OCEANWALK 334 FLORIDA ENERGY EFFICIENCY CODE
FOR BUILDING CONSTRUCTION
SECTION 9 —RESIDENTIAL POINT SYSTEM METHOD CLIMATE ZONES
FORM 900-B-86 DEPARTMENT OF COMMUNITY AFFAIRS NORTH 1 2 3
PROJECTNAME 0':-G)M33-LUZcK, Jt�- 60 -tr'2� PERMITTING OFFICE:
AND ADDRESS: CIRCLE CLIMATE ZONE: 1 2 3
BUILDER: �� ALO-1 'r- Q9 PERMIT NO.:
OWNER: 4-ayj�b--5 Zsk3L �ev'o. JURISDICTION NO.: -j
EeEl`ACHED' CHECK IF WORST F7 IF MULTIFAMILY, GLASS AREA AND TYPE
I
NEW F� ADD. CASE mcuvnON: " NUMBER OF UNITS: CLEAR TINT,FILM,SOLAR SCREEN
CONDITIONED CEILING INSULATION
ATTACHED FLOOR AREA UNDER ATTIC I SGL ASSEMBLY SGL nTfl SGL
NEW ADD. I-01Z
R R DBL DBL
.E1 I FT48 LLA-11
NET WALL AREA AND INSULATION -
CBS R= FRAME R- STEEL STUD R= LOG R= ..
/Iq K 1-17 *
[Efl I IM 1 11 EEI I I I 1 [1:1 M-
DUCTS COOLING SYSTEM HEATING SYSTEM HOT WATER SYSTEM
IN UNCOND. El NONE El ELECTRIC STRIP [9/HEAT PUMP 2/ELECTRIC El SOLAR
SPACE 2"CENTRAL
R =
0 ROOM El NATURAL GAS 1:1 ROOM/PTHP EI NATURALGAS HEAT RECOVERY
IN COND. PTAC 11 OTHER FUELS El NONE OTHER FUELS DED.HEAT PUMP
SPACE SEER/EER 1 -1 EF = R SF/EF = [1.M
R COP/AFUE
NUMBER OF BEDROOMS
INFILTRATION
PRACTICE 9ED 1410101:317- 1,S] 141 ?,11 1707[� x 100 El
TOTAL AS-BUILT POINTS TOTAL BASE POINTS CALCULATED E.P.1
El #1 D-'0#0'2 El #3 CALCULATED ENERGY PERFORMANCE INDEX MUST NOT.EXCEED 100 POINTS.
In accordan wi 8 t n 545A1?907F.V,,,I*re rtify the plans Review of the plans and specifications covered by this calculation Indicates NAI-1.
N S
a I y is Vo tff��
nd spec Ica!tons y thi ca ar in pli with the compliance with the Florida Energy Code.Before construction Is completed,this,,,,
Florida Energy e. building will be inspected for compliance In accordance with Section M.W8
IT.
OWNER/AGENT: BUILDING OFFICIAL:
DATE: DATE: