Loading...
Permit 1912-1914 MarySt (vault) �. � QE�PAI#TINENI`OF BUILD! 0 "iTx t ATLANTIC SEAC . {. � 'ATWWTPC COW, On 3 s s rr w r+r m mwf, rY ► f ,#:iw.Sn�' "«..�r r .+�s 3iri w. ,�c V' " e�: W O ." "XA Lots Ell ack . t ct on: Tg � cvazTo hip Hca c: 0 .its: $ 0..00 CY � s $16.,001 F: �. A: s 11 4. " ,PAt y, ��c PER PSE , VPCATION �Z20, IT _'l:.0�_0,0 , S3"�I�ST 1WALTZ .�N�kP� CT �I� f?�Cy!' #7r4i' � i'$ Name:. ° R OA #LcV 4 400 t tY " YRA, I C SAARIE , . rC ?AT � Q S` �i k� 4 NOTICE- ALLCONG I>:TE EIR i'pk 1t FOOTINGS MU$TBE E�I� G` D flepoolE PC? itl��i PEE MIT VOID S,IX Mt7NTHS ASTER DAT1?C F'I$SUE, BUll.l lfil 'MATO AL,RUBBISH AND.QEBRI$'fROM.THIS WORFf MUST Wf BE PI.A fD IN PU�3LI�.SPA�.'# ,At�1�1 M, St E CLlrARED 11P AIVt1 HAULED AWAY'BY.EITHEO:CONTRACTEA UIQ OWNER ILA OTT ACCORDING lDING TO A�'#�Ftp�El}"F't�lkt� �1f I �f AIDE PART OF THIS #�I=RMlT ANIS,SU13if6t TQ t�1�1 CATIClA1 1=LlF 11 } Tfi 9tV.f l~AFF+I Its LE inn, 1ElC?NS LAtk ATLANTIC$EACH BUILDII DEPARTMENT ' **Pat 1 :41Q y' APPLICATION FOR FENCE PERMIT Owners name_- ---n"K --------------Phone--\ Job Addressf1izIpt6_(�_St------------------------------ Lot Block and/or Unit ♦------------Subdivision_____________ Contractor if different from owner_____ 111___ � _ ----------------------------------------------------------------- 00 Valuation of fence t__ ) ___ Corner or interior lot_ C�cws f- Type construction0�� S6f -------- ---------------------- Show location and height of fence as well as location of street(s). Owner signature_____ _ -------- ----------Date-------- Contractor signature_ �-- __ __ ---�--;---------_Datey w� V ell �w� t �irs���wrr ADDRESS.--/-, CONTRACTOR__ -- -- - -�-------------------------------- OWNER---- � _ �- - ----- -------------------------------- TZ BUILDING__ -__ MECHANICAL_2�2L_ PLUMBING_ 51751 ELECTRICAL__f2,29_ TEMP POLE__5299/ MISC ELECTRICIANJL,Lt ,. _ ---� a DATE FAILED DATE PASSED TEMP POLE JEA FOOTING ----------- ----------- ROUGH PLUMBING ----------- ----------- SLAB FRAMING MECHANICAL/FIREPLACE TOP OUT PLUMBING ----------- ----------- ROUGH ELECTRIC ----------- ----------- FINAL ELECTRIC FINAL BUILDING _-_________ ELEVATION SUBMITTED CERTIFICATE OF OCCUPANCY ___________ �����' _ DATE ORDEREDAW DATE ISSUED MAP SHOWING SURVEY OF IAT 4, BLOCK 4, LEWIS SUBDIVISION AS RECORDED IN PLAT BOOK 24 PAGE 92 OF THE CURRENT PUBLIC RECORDS OF DUVAL COUNTY, FLORIDA. _ _MARY STREET 46 50' R/W (PAVED) e Nr der FN0.1/2"1 P SET I/2�'I.P FN0.Ile IP No. 3295 56.00, R.L.S.No. 3295 NO CAP Oo 00 56.00' oo, 011 O0, 2 Q t � 2 � 2 � o W a P2'1111 12`t/" I� a to 3 tJf� �[ 3 �. W 0 0 BLOCK 4 LOT 3 0 O L0. 5 Z C O O o ri J m ISE1/3 o goo 0 cP 00' 56.00 SET I/2"I P RL.S. No. 3295 1 NOTE: LOT 6 I. ANGLES AS PER FLAT. 2 NO B.R.L. AS PER PLAT. 3.THIS IS A BOUNDARY SURVEY. I ABY CERTIFY THAT THE PROPERTY SHOWN HEREON LIES IN FLOOD ZONE "C" AS SHOWN ON THE FLOOD HAZARD Bd[1NDMY MAP FOR ATLANTIC BEACH, FLORIDA. I HEREBY CERTIFY TO SAM WATERS THAT I HAVE SURVEYED THE LANDS AS SHOWN IN THE ABOVE CAPTION AND THAT THIS MAP IS A TRUE AND CORRECT REPRESENTATION OF THAT SURVEY AND THAT THE SURVEY REPRESENTED HEREON MEE:"I'S THE MINIMUM TE7CHNICAL STANDARDS OF THE FLORIDA ACMINISTRATIVE CODE CHAPTER 21-HH-6 AND THE FLORIDA LAND TITLE ASSOCIATION. 1 THIS SURVEY NOT VALID UNLESS SEALED WITH AN EMBOSSED SEAL OF SURVEYOR SIGNED HEREON DONN W. BOATWRIGHT, L.S. FLORIDA REQ. LAND SURVEYOR No. 3395 SCALE: /"= tc` BOATWRIGHT LAND SURVEYORS, INC. DATE SIGNED: DRAWN BY: -r' w QAWf- 1401 PENMAN ROAD SUITE D s ep r. q97 F.B. # F/1-1 JACKSONVILLE BEACH, FLORIDA 341-8530 SHEET OF 3 CITY OF 716 OCEAN BOULEVARD P.O.BOX 25 ATLANTIC BEACH,FLORIDA 32233 TELEPHONE(904)249-2396 July 23, 1987 Mr. Sam Waters 1207 North 21st Street Jacksonville Beach, Florida 32250 Ref: Water Facilities at Stewart & Main Sts. Dear Mr. Waters: Construction plans for your housing project in the Stewart, Main and Church Sts. area were issued June 23, 1986 and received in the City on June 30, 1986. These plans incorporated changes to your original plans which had been recom- mended by the engineering firm preparing a Master Plan for Section "H", a consulting engineer who reviewed your specific requirements and reflected the city's current utility specifications. Record drawings (As-Builts) issued by Connely & Wicker, Inc. were received May 17, 1987. The record drawings contained major differences in the water system when compared to the plans approved for construction. The differences that affect master planning for the area are as follows: 1. The water main on Main St., and Church/Dutton Road was specified to require eight (8") inch diameter pipe. Record drawings indicate six (6") inch mains were installed. A recent water tap confirmed a 6" main on Dutton Rd. 2. The Church/Dutton water main was planned for location on the south side of the right-of-way. Record drawings indicate the main was placed on the north side of the road which is in the City of Jacksonville. 3. A fire hydrant was planned for the southeast corner of Main St. and Church Rd. Inspection confirmed that it is located on the northeast corner in the City of Jacksonville. A review of the files on the project do not contain any indication that Atlantic Beach Public Works was ever notified that work was in progress as required by General Note:' #2 on sheet # 7 of approved construction plans . There is no indi- cation that your engineering firm was ever required to make any on-site inspect- ions of work in progress on the water mains. The city's master plan engineer has been consulted and he has stated that "with the placing of an undersized line in the system, it (the planned looped system) will not function as designed." s Page 2 (Stewart St. Project) I would appreciate your investigating the circumstances which caused the descrepancies and any proposed actions to correct them. Sincerely, R.A. Braid Director of Public Services RAB/bb cc: City Manager Connelly & Wicker Building Coord. Donald Ford i� y b. DEPARTMENT OF BUILDING 9119 CITY OF ATLANTIC BEACH.FLORIDA PERMIT NO. PERMIT TO BUILD THIS PERMIT MUST BE POSTED ON JOB Date Sept. 22 19 87 3'P.4.75 Ti 32475 1^is•75CKT ` Valuation$84,472.00 Fee$ . 7" 1 i anlrvS This permit not valid until above fee las been paid to City Treasurer,and is 9 1 1-9 R nDNA subject to revocation for violation of applicable provisions of law. " § ` 03/06/8: i This is to certify that Samuel Waters CRC033468 1207 No. 21st Street J.B. 32250 NO SIKLAR BUILDING has permission to build Duplex WITHIN 500' Classification New Residential Zone RG-1 Owned by Samuel Waters Lot 4 Block 4 S/D Lewis House No. 1912-1914 Ma= Street According to approved plans which are part of this permit NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. PERMIT VOID SIX MONTHS AFTER DATE OF ISSUE --� f----11110. O Building material,rubbish and debris 34 from this work must not be placed in public space, and must be cleared up and auled away by either con. trac�of r owned 1 Buildin fficial, FOR OFFICE PERMIT DATE CONTRACTOR USE ONLY NUMBER i PLUMBING ELECTRICAL SEWER WATER agAl!►, AMA { PLANS REVIEW CHECK LIST Address_�" /�; _1` �� -t� �� 1 '"" ----Owner �c'c ---------------- Legal Description ____________ --------------- 1 ----------License Number �`2� 3y �L_ ------- --------- License on File YES NO Section 24_101 * Zoning Regulations Zoning District__ _ _____ Proposed Use Required Lot Si e_.5) 1� C Actual Lot Size Setbacks Required rovided Section 24_17 front CORNER LOTINTERIOR LO rear ---C,�d-- ---� -- ! i Flood Zone aide-1 _�y� Required Elevation_ side-2 Max. Height Allowed___� e/ Proposed Height...1�P Section 24_82 * Minimum Lot Coverage Required Heated Area 10 o.,i t, Proposed Area_Gl�� Section 24-161 * Offstreet Parking Number Spaces Required_____ Spaces Provided___ Section 24_82 * Duplicate Buildings Is there a similar building within 500' of proposed building?YES Utilities Water and sewer service is to be provided by: Buccaneer Utilities City of Atlantic Beach Utilities _____ Private Source SEPTIC SEP�T�IC TANK WELL Plans Reviewed by:����j� Date + 14 Building Permit #_ // ____ ISSUED DENIED Address Heated Square Footage @ $ per sq ft = $ g4� Garage/Shed @ $ per sq ft = $ Carport/Porch @ $ per sq ft = $ Deck @ $ per sq ft = $ Patio �Jo�O @ $_ 7,a6 Per sq ft = $ TOTAL VALUATION: $ � TotalValuation lst $ 5 CX>CyDa 3 $ Rc ,nindcr Valuat,i_on , A.b6per thOusMld Or portion thereof _ ------------------------------- -----------� Total Building Fee $ 196 S 6 ADDITIONAL PERMITS and/or FEES REQUIRED + 2 Filing Fee $ q� Mechanical Fireplaces @ 15.00 $ •0� Plumbing BUILDING'PERMCT FEE $ Electric/New L11/ �- ---------------------------------------------- Electric/Temp V Septic Tank BUILDING PERMIT $_ ,�y SWATER METER CHARGE $ Well R,riimnixig Pool SEWER IMPACT FEE $ Sign WATER EAPACr FEE $ Water Connection MISCELLANEOUS $ Sewer Connection $ Water Meter $ Elevation Certificate GRAND TOTAL DUE ----------------------------------------------------------------------------------------------- CALCULATIONS and/or NOTES CITY OF ATLANTIC BEACH APPLICATION FOR BUILDING PERMIT Owner �trvttte_I �hf (^.-S _Address /-Z 07 Al 5'/ j / zip, x2�a phone _W � �f'a.� � I�aac�cock At'ive.- Architect -- ---�=---Address---4a -(14-----------zip_412 Contractor ornk �_W�t� IV � _Address1),O L—�" A 3ax_�zip3i250phone;ZW 3JS2 Contractor's License numberCg_�3 3/jj�____expiration__�_3a_$ Lot '�___Block or Section_ J,-----Subdivision k e-w t 5 Zoning_ Street Anaev-------- between_5�r'w23r ____and_C11,1---r C-Lside Type Construction- -)DI_- ----No• Units___ _____No. Fireplaces--- Purpose --Pur ose of Building- S `Id_Cal '41_---____---Est. Valuation S 7),-_-�2_-0-- _® Utility Method - Water C;.' Sever______ Cj -- - _-_-_- ' P Dimensions - Building_��_X4a ' Lot _ , XJB ___�Size Footings_ /cr n2vn_ Sz. Piers_____-0______Sz. Sills___-'---------Greatest S an Sills 61 ___ ------ 7-- Sz. Ceiling Joists_- ___Distance on Centers__ P Greatest Span__ 2 Sz. Floor Joists _ }S/U___Distance on Centers___/ __Greatest Span__ _ Sz. Rafters __ rgj__Distance on Centers___ 'r`__Greatest Span_ 3kr_ Method of Heatin ( - frm g_ � olid or Filled Ground ' d ___Roof _1. ^ L._ Flood Zone-C, ___If located within a FLOOD HAZARD ZONE complete page 3 In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with the attached plans and specifications, which are a part hereof, and in accordance with the building regulations of Atlantic Beach. The contractor agrees at its expense to provide the necessary access to the properties being developed over dedicated City rights-of-way and to clear, clean, grade, and drain said right-of-way to City specifications. Signature Owner ____-- ___-- __-- _-----Date__--1-8 � Signature Contractor _ __ 'j_ _- Date___ --- 7 2uiuoZ pue guipyn9 page 2 5 FLOODPLAIN DEVELOPMENT INFORMATION Type of Development:------ ---- ----- ------------------------ Flood Zone: --------------- Required ______________Required Lowest Floor Elevation: //�L- If ____building is located within a flood hazard zone (Zone A), a survey must be made AFTER THE SLAB HAS BEEN POURED, certifying that the LOWEST FLOOR ELEVATION is equal to or above the base flood elevation established for that zone. No final inspection will be made and no certificate of occupancy will be issued until the survey is on file with the Building Department. COMMENTS: Applicant Acknowledgement: I understand that the issuance of this permit is contingent upon the above information being correct and that the plans and supporting data have been or shall be provided as required. I agree to comply with all applicable provisions of Ordinance No. 25-7-11 and all other laws or ordinances effecting the proposed development. Date-----_--------Applicant's Signature__________________________ ---------------------------------------------------- Department Use Required Lowest Floor Elevation ___ As Built Lowest Floor Elevation Survey Filed with Building Department ----------- ------ ---------------------------- Build g Department Representative page 3 City of Atlantic Beach Fixture Unit Worksheet for Water .Impact Fee ' FIXTURE UNITS ARE ESTABLISHED AS THE MEASUREMENT OF WATER DEMAND FOR EACH WATER FIXTURE UNIT INSTALLED AND CONNECTED TO THE CITY WATER SYSTEM. THE WATER SUPPLY CHARGE IS HEREBY FIXED AT TEN DOLLARS PER FIXTURE UNIT CONNECTED TO THE CITY WATER SYSTEM. _2__BATHROOM GROUP CONSISTING OF _ _SERVICE SINK TRAP STAND WATER CLOSET, LAVATORY & BATH TUB OR SHOWER STALL (6) Z _WATER CLOSET VALVE _____WATER CLOSET, TANK OPERATED (4) _ VALVE OPERATED (8) __- _ � BATHTUB/SHOWER (2) _URINAL WALL LIP (4) -2.-SHOWER GROUP PER HEAD (3) _FLOOR DRAIN (1) —Q--SHOWER STALL DOMESTIC (2) _LAUNDRY TRAY (2) LAVATORY (1 ) __ _COMBINATION SINK AND TRAY (3) _ _WASHING MACHINE (3) __POT, SCULLERY SINK (4) _Z_DISHWASHER (2) _WASH SINK EACH SET OF 12— FAUCETS (2) KITCHEN SINK (2) __DENTAL LAVATORY ( 1) KITCHEN SINK WITH WASTE GRINDER (3) _DENTAL UNIT OR CUSPIDOR (1) _BIDGET (3) -__URINAL STALL, WASHOUT (4) ___FLUSHING RIM SINK (e) _____COMBINATION SINK AND TRAY WITI FOOD DISPOS. (4) __URINAL, PEDESTAL, SYPHON JET /' ) BLOWOUT (8) •--0 -DRINKING FOUNTAIN (1/2) -L-LAVATORY, BARBER/BEAUTY - , __ SHOP (2) _9_LAVATORY, SURGEONS (2) O.-SURGEONS SINK (3) C ICE MAKER (1/2) �Q TOTAL FIXTURE UNITS0 $10. 00 EACH __ 3 --------------- JOB INFORMATION____�-_C9 o 0 0 C:) CITY OF ATLANTIC BEACH O ATLANTIC BEACH, FLORIDA 32233 M I— M TELEPHONE: 249+2395 L7 O Ct j� A j N N - - UTILITY,BILL OCT 06 1991 DATE METERS WATER TOTAL WATER SEWER GARBAGE OTHER DUE • THIS REMPT SE ES AS W RK ORDER. T KE RECEIPT TO PUBLIC WORKS D T. TO SCHEDU WORK. p' c 1200 SA PIPER NE. MAIN THIS STUB f1 PAYABLE IN ADVANCE SERVICE DISCONTINUED rNO REFUNDS IF NOT PAID WITHIN © 30 DAYS OF DATE SHOWN ..0 d ° 0 0 .,qCITY OF ATLANTIC BEACH O- N ,H ATLANTIC BEACH, FLORIDA 52233 > O M Ln ? TELEPHONE: 249.2395 Ln 1 i -rl = M Q N UTILITY BILL 06 1981 N M M a M O rII 4 d �t Q O N m N $4 cd $ 4-) WATER WATER SEWER GARBAGE OTHER TOTAL U) DATE METERS DUE cn Lu i HIS ctrp I sb = k VIVURKgoa m In N H cd cd ucd 1 f g7 y -DER. TIKE REC IPT TO [PUBLIC, Von 9 �° ORKS D PT. TO CHEDU E WORK. B.I. a O U ° $-4 N 200 SAIL 0PER NL —4N cd 4) 3 41 —4 .-1 h .� Cn MAIN THIS STUB Q PAYABLE IN ADVANCE SERVICE DISCONTINUED � IIF NOT PAID WITHIN NO REFUNDS 30 DAYS OF DATE SHOWN SS� LU ttn LU ix I 4i z Q I � v I DR-1u FLORIDA DEPARTMENT OF REVENUE N.7187 CERTIFICATION OF PAYMENT OF FLORIDA USE TAX I hereby affirm that I am aware of the provisions of Florida law which imposes a 5 percent tax on the use in Florida of goods and services purchased outside of Florida; that it is the obligation of the purchaser to remit the tax to the Florida Department of Revenue if it was not collected by the seller; andhot I have reotttaid or will remit any applicable Florida use tax to tWhe Department f Revenue in the month(s)of (0 19 J � jtj Type of Ucense 5 s 4ekhal 121 License Number cern 3S�9 C31 Type of Business Activities Aa n r" o o A, — [4) Issuing Authority c j51 Date of issuance S7 [61 Name sa m �e4 Address 2'0 2 C City,State,Zip X -- u Sales Tax Number Telephone Number 3 75 2, f (p Signature of Applicant Date Issuing uto ity Signa re of Government Official UTILITY SERVICE AGREEMENT (Water and Sewer) TIIIS AGREEMENT entered into this 22nd day of Sentember , 198 7 , between the City of Atlantic Beach , a Municipal corporation, hereinafter called "City", and Samuel Waters , a , corporation, its successors and assigns, hereinafter called "Developer". W ITNESSET1-1 WHEREAS, Developer owns land in Duval County, Florida, more particularly described as Lot 4 Block 4 Lewis Subdivision refer to acreage, plat engineering 1912-1914 Mary Street drawings, or legal description as Exhibit A and WHEREAS, Developer plans to develop said land by constructing 1 buildings,' 2 residences and/or other improvements thereon consisting of .Ouplex and WHEREAS, City is the owner of water and sewage treatment plants and water distribution and sewage collection systems in the vicinity of the property described above; and r WHEREAS, Developer desires that City provide water and sewage collection service to said property and City desires to furnish same; and WIIEREAS, City is willing to operate such water and sewage collection and treatment systems so that all buildings constructed on Developer's property by developer or by any person, firm, joint venture or corporation holding by, through or under Developer may have furnished to them and to their occupants water and sewer service subject to all terms and conditions of this Agreement; and WHEREAS, in order to provide water and sewer services to Developer it has been or will be necessary, for City -to enlarge and expand its offsite water and sewer plants and facilities and 'it is the desire and intent of Developer to contribute financially to the costs of building such additional offsite water and sewer plants and facilities and to reserve capacity in City's water and sewage treatment plants so that City can provide service to .tile Development without imposing a burden on its existing customers; NOW, THEREFORE, in consideration of the premises and other good and . valuable considerations and in consideration of the mutual covenants and conditions hereinafter contained, subject to any necessary approval by other governmental agencies having jurisdiction, it is . agreed by the parties hereto as follows: 1. Developer agrees that City shall have the exclusive right to furnish water and sewer service to the real property described above and hereby grants to City. this exclusive right..to provide water and sewer service for all uses within all structures now or hereafter constructed on the real property described above. 2. City agrees that after Developer has connected to the systems of City, City will provide at its own cost and expense, water and sewer service to Developer's property in a manner conforming to the reasonable requirements of public or governmental agencies or parties having jurisdiction over City's water and sewer operations; provided, however, that such service shall be in accordance with other provisions of this Agreement, including City's rules and regulations and rate schedules. 3. In the event that Developer or assigns fails to complete construction of all improvements required to be built by Developer and fails to pay all plant and service availability and other fees listed in this Agreement within "six" . . months from date of execution of this Agreement, for any reason whatsoever, but through no act or fault of City, this Agreement shall terminate and City shall be relieved of its obligation to perform under this Agreement. Upon termination of this -2- Agreement under this provision, City reserves the right to negotiate with Developer a new agreement for any additional sums to be paid by Developer to City as plant capacity and service availability charges, fees or other charges based upon increases in the cost of living and/or such other factors as relate to the cost of supplying water and sewer service. 4. All taxes or charges imposed upon the property described above by any governmental entity or agency shall be paid by Developer except such part thereof that has been deeded to the City in accordance with tho terms of this agreement. S. The rates charged by City for water and sewer service shall be in accordance with its rate schedule which shall be subject to change . from time to time. City shall have the right to determine reasonable meter size and location. G. Developer will grant to the City, at Developer's expense, adequate easements for water and sewer lines, for access to lift stations and water stations and related appurtenances. Said easements shall be transferable. Developer will also furnish title evidence satisfactory to the City that said easements are superior to mortgages or other interest in the land, and Developer shall cause any such mortgages to be released or subordinated to said easements. Easements will also be furnished to provide for onsite water distribution lines, including meters and sewage collection lines. Sites for lift stations and water stations and related appurtenances shall be conveyed by warranty deed in fee simple by Developer • to City. Developer will furnish City a warranty deed, title evidence satisfactory to City and any releases from lien holders for any sewage pumping station and water station sites as required by City. Developer hereby grants to City the right to utilize any onsite water and sewage lines and systems to provide services to properties other than Developer's property, provided this does not unreasonably interfere with , service to Developer's project.' Where Developer's property is adjacent to any. state road right-of-way, City will be granted a 25-foot easement, along and adjacent l to said state road right-of-way. Developer shall further grant to the City, its successors and assigns, the exclusive, perpetual right, privilege and easement to construct, reconstruct, operate, maintain, repair, replace, improve, alter, remove, relocate and inspect water transmissions and distribution mains, sewer collection mains, sewer lift stations, pipe lines, lateral lines, valves, connections and appurtenant equipment over, across and under the Developer's property, including the right to ingress and egress to eacii of the building sites oil Developer's property which are served by City. All such easements shall have a .width which is acceptable to the City. 7. City does not guarantee an uninterrupted supply of water, or water at any particular pressure, and reserves the right to shut off the water in its main at any time for the purpose of making repairs or extensions of for providing temporary or emergency water supply. City will not be responsible for any damage caused by low pressure or interruption of service. Neither Developer nor any of its successors or purchasers shall discharge into the sanitary sewer system water from "non-domestic" drains including without limitation swimming pools, air conditioning condensation lines, cooling lines or other discharge from any type of equipment. City shall not be obligated to furnish any water or sewer service to any building which is built on Developer's property to which the City doss not have access. The Developer hereby agrees and warrants that the City will not be held responsible for flooding problems which may result from the failure of sewer line back flow preventor valves on Developer's property. The Developer hereby agrees to hold harmless and indemnify City for all costs and damages resulting from flooding due to .back flow preventor valve failure. 8. The construction and design of all facilities to be transferred to and to be owned and operated by the City shall at all times be subject to prior approval by the City and its engineers. City will provide assistance to Developer's engineers as to design and construction requirements and must approve all plans, documents, and construction requirements in writing prior to any construction being commenced. Constructionof all facilities will be ,performed by Developer or its contractor. Developer will pay the cost of all such construction. The Developer's engineer shall incorporate into the Developer's engineering design, plans and specifications tl►e applicable standards and specifications of the City. 9. A. if the Developer modifies his development plans for Developer's property which would require greater water usage, greater fire flows, additional water facilities, greater sewage flows, or additional sewage facilities than the water and sewer demands previously approved by the City, then the Developer must obtain approval by the City for the construction of such additional water or sewer facilities which shall meet all City and governmental design requirements. The Developer shall pay all additional contributions and fees as may be authorized by the City's service availability policy which is in effect on the date said new agreement is executed. B. In addition to paragraph 9A above, any other change order between Developer and its utility contractor issued after City approval of original plans must be approved by the City before the change order is put into effect. C. City shall have the right to review the systems design drawing and specifications to ensure that they meet the requirements of the City. The systems design drawing acid specifications are to be in accordance with the City of Atlantic Beach requirements unless otherwise specified by City or its engineer. D. The City also reserves the right to approve the utility contractors to which construction bids are sent by Developer as well as the contractor to which the award is made. C. A representative of City or its engineers will be the ,inspector of the project along with the Developer's engineer, but City reserves the right to final acceptance of the work and materials. , Neither the City or its engineers shall be deemed the agent of any other person in making such inspections. 10. After installation of the water distribution and sewage collection systems serving the property described above and acceptance thereof by the City, the City or its assigns shall then be the sole, absolute and exclusive owner of the facilities of said water and sewer systems whether located on, under, above or outside of the property described and regardless of who may have installed or constructed same to the extent described below: A. All water mains, pipes, valves and fittings and appurtenances up to and including all meters shall be dedicated to and will be owned, operated and maintained by City. All water pipes on the customer's side of the meter shall be owned, operated and maintained by the customer or its assigns. B. All sewer mains, manholes, pumping stations, force mains and appurtenances, including service pipes in public right of ways and dedicated easements, shall be owned, operated and maintained by the City. Except as provided in paragraph 9C, all sewer lines on the customer's side of the property line shall be owned, operated and maintained by the customer or its assigns. C. With reference to any blanket easements for multi-family projects such as apartments, mobile home developments, condominiums and PUD's or for commercial developments, all water mains to and including the water meter, all sewer mains, force mains and manholes in such blanket easements over private property allowing utility operations shall be dedicated to and shall be owned, operated and maintained by the City except that the full length of sewer services from the sewer main or manhole shall be owned and maintained by the customer. All such City lines shall terminate with a manhole. U. by these presents, Developer hereby transfers to the City, the title to the water distribution and sewer collection systems to be installed pursuant to this Agreement, such , conveyance to take effect without further action upon the completion and acceptance by City of said installation. As further evidence of said transfer of title, . upon completion of the installation and acceptance by the City, Developer will provide. City—with ,a hill of Sale or Warranty Deed describing all properties transferred and dedicated to the City by the Agreement. 11. Developer shall pay the City upon, execution of this Agreement the sum of 10¢ per water connection per equivalent residential connection (ERC) as an advanced deposit to cover engineering, plan review, inspection, test, legal and administrative expenses of City in connection with this Agreement. Developer shall also pay to City upon execution of this Agreement the sum of • 10� per sewer connection per ERC as an advanced deposit to cover engineering, plan review, inspection, tests, legal and administrative expenses of City in connection with this Agreement. The charges for engineering and legal expenses and for engineer's inspection and plan review. fee . for non-residential units shall be based upon estimated cost to City: Actual cost will be determined and a refund or additional charge will be made for the difference between the advanced deposit as calculated above and'actual costs. City agrees to .provide water and sewer service . to the Developer's property in consideration for plant capacity charges, fees and other charges to be paid by Developer as follows: A. A water plant capacity charge at the rate of $10.00 per fixture unit. Such charges shall be due and payable as provided in paragraph 12. B. A sewer plant capacity charge at. the rate of onethousand thirty, .five dollars ($ 1,035.00 ) per single family unit. Such charges shall be due and payable. as provided in paragraph 12. C. A sewer plant capacity charge for any commercial customers on the land as described above at. the rate of ($ . ) . Such charges shall be due and payable as provided in paragraph 12. -7 F D. A meter installation fee to cover meter cost and meter lns allation (but not including curb stop or meter box) according to the City's service availability policy at the time of installation which currently is $85.00 per 3/4" x 5/8" meter E. If available, construction .water will be charged to building based on metered usage in accordance with current rates. F. Hydraulic share of main extensions - payment or refund. 1. Developer recognizes that water or sewer utility service to the Developer's property.. is prqvided by the use of a mein • s extension and other improvements constructed by a prior developer and that Developer is obligated to refund a said prior developer PDeveloper's share of the cost of said main extension or other improvements. Accordingly, Developer shall pay its pro rata share of the cost of said' main extension or other improvements to City. Said pro. rata share shall be based on Developer's percentage of the hydraulic capacity of said extension or other improvements, For the purpose of this Agreement, the cost of Developer's said hydraulic share shall be $ payable upon execution• of this Agreement. 2. With respect to utility facilities installed by Developer to which future developers connect directly, and .in consideration for monies expended by Developer toward said facilities, City shall refund to Developer, or Developer's successors or assigns, solely from monies collected from said future developers, said future developer's pro rata share of the cost of said facilities. Said refunds shall be calculated on the basis of the hydraulic capacity and demand of said future developer whenever feasible. The refund obligation of City hereunder and the benefits to Developer related thereto shall expire, five (5) years from the date of execution of this Agreement. Said refund shall be made to Developer within sixty (60) days of the receipt of payment by City from .a future developer. Refer to addendum if applicable, G. Payment of service availability charges and other additional aids in construction for' . . at a cost of $ . 12. All charges to Developer shall be paid by Developer to the City in accordance with the following formula and procedures: A. The advance deposit for engineering, administrative and legal fees and the inspection and plan review fee upon the execution of this Agreement, a total of ; and B. Water plant capacity charge upon the execution of this Agreement, a total of $360.00 ; and C. Sewer plant capacity charge upon the execution of this Agreement, a total of '$2',070,00 and D. Meter installation fee according to the City's service availability policy at time of installation which currently is $85,00 ner 3/4"meter=$170.00 - upon application for hook-up of individual lots, apartments, multi-family lots or units; and E. Construction water based on meter readings in accordance with City's rate schedule; and F. hydraulic share payment, in accordance with paragraph 11F-1 of this Agreement upon execution of this Agreement, in a total amount of-$ and G. Service availability charges and other additional aids in construction in accordance with paragraph 11G of this Agreement in a total amount of $ . . . . ' . . . . . payable . . . . . . . 11. Any plafit capacity charges, fees, or other charges due to City are intended to assist - in defraying costs as to offsite facilities and in no way are to be considered a payment toward the cost of onsite water distribution and onsite sewage collection systems which costs are to be borne by Developer. 13. City agrees to connect individual buildings and structures on the developed property upon application by the builders, plumbers or individual owners subject to the operating rules and regulations of the City and payment of all fees and charges in effect on date of application and compliance by Developer with all provisions of this Agreement. 14. The charges, costs and fees for any separate emergency fire protection water systems. for subject project will be subject to negotiations between City and Developer. if buildings of more than two stories are a part of the project, Developer shall furnish at its expense water pumps and other appurtenances as necessary for pumping water above. 15. All plant capacity and service availability charges, fees and other charges as outlined above are based on normal domestic sewage defined herein as containing not more than three hundred (300) parts per million biochemical oxygen demand or three hundred (300) parts per million suspended solids. Whenever water which contains more than these amounts is to be admitted to the sewers, both the City and the pollution contrul agencles must specifically agree to the connection. An additional charge will be calculated in direct proportion to strength at seventy-five cents ($0.75) for each part per million of either biochemical oxygen demand or suspended solids over three hundred (300) parts per million. All such connections shall provide for a suitable point for the waste to be sampled by the City or the regulatory agencies. An additional charge equal to the pro rata share of any additional sewage treatment plant costs above ninety percent (900) treatment, and of the cost of any additional required outfall pipes to may be required by City. Developer shall have the right at all reasonable times to inspect the invoices of the City in order to determine that said funds have been properly expended by City pursuant to this paragraph. 16. Developer warrants that it is the owner of or the holder of a binding contract to purchase the fee simple title of the real estate described herein and further agrees to have all mortgages or other liens subordinated to the terms of the Agreement and easements required herein prior to any acceptance of the facilities by the City. 17. Upon application by owners, builders or their authorized representatives, the City agrees to connect the •requested dwellings or structures on the said property at no additional connection fee (i.e. , in addition to those provided for above ii► th�s Agreement) , but subject to the continuing operating rules and regulations of the City including, without limitation, the pexiodic payment of the water usage and sewer usage charges in effect on the date of such application or thereafter reflected in the City's rate schedule. 18. This Agreement shall be binding upon and shall inure to the benefit of the Developer, City and their successors and assigns. However, In tine event the Developer has not paid and delivered to the City the plant capacity and service availability charges, fees and other charges provided to be paid to the City by Developer under the terms of this Agreement, and all easement and conveyances required by this Agreement, then this Agreement shall. not inure to the 'benefit of the successors or assigns of the Developer. 19. It shall be .!tile responsibility of Developer to locate for builders any water and sewer taps or lines necessary in conjunction with residential or conn ercial construction. 20. Unless the damage to any onsite improvements, are the result of the negligence or willful act of the City, its officers, or employees or authorized agents, the owner or Developer .of such property upon which the damage occurs shall be responsible for the payment to tine City of such damage to City's property including all necessary and reasonable repairs which must be. made by the City or independent contractors engaged by the City to effect such repairs. If the owner or developer of the real property shall fail or refuse to pay costs of such necessary and reasonable repairs to cure said damage within thirty (30) days from the submission to the owner 'of a statement' for such charges, the City shall . have a lien against such owner's or Developer's property subordinate to those liens created by or under agreements of record prior hereto, for the payment of such necessary and reasonable costs and expenses for effecting such repairs and restoration. to such onsite facilities located upon the owner's or Developer's property. Notice of such lien or claim on lien describing the real pxoperty and the amount owed may be filed within ninety (90) days of the date from the last date upon which any such repairs or restoration were made by the City or its authorized representatives. Thereafter, the City shall be entitled to bring an action for the foreclosed under the laws of Florida. 21. Prior to final acceptance of the utility and other public facilities improvements by the City the following requirements must be met at Developer's expense: A. If the property is platted, one copy of the recorded plat shall be furnished to the City. B. "As built" drawings of utility improvement shall be furnished one week prior to final inspection. "As built" drawings shall be certified by a registered engineer with the cost being borne by the Developer. Two mylar and three printed copies of said drawing shall be furnished to City. C. All lot corners shall be properly marked so that utility company or its engineer can, upon receipt of "as built'► drawings, verify the marked water and/or sewer services as to location and depth. I►i addition, for purposes of locating and protecting installed service , lilies and valves Developer or his contractor shall mark each service line and all valves with an eight (8) ,foot pressure treated wooden post in the manner as shown on the design drawings and specifications. Developer's contractor is required to install curb stop, meter box and valve box on each water service and valve as shown on design drawings. D. All water and sewer services and valves shall be marked on the street curb by etching into the concrete or if no curbing is avallable, a two (2) incl► square metal tag is to be nailed to the street's pavement and Fainted as .specified pn design drawings, E. Developer's contractor shall furnish a one (1) year maintenance bond in the amount of 100% of the cost of tl►e facilities installed. Tile bond may be in the form of cash, surety bond, or irrevocable letter of credit, the terms of which will indemnify and save harmless the City from any loss, damages, costs, claims, suits, debts or demands by reason of defects in the workmanship or materials used in the facilities discovered within a period of one year from and after the date of acceptance by the City of the facilities. , F. A Bill of Sale for facilities from t1►e Developer to City. , G. Conveyanco of easements as required under this Agreement. 11. A deed for ,any and all land on' which lift stations or water stations or other improvements if required by City. 1. The title evidence, mortgage • releases and mortgage subordinations as required in this Agreement. . J. For onsite and offsite construction provide City an ' accounting of the actual costs (schedule of values) and releases of liens from utility contractors in such detail as the City requires. K. City shall have 'tile right to refuse to accept title to Developer's construction until Developer's construction has passed certain tests, including, without limitation, closed circuit television inspection of the gravity sewer lines, witnessed by a City representative, to determine whether the Developer's construction is constructed in accordance with the approved engineering plans and specifications. Said tests may be performed at •least three (3) times: the first test upon completion of the system; the second test upon completion of all building, roads, paving, drainage, and all construction within the right-of-way easement area of adjacent areas. A third test shall be required if the City deems it necessary within a one (1) year period after acceptance. L. Letters of acceptance from the appropriate regulatory agency for tl►e water. and/or sewer system, are required prior to final inspection. M. A copy of the certified water pressure test and force main test as applicable. N. The certification by the design engineer that the system was constructed as designed is required prior to final acceptance. r Q. Pump performance test on pumping stations if applicable. 22. All notices that may or must be given under this Agreement shall be in writing and shall be valid if mailed by United States registered or certified mail, postage and charges prepaid from addressed as follows: To Developer,: To City of Atlantic Beach City Manager 716 Ocean Boulevard Post Office Box-25 Atlantic Beach, Florida 32233 IN WITNESS WHEREOF, the parties hereto have executed this Utility Agreement the day and year first written above. Signed, sealed and delivered in the presence of: Develope Witness o ity of Atlantic Be Witness 41 ,, DEPARTMENT OF BUILDING 9121 ICITY OF ATLANTIC BEACH,FLORIDA PERMIT NO. PERMIT TO BUILD THIS PERMIT MUST BE POSTED ON JOB Date Sept. 22 19 $7 Valuation$ Fee$ 104.On 104,00 T This permit not valid until above fee has been paid to City Treasurer,and is i 04 e nOCKT subject to revocation for violation of applicable provisions of law. `s^j,9 2 4 ' I C M J�{ This is to certify that MCKWORTH PLUMBING ` ` OCK u - 1 r1 1UMP-97 i!1ft(I has permission to install plimbing Classification New Residential Zone RG-1 Owned by Samuel Waters Lot 4 Block 4 S/D LOW c House No. 1912-1914 Mary Street According to approved plans which are part of this permit NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. PERMIT VOID SIX MONTHS „ AFTER DATE OF ISSUE 41111 40 Building material,rubbish and debris z from this work must not be placed in public space, and must be cleared up and lIauled away by either con- tract� owner., r Bu' g Official. FOR OFFICE PERMIT DATE CONTRACTOR USE ONLY NUMBER PLUMBING ELECTRICAL SEWER WATER CITY OF ATLANTIC BEACH APPLICATION FOR PLUMBING-PERMIT JOB LOCATION ' PLUMBING CONTRACTOR jA4 ,; LICENSE NUMBERS OWNER BUILDING CONTRACTOR TYPE OF BUILDING INKS SHOWERS _6_LAVATORY WATER HEATERS BATH TUBS t- DISHWASHERS URINALS ",,DISPOSALS CLOSETS WASHING MACHINE FLOOR DRAINS 0 HER TOTAL FIXTURE CUNT INSTALLATION OF PLUMBING AND FIXTURES MUST BE IN ACCORDANCE WITH THE MOST RECENT EDITION OF THE SOUTHERN STANDARD PLUMBING CODE. CITY OF ATLANTIC BEACH, FLORIDA ApProwd DY APPLICATION FOR ELECTRICAL. PERMIT { TO THE CHIEF ELECTRICAL INSPECTOR: DATE: &ob -7 19 opl IMPORTANT NOTICE: IN CONSIDERATION OF PERMIT GIVEN FOR DOING THE WORK AS DESCRIBED IN THE FOLLOWING, WE HEREBY AGREE TO PERFORM SAID WORK IN ACCORDANCE WITH THE ATTACHED PLANS AND SPECIFICATIONS, WHICH AREA PART HEREOF, AND IN ACCORDANCE WITH THE ELECTRICAL REGULATIONS, CODES AND CITY OF ATLANTIC BEACH ORDINANCES. 2 C® R#;s c- flKJMPfS0A ELECTRIC CO., INC. P 0. BOX50398O`t lQ� JA ;ONVILLE RFArd F1 "2490298 LECTRICAI FIRM: ERE ECT ICI I TUJOURNEYMAN NAME� 0rzE &_ ADDRESS: /9f Fff $OiC -, OLDG.SIZE ` ETWEENc RES.l I APT.S COMM.( ! PUBLIC( 1 INDUS.( ! NEW( ! OLD ( ► REW.( ! ADDITION l I TRAILER t 1 TEMP.( ! SIGNS ( ) SO. FT. SERVICE: NEW(�/ INCREASE ( ! REPAIR( ! FEE CONDUCTOR SIZE _z_ AMPS C2 COPPER ( ALU TCH OR BREAKER GA'6?AMPS PH W VOLT RACEWAY II!XIST.SERV.SIZE AMPS PH W VOLT RACEWAY )FEEDERS NO. SIZE NO. SIZE NO. SIZE LIGHTING OUTLETS CONCEALED OPEN TOTAL RECEPTACLES CONCEALED OPEN TOTAL 0.90 AMPS. 91.100 AMPS. SWITCHES INCANDESCENT 'FLUORESCENT&M.V. FIXED 0.100 AMPS. OVER 'APPLIANCES BELL TRANSF. ,AIR H.P.RATING H.P.RATING CONDITIONING COMP.MOTOR OTHER MOTORS AMPS ICEIL HEAT KW-HEAT 0.1 OVER MOTORS H.P. I VOLTAGE PHS NO. 1 ILP. VOLTAGE PHS MISCELLANEOUS tRANSPt3R1i R&1 "UNDER 600 V. OVER 600 V. _ NO. KVA NO. lKVA NO.NEON TRANSF. N0. VA. MA. MOTOR SIZE SWITCH FLASHER EACH SIGN FORWARDED TOTAL FEES r'' I DEPARTMENT OF BUILDING 9120 CITY OF ATLANTIC BEACH,FLORIDA PERMIT NO. i PERMIT TO BUILD ,;�, THIS PERMIT MUST BE POSTED ON JOB 1, ,*011 _ 1 Tt Date Sept. 22 19 87 1544 I n {I 1/24/8 91'?10 .C+lCAC j Valuation$ Fee$ 50.00 1544 1 A, 11/24/0 I�Cti This permit not valid until above fee has been paid to City Treasurer,and is subject to revocation for violation of applicable provisions of law. This is to certify that Rivercity Refrig A/C CAC417504 f ihas permission to install heat/at- Classification New Residential Zone RG-1 I Owned by Sal [Paters Lot 4 Block 4 S/D Inis I House No. 1812-1914 Ne Street According to approved plans which are part of this permit j NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. l PERMIT VOID SIX MONTHS „ AFTER DATE OF ISSUE .4 10 4 i O Building material,rubbish and debris ZI from this work must not be placed in public space, and must be cleared up and hauled away by either con- trac501 or owner.. ilding Official. FOR OFFICE PERMIT DATE CONTRACTOR II USE ONLY NUMBER PLUMBING ELECTRICAL SEWER i WATER CITY OF JA(XS(N=Jr-, BILI APPLICATION FOR MECHANICAL PERMIT Appromd By Mechanical Permit Nunte..r L60MCN S R= ADDRESS: _ ICA a-_�2 .�`4 F__�e �T cF USE CF BUILDING: �.�* 7�r_wc^ y a�- wt .a �c�• BUILDING BUILDING PM4IT #: C' q MATURE CP Womac NEW BUILDING L�� REPLACEMENT ALTERATTC N REPAIR ADDITICN 071118 IBIANICAL WORK TO BE DCNE PiINTT F M- BOUIPMERr M BE INSr UJM $ Air Oord.iti.oning tons #units TYPE UNITS: 2 f1 i Heat L,3,2_.6_6 B'IU'S .2y # units _ Pumps how many Wells how marry _ Boilers WulS #boilers _ Tanks 0-600 gallons over 600 gallons _ Duct Systems: 66 cy" c # systems _ Auti mobile Lifts: # 1 i f is _ Elevators/Escalators: #cars #floors _ Fire Sprinkler Systeme: #heads _ Fire Standpipes: # standpipes _ Fire Hose Cabinetts: # cabinets _ Fireplaces: how uany _ Alteration or repair of boilers: Solar Collection Systems: #collectors _ OommQsci al Floods: # hoods Heat exchanger or coil in ducts: _ Gas Piping Systems: # outlets _ Gas Vented Wall Furnaces or Water Heaters: # units misc. or otter work: Permit Issuing Fee TOTAL FEE: (mailing address) (phone) State Certification/Registration No.: c`G> Maso=n # Qigina�yre:ing Agents -� .x-71 < c : Date: Property Owner's Naane: Permit becomes void if no work is done during a six month period. I hereby certify that I have react this application and know same to be true and correct. All pr(visions of laws and ordinances governing this work wi 11 be compl ied with whet-l*--r spc�ci f i cxj nr. not. This permit does not give authority to violate the provisicxls of any other stage or local Laws regulation construction or the perform nm of construction. CITY OF rrt�c �eac�-��vac'da Office of Building Official REQUEST FOR INSPECTION ��- � Date 1� � t ,� �..- Permit No. Time A.M. r Received PM. District No. Job Address f, Locality Owner's ' . 1 Name Contractor BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing 0 Footing a Rough Wiring Ci j Rough C, Air.Cond.& Q Re Roofing D Slab Cl Temp Pole fP' Top Out Q Heating Lintel L7 Final 0 Sewer ❑ Fire Place 0 READY FOR INSPECTION Pre Fab A.M. Mon. Tues. CWed., Thurs. Friday P.M. Inspection Made 40 PR Inspector Final Inspection D Certificate of Occupancy Date AwJ CITY OF ATLANTIC BEACH, FLORIDA ` Approved by APPLICATION FOR ELECTRICAL PERMIT TO THE CHIEF ELECTRICAL INSPECTOR: DATE: 19 IMPORTANT NOTICE: IN CONSIDERATION OF PERMIT GIVEN FOR DOING THE WORK AS DESCRIBED IN THE FOLLOWING, WE HEREBY AGREE TO PERFORM SAID WORK IN ACCORDANCE WITH THE ATTACHED PLANS AND SPECIFICATIONS, WHICH ARE A PART HEREOF, AND IN ACCORDANCE WITH THE ELECTRICAL REGULATIONS, CODES AND CITY OF AT EACH ORDINANC Z dmp�oneCCo:InC .ate EaxV�q(, ELECTRICAL FIRM: MASTER ELECTRICIAN T NAME t -r 0� • ADDRESS r2- _ RFD—BOX— SLOG. FDBOXSLOG.SIZE BETWEEN: RES.A APT.( ► COMM.( ► PUBLIC( ) INDUS.! ) NEW( i OLD( ► REW.( ) ADDITION ( ) TRAILER ( ) TEMP.W SIGNS 1 ) SO. FT. SERVICE: NEW INCREASE( ► REPAIR ( ) FEE CONDUCTOR SIZE AMPS COPPER I ALUM. SWITCH OR BREAKER AMPS PH W VOLT RACEWAY ,,EXIST.SERV.SIZE AMPS PH W VOLT RACEWAY FEEDERS NO. SIZE IND. SIZE NO. SIZE LIGHTING OUTLETS CONCEALED OPEN TOTAL RECEPTACLES CONCEALED OPEN TOTAL 0.50 AMPS, 91.100 AMPS. SWITCHES INCANDESCENT FLUORESCENT&M.V. FIXED 0.100 AMPS. OVER APPLIANCES BELL TRANSF. AIR; H.P. RATING H.P. RATING 'CONDITIONING COMP.MOTOR OTHER MOTORS AMPS CEIL HEAT: KW-HEAT 0.1 OVER 'MOTORS H.P. VOLTAGE PHS' NO. 1 H.P. VOLTAGE PHS s MI Mu TRANSFORMERS: UNDER 600 V. OVER 600 V. NO. ' Kl/'A NO, lKVA NO.NEON TRANSF. NO. VA. MA. MOTOR SIZE SWITCH FLASHER EACH SIGN FORWARDED TOTAL FEES J r., of �� Jrilo�'Y Southern Standard 20 o the 9 f with the is of Section carnt'lt"nce urs ant to the requtrern a structure u'as in irate issued ua t the i. c of issu acc those.is tar the folloioitt T his Cetttf ng that a truct'ort of Code certif yi Wilding cans �tagpen";tNQrh / �n",` $wilding regulating bu dina�tces nous or. ;.t ter �strSt n > lAr4 GMM? Owner of Bwtdt°g ate �idlag Aadtess BUILDING, PLANNING AND ZONING INSPECTION DEPARTMENT CITY OF ATLANTIC BEACH, FLORIDA CERTIFICATE OF OCCUPANCY WORK SHEET Date Requested: February 25, 1988 Building Contractor: Samuel Waters Building Permit Number: 9119 Address: 1912 Mary Street Legal Description: Lot 4 Block 4 Lewis Subdivision Improvements to the above described property have been completed in accordance with the terms of the permit and is certified to be ready for occupancy as _ Duplex ___ Lowest Floor Elevation: ---- ---------- ---------- required as built n/a S ax Certificate: J / 'T -- daie submitted BEFORE ISSUING CERTIFICATE OF OCCUPANCY THE FOLLOWING MUST BE COMPLETE DEPARTMENT DATE NOTIFIED: DATE APPROVED: BY: ZA Fire Chief ?/?S/88__ f Public Works 2/25/88 __-zz��1' c ___ Planning Director 2/25J88 Building Inspector -_ 2/25/88 - 01 101 SgS t� 100 Co �e Sw`5 0 0 e5 44111, CP 0l �o ('O, SV s C� 0e VJ, l(VV BUILDING, PLANNING AND ZONING INSPECTION DEPARTMENT CITY OF ATLANTIC BEACH, FLORIDA CERTIFICATE OF OCCUPANCY WORK SHEET Date Requested: February 25, 1988 Building Contractor: Samuel Waters Building Permit Number: 9119 Address: 1914 Mary Street Legal Description: Lot 4 Block 4 Lewis Sibdivision Improvements to the above described property have been completed in accordance with the terms of the permit and is certified to be ready for occupancy as Duplex Lowest Floor Elevation: XXXXXX - ---------- ---------- ---------- required as built n/a es Tax Certificate: 1jidatsubmitted- - BEFORE ISSUING CERTIFICATE OF OCCUPANCY THE FOLLOWING MUST BE COMPLETE A DEPARTMENT DATE NOTIFIED: DATE APPROVED: BY: Fire Chief 2/25/88 --- 7Z ---- --- Public Works 2/25/88 Planning Director 2/25/88 --------------- - ---- -------- Building Inspector 2/25/88 DR-lCO FLORIDA DEPARTMENT OF REVENUE N. 7/87 APPLICATION FOR CERTIFICATE OF OCCUPANCY 9/19 I hereby certify that the property described below: - - Contract Identification Number Description of Property (Example: house, commercial building, road, bridge, etc. ) Contractor's Certification # Issued by Department of Address of Improved Properti Professional Regulations, ) L rn _If Applicable � ( �� � (4z) 1og226 - 53 City State Zip Sales Tax Registration # is substantially completed and that we are registered for paying Sales and Use Tax with the Florida Department of Revenue. Name of Prime Contractor/General Manager -1&l hca c- 1 Address /;Z o7 /V". 2/ s City, State, Zip {s x,. [3 c, H _ 3 Z Z- SZ Total Contract Materials $ Total Contract Labor 15000 Total $ Signature of Prime Contractor/General Manager DateSig ture of -Genret'y fficial Date -4-1 aoirar al O�ESofl FOR rNgpE Pecm�c N°. pate p tray°r H e ��e�ved on ly F\te P�aC R013 Out Pre pab °b padtess "'NAVAn9 O �SeNet 6ou9 P. OWpef s coNCtemp P0`e j Q�pG Ptq 9 �.�aFORN� Sp� hON P / 6 C 1 Kms' O Wed ay \s� wn Pe p'�n pa te Mo Made 1nsPel on or \nsPect c� °� Ste, pNicrer t¢ � e o+e�rrarng ��N (� Ftp 1NSpE� o REQV,est Qe�m�cN :��, p�,.,G' r 1fond• 1 Gonua�°K ~ P`V�pgrNG` NQatm9 Pei wea 1ce Rraou9h Q F`rep\a mess E4K (� log Out D pre Fab p,M Job Poughvff,"( SOWPM' ner s � GpN�A�'tE pole ame �otrn9 F;na� pEcrpN BV1r.OrNC' p SO 0 D"vofF Ng thurs Franrm9 in9 O V11*6 P. rr1 p foot d Edon� of ocopanci OO s' Mon. Date ospedron Maas P or ins4gGt CITY OF aft &ad- Offioe of Building Official REQUEST FOR INSPECTION Dat e__ r Permit No, Received PM. District No. a 1r � c 7 _ . Job Address featly Owner's Name Contractor BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing ❑ Footing ❑ Rough Wiring ❑ Rougher Air.Cond.& ❑ Re Roofing ❑ Slab ❑ Temp Pole ❑ Top Out ❑ Heating lintel ❑ Final ❑ Server ❑ Fre Place ❑ READY FOR INSPECT Pre ' A.M. Mon. Tues, Wed. Th 1 Friday P.M. Inspection Made j, A.M. P.M. Inspector Final Inspection❑ Certo of Occupancy Date CITY OF 11 - 575 1 0� Office of Building Official stn(/REQUEST FOR INSPECTION fI )) Dates Permit No. ! 1 Time A.M. Received P.M. District No. l Job Addreessss Locality Owner's Name I �= G.� `✓ � t, tractor BUILDING CONCRETE EL PLUMBING MECHANICAL Framing ❑ Footing 0 Rough Wiring 0 Rough 0 Air.Cond.& ❑ Re Roofing ❑ Slab 0 Temp PoleD ,� Top Out Cl Heating Lintel Cl Final yy/' Sewer 11 Fire Place El Y FOR INSPECTION Pre Fab A.M. Mon, Tues_ Thurs. Friday PM. Inspection Made Inspector Final Inspection Lam' Certificate of Occupancy Date 2 / CITY OF 1 1'44usfcc Vead — 9&ud4 716 OCEAN BOULEVARD P.O.BOX 26 ATLANTIC BEACH,FLORIDA 32233 TELEPHONE(904)249-2396 February 25, 1988 Third Floor Pre-Service Section Jacksonville Electric Authority Building 233 West Duval Street Jacksonville, Florida 32202 The following courtesy inspections have been made and are satisfactory: Please see attached copy, The following final inspections have been made and are satisfactory: Permit #5309---2329 Barefoot Trace Permit issued to United Electric Company. Permit #5757----1912 Mary Street Permit #5758----1914 Mary Street Permits issued to Bill Thompson Electric Company. Since ely, Rene' Angers Comm ity Develo men Director RA/tb cc: file FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION SECTION 9 RESIDENTIAL POINT SYSTEM METHOD CLIMATE ZONES FORM 900-A-86 DEPARTMENT OF COMMUNITY AFFAIRS NORTH 1 2 3 This form maybe used to demonstrate compliance with the Energy Code for new single-family detached or multifamily attached dwellings under Section 9.An alternative to this method for single-family detached dwellings,and multifamily attached dwellings of three stories or less,is provided in Section 10.Multifamily attached dwellings greater than three stories must comply under Section 9 or 5.Additions to existing residential buildings must comply under Section 9 or 10.Additional information may be obtained from your local building department or the Department of Community Affairs,Energy Code Program,2571 Executive Center Circle East,Tallahassee,Florida 32301.8244. PROJECT NAME PERMITTING OFFICE: AND ADDRESS: v �---U.AS CIRCLE CLIMATE ZONE: 1 2 BUILDER: PERMIT NO.: OWNER: Sit e- ry Q-�e vr JURISDICTION NO.: 02 ( J 1 C) C) DETACHED GLASS AREA AND TYPE CHECK IF WORST IF MULTIFAMILY, El NEW ❑ ADD. CASE CALCULATION: �,NUMBER OF UNITS: CLEAR TINT,FILM,SOLAR SCREEN CONDITIONED CEILING INSULATION ATTACHED FLOOR AREA UNDER ATTIC SGL.ASSEMBLY ❑ 1 11 SGL F1 I ❑ SGL NEW ❑ ADD. R =�.❑ R ❑.❑ 7 DBL LTJ DBL NET WALL AREA AND INSULATION CBS R= FRAME R= STEEL STUD R= LOG R= ❑.❑ 5 7 � [11IE DUCTS COOLING SYSTEM HEATING SYSTEM HOT WATER SYSTEM IN UNCOND. SPACE IN CENTRAL ❑ NONE ❑ ELECTRIC STRIP HEAT PUMP ELECTRIC ❑ SOLAR R F3.P ❑ ROOM ❑ NATURAL GAS ❑ ROOM/PTHP ❑ NATURAL GAS ❑ HEAT RECOVERY IN COND. ❑ PTAC ❑ OTHER FUELS ❑ NONE ❑ OTHER FUELS ❑ DED.HEAT PUMP SPACE R SEER/EER = ®. COP/AFUE _ �. �� EF = SF/EF = ❑.❑ ❑•❑ NUMBER OF BEDROOMS = INFILTRATION r i , PRACTICE USED 2 rC ('I — $ 1J X 100 _ #1 X #2 ❑ #3 TOTAL AS-BUILT POINTS TOTAL BASE POINTS CALCULATED E.P.I CALCULATED ENERGY PERFORMANCE INDEX MUST NOT EXCEED 100 POINTS. In accordance with Section 553.907 F.S., 1 hereby certify that the plans Review of the plans and specifications covered by this calculation indicates and specifications covered this calculatto re in complia oe with the compliance with the Florida Energy Code.Before construction is completed,this Florida Energy Code. building will be inspected for o lienee in acoordpwwt ction 55 .908 F.S. OWNER/AGENT: BUILDING OFFICIAL: _. DATE: 9 — d - 97 DATE: 9A I PRESCRIPTIVE MEA u be met or uggeoded b 1 ces. SECTION I REQUIREMUffS CHECK )ONDOWS 904.1 1 MAXIMUM OF 0.5 CFM PER LINEAR FOOT QF OPERABLE SASH CRACK. EXTERIOR& 904.1 MAXIMUM OF 0.5 CFM PER SQ.FT.OF DOOR AREA. INCLUDES SLIDING GLASS DOORS,SOLID CORE, ADJACENT DOORS WOOD PANEL, INSULATED,OR GLASS DOORSONLY. EXT.JOINTS& 904.1 TO BE CAULKED,GASKETED,WEATHERSTRIPPED OR OTHERWISE SEALED. CRACKS MUST BEAR LABEL INDICATING COMPLIANCE WITH ASHRAE STANDARD 90 OR COMPLY WITH EFFICIENCY AND WATER HEATERS 904.2 STANDBY LOSS REQUIREMENTS. SWITCH OR CLEARLY MARKED CIRCUIT BREAKER(ELECTRIC),OR CUT-OFF G MUST BE PROVIDED. AN EXTERNAL OR BUILT-INT TRAP MUST BE PROVIDED. SWIMMING POOLS 904.3 SPAS&HEATED POOLS MUST HAVE COVERS(EXCEPT SOLAR HEATED). NON-COMMERCIAL POOLS MUST PAS HAVE A PUMP TIMER. GAS SPA&POOL HEATER5 MUST HAVE MINIMUM THERMAL EFFICIENCY OF 750/'. HOT WATER 904.4 INSULATION IS REQUIRED ONLY FOR RECIRCULATING SYSTEMS. IN SUCH CASES,PIPING HEAT LOSS SHALL ERES BE IMIT D TO 17.5 BT /H (NEAR FOOT OF PIPE. MWER HEADS 904.5 WATER FLOW MUST BE RESTRICTgDTO NO MORE THAN 3 GALLONSPER MINUTE AT 20 TO 80 PSIG. HVAC DUCT 03.2 CONSTRUCTED IN ACCORDANCE WITH INDUSTRY STANDARDS&LOCAL MECHANICAL CODES . DUCTS IN N TR T N D A MUST INSULATED MINIMUM R. 4. T T E D. I HVAC R READILY ACCESSIBLE MANUAL OR AUTOMATIC THERMOSTAT FOR EACH SYSTgM. • DOUBLEGLASS BASE BASE GLASS X1 SINGLE �R AREA x SPM SUMMER .. _SPM X - GLASS POINTS AREA W-PILTUMNIM17=11M�Nffm= - (913) Sum.PTS. ©i�i;�Z'i�l�S�i�I'r�� ©l��•}I3,i����■"i�7►��l�l�l■F�'•�iF7 RSG_ i�a■k�® .•�� �a'a[l'll/ / KINKIM COND. .� • BASE SUM.PT. AS-BUILT COMPONENT x BASE SUM. COMPONENT POINTSAREA SUMMER AREA x MULT. SUMMER DESCRIPTION PT.MULT. DESCRIPTION ��■■�r�■■�r��-�� ■■■■��■��■■�i-tea■■ r ,■�P3•�■■■FF�rtLi'.�■ �L' 7csi '�■�S-.�s.MI■■�Lr•� ���■■■■■■ terr■■++ ��■■■■� USE fLOOR-AREA OF CO •TAL-f— - BASE MMFIM = COOLING BASE CSM x BASE COOLING , 0 SYSTEM SU .PT P• . • .l NUMBER BASE W-3,241101 NUMBER AS-13UILT AS-BUILT AS-BUILT HOT OF BASE • • • • CoefficientHWM For Shading :. for glass with solar 91 HEATING SYSTEM MULTIPLIERS(HSM) CLIMATE ZONES 1 2 3 SYSTEM TYPE HEATING SYSTEM MULTIPLIERS Heat Pump COP 2. -2.69 2.7-2.89 2.9 .09 3.1 -3.29 3.3-3.49 3.5-3.69 3.7 HSM .5 .52 .48 .45 .42 .40 .38 Electric ri 1. Gas&Other Fuels HSM 1.0 Table 9J for Credit Multipliers) PTHP&Room Units HSM HSM for COP 2.2-2.4 = .63. See above for COP>2.49. Minimums:Central Units 2.5 COP. PTHP&Room Units 2.2 COP. COP means Coefficient of Performance. 9J HEATING CREDIT MULTIPLIERS(HCM) SYSTEM TYPE HEATING SYSTEM MULTIPLIERS -Multizone HCM .90 Natural Gas AFUE .60-.64 .65-.69 .7 -.74 .75-.79 .80-.84 .85-.89 .90-U M H 0 40 .36 Other Fuels H M .77 .72 7 .6 9 6 Where more than one credit is claimed, multiply HCM's together. Enter product on page 4. AFUE means Annual Fuel Utilization Efficiency. 9K COOLING SYSTEM MULTIPLIERS(CSM) SYSTEM TYPE Y IPgone SEER 7.8• 8.0 8.5• 9.0 9.5 10.0• 10.5 11.0 11.5• 12.0- Central Units 7.9 .4 8. .4 9. 10.4 10. 11.4 11.9UQ M .44 .'W 38 36 1 ,34 .32 .31 1 .30 1 .28 PTAC&Room Unit CSM CSM for EER 7.5-7.7 .46. For EER's>7.7 use multipliers above. Minimums:Central Units 7.8 SEER. Room Units 7.5 EER. PTAC under 13,000 BTU/H 7.5 EER,and over 13,000 BTU/H 7.0 EER. SEER means Seasonal Energy Efficiency Ratio. EER means Energy Efficiency Ratio. 9L COOLING CREDIT MULTIPLIERS(CCM) SYSTEM TYPE COOLING CREDIT MULTIPLIERS Ceiling Fans CCM .66 -Multizone CM .90 -CrossVentilation r Whole House Fan(Credit for only one) 5 Where more than one credit is claimed multiply CCM's together. Enter product on page 2. 9M HOT WATER MULTIPLIERS(HWM) SYSTEM TYPE HOT WATER MULTIPLIERS Electric EF .80-.81 .82-.83 .84-.8 .86-,87 .8 -.90 .91 -.93 .94-.96 .97& P Resistance H 41 1 84 1 3 7 3450 Natural Gas EF .48-.49 .52-53.53 -.5 5 - 7 .59 .60-61.61 .6 &U HWM 22 2169 20 2 193 187 1807 174 Other Fuels HWM 22 310 29 2 91 2795705 Water heaters must comply with prescriptive measures of Table 9A. EF means Energy Factor. 9N HOT WATER CREDIT MULTIPLIERS(HWCM) SYSTEM TYPE HOT ftTER CREDIT MULTIPLIER Solar Water Heater F 1 2 3 .4 .7 .8 1 .9 1.0 HWM .9 .8 1 .7 .6 .5 4 3 2 1 Heat Recovery Unit With Air-conditioner Heat Pum HWM 2 .5 Dedicated Heat Pump F -2.49 . -2.99 3.0- .49 3. U HW 44 A HWM must be used in conjunction with all HWCM. See Table 9M. SF means Solar Fraction. EF means Energy Factor. 9P INFILTRATION REDUCTION PRACTICE COMPLIANCE CHECKLIST(See Section 903.2(f)) ENTS -- REQUIREMENTS-FOR EACH PRACTICE CHECK PRACTICE#1 COMPLY WITH ALL INFILTRATION PR R PTIVE N TABLE 9A. PRACTICE#2 COMPLY WITH PRACTICE#1 AND THE FOLLOWING: xterior Waill andFloors -1Qa2La-tq_i2g-netrations sealed.Infiltration barrier install . Sole I to/floor'oint caulked or sealed. -Exterior Walls ilin ne r ins toints and cracks on interior urf caulked,sealed and oasketed. Ductwork ork in unconditioned space must be sealed. Fireplaces i with outside combustion air,doors, nd flue dampers. -Exhaust Fans -Epuipped with dampers.Combustion devicRs seedevice 903.2[h. Combustion Appliances Provided with outside combustion air. PRACTICE PLY WITH PRACTICES#1 AND#2 AND THE FOLLOWING: Ceilings i i n barrier installed, Interior Walls I n i n I r' 'nts-&cracks on interior-walls caulked-sealed or k ted. RecesseQ Ughts1 from conditioned space&insulated from ventilated atti c . Ductwork All ductwork located In conditioned space. Combustion Appliances Be in unconditioned space(except direct vent),draw air from unconditioned space,exhaust by-products to outside.Stoves see 903.2(f). 6 WINTER CALCULATIONS CLIMATE ZONES 1 2 3 BASE SINGLEOR DOUBLE AS-BUILT GLASS BASE GLASS x x WOF OR AREA x WPM WINTER OR AREA WPM WPM 19B) a GLASSP INT R TNT" CLEAR TINT" WIN.PTS. N 7.3 N 13.8 13.6 7.3 8.1 NE 4.6 NE 10.7 10.5 4.6 6. - 9.2 E - 3.6 - 5.7 SE - 7E -18.1 -17. - 2.7 -17.3 -28.4 - 5S -24.0 -23.0 -22.3 SW -227 SW -18.1 -17.5 - 2.7 -17.3 W Liz 23 - 9.2 • W - 3. - 3.6 - 5.7 W 4.6 NW 10.7 10.5 4. 6.0 ` " -28.4 H' -67.6 -59.1 -57.7 -45.0 t7 COND. TOTAL BASE BASE ADJUSTED AS-BUILT .15X FLOOR + GLASS = ADJ. x GLASS = GLASS GLASS ARIA I AREA FACTQR I §ULTQTALE Wp T BASE WIN.PT. AS•BUILT COMPONENT AREA x BASE WIN' _ WINTER COMPONENT AREA x MULT. = WINTER 11 POINTS DESCRIPTION PT.MULT. - DESCRIPTION 9C THRU 9G POINTS EXTERIOR 2.2 / ot vne.. < ADJACENT 0 3 �1 EXTERIOR 15.4 ADJA ENT 13.3 UNDER ATTIC 2 1 1.2 Y C- OR SINGLE 1.2 8-19 ASSEMBLY 1.2 1 :Lj SLAB O 0 1 6.9 RAISED FOR SLAB ON GRADE USE PERILENLTH ALONG CONDITIONED FLOOR IN PLACE OF AREA. INFILTRATION 7.4 CONDITIONEDUS cL0Q0 Amch OF r-TOTAL ENT AS-BUILT WINTER , TOTAL BASE TOTAL AS-BUILT I AS-BUILT i AS-BUILT AS•BUILT HEATING BASE HSM x BASE = HEATING AS-BUILT x DM x HSM x HCM = HEATING SYSTEM WIN.PTS. POINTS 8 91 (9j) POINTS .59 /62s�. 6566' $ 1310.5? 1.12- • 52, /1/.34' BASE BASE BASE TOTAL AS-BUILT AS-BUILT I AS-BUILT TOTAL COOLING + HEATING + HOT WATER = BASE COOLING + HEATING + HOT WATER = AS-BUILT a POINTS POINTS POINTS POINTS POINTS POINTS POINTS POINTS C Fr P.2 F P.2 n n P.1 (From P.2 From P. (Enter n P.1 83$7.75 74o to 2zq-q' 50 Y. 65 V/1 31 73 s 2235,o H = Horizontal Glass(Skylights) For Shading Coefficient less than 0.83.,see sec.903.2(a).Tint Multipliers may be used for glass with solar screens,film,or tint. -4- SUMMER POINT MULTIPLIERS 9B SUMMER OVERHANG FACTORS(SOF) For single and double pane glass. CLIMATE ZONES 1 2 3 ORIEW OVERHANG RATIO TATION 0.0 0.18- 0.27 40.36- 0.47- 0.58 0.71- 0.84- 1.19- 1.73• 2.74-. 5.67- .17 .26 0. 7 1.18 1.72 2.73 5.66 up1. 1 .7 .72 .6 . 3 5 .4N NW 1.0 .91 .7 .71 .67 .5 .48 .42 .37 t .92 7 7 .47 .3 .31 5 W 1. 4 7 9 .32 .27 1. .77 1 .31 OVERHANG RATIO = L/H T_�L H L H H 9C WALL SUMMER POINT MULTIPLIERS(SPM) CONCRETE BLOCK FACE 8 ICK FRAME INTERIOR IN L. EXT. UL. R•VALUE WOOD FR Lam' W D NORM WT. T N R LT WT 2.4 6 INCH V ADJ FR. ALE E ADJ EXT T EX 7- 6 R-VALUE 7 6. 5 2.2 .9 2.2 1.1 1.7 2.2 1.7 11 .18.9 4 0-2.9 1. 7-10.9 2.1 .8 4. L 1.0 .8 7 19-25.9 2 3-6.9 1.0 t1 •12.9 1.7 .7 5- 6.9 1. .7 .8 .5 .4 26&UD .1 7& 13-18.9 1.5 .6 7-10.9 .7 .5 .6 .2 R-V LUE BLOCK 6 INCH 19-25.9 .9 4 11 -18.9 .4 4 .4 .0 .1 0-2.9 1. R-VA UE EXT 19-25.9 .2 .2 .2 3-6.9 .6 0-2.9 1 TE & 1 .1 1 .1 7 .4 •69 .7 R-VA UE T 0- 6.9 7.6 2.8 7-10.9 3.5 1.3 9E CEILING SUMMER POINT MULTIPLIERS(SPM) 1 7 1. UNE ATTIC SINGLE ASSEMBLY CONCRETE DECK ROOF R-VALUE P R-V L E PM CEILIN TYPE •2 19-21.9 1.1 5- 6.9 5.8 R-VALUE DROPPED EXPO ED 1. O 2.25.9 7- 3.9 10-13.9 3.2 3. -29.9 .8 9-10.9 3.1 14-20.9 2.2 2.4 -37. .6 11 -12.9 2. 21 &U 1.5 1.6 38&U 13.1 . 2.4 19-25.9 1.8 9D DOOR SUMMER POINT MULTIPLIERS(SPM) CREDIT MULTIPLIER FOR ATTIC RADIANT BARRIER = .55 DOOR TYPE EXT, ADJ 9F FLOOR SUMMER POINT MULTIPLIERS(SPM) WOOD 7.7 2.9 SLAB-ON-GRADE RAISED RAISED WOOD GE INSULATION CONCRETE (See 903.2(x)) INSULATED 8.5 3.1 R-VALUE SPM R-VALUE SP R-VALUE SPM -2. -41.2 0-2.9 - .8 0- 6.9 -1.0 -4.9 -37.2 3-4.9 -1.3 7-10.9 -1.1 5-6.9 -36,2 5-6.9 1.3 11 -18.9 7&U -35.7 7&Ug -1.3 19&U 9G INFILTRATION SUMMER POINT MULTIPLIERS_ 9H DUCT MULTIPLIERS(DM) INFILTRATION PRACTICE R-VALUE With Return W/O Return SPM Air Duct Air Duct (See Table 9P) 4.2-4.9 1.14 1.10 PRACTICE#1 10.2 5.0-6.6 1.12 1.08 PRACTICE#2 8.0 6.7&Up 1.09 1.06 PRACTICE#3 5.2 DUCTS IN CONDITIONED SPACE 1.00 1.00 -3- WINTER POINT MULTIPLIERS 9B WINTER OVERHANG FACTORS(WOF) CLIMATE ZONES 1 2 3 ORIEN- QVERHANG RATIO TATION 0.0 0.18- 0.27• 0.36• 0.47- 0.58 0.71- 1 0.84• 1 1.19• 1 1.73• 1 2.74- 5.67- 0.17 7 0.70 0.83 1.18 1 INI ILE PANE GLASS N 1.0 1.08 1,12 .1 1.20 1.24 1.27 1.31 1 1.45 1.51 1.57 NEINW 1.0 1.13 1.20 1.26 1.33 1.39 1.45 1.50 1.63 1.74 1.84 1.93 1. 1 - - - -1. -1 -2.51 -3,31 -4.64 SE/SW 1. .77 .21 .7a 2 .84 .7 .1 4 .54 .67 .7 DO NE GLASS 1 1 1 1 7 1 1 1.88 NE/NWNE/NW 1.0 1.23 1.35 1 1 1 1.78 1.87 EM . 1 1. .77 2 .1 - - .24 -1. -1. W 1. .72 1 1 .4 - .19 - .40E77T 1.0 .94 7 .41 .4 OVERHANG RATIO = L/H T-li-L H L-, T H ❑� H 9C WALL WINTER POINT MULTIPLIERS(WPM) FRAME CONCRETE BLOCK FACE Bi 1ICK LOG _ IN RIOR INSUL. EXT.INSUL. R-VALUE D FR T R- LUE EXT ADJ L EXT 7-10.9 4.2 R-VALUE EXT 10.4 11 11. 11 -18.9 3.5 0-2.9 4. 1 .4 7.3 5.1 1 11 -1 7 4. 4. 1.4 7&Up 1 13-18.93.3 7-10,9 4. jR--VALUE BLOCK 6 INCHi 19-25.9 2.2 11 -1 7.9 9.9 130 1R-V 1 1. 1 .7 TEE 1. 1. 72- LUE T 1.7 1 0- 6.9 15.1 13.1 7-10.9 7.3 6.6 9E CEILING WINTER POINT MULTIPLIERS(WPM) 11 •12• 2 UNDEF ATTICIN BLY CON RETE DECK ROOF 1 4• R-VALE WPM R-VALUE WPM _CEILIM TYPE 1 4.6 4.4 19-21.9 2, - 6.9 6.5 R•VAL E DROPPED EXPOSED 22-2 . 1.7 7- 8.9 4.3 10-13.9 2.9 3.3 6-29.9 1.4 9-10.9 3.4 14-20.9 2.0 2.1 30-37.9 1. 11-12.9 2.9 21 &U 1.3 1.3 9 13-18.9 2.6 19-25.9 2.0 9D DOOR WINTER POINT MULTIPLIERS(WPM) 1 CREDIT MULTIPLIER FOR ATTIC RADIANT BARRIER = .65 DOOR TYPE EXT ADJ 9F FLOOR WINTER POINT MULTIPLIERS(WPM) WOOD 15.4 13.3 SLAB-ON-GRADE RAISED RAISED WOOD EDGE INSULATION CONCRETE (Sea 903.2 e INSULATED 16.8 14.5 R-VALUE WP R-VALUE WPM R-VA UE WPM 1 0-2.9 9.9 0- 6.9 8.3 3-4.9 5.1 7-10.9 3.0 5 7.6 .6 11 -18.9 22 7&Up 7.0 Ir 7&U 2.9 19&uo 1.4 9G INFILTRATION WINTER POINT MULTIPLIERS 9H DUCT MULTIPLIERS(DM) INFILTRATION PRACTICE R•VALUE With Retum W/O Retum (See Table 9P) WPM Al Ai uct 4.2-4.9 1.14 1.10 PRACTICE#1 10.9 5.0.6.6 1.12 1.08 PRACTICE#2 7.4 6.7&Up 1.09 1.06 PRACTICE#3 4.1 DUCTS IN CONDITIONED SPACE 1.00 1.00 -5- Ator 4 b -ki FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION FORM 900-M86 SECTION 9 —RESIDENTIAL POINT SYSTEM METHOD CLIMATE ZONES REVISED: 1/87 DEPARTMENT OF COMMUNITY AFFAIRS NORTH 1 2 3 This form may be used to demonstrate compliance with the Energy Code for new single-family detached or multifamily attached dwellings under Section 9.An alternative to this method for single-family detached dwellings,and multifamily attached dwellings of three stories or less,is provided in Section 10.Multifamily attached dwellings greater than three stories must comply under Section 9 or 5.Additions to existing residential buildings must comply under Section 9 or 10.Additional information may be obtained from your local building department or the Department of Community Affairs,Energy Code Program,2571 Executive Center Circle East,Tallahassee,Florida 32399. PROJECT NAME BUILDER: PERMITTING CLIMATE AND ADDRESS: OFFICE: ZONE: 1 ❑ 2 ❑ 3 6N PERMIT JURISDICTION OWNER: hit tL e f K Cl f(I'�> NO.: NO.: I U NEW CONSTRUCTION IF MULTIFAMILY,NUMBER OF CONDITIONED LJLL�1s�+J_7 SQ. GLASS AREA AND TYPE UNITS COVERED BY FLOOR AREA FT. CLEAR TINT,FILM,SOLAR SCREEN ADDITION. ❑ THIS SUBMITTAL: EAVE OVERHANG ❑.® SIP NE ❑❑�SQ. SINGLE SO. MULTIFAMILY ATTACHED ❑ CHECK IF THIS SUBMITTAL LENGTH FT FT. PANE FT SINGLE-FAMILY DETACHED❑ REPRESENTS A WORST CASA PORCH NGTH�ERH A `' FTD PANES x � T.OUBL - D PANEE OUBL -�❑ FTCONDITION: �/' NET WALL AREA AND INSULATION MASONRY R = FRAME R = STEEL STUD R = LOG R = �❑FT ❑.❑ 1 FTT. FTT [I] ❑❑❑FT ❑ CEILING AREA AND INSULATION FLOOR TYPE AND INSULATION UNDER ATTIC R = SGL ASSEMBLY R = SLAB PERIMETER R RAISED:WD 0 CON❑ R = t FQ. L_J _l.❑FQ. ❑ O a FT M 71711 FO. ❑ DUCTS COOLING SYSTEM HEATING SYSTEM HOT WATER SYSTEM IN CENTRAL ❑ NONE ❑ ELECTRIC STRIP HEAT PUMP ELECTRIC I ❑ SOLAR UNCONDITIONED SPACE R = ❑ ROOM ❑ NATURAL GAS ❑ OTHER FUELS ❑ NATURAL GAS ❑ HEAT RECOVERY ❑ ❑ PACKAGE TERMINAL ❑ ROOM UNIT OR ❑ NONE ❑ OTHER FUELS ❑ DEDICATED HEAT PUMP IN CONDITIONED AIR CONDITIONER PACKAGE TERMINAL SPACE R = HEAT PUMP EF = ff SF/EF = ❑.❑ [1:1.11SEER/EER = ® COP/AFUE = L : e NUMBER OF BEDROOMS = F1 INFILTRATION PRACTICE USED ',t� h✓ I 1 p=Its� a�3 X 100 b GL.� �j�I ❑ #1 �#� 1-1 #3 TOTAL AS-BUILT POINTS TOTAL BASE POINTS CALCULATED E.P.I. CALCULATED ENERGY PERFORMANCE INDEX MUST NOT EXCEED 100 POINTS. In accordance with Section 553.907 F.S.,I hereby certify that the plans Review of the plans and specifications covered by this calculation indicates and specifications cover by this cal tion are in pIi ce with the compliance with the Florida Energy Code.Before construction is completed,this Florida Energy Code. building will be inspected for om ance in accord a with ion -3.908 F.S. OWNER/AGENT: BUILDING OFFICIAL � �^ DATE: �' D^ DATE: SA I PRESCRIPT MEASURE Must be met or exceeded by all residences.) COMPONENTS SECTION REQUIREMENTS CHECK.,,, WINDOWS 904.1 MAXIMUM OF 0.5 CFM PER LINEAR FOOT OF OPERABLE SASH CRACK. EXTERIOR& 904.1 MAXIMUM OF 0.5 CFM PER SQ. FT. OF DOOR AREA. INCLUDES SLIDING GLASS DOORS,SOLID CORE, ADJACENT DOORSWOOD PANEL, INSULATED,OR GLASS DOORS ONLY. EXT.JOINTS& 904.1 TO BE CAULKED,GASKETED,WEATHERSTRIPPED OR OTHERWISE SEALED. CRACKS MUST BEAR LABEL INDICATING COMPLIANCE WITH ASHRAE STANDARD 90 OR COMPLY WITH EFFICIENCY AND WATER HEATERS 904.2 STANDBY LOSS REQUIREMENTS. SWITCH OR CLEARLY MARKED CIRCUIT BREAKER(ELECTRIC),OR CUT-OFF GA MY 5T BE PROVIDED. AN EXTERN L OR B 1LT IN HEAT TRAP MUST BE PROVIDED. SWIMMING POOLS 904.3 SPAS&HEATED POOLS MUST HAVE COVERS(EXCEPT SOLAR HEATED). NON-COMMERCIAL POOLS MUST SPAS HAVE A PUMP TIMER. GAS SPA&POOL HEATERS MUST HAVE MINIMUM THERMAL EFFICIENCY OF 750/0. HOT WATER 904.4 INSULATION IS REQUIREDONLYFOR RECIRCULATING SYSTEMS INCLUDING HEAT RECOVERY UNITS.IN SUCH CASES,PIPING HEATLOSS PIPES SHALL BE LIMITED TO 17.5 BTUIH/LINEAR FOOT OF PIPE. HOWER HEADS 904.5 WATER FLOW MUST BE RESTRICTED TO NO MORE THAN 3 GALLONS PER MINUTE AT 20 TO 80 PSIG. HVAC DUCT 903.2 CONSTRUCTED IN ACCORDANCE WITH INDUSTRY STANDARDS&LOCAL MECHANICAL CODES. DUCTS IN CONSTRUCTION 6 R- 4.2&JOINIS MUST BE SEALED, VAC CONTROLS .7 SEPARATE READILY ACCESSIBLE MANUAL OR AUTOMATIC THERMOSTAT FOR EACH SYSTEM. 94SULATION CEILINGS-MIN.R-19. COMMON WALLS-FRAME R-11 OR CBS R-3, FRAME COMMON CEILINGS&FLOORS R-11. -11- SUMMER CALCULATIONS CLIMATE ZONES 1 2 3 ►=I BASE BASE ~' CLASS SINGLE-PANE OR DOUBLE-PANE SUMMER AS-BUILT c AREAS x pT. MULT.UMMER SUMMER AREA x SUMMER POINT MULT. SUMMER POINT MULT. x OVERHANG= GLASS POINTS o LAR TINT** CLEAR TINT" FACTOR(9B) SU PT , N 38.3 N 2. 40.7 41.5 38. 34.9 NE 57.7 1 NE 61.5 61.6 51.0 E 79.7 E 84.9 83.9 79 68.9 0 46 E 79.1 SE 8 .4 84.3 .1 68.8 S 1 66.2 S 73.2 72.7 66.2 58.2 W 7 .1 SW 85.4 84.3 79 68.8 W 79.7 116 W 84.9 83.99.7 68.9 NW 57.7 NW 61.5 61,6 7 51.0 FI' N 6 .2 H' 290.2 250.1 267.0 195.3 N - - od 'eq 41 t9 • COND. TOTAL BASE BASE I ADJUSTED AS-BUILT .155 x FLOOR T GLASS = ADJUST. x GLASS = GLASS GLASS REA I ARFAFACTOR I RYPIRT&OBAAE SP SUBTOTAL 1 .? �G 1 COMPONENT BASE SUMMER= BASE COMPONENT SUMMER AS-BUILT DESCRIPTION AREA x POINT MULT. SUMMER DESCRIPTION AREA x POINT MULT. = SUMMER 11 PIT (9C THRU 9G) p l EXTERIOR .9 ADJACENT .7 5 LOCI 14 Y4 3 � 1 FXT RIR 7.7DA ENT 2.9 1 UNDER ATTIC .6 OR SINGLE .6 ASSEMBLY BASE CEILING AREA EQUALS FLOOR AREA UNDER CEILING. AS-BUILT CEILING AREA EQUALS ACTUAL CEILING SQUARE FOOTAGE. SLAB -37.0 --� -- gRAISED - 3.99 J W FOR SLAB-ON-GRADE USE PERIMETER LENGTH AROUND CONDITIONED FLOOR.1 FOR RAISED FLOORS USE AREA OVER UNCONDITIONED SPACE. v INFILTRATION 1 /631 1 8. t USE TOTAL FLOOR AREA OF CONDITIONED SPACE. TOTALM N T BASE SUMMER POINTS TACOMPONENT T BASKOOLING I TOTAL BASE BASE TOTAL AS-BUILT I AS-BUILT I AS-BUILT AS-BUILT COOLING SYSTEM x SUMMER = COOLING AS-BUILT x DM x CSM x CCM = COOLING SYSTEM MULTIPLIER POINTS POINTS UM PT 9H 9K 9L P INT .46 7 , j?0L .3F1 � 6 �{ I. 1 �-- ,5 5 ,31 NUMBER BASE BASE AS-BUILT NUMBER AS-BUILT AS-BUILT AS-BUILT HOT OF x HOT WATER = HOT WATER HOT WATER OF x HWM x HWCM = HOT WATER WATER BEDROOMS MULTIPLIER POINTS SYSTEM DESC. BEDROOMS 9M 9N POINTS SYSTEM 38031136-W1 73 ' H = Horizontal Glass(Skylights) •• For glass with known Shading Coefficient, see sec.903.2(a).Tint Multipliers may be used for glass with solar screens,film,or tint. -2- 91 HEATING SYSTEM MULTIPLIERS(HSM) CLIMATE ZONES 1 2 3 SYSTEM TYPE HEATING SYSTEM MULTIPLIERS Heat Pump P 2.5-2.69 1 2.7-2.89 1 2.9.3.09 3.1 .3.29 3.3-3.49 3.5-3.69 3.7-U HSM 56 52 .48 .45 .42 .40 .38 Electric Strip HSM 1.0 Gas&Other Fuels HSM 1.0 (See Table 9J for Credit Multipliersl PTHP&Room Units HSM HSM for COP 22-2.49 = .63. See above for COP 2.49. Minimums: Central Units 2.7 COP. PTHP&Room Units 2.2 COP. COP means Coefficient of Performance. 9J HEATING CREDIT MULTIPLIERS(HCM) SYSTEM TYPE HEATING Y T MULTIPLIERS Attic Radiant Barrier HCM .98 Multizone HCM .90 Natural Gas AFUE .60- .64 .65-.69 .70-.74 75-79.79 .80 .84 .85- .89 .90-U HCM .54 .50 .46 .43 40 .38 .36 Other Fuels HCM 4 .77 .72 1 .67 .63 .59 .56 Where more than one credit is claimed, multiply HCM's together. Enter product on page 4. AFUE means Annual Fuel Utilization Efficiency. 9K COOLING SYSTEM MULTIPLIERS(CSM) SYSTEM TYPE 00 Mr.qYqTFU MULTIPL R SEER 7.8- 8.0- 8.5 9.0- 9.5- 10.0- 10.5• 11.0- 11.5- 12.0- Central Units 7.9 8.4 8.9 .4 9. 10.4 10.9 11.4 11.9 &U CSM .44 .43 J .40 .38 .36 .34 •.32 .31 .30 .28 PTAC&Room Unit CSM CSM for EER 7.5 7.7 = .46. For EER's>7.7 use multipliers above. Minimums:Central Units 7.8 SEER. Room Units 7.5 EER. PTAC under 13,000 BTU/H 7.5 EER,and over 13,000 BTU/H 7.0 EER. SEER means Seasonal Energy Efficiency Ratio. EER means Energy Efficiency Ratio. 9L COOLING CREDIT MULTIPLIERS(CCM) SYSTEM TYPE IT MULTIPLIERS(MM) ilin Fans .86 Multizone .90 Cross Ventilation Attic Radiant Barrier .95 Where more than one credit is claimed multiply CCM's together.Enter product on page 2. 9M HOT WATER MULTIPLIERS(HWM) SYSTEM TYPE HOT WATER MULTIPLIERS Electric EF .80-.81 .82-83.83 .84-.85 .86-87.87 .88-.90 1 .91 -.93 .94-96.96 .97&UP Resistance HWM 4183 4081 3984 3891 380 3678 60 3450 Natural Gas EF .48-.49 .50- .51 .52 .53 .54- .55 .56 .57 .58-. 9 .60-61 .62&U HWM 2259 2169 208 2008 1936 1870 1807 1749 Other Fuels HWM 3494 3354 322 3105 2995 2891 2795 2705 Water heaters must comply with prescriptive measures of Table 9A.EF means Energy Factor. 9N HOT WATER CREDIT MULTIPLIERS(HWCM) SYSTEM TYPE HOT WATER CREDIT MULTIPLIERS Solar Water Heater SF .1 .2 .3 .4 .5 .6 7 .8 1 .9 1.0 HWCM .9 .8 .7 .6 5 4 3 .2 1 1 .0 Heat Recovery Unit* With Air-conditioner Heat Pum HWCM .62 .58 Dedicated Heat Pump EF 2.0-2.49 2.5-2.99 3.0-3.49 3.5&U HWCM .44 5 .29 .25 .A HWM must be used in conjunction with all HWCM. See Table 9M. SF means Solar Fraction. EF means Energy Factor. *Form 90OD-86 must be submitted to obtain credit for Heat Recover Unit. 9P INFILTRATION REDUCTION PRACTICE COMPLIANCE CHECKLIST(See Section 903.2(f)) COMPONENTS REQUIREMENTS FOR EACH PRACTICE CHECK PRACTICE#1 -COMPLY WITH AL INFILTRATION PRESCRIPTIVE ON TABLE 9A. PRACTICE#2 COMPLY WITH PRACTICE #1 AND THE FOLLOWING: Exterior Walls and Floors Top plate penetrations sealed. In iltr tin barrier installed. Sole late/floor' int caulked orsealed. Exterior Walls A Ceilings Pe tra ions 'oints and cracks on in erior surface caulked,sealed r gasketed. Ductwork Ductwork in unconditioned spac§must be sealed. fire la s -Ecuioped with outside combustion air,doors and flue dampers. Exhaust Fans EQuipped with dampers.Combustion devices see 903.2(n. Combustion Heating Combustion space&water heating systems provided with outside combustion air,except direct vent appliances. PRACTICE #3 COMPLY WITH-PRACTICES#1 AND#2 AND THE FOLLOWING: CollingsInfiftratLQn barrier installed. Interior Walls Top plateEenetrations sealed r' ints&cracks on interior walls caulked, ed or gasketed. Recessed i h led from conditioned space&insulated from ventilated attic spaces. Ductwork All ductwork located in conditioned space. Combustion Appliances Be in unconditioned space(except direct vent),draw air from unconditioned space,exhaust by-products to outside. Stoves see 903.2ft -6- WINTER CALCULATIONS CLIMATE ZONES 1 2 3 BASE WINTER BASESINGLE-PANE DOUBLE-PANE WINTER I AS-BUILT GLASS _ W W x x POINT WINTER GLASS x OR WINTER POINT MULT. WINTER POINT MULT. OVERHANG = GLASS FE c AREA MULTIPLIER POINTS c AREA CLEAR I TINT" CLEAR TINT" FACTOR(98)I WIN.PTS. N 7.3 N 13.8 13.6 3 8.1 NE 4.6 NE 10.7 10.5 6.0 E - 9.2 - E S& - 3.8 - 3.6 2 - 5.7 E -22.7 SE -18.1 -17.5 -17.3 -28.4 S -24.0 -23.0 -28.4 -22.3 W -22.7 SW -18.1 -17.5 -22.7 -17.3 W - 9.2 In.79 W 5Z - 3.8 - 3.6 9.2 - 5.7 r r NW 4.6 NW 10.7 10.5 .6 6.0 H' -28.4 H' -67.6 -59.1 -57.7 -45.0 g COND. TOTAL BASE I BASE ADJUSTED AS-BUILT .15 x FLOOR + GLASS = ADJUST x GLASS = GLASS GLASS APEAPEA I AREA I FACTOR I SUBT T E WP SUBTOALI L, 15 • r - • • COMPONENT AREA x BASE WINTER BASE WINTER COMPONENT AREA x POINT MULT.WINTER AS-BUILT WINTER = DESCRIPTION POINT MULT. POINT DESCRIPTION 9C THR 9G POINTS EXTERIOR 2.2 ADJACENT 160 3.6 3 1 � � EXTERIOR 15.4 ADJACENT 13.3 G 1 � UNDER ATTIC 1.2 r -r OR SINGLE 1.2 LU ASSEMBLY 1.2 BASE CEILING AREA EQUALS FLOOR AREA UNDER CEILING. AS-BUILT CEILING AREA EQUALS ACTUAL CEILING SQUARE FOOTAGE. SLAB 8.9 G RAISED .96 0 LL FOR SLAB-ON-GRADE USE PERIMETER LENGTH AROUND CONDITIONED FLOOR. FOR RAISED FLOORS USE AREA OVER UNCONDITIONED SPACE. INFILTRATION 1 7.4 USE TOTAL FLOOR-AREA OF CONDITIONED SPACE. t TOTAL COMPONENT BASE WINTER POINTS . TAL COMPONENT AS-BUILT WINTER POINTS r BASE�HEATfNG TOTAL BASE BASE TOTAL AS-BUILT AS-BUILT AS-BUILT AS-BUILT HEATING SYSTEM x WINTER = HEATING AS-BUILT x DM x HSM x HCM = HEATING SYSTEM MULTIPLIER POINTS POINTS WIN. PTS. 9H 91 9J POINTS .59 i t 7453,57 15976,7_ 2 . 5 2,. V 116,33 BASE BASE BASE TOTAL AS-BUILT AS-BUILT I AS-BUILT TOTAL COOLING + HEATING + HOT WATER = BASE COOLING + HEATING + HOT WATER = AS-BUILT < POINTS POINTS POINTS POINTS POINTS POINTS POINTS POINTS From P.21 K From P.211 (Enteron �P.11- (Frogi,P.21 �'(1From P.2 •!� Enter on P.1 01 30 10 H = Horizontal Glass(Skylights) " For glass with known Shading Coefficient,see sec.903.2(a).Tint Multipliers may be used for glass with solar screens,film, or tint. -^ SUMMER POINT MULTIPLIERS (SPM) 9B SUMMER OVERHANG FACTORS(SOF)For single and double pane glass. CLIMATE ZONES 12 3 10. OH RATIO .0-.11 .12-.17 .118-.26 27-.35 .36-.46 .47-.57 .58-.70 .71-83 .84-1.18 1.1 1.72 1.73-2.73 2.74+ t N 1.0 .94 .91 .87 .83 .79 .76 .72 .69 .63 .56 .50 >-t m t NE/NW 1.0 .94 .91 .86 .80 .75 .71 .67 .63 .55 .48 .42 o E/W 1.0 .95 .92 .86 .80 .73 .68 .63 .57 .47 .39 .31 N SE/SW 1.0 .93 .90 .82 .74 .66 .60 .54 .47 39 .32 .27 t ` S 1.0 91 .86 .77 68 60 54 .51 .45 .39 35 !Ej31 �-OH LENGTH* 0 ft. 1 ft. 1 1h ft. 2 ft. 3 ft. 31h ft. 41h ft. 5'h ft. 6'h ft. 91h ft. 14 . *To select by Overhang Length,no part of glass shall be more than 8 ft.below the overhang, OVERHANG RATIO= OH LENGTH OH HEIGHT �i-L H L H F1H 9C WALL SUMMER POINT MULTIPLIERS(SPM) FRAME CONCRETE BLOCK FACE BRICK LOG INTERIOR INSULATION EXT.INSULATION R-VALUE WOOD FR WOOD NORMAL WT. LT. WT. NOR. WT. LT. WT. 0- 6.9 2.4 6 INCH R-VALUE EXT ADJ R-VALUE EXT ADJ EXT EXT EXT 7- 10.9 .6 R-VALUE EXT 0- 6.9 5.5 2.2 0 2.9 2.2 1.1 1.7 2.2 1.7 11 - 18.9 .4 0-2.9 1.5 7-10.9 2.1 .8 3- 4.9 1,3 .8 1.0 .8 .7 19.25.9 .2 3.6.9 1.0 11 -12.9 1.7 .7 5- 6.9 1.0 .7 .8 .5 .4 26&U .1 7&U .8 13-18.9 1.5 .6 7- 10.9 .7 .5 .6 .3 .2 R-VALUE BLOCK 8 INCH 19-25.9 .9 .4 11 -18.9 1 .4 1 .4 .4 0 .1 0-2.9 1.0 R-VALUE EXT 26&U .6 .2 19-25.9 .2 .2 .2 3-6.9 .6 0-2.9 1.0 STEEL 26&U 1 .1 .1 7-9.9 .4 3 6.9 .7 R-VALUE EXT ADJ t>+ ". 10&up .2 7&Ug 0. 6.9 7.6 2.8 7-10.9 3.5 1.3 11 -12.9 2.7 1.0 9E CEILING SUMMER POINT MULTIPLIERS(SPM) 13-18.9 2.5 0.9& UNDER ATTIC SINGLE ASSEMBLY CONCRETE DECK ROOF 26 19 Uv 1.2 0.4 2.2 0.8 R-VALUE SPM R-VALUE SPM CEILING TYPE 19-21.9 1.1 10-10.9 2.9 R-VALUE DROPPED EXPOSED 22-25.9 .9 11 -12.9 2.6 10-13.9 3.2 3.5 26.29.9 .8 13-18.9 2.4 14-20.9 2.2 2.4 30.37.9 .6 19-25.9 1.8 21 &U 1.5 1.6 38&U .5 `S 9D DOOR SUMMER POINT MULTIPLIERS(SPM) DOOR TYPE EXTERIOR ADJACENT 9F FLOOR SUMMER POINT MULTIPLIERS(SPM) SLAB-ON-GRADE RAISED RAISED WOOD WOOD 7.7 2.9 EDGE INSULATION CONCRETE (See 903.2(e)) R•VALUE SPM R-VALUE SPM R-VALUE SPM INSULATED 8.5 3.1 0-2.9 -41.2 0-2.9 - .8 0- 6.9 -1.0 3-4.9 -37.2 3.4.9 -1.3 7-10.9 -1.1 5-6.9 -36.2 5-6.9 -1.3 11 -18.9 -1.0 7&U -35.7 7&UDF 19&U - .9 913 INFILTRATION SUMMER POINT MULTIPLIERS(SPM) 9H DUCT MULTIPLIERS(DM) INFILTRATION PRACTICE SPM R-VALUE With Return W/O Return (See Table 9P) Air Duct Air Duct 4.2-4.9 1.14 1.10 PRACTICE#1 10.2 5.0-6.6 1.12 1.08 PRACTICE#2 8.0 6.7&Up 1.09 1.06 PRACTICE #3 5.2 DUCTS IN CONDITIONED SPACE 1.00 1.00 3- WINTER POINT MULTIPLIERS (WPM) 9B WINTER OVERHANG FACTORS(WOF) CLIMATE ZONES 12 3 OH RATIO .0-.11 .12-.17 .18-.26 .27-.35 .36-.46 .47-.57 .58-.70 .71-.83 .84-1.18 1.19-1.72 1.73-2.73 .74+ 1 SINGLE PANEGLASS i N 1.0 1.05 1.08 1.12 1.16 1.20 1.24 1.27 1.31 1.38 1.45 1.51 1 NE/NW 1.0 1.09 1.13 1.20 1.26 1.33 1.39 1.45 1.50 1.63 1.74 1.84 E/W 1.0 .67 .50 .16 -.20 -.60 -.95 -1.32 -1.73 -2.51 -3.31 -4.05 m SE/SW 1.0 .92 .88 .77 .66 .52 .39 .25 .10 -.21 -.48 -.74 S 1.0 .95 .92 .84 .74 60 .46 .29 .13 -.24 -.54 -.67 w I DOUBLE PANE GLASS N 1.0 1.09 1.13 1.19 1.25 1.31 1.37 1.42 1.48 1.58 1.69 1.79 1 1 NE/NW 1.0 1.15 1.23 1.35 1.46 1.58 1.68 1.78 1.87 2.09 2.28 2.46 i E/W 1.0 .85 .77 .62 .46 .28 .12 -.05 -.24 -.59 -.96 -1.29 j SE/SW 1.0 .93 .90 .82 .72 .61 .51 .40 .28 .03 -.19 -.40 1 S 1.0 .96 .94 .87 .78 .67 .55 .41 .27 -.04 -.29 -.40 SOH LENGTH* 0 ft. 1 ft. 11/2 ft. 2 ft. 1 3 ft. I 31h ft. 1 02 ft I 51h ft. 61h ft. 912 ft. 14 ft. 20 ft.+ *To select by Overhang Length,no part of glass shall be more than 81 ft.'below the overhang. OVERHANG RATIO= OH LENGTH OH HEIGHT TL H L H - H 9C WALL WINTER POINT MULTIPLIERS(WPM) CONCRETE BLOCK FACE BRICK FRAME INTERIOR INSULATION EXT.INSULATION R-VALUE WOOD FR LOG WOOD NORMAL WT. LT. WT. NOR. WT.j LT. WT. 0- 6.9 12.6 6 INCH R-VALUE EXT ADJ R-VALUE EXT ADJ EXT EXT EXT 7- 10.9 4.2 R-VALUE EXT 0. 6.9 11.1 10.4 0- 2.9 11.2 6.6 8.8 11.2 8.8 11 - 18.9 3.5 0-2.9 4.5 7-10.9 4.4 4.4 3- 4.9 7.3 5.1 6.1 5.6 4.9 19-25.9 2.2 3-6.9 2.8 11 - 12.9 3.7 3.6 5- 6.9 5.7 4.2 4.8 4.3 3.9' 26&UD 1.4 7& Up 2.1 13-18.9 3.4 3.3 7-10.9 4.6 3.5 4.0 3.3 3.1 R-VALUE BLOCK 8 INCH 19-25.9 2.2 2.2 11 - 18.9 3.0 2.6 2.8 2.2 2.2 0-2.9 7.9 R-VALUE EXT 26&U 1.5 1.5 19-25.9 1.9 1.7 1.8 3-6.9 5.7 0-2.9 3.0 STEEL 26&UD 1.3 1.2 1.3 7-9.9 3.8 3-6.9 2.2 R•VALUE EXT ADJ - 10&U 3.0 7&U 1.7 0- 6.9 15.1 13.1 7-10.9 7.3 6.6 9E CEILING WINTER POINT MULTIPLIERS(WPM) 11 -12.9 5.7 5.2 UNDER ATTIC SINGLE ASSEMBLY CONCRETE DECK ROOF 13-18.9 5.2 4.9 R-VALUE WPM R-VALUE WPM CEILING TYPE 19-259 4.6 4.4 19-21,9 2.0 10-10.9 3.2 R-VALUE DROPPED EXPOSED 26&Uo 1 2.7 1 2.6 22-25.9 1.7 11 - 12.9 2.9 10-13.9 2.9 3.3 26-29.9 1.4 13-18.9 2.6 14-20.9 2.0 2.1 9D DOOR WINTER POINT MULTIPLIERS(WPM) 30-37.9 1.2 19-25.9 2.0 21 &Up 1.3 1.3 38&UD 1. DOOR TYPE EXTERIOR ADJACENT 9F FLOOR WINTER POINT MULTIPLIERS(WPM) WOOD 15.4 13.3 SLAB-ON-GRADE RAISED RAISED WOOD EDGE INSULATION CONCRETE See 903.2(e)) INSULATED 16.8 14.5 R-VALUE WPM FI-VALUE WPM R-VALUE WPM 0-2.9 18.8 0-2.9 9.9 0- 6.9 8.3 3-4.9 9.3 3-4.9 5.1 7.10.9 3.0 576.9 7.6 5-6.9 3.6 11 -18.9 2.2 7&UP 7.0 7&U 2.9 19&Up 1.4 9G INFILTRATION WINTER POINT MULTIPLIERS(WPM) 9H DUCT MULTIPLIERS(DM) INFILTRATION PRACTICE R-VALUE With Return W/O Return See Table 9P WPM Air Duct Air Duct ( ) 4.2-4.9 1.14 1.10 PRACTICE # 1 10.9 5.0-6.6 1.12 1.08 PRACTICE #2 7.4 6.7&Up 1.09 1.06 PRACTICE #3 4.1 DUCTS IN CONDITIONED SPACE 1.00 1.00 -5-