 1/2" 4'-5 I/2" 12'-8" 12'-0" . 06-29-m4 DRAWN BY: FIR5`7 FLOOR FLAN HSP - SCALE4SHEET NO. I NORTH A/C AREA = 910 SF. 04018 EDGE OF DRIVEWAY NON-A/G COVERED AREA = 1,054 �.F. _ _ _-_ All PROPERTY LINE — — — — — — — - — _ w PROPERTY LINE REVISIONS Q01-28-04 DOOR SCHEDULE DOOR SCHEDULE DOOR FRAME DOOR FRAME MARK ROOM FROM: ROOM TO: SIZE MATERIAL TYPE MATERIAL RATING NOTES MARK ROOM FROM: ROOM TO: 51ZE MATERIAL TYPE MATERIAL RATNG NOTES 1 EXTERIOR ENTRY 3'-01x6'-81x1 3/4" WOOD SC WOOD - - 18 ELEVATOR FAMILY ROOM 2'-81x6'-8"xly" WOOD $C UJOOD - - 2 ENTRY OFFICE 2'-8"x6'-811xi %41 WOOD HC WOOD - - IS FAMILY ROOM DECK PR 3'-01x6'-8"X1 3/4" WOOD HC WOOD - - --------------- 3 �3 ENTRY BEDROOM No. 1 2'-81X6'-81x1 4" WOOD - WOOD - - 20 DINING SCREENED PORCH PR 3'-0"x6'-8"xl 3/4' WOOD - WOOD - - 4 ENTRY ELEVATOR 2'-8"xb'-a°xl 3a" WOOD - WOOD - - 21 SCREENED PORCH DECK 2'-8'xb'-a"xl �'a" WOOD SCREENED WOOD - 5 ENTRY POUVER ROOM 2'-61x6'-811x1 fib" WOOD POCKET WOOD - - 22 DINING PANTRY 2'-Wx6'-8"xl 3811 WOOD POCKET WOOD - - 6 ENTRY ELEVATOR EQUIP 2'-8"x6'-8"xl 3/a" WOOD - - - - 23 FOYER BATH No.2 2'-8'x6'-8"xl %II WOOD - - - 1 GARAGE ENTRY 2'-8'x6'-8"xl 3/a" WOOD - - 20 MIN. - 24 GUEST BATH No.2 2'-6"xb'-8"x1 %11 WOOD POCKET 8 EXTERIOR GARAGE 16'-011x8'-0" - OVER1-iEAD WOOD - - 25 GUEST W.I.C. 2'-0"x6'-81x1 %. - POCKET - - - S OFFICE CLOSET 2'-b"xb'-81x1 34" WOOD - - - - 26 FOYER GUEST 2'-6"xb'-8"xI %" WOOD SC - - - 10 EXTERIOR OFFICE PR 2'-6"x6'-8"x1 3/4" - - - - - 21 FOYER OFFICE 2'-6"x6'-81x1 34" WOOD 5C - - - 11 EXTERIOR BEDROOM Not PR 2'-61x6'-81x1 3/4" - - - - - 28 OFFICE CL96ET 6'-V"x6'-8"xl '/8" - BIFOLD - - 12 BEDROOM Na 1 ENTRY 2'-8"xb'-8"xl 3/e" - - - - - LL 19 NOT USED I L I 13 BEDROOM No. 1 W.I.C. .I.C. 2'-6" 6.4.1XI 411 WOOD POCKET - - - 30 COVERED PORCH FOYER PR UJOOD - - - 14 BEDROOM Na 1 BATH Mo.l 2'-61x6'-8"xI -8" WOOD POCKET - - - 31 COVERED PORCH FOYER PR 3'-0"x6'-8"xl 3/4" WOOD - - - - 15 EXTERIOR GARAGE 3'-0"x6'-a"XI 3/4" WOOD 5C - - - 32 COVERED PORCH FOYER PR 3'-0"x6'-8"xl 3/4" WOOD - - - - ,1i 16 GARAGE wow SHOP PR 3'-0"xb'-8"x1 3/4' WOOD - - - - 33 NOT USED 11 BEDROOM No. 1 BATH No.] 2'-61x6'-81x1 3/4" WOOD POCKET - - - 34 HALL A/C 2'-6"xb'-8"x1 34" WOOD POCKET - - - " - - - - 35 HALL STORAGE BIFOLD 36 HALL MASTER BEDROOM 2'-61x6'-81x1 " WOOD SC - - - �pp 31 MASTER BEDROOM MASTER BATW 2'-611x6'-81x1 341, WOOD POCKET - - - 8` 38 MASTER BATH W.I.C. 21_66x6'-8"X1 fie" - POCKET - - - `- 39 MASTER BEDROOM DECK 2'-81x1'-0"x1 3/4" WOOD SC - - - I I u z 1 I I d �1 Q I � dw l3'-61 W N 8'-0" 11'-81/2" 5'-1" 11'-3" 13'-0" 12'-21/2" 12'-31/2 d U 2'-0" 10-10" L ll'-0" W 3 � 2 A-1 Q A-, 01 0 --------[ O �, ►--, e TVQ� I O 0 LTV Q ------ - ---- j n = WRAPPED 4x4 POST, TI'P. SCREEN 5Y5TEM, TY`P. d OFFICE No. 2 ,� T Ir 02s28 Q UST A1C CLOSET SCREENED PORCH a 4-2x4 POST 2 2 < } - m A-9 ' N 44 I MI 44111 HONE -- -�f _ ----� D NINCx KITCHEN SLOPE DOWN,SEE SECTION 1 42" H.RAIL ATHo. 2 , > . w Z ----- ----- ---- C 1 o o DW -- � 1 v o ;;' dY ------- ------- L----- ---------1------ N. 32' 32' 32' rq - v F01r TO WALL 5 OPE DOUN j LIGHT J DIE 9 SLOPE DOUN,SEE SECTION _ 42" HIGH RAIL Q m _ FAMILY ROOM 2 fL EL E n V p 4'-2112" o o 14 a t7 N M COVERED PORCH HEARTH o U 4'-8 1,2" 3 II 3'11811 �r v 42" H.RAIL 42" HIGH RAIL 1 M O u eJ'TAIL ¢ Fw 04-8 a 11' 4" 13'-b 131" 61-31/211 4'-4" 6'-8 1/2" 12'-01/2" DATE OF 13'-6 1/2" ISSUE .•~` QF• r. �;�'� I`r�i�i DRAWN BY: _. �G, ,• v* �j. HCsP &A/C; ECOND FLOOR PLAN - ALE ��4" 11-011 .: SHEET NO. NORTH AREA 1,129 S.P. `, r 9 •/�f = @4018 A-3 I REVISIONS Q01-28-04 WINDOW SCHEDULE WINDOW MARK ROOM FROM: SIZE MATERIAL TYPE NOTES A NOT USED B NOT USED - G Not USED r. - D FOYER 4'-0"x6' 6" VINYL D,H./TRAN. - E FOYER 1'-6"x5'-O" VINYL FIXED - F FOYER 1'-6"x5'-0" VINYL FIXED G 5TAIR 3'-6"x5'-4" VINYL FIXED - H DINING 3'-0"x6'-6" VINYL D.H./TRAN. - J DINING 3'-O"x6'-6" VINYL D.H./TRAN. - K DINING 24-6"x6'-6" VINYL DA./TRAN, - L GUE:5T 3'-0"x6'-6" VINYL D.H-/TRAN. Q M OFFIICE Y-0"x6'40" VINYL DA./TRAN. N OFFIICE 3'411x6'40" VINYL D.H./TRAN. P OFFIICE 3'-O"x6'40" VINYL D.N./TRAN, - Q NOT' USED - - - R MA6TER BEDROOM 3'4"6'40" VINYL D.H./TRAN, - 6 MA6TER BEDROOPI 3'-O"x5'-6" VINYL D.N./TRAN, - T MAaTER BEDROOM Y-ON3'-0" VINYL AWNING - U MASTER BEDROOM Y-ONY-0" VINYL AWNING - V MAOTER BEDROOM 3'-0"x3'-0" VINYL ALNING - W MASTER BEDROOM 3'-0"x3'-0" VINYL AILNING - X STAIR 3'-6"6'4" VINYL FIXED - Y W.I.G• 3'-0"x1'-0" VINYL AWNING - Z W.I.O. 3'-0"4'-0" VINYL AWNING - AA MA6TER BATH 3'-0"x3'-O" VINYL AWNING 55 MASTER BEDROOM 3'-0"x3'-O" VINYL AWNING - CG MA6TER BEDROOM 314"x3'-0" VINYL AWNING ~ DD MATER 5EDROOM Y-0"x3'-0" VINYL ALNING - EE OFFICE Y-4"x5'-0" VINYL D.H./TRAN. - W FF C FIIGE 3'-4"x5'-0" VINYL D.H./TRAN. Q ami CG BEDROOM No.2 3'-4'x4'-0" VINYL D.H. - HN 5EpROOM No,1 3'-4'x4'-O" VINYL D.H. - `� JJ BATH No.I 2'-0"x3'-4" VINYL D.H. Q 53'-11/2" ¢, w 22'-5 1/2" 13'-6 I/2" 8'-3 I/z" U way 2 3 ar w A-7 A-1 Pq t � \ _.... - - - - -- - - - - - - - - - - - - - - � - - - - - - - - - _ - _ _ - - - - z MASTER 5,41H \ WHIRL COL \ O / TUB \ \ I `\ 51-IOUJER17 I — . - - - - - - - - - �1 I 5TOR GE 42"45H WALLCA \ r '_ w•r c DECK •_ ANO / 1 Q A/C I I I _ 1 MASTER 5EDROO'1 Il4ALL ^2 42" HIGH WALL Tv I A-9 z (DQ 1l. Q I M � N � U / 3'-8 3 4'41 3 3'-8" ( p4 WALL LINE BELOW - Z ROOF LINE BELOW STAIR O w A-S 2 \A-8 8'-011 22'-6 1/2" 13-6 I/2" 8'-3 I/2" 8'-1" DATE OF ISSUE Oro-29-04 DRAWN BY: I i--f ( D FLOOR PLAN SHEET NO. SCALE 1/4 11 1'-0" 04018 A/C AREA = 1,0ro4 5.1r. g A-4 NORTH �,•. -�, C, c�. REVISIONS Q0-1-28-04 i i I ROOF BEARING LEVEL - - - - - - - - - - 17��- - - - - - - - - -- - - - - - -- VINYL SHINGLE SYST€M METAL ROOF IL-Li I THIRD FLOOR LEVEL _ _ _ _ _ T RD LO R L EVE -T - Q -- -- iFW 5 ENED ENCLC UE I T I I I I F I I oil Firs U SECOND FLOOR LEVEL STUCCO ON CMU WALL W ►.� Q FIRST FLOOR LEVEL -- - - - - - - - - - - - - - - . _ - - - - - - - -- - - - - - - – – - - — �. � - - - - - - - - - --.... — — — - — — �_ - - - - C` U E-•+ z 0 WF-5T ELEVATION -el SCAL.1E 1/4" I._ 0.4 0„ W I ROOF SEARING LEVEL -I' VINYL SHINGLE 5Y5TEM ___..4"E II - - -171111 111 IILIHI I NI FL OR LE L I YT-Y ii-L_:�7 I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 1 -1 17 1 1#- O 4-1111 111111111111 1 1 H1111. 11111 1111111111111 1111 1111111111111111111 - fsieec) ENGL Q 11 TRE IL SYSTEM a+ U cn W a H w SECOND FLOOR LEVEL cn _ ---- GANtIvEVERED 4 �• BEAMu •- STUCCO ON I(o'-0" x 8'-m"GARAGE DOOR / \ -_ CMU WALL -� STUCCO ON STUCCO ON FRAME CONSTRUCTION CMU WALL OPEN ' DKrE OF - \ ISSUE Ll 06-2'3-04 FIRST FLOOR LEVEL - _ - __ - - - - .._.. __ - - - - - ._ .. _ - - - - - - - - - - _ -- - - - - - - - - - _ - - - - - _ - - - - - -_ _ - - - - r`QF �� '�,� D Y. RAWN 13 D . ` WGP SHEH'P NO. ' 04018 5T ELEVATIONo A-5 SCALE i/4 = V-m" Is ® / REVISIONS Q07-28-04 ROOF SEARING LEVEL TTQ THIRD FLOOR LEVEL ooC� C� 00 / INSECT ENING / Iq ALUM IFSTEM V F'E'ED 44 OST,TYF' SECOND FLOOR LEVEL A A lul � STUCCO ON CONCRETE BLOCK Q FIRST FLOOR LEVEL r- V M � F z d NORTH ELEVATION 5CAL.E 114" ROOF BEARING LEVEL — — — — — _ — — — — — _.._ — ____ ____ _" — — VINYL SHINGLES THIRD FLOOR LEVEL VINYL SHINGLES pOUBLE HUNCs VINYL WINDOWS M ,' A. U SECOND FLOOR LEVEL Z pq14 W � W STUCCO ON CONCRETE BLOCK pU� DATE OF ISSUE Oro-29-04 FIRST FLOOR LEVEL T — — — - r T — _ — — — — _ _ _._. . ►~ ` F f '" DRAWN BY: WSP �/) F t • -- SHEET NO. 04018 V � I DN '2 r, A-6 SCALE /4n n I1-011 ,I'��l�l:,. @ / REVISIONS Qm�-28-04 METAL ROOF ON GRACE ICE AND WATER SHIELD ON Vz" �- METAL ROOF ON GRACE ICE PLYWOOD SHEATHING ON TRUSSES � 24" O.C. AND WATER SHIELD ON 112' �^ - PLYWOOD S '�HEAWING ON I JOISTS TRU85 SEARING r m 24"O.G. VERIFY ELEVATOR HEADROOM REOUIREMENt - ALUM,DRIP OVER P.T. Ix2 OVER P.T.2x& FASCIA,TYP. , N 2x8 CEILING JOISTS VINYL SOFFIT VENT SYSTEM SLOPED w/ROOF MASTER_PEDta+ OOM W 1IN r A 3/4" PLYWOOD DECK GLUED ANp ~ 3/4" PLYWOOD DECK GLUED AND NAILED TO JOISTS NAILED TO JOISTS METAL ROOF ON GRACE ICE O AND WATER SHIELD ON 1/2" THIRD FLOOR PLYWOOD SHEATHING ON 0-� JACK TRUSSES a 24" D.C. w 14" TJI JOISTS L___L14" TJI JOISTS VINYL SOFFIT SYSTEM _ N x VINYL SOFFIT SYSTEM R-13 ACOUSTIC L__ R-13 ACOUSTIC U BATT INSULATION BATT INSULATION i7: L__ a„1 W viz"GWB GWB L___� L U M w� JL l _ E...1 m � — N � 0 ty 0 ___LANDING __ _____ VINYL SIDING SYSTEM X ON 1/1" SHEATHING ON �++ 3V2" WOOD STUDS 0 Ib" O.C- ELEV. 6HAE-1 5--- J 1/2"GWS OVER R-13 BATT INSULATION FOYE GOVEREP. PORCH r ——J "TREK" RAIL SYSTEM 5 �r _ J DECK CONSTRUCTION: EPDXY iii" PLYWOOD DECK GLUED AND _T COATING ON PREPARED 3a" NAILED TO JOISTS ——J SLOPED PLYWOOD DECK SECOND FLOOR 2x8 0 i'4" O.C. m 12" TJI JOISTS I w HANGERS BOTH 2-115"x14" LVL m END R-13 ACOUSTIC k L___ VINYL SOFFIT SYSTEM BATT INSULATION l CAST-CRETE BEAM of SPLICE OUTSIDE .1 _ LSTUDS * WINDOW SILL LEVELS — - NOT —3/4" SYNTHETIC FINISHED STUCCO GAA I�l ON BLOCK w W SHOLUN — LANDING — — — a C,4RACE a r , m z SPLICE SIDEWALL 2x6 V N wJ STUDS 6 LANDING LEVELS N 11 K, (� x U 4" 3000 P51 FIBER REINFORCED _— _m x 6 H CONCRETE SLAB ON 6 MIL PVC — Z VAPOR BARRIER ON 959. MODIFIED PROCTOR COMPACTED FILL,w/ _ —J 2+ H TERMITE TREATMENT,TYP.11 N FIRST FLOOR _ 5 — w �. .p n > .n .. ELEVATOR PIT o D , A /.j /- /../ , GRADE DRIVEWAY a j\j vp \\�\\/\\/\\/\\ .. Q / / \/\/\ / / / / ° ° p \ \ � \\ a a \\ \\ /\/\\/ //\\//\\//\\//\\//\\ //\/�\\ /\\�\ —TYPICAL FOOTING,24"xl2" �i\�% %\\\%\�% j\\\j/ /\\\/ DATE OF 8 \\%\\/\\/�\\ = 77, �\ w/3-YO BARS CONT. t ISSi]E 05 TIES m 48 O.G. Orb-2'9-04 / DRAWN BY: Al fir �(V 2 WALL SECTION 1 WALL !BEC I I01 V •..� �r SHEET NO. `' 04010 A-8 SCALE: �/2" - 1'-m" A-8 5GALE: I/2" = I'-o" A-8 REVISIONS Q0-1-28-04 CAST-IN-PLACE 3000 P51 GON ______ ______ __ -_----__ ____ ____-- _ _______ 2-05 BARS CONT FROM --- ------------------- - -�� - -- --- ------ -- -------------------- --------------- BONA BEAM 111 I I I II If II II II 11 II II II it II II 11 II II II _-___-_ _-__LL..___ _____SJ__________11________________________________ ______ 11LL �1_-_---,-__,--_„_.-.--____.___________ II II II FACE OF BEAM BEYOND I I II II II 11 II II 11 II II ' CMU II BENT DOUJELS FROM FILLED CORES 1 , ,I II II ,I I, 11 II „ �I II II II II it II 11 II II II II II II II g-1 SCALE.- P = 1'-m'1 V z W � A Q o 81-/h II651-411 22'.811 � V 2 3 r� A-7 < a-1 W --- -� a . - - M ---------------- ------- -I---I- ---------------------------- ----------T--r ------------------- 1/1 -------------- I I I ' r1 I I I I I I I I I I I I I I I II I III I I I I I I I III o I I I I THICKENED SLAB,2'-0"x2'-0" x 8" I I I I THICK w/3-4`5 BARS E.W. ------- -----J I I 4 11/2"x8" ANCHOR BOLTS TO SIMP50N ASU44 I III � I I I I i I I I I I I I I III N I I I I I I I I I I I I ' --- _�-I___I� I I u I I Q I -_-- --I--- THICKENED SLAB, 1'-4 LUIDE x 8 I I I I j l THICK w/3-05 BARS CONT. 415 I I I i L-- _J I I L j I TIES 0 32" O.C.,TYP. 4 v2"x811 ANCHOR.5OLT5 I I 1 32" O.C.,TYP. I I I I 1 1 I I I I I I I I I I j I 1 THICKENED SLAB, 1'-4" U OE x 8" I I j CAST-CRETE BEAM THICK w/3-05 BARS CONI. 4 05 I I I I I ABOVE TIE$ o 3211 O.C., TYP. 4 112"xW ANCHOR BOLTS I I I I I I I ® 32" O.C.,TYP. CMU POST j l I 4" F18ER REINF.CONC.SLABw l j j « I I /2- 5 BARS VERT TO BEAM I I ON VAPOR BARRIER I I I ( I I I ON COMPACTED FILL,TYP. I I 3-0'x3-0 xl-0„ FOOTING ' 1 I I I I I j j I I TOP 1'-4” BELOW FIN.FLOOR j 1 I I 1 j I w/3-05 BARS Eb. 4 2-05 DOWELS UP IN FILLED I I I j I I j CELLS,TYP. I I 1 I I I I I r---------- -- I I I I I I r I l__ -- - - — ..- -.. — - - +- 1 1 I I I I I I I I I L___ __J «5 VERTI VAL ROD IN CELL I h-I -� J 1 Z F ILLEDw/ 3000 P51 GONG I N - / — — — — __ _ — I i A-1 7 PI ATMAX. 32" O.C. AND AS SHOWN, LEVIII iIIII L-III L---_--- PROVIDE "a HOOK BAR (INTO CAST-CRETE BEAM all BOND BEAM. I -- --_-J � JI F - JIIIII A-9 / ai V�N mNNm¢ O -- ---- - � L--- - ----- _ _---- LINE OF DECK ABOVE - ___ _ -_---_ L- ------- -------..--_ ---- ats7 rr� oil Oil � Q CANTILEVERED GAST-IN-PLACE I 2 S%"4, x8" ANCHOR BOLTS CONCRETE BEAM ABOVE SET IN GONC f> MAX 32" O.C. DATE OF ISSUE 06-213-04 DRAWN BY: FOUNFDATION PLAN- SCALE I% I'-0" r� .•e.. '� SHEET NO. NORTH 04018 04m18 S REVISIONS Q0-1-28-04 V z W � A A o � Qw Ir-21/2" 12'-011 N x 3 � Q V a 2 12" RIM JOIST, TYP, r-, FRIO IL m O O Ln to Z x N 12" RIM JOIST,TTF. 4-9 4ST-ORET15 15EAWBEL� 1 WI/5 TJI TOP v2" B LOIU LOOF JOIS N ELEV. ` N 5LOD 2.6 1' 4" 0. .ON ANGE m 3 STRING 5 I liz JL, JL H FROM 2x12 2x8 A 16" 0. . 2x8 Is 16" O.C. � d b 3 14" LVL LINE OF DECK ABOVE rip- C.4z \ O U CANTILEVER CONC BEAM 5 TO CORNER 5EE DETAIL 1/5-3 1 A-8 3-2x8/ � Q 2 U A-8 DATE OF r-*N\ &EC0N[) FLOOR FRAMING FLAN ISSUE Oro-29-04 SEE HOLD DOU1N ELEVATION AT SHEETS 5-4 AND 5-5 DRAWN BY: NORTH OF ......; •f `,`4. 1141y SHEET NO. :c r,A 04018 x .. S -2 REVISIONS Q01-28-04 2-2x6/1 2 A-1 z-2x6 2 x6/I 2-2x6 I B-1 I - 14" L L \ 2-2x6/2 / � 0*1- \ 2- 8/2 ` / 11 � 2 �--' //�/2- 8/2 0 2-2x61 2 x6/I 2-2x6 I 2 x6/I 2- 8/I 2- 8/I 2-2x8/2 d 1 N ►r FA_a 00F FfRAt'-IING PLAN � w E SCALE /a" z i'-0"Ll U M �-•1 NORTH TRUSS TO TRU55 CONNECTORS TO 5E DESIGNED AND F'ROvIpED � 5Y THE TRUSS PROVIDER 04 2 At A-8 a 2 � � —..._ A2� r o JACK I RUSSEB 24" O.C. \\ MOOPx36 w/ , \\ LV. SEAM, Z11 28 0d N--LTRUSS LL ABJ A-9 2 - 18" LVL 2 - 14' LV 2-81 P C 6,66-- - _-- RIDGE_ W/ 31, O R TOP ` LV1. BE 411, o 28- d AIL5 DTA OVER PLYWOO DECK \ \ a \ ss \ \ \ I6' 3/4" - 2x6 ROOF FRAMING 14" Vi/550 I IZ 1 ca 6" O. 14" LVL w/ TAPEREDCA p 2- I P C&66 w/ ' OVERT LV BEAM, x <n 28-I d AILS OTAj[' - -- � `\+s A-9 v 2" HIGH LUALL I " RIM J015T.TVP. _.•_ 2 - 14" LVL \ 2 ' N n TRU55 \ W N ELE 7C ` A 1 / CK T SES 2 " O.C. m m JOCK TRU ES :O.C,3 STRING 52 - 14" LvL - FROM 2x122 ` 2X6 -0 \ DATE OF ` ISSUE 2-2x8/2 c� ` 08-29-04 L ri _,PRAWN BY: 3-2x8/201 G OF •PNCP �a • r [.J) - SHEET NO. rOA9SO 04018 THIRD FLOOR 4 PARTIAL ROOF FRA�IING fz�.AN-" fill, $GALE 1/4 = 1'-0" .. G S3 _ SEE HOLD DOU.N ELEVATION AT SHEETS 5-4 AND 6-5 NORTH �` REVISIONS F� U W � o � U 3 W 2 A-'1 G" �4 � U 12" RIM JOIST,TYP. N wl � 1 W A-9 p p ` cmv m � w O a ( N c 1+ til N N N m X N m 2 12" RIM JOIST TYP. 1 CAST-CRETE BEAM BELOW Lw N Y uJ C4 uJ m z0 {O II Inic;JSX X Li U M w m u m�i N vai 1. - LA N 1 M 3 STRINGE IRS FROM 2x12 A'' UV. 3 - 14 LYL 2x8 g 16" O.C. X X Zx8 g 16" O.C. E W W o U N N N N \'\ CANTILEVER CONC BEAMS TO CORNERI-PW SEE DETAIL 1/6-3 A 18 3-2x8/2 \ U A-8 DATE OF S COl�lI� FLOOR FRAMING PLAN ISSUE -2e- SCALE 1/4' = 1'-0" „�' / .� DRAWN BY: SEE HOLD DOWN ELEVATION AT SHEETS 5-4 AND 5-5 F, NORTH ', '``•`� '. ' ' Ag SHEET NO. ', n ••�.I• r S -2 REVISIONS 2-2x6/1 2 A-� \\ 2-2x6 2 x6/1 2-2x6 I 5-1 1 - 14" L 2-2x8/2 / . • i�ORCH \\ , X ---- --- --- -- N N MAT O0 \ / W \ I i/ 2-2x(0/11 11 2� x6/I I I 2-2x6 I 2 x6/I 2.10/1 2- 8/1 2-2x8/2 0 / V ELE \ / WNx A-8 U . a W '00 Ffi;ZAM lNG PLAN � SCALE 1/4" = 1'-m" U NORTH TRUSS TO TRUSS CONNECTORS t0 BE DESIGNED AND PROVIDED (� BY THE TRUSS PROVIDER z A2-7 W � JA K TRJSI,ES g 24' O.G. V \\ JACK I RU55ES 2411 OC \e/ \ I w/ 'MOVER OPPSON x36 / \\ LV BEAM, ` 26 Dd NAIL TOTAL \ TRUSS LL AB / - x / 2 - 18" LVL 2 - LV , N ----------- w/ ' OV=R TCP \ LVI. BE M, 28- d AILS OTA \ �\ x6 RDOF-0-VTf RAMING -' \\ OVER PLYWO DECK \\ 9 U X 111 N p-. \ \ 16' 3/4"Lu \ ` \ 24 ROOF FRAMING 14" 1/55 Z x 1 ' OZ. 6" O. -1 14" LVL w/ TAPEREDU 2-611PEON C 6x36 w/ ' 0 RT ' Lvl. BE 4M, �o u 28-0d AILS OTAJ�, u x rn Nj L JL JL v 14" RIM JOIST.TYP, I 2 - 14" LVL \ 2 \ W 0 TRUSS CV / 111 N N \ \\ 1 y/ E LIE CIA mu- Mu- \\ y CK T SES 6 2 " OC. J CK TRU ES 9 24 O.C. `!o / \ s • \s 3 STRING \ 2 -114" LVL FROM 2x12 2x8 \ DATE OF 2-2x8/2X8 16 C.C. 110 \ ISSUE cZii �p 0 DRAWN BY: 3-2x8/2 1 (0 2 , b A-8 A-8 ro Q : 00 ''-����l �:. SHEET NO. �� � � �TIAL ROOF F RAM I NG F 'G`�� 04018 SCALE 1i4�� = 1'-0" ��� FfiEP_ P� S_3 SEE HOLD DOWN ELEVATION AT SHEETS 5-4 AND 5-5 �'r t r i t I II I It It �� NORTH ____y_y_ , REVISIONS H25A w/10-8d EA.TRUSS H6 v 48" O.C.AND AS SHOIIIN w/ 8-8d TO PLATE t 8-8d TO STUDS HCP2 w/12-10d NAILS 9 HIP TRU55 ROOF BEARING LEVEL — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — �- — — — — — — — — — — — — — — — — — — — 4 7—fl—, — -- — — — — — — — — — — — — — — — — — — — — — — — — — — — — If I If If I ALL EXTERIOR SHEATHING TO BE 15/32" PS-1 W2.5A w/ 10-8dOR Fi GRADE SHEATHING NAILED AT 4" O.C. 6 EA.TRUSS SIMPSON C628 AT DIAPHRAGM BOUNDRIE5 AND AT ALL PANEL w/3" OVER TOP EDGES AND 6" O.0 AT ALL OTHER EDGES. H6 im 48"O.C.AND AS SHOWN w/ AT WALL STUDS TO OF STUDS t 9" ON AT WALL STUDS TO 8-8d TO PLATE t 8-8d TO STUDS RIM JOISTS,SIMPSON JACK STUDS,w/ RIM JOISTS,SIMP60N HCP2 w/ 12-10d NAILS H6 STUDS TO JOISTS IS-10d NAILS TOTAL H6 STUDS TO JOISTS o HIP TRUSS a-ed TO STUDS,6-6cl 57F70-=5,Fed TO RIM JOISTS a 32" O.C. 70 RIM JOISTS g 32" O.C. THIRD FLOOR LEVEL — — — — — — — —�— — — � SIMPSON CS36 3" OVER w/3" OVER TOP u� l� �L--•.—J OF STUDS 4 '3" ON JACK STUDS,w/ 18-10d NAILS TOTAL ALL EXTERIOR SHEATHING TO BE 15/32" Fi w OR P5-2 GRADE SHEATHING NAILED AT 4" O.C. AT DIAPHRAGM BOUNDRIES AND AT ALL PANEL EDGES AND 6" O.0 AT ALL OTHER EDGES. V I- SIMPSON AC4(MIN)w/ 12-16d TO BEAM t 8-11 — — — TO POST,TYP.EA POST SECOND FLOOR LEVEL A 2- SIMPSON MSTAIS w/ 1- SIMPSON MSTAM24 w/ a/ 7-10d TO BEAM t 5-144"41/4" 9-I0d TO STUDS t 5-1/4"x2144" TITEN HEX HEAD SCREWS TITEN HEX HEAD SCREWS TO POST,TYP.EA POST TO CMU,TYP. w STAIR NOT SHOWN ' OPENLL • � U W � p., W FIRST FLOOR LEVEL E-4 z WEST .HOLI]I]OWN ELEVATION � SCALE 1/4u 1'-0u H25A w/10-8d ® EA.TRUSS HCP2 w/ 12-10d NAILS g HIP TRUSS ROOF BEARING LEVEL — — — — — — — — — —� — — — — — — — — — — — — — — — — — — — — — — — — — — — — — If ALL EXTERIOR SHEATHING TO BE 15/32" P5-1 OR PS-2 GRADE SHEATHING NAILED AT 4" O.C. AT DIAPHRAGM BOUNDRIES AND AT ALL PANEL EDGES AND 6"O.0 AT ALL OTHER EDGES. — H25A w/10-8d 2-SIMPSON C536 AT WALL STUDS TO AT WALL STUDS TO e EA.TRUSS 13" OVER TOP RIM JOISTS,SIMPSON HCP2 w/12-10d NAILSl_VL AM t S" ON H6 STUDS TO JOISTS 1,4o STUDS TO JOISTS g NIP TRUSS JACK STUDS,w/ 8-2d TO STUDS,&-ad 8-8d TO STUDS,6-8d THIRD FLOOR LEVEL 18-10d NAILS TOTAL TO RIM JOISTS a 32" O.C. TO RIM JOISTS S 32" O.C. - - - - - - - - - - - - - - - - - - - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — HOLDDOILNS SAME AS WEST ELEV. If 11 ---------------- L--- ALL --------------- L---ALL EXTERIOR SHEATHING TO BE 15/32" PS-1 / \ / \ L- --7 EN SYSTEM � Z OR PS-2 GRADE SHEATHING NAILED AT 4" O.C. AT DIAPHRAGM BOUNDRIE5 AND AT ALL PANEL L- -------------- Q EDGES AND 6"O.0 AT ALL OTHER EDGES. M SECOND FLOOR LEVEL • NW 2- SIMPSON MSTAIS w/ �, W a W 1-I0d TO BEAM t 5-3/1ii" ---------------- TITEN HEX HEAD SCREWS 1- SIMPSON MSTAM36 w/ L ? TO POST,TYP,EA POST U S-10d TO STUDS t 5-1/4"x21/4" L p / L_ T ENHEX HEAD SCREWS I6'-0"x 8'-0"GARAGE DOOR STAIR NOT SHOWN L---L------------------ / OPEN DATE OF \ ISSUE FIRST FLOOR LEVEL - - - - - - - - - - - - \\ - - - - - - U�•,,,L,0I'j/ DRAWN BY: r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - :F- SHEET NO. A W 04016 ELEVATION , '. S-4 o� - SCALE 1/4" c 1'-0" '"410r CRED �`V���• REVISIONS H2BA w/10-8d— m EA.TRUSS H6 m 48" O.C.AND AS SHOWN w/ 8-8d TO PLATE t 8-8d TO STUDS HCP2 w/12-10d NAILS— m HIP TRUSS ROOF BEARING LEVEL AT WALL STUDS TO W2.5A w/10-5d LVL JOISTS,51MP50N ALL EXTERIOR SHEATHING TO BE 15/32" PS-I m EA.TRUSS H6 STUDS TO JOISTS OR P6-2 GRADE SHEATHING NAILED AT 4" O.C. 8-8d TO STUDS,8-6d AT DIAPHRAGM BOUNDRIES AND AT ALL PANEL H6 m 48" O.C.AND A$SHOWN w/ TO LVL JOISTS m 32" O.G. EDGES AND b" O.0 AT ALL OTHER EDGES. H2.5A w/10-6c 84d TO PLATE t 54d TO STUDS m EA.TRUS HCP2 w/12-10d NAIL HCP2 w/12-10d NAILS m HIP TRUS m HIP TRUSS THIRD FLOOR LEVEL Ll - OO 0000 / \ ALL EXTERIOR SHEATHING TO BE 15/32"PS-I W / \ OR P5-2 GRADE SHEATHING NAILED AT 4" O.C. / \ AT DIAPHRAGM BOUNDRIES AND AT ALL PANEL T ` EDGES AND 6" O.0 AT ALL OTHER EDGES. V I- SIMP60N AC4(MIN)w/ 12-16d TO BEAM t 8-16d TO POST,TYP.EA POST – SECOND FLOOR LEVEL — — — — — — - SIMPSON A 2- SIMPSON MSTA18 w/ 1-10d2 2TO BEAM 15-1/4"A41/4" 1-10d TO iz" TITEN HEX HEAD SCREWS 0 TITEN X HEAD SC WS TO POST,TYP.EA POST 0-4 TO F G T,TYP.EA IC ST LJ <Il u �4 FIRST FLOOR LEVEL - - - - - - - - - - - � � U H z NOIRTH H0L[:)F,)(f)WN ELEVATION l � SCALE 1/4" I'-0" H2.5A - .5 0 Sd m EA.TRUSS HCP2 w/12-10d NAILS V m HIP TRUSS ROOF BEARING LEVEL ALL EXTERIOR SHEATHING TO BE 15/32" P5-1 % \ OR PS-2 GRADE SHEATHING NAILED AT 4" O.C. \ AT DIAPHRAGM BOUNDRIES AND AT ALL PANEL EDGES AND 6"O.0 AT ALL OTHER EDGES. H2.5A w/10-8d irl J I I I t I 12�1 ll/ \ AT WALL STUtS TO m EA.TRUSS LVL JOISTS, O 101STS HCP2 w/12-10d 8- STUDS t NAILS 8Sd TO STUDS,8-8d m HIP TRUSS,TYP. I TO LVL JOISTS m 32" O.C. I THIRD FLOOR LEVEL — — — — — — — — — — — — — — — — — — — — — — — — — — — - - — — — — — — —BEARING m SUN ROOM ALL EXTERIOR SHEATHING TO BE 15/32" PS-1 OR PS-2 GRADE SHEATHING NAILED AT 4" OC. AT DIAPHRAGM BOUNDRIES AND AT ALL PANEL EDGES AND 6"O.0 AT ALL OTHER EDGES. U W c eU SECOND FLOOR LEVEL — — — ZO Z5 — — U vl- SIMPSON MST M36 w/ S-10d TO STUDS 15-1/4 11x21/4" TITEN HEX HEAD SCREWS STAIR NOT SHOUN TO CMU,TYP. DATE OF ISSUE 06-29-04 F L �•.�G DRAWN BY: FIRST FLOOR LEVEL - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - G. P .y �'• HCsP :z 6 SHEET NO. .' 04018 5OUTH HOLIDIDOWN ELEVATION S-5 SCALE 1'-011 �<<� , REVISIONS METAL ROOF ON GRACE ICE AND WATER SHIELD ON %" PLYWOOD SHEATHING ON TRUSSES 24" O.C. METAL ROOF ON GRACE ICE AND WATER SHIELD ON 1i2" PLYWOOD SHEATHING ON TRUSSES r g 24" O.G. ALUM.DRIP OVER P.T.Ix2 14" LVL BEAM OVER P.T.2x6 FASCIA,TYP. 2'-0" VINYL SOFFIT VENT SYSTEM ALUM.DRIP OVER P.T.Ix2 OVER P.T.2x6 FASCIA,TYP. 21-011 VINYL SOFFIT VENT SYSTEM VINYL SIDING SYSTEM THING ON MASTER OOl"I 31N"WOOD STUDS -9 6"O.C. a MASTER 5ATH � W CONT. FLASHING 11/2"GWB OVER GWB OVER u r R-13 BATT INSULATION R-13 BATT INSULATION WOOD BASE WOOD BASE f/2" SHEATHING EXTENDS TO Z BOTTOM OF LVL BEAM PREFABRICATED WOOD TRUSS SUPPORTING JACK TRU55ES A 3/4" PLYWOOD DECK 3/4" PLYWOOD DECK 1--1 GLUED AND GLUED AND METAL ROOF ON GRACE ICE AND WATER SHIELD ON /2 METAL ROOF ON GRACE ICE W NAILED t0 JOISTS NAILED TO JOISTS AMC) WATER SHIELD ON i" THIRD FLOOR THIRD FLOOR ACK TRUSSES aT24" O.C. PLYWOOD 2 �••� O PLYWOOD SHEATHING ON TRUSSES � g 24" O.C. 14" TJI JOISTS 14' TJI J015TS �, w 16' O.G. cricr, 16' O.C. R-19 BATT INSULATIO 12 - r 14 N � ALUM.DRIP OVER P.T.Ix2 V ACOUSTICAL L ACOUSTICAL OVER P.T.2x6 FASCIA,TYP. a INSULATION INSULATION TRU55 BEARING 2 - 18" LVL BEAM 2 - 18" LVL BEAM VINYL SOFFIT VENT SYSTEM ALUM.DRIP OVER P.T. Ix2 a w 2'-0" OVER P.T.2x6 FASCIA,TYP. 1/2 GU1B i�z GU18 viz GWB ,rr1 U p R-19 BATT INSULATION VINYL SOFFIT VENT SYSTEM M 0-4 tu 2-2x8 HEADER Z 04 0 8 VINYL DOUBLE HUNG WINDOW 0 Q 8 w/TRANSOM�xV' ANCHOR BOLTS 0 32" O.C.,TYP. VINYL SIDING SYSTEM VINYL SIDING SYSTEM -1 ON 1i2" SHEATHING ON ON 1i2" SHEATHING ON 312" WOOD STUDS m 16" O.C. 31/2"WOOD STUDS a 16" O.C. PANTRY OFFICE COVERED PORCH 1/2"GWB OVER Y'GWB OVER V/2"GWB OVER "TREK" RAIL SYSTEM R-13 BATT INSULATION R-13 BATT INSULATION R-13 BATT INSULATION WOOD BASE WOOD BASE WOOD BASE DECK CONSTRUCTION: EPDXY VINYL SIDING SYSTEM 34" PLYWOOD DECK GLUED AND 4 COATING ON PREPARED ON 1/2" SHEATHING ON SLOPED PLYWOOD DECK ii NAILED TO JOISTS 3 2" WOOD STUDS im 16" O.C. SECOND FLOOR SECOND FLOOR SECOND FLOOR CONT.ALUM FLASHING 'n 12" TJI JOISTS CONT.RIM JOIST,TYP.. `n CONT.RIM JOIST,TYP- 'n CONT.RIM JOIST,TYP. 1"x14" CONT.TRIM BAND 1"x14" CONT.TRIM BAND CONT.ALUM FLASHING CONT.BOND BEAM,05 BAR CONT CONT.BOND BEAM,05 BAR CONT R-13 BATT INSULATION ON BEAM BLOCK w/300 PSI CONC, - ON BEAM BLOCK w/300 PSI CONC, _ 1i2"08" ANCHOR BOLTS a 32" O.C.,TYP. 1i2"Ox8" ANCHOR BOLTS g 32" O.C.,TYP. �i2"GWB ON FRAMING CONT.BONA BEAM,'S BAR CONT ON BEAM BLOCK w/300 PSI CONC, 1-HOUR RATED GWB CEILING, I-HOUR RATED GWB CEILING, 1/2"Ax8" ANCHOR BOLTS a 32" O.C.,TYP. 2 LAYERS Na" X BOARD 2 LAYERS Nei" X BOARD R-19 BATT INSULATION 1%4,VERTICAL BARS IN FILLED CELLS 5/8110 VERTICAL BARS IN FILLED CELLS g1e"o VERTICAL BARS IN FILLED CELLS 0 LOCATIONS SHOWN ON a LOCATIONS SHOWN ON m LOCATIONS SHOWN ON FOUNDATION PLAN,SPLICE BARS FOUNDATION PLAN,SPLICE BARS FOUNDATION PLAN,SPLICE BARS �t AS PER A.C.I.CODE AS PER A.G.I.CODE AS PER A.G.I.CODE 3/4" SYNTHETIC FINISHED STUCCO 3/4" SYNTHETIC FINISHED STUCCO 34" SYNTHETIC FINISHED STUCCO ' ON BLOCK � ON BLOCK � ON BLOCK BEDROOM No. I WORK SHOD Q z GARAGE � M U a =u 4" 3000 PSI FIBER REINFORCED 4"3000 PSI FIBER REINFORCED 4"3000 PSI FIBER REINFORCED (;j H Q W CONCRETE SLAB ON 6 MIL PVC CONCRETE SLAB ON 6 MIL PVCPVC VAPOR BARRIER ON 95go MODIFIED VAPOR BARRIER ON 95go CONCRETE SLAB ON 6 MIL ODI Z u W MODIFIED VAPOR BARRIER ON 95q•MODIFIED °\ Q U PROCTOR COMPACTED FILL,w/ PROCTOR COMPACTED FILL,w/ PROCTOR COMPACTED FILL,w/ I TERMITE TREATMENT,TYP. gib"Q DOWEL BARS IN FILLED CELLS TERMITE TREATMENT,TYP. %9 DOWEL BARS IN FILLED CELLS TERMITE TREATMENT,TYP. 5/8"t DOWEL BARS IN FILLED CELLS W a LOCATIONS S SHOWN ON g LOCATIONS 5 SHOWN ON g LOCATIONS 5 SHOWN ON \ � FIRST FLOOR FOUNDATION PLAN FIRST FLOOR FOUNDATION PLAN FIRST FLOOR FOUNDATION PLAN \\ �//j // //// // // / •/ /' GRADE /\/j\/\/\//�//\//\/ //\/ GRADE Al j\%j\/j _ • /\\�\ TYPICAL FOOTING,24"xi2" a /\ TYPICAL FOOTING 24"4" \�i// .. ///\�/� DATE OF /\/\/ \� �='a ===—� /\\j ISSUE w/3-5/8 p BARS CONT. tw/3-5/a9 BARS CONT. ta n \/\/ /��• 05 TIES a 48"O.C. �i\\j�\/�/\/\/\/\/\j\�� 5 TIES 0 48" O.C. FL DRAWN BY: F '� WALJ_ SECTIONr2 � WALLUJ B S C�" 101 1 SECT I01 1 A-� SCALE: i/2� 1'-0" A-� SCALE: �i2" = I'-0" SCALE: 1/2" 1'-V r SHEET NO. _ •i ,'�� 04018 " cl A-7 REVISIONS METAL ROOF ON GRACE ICE AND WATER SHIELD ON 1/2" METAL ROOF ON GRACE ICE PLYWOOD SHEATHING ON 24" O.C. AND WATER SHIELD ON TRUSSES ® PLYWOOD SHEATHING ON I JOISTS TRUSS BEARING im 24"O.C. VERIFY ELEVATOR HEADROOM REQUIREMENT \ ALUM.DRIP OVER P.T. Ix2 OVER P.T.2x6 FASCIA,TYP. 2x8 CEILING JOISTS VINYL SOFFIT VENT SYSTEM SLOPED w/ROOF C MASTER BEDROOM U z W � A 3'4" PLYWOOD DECK GLUED AND 3'4" PLYWOOD DECK GLUED AND NAILED TO JOISTS NAILED TO JOISTS THIRD FLOOR _ 14"7J1 JOISTS L___ 14" tJl JOISTS METAL ROOF ON GRACE ICE AND WATER SHIELD ON 1/2" PLYWOOD SHEATHING ON L- -— [V x JACK TRUSSES 0 24" O.C. R-13 ACOUSTIC L——— R-13 ACOUSTIC VINYL SOFFIT SYSTEM �' U BATT INSULATION BATT INSULATION 1� 1'2„GWB 1,2"GWg VINYL SOFFIT SYSTEM U (h z i „ ----- -----Tl- ---------------- LANDING --------------LANDING ______ VINYL SIDING SYSTEM -' ON 1i2" SHEATHING ONffi 61 F 31/2"WOOD STUDS 16" O.C. F , ELEV. SHAFT 5--- Z -- J 2 R-13 BATTT INSULATION OVER FOl' COVERED PORCH _J \ "TREK" RAIL SYSTEM —J DECK CONSTRUCTION: EPDXY 3j4" PLYWOOD DECK GLUED AND COATING ON PREPARED 34" NAILED TO JOISTS —— SLOPED PLYWOOD DECK SECOND FLOOR . 12" TJI JOISTS L___� m wj www9w 1:3 L---� R-13 ACOUSTIC L——— VI YL SOFF T SYSTEM BATT INSULATION 1,_0„ EACH JOIST BEARING BELOW ADJACENT JOIST FOR SLOPE CAST-CRETE BEAM • c� SPLICE OUTSIDE WALL 2x6 tv3 STUDS a, WINDOW SILL LEVELS e ELEVATOR _ __ Q NOT _ _ Sia" SYNTHETIC FINISHED STUCCO CAA MOT ON BLOCK GARAGE SHOW IIIN w — LANDING - - - 61 j av� U M W SPLICE SIDEWALL 2x6 � O /� W w _J M STUDS 9 LANDING La LEVELS 0 t ' � U1 U CD 4" 3000 PSI FIBER REINFORCED ———i I J X � C7 yM W vWi CONCRETE SLAB ON 6 MIL PVC VAPOR BARRIER ON 95% MODIFIED PROCTOR COMPACTED FILL,w/ ——J 0 TERMITE TREATMENT,TYP. �� W FIRST FLOOR ELEVATOR PIT , •° 4 >/ / j / / / / GRADE DRIVEWAY /\\/\ //.✓/.�//.� .�//.� //. //. //. //. //. //. //. //. //. //, //. //. //. //. //. //.�//.�//.�/j\\//\\/j\\//\\//\\ ;. e \ \j//\\j/ %/\\ \j/\\j/\\j/\\ \%/\\\/\\/\\ �\/\\/\�\/\\\/.\\\ �\/\\\/\�\/\�\/ DATE OF S" \//�\/�\/�\//\ = TYPICAL FOOTING,24"x12" BARS CONT. t \/�\//\j� ISSUE 95 TIES +3 48" O.C. �i,\\j\\j\\j \j\\j/\\/\ �t�� Oro-29-04 L 0 f�/ 1 DRAWN BY: 2 WALL_ SECTION 1 WALL_ SECT f ON6q y I �- � ``• uj� SHEET NO. • Vim•, 0dfd1>3 A-8 SCALE: 1/2" = 1'-0" A-8 SCALE: 112 - V-0" ��•''•...�o'�Q�.`,' r TpA-8 ., ERE r"111111111111,,`` REVISIONS T-0" 8l--III HANGER z METAL ROOF ON GRACE ICE AND U IATER SHIELD ON 1/2 PLY OD SHEATHING ON 2x6 METAL ROOF ON GRACE ICE A 24" .C. AND WATER SHIELD ON 11/2" PLYWOOD SHEATHING ON �..� Q JACK TRUSSES ® 14" O.C. a 12 Qi w a I LVL BEAM ZBA7ULATION _ 4g 16" O.C.w TAPERED END - � NyyyyMyYY x 0 ALUM,DRIP OVER P.T.1x2 ALUM.DRIP OVER P.T. Ix2 Qr V 1,2OVER P.T.2xOVER P.T.2x6 FASCIA,TYP. a �� GWB 2x6 FASCIA,TYP. R-19 BATT INSULATION VINYL SOFFIT VENT SYSTEM VINYL SOFFIT VENT SYSTEM 2-2x8 HEADER r V M � Z C W � 8 VINYL DOUBLE HUNG WINDOW r`I FAMILY ROOM w/TRANSOM i2 Ox8 ANCHOR BOLTS 9 32' O.C.,TYP. WRAPED 44 POST ` DINING ROOT"I SCREENED PORCH r� %"GWB OVER R-13 BATT INSULATION SCREEN SYSTEM W00D BASE PECK CONSTRUCTION: EPDXY W PL1 tU00D DECK GLUED AND - VINYL SIDING SYSTEM 344„ ON DECK ON COATING ON PREPARED a SLOPED PLYWOOD DECK 312" WOOD STUDS 9 16" O.C. SECOND FLOOR CONT.ALUM FLASHING I"x14" CONT.TRIM BAND 2x8 JOISTS 6 12" O.C. CONT.RIM JOIST,TYP- ' CONT.ALUM FLASHING VINYL SOFFIT SYSTEM I"xl4" CONT.TRIM SAND CONT.BOND BEAM,r5 BAR CONT ON BEAM BLOCK w/300 PSI CONIC, 1/2"06" ANCHOR BOLTS A 32" D.C.,TYP. 1i2"GWB ON FRAMING CONT.BOND BEAM,15 BAR CONT i, ON BEAM BLOCK w/300 PSI CONC, 2 GWB ON FRAMING R-19 BATT INSULATION 1/2"mx8" ANCHOR BOLTS 9 32" O.C.,TYP. R-19 BATT IN5ULATION Y0 VERTICAL BARS IN FILLED CELLS 1/2' GU1B ON P.T. 2x2 FURRING 9 LOCATIONS 5 SHOWN ON 1/2' GWB ON P.T. 2x2 FURRING w/ 1 1/2" FOAMBOARD INSULATION FOUNDATION PLAN,SPLICE BARS w/ 1 1/2" FOAMBOARD INSULATION AS PER A.C.I.CODE N SYNTHETIC FINISHED STUCCO 3/4" SYNTHETIC FINISHED STUCCO Q' ON BLOCK ON BLOCK p OFFICE SITTING ROOT"I COVERED PATIO Q � y� / w 4 3000 PSI FIBER REINFORCED 4„ 3000 PSI FIBER REINFORCED CONCRETE SLAB ON 6 MIL PVC CONCRETE SLAB ON 6 MIL PVC z VAPOR BARRIER ON 9590 MODIFIED VAPOR BARRIER ON 95go �¢ PROCTOR COMPACTED FILL,w/ PROCTOR COMPACTED FILL, �� � u TERMITE TREATMENT,TYP. YO DOWEL BARS IN FILLED CELLS gib"O DOWEL BARS IN FILLED CELLS Sia 0 DOWEL BARS IN FILLED CELLS �, TERMITE TREATMENT,TYP. W a LOCATIONS S SHOWN ON ® LOCATIONS 5 SHOWN ON g LOCATIONS S SHOWN ON FOUNDATION PLAN,SPLICE BARS FOUNDATION PLAN,SPLICE BARS FOUNDATION PLAN,SPLICE BARS FIRST FLOOR III FIRST FLOOR FIRST FLOOR / / / / / / / • / / / / / / / / moi / / / GRADE • �\\/\\\/\\\/\ j\\/\\ .�\j\\/�\/\ j\\\/\\ DATE OF FOOTING,V-0"x3'-0 x1,-0 ISSUE \ i w/4-r5 BARS E W. 06-29-04 F L Q�, ili�� DRAWN BY: • HGP 2 1�,�L L S CS" f 01 1 1 WALL SECT 101 1 :••;����'��•P,;� . ..Z r� A-9 SCALE: 1'-0” A-g SCALE: 1i2" = 1'-0" `J N : r' SHEET NO. yo 0401S -.,cis TER ED P�' REVISIONS • w . U W � A A a w w N x U aw � U H Z H m DECK CONSTRUCTION: EPDXY COATING ON PREPARED 34" ;n SLOPED PI-TWOOD DECK `t "TREK RAILING SYSTEM %Q AND TREAD BOARDS cn SIMPSON TALO STAIR ANGLES 4"x4"xro" ANGLE w/ 2-/2"0 BOLTS TO �U; STRINGER a 1 1/2"0 STUD IN FOOTING a" UQ �¢ P.T.44 POST ON Z m SIMP50N ABL144, FACE OF BLOCK FOOTING I'-6,"x4'-5 3-4"x8" DEEP Q U i BOLT TO STRINGER w/ 2-04 BARS CONT. i W 2 COURSES 8x8 BRICK STEPS TO° CMU ON 24"x24NI2" DRIVEWAY 0 U�4 GRADE CONd DOWEL IN FILLED CELLS DATE OF ISSUE DRAWN BY: CC tt .1�:'�.� �• P�r ;� HGP 1 N Itt IR� 5TA I R c cry �10 SCALE: '�2" = 1'-0" �; c SHEET NO. 0018 A- 10 • �'�,,,4,��REO- tom`, REVISIONS CAS<FC 3000-PSI-CON ----------- ------ ----------- --------------------- --------------- 2-"5 BARS CONT FROM --- --------- � ----- --BOND BEAM I I I I I I IIIIIIIIII---- --------- -1L---- -----L'--_LL____ FACE OF BEAM BEYOND II II II II 11 II II II . II II II II II II II II II II II II CMU II II II BENT DOWELS FROM FILLED CORES I I I I II 11 II II II II II II II II II II II II II II II II II II II II II II II II II CANTILEVERED 5r=A r S-1 SCALE: P = I'-m'1 w U z ' w � A Q o 81-0'1 651-411 1--1 221-811 51 8'-01' II'-0" 11'-21/2" 121-0" N x U <( 23 � ►-a A-1 A-, �, w r ---------------- -------------------------------- ---------- ---- ------------------------ ------------------------ -I — — — — — — — — — — — I I M 1--1 ------------------------------ —I---I— ------------------------------ I 1 � I I I I a4LICsNj j I I I I I I r-- ----------------i ----------------i II II II r------i I II I II 1 r-----------——I---J I I I I I I I I 1 L__ J I I I I I I I I I I I j 0 I I I I THICKENED SLAB,2'-011x2'-011 x 811 1 1 I I 1 I 1 I I I 1 I I I I THICK w/3-05 BARS E.W. 1 I I I I I L j i i t I j t 1 I I 4 1/2'1x8" ANCHOR BOLTS TO 5IMP60N N I I I I I I m I I I I ABU44 I I I I 1 I I v 1 1 I I I I N I I I I 1 1 1 1 1 I I I 1 1 I I I I w I I I THICKENED SLAB,II-411 WIDE x SII I I I I I I O I I I I THICK w/3-"5 BARS CONT. 4 05 I I I I 1 - I I I I I TIES 0 3211 D.G.,TYP, 4 1/2"x81' ANCHOR BOLTS 1 1 11 I i I 1 I I I 1 I I I 132"O.C.,TYP. I 1 1 1 I I I I 11 I I I I I I I I I I I I I I THICKENED SLAB,11-411 WIDE x 8" I I I i I I I I 1 CAST-CRETE BEAM i I I I I THICK w/3-05 BARS CONT. 4 05 I i I I I I I I I I ABOVE m j i 1 1 1 1 TIES 10 3211 O.C.,TYP. 4 1/2"x&" ANCHOR BOLTS I I I j "9 32O.C.,TYP. I I i I I I I 1 1 I j I I I I I I I I I II I I I I 11-011x11-0'1 CMU POST j I I I I I I I I I 4" FIBER REINF.CONC.SLAB I I I I 1 w/2-"5 BARS VERT TO BEAM ON VAPOR BARRIER 3'-0"x31-0"xl'-0" FOOTING I 1 1 1 I I I I ON COMPACTED FILL,TYP. I 1 I i 11 I I I I I I 1 1 i I I TOP 1'-4" BELOW FIN.FLOOR j I I I I I I I I 1 j w/3-05 BARS E.W. 4 2-05 DOWELS UP IN FILLED 1 1 I i I I I I I I 11 1 1 I I 1 CELLS,TYP. f----------------� I I I 1 � t— - - - - - - - - - T I I I I 1 I I I I I r------------� I 1 r---, I I r I j 1 L-- - - - - - - - - - 4 1 I I I I I I I I I I I I I I I I I I I 1 I � I I I I L_____J 'S VERTIVAL ROD IN CELL I I r1--I- ---, -- ->- i-. FILLEDw/ 3000 PSI CONC 1 I �N I- - -- — — — — — — — — — — — —I I P I 1 I I 1 -� . 2 a MAX. 32" O.C. AND AS SHOWN, j I I I I I I LEVAT R I I L___J A-9 PROVIDE "5 HOOK BAR INTO I I I CAST-CRETE BEAM ___ _ I I L______J I I I 1 I 1 BOND BEAM. I i ----- ABOVE , i j I i 8" DROP I j I I I I I I 1 ------- a -�---i I I I I 1 I 11 1 1 I I cn W _ � U I ^� � J i i i I I i i i------i i 1 i // N a L---------JI I/ 9 I I I -- ---------J 1 I I 1 L--------------------J I en • 1 1 •1 • �i I i �---- ----------J i i x ,i — �ou — — — — — — — — — — — — — — — — — — — --� I 1 x L--------------- LINE OF DECK ABOVE I I I 1 IL J ! ¢ L------- ---------------J I --- — L——— ------------- I F"� w (rW� -011 1 I I 12'-8 vt611 \ 0 u H d A-8 ----------- ---- -------------- w ¢ H CANTILEVERED CAST-IN-PLACE I 2 5i8"0 x811 ANCHOR BOLTS CONCRETE BEAM ABOVE g_I A-8 SET IN CONC a MAX 3211 O.G. u DATE OF ISSUE Lo Oro-29-04 Q loo DRAWN BY: SCALE I1411 11-�II ••�- O ! = SHEET NO. 04018 NORTH 'ST•'. �,'1/ �� • �" TFF�ED. P - o REVISIONS ROOM FINISH SCHEDULE ROOM FINISH SCHEDULE ELECTRICAL LEGEND ROOM BASE FLOOR WALLS CEILING NOTES: ROOM BASE FLOOR WALLS CEILING NOTES: SWITCH QTV CABLE TV OUTLET MATERIAL FINISH MATERIAL FIN15H MATERIAL FINISH CEILING HEIGHT MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH CEILING HEIGHT WORK SHOP NONE CONC STAIN CMU/GWB PAINT GWB PAINT 8'-9" - STAIR WOOD PLYWOOD - GWB PAINT GWB PAINT 9'-011 _ THREE-WAY SWITCH / \ TWO CAR GARAGE NONE CONC STAIN CMU/GWS PANT GWB PAINT 8'-9" I A/C WOOD PLYWOOD - GWS PAINT GIB PAINT 9'-0" - $4 FOUR WAY SWITCH \ 54" CEILING FAN ENTRY WOOD CONC STAIN GWB PAINT G 9 WB PAINT 8'-9" - STORAGE WOOD PLYWOOD - GWB PAINT GWB PAINT '-0" - ( w/LIGHT STAIR WOOD WOOD - GWB PAINT GWB PAINT VARIES - $ MASTER BEDROOM WOOD PLYWOOD - GWB PAINT GWB PAINT 9'-011 - R RHEOSTAT SWITCH ELEVATOR - - - - - - - - - u- DECK NONE PLYWOOD EPDXY VINYL SHINGLES NONE NONE - - - / OFFICE WOOD CONC STAIN GWB PAINT GIB PAINT 8'-9" - MASTER BATH TILE PLYWOOD TILE WRGIB PAINT WRGWB PAINT 110V DUPLEX OUTLET — COVERED PATIO NONE PAVERS - STUCCO - VINYL - - - '' WALK-IN CLOSET WOOD PLYWOOD - GWB PAINT GIB PAINT 04 IIOV DUPLEX OUTLET w/ MOUNTING HEIGHT BEDROOM No. I WOOD CONC STAIN GWB PAINT GIB PAINT LL BEDROOM No.2 WOOD GONG STAIN GWB PAINT GWB PAINT 8'-9" - 0-F IIOV DUPLEX OUTLET a FLOOR 54" LEI`LING FAN BATH No. I TILE CONC TILE WRGWB PAINT WRGWB PAINT 8'-9" - NOTES: '- POWDER ROOM TILE CONC TILE WRGWB PAINT WRGWB PAINT 8'-9" - I. CEILING TO BE 2 LAYERS Die"FIRE-CODE GWB.SIDE WALLS TO BE 0WWWATERPROOF IIOV DUPLEX OUTLET COVERED PORCH NONE PLYWOOD EPDXY VINYL SHINGLES NONE VINYL - 101-0" - SIDE WALLS TO BE Die" FIRE-COD GWB OVER 1/2" SHEAR WALL SHEATHING 110V DUPLEX OUTLET HALF SWITCHED / OFFICE No.2 WOOD TILE - GWB PAINT GWB PAINT I0'-0" - ON 2x6 STUDS 0 IV' O.C. — FOYER WOOD TILE - GWB PAINT GWB PAINT 10'-011 - 2, ELEVATOR CAB FINISHES TO BE SELECTED BY OWNER EM 11RV GFI DUPLEX OUTLET STAIR WOOD WOOD - GWB PAINT GWB PAINT VARIES - 3. CLOSETS AND W.I,C.TO BE FINISHED TO MATCH THE ROOM THEY SERVE, Q 220V OUTLET FAMILY ROOM WOOD TILE - GWB PAINT GWB PAINT I0'-0" DECK NONE PLYWOOD EPDXY VINYL SHINGLES NONE VINYL - - - WALL MOUNTED FIXTURE SCREENED PORCH NONE PLYWOOD EPDXY VINYL SHINGLES NONE VINYL - - - 0 DINING WOOD TILE - GWB PAINT GWB PAINT I0'-0" - CEILING MOUNTED FIXTURE LL KITCHEN WOOD TILE - GWB PAINT GWB PAINT 101-0" - JUNCTION BOX PANTRY WOOD TILE - GWB PAINT GWB PAINT 10'-0" - � S BATH Not WOOD TILE NONE WRGWB PAINT WRGWB PAINT 101-0" - ua ELECTRICAL DISCONNECT `� GUEST WOOD TILE I GWB I PAINT I GWB PAINT 101-0" - 1 ELECTRICAL PANEL 0 PHONE OUTLET U z • w � A A o 8,-011 651-411 a 6'-6 1/2" 11'-2 1/2" 12'-011 131-411 31-411 1'-4" 4 31_ 11 J-011 21-011 t 7 Y •F1_ 11 31_A„ Y 6�_ 11 . N x PROPERTY LINE /� V w a � aw WALL MO NTED GAS STUCCO ON 12" SQ. 0 • 2 I IM A T WATER HEATER CMU POST,TYP.INCFIRST < SECONFLOORSE A_- HOE 0V-4 5' SIDE YARD SETBACK LINE B JJ ® SET BACK LINE Lu 15 LTV a METER e No.l BEDROOM No. I (;D — 't F-4Oilo 2'-51/2" `r 12'-51/2" o6'-61 101401/2" No.2 No.l 9w A' o. 1 14 BEDROOM No. 2 I I = s 441, r-m" 18'-211 HONE W ►� / I I v TWO CAR GARAGE WORK SHOPN SHOWER � I A-9 I I tt O N I N `7 I W-I_C _ II 9 I GARAGE DOOR ONV e 6 QOPERATOR OW 44„ 13 - LTV -HO E CIN IQ_ _ I c �� 17, L w1c: Lu Do NII A 5 5 1 1-6 1/2 5 4-2 4-0 1/2 2- 5 1 COVERED PATIO Lu - - - - -- ENTRY I N g O ' 0 ONCE - - - - - - - - e 2 Q ELEV. EQUIP. M Y w t 3'-11 „ _4„ O cn Z A-1 Ii i/ U 4 < 48141 _ 3 „ 31 8,1 iY1 �, z ai — — — — — — — — — — — — — — — — — U O LINE OF DECK ABOVE "' — — — ® \ Coll \� w (L Z STAIR = FIREPLACE ABOVE 21'8" N EDGE OF DRIVEWAY 1 A-S U IO' SIDE YARD SETBACK LINE wil O SET BACK LINE L 0 m - DRIVEWAY A_S DATE OF v N 21-011 ISSUE 81-811 221-01' 13'-6 1/2" I'-5 I/2" 121-811 12'-0" „; �,������� Ob-2c3-04 Z31-4 26'-I0” 11 � FL �''�, DRAWN BY: FIRST FLOOR - FLAN �- • �� '. SCALE 11411 - V-0" -. -<;•' f SHEET NO. AREA = EDGE OF DRIVEWAY A/CN A/C COVERED AREA = 1054 S.F. •• '! h : .- 04015 NORTH NO R PROPERTY LINE • \ 2 — — — — — — — — — — — — — — — — — — — — PROPERTY LINE A— _ .''';�(��'��n•.��i i;�,�G REVISIONS DOOR SCHEDULE DOOR SCHEDULE DOOR FRAME DOOR FRAME MARK ROOM FROM: ROOM TO: SIZE MATERIAL TYPE MATERIAL RATING NOTES MARK ROOM FROM: ROOM TO: SIZE MATERIAL TYPE MATERIAL RATING NOTES I EXTERIOR ENTRY 3'-0"x6'-8"x1 3j4" WOOD SC WOOD - - 18 ELEVATOR FAMILY ROOM 21-8"xb'-8"x1 3/8" WOOD SC WOOD - - 2 ENTRY OFFICE 2'-8"x6'-8"xl 3/8" WOOD HC WOOD - - 19 FAMILY ROOM DECK PR 2'-6"x6'-8"x13/4" WOOD HC WOOD - - 3 ENTRY BEDROOM No.l 2'-8"x6'-8"xl 3/a" WOOD - WOOD - - 20 DINING SCREENED PORCH PR 2'-6"x6'-8"x1 3/4" WOOD - WOOD - - 4 ENTRY ELEVATOR 2'-8"x&'-8"xl 3/a" WOOD - WOOD - - 21 SCREENED PORCH DECK 2'-8"x6'-8"x1 3/8" WOOD SCREENED WOOD - - 5 ENTRY POWDER ROOM 2'-6"x&'-8"x1 3/al' WOOD POCKET WOOD - 22 DINING PANTRY 2'-6"xb'-8"x1 3/6" WOOD POCKET WOOD - - 6 ENTRY ELEVATOR EQUIP 2'-8"x6'-8"xl 3/0" WOOD - - - - 23 FOYER BATH No.2 2'-8"x6'-8"xl 3/8" WOOD - - - 1 GARAGE ENTRY 2'-8"x6'-8"xl 3/a" WOOD - - 20 MIN. - 24 GUEST BATH No.2 2'-6"xb'-8"x1 3/8" WOOD POCKET - - - 8 EXTERIOR GARAGE 16'-011x8'-0" - OVERHEAD WOOD - - 25 GUEST W.I.C. 2'-011x(0'-8"x13/a" - POCKET - - - 9 OFFICE CLOSET 2'-6"x6'-8"x13/a" WOOD - - - - 26 FOYER GUEST 2'-6"x6'-8"x13/8" WOOD SC - - - 10 EXTERIOR OFFICE PR 2'-6"x6'-8"x1 3/4" - - - - - 21 FOYER OFFICE 2'-6"x6'-8"x1 3/8" WOOD SC - - - 11 EXTERIOR BEDROOM Not PR 2'-6"x6'-8"x1 3/4" - - - - - 0 28 OFFICE CLOSET 6'-0"xb'-8"x1 1/8" - BIFOLD - - - 12 BEDROOM No.2 ENTRY 2'-8"x6'-8"xl 3/a" - 29 NOT USED 13 BEDROOM No. I W.I.C. 21-6"xb'-8"xl 3/8" WOOD POCKET - - - n 30 COVERED PORCH FOYER PR 3'-011x6'-8"xi 3/8" WOOp 14 BEDROOM No. I BATH No.1 2'-6"x&'-8"xl 3/a" WOOD POCKET - - - 31 COVERED PORCH FOYER PR 3'-0"x6'-8"xl 3/4" WOOD 15 EXTERIOR GARAGE 3'-0"x6'-8"xl 3/4" WOOD SC - - - 32 COVERED PORCH FOYER PR 3'-0"x6'-5"x1 3/4" WOOD 16 GARAGE WORK SHOP 3'-0"x6'-8"x1 3/4" WOOD - - - - 33 NOT USED - 11 BEDROOM No. I BATH No.l 2'-611x6'-8"x1 3/4" WOODPOCKET - - - 34 HALL A/C 2'-611x6'-811x1 3/e" WOOD POCKET 35 HALL STORAGE i 6'-0"x6'-8"xI ka" - BIFOLD - - - p 36 HALL MASTER BEDROOM 2'-6"xb'-8"x1 3/a" WOOD Sc - - - 0 31 MASTER BEDROOM MASTER BATH 2'-6"x6'-8"x1 3/6" WOOD POCKET - iK 38 MASTER BATH W.I.C. 2'-611x6'-811x1 3/e" POCKET '- 39 MASTER BEDROOM DECK 2'-81jx1'-0"xl 3/4" WOOD SC - - - u A 0 � w 12'-11/211 10'-10" 5'-41/2" 13'-0" 12'-21/2" 12'-01/2" N W � U aw 2 3 t� A-1 A-1 Q� 'ry QD QDL, _ SdR0 WRAPPED 4x4 POST, TYP.J Z SCREEN SYSTEM, TYP, LO W-I-C FAt 4TRY O / CxU ST 5 � SCREENED PORCH I 4.2x4 POST 22 < I I O \ ° 42" H.RAIL 44 m A-9 N — PHONE tY 44" 44" I MI O� I 44"� (Y � I I I/2 P OFFICE 0 w REF. ---- I � I ---- I O ` n ---- ID NINCx � I GNO. KITCHEN SLOPE DOWN,SEE SECTION j DESK — �TV HONE 4 rr I Q 21 ul z --- r r R �r r rr ------- ------- r i L----- 1--L------I----J_� r Q on, 2(0 L----------------------� 32' 32' 3X' Ila tmrl - SLOPE DOWN 23 cj G ° FQIT' SLOPE DOWN,SEE SECTION a-r 18 = 42" HIGH RAIL Li 31 32 -0 "' FAMILY ROOM 2 EL np a M w COVEREEP FORCH x �+ HEARTH aVa ° ° 3'-8 3 All 4-8 I 3 3. 8� AI W 42" H.RAIL 42"HIGH RAIL O _C m _ ^ V STAT N W A-8 - t- � u 8'-0" 22'-8" 13'-6 1/2" (V-31/2" 4'-4" 6'-8 I/2" 121-01/211 8 DATE OF — Q ISSUE 13'-1° 06-29-04 1, ••0�� �' �A , .•, DRAWN BY: r`� &ECO D FLOOR FLAN a _ SCALE �� " = 1'-0" T Y ✓� 4,�(O� SHEET NO. d J- NORTH A/c; AREA = 1,129 S.F. � C . .�j'�� 04018 A-3 REVISIONS WINDOW SCHEDULE WINDOW MARK ROOM FROM: SIZE MATERIAL TYPE NOTES A NOT USED B NOT USED C NOT USED D FOYER i'-6"x5'-O" VINYL FIXED - E FOYER 1'-6116'-0" VINYL FIXED - F FOYER 1'-6"x5'-0" VINYL FIXED - G STAIR 314011x5'-4" VINYL FIXED - H DINING 3'-0"xb'-6" VINYL D.HJTRAN. - J DINING Y-0"40'40" VINYL D.HJTRAN. - SK DINING 2-4'-0"x6'-6" VINYL D.HJTRAN. - L GUEST 3-6'-10"x6'-6" VINYL DR/TRAN. - M OFFICE 3-6'-10"x6'-6" VINYL D.HJTRAN. w N OFFICE 3-6'-10"x6'-6" VINYL D.HJTRAN. `n P OFFICE 3-6'-10"x6'-6" VINYL D.HJTRAN. - 0 MASTER BEDROOM I'-6116'-O" VINYL D.H. R MASTER BEDROOM 1'-6116'-O" VINYL D.H. - S MASTER BEDROOM 3'-0"x5'-0" VINYL D.H. - T MASTER BEDROOM 3'-0"x3'-0" VINYL AWNING U MASTER BEDROOM 3'-O"x3'-0" VINYL AWNING V MASTER BEDROOM 3'-0"x3'-0" VINYL AWNING - W MASTER BEDROOM 3'-0"x3'-0" VINYL AWNING - X STAIR V-6116'-4" VINYL FIXED - Y W.I.C. 31-0114'-0" VINYL AW ING - Z W.I.C. Y-ON2'-0" VINYL AWNING - 1 p AA MASTER BATH 3'-0"x3'-0" VINYL AWNING BB MASTER BEDROOM Y-01'6'-O" VINYL AWNING - (~j• CC MASTER BEDROOM Y-ONY-0" VINYL AWNING `- DD MASTER BEDROOM Y-ONV-0" VINYL AILNING - EE OFFICE 3'-4"6'-0" VINYL D.HJTRAN. - FF OFFICE 3'-4"x5'-0" VINYL D.HJTRAN. - Q 1� GCs BEDROOM No.2 3'-4'x4'-0" VINYL D.H. - A ►.-i HH BEDROOM No.I 31-41x4'-0" VINYL D.H. u JJ BATH No.1 2'-0"x3'-4" VINYL D.H. - Q 53'-11/2" V 1 w 22'-5 1/2" 13'-6 1/2" V-31/2" 8'-l" N x w � V 2 3<( a•, W A-1 A-Z U - - - - - - - -- - - - - - - - - - - - - - - - - ® - - - - - - - - - - - - - - - - - - M � 01 z C p W/D I I �4 °o I ® � ® MA-STr=R 5ATH � I LTV o 5'-3 I/2' 6'-4" 21- 4'-9" 8'-3 I/2" I I r c 31 © I I I A19 v DEC 3C3 WHIRL COL \ TUB 2 0 SHOWER - - - - - - - - - - - - -1 --- ----- ------- -- c � — --- -------- — _r • - � _ STORACxE I I w1c. No 0 AIC. Q AHu I I I s MASTER BEDROOM cHALL I - - - - -- � 2 LTV O O O O 6 -1 � M A-, I I ; w �x . � u n u V-811 ' I WALL LINE BELOW 3-8 3 4-8 I 3 I '�C z — — — — — — — — — — — — — — — — — — — — — — — — — — — — — m — — — — — I r— — — — — — \\ U cx c4 u� ROOF LINE BELOW STAIR 1— — — --I 1 E4 > O X 2 A-8 DATE OF ISSUE 06-29-04 ' ^ • P �/ F"'�� DRAWN BY: ` '���G � •• HGP THIRD FLOOR Pl.._AN � 1- C ' U V4 « SHEET NO. oGA E �/4 = V-0" t 04018 L � NORTH AIC- AREA = 1,064 S.F. '�., �S�•CJ�.:..••��� 0 A-4 REVISIONS ROOF BEARING LEVEL - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - VINYL SHINGLE SYSTEM Jill I METAL ROOF THIRD FLOOR LEVEL ,4;j;L- - I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 11 -=-Z-Z- -- - - - - - --- - -_ I - - -1 � - - - - - - - - - - - L1 IJ S ENED ENCL U E:1 1 1 IIJ I.J. fill I i F1 I I I Lill III I SECOND FLOOR LEVEL - - - - - - - - - - I�1 Q STUCCO ON CMU WALL Q w OPEN w � � aw FIRST FLOOR LEVEL - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- --- - - - - - U WE5T ELEVATION SCALE 114" - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - V ROOF BEARING LEVEL 4441 VINYL SHINGLE SYSTEM i THIRD FLOOR LEVEL IF T 7-T7-F-TT I - - - - - - z ENED ENCL 0 Q TREI 1,.AILSY5TEM �i W `x' w S - - - - - - - - - - - - - - - - - -ECOND FLOOR LEVEL W W CANTIVEVERED BEAM U STUCCO ON IV-0" x V-0"GARAGE DOOR CMU WALL STUCCO ON � STUCCO ON FRAME CONSTRUCTION CMU WALL OPEN DATE OF \ ISSUE \ 06-29-04 FIRST FLOOR LEVEL \ O FL L�r�i DRAWN BY: f.� N y HCxP 1, • F- SHEET NO. 1�. 0018 EA&T ELEVATION s� A-5 SCALE 1/4" REVISIONS ROOF BEARING LEVEL I i THIRD FLOOR LEVEL . 000000 IIIIIIIIIIIIII / \ INSECTS ENING W / \ Iq ALUM FRAM STEM PPED 44 OST,TYP — SECOND FLOOR LEVEL — — — !�1 Q STUCCO ON CONCRETE BLOCK U Lj FIRST FLOOR LEVEL z NORTH ELEVATION a SCALE 1/4" ROOF BEARING LEVEL — — — — — — — — — — — — — — — VINYL SHINGLES / THIRD FLOOR LEVEL — — — — BEARING SUN ROOM VINYL SHINGLESE: J I I I I I I I I� Q O M W DOUBLE HUNG VINYL WINDOWS U zu "t, � SECOND FLOOR LEVEL << w W +\ aG w STUCCO ON CONCRETE BLOCK REMAINDER OF STAIR NOT SHOWN U DATE OF ISSUE 06-29-04 F L.t) r'0r DRAWN BY: FIRST FLOOR LEVEL - - - - - - - - - - - - - •• - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - ��'. .��` 0. ,e�•. �`; HCzP SHEET NO. 04018 SOUTH E L E VAT 1011 `'%��sr� "p '��r�'•• A6 �E SCALE 1/4.. = P-0" i A r. fE • LU ----- - -- --- - --- - - �� - - - cc 4-t� r� 5' OL-LA A1A e7M ! LL ' ' •� I r-j � 1 �� 114 �c�;;,� (.;,P.�� '� i ,` � 'L CIO �j I -�! - i 1 % 12't o•� ; v ; , 2X 12 Rco • I,1 t i 'i -�� I i' I p���NC.i' � �,I Y'C'��j��� �'��`,CG'Y� •t=-_ I � � � �� �'+��`' I 1 cc CL cc LU 1tJ� _.__� . . � �- �YI•'�,hiGF-• R�' 1rV � i4, i' cc I i A MI� 2 a ` •�_ �EAp �•r,����r _--_.lam--4 �-__1�.=� ._. __--y i � ! O �� � � ��� � SIX��C-:At.-�. �l.A�•�•ilr-�C�- � h �, �°� � C=m GJ%'r-,IT �o CD LU CV . I Eli' - j i � v firCp i r 1 f2 cc 00 LL t--._..-•- ---- --------.___.__. __ i ;.,-�� - - -- �'- ?=G INCUS.. I � II� -_ _—_-- - 1,}titfJ .. .'�•: '✓� {X:_ 1 _ �i^,\��, FI ���., ,:ter' _ * '+ ''.� 1 ''J4`• J ' G.. J- ✓�Y ,� -__ - 'Iti'✓. ��G, �!�,, 2'^o I �j'-c �' �. �'� ' i I s 6L ale x IS GLULAM e7M, 1 Z M 9 ul G�-'.,! :�, iCL• `rifer-!- jV -_ . --- -- �- -e - l„ i�'. I%' • F',�= %:- Rc.-r= it 1J. 1 � W LL m yj �'r�- �A,-;-r' FGl L rDLGV R= _ N t✓• G. = i �% ` `'�A1C=f , j�it �:1 `` iJ 1121 itJG+J►. �� +�aA.}I1;�� -- a I �:S� ?�� / , may'_ 1) , ! ` ✓ _ . �/M"��!ir. `1�NL�►l, `�.J' _. __ __. � � _,c•l}G• ✓!.APi ' ,'� '' � � m� 5 (�?L'J•�IG �. '+ �� C• G �,niz12. ` t i ,'— ._- s��mo _ .---- � , REVISIONS _ -- - ----- ---- -----_-- --_.-- ----------... _.___— __ II +i i� NO DATE , ' - - - I JOB NO. it U t .- - -- �2�''� �-D I�'�• -- :_ � 1 DAT to � .� ( � • . _ ,, � �! ORA BY i C) � �► CHECKED Y Aj OF 0 m . . . . ,---O' - - _ • - - ---- -.------------ 1 �e) H j�f �`�'. } L.,,e� 1N��0 ltjV4+-lb. v��lb 1� ----•�l�f 4-O, 4t ' ,t,13oe yl3h i ! ------ --------*-"--- A3 i rd 7- �- N� E5 �' M I ! 1 GIrI Lt 6 , ! I 11 I ___,_ ! 1T n V-�t�A tAN',� 'Y L.00 V\ I ? r�'�1 %r,Jl,\G•1-� r-I t ,I 4,�A` - F�rT ---- --- - I - -_--- - -- - _ _ _ I ! -_---_�- -�__ - _�_ ---- - _ _ cu i , : , r 1 , -� - -- - i _ � u _. , -' -- _ - - , ---- w L. _._-- --; ---- -_ - - -- - T �1 _. n _. -- --- -- _ - - -- _�_ --- - --- - -- ___ - - -- -- -- - :T =- ---it--_-�r - -, { - -„ j �. I� / -. N#.TG i r^ '��� rJt.G M i -� �i, I II 1; i I ( ,, ! - �I, ,i! '! GAO1►JET�� Q ,� ALL 11.1; W� ?K c►.l !i� ; ,i, 1 i , , ,• ! i .j I � I I a I i d I n WAu.S 54�AL1, �i✓ �_=_-_ --- ___ �1'I-- - i, . '! I! -- -- - _ _l' I L _--_� .1 - _ _----- - _ i d _- - -- -- - - I - -__. - ;I 1: i -- _. _. - - - _. _-- �- . Lq It�STAC.LEt% oil I �r. 11( '�. '� i �` ( i (1 ,i ; ��� I� �! ;�, ! O �) ' G ,0' r ; i I _ - r. i f�- -- -- -- i i ti,��;� � -,, -- .-_ .. .1----,----; ,_, ..1 y �' �� . .� IL -Z Y 0 . ! I 1i I i li !� �` •r , I I; �I T, t !- -��- (' - 1 ILL sa --� 1 Q tv - DU�GY.�, SU��i FACE __ i-- ._ i� i _ .�t - -�t1 I t �: I j I `� - �) -,, �'" � Q '� : - --- - ---- �.. _._ ...__I F I! Ij V I I I -------- . Ll w t1 Im -- ' tel y ac �� t- A 0. > S . t- , �- -I I; i ,, '� _ I _(I-- -I -. _ _ - r - -- I ��"i b t _yI Y . ; ' I, ` Q i - - -1 t I I r� -- - - - I I. L_. . �i 10 �,I j -- -- - -- --- ----- -�--• -- -- -- - -- - -- -- - - 1. - -- _ G 1,.- i. ,1. I P A�1tc LAJA. 'op o Q �Al.l.iz( : CL Q i ® : ' �! _ - -- - ` 2 A �R> ..'� 14 Y Worn . o'° YEtU 'fa ExT ^ L -- --- 1 I I �� 1 t____ __.-.-.�- -L-._-_-• - r r I l0 1p'I 6l ,c'wt-1 MoULrJ _ _ - Mr� o I - ____ - - - -- -.-=,.--- ..- .--- :;_�_ --__ --.--- ---- _ _.--. -- _�-_ - - . -- . -_ :. - - --- -- - - --- - - -_..--__. ._--_- _ .__.. _ f I CC W _ . _4 _ ``A /� /�,.�{{��rr�� p, ,I ► - _ - -- ,f _ 111- -: I ! t ;� ; ,;. ,�_ 1'1\A% G�}'� fiA i'T � to ; i �! � I ! ® ! i I :-- !_ 1 r , .. .. ..-- 1-_._ __.--- I 1-_ IIS T i I _ . I - - - - - - -- - - -- -- ---.- _ _ - -------- _ - f - - - -- -- =- 1 �. _ 1. -- --. ..-- I r - - -! r 14 2 A �, r l ! _ 11, I !, i Q -- -- - --- ----- - - - -- -- - - --- - --i----"----,---•----•--- --.-'----�----- ---•- ---+----- -t-t- - �� - --� - - - _ - ' pti _. - - - - -- -- - - - i - -! - I - - - - i t (1{ i mi lz I�ALh-t r-ct-o:.�2 ! €3 ' ; : o ® ! j i i t p-a i I!I , I; .{_ 1 , I ` I 11 ;I I { I� t I, i 1 I -- -- -- -------�-- - i I I' , F -------.---..----I--------- ---- -;- ; 1---- ----.J I-• -- - - _ I ? ____1.-,--'.,----.------ !• - - -- 11; I ; L-- - `�------• =-----il-- - - I i mA I. -2- - --- ®-= - -- - ---- ®. -- ------ '{- -- - - -- --- --�.+-- --------- ---- - .-------- ---- --'- ---- - _____ ' . -- _- ' i i ol O --_-_ I I __ - _. _ , , , - , T - ��-Q��GCiO,'�,", ® ' 0. 0 i i ! 0 I { i ,v !, I+' 1 I 1 _ i . 1 i !' - .-------- `I ` -. _. • __. _._. t ! � 1• 1' i 1 } ,1 r 1 'L r , c `r4 44- 1•--e ,-6.s�� ® I i p ; ®i i 0 I C-C? ' _G'=� '_`- rJ_2_ r `"> -- �a l ---�! ��'--------- ----��- .-----. _- -_�J_i� __ 2`T I 2-O ��3 - -3 1 �3� ! v 33 If- C I'c s I --- r �t - - - .+ - .r i - - --- -- -- - --, - - -- - --- -------- ---- --- ..------------ - - - _ _ _ - -- ___. . _ _. _._. ... MirGI�P,N IGAI• p . ! ® ! . p , ,► r. r ^I, �," • -- -- --- - - ---:.- •--- ---- --------- - --- - - o-o I 1� -- --�- - _ - -- -- -- - -- -- - --- ---- - -- ----------- --- I - I i - L1�11 T ; 0 0 ! i 0 I 4 , VAULT - ------_ .-------------.- ---------- --- --- ------ ------- _._... _ - ----- -__ __-_ ---__ ----- --- - - ' --- - - - -_ ;�---- ----------.-------------_.-'--r-------,tl ,r . --- - -.I -------------- ---.---. ---- ----� ---� - -- ------ - - - ---- - -- -- --- --- • ----- _ - - --- .------ --- --- ---- ---- r2 �jAR ! I I I oT'�rt th , ---'-- - - - --- -- - - - -- -- - - --- --p1�l1�1C ---®+-1 - - � ; - - Q -�j ���r^ �l M t.� � s`- - )/� 3a �t Q 1� IT - --- - - - -- -- - - - -- - - ._. .- -------- V I ) \ P,At-t. 2. ® p ! 0i �) , Io-� I �i t 11 � 1' � !! KI;G el ® ® 8-4 wlr► W&l -r �FFIT .,----.--- ---- - - - - -- - _. --- - , , I N - ---- -- --.. -- - . ----- --- ---- - --•-- - -- - -- •- -- -- --, --- -- ------- -- -- --------- - --- --- r jt G 1 11 ice/ ��reAKFa ® ` 0 , 0 �v I 2- , 1. -----r1------ -,-,--- --- -- - - -- . . .- _ .:- .�-- --- -.--- - _ .- ----- - -- ----•-- - -- ---- - --- --- -- ---.--------------- - -- -.._. -o-o o ,� s:- : 0 4 I t o C� I j w ,� ATP'a2 0 I ® 0 -. . . ---- -- --- --.. . _ ._ . . - . - . - -•- --- - . .- --- -•- - - - - - - _ - -- t 9-O i X m eyk,r I 3 0 o. €a ; - = ---------. .-----. -- - . - --.. .- - •--- -- ---- -_ -- - - ----- - --- - - --,-- - - - --- -- .�. _. _. .._ _ ..--------- 1 L,ITILiT-f ; o 0, © ; 0 . � 0 , gr -rr 1 � � W .- ---- .---•-----------.- -- _ _. - ---- -- - ' • • •--- - - - - -- - - --- ---------- ------ --- C�ARAGt; &y, 0 0 l o- t�'� - . - ------------. ..--- - ------- --- --•- ---- ---- ------' --•-- - -- --,- --- - -, __.. _ _ .. _ .------- - . ---- --- __ - ---- - -_- _- -- / - - - - - - ( ! / ! I 0 i i r ' I i ✓ ! -------- - ------ -- _-- __ ._, - --- ,---.-i---- ----- ---- -' --- ._ _ . .- : - - - - - - 1 -- _ _ --- -- - - - - _ , : t it - - - - -- - - - -.-- -- - - - - - -' ----.------- i I 1 I_ i ! A O' 1 I j _ .. _- _-- _. -- y i ,� _ . y - -- ---- - - ---- - --- - -- --- - - --- - ' ---'---- --- ._ -_-.---- -. ------ ----- 7- 7 '1r I I i.- I I i ' ' I I I i i -i- ; - -- _ : - L Gam►IGEAt.e� j�'' ! APV- h I /� __ 7_ l ` i - I C,-)(�,�)tIII� --' ! w i I r �N !` r�`\ J -,- -- ------------- - - -. i. - - j - - - -- - 1. � 1 �� j r I _J 1 rr ;JO, ✓>I�l�i i l^I '' x�(� N 't, i=1 J:� 'j'`{I,'G �t1��+'i�a.�. r!f i�.t1 ; I j I I L_ _ _ _ 1 l-- -- LI.G;Nr 1?tet. i'L���, ' i v V-X'f 11 yJc- D ,.•(•A L w o o D SAI N - - - ,, _--- -- --------- - 1_- - -- - - -- - - --. -- -- --- -- -- ----- P „ ., - ----- ---- ' - - - --- " -- ----- _ --- - - - - - ----- - -r 2 �'?j�" X� I ''!4j SY:�- Woop �Tpl� FFA r l�I W coo1G.I,A,lz �cTAtr� �� \ = --�_-___-_ - __ ---- -- - _, ( ;---� f , c. 1-4/4" A,� c`- T-,,i'' C^C% ��� t L=---- - "----- =_1 ,� ,r - -_._ _ :' L~--.___ ._._ I _-.--_-- - 1: r j'' _ - lI EXT v�lo c p �%( F� r 1rn �N l�t..� �:f A I N -_ .-- _ t- - _ - - _ --- --- - ' - - - - - - - - -- - - -------- - - - - ---- - - - - --- - - -- - - r , _ , lll,�' �, ,,^.� �`; ��4+r Ex-r Wo°G �Ati-� oi��, vtc^i:' AIe� ! {. . - _, I i' ---�?q5. 515. !I I ;I �� , I . l! i t -- - -' - - - q `� �� r' �''�1 �� WOG It-i N1", CC^ri-' 4�A1. �� 1 ,I I' !I --- - - -- -- - ----\N-,-o--C-)-P- - - !j .--- - - - -- -- ----- --1-_.._.._. - -------- - - ------ -' -----' - - - - - - - - - ----- >;' I+ Qkk) 1'JdGYi h1t�.t�'7t- - i I r r - � ,i ~ 1 !d I� 1 ., I I G^ 'riG/ w� 13/e� I W co 0 STAt^� Y• '' NcoV AIJ __: ; I; !.- __. - .__ ,`_ -- - 1 -- - I - - - ' _____ __l.�:�__:� , i--- -';r _. 1 I -- --- -- ---'---- --- - -..___ ----- , _ - - -- -- - - ----- - -- ---- - ---- ------ - - - - --•- -- --- --_- - ' -- ------ - - - --; - - - I -I V-)/e I lb ItFT' Woop `,TAtt� yf,4- Wn^p �Al� 1 i i 1 ' tt ------ --- - ------------- ----- -- - ------ - -------- t MARtt.E ; ---------------- : j _ I� �I v - 1 �- r i� I � 1 I o � t tt �: � � I ,.T Won TAI P , we v SAI ,,, =:7- - --- --- -_---- ---=- :1 -_ _- -- --� ---- -- _ yC�` � �%� t� 00 o n p I rJ ��Gv'r �-� 17"Al j �- I �C�n e =�j�'T ;'- 1�1��I - ---- . ----. . _y .. . �V�t� r ! r. ._. .� �. �.._. - T I` t F 'Lrr. i, 'I -i i 8 I it %TA �T W G 1 - - RA r L I ; -- -- ---- --------- ------- ----- ------ � ,J 13/ I t�f o f� 1 �T car- - - --- -- r- 'j i •. w cc 10 � .j. c- ,� SAI ', __ j^_----- -'` -. . - - �' __----_- 11 - -_=__- `I, W c �A P > v,1 r� .� - .-.------------------- --- - - -- - - , - ---. .---.. . . - -- - . -- - . I ! �j ------ -----, - --- - -- - ----- - -- I i I I 5``� 1 IG I I Waco �;'A1.1 �• Wc4A1+� PA►.Iv TYPE _. - _____ ` i. - -' -._ - - ------ --- - ' -- ---- ---- . - --'-- -- - - _ - - c d 11 - ----- - - -_.. - - - -- � a � �, - i` , it T . I tl lr `/� I '�z Itrl Wcop �A,f� ?J.r yJo^U J1�11 pA�1EL i`fPE __ -_-.-- _ ___=- r- - _ _- ___- - -__-_-- -___ -- - - - - - - - - - _ -_ _ -_ , _ - --- /� A ,; _ j; I rc z� /� ► t�T. w�D �fA.1 �,, . Wa�D 1A1� PA�1�L TYFE '� , _ I , , �� 1. 1, 1 A,- .j r. _.. . - - - ----- ---- ----- - - •--- ------------------- --- - w cc s :, - - - ' ft I It- _ - _ _ _ - n,.� -I I I f l (�;- �1yX �i° I'f4 EX f Wc<-'D �A1�. <^•1� yJ�.D TAI "11-G' tet- [ i - [ --- - -- ---- -1 ._.. __._ - -:1 0 ` . �/ 11- _� j Moo m LL. _ _.__ _ M.'� E - I ('~: 2°X �O5 �. `j I'` �%l�o'�;ER ALUN`. FGtA�s �: ,,,r�� SLUM GLA., I U r�� -L I'0"A•F.F• I _ ! ' I, i ��: 0 1 kA ys --- --- - - _ . . -- - _ .. - --.----.----- ----- -- - _ ----- -------- -- -- ---- ---- --- ----------- --- -- ----'---- \---- _ ---.-------.-------,l .--.--.---% - - ---- - - --- - 1 �l .------- --- --------_-- ..----- _ --.-------- ----•-- '-----_------ --- -------- ---- ---- . - - '- ----- -- -- ------- b, ; E � W m :R. - - -- -- - -- -- - - - - - - - - - . v i, •l! 1 \-J ' i j� -,Y---,e 13 11 i. I, ,-� ' `\ I�' •� ,� `,;�`r � '..�- � r-;i1 ' r� "-Nel 11 01. - MAI��1'Lt✓ � -fl o - Q�t ` r 1 r, /�G ��� I-( - w 1� 1 E> art►J G A'S i rJ C1 r- NlA'(G VA 1J tT`� ' 0� r,,,,- r�C�� !^t'rJ1✓ _7 ,� �._.rrl�PEr.�L W�iFK� �� r (` ;�I e ti's,I;�L , h. (� •J F,�r• 1 t``�7 _ - ---- ---- - -- ----- --- - - -- -- - � rJ ET �, ti. ,, , �- I .r.l . i•.ra:.L.�F:�,_ _. » - - _ _ _ _ .__ _ .__.__ Z _ r iI I �_ _..--- -.-- - ---. r1 I� 02 --Z, ?"f Y .,-O N�'P yAl t it IEf V:ICf•i i�s�vL. )~r.of�L_- i � - - _ ; -'-•- .- _ -- ---- ---. - _-- _ --- ----- --- - - -- ----. _ --- -- - ----- -- ------------- -- - _ - - -- - _ _ - _ __ - .. . _ . r�,-�. �!-�i II }Nn r -__._ Lc� t I�rG"I✓ 'G r , - .. . 'r - - -' _- - - __ ; I ' 1; - I I .__- I O ! II t- I ` 1 I -- r �� 1 �r�' �I I � Ij. , ff _ - - -- -I--- --- -T ' -- ------ - --- - - - . -------- - _ _._ ------ , i I tR 1 - - - ---- .- -- ,. _. . . _ -- - - .- - -- �1Jc�� _ t , ! �i�S 1�` L.� l'r '��'� - ; J -- - ' Mt�Ko�;----. . IW t. 1,j } 1 I h_ r i. I I. I - -- - -----' ---- - - -- --- ,j -C, <��-�TI �� a I -- -, --- - - i. ;; -- , TiL� *- !i j , TIhE REVISIONS A J W. ,C .- AI tr-3 rt=,i - Nz-E ,� ,! . . -- -- --i - _ - - - - - - - - - - - - -- --------- --- ----- _. _ _ _ _ - - _ . . .. - _ - - ----- ----- �� „ - ----- MAR ^ _. \ - it !� NO DATE �� `� Arps (/ �-� -� �J-(� 1I w t- Al li ~ .I�µ, fa15Ul. C, u / -- - -,�-- -- ,; I ' -I-- MM ;f- -f-_._-... -- - ,- - _.. - M �t t --,. - - - -- ._ . . L. _ - ..- .--- - --._ - - . -_ - -- - - -- - -. - '---- -- _ . -- ---- - - I __ II ;� _ t P r �:F I I• ' r _ . . -- - ` _ 1 �j. . .1 �L /• ' /. n r -ti.__ ---' -•- _.- ..-:.;- -- •�i --- ---_ _-_.. I I - _- ..._ _. .. r% I i .T .-- _ - _ - :. _ - qr' C, c,tF • G• ALU11 . P)F,C,>,IZ tc��:O, z� � � i - . -.. --._ - . -__ .-_ -. _______ __ __._ - tI. i r --- - - ' -- -----------L-- - - ---- - ----. --_ - _- - - _ j - i; I 7 t-- i - - - _ O - rr ---, --� - -- -- - J 5-2 x4 -o G• r�LI.M. �Rvr•� It.l�•uV I �_t i !I _ I _ ! - ----- - - ------- -- -' -- - -- _ e:I^ ,4 z , --- - -- �A �-E � i IL it __ - r-- - - • , - - . - _- F,. I I 11, -------- ------ --- --- -- - -- -- - --'- --- - ----_.------ --.-- ---- Ill I _ - -_ - -- _ - -_-.- _- . ( ! I T 1 t t--, - - - _ i l -� -- - - - -- ------ ----------- - ------ _.I , . ---- --------- ----------- -- -- - ------ F - -- - --- --- _._-- -=- - - _-- _ - 1 I - { t II -,.. ! r -.. I I ! I ;J jt I i I I i I __ _ _ i ,,�. I JOB N0. I I � 7 i_ _. .._.__.__ i------'-' -- -+------.------.-- ------L- -- --- --- ...--.-:-. --- --'_ - _ .------- ------'---L---'-----.. . _..... .__-._. ._r.. -...- -_.. _ -- : - .I _ ;= �-- �� � �. - L�=----- - I --- y --- 1-----_._-._----------_. .1 .. � .i --•-_-� .a j - - -- - - ---- j -- ---- - - _ j ` 1� I ! ,- I I I. t► ,� 15 0 I ;v�l� : `t�:r% 'oIS! `/=r-� 2 - DAT �- -. / ./-._ ... _� ... _... -...--- .-o _- ..*- - --- - - - _ - - - -� .. ,e F .. . �! I/� ill 1; i 5-o 1. / I /_ -- --_------- _..-_ ___ _ __. ,, DRAWN BY ' :-` M 3 6 �AA �A � r -A I -,-- I. 5 I ��I I `i CHECKED BY X18 - I -o ��11- i - t'11 1\ , I 1; � - . .; . � OF li O . � . I . I .1 , . L . 1. . 1 . . I � . I I 1. I . . L . - - 1. . . � I . I .. I . . I I '. . I . I . 1 I I L� I �. I �` . - - - :- , " ..I L � � I I L I I I L . � 1. � 1. I. . L I I' ll I : I I I I � L I . '. � I 1 .� . . -1 - .1 L . .­ - I .. I . . . "I . . . . . . + I . I . I . . I . I . I I , � 1. , . I L - . .. . � . I. . .. I I I I .1 I . . L, I . 11 L I � - - ,+ I .1 � L . 1. . . . . . � � I . L I I 1 . I . L - .11, I 1 . .. - . - . . . I -- L L . I � + � . . L . .. --:, ), , ­ ; , - .-. : -. ,. - " . . . '' . .1 _L . -L 1� I - - . - . . I - I . - 11 _ - .. - -, . � : , . I 'L". - - � . - , .. � . . *. . • A/0 HEATPUMP SCHEDULE UNIT NO. %,�' - / 1 T ~ n FAN DATA O N CFM S.A.- /G o ca /e 4 LLI C9 CFM O.A: EXT. S.P. IN. W.G. i - -- 777y ----- -- - -- - -------- - 1 ---- L - _ --- ---- - - __ - -- --- -- - .— --t -- -� t ( — N.P. ..� 3 I ELECT. V-0-HZ -� I � - -- ----- -- - ---- ----- - �- - T--� t � Z,r.'�' Ze�-/-fid 7c� z�n---/=In LL i ! COOLING DATA cc ENT. AIR DB/WB , - Y 1 BD 67 "�, -• cc AMBIENT TEMP. Q SENSIBLE CAP.: 3.yoo o z/ a n c� - - - — -- - I-_ - TOT. CAP. V I HEATING DATA .. a loxcGF, TOT. CAP. STEPSO ---. -.� - - � - -. SUPPLEMENTAL HEAT /!'' /_4%J "GcJ CONDENSING UNIT ! �-- -- � ;--- — --. �� -: ---- ------ - -- - -- -_ - ---- 1_:- - _ -. -- - -- ----------� x UNIT NUMBER �l/- / �CfJ�--� • - - COMPR. F.L.A. L3 I I SII STEPS CAP. CONTROL. -- M �_ -_:1' I -- - -, _-- ELECT. V-O-HZ !'7 t f1lFAN DATA! � �;-4 [OND. _ . s �'7'l�!G1=M Al-T16- i �Il�i NO. OF FANS ' I ' I � 210 Cr� FAN H.P. /. `9 FL 4i � -Z/.#•• cD o r - N �r � i 12.x�a �R I - ELECT. V–O–HZ FILTER DATA I I N�cw tJT 21-c� A?�ov� j I I IBX Iv �t I TYPE 0 F=F IT ' ' I _ 4"A'F MANUFACTURER O CL w I �-, ---------- -, - -- ---- --- ,- - - -------- ----- -_- -------- - --- ------ � DEL n� W 2 I EL ACCU MO AHl! �%-� ,� �' A' 0 ` i f , aI� iF ACCESSORIES CL• ` I I 127c!Co 1M Fti _ ' I OX(/ F2F;C I F� �GGU �Y�JTC M w I ri K I _ - I T _ ! �. i� _ — - -- _ i RI:�R1c-,� •rJT i o- Wkr F� I•��AT c- -'��c, F<, _ j � .--------- - -- T` - -..- - ---- - - - I -�- -- --- � 7 -.A-- , 16X12 1 I�Xl2 { �ft�"�- '�1;1=F�iG�. PICU i E%'F� YpR<%iJ ''" � F I G CYST EM xLZ L) PvG TO ME-.rAi i - -- --- -- — ii cc Gct-JI r ------ - -- `� x � I icx � i2:� 12 --- � ` v �- �M A}•�U� XT G-t KA�� - • 2) ;-ucrlc IJ LIfJs,�, WITH MAF e:X I 3) FR,CVIvE F_XTRA(,Tc?,S I,J �p�!-Y DUG�tNof�h v , - �� I lax(r �o 00 I , ��M I 1 J ox x IGXU G i I A) �G04 P, PF�c�'�RAMA�LE lYF'F TFI�RMG_�il�.T�a LL i tvtcV�, 99 TZ 171 00501 w .�, I ' Ac`-v-1 WITH Ct-t �LEEvE TO -- ---- — - --- -- — — — -- --- - --_--- -- - - - -- - _--- NEAT REGcv Y rJIT G�. WAATac� ! , i F h�oT Z ca ui F+�p,IL�• Plalt-�L�{�.i I R � i (`fYP� � ; -- - _ --,-- - - ._--- - - - _�----� I_1---- _---- _-- ---_:�. -_____._ I � M6 To AHOujim j { "--- -- --- --- ----- AGGU w .N 1.4 CGU I I ?A" Got-1� �b,I0 RAS, To Exr 4" A.F•F• I a • ! uJcc Vz 1 O II j ik I REVISIONS I NO DATE -.- I ; li • II I ! '-E JOB NO. GTIu,t I � 1 DRAWN BY G>G CHECKED BY �,A � I OF I1 0 w .z 0 m r M . O . N ---- - - — ----- - 'kn� _ LIJ _ M cc �1- -- -- - - - -- - -- - - -- - — - ft -- r--- LL cc Ift /z6 P7 i � { i W C T67 tj i Imo+ �� icy r•�AKEtr. nc T M cu i�Zi G N Tv ��`1 \ i VZ N S. iI `2 IfJ� i� } I G. i I �• ! i CT LU o �1/4 ( 3 ►+ - I PGF cFF To EXT. L. m -* t w yzllT F-1 Lu oFF�ET FR°►�\ ` �� I �,li�_� 2�ZS• I I I I w ►� ; 2 --�` ���I n F'2 O �I wA I-1, 1 tJ ATT I G ��., �/Z+ d Ea Ta �>� '/4 ®, II II { I II - II N 9 N. 2_._.II 5 -- — /4 11G I + I I I ( n To, F-2 F-2 ! ! I I n _ VO0 1 i + I , UJ I V2`I G 4 H Ta Z j - -�_�. , it :♦- - i ; � � �-- -- LLI Cc - 1 _ ,i l ._ Ll. �! LTJ, ,;_. � j � G, •L_ - - • _ ----ti I---- ----- 1. , �i L — �� � -- 1 Vv 2 V211'5I I I+��'/, t#. ( -4 � ` ~— ,. 14 cn To r-SGrL -4o FRIG �-1Yp) zca I I 3 \/-T R �N c>=F To �xT' To e AOTAiX � MAiO I+ I 1 Fop. 60tiT. Sea.emT FLA;j) i 2�2 i 31i •--� I 11/411 WA-60. 1 3' REVISIONS NO DATE F-2 I ti. I ,. -;-7i1 I If 11 II L JOB NO. €�€ j I 2 3 2 vTf� F�-;1��:� f -411 wAtE DAT TRE�TM -}t 1 IF "c DRAWN BY -A U. I1411v CHECKED BY u 1141 IIi _ II 11/41 FI�.oM Maj E�, �+�I`" { { �� I�Ci� �/ f'`�'2 �f'` `4 11 Fcl, GctjT PLAO 1 o gR s P , 0 m V � L M — ---- --- I Do � I ✓ - - -- -- i -------- - - _ fLarP tib. � - cc �-�- m CL eF CC w 44 i 41 JF -r• V,ptp t N \ \L I 6H I - i I -S + ul 0 _.] Ft / LuND C. - i - - -------_ --- I -- --_ _ 1 to -- .. UN IT- -MMt GA" TCR i a v \X cci00 +h LL ' I uj , I i_ ►, - -- - -- --_ - - -- - -- -_- - - - -- - -- - - - -- uj VJi*cjt� t_ uj ® Q 1L1L1 I i ' VFI► �o at... ; ( 1 � � � i j ss��►. U T R ! ' I i Row c o00 e'41 Z �d Ll --- -- Il VAG) 200 AMC �t z 10 i LI�aH-r,-. pl~> 11 iii Prov L I[��1T �I xi cJ�l 1�LLcv��t�� Lu CC i U C-ADI e T`� I I� p�, /Ib� BOO I IJTE}�>C,aM AL�oY�1��Gi✓ ATTIG i • Pr�oV t GG GcAX1AL GA�1.1r ! 1�j TAUS �-�; _' �'oor- or:tR I i f REVISIONS 140 DATE ALL, 101\JI WA1. t�`T I t j JOB NO. 7 I1 j •",- OAT Co I r>7 , DRAWN BY \ ( % L CHECKED By i �1 OF 0 I� 1 REVISIONS a RES L. DENCE M 371 PLAZA �- ATLANTIC BEACH , FLORIDA 130' J �-- --�1-�-- -- -- - -- - - I� 1 REVISIONS a RES L. DENCE M 371 PLAZA �- ATLANTIC BEACH , FLORIDA 130' J �-- --�1-�-- -- -- - -- - - REVISIONS ROOM FINISH SCHEDULE ROOM FINISH SCHEDULE ELECTRICAL LEGEND ROOM BASE FLOOR WALLS CEILING NOTES: ROOM BASE FLOOR WALLS CEILING NOTES: SWITCH QTV CABLE TV OUTLET MATERIAL FINISH MATERIAL FIN15H MATERIAL FINISH CEILING HEIGHT MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH CEILING HEIGHT WORK SHOP NONE CONC STAIN CMU/GWB PAINT GWB PAINT 8'-9" - STAIR WOOD PLYWOOD - GWB PAINT GWB PAINT 9'-011 _ THREE-WAY SWITCH / \ TWO CAR GARAGE NONE CONC STAIN CMU/GWS PANT GWB PAINT 8'-9" I A/C WOOD PLYWOOD - GWS PAINT GIB PAINT 9'-0" - $4 FOUR WAY SWITCH \ 54" CEILING FAN ENTRY WOOD CONC STAIN GWB PAINT G 9 WB PAINT 8'-9" - STORAGE WOOD PLYWOOD - GWB PAINT GWB PAINT '-0" - ( w/LIGHT STAIR WOOD WOOD - GWB PAINT GWB PAINT VARIES - $ MASTER BEDROOM WOOD PLYWOOD - GWB PAINT GWB PAINT 9'-011 - R RHEOSTAT SWITCH ELEVATOR - - - - - - - - - u- DECK NONE PLYWOOD EPDXY VINYL SHINGLES NONE NONE - - - / OFFICE WOOD CONC STAIN GWB PAINT GIB PAINT 8'-9" - MASTER BATH TILE PLYWOOD TILE WRGIB PAINT WRGWB PAINT 110V DUPLEX OUTLET — COVERED PATIO NONE PAVERS - STUCCO - VINYL - - - '' WALK-IN CLOSET WOOD PLYWOOD - GWB PAINT GIB PAINT 04 IIOV DUPLEX OUTLET w/ MOUNTING HEIGHT BEDROOM No. I WOOD CONC STAIN GWB PAINT GIB PAINT LL BEDROOM No.2 WOOD GONG STAIN GWB PAINT GWB PAINT 8'-9" - 0-F IIOV DUPLEX OUTLET a FLOOR 54" LEI`LING FAN BATH No. I TILE CONC TILE WRGWB PAINT WRGWB PAINT 8'-9" - NOTES: '- POWDER ROOM TILE CONC TILE WRGWB PAINT WRGWB PAINT 8'-9" - I. CEILING TO BE 2 LAYERS Die"FIRE-CODE GWB.SIDE WALLS TO BE 0WWWATERPROOF IIOV DUPLEX OUTLET COVERED PORCH NONE PLYWOOD EPDXY VINYL SHINGLES NONE VINYL - 101-0" - SIDE WALLS TO BE Die" FIRE-COD GWB OVER 1/2" SHEAR WALL SHEATHING 110V DUPLEX OUTLET HALF SWITCHED / OFFICE No.2 WOOD TILE - GWB PAINT GWB PAINT I0'-0" - ON 2x6 STUDS 0 IV' O.C. — FOYER WOOD TILE - GWB PAINT GWB PAINT 10'-011 - 2, ELEVATOR CAB FINISHES TO BE SELECTED BY OWNER EM 11RV GFI DUPLEX OUTLET STAIR WOOD WOOD - GWB PAINT GWB PAINT VARIES - 3. CLOSETS AND W.I,C.TO BE FINISHED TO MATCH THE ROOM THEY SERVE, Q 220V OUTLET FAMILY ROOM WOOD TILE - GWB PAINT GWB PAINT I0'-0" DECK NONE PLYWOOD EPDXY VINYL SHINGLES NONE VINYL - - - WALL MOUNTED FIXTURE SCREENED PORCH NONE PLYWOOD EPDXY VINYL SHINGLES NONE VINYL - - - 0 DINING WOOD TILE - GWB PAINT GWB PAINT I0'-0" - CEILING MOUNTED FIXTURE LL KITCHEN WOOD TILE - GWB PAINT GWB PAINT 101-0" - JUNCTION BOX PANTRY WOOD TILE - GWB PAINT GWB PAINT 10'-0" - � S BATH Not WOOD TILE NONE WRGWB PAINT WRGWB PAINT 101-0" - ua ELECTRICAL DISCONNECT `� GUEST WOOD TILE I GWB I PAINT I GWB PAINT 101-0" - 1 ELECTRICAL PANEL 0 PHONE OUTLET U z • w � A A o 8,-011 651-411 a 6'-6 1/2" 11'-2 1/2" 12'-011 131-411 31-411 1'-4" 4 31_ 11 J-011 21-011 t 7 Y •F1_ 11 31_A„ Y 6�_ 11 . N x PROPERTY LINE /� V w a � aw WALL MO NTED GAS STUCCO ON 12" SQ. 0 • 2 I IM A T WATER HEATER CMU POST,TYP.INCFIRST < SECONFLOORSE A_- HOE 0V-4 5' SIDE YARD SETBACK LINE B JJ ® SET BACK LINE Lu 15 LTV a METER e No.l BEDROOM No. I (;D — 't F-4Oilo 2'-51/2" `r 12'-51/2" o6'-61 101401/2" No.2 No.l 9w A' o. 1 14 BEDROOM No. 2 I I = s 441, r-m" 18'-211 HONE W ►� / I I v TWO CAR GARAGE WORK SHOPN SHOWER � I A-9 I I tt O N I N `7 I W-I_C _ II 9 I GARAGE DOOR ONV e 6 QOPERATOR OW 44„ 13 - LTV -HO E CIN IQ_ _ I c �� 17, L w1c: Lu Do NII A 5 5 1 1-6 1/2 5 4-2 4-0 1/2 2- 5 1 COVERED PATIO Lu - - - - -- ENTRY I N g O ' 0 ONCE - - - - - - - - e 2 Q ELEV. EQUIP. M Y w t 3'-11 „ _4„ O cn Z A-1 Ii i/ U 4 < 48141 _ 3 „ 31 8,1 iY1 �, z ai — — — — — — — — — — — — — — — — — U O LINE OF DECK ABOVE "' — — — ® \ Coll \� w (L Z STAIR = FIREPLACE ABOVE 21'8" N EDGE OF DRIVEWAY 1 A-S U IO' SIDE YARD SETBACK LINE wil O SET BACK LINE L 0 m - DRIVEWAY A_S DATE OF v N 21-011 ISSUE 81-811 221-01' 13'-6 1/2" I'-5 I/2" 121-811 12'-0" „; �,������� Ob-2c3-04 Z31-4 26'-I0” 11 � FL �''�, DRAWN BY: FIRST FLOOR - FLAN �- • �� '. SCALE 11411 - V-0" -. -<;•' f SHEET NO. AREA = EDGE OF DRIVEWAY A/CN A/C COVERED AREA = 1054 S.F. •• '! h : .- 04015 NORTH NO R PROPERTY LINE • \ 2 — — — — — — — — — — — — — — — — — — — — PROPERTY LINE A— _ .''';�(��'��n•.��i i;�,�G REVISIONS DOOR SCHEDULE DOOR SCHEDULE DOOR FRAME DOOR FRAME MARK ROOM FROM: ROOM TO: SIZE MATERIAL TYPE MATERIAL RATING NOTES MARK ROOM FROM: ROOM TO: SIZE MATERIAL TYPE MATERIAL RATING NOTES I EXTERIOR ENTRY 3'-0"x6'-8"x1 3j4" WOOD SC WOOD - - 18 ELEVATOR FAMILY ROOM 21-8"xb'-8"x1 3/8" WOOD SC WOOD - - 2 ENTRY OFFICE 2'-8"x6'-8"xl 3/8" WOOD HC WOOD - - 19 FAMILY ROOM DECK PR 2'-6"x6'-8"x13/4" WOOD HC WOOD - - 3 ENTRY BEDROOM No.l 2'-8"x6'-8"xl 3/a" WOOD - WOOD - - 20 DINING SCREENED PORCH PR 2'-6"x6'-8"x1 3/4" WOOD - WOOD - - 4 ENTRY ELEVATOR 2'-8"x&'-8"xl 3/a" WOOD - WOOD - - 21 SCREENED PORCH DECK 2'-8"x6'-8"x1 3/8" WOOD SCREENED WOOD - - 5 ENTRY POWDER ROOM 2'-6"x&'-8"x1 3/al' WOOD POCKET WOOD - 22 DINING PANTRY 2'-6"xb'-8"x1 3/6" WOOD POCKET WOOD - - 6 ENTRY ELEVATOR EQUIP 2'-8"x6'-8"xl 3/0" WOOD - - - - 23 FOYER BATH No.2 2'-8"x6'-8"xl 3/8" WOOD - - - 1 GARAGE ENTRY 2'-8"x6'-8"xl 3/a" WOOD - - 20 MIN. - 24 GUEST BATH No.2 2'-6"xb'-8"x1 3/8" WOOD POCKET - - - 8 EXTERIOR GARAGE 16'-011x8'-0" - OVERHEAD WOOD - - 25 GUEST W.I.C. 2'-011x(0'-8"x13/a" - POCKET - - - 9 OFFICE CLOSET 2'-6"x6'-8"x13/a" WOOD - - - - 26 FOYER GUEST 2'-6"x6'-8"x13/8" WOOD SC - - - 10 EXTERIOR OFFICE PR 2'-6"x6'-8"x1 3/4" - - - - - 21 FOYER OFFICE 2'-6"x6'-8"x1 3/8" WOOD SC - - - 11 EXTERIOR BEDROOM Not PR 2'-6"x6'-8"x1 3/4" - - - - - 0 28 OFFICE CLOSET 6'-0"xb'-8"x1 1/8" - BIFOLD - - - 12 BEDROOM No.2 ENTRY 2'-8"x6'-8"xl 3/a" - 29 NOT USED 13 BEDROOM No. I W.I.C. 21-6"xb'-8"xl 3/8" WOOD POCKET - - - n 30 COVERED PORCH FOYER PR 3'-011x6'-8"xi 3/8" WOOp 14 BEDROOM No. I BATH No.1 2'-6"x&'-8"xl 3/a" WOOD POCKET - - - 31 COVERED PORCH FOYER PR 3'-0"x6'-8"xl 3/4" WOOD 15 EXTERIOR GARAGE 3'-0"x6'-8"xl 3/4" WOOD SC - - - 32 COVERED PORCH FOYER PR 3'-0"x6'-5"x1 3/4" WOOD 16 GARAGE WORK SHOP 3'-0"x6'-8"x1 3/4" WOOD - - - - 33 NOT USED - 11 BEDROOM No. I BATH No.l 2'-611x6'-8"x1 3/4" WOODPOCKET - - - 34 HALL A/C 2'-611x6'-811x1 3/e" WOOD POCKET 35 HALL STORAGE i 6'-0"x6'-8"xI ka" - BIFOLD - - - p 36 HALL MASTER BEDROOM 2'-6"xb'-8"x1 3/a" WOOD Sc - - - 0 31 MASTER BEDROOM MASTER BATH 2'-6"x6'-8"x1 3/6" WOOD POCKET - iK 38 MASTER BATH W.I.C. 2'-611x6'-811x1 3/e" POCKET '- 39 MASTER BEDROOM DECK 2'-81jx1'-0"xl 3/4" WOOD SC - - - u A 0 � w 12'-11/211 10'-10" 5'-41/2" 13'-0" 12'-21/2" 12'-01/2" N W � U aw 2 3 t� A-1 A-1 Q� 'ry QD QDL, _ SdR0 WRAPPED 4x4 POST, TYP.J Z SCREEN SYSTEM, TYP, LO W-I-C FAt 4TRY O / CxU ST 5 � SCREENED PORCH I 4.2x4 POST 22 < I I O \ ° 42" H.RAIL 44 m A-9 N — PHONE tY 44" 44" I MI O� I 44"� (Y � I I I/2 P OFFICE 0 w REF. ---- I � I ---- I O ` n ---- ID NINCx � I GNO. KITCHEN SLOPE DOWN,SEE SECTION j DESK — �TV HONE 4 rr I Q 21 ul z --- r r R �r r rr ------- ------- r i L----- 1--L------I----J_� r Q on, 2(0 L----------------------� 32' 32' 3X' Ila tmrl - SLOPE DOWN 23 cj G ° FQIT' SLOPE DOWN,SEE SECTION a-r 18 = 42" HIGH RAIL Li 31 32 -0 "' FAMILY ROOM 2 EL np a M w COVEREEP FORCH x �+ HEARTH aVa ° ° 3'-8 3 All 4-8 I 3 3. 8� AI W 42" H.RAIL 42"HIGH RAIL O _C m _ ^ V STAT N W A-8 - t- � u 8'-0" 22'-8" 13'-6 1/2" (V-31/2" 4'-4" 6'-8 I/2" 121-01/211 8 DATE OF — Q ISSUE 13'-1° 06-29-04 1, ••0�� �' �A , .•, DRAWN BY: r`� &ECO D FLOOR FLAN a _ SCALE �� " = 1'-0" T Y ✓� 4,�(O� SHEET NO. d J- NORTH A/c; AREA = 1,129 S.F. � C . .�j'�� 04018 A-3 REVISIONS WINDOW SCHEDULE WINDOW MARK ROOM FROM: SIZE MATERIAL TYPE NOTES A NOT USED B NOT USED C NOT USED D FOYER i'-6"x5'-O" VINYL FIXED - E FOYER 1'-6116'-0" VINYL FIXED - F FOYER 1'-6"x5'-0" VINYL FIXED - G STAIR 314011x5'-4" VINYL FIXED - H DINING 3'-0"xb'-6" VINYL D.HJTRAN. - J DINING Y-0"40'40" VINYL D.HJTRAN. - SK DINING 2-4'-0"x6'-6" VINYL D.HJTRAN. - L GUEST 3-6'-10"x6'-6" VINYL DR/TRAN. - M OFFICE 3-6'-10"x6'-6" VINYL D.HJTRAN. w N OFFICE 3-6'-10"x6'-6" VINYL D.HJTRAN. `n P OFFICE 3-6'-10"x6'-6" VINYL D.HJTRAN. - 0 MASTER BEDROOM I'-6116'-O" VINYL D.H. R MASTER BEDROOM 1'-6116'-O" VINYL D.H. - S MASTER BEDROOM 3'-0"x5'-0" VINYL D.H. - T MASTER BEDROOM 3'-0"x3'-0" VINYL AWNING U MASTER BEDROOM 3'-O"x3'-0" VINYL AWNING V MASTER BEDROOM 3'-0"x3'-0" VINYL AWNING - W MASTER BEDROOM 3'-0"x3'-0" VINYL AWNING - X STAIR V-6116'-4" VINYL FIXED - Y W.I.C. 31-0114'-0" VINYL AW ING - Z W.I.C. Y-ON2'-0" VINYL AWNING - 1 p AA MASTER BATH 3'-0"x3'-0" VINYL AWNING BB MASTER BEDROOM Y-01'6'-O" VINYL AWNING - (~j• CC MASTER BEDROOM Y-ONY-0" VINYL AWNING `- DD MASTER BEDROOM Y-ONV-0" VINYL AILNING - EE OFFICE 3'-4"6'-0" VINYL D.HJTRAN. - FF OFFICE 3'-4"x5'-0" VINYL D.HJTRAN. - Q 1� GCs BEDROOM No.2 3'-4'x4'-0" VINYL D.H. - A ►.-i HH BEDROOM No.I 31-41x4'-0" VINYL D.H. u JJ BATH No.1 2'-0"x3'-4" VINYL D.H. - Q 53'-11/2" V 1 w 22'-5 1/2" 13'-6 1/2" V-31/2" 8'-l" N x w � V 2 3<( a•, W A-1 A-Z U - - - - - - - -- - - - - - - - - - - - - - - - - ® - - - - - - - - - - - - - - - - - - M � 01 z C p W/D I I �4 °o I ® � ® MA-STr=R 5ATH � I LTV o 5'-3 I/2' 6'-4" 21- 4'-9" 8'-3 I/2" I I r c 31 © I I I A19 v DEC 3C3 WHIRL COL \ TUB 2 0 SHOWER - - - - - - - - - - - - -1 --- ----- ------- -- c � — --- -------- — _r • - � _ STORACxE I I w1c. No 0 AIC. Q AHu I I I s MASTER BEDROOM cHALL I - - - - -- � 2 LTV O O O O 6 -1 � M A-, I I ; w �x . � u n u V-811 ' I WALL LINE BELOW 3-8 3 4-8 I 3 I '�C z — — — — — — — — — — — — — — — — — — — — — — — — — — — — — m — — — — — I r— — — — — — \\ U cx c4 u� ROOF LINE BELOW STAIR 1— — — --I 1 E4 > O X 2 A-8 DATE OF ISSUE 06-29-04 ' ^ • P �/ F"'�� DRAWN BY: ` '���G � •• HGP THIRD FLOOR Pl.._AN � 1- C ' U V4 « SHEET NO. oGA E �/4 = V-0" t 04018 L � NORTH AIC- AREA = 1,064 S.F. '�., �S�•CJ�.:..••��� 0 A-4 REVISIONS ROOF BEARING LEVEL - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - VINYL SHINGLE SYSTEM Jill I METAL ROOF THIRD FLOOR LEVEL ,4;j;L- - I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 11 -=-Z-Z- -- - - - - - --- - -_ I - - -1 � - - - - - - - - - - - L1 IJ S ENED ENCL U E:1 1 1 IIJ I.J. fill I i F1 I I I Lill III I SECOND FLOOR LEVEL - - - - - - - - - - I�1 Q STUCCO ON CMU WALL Q w OPEN w � � aw FIRST FLOOR LEVEL - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- --- - - - - - U WE5T ELEVATION SCALE 114" - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - V ROOF BEARING LEVEL 4441 VINYL SHINGLE SYSTEM i THIRD FLOOR LEVEL IF T 7-T7-F-TT I - - - - - - z ENED ENCL 0 Q TREI 1,.AILSY5TEM �i W `x' w S - - - - - - - - - - - - - - - - - -ECOND FLOOR LEVEL W W CANTIVEVERED BEAM U STUCCO ON IV-0" x V-0"GARAGE DOOR CMU WALL STUCCO ON � STUCCO ON FRAME CONSTRUCTION CMU WALL OPEN DATE OF \ ISSUE \ 06-29-04 FIRST FLOOR LEVEL \ O FL L�r�i DRAWN BY: f.� N y HCxP 1, • F- SHEET NO. 1�. 0018 EA&T ELEVATION s� A-5 SCALE 1/4" REVISIONS ROOF BEARING LEVEL I i THIRD FLOOR LEVEL . 000000 IIIIIIIIIIIIII / \ INSECTS ENING W / \ Iq ALUM FRAM STEM PPED 44 OST,TYP — SECOND FLOOR LEVEL — — — !�1 Q STUCCO ON CONCRETE BLOCK U Lj FIRST FLOOR LEVEL z NORTH ELEVATION a SCALE 1/4" ROOF BEARING LEVEL — — — — — — — — — — — — — — — VINYL SHINGLES / THIRD FLOOR LEVEL — — — — BEARING SUN ROOM VINYL SHINGLESE: J I I I I I I I I� Q O M W DOUBLE HUNG VINYL WINDOWS U zu "t, � SECOND FLOOR LEVEL << w W +\ aG w STUCCO ON CONCRETE BLOCK REMAINDER OF STAIR NOT SHOWN U DATE OF ISSUE 06-29-04 F L.t) r'0r DRAWN BY: FIRST FLOOR LEVEL - - - - - - - - - - - - - •• - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - ��'. .��` 0. ,e�•. �`; HCzP SHEET NO. 04018 SOUTH E L E VAT 1011 `'%��sr� "p '��r�'•• A6 �E SCALE 1/4.. = P-0" i REVISIONS METAL ROOF ON GRACE ICE AND WATER SHIELD ON %" PLYWOOD SHEATHING ON TRUSSES 24" O.C. METAL ROOF ON GRACE ICE AND WATER SHIELD ON 1i2" PLYWOOD SHEATHING ON TRUSSES r g 24" O.G. ALUM.DRIP OVER P.T.Ix2 14" LVL BEAM OVER P.T.2x6 FASCIA,TYP. 2'-0" VINYL SOFFIT VENT SYSTEM ALUM.DRIP OVER P.T.Ix2 OVER P.T.2x6 FASCIA,TYP. 21-011 VINYL SOFFIT VENT SYSTEM VINYL SIDING SYSTEM THING ON MASTER OOl"I 31N"WOOD STUDS -9 6"O.C. a MASTER 5ATH � W CONT. FLASHING 11/2"GWB OVER GWB OVER u r R-13 BATT INSULATION R-13 BATT INSULATION WOOD BASE WOOD BASE f/2" SHEATHING EXTENDS TO Z BOTTOM OF LVL BEAM PREFABRICATED WOOD TRUSS SUPPORTING JACK TRU55ES A 3/4" PLYWOOD DECK 3/4" PLYWOOD DECK 1--1 GLUED AND GLUED AND METAL ROOF ON GRACE ICE AND WATER SHIELD ON /2 METAL ROOF ON GRACE ICE W NAILED t0 JOISTS NAILED TO JOISTS AMC) WATER SHIELD ON i" THIRD FLOOR THIRD FLOOR ACK TRUSSES aT24" O.C. PLYWOOD 2 �••� O PLYWOOD SHEATHING ON TRUSSES � g 24" O.C. 14" TJI JOISTS 14' TJI J015TS �, w 16' O.G. cricr, 16' O.C. R-19 BATT INSULATIO 12 - r 14 N � ALUM.DRIP OVER P.T.Ix2 V ACOUSTICAL L ACOUSTICAL OVER P.T.2x6 FASCIA,TYP. a INSULATION INSULATION TRU55 BEARING 2 - 18" LVL BEAM 2 - 18" LVL BEAM VINYL SOFFIT VENT SYSTEM ALUM.DRIP OVER P.T. Ix2 a w 2'-0" OVER P.T.2x6 FASCIA,TYP. 1/2 GU1B i�z GU18 viz GWB ,rr1 U p R-19 BATT INSULATION VINYL SOFFIT VENT SYSTEM M 0-4 tu 2-2x8 HEADER Z 04 0 8 VINYL DOUBLE HUNG WINDOW 0 Q 8 w/TRANSOM�xV' ANCHOR BOLTS 0 32" O.C.,TYP. VINYL SIDING SYSTEM VINYL SIDING SYSTEM -1 ON 1i2" SHEATHING ON ON 1i2" SHEATHING ON 312" WOOD STUDS m 16" O.C. 31/2"WOOD STUDS a 16" O.C. PANTRY OFFICE COVERED PORCH 1/2"GWB OVER Y'GWB OVER V/2"GWB OVER "TREK" RAIL SYSTEM R-13 BATT INSULATION R-13 BATT INSULATION R-13 BATT INSULATION WOOD BASE WOOD BASE WOOD BASE DECK CONSTRUCTION: EPDXY VINYL SIDING SYSTEM 34" PLYWOOD DECK GLUED AND 4 COATING ON PREPARED ON 1/2" SHEATHING ON SLOPED PLYWOOD DECK ii NAILED TO JOISTS 3 2" WOOD STUDS im 16" O.C. SECOND FLOOR SECOND FLOOR SECOND FLOOR CONT.ALUM FLASHING 'n 12" TJI JOISTS CONT.RIM JOIST,TYP.. `n CONT.RIM JOIST,TYP- 'n CONT.RIM JOIST,TYP. 1"x14" CONT.TRIM BAND 1"x14" CONT.TRIM BAND CONT.ALUM FLASHING CONT.BOND BEAM,05 BAR CONT CONT.BOND BEAM,05 BAR CONT R-13 BATT INSULATION ON BEAM BLOCK w/300 PSI CONC, - ON BEAM BLOCK w/300 PSI CONC, _ 1i2"08" ANCHOR BOLTS a 32" O.C.,TYP. 1i2"Ox8" ANCHOR BOLTS g 32" O.C.,TYP. �i2"GWB ON FRAMING CONT.BONA BEAM,'S BAR CONT ON BEAM BLOCK w/300 PSI CONC, 1-HOUR RATED GWB CEILING, I-HOUR RATED GWB CEILING, 1/2"Ax8" ANCHOR BOLTS a 32" O.C.,TYP. 2 LAYERS Na" X BOARD 2 LAYERS Nei" X BOARD R-19 BATT INSULATION 1%4,VERTICAL BARS IN FILLED CELLS 5/8110 VERTICAL BARS IN FILLED CELLS g1e"o VERTICAL BARS IN FILLED CELLS 0 LOCATIONS SHOWN ON a LOCATIONS SHOWN ON m LOCATIONS SHOWN ON FOUNDATION PLAN,SPLICE BARS FOUNDATION PLAN,SPLICE BARS FOUNDATION PLAN,SPLICE BARS �t AS PER A.C.I.CODE AS PER A.G.I.CODE AS PER A.G.I.CODE 3/4" SYNTHETIC FINISHED STUCCO 3/4" SYNTHETIC FINISHED STUCCO 34" SYNTHETIC FINISHED STUCCO ' ON BLOCK � ON BLOCK � ON BLOCK BEDROOM No. I WORK SHOD Q z GARAGE � M U a =u 4" 3000 PSI FIBER REINFORCED 4"3000 PSI FIBER REINFORCED 4"3000 PSI FIBER REINFORCED (;j H Q W CONCRETE SLAB ON 6 MIL PVC CONCRETE SLAB ON 6 MIL PVCPVC VAPOR BARRIER ON 95go MODIFIED VAPOR BARRIER ON 95go CONCRETE SLAB ON 6 MIL ODI Z u W MODIFIED VAPOR BARRIER ON 95q•MODIFIED °\ Q U PROCTOR COMPACTED FILL,w/ PROCTOR COMPACTED FILL,w/ PROCTOR COMPACTED FILL,w/ I TERMITE TREATMENT,TYP. gib"Q DOWEL BARS IN FILLED CELLS TERMITE TREATMENT,TYP. %9 DOWEL BARS IN FILLED CELLS TERMITE TREATMENT,TYP. 5/8"t DOWEL BARS IN FILLED CELLS W a LOCATIONS S SHOWN ON g LOCATIONS 5 SHOWN ON g LOCATIONS 5 SHOWN ON \ � FIRST FLOOR FOUNDATION PLAN FIRST FLOOR FOUNDATION PLAN FIRST FLOOR FOUNDATION PLAN \\ �//j // //// // // / •/ /' GRADE /\/j\/\/\//�//\//\/ //\/ GRADE Al j\%j\/j _ • /\\�\ TYPICAL FOOTING,24"xi2" a /\ TYPICAL FOOTING 24"4" \�i// .. ///\�/� DATE OF /\/\/ \� �='a ===—� /\\j ISSUE w/3-5/8 p BARS CONT. tw/3-5/a9 BARS CONT. ta n \/\/ /��• 05 TIES a 48"O.C. �i\\j�\/�/\/\/\/\/\j\�� 5 TIES 0 48" O.C. FL DRAWN BY: F '� WALJ_ SECTIONr2 � WALLUJ B S C�" 101 1 SECT I01 1 A-� SCALE: i/2� 1'-0" A-� SCALE: �i2" = I'-0" SCALE: 1/2" 1'-V r SHEET NO. _ •i ,'�� 04018 " cl A-7 REVISIONS METAL ROOF ON GRACE ICE AND WATER SHIELD ON 1/2" METAL ROOF ON GRACE ICE PLYWOOD SHEATHING ON 24" O.C. AND WATER SHIELD ON TRUSSES ® PLYWOOD SHEATHING ON I JOISTS TRUSS BEARING im 24"O.C. VERIFY ELEVATOR HEADROOM REQUIREMENT \ ALUM.DRIP OVER P.T. Ix2 OVER P.T.2x6 FASCIA,TYP. 2x8 CEILING JOISTS VINYL SOFFIT VENT SYSTEM SLOPED w/ROOF C MASTER BEDROOM U z W � A 3'4" PLYWOOD DECK GLUED AND 3'4" PLYWOOD DECK GLUED AND NAILED TO JOISTS NAILED TO JOISTS THIRD FLOOR _ 14"7J1 JOISTS L___ 14" tJl JOISTS METAL ROOF ON GRACE ICE AND WATER SHIELD ON 1/2" PLYWOOD SHEATHING ON L- -— [V x JACK TRUSSES 0 24" O.C. R-13 ACOUSTIC L——— R-13 ACOUSTIC VINYL SOFFIT SYSTEM �' U BATT INSULATION BATT INSULATION 1� 1'2„GWB 1,2"GWg VINYL SOFFIT SYSTEM U (h z i „ ----- -----Tl- ---------------- LANDING --------------LANDING ______ VINYL SIDING SYSTEM -' ON 1i2" SHEATHING ONffi 61 F 31/2"WOOD STUDS 16" O.C. F , ELEV. SHAFT 5--- Z -- J 2 R-13 BATTT INSULATION OVER FOl' COVERED PORCH _J \ "TREK" RAIL SYSTEM —J DECK CONSTRUCTION: EPDXY 3j4" PLYWOOD DECK GLUED AND COATING ON PREPARED 34" NAILED TO JOISTS —— SLOPED PLYWOOD DECK SECOND FLOOR . 12" TJI JOISTS L___� m wj www9w 1:3 L---� R-13 ACOUSTIC L——— VI YL SOFF T SYSTEM BATT INSULATION 1,_0„ EACH JOIST BEARING BELOW ADJACENT JOIST FOR SLOPE CAST-CRETE BEAM • c� SPLICE OUTSIDE WALL 2x6 tv3 STUDS a, WINDOW SILL LEVELS e ELEVATOR _ __ Q NOT _ _ Sia" SYNTHETIC FINISHED STUCCO CAA MOT ON BLOCK GARAGE SHOW IIIN w — LANDING - - - 61 j av� U M W SPLICE SIDEWALL 2x6 � O /� W w _J M STUDS 9 LANDING La LEVELS 0 t ' � U1 U CD 4" 3000 PSI FIBER REINFORCED ———i I J X � C7 yM W vWi CONCRETE SLAB ON 6 MIL PVC VAPOR BARRIER ON 95% MODIFIED PROCTOR COMPACTED FILL,w/ ——J 0 TERMITE TREATMENT,TYP. �� W FIRST FLOOR ELEVATOR PIT , •° 4 >/ / j / / / / GRADE DRIVEWAY /\\/\ //.✓/.�//.� .�//.� //. //. //. //. //. //. //. //. //. //, //. //. //. //. //. //.�//.�//.�/j\\//\\/j\\//\\//\\ ;. e \ \j//\\j/ %/\\ \j/\\j/\\j/\\ \%/\\\/\\/\\ �\/\\/\�\/\\\/.\\\ �\/\\\/\�\/\�\/ DATE OF S" \//�\/�\/�\//\ = TYPICAL FOOTING,24"x12" BARS CONT. t \/�\//\j� ISSUE 95 TIES +3 48" O.C. �i,\\j\\j\\j \j\\j/\\/\ �t�� Oro-29-04 L 0 f�/ 1 DRAWN BY: 2 WALL_ SECTION 1 WALL_ SECT f ON6q y I �- � ``• uj� SHEET NO. • Vim•, 0dfd1>3 A-8 SCALE: 1/2" = 1'-0" A-8 SCALE: 112 - V-0" ��•''•...�o'�Q�.`,' r TpA-8 ., ERE r"111111111111,,`` REVISIONS T-0" 8l--III HANGER z METAL ROOF ON GRACE ICE AND U IATER SHIELD ON 1/2 PLY OD SHEATHING ON 2x6 METAL ROOF ON GRACE ICE A 24" .C. AND WATER SHIELD ON 11/2" PLYWOOD SHEATHING ON �..� Q JACK TRUSSES ® 14" O.C. a 12 Qi w a I LVL BEAM ZBA7ULATION _ 4g 16" O.C.w TAPERED END - � NyyyyMyYY x 0 ALUM,DRIP OVER P.T.1x2 ALUM.DRIP OVER P.T. Ix2 Qr V 1,2OVER P.T.2xOVER P.T.2x6 FASCIA,TYP. a �� GWB 2x6 FASCIA,TYP. R-19 BATT INSULATION VINYL SOFFIT VENT SYSTEM VINYL SOFFIT VENT SYSTEM 2-2x8 HEADER r V M � Z C W � 8 VINYL DOUBLE HUNG WINDOW r`I FAMILY ROOM w/TRANSOM i2 Ox8 ANCHOR BOLTS 9 32' O.C.,TYP. WRAPED 44 POST ` DINING ROOT"I SCREENED PORCH r� %"GWB OVER R-13 BATT INSULATION SCREEN SYSTEM W00D BASE PECK CONSTRUCTION: EPDXY W PL1 tU00D DECK GLUED AND - VINYL SIDING SYSTEM 344„ ON DECK ON COATING ON PREPARED a SLOPED PLYWOOD DECK 312" WOOD STUDS 9 16" O.C. SECOND FLOOR CONT.ALUM FLASHING I"x14" CONT.TRIM BAND 2x8 JOISTS 6 12" O.C. CONT.RIM JOIST,TYP- ' CONT.ALUM FLASHING VINYL SOFFIT SYSTEM I"xl4" CONT.TRIM SAND CONT.BOND BEAM,r5 BAR CONT ON BEAM BLOCK w/300 PSI CONIC, 1/2"06" ANCHOR BOLTS A 32" D.C.,TYP. 1i2"GWB ON FRAMING CONT.BOND BEAM,15 BAR CONT i, ON BEAM BLOCK w/300 PSI CONC, 2 GWB ON FRAMING R-19 BATT INSULATION 1/2"mx8" ANCHOR BOLTS 9 32" O.C.,TYP. R-19 BATT IN5ULATION Y0 VERTICAL BARS IN FILLED CELLS 1/2' GU1B ON P.T. 2x2 FURRING 9 LOCATIONS 5 SHOWN ON 1/2' GWB ON P.T. 2x2 FURRING w/ 1 1/2" FOAMBOARD INSULATION FOUNDATION PLAN,SPLICE BARS w/ 1 1/2" FOAMBOARD INSULATION AS PER A.C.I.CODE N SYNTHETIC FINISHED STUCCO 3/4" SYNTHETIC FINISHED STUCCO Q' ON BLOCK ON BLOCK p OFFICE SITTING ROOT"I COVERED PATIO Q � y� / w 4 3000 PSI FIBER REINFORCED 4„ 3000 PSI FIBER REINFORCED CONCRETE SLAB ON 6 MIL PVC CONCRETE SLAB ON 6 MIL PVC z VAPOR BARRIER ON 9590 MODIFIED VAPOR BARRIER ON 95go �¢ PROCTOR COMPACTED FILL,w/ PROCTOR COMPACTED FILL, �� � u TERMITE TREATMENT,TYP. YO DOWEL BARS IN FILLED CELLS gib"O DOWEL BARS IN FILLED CELLS Sia 0 DOWEL BARS IN FILLED CELLS �, TERMITE TREATMENT,TYP. W a LOCATIONS S SHOWN ON ® LOCATIONS 5 SHOWN ON g LOCATIONS S SHOWN ON FOUNDATION PLAN,SPLICE BARS FOUNDATION PLAN,SPLICE BARS FOUNDATION PLAN,SPLICE BARS FIRST FLOOR III FIRST FLOOR FIRST FLOOR / / / / / / / • / / / / / / / / moi / / / GRADE • �\\/\\\/\\\/\ j\\/\\ .�\j\\/�\/\ j\\\/\\ DATE OF FOOTING,V-0"x3'-0 x1,-0 ISSUE \ i w/4-r5 BARS E W. 06-29-04 F L Q�, ili�� DRAWN BY: • HGP 2 1�,�L L S CS" f 01 1 1 WALL SECT 101 1 :••;����'��•P,;� . ..Z r� A-9 SCALE: 1'-0” A-g SCALE: 1i2" = 1'-0" `J N : r' SHEET NO. yo 0401S -.,cis TER ED P�' REVISIONS • w . U W � A A a w w N x U aw � U H Z H m DECK CONSTRUCTION: EPDXY COATING ON PREPARED 34" ;n SLOPED PI-TWOOD DECK `t "TREK RAILING SYSTEM %Q AND TREAD BOARDS cn SIMPSON TALO STAIR ANGLES 4"x4"xro" ANGLE w/ 2-/2"0 BOLTS TO �U; STRINGER a 1 1/2"0 STUD IN FOOTING a" UQ �¢ P.T.44 POST ON Z m SIMP50N ABL144, FACE OF BLOCK FOOTING I'-6,"x4'-5 3-4"x8" DEEP Q U i BOLT TO STRINGER w/ 2-04 BARS CONT. i W 2 COURSES 8x8 BRICK STEPS TO° CMU ON 24"x24NI2" DRIVEWAY 0 U�4 GRADE CONd DOWEL IN FILLED CELLS DATE OF ISSUE DRAWN BY: CC tt .1�:'�.� �• P�r ;� HGP 1 N Itt IR� 5TA I R c cry �10 SCALE: '�2" = 1'-0" �; c SHEET NO. 0018 A- 10 • �'�,,,4,��REO- tom`, REVISIONS CAS<FC 3000-PSI-CON ----------- ------ ----------- --------------------- --------------- 2-"5 BARS CONT FROM --- --------- � ----- --BOND BEAM I I I I I I IIIIIIIIII---- --------- -1L---- -----L'--_LL____ FACE OF BEAM BEYOND II II II II 11 II II II . II II II II II II II II II II II II CMU II II II BENT DOWELS FROM FILLED CORES I I I I II 11 II II II II II II II II II II II II II II II II II II II II II II II II II CANTILEVERED 5r=A r S-1 SCALE: P = I'-m'1 w U z ' w � A Q o 81-0'1 651-411 1--1 221-811 51 8'-01' II'-0" 11'-21/2" 121-0" N x U <( 23 � ►-a A-1 A-, �, w r ---------------- -------------------------------- ---------- ---- ------------------------ ------------------------ -I — — — — — — — — — — — I I M 1--1 ------------------------------ —I---I— ------------------------------ I 1 � I I I I a4LICsNj j I I I I I I r-- ----------------i ----------------i II II II r------i I II I II 1 r-----------——I---J I I I I I I I I 1 L__ J I I I I I I I I I I I j 0 I I I I THICKENED SLAB,2'-011x2'-011 x 811 1 1 I I 1 I 1 I I I 1 I I I I THICK w/3-05 BARS E.W. 1 I I I I I L j i i t I j t 1 I I 4 1/2'1x8" ANCHOR BOLTS TO 5IMP60N N I I I I I I m I I I I ABU44 I I I I 1 I I v 1 1 I I I I N I I I I 1 1 1 1 1 I I I 1 1 I I I I w I I I THICKENED SLAB,II-411 WIDE x SII I I I I I I O I I I I THICK w/3-"5 BARS CONT. 4 05 I I I I 1 - I I I I I TIES 0 3211 D.G.,TYP, 4 1/2"x81' ANCHOR BOLTS 1 1 11 I i I 1 I I I 1 I I I 132"O.C.,TYP. I 1 1 1 I I I I 11 I I I I I I I I I I I I I I THICKENED SLAB,11-411 WIDE x 8" I I I i I I I I 1 CAST-CRETE BEAM i I I I I THICK w/3-05 BARS CONT. 4 05 I i I I I I I I I I ABOVE m j i 1 1 1 1 TIES 10 3211 O.C.,TYP. 4 1/2"x&" ANCHOR BOLTS I I I j "9 32O.C.,TYP. I I i I I I I 1 1 I j I I I I I I I I I II I I I I 11-011x11-0'1 CMU POST j I I I I I I I I I 4" FIBER REINF.CONC.SLAB I I I I 1 w/2-"5 BARS VERT TO BEAM ON VAPOR BARRIER 3'-0"x31-0"xl'-0" FOOTING I 1 1 1 I I I I ON COMPACTED FILL,TYP. I 1 I i 11 I I I I I I 1 1 i I I TOP 1'-4" BELOW FIN.FLOOR j I I I I I I I I 1 j w/3-05 BARS E.W. 4 2-05 DOWELS UP IN FILLED 1 1 I i I I I I I I 11 1 1 I I 1 CELLS,TYP. f----------------� I I I 1 � t— - - - - - - - - - T I I I I 1 I I I I I r------------� I 1 r---, I I r I j 1 L-- - - - - - - - - - 4 1 I I I I I I I I I I I I I I I I I I I 1 I � I I I I L_____J 'S VERTIVAL ROD IN CELL I I r1--I- ---, -- ->- i-. FILLEDw/ 3000 PSI CONC 1 I �N I- - -- — — — — — — — — — — — —I I P I 1 I I 1 -� . 2 a MAX. 32" O.C. AND AS SHOWN, j I I I I I I LEVAT R I I L___J A-9 PROVIDE "5 HOOK BAR INTO I I I CAST-CRETE BEAM ___ _ I I L______J I I I 1 I 1 BOND BEAM. I i ----- ABOVE , i j I i 8" DROP I j I I I I I I 1 ------- a -�---i I I I I 1 I 11 1 1 I I cn W _ � U I ^� � J i i i I I i i i------i i 1 i // N a L---------JI I/ 9 I I I -- ---------J 1 I I 1 L--------------------J I en • 1 1 •1 • �i I i �---- ----------J i i x ,i — �ou — — — — — — — — — — — — — — — — — — — --� I 1 x L--------------- LINE OF DECK ABOVE I I I 1 IL J ! ¢ L------- ---------------J I --- — L——— ------------- I F"� w (rW� -011 1 I I 12'-8 vt611 \ 0 u H d A-8 ----------- ---- -------------- w ¢ H CANTILEVERED CAST-IN-PLACE I 2 5i8"0 x811 ANCHOR BOLTS CONCRETE BEAM ABOVE g_I A-8 SET IN CONC a MAX 3211 O.G. u DATE OF ISSUE Lo Oro-29-04 Q loo DRAWN BY: SCALE I1411 11-�II ••�- O ! = SHEET NO. 04018 NORTH 'ST•'. �,'1/ �� • �" TFF�ED. P - o REVISIONS F� U W � o � U 3 W 2 A-'1 G" �4 � U 12" RIM JOIST,TYP. N wl � 1 W A-9 p p ` cmv m � w O a ( N c 1+ til N N N m X N m 2 12" RIM JOIST TYP. 1 CAST-CRETE BEAM BELOW Lw N Y uJ C4 uJ m z0 {O II Inic;JSX X Li U M w m u m�i N vai 1. - LA N 1 M 3 STRINGE IRS FROM 2x12 A'' UV. 3 - 14 LYL 2x8 g 16" O.C. X X Zx8 g 16" O.C. E W W o U N N N N \'\ CANTILEVER CONC BEAMS TO CORNERI-PW SEE DETAIL 1/6-3 A 18 3-2x8/2 \ U A-8 DATE OF S COl�lI� FLOOR FRAMING PLAN ISSUE -2e- SCALE 1/4' = 1'-0" „�' / .� DRAWN BY: SEE HOLD DOWN ELEVATION AT SHEETS 5-4 AND 5-5 F, NORTH ', '``•`� '. ' ' Ag SHEET NO. ', n ••�.I• r S -2 REVISIONS 2-2x6/1 2 A-� \\ 2-2x6 2 x6/1 2-2x6 I 5-1 1 - 14" L 2-2x8/2 / . • i�ORCH \\ , X ---- --- --- -- N N MAT O0 \ / W \ I i/ 2-2x(0/11 11 2� x6/I I I 2-2x6 I 2 x6/I 2.10/1 2- 8/1 2-2x8/2 0 / V ELE \ / WNx A-8 U . a W '00 Ffi;ZAM lNG PLAN � SCALE 1/4" = 1'-m" U NORTH TRUSS TO TRUSS CONNECTORS t0 BE DESIGNED AND PROVIDED (� BY THE TRUSS PROVIDER z A2-7 W � JA K TRJSI,ES g 24' O.G. V \\ JACK I RU55ES 2411 OC \e/ \ I w/ 'MOVER OPPSON x36 / \\ LV BEAM, ` 26 Dd NAIL TOTAL \ TRUSS LL AB / - x / 2 - 18" LVL 2 - LV , N ----------- w/ ' OV=R TCP \ LVI. BE M, 28- d AILS OTA \ �\ x6 RDOF-0-VTf RAMING -' \\ OVER PLYWO DECK \\ 9 U X 111 N p-. \ \ 16' 3/4"Lu \ ` \ 24 ROOF FRAMING 14" 1/55 Z x 1 ' OZ. 6" O. -1 14" LVL w/ TAPEREDU 2-611PEON C 6x36 w/ ' 0 RT ' Lvl. BE 4M, �o u 28-0d AILS OTAJ�, u x rn Nj L JL JL v 14" RIM JOIST.TYP, I 2 - 14" LVL \ 2 \ W 0 TRUSS CV / 111 N N \ \\ 1 y/ E LIE CIA mu- Mu- \\ y CK T SES 6 2 " OC. J CK TRU ES 9 24 O.C. `!o / \ s • \s 3 STRING \ 2 -114" LVL FROM 2x12 2x8 \ DATE OF 2-2x8/2X8 16 C.C. 110 \ ISSUE cZii �p 0 DRAWN BY: 3-2x8/2 1 (0 2 , b A-8 A-8 ro Q : 00 ''-����l �:. SHEET NO. �� � � �TIAL ROOF F RAM I NG F 'G`�� 04018 SCALE 1i4�� = 1'-0" ��� FfiEP_ P� S_3 SEE HOLD DOWN ELEVATION AT SHEETS 5-4 AND 5-5 �'r t r i t I II I It It �� NORTH ____y_y_ , REVISIONS H25A w/10-8d EA.TRUSS H6 v 48" O.C.AND AS SHOIIIN w/ 8-8d TO PLATE t 8-8d TO STUDS HCP2 w/12-10d NAILS 9 HIP TRU55 ROOF BEARING LEVEL — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — �- — — — — — — — — — — — — — — — — — — — 4 7—fl—, — -- — — — — — — — — — — — — — — — — — — — — — — — — — — — — If I If If I ALL EXTERIOR SHEATHING TO BE 15/32" PS-1 W2.5A w/ 10-8dOR Fi GRADE SHEATHING NAILED AT 4" O.C. 6 EA.TRUSS SIMPSON C628 AT DIAPHRAGM BOUNDRIE5 AND AT ALL PANEL w/3" OVER TOP EDGES AND 6" O.0 AT ALL OTHER EDGES. H6 im 48"O.C.AND AS SHOWN w/ AT WALL STUDS TO OF STUDS t 9" ON AT WALL STUDS TO 8-8d TO PLATE t 8-8d TO STUDS RIM JOISTS,SIMPSON JACK STUDS,w/ RIM JOISTS,SIMP60N HCP2 w/ 12-10d NAILS H6 STUDS TO JOISTS IS-10d NAILS TOTAL H6 STUDS TO JOISTS o HIP TRUSS a-ed TO STUDS,6-6cl 57F70-=5,Fed TO RIM JOISTS a 32" O.C. 70 RIM JOISTS g 32" O.C. THIRD FLOOR LEVEL — — — — — — — —�— — — � SIMPSON CS36 3" OVER w/3" OVER TOP u� l� �L--•.—J OF STUDS 4 '3" ON JACK STUDS,w/ 18-10d NAILS TOTAL ALL EXTERIOR SHEATHING TO BE 15/32" Fi w OR P5-2 GRADE SHEATHING NAILED AT 4" O.C. AT DIAPHRAGM BOUNDRIES AND AT ALL PANEL EDGES AND 6" O.0 AT ALL OTHER EDGES. V I- SIMPSON AC4(MIN)w/ 12-16d TO BEAM t 8-11 — — — TO POST,TYP.EA POST SECOND FLOOR LEVEL A 2- SIMPSON MSTAIS w/ 1- SIMPSON MSTAM24 w/ a/ 7-10d TO BEAM t 5-144"41/4" 9-I0d TO STUDS t 5-1/4"x2144" TITEN HEX HEAD SCREWS TITEN HEX HEAD SCREWS TO POST,TYP.EA POST TO CMU,TYP. w STAIR NOT SHOWN ' OPENLL • � U W � p., W FIRST FLOOR LEVEL E-4 z WEST .HOLI]I]OWN ELEVATION � SCALE 1/4u 1'-0u H25A w/10-8d ® EA.TRUSS HCP2 w/ 12-10d NAILS g HIP TRUSS ROOF BEARING LEVEL — — — — — — — — — —� — — — — — — — — — — — — — — — — — — — — — — — — — — — — — If ALL EXTERIOR SHEATHING TO BE 15/32" P5-1 OR PS-2 GRADE SHEATHING NAILED AT 4" O.C. AT DIAPHRAGM BOUNDRIES AND AT ALL PANEL EDGES AND 6"O.0 AT ALL OTHER EDGES. — H25A w/10-8d 2-SIMPSON C536 AT WALL STUDS TO AT WALL STUDS TO e EA.TRUSS 13" OVER TOP RIM JOISTS,SIMPSON HCP2 w/12-10d NAILSl_VL AM t S" ON H6 STUDS TO JOISTS 1,4o STUDS TO JOISTS g NIP TRUSS JACK STUDS,w/ 8-2d TO STUDS,&-ad 8-8d TO STUDS,6-8d THIRD FLOOR LEVEL 18-10d NAILS TOTAL TO RIM JOISTS a 32" O.C. TO RIM JOISTS S 32" O.C. - - - - - - - - - - - - - - - - - - - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — HOLDDOILNS SAME AS WEST ELEV. If 11 ---------------- L--- ALL --------------- L---ALL EXTERIOR SHEATHING TO BE 15/32" PS-1 / \ / \ L- --7 EN SYSTEM � Z OR PS-2 GRADE SHEATHING NAILED AT 4" O.C. AT DIAPHRAGM BOUNDRIE5 AND AT ALL PANEL L- -------------- Q EDGES AND 6"O.0 AT ALL OTHER EDGES. M SECOND FLOOR LEVEL • NW 2- SIMPSON MSTAIS w/ �, W a W 1-I0d TO BEAM t 5-3/1ii" ---------------- TITEN HEX HEAD SCREWS 1- SIMPSON MSTAM36 w/ L ? TO POST,TYP,EA POST U S-10d TO STUDS t 5-1/4"x21/4" L p / L_ T ENHEX HEAD SCREWS I6'-0"x 8'-0"GARAGE DOOR STAIR NOT SHOWN L---L------------------ / OPEN DATE OF \ ISSUE FIRST FLOOR LEVEL - - - - - - - - - - - - \\ - - - - - - U�•,,,L,0I'j/ DRAWN BY: r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - :F- SHEET NO. A W 04016 ELEVATION , '. S-4 o� - SCALE 1/4" c 1'-0" '"410r CRED �`V���• REVISIONS H2BA w/10-8d— m EA.TRUSS H6 m 48" O.C.AND AS SHOWN w/ 8-8d TO PLATE t 8-8d TO STUDS HCP2 w/12-10d NAILS— m HIP TRUSS ROOF BEARING LEVEL AT WALL STUDS TO W2.5A w/10-5d LVL JOISTS,51MP50N ALL EXTERIOR SHEATHING TO BE 15/32" PS-I m EA.TRUSS H6 STUDS TO JOISTS OR P6-2 GRADE SHEATHING NAILED AT 4" O.C. 8-8d TO STUDS,8-6d AT DIAPHRAGM BOUNDRIES AND AT ALL PANEL H6 m 48" O.C.AND A$SHOWN w/ TO LVL JOISTS m 32" O.G. EDGES AND b" O.0 AT ALL OTHER EDGES. H2.5A w/10-6c 84d TO PLATE t 54d TO STUDS m EA.TRUS HCP2 w/12-10d NAIL HCP2 w/12-10d NAILS m HIP TRUS m HIP TRUSS THIRD FLOOR LEVEL Ll - OO 0000 / \ ALL EXTERIOR SHEATHING TO BE 15/32"PS-I W / \ OR P5-2 GRADE SHEATHING NAILED AT 4" O.C. / \ AT DIAPHRAGM BOUNDRIES AND AT ALL PANEL T ` EDGES AND 6" O.0 AT ALL OTHER EDGES. V I- SIMP60N AC4(MIN)w/ 12-16d TO BEAM t 8-16d TO POST,TYP.EA POST – SECOND FLOOR LEVEL — — — — — — - SIMPSON A 2- SIMPSON MSTA18 w/ 1-10d2 2TO BEAM 15-1/4"A41/4" 1-10d TO iz" TITEN HEX HEAD SCREWS 0 TITEN X HEAD SC WS TO POST,TYP.EA POST 0-4 TO F G T,TYP.EA IC ST LJ <Il u �4 FIRST FLOOR LEVEL - - - - - - - - - - - � � U H z NOIRTH H0L[:)F,)(f)WN ELEVATION l � SCALE 1/4" I'-0" H2.5A - .5 0 Sd m EA.TRUSS HCP2 w/12-10d NAILS V m HIP TRUSS ROOF BEARING LEVEL ALL EXTERIOR SHEATHING TO BE 15/32" P5-1 % \ OR PS-2 GRADE SHEATHING NAILED AT 4" O.C. \ AT DIAPHRAGM BOUNDRIES AND AT ALL PANEL EDGES AND 6"O.0 AT ALL OTHER EDGES. H2.5A w/10-8d irl J I I I t I 12�1 ll/ \ AT WALL STUtS TO m EA.TRUSS LVL JOISTS, O 101STS HCP2 w/12-10d 8- STUDS t NAILS 8Sd TO STUDS,8-8d m HIP TRUSS,TYP. I TO LVL JOISTS m 32" O.C. I THIRD FLOOR LEVEL — — — — — — — — — — — — — — — — — — — — — — — — — — — - - — — — — — — —BEARING m SUN ROOM ALL EXTERIOR SHEATHING TO BE 15/32" PS-1 OR PS-2 GRADE SHEATHING NAILED AT 4" OC. AT DIAPHRAGM BOUNDRIES AND AT ALL PANEL EDGES AND 6"O.0 AT ALL OTHER EDGES. U W c eU SECOND FLOOR LEVEL — — — ZO Z5 — — U vl- SIMPSON MST M36 w/ S-10d TO STUDS 15-1/4 11x21/4" TITEN HEX HEAD SCREWS STAIR NOT SHOUN TO CMU,TYP. DATE OF ISSUE 06-29-04 F L �•.�G DRAWN BY: FIRST FLOOR LEVEL - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - G. P .y �'• HCsP :z 6 SHEET NO. .' 04018 5OUTH HOLIDIDOWN ELEVATION S-5 SCALE 1'-011 �<<� ,