Loading...
Permit 631 Beach Ave (revisions) 2011 mop-- ,-EXISTIING SLAB 20" WIDE BY 12" DEEP -CONTINUOUS CONCRETE FOOTING WITH 2,--#4 CONT. REBAR CTION 3 /411 __-77 N, -% EXISTING STRUCTURE. EXIS] NO STRUCUTRAL, CH AN E N 0 STIR z 74 N 6 @ F 0 L E lz -A F3.0 Flo L MINIMUM (2)2xl2 GARAGE HEADER WITH 2-JACKS ALL SW NAILING: AND 2 KING STUDS. SKIIE-ATHING CONTRACTOR TO VERIFY __'^jjjj_� 'ljjj SIMPSON lvGU3.63 SD! w/ 24-Y4"x2,%" $DS SCREW! SEE 1/Sl.0 TO FACEANE 16-4"xZ� Sim, SDS SQJ_REWS TO JOIS' L MEND: F2.5 (2)MSTA24 STRAPS I mx6m EFOXY ANCH F 1/2 EACH END OF-N\, HEADER, 22-- rq X EXISTING E (2)2x6-1/1 (2) FIRST FLO FOUNDATION PLAN SCAILFE: 1/4" = l'—O" %CALE: 1/4" = l'— ms NDATIONI [PLAN ONLY CONVEYS STRUCTURAL INFO. RELATED TO THE F[fRAMING NOTES: 0 U*Nfl D . FOR WNERAL FEATURES, DIMENSIONS, CONDUITS, ELECTRICAL EMBEDS, 1. FOR TYPICAL N ;TEP H TS. ECT-,, SEE ARCH. PLAN. ARCHITECTURAL PLAN SHOWN HERE IN FOR IEFIER ONLY. t. FTGS.; & FND. sl­41ALL BE IN ACCORDANCE w/ LOCAL BUILDING CODES. OMPACTIONJ AND FILL SHALL BE COMPACTED TO A MIN. OF 95% MODIFIED 0scoT IN ACCORWANCE WITH ASTM D 1557. 43L FOR RAISED HEADERS, STRAP THE TOP UPLIFT STRAP PLATE TO HEADER WITH LSTA12 0 32" O.C. N 3X3XY4" IN LIEU OF THE H2.5A STRAPS ROOF A FULL HEIGHT WASHER FR ING vv STUD—\ —(2)2x6 SYP#2 EXISTING DOULBLE TOP PLATE SECOND STORW TOP PL�LTE E�ZV. L FLOOR TO BE REMAIN MATCH CE11LING m Su HEIGHT ELIEVATION H2.5AO 32" ON-CENTER SIMPSON H\3 TOP & BOT. OF EADER TO JACK STI CRIPPLE STUD LVL B MSTA24 STRAP EA H 0 32" O.C. SEE P SIDE OF HEAD R STUD TO LOVA 4 MSTA24 OR (�S16 STRAP si. @ 32" CON-CENTER 2 MSTA24 OR (PS16 LOWE 2x6 SPF7#2 STUD FASTEN 2x6 SPF#2 STUD 3" MAX STRAP EACH LEND rRAMING 2 MSTA24 OR TO FtULL HEIGHT STUD \—FROM THREADED ROD. FASTEN OF WALL SEGWNT CS16 STRAPS WITH 2—ROW OF 10d7 TOP & BOT w/3-10d TOENAILS COMIVONS @ 12" O.C. 2ND FLOOR 9LLEV. (2 PLACES) FULL HEIGHT THREADED ROD, SEE PLAN FLOOR THREADED ROD INSTALLED SHEATHIN r 7-s\ IN BALLOON FRAMED WALL 2 .1 SCALE: N.T.S. CONVENTIONAL STRAPPING SCHEDULE X A/ TING STIR (CTURE. 'UCLITRA L CHANGE st EXISTING STRUCTURE. A NO STRUCUTRAL CHANGES ' 7' 7' R A L FULL HEIGHT THREADED ROO,, SEE SO.0 FOk ;SPECIFICATION$ ISEE ARqHITECTUF N A (TYPICAL) \TER PROC L > E x [vviz NMI I y v lnAez r -i r -1 r NEW �f4" OSB SHEATHING. NAIL THRU E->XISTING SHEATHING a 10d COMMONS @ 3"' EDGE & 6" FIELD. -1 OFFSET PANnL JOINTS BETWEEN 0 d Of L.L 0 INSIDE & OUTSIDE I_AyE�RS OF SHEATHING. v < A I _j N-, Lr_ Z 0 V) w V) 0 0 m — 0 c*4 < > 0 LLJ All V) Of _c Lc. _j m ;� x LL < F_ 04 < w 04 V) x cn :*z 04 V) < w >: LL C m: zom > 0 UJ U8 - 0 of a- z Y2" FUL-LL HEIGHT THREADED 0 e cp 4 C [ROD, SEE SO.0 FOR SPECIFICATIONS—\ Is 4, (TYPICAL) x sk (2)2xl LL LUS28 9�L 71 - -7 HANGER �2X8 (2)2x6-1/1 6-1 /1 ) x BOARD A H v (TYPICAL) x ommmag X0 SEE 2/%1.2 2x8 SYP#2 BLOCKING 0 FOR BEAM CONN. 4G 48" O.C. FASTEN EA. END (TYPICAIL) SEE DETAIL 2/S1.1 e WITH 4-10d TOENAILS. MR ROD INSTALLATIONL_,,- J: FASTEN TO TOP PLATE WITH IN BALLOON FRAME WALL 2x6 SPF#2 @ 16" O.C. 3-10d TOENAILS TYPICAL 2x1/r2 RIM BOARD BALLOON FRAME WALL IOR FRAMING PLAN 2ND FLOOR WALI Fmlml '� SCALE: 1/4' = V-0" FRAMING NOTES: WALL FRAMING, %EE DETAIL 7/SO.O. 1. FOR TYPICAL WALL FRAMING, SSEE DETAIL 7/SO.O ./ RONK U C H A R C H I T E C T U R E 7_7........................... .................... Z. J ............ . ..... J, ]I, it ................ F! R,J ..... ..... ............. it L ............. .......... It 1 ....... .......... ............ .L it .............F ........... ........ .......... __jL_, IL 11 1 ............. it N _L_jLii ........... ......_T H it ............. il 1. . .... ... .... I J --------------- ......... ........... . ..... ..... ............... I L lui .... ... ... ....... LJ i I L 1 1 1 T 11 ................I u......... .......... L! Lj LJ .......... ............... ............. .............. . . ....... L .......... ....... ....... ."Hu L, 1 111,11............. .......... ....... ... .......... ...... .............J ....... ...... .................. .............. . . ...... ..... . ...... .... ..........I L :.... .......[ ]f.*......... ........ ..... ...... ..... .. ..... _H ...........11_11-11L. ZE" ........................ ....................... ........................ ....... ........ .... ... ... ...... .................. .......... 1H 1E ......... ........... .......­: ­ 4 . �:: . , -------------------- .......... ....... .......................... ........ ............ .............. .............................. . ............ ------------- ....... --------....... ........... ------------ ................... ........... ............. ............................ .......... ................ ..........I....... .......... .................. ................. ........................ ......................... ................... ................. ............. ............ ..... I......... ......... ..... 4............... ........... ................... .......... .............. .................... ................. ............ ............... ............ ........ ....... ............. ............... ........ di_ ........... ............. ........... ................... ............ ........ ............. ................ ........... ....... .. ........ ............ /M /W ............. antl" c eac ori a lovATION CARRIAGE HOUSE A2A3 REVISION - CONSTRUCTION ISSUE RENOVATIONS April 6, 2011 N. S.F. SQUARE FOOT/FEET N. NORTH SFO. SOLICITATION FOR OFFER ;B NAP. NAPKIN SHWR. SHOWER CORE N.I.C. NOT IN CONTRACT SHT. SHEET MATERIAL CONVENTIONS PPEC NO. NUMBER Sim. SIMILAR NOM. NOMINAL SP. STAIR PRESSURIZATION 4SITY FIBER N.P.S. NATIONAL PIPE SPE. STAND PIPE EXTENSION RIGID G.W.B. STANDARD SPECS. SPECIFICATIONS SULATION IN RE N.T.S. NOT TO SCALE SP. HD. SPRINKLER HEAD co ,OD N/A. NOT APPLICABLE SPKR. SPEAKER METAL SQ. SQUARE 'ROOM R01 NEOPRENE S.S. STAINLESS STEEL SSIO1, GASKET 0 PLYWOOD ACOUST. TILE L xxx NUI z SSS. SILICONE SANITARY xx OR PANEL 271,_0 V-2' MN 4ENSION SEALANT x 1 �TAL OA. OUTSIDE AIR ST. STONE XXXX DO INT O.C. ON CENTER STD. STANDARD OP O.D. OUTSIDE DIAMETER DIMENSION STIL. STEEL STEEL BATT PAI STOR. STORAGE INSULATION OWEL., MOIST O.F.D. OVER-FLOW DRAIN STP. STAND PIPE TYI D HARDENER OFF. OFFICE STIR. STAIR Xxxx wit OWEL., MOIST O.H. OPPOSITE HAND STRUCT. STRUCTURAUSTRUCTUIRE POROUS FILL D SEALER OPNG. OPENING VENnLATING O.R.D. OVERFLOW ROOF DRAIN SUP. SUPPLY ALUMINUM ...... (STONE OR '.'O'ONCITIONINQ OV.HID. OVERHEAD SUSP. SUSPENDED GRAVEL) 2 4 INT 'ER oz. OUNCE S.Y. SQUAREYARDS PIPED SYM. SYMETRICAL 3 1-0................ 0 SOIL BRICK ............................. P. , ............................ T. <��PE 1 CEI :R P. PAINT T. TREAD F=Po 1 FLC AME1 ER/ P.A. PUBLIC ADDRESS TBD. TO BE DETERMINED ­--------------------- ...............-------- WO, C ................. OD )N Mu P.C. PRECAST CONCRETE TBS. TO BE SPECIFIED ................. PD. PLANTER DRAIN ------------------------- PDR. POWDER TE. TOILET EXHAUST - --- ---__ ( FINISHED) SCENT PH. PENTHOUSE TEL. TELEPHONE DE- TION TEM. TEMPERATURE PL. PROPERTY LINE ON TEMP. TEMPERED PLAM. PLASTIC LAMINATE STUD WALL THD. THRESHOLD ....... PLAS. PLASTIC THK. THICK PLBG. PLUMBING TLT. TOILET PLST. PLASTER T.O. TOP OF PILYWD. PLYWOOD T.O.C. TOP OF CONCRETE Z 4 BOX PNT. POINT T.O.D. TOP OF DECK CONCRETE SCL6SET PNTD. PAINTED T.O.P. TOP OF PARAPET POL. POLISHED T.O.S. TOP OF SLAB OR P.O.S. POINT OF SCALE TOP OF STEEL PP. PRECAST PAVERS T.O.M. TOP OF MASONRY PPMC. POILYISOBUTYLENE/ T.O.W. TOP OF WALL POLYBUTENE TV. TELEVISION Do N MASTIC COMPOUND TYP. TYPICAL EXH UST PR. PAIR TZ. TERRAZZO PSF. POUNDS PER SQUARE FOOT T&G. TONGUE AND GROOVE I LEVI-'R PT. PRESSURE TREATED JT PTD. PAINTED PTN. PAINTED PARTITION u PVC. POLY VINYL CHLORIDE UL. UNDERWRITER'S LABORATORY 4GTH U.N.O. UNLESS NOTED Q. OTHERWISE Y USG. U.S.GYPSUM COMPANY QTY. QUANTITY PHTING V. :IGHT�CONCRETE R. V. VINYL FABRIC V.B. VAPOR BARRIER R. RISER OR RADIUS RB. RESILIENT BASE VCT. VINYL COMPOSITION TILE VERT. VERTICAL R.C.P. REFLECTED CEILING PLAN VEST. VESTIBULE R.D. ROOF DRAIN RE: REFERENCE VIF. VERIFY IN FIELD RECT. RECTANGULAR VWC. VINYL WALL COVERING CAL REFIR. REFRIGERATOR/ "TOR REFRIGERATION )ENS TY FIBER REINF. REINFORCED W. REQ'D. REQUIRED W. WEST OR WIDTH )ENS TY REV. REVISION WC WATER CLOSET RF. ROOF WD. WOOD CAL RL. RELOCATED WH. WATER HEATER 4E RLD. ROLLING DOOR WNDW. WINDOW 'FTURED RM. ROOM WP. WATERPROOF ROUGH OPENING WPMEM. WATERPROOF MEMBRANE ,TURI�G R.O. RRD. RADIUS ROOF DRAIN ,TURER WPT. WORKING POINT RT. RESILIENT TILE WR. WATER RESISTANT WRGB. WATER RESISTANT GYPSUM BOARD �NEOIJS WS WET STACK REGIONAL FLORIDA STATE MAP LVE S. WT. WEIGHT �.05 Scale: N.T.S. lop ING S. SOUTH W/ WITH RESIL ENT SAN. SANITARY W/1. WITHIN IE GA )KET S.C. SOLID CORE W/o. WITHOUT SCHED. SCHEDULE SECT. SECTION Y. SEC'Y SECRETARY YH. YARD HYDRANT GENERAL NOTES: 1. DISTANCE Or PROPOSED HOUSE TO PROPERTY LINES - EXISTING. 2. A/C COMPRE§SORS, GENERATORS, LP GAS TANKS, P60L EQUIPMENT EEITC. - EXISTING 3. DRIVEWAYS, WALKWAYS, PATIOS - EXISTING SLOPE 4. IMPERVIOUS §URFACE AREA ( LOT COVERAGE) CAL I CULATIONS - DRAIN� EXISTING. 5. DRAINAGE PLAN WITH SUPPORTING ON-SITE WATER STORAGE CALCULAT104S, AND LOCATION OF EASEMENTS - EXISTING. 6. A FOUNDATION SURVEY SHALL BE PERFORMED AND AICOPY OF THE SURVEY SHALL BE ON THE SITE FOR THE BUILDING INSPECTOR'S 1 . NEW CONSNUCTION USE PRIOR TO FRAMING INSPECTION (OM ALL PROPERTY MARKERS SHALL BE EXPOSED AND A STRING STRETCHED FROM 2. NO EFFECT RkOM CURREt MARKER TO NOARKER TO VERIFY REQUIRED SETBACKS. 7. NEW WINDOWS TO MATCH EXISTING. DOUBLE-HUNG OR CASEMENT TO BE USED. ..............-..........-.............................. ...................................... ............................................ ------------------------- .............................................................................................................................................. 2? 1 .92'(IRON TO IRON) :--------------- EXISTIN ..................... ............. ................................2 oz 3 G FENCE N 83020'30"E _x_x_x X-X-X-X-X-X X-X-X-X-X-X-X-X--X-X-X-X- -X-X-X-X-X-x--Jx-x�x-X-X-x-x-x-X-X-x-x-x-x-"-X-.-.-.-X-.-.-.--AA .......... ........... .......................... .......... ..... EXISTING PADS (3)��� EXISTING DUMPSTER EXISTING -STORY TWO nL DRIVEWAY LOT 2 A RESIDENC 0 CONSTRUCTION TOP OFIFINISHED FLOC* E L: 18.91 NAVD EXISTING c PARKING n EXISTING CONDEN OR EXISTING LOT 3 BRICK WALK STONE WALK NORTH 1 /2 ..................................... EXI ING STAIRS ......................................................................... ........... ........... EXISTING GAS COVER .............----------------- ................. . ......................... EXI TING C SN D)EN CC 0 NO RT EXISTING POOL '�L--------......................... ......... ..... .......... ------ -------- ............. EXISTING WALL .........................----------- -_- .............. ........... ............... ------------- -------- ......... ..... .......... ... ................. S83020'30"W 261 . 00 1 231 .93'(IRON TO IRON) ................ L................... ........... N EX,1 !_'� LOT 3 LOT 1 . ....... J : ................. L I q ('J E SOUTH 1 /2 L 111 ............ F;N 2—'ST(__N;RY A M.EE ":'1§1 1` RE S�k[*_ _'E #-6 4'7 FOUND I ........................................................ ... ........................................ ..... ............ 1/2"IRON PIPE ............................ .1-1-- 1 !0130"E ............. ..........________263'.'27' LB 169 0 ........................................ F-7 f 114 1 112 1 4 EXISTING 16 TWO-STO ,Rl LOT 2 10 1 RESIDE 11.!3_1 AiK TOP 0 FINISHED FLOOR ;�z 'FEL: 18.9'NAVD t 15 80 —------------- cy) AIN .......... F�LJND 112"IRON PIPE L$3295 23�.93'(IRON TO IRON) -4 LOT 1 N Nut 01 2 BATH REMOVE EXIST. SINK&COUNTERY11 WALL LEG[ TYPE DES EXISTING ft BONUS ROOM TO REMAIN 3 2 NIIIIIIIII NEW STUD I CONSTRU EXISTING Wj REMOVED ( ENTRY REMOV�-,VIST. WINDOW— REMOVE EXIST. DOOR ASSEMBLY. DOORS TO BE REUSED IF POSSIB" A LL BALCONY CARRIAGE HOUSE - SECOND FLOOR DEMOLITION PLAN Al-%5 Scale: 1/4" V-0" Lj.j Ce *MOVE WALL TO ItOSTACL NEW DOOR 2-CAR GARAGE WORK SHOP 2 2 FNIST.LALLY COLUMN (SEE STRUCT.) --- -------- ------------------- I-CAR RAGE Gi A A3.15 ------------------------------------------------------------------------------------------------------............--------------------------------- ----------------- - ------------------------------------------------------------------------------------------------------------------------ ----------------------------------------------------------- ............... HVA(: --�2-2 rb," y BATH q 221 IEW s R 6 O"x6' 8 2 ................ am:mz INK WHOCD 7 Z� PPE ..........................R.I.D-G.E....................... .......... KITCHEN <: L 11'-6"xW10-- 6 3 d'�3 2 1,A2.25) 5 REF ENTRY 220A 7'-6"x 6-0" z 0 T-11 L) F- Co z 0 4 ....................... .................................................... ..................... z 0 ...................................................... 0 . . ..... ..... . . . . .......... . .. ......... .. ........ ........................... ........ 5 ...............z w < z �- w w Co -i z 5 5�01 x 0 7 - - B%B L) B-13, SLOPE_ ................ - 19 ................... ........ ...... > ...............- 3 A3.1.'P v .......................�j­................. ------------------------­----------- C? 1 ................................. ........... 1�0 i) A4.1�o z -----------------.......I----- ............. .............. ................................... �2 0 HANDRAII u — — — — — — — — — -- NG —WOCID DECKING (SEE$PECS.) SLOPE 7:12 LEXISTING STAIRS CARRIAGE HOUSE CARRkAGE HOU 71-711 TO REMAIN SECOND FLOOR PLAN ^1 :OL. 1 GABLE,END A Y A-A "�k ROOF PLAN 8--011 —11 r3 �4O Scale: 1/4' V-0" �-2 5 .�4O Scale: I/f4o I--o- UTILITY t�E MWA I N 5" aSTING 1C. 71-3" rSTU'D NEW WALL- S WER BATH LL 012A 2. Z TILE 6'-4"x 1 V-7 EXISTING 4 STUD CONC. DRIVEWAY 10 5" ""\�.25 WALL- 2x6%TrUD 1x10 BD. WALL— ............... TOP OF PARTITION WALL '1111V 8'.6" IN ISTNCKEDI 3/4n COVE MOLDING ------------- 2-2x6 TOP PLATE EXISTING A/C SHIP LAP :)N OF LUNDENSER PAD f HVAC (BUTT JOINT 1 x6) 2x6 STUD(MIN.) 5 STUD WALL— 3141, N NEW— v B-B 15 rB2 16 1x10 BD. TOP OF FIN.FLR. FIN. FURL v LEY'ISTING STAIRS EXISTING GAS 2 TO REMAIN COVER -:7 CARRIAGE HOUSE - FIRST FLOOR PLAN r4� PARTITION WALL DETAIL L40 Scalle: 1/4,, = 1,-oH .�4O Scale: 1 1/2" = V-0- rA-A� A3.15 3 B, RIDGE HT. RIDGE HT. 23'-9 3/4" (FL.??'NAVQ 23'-9 3/4- (EL. NAVD) 7-777, DECORATIVE SHINGLES (MATCI LOUVERED VENT . . ..... :I.. IT Ir... EXIST. MATERIAQ 71 1 1 1 1 1 1 1 1 1 7 F LLL L DE (7 .............. TO TOP OF PLATE (CARRIAGE HO�!S@— P OF PLATE (CARRIAGE HOUSE) (+) 17'-8 SHINGLES (MATCH 17 T.y r EXIST. MATERIAL) 11 1 L I I LI 11 SHAKE SIDINO U 11 114 SHAKE SIDING MATCH EXIST.MATERIMP 1149T* ............. Lj MATCH EXIST.MATERIAL) 'J1 I I J "I'l i'D J IJ 4(.125 -Ti i I IT IF AGE HOUSE) TOP OF FIN.FLR. (CARRI j4TOP OF FIN. FLR. (CARRIAGE HOU§Q -5 3/4" V(+) 9' 9-53/4 OUS BOTTOM OF STRUCT. (CARRIAGE HOUSE)ob jhBOTTOM OF STRUCT. (CARRIAGE 00OUS I I -TYT-11 I I IT I I I T N TR Fill ........ I I I-T1[ II [Til Ill 11 ............... TT 11 1111 1 I IT 1 11 1.1 LT T- ................ ................. ...................................... EXISTING O.H.DOOR TO BE TIT 11 FIXED IN PLACE ....................................... ....................................... IT 11 1111 I I I 1 11 IT 11 111 11 1111 El 111 11 1 1 11 IT 11 1111 11 1 11 11 MAIN HOUSE-TOP OF I ST FIN.FLR. E-TOP OF 1ST FIN. FLk, -H I L OIL JhMAIN HOUS L V-0- (EL.?TNAVW-F VO'-O" (EL.7?'NAVQ ..........- -THRI 11 IT 11 H 1111 1 LU -fl I-T I ,aT TOP OF BLOCK (CAR 'E HOUQ4& [AGE HOUSE) JkTOP OF BLOCK (CARRIAC- 0. -01. Vol MXMMMMN x\\\\\E\\\\W\\\-N�'1\� NEE rA-A ,-B �A3.15 C ( FRONT VIEW r2 ARRIAGE HOUSE - SOUTH ELEVATION ( RIGHT-SIDE ) 1\�.25 Scale: 1/4"= V-0" A3.15 L 11 1 1 1 r -,elf I I I I I I /1E I I I I I J I I 11 IT IPH .1 ............ .............. .1 Liu U I LIJILU 11 ........... IT I JI I -TU Ill 11 IIITI1 111111 111 \7 11 IT 1 11 IT 11 1 TJ1 I I I 1 11 1111 H H 11 If I T 11 1 11 11 1 11 1 /4 H-11 111 r3 I HIT 11 1111 -AIT 11 11 If 11 111111 11 IT 11 1 11 IT 11 11 IT 11 111 11 111111 -11 IT ............... ............... I M 11 IT I 111 1111 1 11 1 IT 11 11 IT 11 -11 11 IT I FT 11 11 IT 11 11 IT 11 111 T-TTTT-u- ITT 11 11 If 11 11 11 11 m 11 111 TT IT 11 1 IT 11 1 1 IN 1111 11 11 It 11 111111 1111 1 1 L -mill "41 1 �Iwq 144. 14- LLJ'= w JjJL LL 1111 U Ll 1 111111 -11-Titfft I I I I I I I I T 1 111111 htil I IT 11 H .. .........�.i 1 11 IT 11 11 IT 11 1111 11 11 1 1111 1 11 1: ........... 1111 11 IT 11 11 1111 1 TT 11 11 1 11 11 T 11 11 H 11 11 IT 11 11 H 11 1111 11111 11 IT:: \E3 Im TI El 11 [1 11 11 IT 11 11 IT 11 11 H 11 1 1,],1 T 0 ITT11 111 11 11 Ij 11 JI IT 11 11 IT 11 11 IT 1 111111 [T[PII I IT I 11 11 IT 11 11 IT 11 1111 11 11 IT 11 -Tl IT 11 1.1 L 11 11 IT 11 11 IT 11 111111 1 IT I TI 11 ill Hill 11 Ill 11 11 IT 11 11 IT 11 1 IT 11 11111 11 11 % H H if I I --I 41 -ff-TFFnT-Tl lull 11111 -T I I I 3068 .................... ...... MWEENE/m/1 V/////V/l REMOVE PORTION OF WALL TO INSTALL EXTERIOR DOOR .�15 ( REAR I OCEAN-SIDE VIE" K 4 ARRIAGE HOUSE - NORTH ELEVATION ( LEFT-SIDE)lliiii ��25 Scale: 11/4"=V-0" 5 2 B2 �A-A 1j'B-B A PRE-ENGINEERED ROOF TRUSS (SEE 5 4]EE SU ,,A3.15 Ak,4.1 STRUM SPRAYED-ON ICYNENE INSULA)TION -,A4*.,113*- --A3:"t (R-21 @5.51 SEE SPECS. ................... WAMW # 12 12 RE INEW STR T) . Mp�OOF TRUSS (SEE 7 7 SftAYMqN ICXNENE INSULJ 12 1.6 5 TOP OF PLATE (CARRIAGE HCUSrz),IK ................................ ................ .................................... +) 1 T-8"4w .......... ...... ........ ............. ............. ----------------------- .................................... .................................... ................... .............................................. .................................. .............................. ... .................... ...................... .... ........ ..... ... ..... . .. . .......... .. ....................... ........................................ ------------ .............. .......... ............... ........................................................... ....................... ...... ..... GUEST BED . ........................... 101/�2 G%UEST-- PORCH N F70g .......... .......... ...............- 5 N�.�25 .25 .......... ............... ................... ............. ............... ........... .25 ................................. ........... .... ......... ................. .................. ............ ........... ......................... ................................. ......................................................... ................-....................................... ......... ..............- .............. .................. .................... .. ................. ov FM (CMKIAGE t) 975 3P 1$ BOTrOM OF STRUCT. (CARRIAGE H ............. — ot 3 2 2 EDGE OF WALL ............................ ........... EDGE O�NEW 8ATH WALL (BEYONP (BEYONM,) 1X,"ARGARAGE CAR GA UMN ---------------- ION 4 F-o 1-3 TING LALLY 4SEE-STRUCT.FOR 40C TOP OF BLOCK (CARRIAGE HOUS 01- ------ .. ........... ggj —Tm =ohm f/�B-B rA%-A �M.15,r BUILDING SECTION �B-B Scale: 1/4"= V-0" 5 2 &ENGINEERED PROOF TRUSS (SEE STRUCT) B-B 111 Nilli� ' ,!!. P. OF A3.15 A4.1�kA4.1 i I CARRIAGE HOUSE RAFTERS & PORCH RAFTERS - ,%EE SPECS) - - - - - - - - --- - SHINGLES TO MATCH EXISTING TOP OF PLATE (2-NKRIAGE HOUS ...................................... .......................................... ....................................... ...................... f.1 - i, t.I'. ..................... ........... ................................. ....................... ..... ............................ . .................. ............................................... . ............. ..................... +) 17 .................................................. ............... .........................................I.................................-11-111-........... ................... ............ ........... ............. ......... ................ 1/2" GWB .......................... -OLDING.. ..... . ...... ................................. .......................................................................................................................................................... .......................................................................... ............................... ............ ............... .......... .......................... ......... ....... ................................................. ......................................................CROWN"M 2 I.I n.. ......... ..... l./2T..GW.B..OVER 2.x6..STU.D.. HEAD ASSEW ........... ....................................... LY 5 ........... .............................................................................. ............... ........................................ \V25 : A' WALL W/ BATT INSUL. .................................................... t: it : it (TO MATCH UIST ............................ .............. ........... -------- ..... ..... i 3 SIM. p i Al. i ........................... ........................................................................................................................................... ................................................................. .............. A6.15 ............... ............... ...................... .................... ............. ......................... ___�S I M GUEST BED ................................................ .......................... r2 .............. ............................................. .................... .......................... ................... ...... ................ 2257 A6.15 I bo PIS I R TO ---------------------------- 1!P INDOW AS-%EMBLY 'RIO ................... ............................. kCH ........ ............................................. (SEE SPEM), ,C.-AS LLj ........... _bm........................... ............ ........................................ ....................................................... .................- 1 SIM. HIP LAP ------j ------ 00 ............................ it : H ___.............. A6.15 ........... (BUTT JOINT 1 x6) ....................... ............................................................. .......................... ................................................ .......... .......................................... SILL ASSEIVIVALY (TO MATCH tXIST) .............._-------------- ............... ........... ................ ............................... .......... SHINGLES T40 MATCH T SUBFLOOR ........................................ EXISTING ... ............ ..................................................................................... ............ cn ...... V 2x6 STUD WALL W/ 1/2" .................. MEATRI TOP OF FIN.FLR. AlkRAGE HOU sg)Ak!,_ +) W-5 3/4" BOTTOM TRUCTURE (P-A-&RIAGE tLO�U AL +) — -------------- .iiiiiiii""N,, 2 ................................ .............................. .............................. EXISTING LALLY COLUMN (SEE STRUCT. FOR LOCATIO EXISTING WALL/ MATERIALS TO REMAIN 1 -CAR GARAGE HVAC CLOSET ( BEYON 013 2 2 TOP OF BLOCK L2NRRIAGE HO ........................ ...... ................ .........——­­................... ................. ............ cr _T w 7 �j B B A4.16 AN /B-B A3.15 A4.1 V A,4 A 5 O�sca . A A-A A4.15 A3.15 12 (TO MATCH EXISTING 7 SHI MATERIAL &ENGINEERED RO F TRUSS 5 RL '�60FING MEMBRANE ON ( SEW STRUCT) SPRAYED-ON PEAL & STICK ICyMENE INSULATION ( R-21 TOP OF �/16" O.S.B. SEE SPECS. CONVENTIONALLY FRAMED'ik6, .......... 3/4"SHEATHING CONSTRUCTION (SEE STRUCT. 6WC7 N ----------- FOR ADD'L INFO.) W/ SPRAYED-0 ICYNENE INSULATION ( R-21 @5.5') SEE SPECS. ' COLUMN ------------ 12 _TrOP F PLATE (CARR P.7......... 1//' " G"WB :76 G.......................................... ................................................. ............ ................... ..................... C-ROWN-MC LQ4NG" lx6T & G ........... V,UD .................... ................. ........................ 1/2" GWB OVER 2x( STUD .......... ............................................... 11 . ......... e T P OF BEAM (CARR .............. ............ .................................................. NSUL . ............... BEAD WALL BATT. I.N.3UL.==�� 1x BAND BOARD TO MATCH —------------ ......... FINISHED BEAM #2 P.T. ..................... T-7�' BIRDBOARD .................................... ....... .................................................................................... ..... 2*-9" STUD C.L.COLUMN OVERHANG .............................. ................... ........................ ................ .............................. ..................................... 6 Sim. DECORATINE BRACKET .......... ............... z A6.15 3EC PORCH w ( FOREGR40UND) ............... ..................................... w F 015 5 Im. W4 FL DOO T ................ .............. Z ............. LLOV� !DIN' qG A6.15 1 OX1 0 SQUARE HO ................................. COX. BEY40ND ( SEE SP ............... ..................... ............. ................................................ UL _j .......... ................ .. . .........- i DOOR ASSEMBLY 0 2x6 CEDA@k CAPPED FPJ (SEE SPECS) U- ..................... ........... .. . ........ PRE-PAINTED 2x2 PICKE ............ .............................................. ........................ ................................ 4 SIM. ......................... ........................................ .......... ........................................ A6.15 NOTE: CLEAR OPENING PICKETS .............................. ....................... ............- AIND/OR POSTE ........... 314" 1 IL 0 Dpp A CIRCLE DIAMETER OF 1 SjB )o 60D DECKING OVER WATERPRQOFINGP ............................... ............................................... .............................. ............................................................ ME BRANE TO PROTECT EXISTING ST CTURE BELOW. TOFP OF FIN.FLR. (CARRL ............. ...........1A BAND-11 ........... 2x TO MATCH SIZE & LO, EXISTING SAND ......................................B01 rOM STRUCTUREE f-CARRfj 2 EXISTING LALLY COL JMN EDGE OF NEW BATH WALL (%SEE STRUCT. FOR L OCATION) (BEYOND) ............. ........... ................................ .......... ................... ............................ ........... .......................... ........... EXISTING WALL TO REMi ........... .............. .......................... ....................... GE 1-CAR GARAGE .......................... ............. 0131 ................................ ............ ........... ...................................... ..................... ................... ............ .............................................. 2 2 ........... ...................... CONC. SLAB ( REFER 'to STRUCT. FOR ' AB ( REFER TO I SLAB ELEVATION) :OR �LAB ELJ�VATION .4 i2lP OF BLOCK (CARRIA .4 -j T-T-T- r T� A-A WA CT till rB2 LL SE A4.15 �A 6 Scale: 3/4" 1 1-0" rA A-A INSTALLATION GUIDSILINES A, Cut Duponr RoxWrar at least 12*longer then width:of rough opening sill IS). for DuPonr Rash'Ing System- with integrol flanged windows & Remove first Piece of reloaU Paper�coverhorizontal sill by aligning inside adta of sill, dadhr int till and up iambs(min.Vj, Co.ver honzo"101 sill byaligning Bexwrap-edge Wi4hinsideedge Of sill. r is installed. V, Amr""1wER weather-resistive barrio C..Remove second release paper. T ON DuPontoo FlexWrapw and DuPont-StralghtFla*,are highly engineered flashing poes designed to be compatible with ct Ott! 10 0 Tyvek,& Tyvqk*Weatherization Systems products.For optimal weather-resistive prote i f,w suggest V U Us's N E, Nome%Afrap*,Tyvaks Stucco.Wrapa or Tyvek*Commerc WWrap4t,DuPonry Tyveklk*Pe,Snd.7yvekV Wraptaps. GENERAL INSTRUCTIONS; - DO NOT STRETC10 DuPont-Flexftap-WHEN INSTALLING, oo n0liedw U,AALLS; Ht%Wrapoo and StmightFlash-should be i :.clean,dry iiurfaces. ,W.1pe surf.sces to remove moisture,dirt, * DuPont-FtexWrol)-performs best when installed at greass andether debris thAt.could interfere with adhesion. temperatures&bigve 400F(4*C). IV presiure along entire surface for a good bond. * For additiorigi guljoelines-and suggested caulks,pl ease call 1-800-44-TYV EK 01NO-448-9635). Remove all wrinkles and bubbles by smoothing.surface and to ositionfilo as nacessarr p mini"-W%__AW r v S Asotm using 84.hesjvas� ........... PREPARE VVEATHER-RESISTIVE BARRIER FOR WINDOW OR DOOR INSTAL�LATI:Oly olastemotic,or latex base 1049mcalltrip paced t across thW topof the window frame,from the-center k,imake a madified')-Cut'in the vveather-resistive barrierby cutting straigh A), �cot ittraight down about two-thirds of the way then angling the cut to�oach cornet(0) 6 �Cut a flop above the rough opening to expose sheathin%or framing members andallaw head flashing installation.Head flashing adhet*a,A call 1,46644-­ �"", ", I I 'I I 1 1,1 1 ber&, :should adliere to exposed sheathing or framing.mern ME)(1. cladding Fin Dupotir"Floxwrar otbottom comers ontotace of wall, A. Apply coftinuous bead of caulk t C Fold side it nd bottom flaps into rough opening and secure. Flip head UP up:and temoloferily secure- ast window r(houn%ti 8,firmly press sill flashing to ensure fulladhasion ng flenge across. melarts of attachment bottom 011flange'uncaud _d, C..: SE URE fANNED.EDGES WITH MECHANICAL FASTENERS. ke ----------------------- ie.CapNsilsz steple*screws,etCl B. 00 N-OT"APPLY rAULK.ACROSS I goo* direttly over! d�d upper ri C APO B am by 14 P In 001 ate V Vir WK top 01 ower best Ott TZ !�®r arbantfisim.he"Orsof A(�NDTOP WIN 1640"Aspawwr Orr FOR RECTANGULAR WINDOWS FOR Dews v U�i Repara accidental, ars, *4k damage or papetre,ions a. ap 1*010411iWTOAPT ....... ............ ------------- F011:110UNUTOPMIN00 ToArhtw Ak -1.ekotc:.tras d, S0 itmupm' I rapaired by n j4ljig 4,i 04i R", ation A) jtr0W1t&i111 6Oijoeid, A J-_ '04 ------------ .......... Secure outer edgeW,0[t Ono StraroWl" 041PI Pa Wo X Cuthead flashin longer than the etc length(H) ga�flashing using Mac irk gat least�12 that 1419 044"ding window head.flange and below 8�lso staples,screws emt afround-top wind fasteners. (eg.CaOIN t, dk=$i$MaPe a sides of wind .o .wfry ustraton a ow 9 na,.Jqj V,We di all to conform around $u ro"vVilhow bi r"q Lit filwri;� oil 1111,10''0_0 8, Remove both releose,�Ospersln inst hich exit rids beyond oo or edge$of,jamb flashings,Remove it M, Wilding otto'chemi top of window,covering entire mountinq flange and Additiwstl a V 0�,esil M�o roModed 4170.the Wd OftmWimet ift:.)i I M11 ad" b ....... ... (Moto exposed sheaftrig o.rftming members.fillusuation Q wiWfou(momb.3 mbers,Head t mc,,�6, AVV99_0 adhering 0 exposed 0eathing or framing me qr oiryo of ina,4000010� Tj k gs at I ew 6'. lashing should overlap jamb flashin Flak Fl W M Straigto(O'sw Oro od fm 'a thaft*16w W99tall" ,rq it 3 t d-1, zinde ieminats M VO mfilm,�iaw� ���15111 ft__ Ftow mori. Z 020. wPtn&A#XWrap­i4n;dSvAi F sh VIC MOT It INSTALLATION TIP! aysj:, mstesTIMOR M_t�_ Remove short lengths It.A01 E 9 W41 r, 104 Mailed: IV Impela.7, ase papers,begin a ot aw­ �to proce dares Im 6 quiW"�,rall D~1 installation,then repeat to tm.4981 try .W,ave Nov, &:#14 -T f subjlwto(SVISAW _00* YV Is I unt4 installation is A" hk Woof oct,644 to(040t PAft, w .......... t10 f MAKES ND W, complete, jftmt ill$066 ;Ar;1:P!i. mg�.�o au**d ANTIJES...EXPRES1 000veiri.ato, W to. go, LIABIL WH� char. t WSUEVER AS.TO THE APA ve......................... it"Af000f y Ono 0"D sed 41 TyVe ''Oto trat lto a I - " ,­­ 1, it fr,: 0,; d, '6 its 0 in AN tirtiolmmolt$tot 0 ISIStank. ....... ......................... A. Flip down upper 6 Of or-resistive,barrier so it lays flat across head flashing, p weath B. Tepealonjallcutsio 0$thet-resistivabatriet and across head of the window with ffiuPonvw'Tyve­k,*Tape.. ,W 4ugh opening across bottom sod 0 Q liiipory,.� ��TEP 12 ulk lusiRg backer rodif oeressary)to sea)rear of:window/door frame to inside of K wr lesepapowas go clzit d th -�b k:ed bow od,on, ...rat k:111,12 ri& Ilk 116aw mlvawp -d ww �� 40 p#rJ a ilk 4usini backer rod*�nacessary)to seal rearofwindowt to forma back dam�To air seal around the window openift,caulk complat0y.aroun.......o the umatlTup: Aides: 01 M "U.I 'm . him A :96 (A ir frame a inside of rftgh opening across bottom and a ofthe window p4rlmatet 30li&Ftj21&C)D. 1�iin d A% US �,afft imum of 12'up the 046s to forma baick dam,To air seal und the i vindow oPe*g,caulk completely around the 96 6#4 ti iii: OW14 wrog.Dec f8li away a :k edge f f the vAndo*4)erimeter, awl, 12* Minimum V .......... .......... For 7m m!t0 ,t With NOTE: FLUID APPLIED'ROLL-ON'MEMBRANE] NOTE: FLUID APPLIED'ROLL-ON'MEMBRANE COMPATIBLE W/ALL METERIALS USED. COMPATIBLE W/ALL METERIALS USED. MATERIAL DIRECTLY APPLIED TO SHEATHING MATERIAL DIRECTLY APPLIED TO SHE THING_ CEDAR SHINGLES CEDAR SHINGLES OR SIDING ...............- ............... .......... ........... .. ....... ..................... .................................. 1X P.T. 1X P.T. FURRING (TYP)- FURRING (TYP) 1/2H C 1/2"GWB 1/2"PLYWOOD SHEATHING— 1/2"PLYWOOD SHEATHING MASTIC TAPE (ADHESIVE PRIMER 2x6 STUD WALL Wf MASTIC TAPE (ADHESIVE PRIMER 2x6 R-19 OVER SHEATHING PRIOR TO TAPQ R-1 9 INSUL. (SEE§PECS) OVER SHEATHING PRIOR TO TAPQ CAULKING CAULKING 6 6 6 6 METAL FLASHING METAL FLASHING 2 2 v v v A A MATCH EXIST. MATCH EXIST. HEAD DETAIL HEAD DETAIL 2 2 2 Z-WINDOW HEAD TRIM 2 2 2 WINE (SEE 0 (SEE SHEET A8.20 10 a FOR `0 ----------- FOR ADD'L. INFO.) :5 MASTIC TAPE WOC EL WOOD JAMB EXTE EXTENSION Lu HAND-PAINTED VULCUM z _j z uj DOOR ASSEMBLY OVER WINDOW FINS TRIM TRIM (BEYOND) z M (SEE SPECS) Lu ui ui (L W a. 0 3: VULCUM CAULKING PRIOR TO 0 INSTALLATION OF WINDOW ............... ... ..... ................. ................................................ ............................................ .......................................... .......................................................... :....................................... ................................... D m NOTE: VULCUM CAULK A 0 8 NJ E LCUM CAULK ALL LL OTS�: VU C4 ONTS @ CORNERS,TYP. Z FINS @ CORNERS,TYP. =F1 ui ui w WINDOW HEAD DETAIL ( SIDING) ri--� HEAD .0 DOOR ( SIDING) Scale: SCALE: 3" V-0m � -�15 Scale: SCALE: 3"= V-0" HOUSEWRAP OVER EXTERIOR HOUSEWRAP OVER EXTERIOR FURRING (TAPE FROM FINISH FURRING (TAPE FROM FINISH TO HOUSE WRAP) --------------- TO HOUSE WRAP) CEDAR CEDAR SHINGLES SHINGLES 1/2"C 1/2"GWB 1/2"PLYWOOD SHEATHING 1/2"PLYWOOD SHEATHING F................................. 2x6 STUD WALL W// ............. 2x6,9 DRYLIN MASTIC TAPE DRYLIN MASTIC TAPE R-19 INSUL. (SEE§PECS.)-- R-19 .................... (ADHESIVE PRIMER OVER (ADHESIVE PRIMER OVER . ....................... SHEATHING PRIOR TO TAPE SHEATHING PRIOR TO TAPE 1X P.T. IX P.T. FURRING (TYP) FURRING (TYP) MATCH EXIST.TRIM DETAIL INTERIOR WINDOW ITRIM MATCH EXIST.TRIM DETAIL INTER 2 (SEE SHEET A8.20) (SEE % % VULCI VULCUM BETWEEN MATCH EXIST. MATCH EXIST. a. SILL CONDITION SILL&STUD WALL SILL CONDITION siLL& Lu Z W WINDOW STOOD z D ZE WINDOW w a DOOR ASSEMBLY Uj Lu (BEYOND) (L X ASSEMBLY a- ul (SEE SPECS.) 0 0 (SEE SPECS.) 00 WOOD JAMB D 0 EXTENSION OC EXTE ............ ....................... ....... ...... . ..... ............................. OR 8 ........................................ z w NOTE: VULCUMCAULKA NOTE: VULCUM CAULK ALL LL Uj FINS @ CORNERS,TYP. FINS @ CORNERS,TYP. uj vv WINDOW JAMB DETAIL ( SIDING) JAMBA DOOR ( SIDING) Scale: SCALE: 3"= V-0. � -�15 Scale: SCALE: 3"= I'-U' a. ............................... ........................................ ............................................... .............. ................. .............. ................................... .......................................... W z _j D TRIM (BEYOND) TRIM ,u' ul (BEYOND) L DOOR ASSEMBLY 0 L) WOOD JAMB (SEE SPECS) EXTENSION WINDOW DOOF 0 WHITE FINISHED 00 ASSEMBLY a- (BEY Z (SEE SPECS) ALUMINUM VULCUM BETWEEN z LLJ FLASHING _j w SILL&STUD WALL z NOTE: DETAIL PEI� w w 13 5/4 P.T.WOOD VINYL W/INTERNA Co SLOPE (L w 0 x BUCK (TO BE _�ZOPPER FABRICA1 INTERIOR WINDOW 1TRIM N INCLUDED IN M.O. Cf) MATbH EXIST. (SEE SHEET A8.20) m CIC SILL CONDITION 20 SLOPED SILL W/ RETURN'DOG EARS CEDAR w ........... ----------- w SHINGLES VULCUM (z DRYLIN MASTIC TAPE BEADS CONC. 1/2"GWB FLOOR (ADHESIVE PRIMER OVER .. .......................-..................... .......... SHEATHING PRIOR TO TAPQ 2x6 STUD WALL W/ R-19 INSUL. (SEE WECS) HOUSEWRAP OVER SHEATHING .....--- --- (TAPE FROM FINISH TO HOUSE CON( WRAP� CON[ FOR) 1/2"RLYWOOD SHEATING ........................................................ ........................ .................................... ........................... ................... ............................. ................- ........... APPLY ASPHAULTIC ROLL-ON MATERIAL DIRECTLY TO CONC. TH WINDOW SILL DETAIL ( SIDING) r4 RESHOLD 0 DOOR ( SIDING) � -�15 Scale: SCALIE: 3" V-0" 1\ -�15 Scale: SCALE: 3" V-9- '0 B D E IN M 0.- THING E it OVER 0 T FEAH NG APEJ:: T I PE �R OV ER To TAPE WEST A A L L W/ OG EARIS' Z '0 C TAPE N TIC 0 RIMER VER C_ PRIOR To TAPE) OVER SHEATHING 4 FINISH To HOUSIE CEILING ..............1 ........... At4b­ �i I H.EAD .bA§046.......... CASING .......... .............................. C.H.AIR .PMR........... E .......... P1 INTH P-LINTH CEILIiTG HEAD ............. N 222.. .............. 221 ................................ FLFX ROOM r 2-2-3-1 [kit LIVING 2-2-4 CEILING ...... .... TCHEN HEAd CASING CEILING r220 ................... .... . ........................ ............. kD ............ .......... BASE MWE 'H'A"I R .......... ............................. .............................. CEIUN( CEILING .............. .......... ......... ................. HEAD HEAD . ..... . ............. .............I.................. ............................ ... ..................... .... ING t" C �v....................... ...41? *T- .......... CHAIR .......... ............ ..................... BASF-__ .............. I i.................... ........... ........................ TH ----------........ ........... Lam .......... ............ ..................... GUES 9 D 2 5 ................. ....... ... ............. Le._. r2z-� CARRIAGE HOUSE - SECOND FLOOR TRIM PLAN Scale: SCALE: N.T.S.- -------------- .............. ......... ............... .......... .............. ............... .................... M7 2-CAR GARAG E r_01-2-1 till .............. t ASI ........... BATH Mo r0_1 2-A-1 PLINTH iN ................. .... ................... ............................ .... ............................ 7. 9!" ................ ... ....... ............................... .t I-cm ____1. ............. it 1-0-1-3-1 .......... C,r v J ............ ............i CARRIAGE HOUSE FIRST FLOOR TRIM PLAN Scale: SCALE: N.f,S- t GENEFAL NOTES: A3 REVISION #3 - AgREVISION #2 - CONSTRUCTION ISSUE MODIFICATIONS CONSTRUCTION ISSUE MODIF11CATIONS 1. DISTANCE OF PROPOSED HOUSE TO PROPERTY LINES-EXISTING. AS OF: APRIL 6, 2011 AS OF: MARCH 31, 2011 2. A/C COMPRESSORS,GENERATORS,LP GAS TANKS,POOL FLIPPED COMPONENTS (SHOWER,TOILET&SINN IN REMOVED WINDOWS (PREVIOUSLY SHWO?t IN 1-CAR EQUIPMENT ETC.-EXISTING GARAGE BATH. MODIFIED ELECTRICAL AS PER NEW FLOOR GARAGE&FLEX ROOM. 3. DRIVEWAYS,WALKWAYS,PATIOS-EXISTING PLAN. SHOWED LOCATION OF LALLY COLUMN IN GA(RAGE. REFER 4. IMPERVIOUS SURFACE AREA (LOT COVERAGE) CALCULATIONS TO STRUCTURAL DRAWINGS FOR LOCATIONI. INDICATED EXISTING. NEW 311 (+/-) FLANKING WALLS &LVL FOlk STRUCTURAL SUPPORT IN GARAGE (SEE STRUCT.DWGSb 5. DRAINAGE!PLAN WITH SUPPORTING ON-SITE WATER STORAGE CALCULATIONS,AND LOCATION OF EASEMENTS-EXISTING. SHOWED EXACT SIZE&LOCATION OF WIND03WS IN PROPOSED KITCHEN AREA. 6. A FOUNDATION SURVEY SHALL BE PERFORMED AND A COPY OF THE SURVEY SHALL BE ON THE SITE FOR THE BUILDING INSPECTOR"S MODIFIED SIZE OF STUD WALLS (SEE NOTAT #IONS) . MOVED USE PRIOR TO FRAMING INSPECTION (OM ALL PROPERTY WESTWARD. BUTT INSIDE FACE OF SLAB W[I_EDGE OF RAISED MARKERS SHALL BE EXPOSED AND A STRING STRETCHED FROM SLAB. INDICATED WALL FINISHES&FLOOR rOINISH. SHOWER MARKER 70 MARKER TO VERIFY REQUIRED SETBACKS. WALLS/FLOOR TO BE TILED. 7. NEW WINDOWS TO MATCH EXISTING. DOUBLE-HUNG OR CASEMENT REDESIGNED CLOSET AREA IN GUEST ROOMI;225. DOOR TO BE USED. RESIZED TO 2670. SHOWED BOOK NOOKS WHERE DOORS WINDOWS TO BE REMOVED. SHOWED WALLIFINISH NOTES. PRE-ENGINEERED TRUSSES TO BE INSTALLEib FOR ROOF CEILING. PANTRY REMOVED&REFRIGERATOR CENTElikED ON WALL. (D NDICATED LOCATION OF DISH WASHER. INDICATED NEW DOOR TO SHOWER. SHOWED LOCATION OF BUNK BED FRAMING I`FOR FLEX ROOM. ADDED PARTITION WALL DETAIL TO SHEET AI ING& IN BATHROOM 17 F m ............ ............ .............................. ............— 1: UTILITY ..................... ...................................... BATH 2 2K1 j H f CONNEJ�E ECTRICAL LINE TO: 2 EXISTIN HT CURCUIT .......... G �K 2-CAR GARAGE B F-0 1— :HEN E )'I; 20 'E: U L TO N 0 T E: E8XJ NG UGHTING&ELECTRICA REMAIN I LTO1 PORT WORK SHOP AREAS It 3 ........... 2 BATH 3 F 0-1_2A_ 4 REF. J, ................. .............. . ........... ....................... STACKED ........................ .............. ............ ....................... W/D 220 G Fr-I .......................... ....... ....... FDD] X15TING AI �NIKY "'ONDENSER PAD HVAC ............... .......... C14 .............................. .... ...................... .. ....... ....... . ....... ....... ...... ....... ....... ....... ................................. .......... .... ...................... ....... ........... ... ....... ...... ....... ...... .............. ........ .................... .......... ....... ............ -CAR GARAGE .................. ...........-.........................- .................................. .............. ....................................... ..................... ............. ....... ................ ............................ ...................... ............................................ ................. .................................. .......................... .......... .......... .................................... ............ ................ ...................... v LECTRICAL PLAN CARRIAGE HOUSE FIRST FLOOR ELECTRICAL PLAN A16500 Scale: 1/4" = V-0' zz 0 0 0 0 z lo