Loading...
Budget Workshop Agenda Packet 8-9-11 Budget Workshop Schedule July 13, 2011 Workshop # 1; Tuesday, August 9, 2011 5-9 p.m. • Budget Overview • Water & Sewer Systems  Maintenance project status & operations issues  Wastewater improvements to meet nitrogen standards -Status -Financing/rate coverage  Sales forecasts  Transfers to General Fund  10-year plan • Additional subjects as time allows Workshop #2; Wednesday, August 24, 2011 5-9 p.m. • Public Works  Streets  Gas Tax Fund  Stormwater Fund -Master Plan update; status  Sanitation Fund  Tree Fund  Marsh Master Plan • Additional subjects as time allows Workshop #3; Wednesday, August 31, 2011 5-9 p.m. • Police  Operating budget  Police building • Mayport Corridor and Royal Palms projects • Fire contract with Jacksonville • Lifeguards • Building Fund, Zoning and Code Enforcement • Employee pay and benefits • Final subjects not covered in previous workshops Workshop #4; Tuesday, September 6, 2011 5-complete • Discussion/amendments to draft budget by Mayor and Commissioners Other subjects as time allows • General Fund revenues and expenses • General Fund 10-year plan • Grants; not otherwise covered • Agency funding requests City of Atlantic BeachBudget WorkshopAugust 9, 2011 Overview•Multi-year economic downturn•Revenue reductions, expense increases•Other cities•No rate increases proposed•Contingencies maintained +•Water, sewer, stormwater, parks in good shape•Service levels remain high Revenues•Down over 4 years•Prop tax $185k next year, $500k over 4 years•Interest, sales taxes•General Fund = main problem Expenditures •Numerous reductions in recent years•Pensions up $420,000 next year, $800,000 over 4 years•Health Insurance; no increase to City in budget•Cut 4 positions: -W/S Collection/Distribution Operator -PW Heavy Equip Operator -COPS Officer (grant?) -½ Community Redevelopment Coordinator -½ Detective •No COLA/raises (wage compression being created) •No tipping fee increase•Police Building Big Issues•Pensions•Health Insurance•Tipping fee to COJ•Police Building•Tax rate•Long term outlook Schedule•Workshop 1 (tonight) Water/Sewer•Workshop (August 24) Public Works•Workshop 3 (August 31) Police, Pay & Benefits•Workshop 4 (Sept 6) Water & Wastewater Financing; Project Costs 8/10 Budget8/11 Estimate Engineering$1,352,560$1,608,946Buccaneer Line$3,500,000$1,403,656Main Plant Upgrades $6,169,000$5,374,940Sludge/Odor Control$0$2,410,200Other Projects$1,244,787$816,610$12,266,347$11,614,352 Water & Wastewater Financing; Sources of Funds 8/10 Budget8/11 Estimate SRF Loans$902,787$9,721,792Cash/Loan Offset$102,787$0Bank Loans $10,260,773$892,560WMD Grant $1,000,000 $1,000,000 $12,266,347$11,614,352 Water & Sewer Financing; Debt Payments 8/10 Budget 8/11 EstimateYearly P&I; new debt $904,000 $759,816Yearly P&I; old debt $1,396,000 $1,388,994$2,300,000 $2,148,810 012345678910Atlantic Beach Inside29.4332.0734.7137.3545.4653.5761.6869.7977.9086.4595.00Atlantic Bch Outside36.7940.0943.3946.6956.8366.9677.1087.2497.38108.06118.75Jacksonville Beach17.4323.9130.393 6.8743.3551.7360.1168.4976.8785.2593.63Neptune Beach25.3734.4043.4352.4661.4970.5281.8293.12104.42115.72127.02JEA22.5328.4034.2740.1446.0151.8857.7565.0272.2979.5686.83JEA-FY1226.7032.5738.4444.3150. 1856.0561.9269.9377.9485.9593.96JEA-FY1330.5036.3742.2448.1153.9859.8565.7274.3482.9691.58100.20Neptune -FY1227.4237.1546.8856.6166.3476.0788.26100.45112.64124.83137.02Neptune -FY1329.6440.1250.6061. 0871.5682.0495.19108.34121.49134.64147.79$0$20$40$60$80$100$120$140$160Gallons in ThousandsWater and Sewer Utility Bill Comparison August, 2011 $0$50$100$150$200$250$300$350$400012345678910111213141516171819202122232425Water and Sewer UtilityBill Comparison2011 RatesJacksonville BeachNeptune -FY11Atlantic Beach InsideJEA-FY11Atlantic Bch OutsideNeptune -FY12Neptune -FY13JEA-FY12JEA-FY13 0200,000400,000600,000800,0001,000,0001,200,000FY 2000FY 2001FY 2002FY 2003 FY 2004FY 2005FY 2006FY 2007FY 2008FY 2009FY 2010FY 2011Gallons x 1,000Water/Sewer Sales 11.73 10.68 10.50 10.10 9.79 8.90 8.99 8.817.91 7.577.54-2.00 4.00 6.00 8.00 10.00 12.00 14.00 1999-002000-012001-022002-032003-042004-052005-062006-072007-082008-092009-10Gallons x 1,000City of Atlantic Beach Average Monthly Water Customer Usage -20,000 40,000 60,000 80,000 100,000 120,000 123456789101112Gallons x 1,000 Months of FY October = 1Water Sales Vol 99-00 to 10-11FY 99-00FY 01-02FY 03-04FY 05-06FY 07-08FY 09-10FY 10-11 010,00020,00030,00040,00050,00060,00070,00080,00090,000123456789101112Gallons x 1,000Months of FY; October =1Sewer Sales Volume FY 2000-FY 2011FY 1999-00FY 2001-02FY 2003-04FY 2005-06FY 2007-08FY 09-10FY 10-11 $0$100,000$200,000$300,000$400,000$500,000$600,000$700,000$800,000FY 2005FY 2006FY 2007FY 2008FY 2009FY 2010FY 2011FY 2012FY 2013FY 2014FY 2015Transfers to General Fund vs Surcharge 0510152025MillionsPublic UtilitiesPersonal ServicesOperating ExpensesDebt ServiceTransfersCapital OutlayRevenue Public Utilities BudgetFY 12 Current FY Project StatusProjectCurrent FY AmountStatusWell No. 1 Rehabilitation$51,026UnderwayWaterPlant 2 & 4 Tank Repairs/Rehabilitation$47,790Underway11thSt. Water Main Replacement$120,000Bidding SelvaMarina Sewer Rehabilitation$286,727CompleteDonner Subdivision Sewer Rehabilitation (Grant)$178,000Bidding(Re-Bid)Replace YardStation Equipment$40,000Under ConstructionTMDL Project –Force Main$1,403,656CompleteTMDL –WWTP#1Upgrades with Sludge & Odor Control$8,344,644UnderConstruction TMDL Project SummaryDEPDeadlineComplete Construction12/31/2012Begin Operation of Upgraded WWTP3/31/2013OperationalLevel to Remove Nitrogen Attained10/1/2013Project StatusForcemain constructionComplet eWWTP #1 UpgradesConstruction underway, approximately 35% completeSludge & Odor ControlNoticeto Proceed 7/20/2011 TMDL Project Description•Consolidating two wastewater treatment plants to a single plant•Transferring flow from smaller plant with limited space and aging metal tanks to main plant with newer, large concrete tanks that could be modified for nitrogen removal•Used directional drilling technology for force main installation to avoid environmental damage and neighborhood disruption•Installing state-of-the-art equipment for electrical efficiency •Included more efficient, effective sludge treatment and odor control TMDL Construction Cost Savings•SJRWMD Grant of $1,000,000•Other funding with State Revolving Fund Loan with much lower interest rates•Received excellent construction prices due to bidding while the market was right•Major equipment procurement process resulted in excellent pricing for equipment TMDL Operational Cost Savings•Consolidating treatment plants results in more efficient operations and cost savings•New equipment is much more efficient, resulting in electrical savings•Estimated operational savings is $340,000/year•Pro-rated savings in FY12 Budget is approximately $110,000.•New sludge treatment process will result in major savings in tipping fees if implemented by COJ Water Master Plan Status•Some recommended projects have been delayed due to reduced funding, but progress still being made. Since the 2001 Plan we have:▫Interconnected the Buccaneer & Atlantic Beach Water Systems▫Added a 300,000 gallon elevated storage tank at Water Plant #2▫Replaced old cast iron water mains with new PVC mains in several areas of the City▫Updated the Water Distribution System Model in 2007.▫Constructed a new well and rehabilitated another well. Water Master Plan Future Issues•Continue with Well Evaluation, Rehabilitation, Replacement •Continue replacing aging or undersized water mains•Many major problem areas are complete. Fewer water breaks, combined with sewer rehabilitation improvements have reduced emergency issues. Staff suggested a reduction of one field position by not replacing a retiring employee. Water Loss•Enhanced meter replacement program in FY11. Analysis of a small sample indicated approximate 5% payback.•Accelerating program in FY12 to approximately 800 meters ($74,000)•Will continue with annual leak detection and large meter testing and repair Water Capital Items for FY12•Interior rehabilitation of elevated tank at Water Plant #1 -$40,000•Interior rehabilitation of ground storage tank at Water Plant #2 -$40,000•Recoat both ground storage tanks at Water Plant #3 -$60,000•Replace old water mains on 12thSt. between Ocean Blvd. & Beach Ave. and on Ocean Blvd. between 14thand 16thStreets -$200,000 2006 Sewer Master Plan Status•Recommended lift station improvements have been completed (Lift Station E at 799 Mayport Rd. and Mimosa Cove Lift Station in FY10).•Sewer rehabilitation in much of the Atlantic Beach system has been completed.•Grant funding has paid for sewer rehabilitation in the Salt Air area, and another project being bid in the Donner Subdivision. Sanitary Sewer Rehabilitation –Status at 2006 Sewer Master Plan Sanitary Sewer Rehabilitation –Status FY 2011 Sewer Capital Items for FY12•Continue sewer rehabilitation in Area B (North of Core City) -$300,000 Grants2011-12 These represent the money coming into the City… not the full cost of the projects;Some may not be formal grants, but they represent monetary gifts… not in-kind contributionsMost grants require a team effort to identify, seek, obtain, and administer Explanation of Application ProcessesLMS Salt Air Rehabilitation Grant Application ProcessKnowledge of the problem from ExperienceMet with Donna K.: Confirmation and Data ReviewCreated Concept Paper and Submitted to Local Emergency PreparednessAdded project to LMS List Salt AirAwaited funding availabilityReviewed and recommended by local LMS committee for fundingPresented to State official in JaxPresented to staff of State Engineers in Lake MaryCreated Benefit/Cost AnalysisPresented to State: ApprovedPresented to FEMA: Approved for $282,000 AdministrationEnergy Grants2 Energy Grants totaling $338,0001 Through COJ1 Through State Energy After receiving the grant approvals from both COJ and the State… Energy GrantsContract with COJ is 54 Pages including attachmentsContract with State is 76 PagesPurchasing rules, regulations, forms, etc.For State Grant: AB Staff handles drafting specifications, qualifications of vendors, advertising bids, selection of vendors, negotiating contracts, construction management, monthly reports, reimbursement requests, etc.For COJ, we deal with an entirely different group of people and processes Example of ONE provision: Davis-Bacon RequirementAll contractors must agree to this provision to pay at least the Dept of Labor rates for our regionContactors must keep the recordsAB Staff must interview workers on job sites, verify type of work and verify wages to verify compliance Completed in 2011Local Mitigation Strategy: Salt Air Sewer Rehabilitation: $282,0000Stimulus Justice Assistance Grant: Residual for Community Redevelopment: $33,000City of Jacksonville: Beaches Veterans’ Memorial Park: $50,000Homeland Security: Mobile Command Vehicle: $30,000 Completed 2011Justice Assistance Grant: Crime Suppression Unit: $42,000Justice Assistance Grant: COPS: $80,660Neighborhood Resource: $2,500 to expand Donner and Jordan Summer CampsFlorida Inland Navigation District: $32,000 for planning, design, permitting Tideviews Extension and Canoe/Kayak Launch/LandingTotal$552,160 In Progress 2011Stimulus Energy Grant(COJ): $103,400◦Includes Energy Audits, HVAC Replacements, Solar Hot Water for Fire DeptStimulus Energy Grant (State): $234,789◦Includes HVAC Replacements, Vehicle Upgrades, Recreation Lighting at Donner ParkCommunity Development Block Grant(Disaster): $178,000 for Donner Sewer Rehabilitation In Progress 2011Florida Inland Navigation District: $96,790 for Construction of Tideviews Extension and Canoe/Kayak Launch/LandingCommunity Development Block Grant: $131,000 for Donner Park Improvements i.e. Soccer Field, Baseball Field, Basketball Lighting, Security Lighting, Security CameraJustice Assistance Grant (Direct): $5,125 EquipmentTotal $749,104 2011-12 Applied for…Community Development Block Grant: $92,690 for Septic to Sewer ConversionsJustice Assistance Grant: $105,574 for COPS, CSU, and partial funding for Community Redevelopment CoordinatorFlorida Department of Transportation: $41,000 for Bicycle/Pedestrian SafetyCOJ 911: $30,000 for Police Building ExpensesCOPS: One officer for 3 years: $192,000 2011-12 Applied for…Local Mitigation Strategy (City Hall Wind Retrofit): $26,000Local Mitigation Strategy (Completion of Donner Sewer Rehabilitation): $200,000Total $687,264Possibility: Solar Panels (Photovoltaic) on Buildings: Between $250,000-$585,000 Questions City of Atlantic BeachFY 2012Budget WorkshopRevenue and Tax Information 11.61%8.90%14.24%7.37%0.68%20.77%1.13%35.30%Total 2012 General Fund RevenuesTaxesLicenses and PermitsIntergovernmentalInterfund TransfersFines and ForfeituresCharges for ServicesMiscellaneousAd Valorem Taxes 02,000,0004,000,0006,000,0008,000,00010,000,00012,000,00014,000,000FY-01FY-02FY-03FY-04FY-05FY-06FY-07FY-08FY-09FY-10FY-11FY-12General Fund Total Revenues by Typeand Total ExpensesAD VALOREM TAXESTAXES AND FRANCHISE FEESPERMITS FEES AND ASSESSMENTSINTERGOVERNMENTAL REVENUESCHARGES FOR SERVICESFINES AND FORFEITURESMISCELLANEOUS REVENUESINTERFUND TRANSFERSEXPENSES 1,349 1,482 1,412 1,360 1,318 1,252 696 820 684 568 434 315 81 81 81 82 89 88 93 93 88 88 47 50 60 63 56 54 $2,183$2,443$2,332$2,168$1,980$1,793-500 1,000 1,500 2,000 2,500 3,000 20062007200820092010 2011MillionsCity of Atlantic BeachAd Valorem Assessment RollsExemptionsHomestead ExemptionHomestead Exemption IIHomestead Exemption for ElderlySave Our Homes Cap ValueTaxable ValueJust Value -200,000,000 400,000,000 600,000,000 800,000,000 1,000,000,000 1,200,000,000 1,400,000,000 1,600,000,000 1999200020012002200320042005200620072008200920102011DollarsFiscal YearAtlantic Beach Taxable Property ValuesNew ConstructionPersonal PropertyReal Property $-$200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 Example of Total Home Just Valueand Taxable ValueTaxable ValueHomesteadSOH CapJust Value $-$2,000 $4,000 $6,000 $8,000 $10,000 $12,000 $14,000 $16,000 Comparison of Total and Atlantic Beach Taxes Based on Home Tax ValueAtlantic BeachTotal School Board42.39%Duval County37.85%Water Management District.2.57%Atlantic Beach17.71%Florida Inland Navigation0.19%CITY OF ATLANTIC BEACHOffice of the Property Appraiser Final 2011 Millages 0.0000.5001.0001.5002.0002.5003.0003.5004.0004.5002002200320042005200620072008200920102011City of Atlantic BeachTen Year Millage Comparison 2011 Final Operating MillagesNeptune BeachAtlantic BeachJacksonville Beach 18.007717.818718.758117.954119.366017.000017.500018.000018.500019.000019.5000Neptune BeachAtlantic BeachJax BeachJacksonvilleTown of BaldwinCITY OF ATLANTIC BEACH2011Proposed Millages 012345678910Atlantic Beach Inside29.4332.0734.7137.3545.4653.5761.6869.7977.9086.4595.00Atlantic Bch Outside36.7940.0943.3946.6956.8366.9677.1087.2497.38108.06118.75Jacksonville Beach17.4323.9130.393 6.8743.3551.7360.1168.4976.8785.2593.63Neptune Beach25.3734.4043.4352.4661.4970.5281.8293.12104.42115.72127.02JEA22.5328.4034.2740.1446.0151.8857.7565.0272.2979.5686.83JEA-FY1226.7032.5738.4444.3150. 1856.0561.9269.9377.9485.9593.96JEA-FY1330.5036.3742.2448.1153.9859.8565.7274.3482.9691.58100.20Neptune -FY1227.4237.1546.8856.6166.3476.0788.26100.45112.64124.83137.02Neptune -FY1329.6440.1250.6061. 0871.5682.0495.19108.34121.49134.64147.79$0$20$40$60$80$100$120$140$160Gallons in ThousandsWater and Sewer Utility Bill Comparison August, 2011 2011-12Miscellaneous Accounts LifeguardsInterlocal Agreement provides funding each year for lifeguards and beach maintenance… started in 1995Based on current staffing levels…Applicable Revenue from COJ: $198,002Projected costs for Lifeguards: $203,247Projected cost for Maintenance:$33,000Atlantic Beach Costs:$38,247 Recreation and Special EventsBudget is relatively flat compared to 2010-11No Increases in StaffingNo Capital Projects Except HVAC ReplacementsContinue to fund at same levels:AB Elementary After School Program $16,500Mayport Middle After School Program $14,000AB Elementary Grass Cutting $5,820Beaches Resource Center $2,000Dial-a-Ride $1,500Total Annual Budget: $388,326 Questions