Loading...
594 Aquatic Dr 2011 - Roof Permit CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH,FL 32233 1A INSPECTION PHONE LINE 247-5826 Application Number . . . . . 11-00001649 Date 2/08/11 Property Address . . . . . . 594 AQUATIC DR Application type description ROOF PERMIT Property Zoning . . . . . . . TO BE UPDATED Application valuation . . . . 2480 ---------------------------------------------------------------------------- Application desc REROOF ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ BISHOP, JOHN & PATSY SHORE ROOFING COMPANY 594 AQUATIC DR 914 7TH AVENUE SOUTH ATLANTIC BEACH FL 32233 JAX BEACH FL 32250 (904) 241-8842 ---------------------------------------------------------------------------- Permit . . . . . . ROOF PERMIT Additional desc . . Permit Fee . . . . 65 . 00 Plan Check Fee . 00 Issue Date . . . . Valuation . . . . 2480 Expiration Date . . 8/07/11 ---------------------------------------------------------------------------- Other Fees . . . . . . . . . STATE DCA SURCHARGE 2 . 00 STATE DBPR SURCHARGE 2 . 00 ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 65 . 00 65 . 00 . 00 . 00 Plan Check Total . 00 . 00 . 00 . 00 Other Fee Total 4 . 00 4 . 00 . 00 . 00 Grand Total 69 . 00 69 . 00 . 00 . 00 PERMIT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF ATLANTIC BEACH ORDINANCES AND THE FLORIDA BUILDING CODES. s BUILDING PERMIT APPLICATION CITY OF ATLANTIC BEACH 800 Seminole Road,Atlantic Beach, FL 32233 Office (904)247-5826 Fax(904) 247-5845 Job Address: .S9 AQ u,rf-�Ic_ /)V- Permit Number: Legal Description Parcel# Floor Area o Sq.Ft Sq' t Valuation of Work$ ,21 IVTO, `% Proposed Work heated/cooled non-heated/cooled Class of Work(circle one): New Addition Alteration Repair Move Demolition pool/spa window/door Use of existing/proposed structure(s)(circle one): Commercial Residential If an existing structure,is a fire sprinkler system installed?(Circle one): Yes No N/A Florida.Product Approval# For multiple products use product approval orm n Describe in detail the type of work to be performed: !'c t Property Owner Information: CE ail or Fax#(Optional) Contractor Information: Company Name: L rt t2covi-y CC-11 Qualifying Agent: Address: 9 City ?"nom , , 4 State /'! Zip?2 2,J-6r Dffice Phone Job Site/Contact Number a2&1 ,Z � re, Fax# Rate Certification/Registration krchitect Name&Phone# Engineer's Name&Phone# Fee Simple Title Holder Name and Address Bonding Company Name and Address .Mortgage Lender Name and Address 4pplication is he made to obtain a permit to do the work and installations as indicated. I cerkfy that no work or installation has commenced prior to the ssuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. This permit becomes null and void if work is not commenced within six(6)months, or if construction or work is sus ended or abandoned for a We of six((6)months at any time after vork is commenced I understand that separate permits must be secured for, lectricalPNTorly Plumbing,Signs, Wells,Pools, 1�urnaces,Boilers,Heaters, ranks andAir Conditioners,etc WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT, hereby certify that I have read and examined th' )plication and know the same to be true and correct. X411 provisions of laws and ordinances governing this ype o work will be complied with whether speci ed herein or not. The granting of a permit does not presume to gave authority to violate or cancel the provisions of any other federal,state, or local law regulating construction or the performance of construction. lignature of Owner Signature of Contractor 'rint Name , 5�o'er Print Name `�� /�pp ..... --;►►,yy...... ................................... . 1. �..r►.............. ... .-....... -�c....................................-......--............ >w�m to MYQIu s riq before me���� Sworn to and subscribed before me his_;)I_Day of , n rtAay 20 this '?-%\-Day of 20 1\ dotary Public MARJORIE M.Ad -F�(lORIE M.ADAMSp NOTARY PUBLIC NOTARY PUBLIC STATE OF FLORIDA jVP1 STATE OF FLORIDA Revised 01.26.10 Comm#DD0933778 Comm#DD0933778 Expires 10/30/2013 • Expires 10/30/2013 r 800 Seminole Road Atlantic Beach,Florida 32233 J is Telephone(904)247-5800 FAX(904)247-5845 a via I Construction Site Management Plan Compliance A construction site management plan conforming to Atlantic Beach City Code Sec 6-18 has been approved as a part of this building permit. The Construction site management plan was approved based upon the following information. 1. Parking plan-parking plan showing how site will be accessed and all onsite and abutting street parking areas. 2. Location of construction trailers, loading/unloading area and material storage area. 3. Location of chemical toilet area-chemical toilets must be kept out of City right-of-way and not further than 15 feet from structure under construction. 4. Location of dumpster-dumpster must be from approved waste company(in accordance with Chapter 16 City Code). As of 2009,approved dumpster companies for AtI.Beach are Advanced Disposal,Realco Recycling,and Shappells. Dumpsters are to have tarp covers or rigid covers on windy days. Dumpsters must be removed prior to issuance of Certificate of Occupancy or Completion. 5. Traffic control plan, showing access with dimensions, area to be stabilized, narrative on phasing of construction with adequate parking and delivery of materials. 6. Site cleanliness. Contractor must have the entire construction site cleaned by Friday of each week. This means removal of scrap lumber, concrete remnants and other such construction debris including cans, metal, plastic and paper. 7. Erosion and Sediment Control. Contractor must maintain all elements of the approved Erosion& Sediment Control Plan (silt fence, catch basin filters, etc.) until sod or other stabilization has been placed and approved by Public Works. 8. Other activities,where special conditions are identified by the Building Official. Failure to comply with the Construction Site Management Ordinance may result in a Stop Work Order being issued in accordance with City Code Sec. 6-17 (3) Revised 6/2009