Item 8B~. CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Well No. 2 -Addition of Pump and Mot ~. SUBMITTED BY: Donna Kaluzniak, Utility Director DATE: February 12, 2004 AGENDA ITEM #8B MARCH 8, 2004 BACKGROUND: As part of the Consumptive Use Permit, the St. Johns River Water Management District required the City to backplug Well No. Z, located at 1100 Sandpiper Lane. ""' A contract was awarded to the low bidder, W. Earl Floyd, and the backplugging was properly completed. Unfortunately, the backplugging of the well has resulted in a significant reduction in the well's capacity from 800 gallons per minute to 200 gallons per minute. In order to provide sufficient supply, a pump and motor will need to be added to the well. This work will also require electrical supply and connection, and additional pipework and valuing. The addition of the pump and motor needs to be expedited in order to have the well ready for the warm-weather demands on Water Plant # 1. CH2M Hill prepared a basic design including ~„ pump/motor sizing and calculations for the project. Staff requested quotes from the existing well contractor, W. Earl Floyd for the pump and motor installation, piping and concrete pad, and received a quote of $39,000 for this work. In addition, quotes for electrical work were requested ~,. from the City's annual electrical contractor, Brooks Limbaugh Electrical, and a cost proposal in the amount of $20,160 was received. To demonstrate that the prices for the additional work are competitive without the delay and additional engineering costs that would be required for a bid, a comparison is provided below using a bid for the same size well (Well #4) at Water Plant #2. The comparison price is the low bid from a project completed in 1948, that included drilling of the well. All costs for the well drilling in the 1998 project were eliminated from the comparison, so only like items are compared: Item Cost Low Bid 1998 Well #4 Addition of the well pump, motor, header line and $59,160 $59,259 piping with valves, fittings, supports, concrete ad, and electrical work. BUDGET: Funds are available in the Water Fund under Account Nos. 400-5502-533-6300 and 400-5504-533-6300, since the security fencing came in under budget and staff has determined that some of the work on Renault project can be done in-house. AGENDA ITEM #8B MARCH 8, 2004 RECOMMENDATION: Use the City's annual electrical contractor, Brooks Limbaugh, and extend the contract with the existing well contractor, W. Earl Floyd, to complete the installation of a pump and motor on Well No. 2, and waive the formal bidding process. ATTACHMENTS: 1. Cost proposal from W. Earl Floyd & Son, Inc. 2. Cost proposal from Brooks Limbaugh Electrical Co. Inc. REVIEWED BY CTTY MANAGER: t 2 ~. W. Earl Floyd Larry J. Floyd Co-Founders ~a~~~~ot~c~ ~ eSon ~ne. EST. 1962 WELL DRILLING CONTRACTORS INDUSTRIAL -MUNICIPAL -IRRIGATION ~" TURBINE AND SUBMERSIBILE -SALES & SERVICE FEBRUARY 2, 2004 CITY OF ATLANTIC BEACH ATTN: DONNA KALUZNIAK ~. 1200 SANDPIPER LANE ATLANTIC BEACH, FLORIDA 32233 RE: PROPOSAL FOR WELL PUMP #2, PLANT #1 GENTLEMEN: t WE PROPOSE TO DO THE FOLLOWING WORK FOR YOU: FURNISH ONE PEERLESS PUMP, AS SUBMITTED; INSTALL HEADER LINE W/VALVES, FITTINGS & LINE SUPPORTS AS SPECIFIED BY CH2MHILL; FURNISH CONCRETE PAD OUR PRICE FOR THIS WORK WILL BE: $39,000.00. U AGENDA ITEM #8B A MARCH 8, 2004 Owners Distributor for PEERLESS PUMP Line Shaft and Submersible Turbines TELEPHONE 781-1313 8901 HERLONG ROAD JACKSONVILLE, FLORIDA 32210 ,~ PLEASE NOTE THAT OUR PRICE DOES NOT INCLUDE ANY ELECTRICAL WORK OR ANY BACTERIOLOGICAL SAMPLES. WE ARE ENCLOSING FOUR (4) PAGES OF THE PAPERWORK FROM PEERLESS PUMP COMPANY REGARDING !*' THE WELL PUMP FOR THIS PROJECT. WE LOOK FORWARD TO WORKING WITH YOU. ~„ L,JF:AF ENC. 4 VERY TRULY YOURS, LARRY J. FLOYD, PRESIDENT GJEZtJ(.CE RIZd ~Rtl1. f RCECOIZ ~IIQZRl2EEEd ~• ~~F<wk, a-,, ~ ~n,~, ~ ~da~,~ f~, .Y ,. 42 West 8th Street Atlantic Beach, Fl. 32233 904-241-9051 904-249-0703 February 13`", 2004 City of Atlantic Beach C/O Tim Townsend Special Projects Coordinator 1100 Sandpiper Lane Atlantic Beach, Florida 32233 904-247-5839 AGENDA ITEM #8B MARCH 8, 2004 Labor and materials to furnish and install a new section for the Switch gear at WWP# 1. This will be Cutler Hammer Freedom MCC sections with a bucket set up with a 240 volt ~"" 3 phase SO Hp motor controller with an HOA switch ,motor starter size 4 , OL relay and heaters. A 2 inch PVC conduit with 3/0 copper conductors to feed the motor, a 200 amp knife blade switch as a disconnecting means. The switch will be NFMA 4X. The rack will be Aluminum strut with stainless steel hardware. This will be located at the remote well. An HOA control switch will be furnished and installed with the disconnecting means. ,,~, Labor costs will be $3370.00 Material costs will be $16, 790.00 Job total will be $20,160.00 Thank you, ~~ ~"' Alex S. Li bough Master electrician ME 295 ER 8880