Loading...
Permit 511 Levy Rd (vault folder) REVIEWED Jacksonvilie Firia Orev'ention bi'visioil' 66, WMING AND ZONING INSPECTION DIVISION DATE FILE CITY OF ATI.AN11C BEACH ATILAINIT..15RAC8,1L.W.41 3,1113. 5x APPLICATION FOR MECHANICAL PERMIT CALL-IN NUMBER IMPORTANT—Applicanf to complefe all items in sections 1, 11, 111, and IV. LOCATION Street AvIcIrssss OF later"atji, street%% htwo.n Add wo r 111,11WING If. IDENTIFICATION—To be completed by all applicants. 10 CONSIderoflan of permit given far doing 0%-ark as doic6bed 1. the above itaternent hemby 89,00 to perform said ark In accordance with the affechpd plans sod operilicationt which are a part hereof add in accordance with the C;t1 of'Jacksonville ordinances and standards of good.prectice listed therein. Name of Mechankal Contractors CONtrester Wall IA/L- cp"�' Master Name all Properly Owner LAR�'?)r Signature of Owner "'n'turs of or #$wind Agent Aralvifest or Engineer III. GINBIAL INFORMATION 117 .A* Type of heating fv@,: IS OTHER CONSTRUCTION BEING DOME ON C3. Electric T"Is BUILDING on 31TET C-3 71� E3 Cres—0. L? 0 Natural 0 Central Utility If YES.GIVE NUMBER OF CONSTRUCTION PERMIT Z c 3 ci I [3 Other—speelf, IV.11611111M�NICAL BOUIPMONIT TO U 114VAUM NATURE OF WORK 1prevido complete list of empowk 00"of this form I C3 Residential-or X Commercial 13, Meet 0 Space 0 Itecessed 13 Central 13 Raw, 0 Now Building C3 Air Comd0lealast C3 Reans C1 Central Cl Existing Building C3 Sydem: Me I Thkkmw— 0 Replacement of existing system Mealmdat capacity CJA X Now Installation(No system previously Installso C] Extension or add-on to existing"atom 13 Wt%—%% IJ Other—Specify C1044101 t-- capacity 1#^ Rov "dolkless: Member of had. -7 13 Beftiad, 0 mantift 13 THIS SPAC*OOR OMW4 UM ONLY 0.04000-Pimps Instabor) (Roomkvdl ROMAN 13 LPG Ustfided"Noseft vessel Boom Parmil Appnmd by— b O*w—-Speelly Permit In— PDT ALL EQUIPMENT AIR CONDMONING AM RZFRIGUA71ON EQUIPMENT C A=bg XWebw Unlita Desuivu- me"Iftmber IIRATuiG-FURNACES,BOILERS,FIREPLACES AMM.AW NvembeirUNxIts Do@-IPU- Me"FlUmbeir xaautaatww TANKS now X&MY Nam of Social App-ing X=="=tr Tg:= tum No. Alpeaday DIVISION'OF PUBOC HEALTH 1!iT.Y OF JA44KSONVILLE 1187 JACKSONVILI�V, FLORJDA FINAL INSOECTION 0F.89WAGE DISPOSALAWIM INN", Name of Owner: UM 3" sea. , 'Address: "20 So" ft,I Date;Tsaaed SM, 12 Installation At: tion By: This certificate does tee the I= functioning of this unit tible for its sathifactbry o ation at all Septk_Mank Capacity Install Dr"'Flild- Sq. Pt- Dosing tank Capacit y FIN CTION DAT AkINM FOR OFF E U§E ONLY I/Date_ ............19 ...... Permit *------------...........Fee 4.-__....T!=:... CITY OF ATLANTIC BEACH 0 do Valuation $.------- .......... FLORIDA House _.74190e'..7.. _ . T.... .............................................................. APPLICATION FOR BUILDING PERMIT ........................................................................... Application is hereby made for theapproval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the City of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the City of Atlantic Beach and all rules and regulations of the Building Department of the City of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the City of Atlaniie Beach,Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub-contractors be submitted to this office so that licenses can be verified. Date------Novembe-r----5----------------------------------------t 19.-7-5..... Owner....-.4-0-hrl---5......Chan-d-Lex......Company...........-----------.--Address.-5 1.1....Lemy...Road.......................Telephone No..2.46:n6.7.1.1..... Architect_.......................... -----------_---_-----------------_----------_---....Address,.----------------------------------------------.........Telephone No......................------ Contractor Builder----Vega---&ul-ld-e-rs----------------------------------------Address.....6.1.2-0---&a.ck---Dr.lve...............Telephone No...7.M­7-36-T.--- Lot No-----------4....---------------------..........Block No------7 ..............Sub Division..... A ---------- ----------------------- ------------_-----Zone---------------- ......................-------------------------------------Street------------------.......Side Between ---------------and.......Maypor-t...Road-----_-------Sts. Valuation $...9.,.7_50----------------For what purpose will building be used.......0ffJ.Ce___------------Type of construction.........B.I.GC..k--------------- Dimensions of Building---------------------------- ------Dimensions of Lot-------6.2...X-14_2...........................Size of Footings............ ...1-6---- Size of Piers..-..-.---- ---------------------Size of Sills------------- -----------Greatest Sill Span in ft.......1.9.1--------------Type Roof---��ji n I es .....9-.................... How will Building be Heated?_.................................... ......---------..-Will Building be on Solid or Filled Ground?--------S-0.1-1-d................... I....911...................... to Size of Ceiling Joists------T rus-e—s.......------------- Distance on Centers......2.4.................................I Greatest Span.....3-6.. 2411 361 911 to Size of Floor Joists---------Truses.... .......Distance on Centers.......... ... ......................... Greatest Span...................................... ....................... Size of Rafters--- .....Truses--------------.......Distance on Centers....241 ......................., Greatest Span.----3.6.- - This rectangle is to represent the lot. Locate the building or buildings in the right position. Give distance in feet from all lot-lines and existing buildings. REAR LOT LINE Two copies of plans and specifications shall be submitted with application. Inspections required. 1. When steel is in place and ready to pour footing. 2. When steel is in place and ready to pour columns and/or lintel. Z 3. When steel is in place and ready to pour beam. 4. When framing is completed. 5. When rough plumbing is completed,and ready to cover up. 6. When septic tank drain field or sewer is laid but before it is covered. 7. Electrical inspection by City of Jacksonville. M 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called for after corrections are made. FRONT OF LOT In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with the attached plana and specifications, which are a part hereof, and in accordance with the building regulations of the City qp�ktlantic Beach. "Ov -ignature of Builder- ......... Address... ....... _44 ........................ ............. S ....................74�.7�>........... Signatureof Owner.... . . .. . . Address.................................................................................................... FOR OFFICE U§E ONLY D a t e.,.#A 9 ...... Permit #--......................Fee CITY OF ATLANTIC BEACH .49 ')o Valuation $...........J. .... _A- ......... . ........ FLORIDA House #.112y.."7... ...................I....................... APPLICATION FOR BUILDING PERMIT ................................... ............... .................................................... Application is hereby made for the approval of the detailed -statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the City of Atlantic Beach, Florida, and all piovisi(ins, of the Laws of the State of Florida, all ordinances of the City of Atlantic Beach and all rules and regulations of the Building 1),,partment of the City of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the City of Atlantic Beach, Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub-contractors be submitted to this office so that licenses can be verified. Date-----Novembe-r-5----------------------------------------- 19_7.5._. Owner.. .....JOhn ..5. ..Chandler Company -Address.5 1 L. Le vy -Ro-ad -------__.........Telephone No..246:441-1...... Architect__..--------------- Address.. ......____-----------------.......................Telephone No..................... Contractor Builder --Veqa- �au�i I derc Address .61.20.. Sa.ck...D-r.ive.-..-.-........Telephone No.-.7-13!n736T Lot No.. Block No. 7 Sub Division - .-A ------- -- ---------------­................... --------.--..Zone........-------- ­ -1.....-I... ------- Street . , Side Between Main Street.. _--- ----and-------Maypor-t--Road..........----St". Valuation $.._9 75-0 .. ........For what purpose will building be used Off ice ---- ---Type of construction-------B.1_o-(,k............. Dimensions of Building Dimensions of 1,�ot 62 X 142 -...-..... Size of Footings----------1.Z.A..)6 Size of Piers., - ----- - Size of Sills Greatest Sill Span in ft.-- .1.9 1­------_ -Type Roof...S h i nq.!.!�§......... ..........I How will Building be Heated? Will Building be on Solid or Filled Ground?-------S-o.l.!,d.................. Size of Coiling Joists . Trus.es. Dista-.ice on Centers 2 4" . . ............. . Greatest Span-----3.6......9'1_................. It 2411 36t 9 It 1P Size of Floor Joists Truses. Distance on Centers Greatest Span.,.---------------------------------------- Sizeof Rafters Truses Distance on Centers 24" Greatest Span....3.&'.__.9...........I...........­ 1P This rectangle is to represent the lot. Locate the building or buildings in the right position. Give distance in feet from all lot-lines and existing buildings. REAR LOT LINE Two copies of plans and specifications shall be submitted with application. Inspections required. 1. When steel is in place and ready to pour footing. 2. When steel is in place and ready to pour columns and/or lintel. 3. When steel is in place and ready to pour beam. 4. When framing is completed. 5. When rough plumbing is completed,and ready to cover up. 6. When septic tank drain field or sewer is laid but before it is covered. .9 7. Electrical inspection by City of Jacksonville. 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called f or after corrections are made. FRONT OF LOT In consideration of permit given for doing the work an described in the above statement, we hereby agree to perform said work in accordance with the attached plan'a and specifications, which are a part hereof, and in accordance with the building regulations of the City Atlantic Beach. /- ZZ............................. ...... ................... . ........ Signature of Builder.. Addren.. C .......... Address -_------_----__ ------- ................. ......... ......... t Signature of Owner rt Cecl