Loading...
Agenda Item 8FAGENDA ITEM # 8F MAY 23, 20I1 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Rehabilitation of Well No. 1 at Water Plant No. 1 SUBMITTED BY: Donna Kaluzniak, CEP, Utility Director DATE: May 13, 2011 BACKGROUND: Well No. 1 at Water Plant No. 1 (469 11 St.) was constructed in 1953. In the last couple of years the well has suffered a serious loss in yield, and is now at less than half of its original production due to excessive calcium and magnesium carbonate mineral deposits in the well bore. Our 2001 Water Master Plan recommended replacing the well by 2008. Replacing the well would cost several hundred thousand dollars. Over the past twelve years, JEA in conjunction with their engineers and contractors have conducted research and developed a proprietary chemical well rehabilitation process that has had excellent results. After discussions with JEA, staff believes Well No. 1 at Water Plant No. 1 can be rehabilitated and its life extended significantly by using JEA's process. The typical chemical rehab process involves injecting strong acid into the well to dissolve built up calcification. There is significant risk involved in this process, including damage to the well or to surrounding properties. The process developed by JEA is much safer, and has greatly increased production and extended the life of many of their public supply wells. In addition, the rehabilitation process results in electrical savings as less energy is needed to overcome well drawdown. JEA has a bid contract with Williams Industrial Services, LLC to complete this work (JEA Bid No. JEV- 015 -11, Contract No. 109689). The bid is based on hourly rates and percentages for labor, equipment and overhead, similar to the City's annual contracts for utility and electrical work. Staff requested a proposal from Williams Industrial Services based on estimated work, which is a not to exceed amount of $39,999.29. Staff would like to piggyback on the JEA bid contract for this work. BUDGET: A total of $50,000 was budgeted for this project in the Water Fund in account number 400 - 5502 -533 -6300. RECOMMENDATION: Authorize Williams Industrial Services, LLC to complete the Rehabilitation of Well No. 1 at Water Plant No. 1 in an amount not to exceed $39,999.29 and authorize the City Manager to sign the contract. AGENDA ITEM # 8F MAY 23, 2011 ATTACHMENTS: 1. Proposal for Rehabilitation of Well No. 1 at Water Plant No. 1 from Williams Industrial Services, LLC. REVIEWED BY CITY MANAGER: AGENDA ITEM # 8F MAY 23, 2011 Williams ids , A S6ihsidiary of Williams bidustrial Services Group, L c. 11 MAY 2011 Re: CITY OF ATLANTIC BEACH REHABILITATION OF WELL NO. 1 AT WTP NO. 1 MS. KALUZNIAK, Williams Industrial Services will provide all supervision,labor, equipment, subcontracts and material required in order to perform the above referenced job per documentation received, e- mail's received, and conversations had for the not to exceed price of: $39,999.29 This price is based on billing rates from Williams Industrial Services, L.L.C. contract with JEA. Should you have any questions or comments please do not hesitate in contacting me. We thank you for the opportunity and look forward to performing this Project for you and the City of Atlantic Beach. Regards, Shawn Landrum Williams Industrial Services 696 -9994 (office) 237 -3007 (cell) 696 -9997 (fax) 100 Crescent Centre, #1240 • Tucker, Georgia 30084 11380 -1 Island Drive • Jacksonville, Florida 32226