Loading...
Permit 1924-1926 Mary St (vault) MAP SHOWING SURVEY OF F5, OC'IL 4, LWI.S MWIVISION AS RECORDED IN PLAT BOOK 24 PAGE 92 OF THE CURREI�IT PUBLIC F DWAL COUNTY, FLORIDA. 1 ' MARY STREET _ 50' R/W (PAVED) 1 X0` 12� SET i/2"i.P. FND.I/2"I.P. R1.3 No. 3295 . 6.00 NO CAP 00, , A° a 1 ' i2,�e„ � a 3 LOT 4 0 VA L A ki T O a 0 a Lc. T c„ O WLn J U 3 �L.' O J P. SET I12"I.P. 56.00 SET 1/232 95 R.L.S.No.3295 RLS.SET No.32 � I NOTE: LOT 6 I, ANGLES AS PER PLAT. 2. NO B.R L. AS PER PLAT, 3. THIS IS A BOUNDARY SURVEY I HRMY CERTIFY THAT THE PROPERTY SHOWN HEREON LIES IN FLOOD ZONE "C" AS SHOWN ON THE FLOOD HAZARD BOUNDARY MAP FOR ATLANTIC BEACH, FLORIDA. I HERESY CERTIFY TO SAM WATERS THAT I HAVE SURVEYED THE LANDS AS SHOWN IN THE ABOVE CAPTION AND THAT THIS MAP IS A TRUE AND CORRECT REPRESENTATION OF THAT SURVEY AND THAT THE SURVEY REpRESENTM HEREON MEETS THE MINIMUM TECHNICAL STANDARDS OF THE FLORIDA ADMINISTRATIVE CODE CHAPTER 21—IST-6 AND THE FLORIDA LAND TITLE ASSOCIATION. • THIS SURVEY NOT VALID UNLESS SEALED WITH AN EMBOSSED SEAL DOW W. BOATWRIGHT, L.S. OF SURVEYOR SIGNED HEREON FLORIDA REG. LAND SURVEYOR No. 3245 SCALE: i''-so' BOATWRIGHT LAND SURVEYORS, INC. DATE SIGNED: DRAWN BY: -r vi. DA -. 1401 PENMAN ROAD SUITE D e" ""' . F.B. # Fick. JACKSONVILLE BEACH, FLORIDA 241-6550 SHEET Of I UTILITY SERVICE AGREEMENT (Water and Sewer) THIS AGREEMENT entered into this 22nd day of September 198 7 , between the City of Atlantic Beach a Municipal corporation, hereinafter called "City", and Samuel Waters , a } corporation, its successors and assigns, 'hereinafter called "Developer". W I T N E S S E T II WHEREAS, Developer owns land in Duval , County, Florida, more particularly described as Lot 5 Block 4 Lewis Subdivision refer to acreage, plat engineering 1924-1926 Mary Street drawings, or legal description as Exhibit A and WHEREAS, Developer plans to develop said land by constructing 1 buildings,* 2 residences and/or other improvements thereon consisting of DuTnlex and WHEREAS, City is the owner of water and sewage treatment plants and water distribution and sewage collection systems in the vicinity of the property described above; and WIIEREAS, Developer desires that City provide water and sewage collection service to said property and City desires to furnish same; and WHEREAS, City is willing to operate such water and sewage collection and treatment systems so that all buildings constructed on Developer's property by developer 'or by any person, firm, joint venture or corporation holding by, through or under Developer may have furnished to them and to their occupants water and sewer service subject to all terms and conditions of this Agreement; and WHEREAS, in order to provide water and sewer services to Developer it has been or will be necessary- for City to enlarge and expand its offsite water and sewer plants and facilities and: it is the desire and intent of Developer to contribute financially to the costs of building such additional offsite water and sewer plants and facilities and to reserve capacity in City's water and sewage treatment plants so that City can provide service to the Development without imposing a burden on its existing customers; NOW, THEREFORE, in consideration of the premises and other good and . valuable considerations and in consideration of the mutual covenants and conditions hereinafter contained, subject to any necessary approval by other governmental agencies having jurisdiction, it is .agreed by the parties hereto as follows: 1. Developer agrees that City shall have the exclusive right to furnish water and sewer service to the real property described above and hereby grants to City . this exclusive right. to provide water and sewer service for all uses within all structures now or hereafter constructed on the real property described above. 2. City agrees that after Developer has connected to the systems of City, City will provide at its own cost and expense, water and sewer service to Developer's property in a manner conforming to the reasonable requirements of public or governmental agencies or parties having jurisdiction over City's water and sewer operations; provided, however, that such service shall be in accordance with other provisions of this Agreement, including City's rules and regulations and rate. schedules. 3. In the event that Developer or assigns fails to complete construction of all improvements required to be built by Developer and fails to pay all plant and service availability and other fees listed in this Agreement within "six" " months from date of execution of this Agreement, for any reason whatsoever, but through no act or fault of City, this Agreement shall terminate and City shall be relieved of its obligation to perform under this Agreement. Upon termination of this Agreement under this provision, City reserves the right to negotiate with Developer a new agreement for any additional sums to be paid by Developer to City as plant capacity and service availability charges, fees or other charges based upon increases in t1le :cost of living and/or such other factors as relate to the cost of supplying water and sewer service. 4. All taxes or charges imposed upon the property described above by any governmental entity or agency shall be pard by Developer except such part thereof that has been deeded to the City in accordance with the terms of this agreement. S. The rates charged by City for water and sewer service shall be in accordance with its rate schedule which shall be subject to change . from time to time. City shall have the right to determine reasonable meter size and location. 6. Developer will grant to the City, at Developer's expense, adequate easements for water and sewer lines, for access to lift stations and water stations and related appurtenances. Said easements shall be transferable. Developer will also furnish title evidence satisfactory to the City that said easements are superior to mortgages or other interest in the land, and Developer shall cause any such mortgages to be released or subordinated to said easements. Easements will also be furnished to provide for onsite water distribution lines, including meters and sewage collection lines. Sites for lift stations and water stations and related appurtenances shall be conveyed by warranty deed in fee simple by Developer . to City. Developer will furnish City a warranty deed, title evidence satisfactory to City and any releases from lien holders for any sewage pumping station and water station sites as required by City. Developer hereby grants to City the right to utilize any onsite water and sewage lines and systems to provide services to properties other than Developer's property, provided this does not unreasonably interfere with , service to Developer's project.' Where Developer's property is adjacent to any state road right-of-way, City will be granted a 25-foot easement along and adjacent to said state road right-of-way. Developer small further grant to the City, its successors and assigns, the exclusive, perpetual right, privilege and easement to construct, reconstruct, operate, maintain, repair, replace, improve, alter, remove, relocate and inspect water transmissions and distribution mains, sewer collection mains, sewer lift stations, pipe lines, lateral lines, valves, connections and appurtenant equipment over, across and under the Developer's property, Including the right to ingress and, egress to eacii of the building sites on Developer's property which are served* by City. All such easements shall have a .width which is acceptable to the City. 7. City does not guarantee an uninterrupted supply of water, or water at any particular pressure, and reserves the right to shut off the water in its main at any time for the purpose of making repairs or extensions of for providing temporary or emergency water supply. City will not be responsible for any damage caused by low pressure or interruption of service. Neither Developer nor any of its successors or purchasers shall discharge into the sanitary sewer system water from "non-domestic" drains including without limitation swimming pools, air conditioning condensation lines, cooling lines or other discharge from any type of equipment. City shall not be obligated to furnish any water or sewer service to any building which is built on Developer's property to wi►ich the City does not have access. The Developer hereby agrees and warrants that the City will not be held responsible for flooding problems which may result from the failure of sewer line back flow preventor valves on Developer's property. The Developer hereby agrees to hold harmless and indemnify City for all costs and damages resulting from flooding due to .back flow preventor valve failure. 8. The construction and design of all facilities to be transferred to and to be owned and operated by titre City shall at all times be subject to prior approval by the City and its engineers. City will provide assistance to Developer's engineers as to design and construction requirements and must approve all plans, documents, and construction requirements in writing prior to any construction being commenced. Construction of all facilities will be performed by Developer or its contractor. Developer will pay the cost of all such construction. The Developer's engineer shall incorporate into the Developer's engineering design, plans and specifications the applicable standards and specifications of the City. : 9. A. If the Developer modifies his development plans for Developer's property which would require greater water usage, greater fire flows, additional water facilities, greater sewage flows, or additional sewage facilities than the water and sewer demands previously approved by the City, then the Developer must obtain approval by the City for the construction of such additional water or sewer facilities which shall meet all City and governmental design requirements. The Developer shall pay all additional contributions and fees as may be authorized by the City's service availability policy which is in effect on the date said new agreement is executed. B. In addition to paragraph 9A above, any other change order between Developer and its utility contractor issued after City approval of original plans must be approved by the City before the change order is put into effect. C. City shall have the right to review the systems design drawing and specifications to ensure that they meet the requirements of the City. The systems design drawing and specifications are to be in •accordance with the City of Atlantic Beach requirements unless otherwise •specified by City or its engineer. D. The City also reserves the right to approve the utility contractors to which construction bids are sent by Developer as well as the contractor to which the award is made. E. A representative of City or its engineers will be the .inspector of the project along with the Developer's engineer, but City reserves the right to final acceptance of the work and materials. Neither the City or its engineers shall be deemed the agent of any other person in making such inspections. 10. After installation of the water distribution and sewage collection systems serving the property described above and acceptance thereof by the City, the City or its assigns shall then be the sole, absolute and exclusive owner of the facilities of said water and sewer systems whether located on, udder, above or outside of the property described and regardless of who may have installed or constructed same to the extent described below: A. All water mains, pipes, valves and fittings and appurtenances up to and including all meters shall be dedicated to and will- be owned, operated and maintained by City.. All water pipes on the customer's side of the meter shall be owned, operated and maintained by the customer or its assigns. , B. All sewer mains, manholes, pumping stations, force mall's and appurtenances, including service pipes in public right of ways and dedicated easements, shall be owned, operated and maintained by the City. Except as provided in paragraph 9C, all sewer lines on the customer's side of the property line shall be owned, operated and maintained by the customer or its assigns. C. With reference to any blanket easements for multi-ftuaily projects such as apartments, mobile home developments, condominiums and PUD's or for conunercial developments, all water mains to and including the water meter, all sewer mains, force mains and manholes in such blanket easements over private property allowing utility operations shall be dedicated to and shall be owned, operated and maintained by the City except that the full length of sewer services from the sewer main or manhole shall be owned and maintained by the customer. All such City lines shall terminate with a manhole. D. By these presents, Developer hereby transfers to the City, the title to the water distribution and sewer collection systems to be installed pursuant to this Agreement, such . conveyance to take effect without further action upon the completion and acceptance by City of said installation. As further evidence of said transfer of title., upon completion of the installation and acceptance by the City, Developer will provide. City 'with , a Dill of Sale or Warranty Deed describing all properties transferred and dedicated to the City by the Agreement. 11. Developer shall pay .the City upon, execution of this Agreement the sum of 10¢ per water connection per equivalent residential connection (ERC) as an advanced deposit to cover engineering, plan review, inspection, test, legal and administrative expenses of City in connection with this Agreement. Developer shall also pay to City upon execution of this Agreement the sum of 1() per sewer connection per ERC as an advanced deposit to cover engineering, plan review, inspection, tests, legal and administrative expenses of City in connection with this Agreement. The charges for engineering and legal expenses and for engineer's inspection and plan review. fee for non-residential units shall be based upon estimated cost to City: Actual cost will be determined and a refund or additional charge will be made for the difference between the advanced deposit as calculated above and actual costs. City agrees to . provide water and sewer service . to the Developer's property in consideration for plant capacity charges, fees and other charges to be paid by Developer as follows: A. A water plant capacity charge at the rate of $10.00 per fixture unit. Such charges shall be due and payable as provided in paragraph 12. B. A sewer plant capacity charge at the rate of onethousand thirty .five dollars ($ 1,035.00 ) per single family unit. Such charges shall be due and payable as provided in paragraph 12. C. A sewer plant capacity charge for any commercial customers on the land as described above at- the rate of Such charges shall be due and payable as provided in paragraph 12. -7- • 1 t D. A meter installation fee to, cover meter cost and meter installation (but not including curb stop or meter box) according to the City's service availability policy at the time of installation which currently is $85.00 per 3/4" x 5/8" meter. C. If available, construction .water will be charged to building based on metered usage in accordance with current rates. F. hydraulic share of main extensions - payment or refund. 1. Developer recognizes that water or sewer utility service to the Developer's property.. is provided by the use of a mein extension and other improvements constructed by a prior developer and that Developer is obligated to refund a said prior developer Developer's share of the cost of said main extension or other improvements. Accordingly, Developer shall pay its pro rata share of the cost of said' main extension or other improvements to City. Said pro, rata share shall be based oil Developer's percentage of the hydraulic capacity of said extension or other improvements. For the purpose of this Agreement, the cost of Developer's said hydraulic share shall be $ payable upon executiod of this Agreement. 2. With respect to utility facilities installed by Developer to which future developers connect directly, and in consideration for monies expended by Developer toward said facilities, City shall refund to Developer, or Developer's successors or assigns, solely from monies collected from said future developers, said future developer's pro rata share of the cost of said facilities. Said refunds shall be calculated on the basis of the hydraulic capacity and demand of said future developer whenever .feasible. The refund obligation of City hereunder and the benefits to Developer related thereto shall expire five (5) years from the date of execution of this Agreement. Said refund shall be made to Developer within sixty (60) days of the receipt of payment by City from .a future developer. Refer to addendum if applicable.. G. Payment of service availability charges and other additional aids in construction for. . . at a cost of $ 12. All charges to Developer shall be paid by Developer to the City in accordance with the following formula and procedures: A. The advance deposit for engineering, administrative and legal fees and the inspection and plan review fee upon the execution of this Agreement, a total of ; and B. Water plant capacity charge upon the execution► of this Agreement, a total of $360.00. and C. Sewer plant capacity charge upon the execution of this Agreement, a total of and D. Meter installation fee according to the City's service availability policy at time of installation which currently is $85.00 per 3/4" meter= $170.00 upon application for hook-up of individual lots, apartments, multi-family lots or units; and E. Construction water based on meter readings in accorda►ice with City's rate schedule; and F. hydraulic share payment, in accordance with paragraph 11F-1 of this Agreement upon execution of this Agreement, in a total amount of,$ and G. Service availability charges and other additional aids in construction in accordance with paragraph 11G of this Agreement in a total amount of $ • • . . . payable 11. Any plant capacity charges, fees, or other charges due to City are intended to assist ini defraying costs as to offsite facilities and in no way are to be considered a payment toward the cost of onsite water distribution and onsite sewage collection systems which costs are to be borne by Developer. 13. City agrees to connect individual buildings and structures on the developed property upon application by the builders, plumbers or ' individual owners subject to the operating rules and regulations of the City and payment of all fees and charges in effect on date of application and compliance by Developer with all provisions of this Agreement. 14. The charges, costs and fees for any separate emergency fire protection water systems, for subject project will be subject to negotiations between City and Developer. if buildings of more than two stories are a part ofthe project, Developer shall furnish at its expense water pumps and other appurtenances as necessary for pumping water above. 15. All plant capacity and service availability charges, fees and other charges as outlined above are based on normal domestic sewage defined herein as containing not more than three hundred (300) parts per million biochemical oxygen demand or three hundred (300) parts per million suspended solids. Whenever water which contains more than these amounts is to be admitted to the sewers, both the City and the pollution control agencies must specifically agree to the connection. An additional charge will be calculated in direct proportion to strength at seventy-five cents ($0.75) for each part per million of either biochemical oxygen demand or suspended solids over three hundred (300) parts per million. All such connections shall provide for a suitable point for the waste to be sampled by the City or the regulatory agencies. An additional charge equal to the pro rata share of any additional sewage treatment plant costs above ninety percent (900) treatment, and of the cost of any additional required outfall pipes to may be required by City. Developer shall have the right at all reasonable times to inspect the invoices of the City in order to determine that said funds have been properly expended by City pursuant to this paragraph. 16. Developer warrants that it is the owner of or the holder of a binding contract to purchase the fee simple title of the real estate described herein and further agrees to have all mortgages or other liens subordinated to the terms of the Agreement and easements required herein y prior to any acceptance of the facilities by the City. 17. Upon application by owners, builders or their authorized representatives, the City agrees to connect the' requested dwellings or structures on the said property at no additional connection fee (i.e. , in addition to those provided for above in this Agreement) , but subject to the continuing operating rules and regulations of the City including, without limitation, the periodic payment of the water usage and sewer usage charges in effect on the date of such application or thereafter reflected in the City's rate schedule. 18. This Agreement shall be binding upon and shall inure to the benefit of the Developer, City and their successors and assigns. However, in the event the Developer has not paid and delivered to the City the plant capacity and service availability charges, fees and other charges provided to be paid to 'tl►e City by Developer under the terms of this Agreement, and all easement and conveyances required by this Agreement, then this Agreement shall not inure to the benefit of the successors or assigns of the Developer. 19. It shall be the responsibility of Developer to locate for builders any water and sewer taps or lines necessary in conjunction with residential or commercial construction. 20. Unless the damage to any onsite improvements are the result of the negligence or willful act of the City, its officers, or employees or authorized agents,, the owner or Developer .of such property upon which the damage occurs shall be responsible for the payment to the City of such damage to City's property including all necessary and reasonable repairs which must be, made by the City or independent contractors engaged by the City to effect such repairs. If the owner or developer of the real property shall fall or refuse to pay costs of such necessary and reasonable repairs to.cure said. damage within thirty (30) days from the submission to the owner 'of a statement' for such charges, the City shall . have a lien against such owner's or Developer's property subordinate to those liens created by or under agreements of record prior hereto, for the payment of such necessary and reasonable costs and expenses for effecting such repairs and restoration to such onsite facilities located upon the owner's or Developer's property. Notice of such lien or claim oJ► lien describing the real property and the amount owed may be filed within ninety (90) days of the date from the last date upon which any such repairs or restoration were made by the City or its authorized representatives. Thereafter, tl►e City shall be entitled to bring an action for the foreclosed under the laws of Florida. 21. Prior to final acceptance of the utility and other public facilities improvements by the City the following requirements must be met at Developer's expense: A. if the property is platted, one copy of tl►e recorded plat shall be furnished to the City. - B. "As built" drawings of utility improvement shall be furnished one week prior to final inspection. "As built" drawings shall be certified by a registered engineer with the cost being borne by tl►e Developer. Two mylar and three printed copies of said drawing shall be furnished to City. C. All lot corners shall be properly marked so that utility company or its engineer call, upon receipt of "as built" drawings, verify the marked water and/or sewer services as to location and depth. In 'addition, for purposes of locating and protecting installed service lines and valves Developer or his contractor shall mark each service line and all valves with an eight (8) foot pressure treated wooden post in the manner as shown on the design drawings and specifications. Developer's contractor is required to install curb stop, meter box and valve box on each water service and valve as shown on design drawings. D. All water and sewer services and valves shall be marked oil the street curb by etching into the concrete or if no curbing is available, a two (2) inch square metal tag is to be nailed to the street's pavement and painted as.specified pn design drawings, C. Developer's contractor shall . furnish a one (1) year maintenance bond in the amount of 100% of the cost of the facilities installed. The bond may be ill tine form of cash, surety bond, or irrevocable letter of credit, the terms of which will indemnify and save harmless the City ,from any loss, damages, costs, claims, suits, debts or demands by reason of defects in the workmanship or materials used in the facilities discovered within a period of one year from and after the date of acceptance by the City of the facilities. , F. A hill of Sale for facilities from the Developer to City. G. Conveyance of easements as required under this Agreement. 11. A deed for .any an4 all land on which lift stations or water stations or other improvements if required by City. I. The title evidence, mortgage • releases and mortgage subordinations as required in this Agreement. J. For onsite and offsite construction provide City an ' accounting of the actual costs (schedule of values) and releases of liens from utility contractors in such detail as the City requires. K. City shall have' the right to refuse to accept title to Developer's construction until Developer's construction has passed certain tests, including, without limitation, closed circuit television inspection of the gravity sewer lines, witnessed by a City representative, to determine whether tl�e Developer's construction is constructed in accordance with the approved engineering plans and specifications. Said tests may be performed at •least three (3) times: the first test upon completion of the system; the second test upon completion of all building, roads, paving, drainage, and all construction within the right-of-way easement area of adjacent areas. A third test shall be required if the City deems it necessary within a one (1) year period after acceptance. L. Letters of acceptance from' the appropriate regulatory agency for the water and/or sewer system, are required prior to final inspection. M. A copy of the certified water pressure test and force main test as applicable. N. The certification by the design engineer that the system was constructed as designed is required prior to final acceptance. 0. hump performance test on pumping stations if applicable. 22. All notices that may or must be given under this Agreement shall •be in writing and shall be valid if mailed by United States ?, registered or certified mail, postage and charges prepaid from addressed as follows: To Developer.: To City of Atlantic Beach City Manager 716 Ocean Boulevard Post Office Box-25 Atlantic Beach, Florida 32233 IN WITNESS WHEREOF, the parties hereto have executed this Utility Agreement the day and year first written above. Signed, sealed and delivered in the presence of: Developer Witness ity of Atla c Beach Witness . 4s - 14- a: x1� CTTY OF X111 xC;(TNT1 J d: BE101 APPLICATION FOR MECHAN ICAL PERMIT Approved By Mechanical Permit Nuaber IbCATIQd S'IREEr ADDRESS: -- 3 CP USE OF BUU DING: �5►1�-,•„�- BUILDING I3UII DI NG PERMIT NWURE CF WORK NEW BUIWING !� REPLACEMWr ALTERATTCN REPAIR ADDITICN OR11Li2 ME MICAL. WORK TO BE DCNE J J PITMTT FEE �TT HQQITO BE I - Z,.t �Z r ,/ - $ z 00 Air 0anditianing tons - #units 2 TYPE UNITS: Heat �3�, '�d BTU'S # units wells now many _ Boilers B73'S #boilers _ Tanks 0-600 gallons over 600 gallons _ Duct Systems: ,%Ov CFM # systems _ ILO , no Autcarabile Lifts: # lifts _ 3 z ElevatQrs/Escalators: #cars #floours _ Fire Sprinkler Systems: #heads _ Fire Standpipes: # standpipes _ Fire Hose Cabinets: # cabinets Fireplaces: how many _ j DEPARTMENT OF BUILDING I CITY OF ATLANTIC BEACH,FLORIDA PERMIT NO. 91 23 . 9 PERMIT TO BUILD THIS PERMIT MUST BE POSTED ON JOB 5040 T Date SePt•22 19 87 NAZI 1A 11/24/87 I Valuation$ Fee$ 50.00 i 9122 001ICAC 1A 1'1 /24/,q7 i i 1`3C1Q 1 This permit not valid until above fee has been paid to City Treasurer,and is subject to revocation for violation of applicable provisions of law. This is to certify that Rivereity Refrig; AZE CAC017SO4 I has permission to�(,i1ii1� install heat/air C Classification New Residential Zone_ RG-1 Owned by Samuel Waters Lot S Block 4 S/D Lewis House No. 2924-1926 Mary Street According to approved plans which are part of this permit NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. PERMIT VOID SIX MONTHS AFTER DATE OF ISSUE 4�—� 4 ----► O Building material,rubbish and debris I from this work must not be placed in public space, and must be cleared up a,41 hauled away by either con- _, try crto or owner. i .t:. Yr Building Official. I� FOR OFFICE PERMIT USE ONLY NUMBER DATE CONTRACTOR PLUMBING ELECTRICAL SEWER WATER \ j CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD j 4 ATLANTIC BEACH, FL 32233 INSPECTION PHONE LINE 247-5826 k' Application Number . . . . . 09-00001060 Date 7/23/09 Property Address . . . . . . 1924 MARY ST Application type description MECHANICAL HVAC ONLY Property Zoning . . . . . . . TO BE UPDATED Application valuation . . . . 0 ---------------------------------------------------------------------------- Application desc 1 cu 1 ahu ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ MANN AIR WRIGHT HEATING AND AIR 1924 MARY STREET 5625-11 VERNA BLVD ATLANTIC BEACH FL 32233 JACKSONVILLE FL 32205 (904) 378-3277 ---------------------------------------------------------------------------- Permit . . . . . . MECHANICAL HVAC PERMIT Additional desc . . Permit Fee . . . . 75 . 00 Plan Check Fee .00 Issue Date . . . . Valuation . . . . 0 Expiration Date . . 1/19/10 ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 75 . 00 75 . 00 . 00 . 00 Plan Check Total . 00 . 00 . 00 . 00 Grand Total 75 . 00 75 . 00 . 00 . 00 PERMIT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF ATLANTIC BEACH ORDINANCES AND THE FLORIDA BUILDING CODES. 4r} CITY OF ATLANTIC BEACH �oAI I I I I BW SEMINOLE ROAD,ATLANTIC BEACH,FL 32233 7 I `I OFFICE:(9D4)247-5826•FAX NO.:(904)247-5845 BUILDING-DEPTCCOAB.US MECHANICAL PERMIT APPLICATION DUVAL COUNTY 1.JOB ADDRESS: Z 13 THISA SUB PER 3.DATE: 8140 3 Lt OYES PERMIT#: PROPS 7 f R: 4.NAME: 5.ADDRESS IF DIFFERENT FROM JOB ADDRESS: 6.PHONE: l 14 5 '141-1i - MECHANICAL CON J O / ) 7.NAME OF COMk7 NY. l✓ -rh 8.ADDRESS.: L;- V t� 6/0-1 9.STATE OF FLORIdA LICENSE NO: 10.CELL PHONE: 11.FAX N a14 e os3 3 - 7y6 � ' 3 ;;1 12.EMAIL ADDRESS'. I r_� � 13.OFFICE PHONE: �� � �� � 14. Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. This permit becomes null and void if work is not commenced within six(6) months,or if construction/or work is suspended or abandoned for a period of six(6)months at any time after work is commenced. ARI CONTRACTORS SIGNATURE: Z � 16.CLASS OF WORK: 16.BUILDING: 1T.SERVICE: IS.CURRENT CODE; ❑NEW INSTALLATION ❑NEW ❑RESIDENTIAL 13'07 FLORIDA BUILDING CODE- ❑REPLACEMENT OF EXISTING SYSTEM ❑EXISTING ❑COMMERCIAL MECHANICAL ❑ALTERATION 1 ADDITION TO EXIST SYSTEM ❑REPAIR ❑OTHER MECHANICAL EQUIPMENT TO BE TAU.ED: 19.HEAT: ❑SPACE ❑RECESSED ❑CENTRAL ❑ FLOOR BURNERS: 20.AIR CONDITIONING: ❑ROOM ❑CENTRAL 21.DUCT SYSTEM: MATERIAL: THICKNESS: MAX CAPACITY: drn 22.REFRIGERATION: MAX CAPACITY: cfm 23.COOLING TOWER: CAPACITY: gpm 24.FIRE SPRINKLER: NUMBER OF HEADS: 25.LIFT SYSTEM: ELEVATOR: MANLIFT: ESCALATOR: AUTOLIFT: 26.COMMERCIAL HOOD NUMBER: 27.FIREPLACE: PREFABRICATED: MASONRY: 28.IRRIGATION: ❑PUMP ❑WELL ❑ PIPING 29.GAS PIPING: #OF OUTLETS: ❑GAS AHU: ❑GAS WATER HEATER: 30.OTHER-SPECIFY: SOLAR HEATING, BOILERS,UNFIRED PRESSURE VESSEL,HEAT EXCHANGER OR COIL IN DUCTS ETC, IVALUE FOR OTHER ITEMS: 31.COOLIING EOLNPMENT. R CONDITIONING, IENSORS.ETC, NUMBER APPROVING OF UNITS DESCRIPTION MODEL# MANUFACTURER TONS AGENCY C R 32.HEATING EQUIPMENT: NUMBER FURNACES. lAIR HANDLERS ETC, APPROVINZT_ OF UNITS DESCRIPTION MODEL# MANUFACTURER BTU AGENCY A �r U &f 33.TANKS: NUMBER GALLONS CONTAINED MANUFACTURER SERI AL# AGENCY BLDGD4 PermitApp"on Rech:REVISED:12JI8J2008 l DEPARTMENT OF BUILDING 912 4 CITY OF ATLANTIC BEACH,FLORIDA PERMIT NO. PERMIT TO BUILD THIS PERMIT MUST BE POSTED ON JOB iDate SM.22 19 87 Valuation$ Fee$ 104.00 04onn t This permit not valid until above fee has been paid to City Treasurer,and is �+ subject to revocation for violation of applicable provisions of law. n - C14L1K s 6. This is to certify that DICKWORTH PLUMBING 9124 00CACI innem �nnrl has permission to bll jMX install nlumhing Classification New Residential Zone RG-1 Owned by Samuel Waters Lot 5 Block 4 S/D Lewis House No. 1924-1926 Mary Street According to approved plans which are part of this permit NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. PERMIT VOID SIX MONTHS „ AFTER DATE OF ISSUE 4 01 4--- 0 O Building material,rubbish and debris z from this work must not be placed in public space, and must be cleared up and ha ed away by either con- tractor ;tner, Building Official. FOR OFFICE PERMIT DATE CONTR OR USE ONLY NUMBER PLUMBING ELECTRICAL SEWER WATER CITY OF ATLANTIC BEACH APPLICATION FOR PLUMBING-PERMIT JOB LOCATION 2-' PLUMBING CONTRACTOR LICENSE NUMBUS OWNER I BUILDING CONTRACTOR TYPE OF BUILDING SINKS SHOWERS LAVATORY WATER HEATERS BATH TUBS DISHWASHERS URINALS DISPOSALS CLOSETS - WASHING MACHINE FLOOR DRAINS EUV TOTAL FIXTURE COUNT . INSTALLATION OF PLUMBING AND FIXTURES MUST BE IN ACCORDANCE WITH THE MOST RECENT EDITION OF THE SOUTHERN STANDARD PLUMBING CODE, c d r�z CITY OF ATLANTIC BEACH, FLORIDA Approwd by APPLICATION FOR ELECTRICAL PERMIT a TO THE CHIEF ELECTRICAL INSPECTOR: DATE: `a� � IMPORTANT NOTICE: IN CONSIDERATION OF PERMIT GIVEN FOR DOING THE WORK AS DESCRIBED IN THE FOLLOWING, WE HEREBY AGREE TO PERFORM SAID WORK IN ACCORDANCE WITH THE ATTACHED PLANS AND SPECIFICATIONS, WHICH ARE APART HEREOF, AND IN ACCORDANCE WITH THE ELECTRICAL REGULATIONS, CODES AND CITY OF ATLANTIC BEACH ORDINANCES. BILL THOMPSO:N ELECTRIC CO.,; INC. P. 0. BOX 50398 G'G� 6e (4 JACKSONVILLE BEACH, LECTRICAL FIRM: N&TER ELECTRICIAN JOURNEYMAN mi ' rNAME1 (-� � CQ�_ADDRESS: (Q?-4 Ls2�Qay II�RFD-BOX- BLDG. D BOX.BLDG.SIZE BETWEEN: RES.( P APT.(XI COMM.( 1 PUBLIC( 1 INDUS.1 1 NEW( 1 OLD ( 1 REW.( 1 ADDITION ( 1 TRAILER ( 1 TEMP.f i SIGNS ( 1 SQ.FT. SERVICE: NEW INCREASE( 1 REPAIR ( ► FEE CONDUCTOR SIZE AMPS 0 COPPERf ALUM. 4-p SWITCH OR BREAKER /a AMPS PH VOLT RACEWAY EXIST.SERV.SIZE AMPS PH W VOLT RACEWAY FEEDERS NO. SIZE NO. SIZE NO. SIZE LIGHTING OUTLETS CONCEALED OPEN TOTAL RECEPTACLES CONCEALED OPEN TOTAL O.JO AMP8. Ji-t00 AMPS. SWITCHES INCANDESCENT ,FLUORESCENT&M.V. FIXED 0.100 AMPS. OVER 'APPLIANCES BELL TRANSF. AIR H.P.RATING H.P.RATING ``CONDITIONING COMP.MOTOR OTHER MOTORS AMPS CEIL HEAT: KW-HEAT 0.1 OVER :MOTORS H.P. VOLTAGE PHS NO. 1 H.P. VOLTAGE PHS MISCELLANEOUS TRANSFORMERS: UNDER 600 V. OVER 600 V. NO. I KVA I NO. Ii(VA NO.NEON TRANSF. NO. VA. MA. MOTOR SIZE I SWITCH I FLASHER EACH SIGN FORWARDED TOTAL FEES PLANS REVIEW CHECK LIST Address_�� I---� ;r� f - -------- Owner r _ '. ------------- � _ ------ µ; Legal Description _Contractor _'66=4:'( d t ---------- ------- - _ ---- License Number_ ------- License ----------- on File YES NO Section 24_101 * Zoning Regulations Zoning District__f-&---t-____ Proposed Use__ �GL ----- Required Lot Size �` f(�d q Size_ Actual Actual Lot Size Setbacks Required Provided Section 24-17 front CORNER LOf INTERIOR LOT rear --- �-- - ---- - �--- -- /� Flood Zone___ - side-1 ------ / Required Elevation__n�ft__ side-2 Gj Max. Height Allowed--- Proposed Height_ c_{Y------ Section 24-82 * Minimum Lot Covv_eragg Required Heated Area Proposed Area Section 24_161 * Offstreet Parking Number Spaces Required__q___ Spaces Provided q------ Section 24=82 * Duplicate Buildings Is there a similar building within 500' of proposed building?YES NO Utilities Water and sewer service is to be provided by: ----- Buccaneer Utilities _-_v City of Atlantic Beach Utilities ----- Private Sourc SEPTIC TANK WELL Plans Reviewed b : t C.�d " ,r y _#_ �a c.t - ---------Date Building Permit #_ �c __ ISSUED DENIED 1 DEPARTMENT OF BUILDING 91.22 CITY OF ATLANTIC BEACH,FLORIDA PERMIT NO. ` PERMIT TO BUILD THIS PERMIT MUST BE POSTED ON JOB 10P4.75 T 3P4.75CKT Date Sept. 22 19 87 6372 to I nIG618 Valuation$94,472-GQ Fee$ %7d 7R 9 12 21 •t?OM 6,972 1 A 10/0615 This permit not valid until above fee has been paid to City Treasurer,and is 1�IAI subject to revocation for violation of applicable provisions of law. This is to certify that Samuel Waters CRCf33346$ 1707 N-71--t Street T A 17290 has permission to build 1kLp1�Y,. Nn STMT T AR RIT71 BTNG WTTHTN 51011" Classification NAW Rt;g i dnt i ni Zone RG-1 Owned by Samuel Waters Lot_ S Block 4 SMswis House No. 1924-1926 Mars► Sheet According to approved plans which are part of this permit NOTICE,-ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. PERMIT VOID SIX MONTHS „ AFTER DATE OF ISSUE 4 10 O Building material,rubbish and debris z from this work must not be placed in public-space, and must be cleared up led away by either con- an owner.J/ s f ding Official. FOR OFFICE PERMIT DATE CONTRACTOR USE ONLY NUMBER PLUMBING ELECTRICAL SEWER WATER ,.ales. N Address- Lo T- � � L 1,-\ /y � FcjrS suep-<v�s ,IAj 116ated Square rootage @ $ _per sq ft Garage/Stied @ $ per sq ft $ Carport/Porch — @ $ per sq ft = $ Beck —�— @ $ per sq ft = $ Patio 3 @ $ C�_per. sq f t = $ 0 9e1 ,©() _ TOTAL VALUATION To—tal Valuation 1st $ y .�� o. o a � $ '7d• o a Ren�ind r Valuation er thousand or , portion thereof -------------------------------------------- Total Building Fee �_ ADDITIONAL PER EIS and/or F=,S REQUIRED i +" filing Fee ' $ 9 �S i Hechamical "Fireplaces @ 15.00 Pluibing I BUILVINGIP -ERMIT $ ,2141, 75 Electric/Necq --------------------- ------------- ------------ Electric/Tec -- h _ Septic Tank BUILDING-PERMIT $ 3([/ 7,5 Well WATER METER CIIARGC $ / �y S draining Pool SEWER IMPACT FEE $ p,qo 7e O d Sign WATER IMPACT PEE $ J366. e) Water Comiection MISCELLANEOUS $ Sewer Connection / $ Water Meter / $ Elevation Certificate GRAND TOTAL DUE $ o ray ------------------------------------------- -------------------------------------------------- CALCULATIONS anti/or NO'T'ES , City of Atlantic: Beach Fixture Unit Worksheet for Water .Impact .Fee FIXTURE UNITS ARE ESTABLISHED AS THE MEASUREMENT OF WATER DEMAND FOR EACH WATER FIXTURE UNIT INSTALLED AND CONNECTED ,TO THE CITY WATER SYSTEM. THE WATER SUPPLY CHARGE IS HEREBY FIXED AT TEN DOLLARS PER FIXTURE UNIT CONNECTED TO THE CITY WATER SYSTEM. ;___BATHROOM GROUP CONSISTING OF ©__SERVICE SINK TRAP STAND WATER CLOSET, LAVATORY & BATH (8) TUB OR SHOWER STALL (6) ZWATER CLOSET VALVE WATER CLOSET, TANK OPERATED (4) VALVE OPERATED (8) BATHTUB/SHOWER ' (2) _URINAL WALL LIP (4) O . SHOWER GROUP PER HEAD (3) _FLOOR DRAIN (1) SHOWER STALL DOMESTIC (2) _LAUNDRY TRAY (2) _ LAVATORY (1 ) ___ _COMBINATION SINK AND TRAY (3) �- WASHING MACIIINE (3) _POT, SCULLERY SINK (4) _Z_DISHWASIIER (2) _�_ _WASH SINK EACH SET OF FAUCETS (2) 2 KITCHEN SINK (2) _ __DENTAL LAVATORY (1) 0_ KITCHEN SINK WITH WASTE -GRINDER (3) _DENTAL UNIT OR CUSPIDOR (1) __0_BIDGET (3) URINAL STALL, WASHOUT (4) _v__FLUSIIING RIM SINK (8) _____COMBINATION SINK AND TRAY WITI FOOD DISPOS. (4) URINAL, PEDESTAL, SYPHON JET BLOWOUT (8) v___DRINKING FOUNTAIN (1/2) __L./__LAVATORY, BARBER/BEAUTY SHOP (2) _LAVATORY, SURGEONS (2) -0_SURGEONS SINK (3) 0 _ICE MAKER (1/2) 00 TOTAL FIXTURE UNITS0 010. 00 EACH 0 3 Ce JOB INFORM ATION__- � _ I �� ___�=`_-. � S( CITY OF ATLANTIC BEACH APPLICATION FOR BUILDING PERMIT Owner ----- -------V--t�------Address - - --7-N-'-2-1-------Sax_. -zip3 50 phone-.-#-/-3--7-JQ Architect YY ,�ro)yl^3-----Address T �a a z�7phoneP_ � Contractor_SgMjAf'l W• ---- VIAftC A_dd_ e_ss/);-�,-Wts-7-•_J-Q-X_��-�zip�ZZ.-$O p hone 2-�-1- ,375� Contractor's License number ___ ex iration_ E— - 17 -_-- Lot-- 15Block or Section_-- -----Subdivision— L e bv►S______Zoning_P1-C7-J__ Street At- .......between. +evA r' and CL Type Construction_Era&uc-------No. Units____�,____No. Fireplaces____: _____ t , Purpose of Building__ ----------Est. Valuation 8_-9 7) 5r-o Utility Method - Water T Sewer Dimensions - Building ` X , ?_;�` ___Lot-_6 X /0-�+_Size Footings-/d X 2,0 Sz. Piers _ Sz. SillsU _ Greatest Sn Sills6____ _ Sz. Ceiling JoistsTrks5 _Distance on CentersGreatest Span_ __ 3 _-_ Sz. Floor Joists _Q,,.,X/ ODistance on Centers__ " ___Greatest Span__/ r_ Sz. Rafters ra .S­Distance on centers__ ____Greatest Span__J___ Method of Heating erg ___Solid or Filled Ground_5a.Lt j-----Roof E -_ Flood Zone__ C-)__If located within a FLOOD HAZARD ZONE complete page 3 In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with the attached plans and specifications, which are a part hereof, and in accordance with the building regulations of Atlantic Beach. The contractor agrees at its expense to provide the necessary access to the properties being developed over dedicated City rights-of-way and to clear, clean, grade, and drain said right-of-way to City specifications. Signature Owner________ - __-- ----------------- Signature Contractor _ c 'A---'' Date----------------- page 2 r- 00 o, o o (.. c 0 0 O CITY OF ATLANTIC BEACH M tp4cm O 'd ATLA TELEPHONE: 2 9-2395 2F-PA I. Q >G.N N X UTILITY BILL OCT 06 1987 'i") DATE WATER WATER SEWER GARBAGE OTHER TDUE NL METERS 1 rA 87 3lq I/ ORDER. T kiKE RE IPT TO PUBLIC $S'00 WORKS PT. TO SCHEDU WORK. 1200 &Q DPIPER LaL RETAIN THIS STUB SERVICE DISCONTINUED PAYABLE IN ADVANCE IF NOT PAID WITHIN NO REFUNDS 30 DAYS OF DATE SHOWN I� CITY OF ATLANTIC BEACH, NTIC BE I D TELEPHONE: 249.2395 Q OO OCT 08 1987 n N ,I 0 MIn UTILITY BILL LL M M Z DATE WATER WATER SEWER GARBAGE OTHER TOTAL I I METERS DUE O rH _ I .3 4. TRDER. TACE RECE PT TO UBLIC oviC06 4J 4J 'td' � 'JORKS DJ- T. TO CHEDU WORK. Q, a o 2U Sal VER ARE. ' RETAIN THIS STUB -41 PAYABLE IN ADVANCE SERVICE DISCONTINUED 1 - 4-) N NO REFUNDS IF NOT PAID WITHIN N a 30 DAYS OF DATE SNOWN Vf - 7 Ill W Cie ' Z Q U Y < F V DR-1u FLORIDA DEPARTMENT OF REVENUE N.7187 CERTIFICATION OF PAYMENT OF FLORIDA USE TAX I hereby affirm that I am aware of the provisions of Florida law which imposes a 5 percent tax on the use in Florida of goods and services purchased outside of Florida; that it is the obligation of the purchaser to remit the tax to the Florida Department of Revenue if it was not collected by the seller; and that I have remits or will remit any applicable Florida use tax to the Department of Revenue in the month(si of ,- - - . 19 [1] Type of License 4-51)<k�4'4 Cn�rOC4'1'[2] License Number C-kca 33q6-T [3] Type of Business Activities 54 Y`u C t` tA-- [4] Issuing Authority C- [5] Date of issuance [6] Name t 4e_( [Al q er . Address /20'7".2-1, City,State,Zipr,x. 6L f u. 3Z150 Sales Tax Number '> / p- Telephone Number „4 7 — /0 Ia �0 f Signature of Applicant Date l IssuingAut r S7- Ign'atu of Government Official v BUILDING, PLANNING AND ZONING INSPECTION DEPARTMENT CITY OF ATLANTIC BEACH, FLORIDA CERTIFICATE OF OCCUPANCY WORK SHEET Date Requested : February 19, 1988 Building Contractor: Samuel Waters Building Permit Number: 9122 Address: 1924 Mary Street Legal Description: Lot 5 Block 4 Lewis Subdivision Improvements to the above described property have been completed in accordance with the terms of the permit and is certified to be ready for occupancy as Duplex ----------------------- Lowest Floor Elevation: -- XXXXXXXX ---------- -------- ---------- required as built n/a Sales Tax Certificate: date subM tted BEFORE ISSUING CERTIFICATE OF OCCUPANCY THE FOLLOWING MUST BE COMPLETE DEPARTMENT DATE NOTIFIED: DATE A, PROVED: BY: Fire Chief ___ 2(191883 Public Works _2(19188______ Planning Director 2/19/88 O Building Inspector ___ 2/18/88 _____ Wrtiftxttft Of (OrrItValtry CITY OF ErVarfmrtu of Builbtug Ataprr#inu This Certificate issued pursuant to the requirements of Section 109 of the Southern Standard Building Code certifying that at the time of issuance this structure was in compliance with the various ordinances regulating building construction or use. For the following. Use Classificati z E?? a.�- Bldg.Permit No. % 1 Group Type Construction Fire District Ownar of Building _ Address - buiiding Address_ Locality_--, z.r rrn >m Br_ Building Official Date: s POST IN A CONSPICUOUS PNCE ttAlUat O of CITY ,� Y�tIIn ntY �q of the Southern Standard Section i liance with the the requirements of re tas ill come ursuant t0 this structu to issued P issuance ollowi�tg. t the time of I or the f This Certifica ,that a use. certif yin ction or Code ff constru o Building Matin; M BUILDING, PLANNING AND ZONING INSPECTION DEPARTMENT CITY OF ATLANTIC BEACH, FLORIDA CERTIFICATE OF OCCUPANCY WORK SHEET Date Requested : February 19, 1988 Building Contractor: Samuel Waters Building Permit Number: 9122 Address: 1926 Mary Street Legal Description: Lor S Block 4 Lewis Subdivision Improvements to the above described property have been completed in accordance with the terms of the permit and is certified to be ready for occupancy as Dupl ex ----------------------- Lowest Floor Elevation: XXXXXXX ---------- ---------- ---------- required as built n/a Sales Tax Certificate: date submitted BEFORE ISSUING CERTIFICATE OF OCCUPANCY THE FOLLOWING MUST BE COMPLETE DEPARTMENT DATE NOTIFIED: DATE /APPROVED: BY- Fire Chief 2/19/88 -_ / 3 - - Public Works 2/19Z88 2/19/88 Planning Director _ ----------- -- --� =_ ---- --- -- Building Inspector 2/18/88 DR-1CO FLORIDA DEPARTMENT OF REVENUE N. 7/87 APPLICATION FOR CERTIFICATE OF OCCUPANCY I hereby certify that the property described below: / Contract Identification Number Description of Property r / (Exa ple: house, commercial building, road, bridge, etc.) 33 33Y' 6 Contractor's Certification # Issued by Department of Address of Improved Property Professional Regulations, // _ /�� S ], If Applicable `- - l r� City41.c„, r L a(g c 5 - State Zip Zip Sales Tax Registration # �! Iti (. is substantially completed and that we are registered for paying Sales and Use Tax with the Florida Department of Revenue. j�f i Name of Prime Contractor/General Manager e5 4 r.1 k e- A/• I-r'S Address k' 5T 5 f. City, State, Zip E,x C) Total Contract Materials $ &.d f'cx ,-5 Total Contract Labo To a $ off- 4L Signature of Prime Contractor/General Manager Date Signature f County Official Date CITY OF 1*&atic gala - 57&ui(a 716 OCEAN BOULEVARD P.0.BOX 26 ATLANTIC BEACH,FLORIDA 32233 TELEPHONE(904)249-2396 February 19, 1988 Third Floor Pre-Service Section Jacksonville Electric Authority Building 233 West Duval Street Jacksonville, Florida 32202 The following final inspections have been made and are satisfactory: Permit #5759----1924 Mary Street Permit #5760----1926 Mary Street Permits issued to Bill Thompson Electric Company. Permit #4912-- -683 Sturdivant Avenue Permit #4913----685 Sturdivant Avenue Permits issued to Brooks $ Limbaugh Electric Company. Permit #5853,----1958 Beachside Court Permit issued to Allstate Electrical Contractors. • Permit #5842----2266 Oceanwalk Drive West Permit issued to Bivins Electric Company. �_... i itc" •c l y, Rene Angers Com ntiy Developme Director RA/tb cc: file Ss ' CITY OF ATLANTIC BEACH � \ 800 SEMINOLE ROAD J - ATLANTIC BEACH,FL 32233 INSPECTION PHONE LINE 247-5826 Application Number . . . . . 08-00000768 Date 6/03/08 Property Address . . . . . . 1924 MARY ST Application type description PLUMBING ONLY Property Zoning . . . . . . . TO BE UPDATED Application valuation . . . . 0 ---------------------------------------------------------------------------- Application desc INSTALL 13 FIXTURES ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ MANN PLUMBING BY JOSH 1924 MARY STREET 44170 COMMANCHE RD ATLANTIC BEACH FL 32233 CALLAHAN FL 32011 (904) 745-3330 ---------------------------------------------------------------------------- Permit . . . . . . PLUMBING PERMIT Additional desc . . Permit Fee . . . . 126 . 00 Plan Check Fee . 00 Issue Date . . . . Valuation . . . . 0 Expiration Date . . 11/30/08 ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 126 . 00 126 . 00 . 00 . 00 Plan Check Total . 00 . 00 . 00 . 00 Grand Total 126 . 00 126 . 00 . 00 . 00 PERMIT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF ATLANTIC BEACH ORDINANCES AND THE FLORIDA BUILDING CODES. CITY OF ATLANTIC BEACH s< 800 SEMINOLE ROAD,ATLANTIC BEACH,FL 32233 07-: ..._. ti OFFICE:(904)247-5826•FAX NO.:(904)247-5845 . J BU ILDING-DEPT@COAB.US r PLUMBING PERMIT APPLICATION DUVAL COUNTY Atlantic Beach FL 32233 ❑YES PERMIT#: 4.NAME: 5.ADDRESS IF DIFFERENT FROM JOB ADDRESS: 6.PHONE: 7.N OF COMPANY: —r. 8.ADDRESS �D 1�i`► `46 qJ�� 4#f/ fin,,,j 3a o 9.STATE OF FLOR A LICE SE NO: 10.CELL PHONE: 11.FAX NO.: 12.EMAIL ADDRESS: ,��0� 01 � 13.OFFICE PHONE: r��� © 14. :zqT Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. This permit becomes null and void if work is not commenced within six(6) months,or if construction or work is suspended or abandoned for a period of six(6)months at any time after work is commenced. CONTRACTORS SIGNATURE: ❑ NEW RE-PIPE BATH TUB SEWER CONNECTION BIDET SHOWERS r DISH WASHER SHOWERS PANS DISPOSAL SINK DRINKING FOUNTAIN WATER CLOSET TANK FLOOR DRAIN WATER CLOSET VALVE HOSE BIB _� WASHING MACHINES 1 ICE MAKER WATER CONNECTION INTERCEPTOR WATER HEATER LAVATORY URINALS LAUNDRY TRAY OTHER (SPECIFY): SEE BACKFLOW AND IRRIGATION PROCEDURE SHEET ROOF DRAIN PERMIT ISSUING FEE: $35.00 TOTAL FIXTURES: x $7.00 (PER FIXTURE) + $35.00 = COAB FORM BLOG03:REVISED:8/13/2007 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION SECTION 9—RESIDENTIAL POINT SYSTEM METHOD CLIMATE ZONES FORM 900-A-86 DEPARTMENT OF COMMUNITY AFFAIRS NORTH 1 2 3 This form may be used to demonstrate compliance with the Energy Code for new single-family detached or multifamily attached dwellings under Section 9.An alternative to this method for single-family detached dwellings,and multifamily attached dwellings of three stories or less,is provided in Section 10.Multifamily attached dwellings greater than three stories must comply under Section 9 or 5.Additions to existing residential buildings must comply under Section 9 or 10.Additional information may be obtained from your local building department or the Department of Community Affairs,Energy Code Program,2571 Executive Center Circle East,Tallahassee,Florida 32301.8244. PROJECT NAME PERMITTING OFFICE: AND ADDRESS: CIRCLE CLIMATE ZONE: 1 2 3 BUILDER: PERMIT NO.: OWNER: 5 Q yy A e Vv Q-�ers JURISDICTION NO.: DETACHED GLASS AREA AND TYPE CHECK IF WORST IF MULTIFAMILY, NEW F-� ADD. CASE CALCULATION: N NUMBER OF UNITS: CLEAR TINT,FILM,SOLAR SCREEN CONDITIONED CEILING INSULATION ATTACHED FLOOR AREA UNDER ATTIC SGL.ASSEMBLY I I SGL F1 I I I SGL NEW ADD. IOU R =©.O R =�.❑ ZlxiqDBL DBL Al NET WALL AREA AND INSULATION CBS R= FRAME R= STEEL STUD R= LOG R= []].[] I 11L50IJ [&] I I I I I I M I I I I I]] [:[]- DUCTS COOLING SYSTEM HEATING SYSTEM HOT WATER SYSTEM IN UNCOND. SPACE CENTRAL ❑ NONE ❑ ELECTRIC STRIP HEAT PUMP ELECTRIC ❑ SOLAR R = E&P ❑ ROOM ❑ NATURAL GAS ❑ ROOM/PTHP ❑ NATURAL GAS ❑ HEAT RECOVERY IN GOND. ❑ PTAC ❑ OTHER FUELS ❑ NONE ❑ OTHER FUELS ❑ DED.HEAT PUMP SPACE R = SEER/EER = ®. COP/AFUE _ ©. � EF = ,® SF/EF = ❑.m ❑.❑ NUMBER OF BEDROOMS = El� I INFILTRATION PRACTICE USED Z � � T X 100 = #1 #2 El #3- TOTAL AS-BUILT POINTS TOTAL BASE POINTS CALCULATED E.P.1 CALCULATED ENERGY PERFORMANCE INDEX MUST NOT EXCEED 100 POINTS. In accordance with Section 553.907 F.S., I hereby certify that the plans Review of the plans and specifications covered by this calculation indicates and specifications cove by this calcul n are in can liar with the compliance with the Florida Energy Code.Before construction is completed,this Florida Energy Code. building will be inspected for oo +a in acoor ena�y�' Sectio 53.908 F.S. OWNER IAGE NT: BUILDING OFFICIAL: ` DATE: DATE: ` 9A I PRESCRIPT MEASURES Mu met or exceeded by all residences.) COM NENTS SECTIONE T CHE WINDOWS 904.1 MAXIMUM OF 0.5 OFM PER LINEAR FOOT OF OPERABLE SASH CRACK. EXTERIOR& 904.1 MAXIMUM OF 0.5 CFM PER SQ. FT.OF DOOR AREA. INCLUDES SLIDING GLASS DOORS,SOLID CORE, ADJACENT MQRS — WOOD PANEL,INSULATED, R GLASS DOORSONLY. EXT.JOINTS& 904.1 TO BE CAULKED,GASKETED,WEATHERSTRIPPED OR OTHERWISE SEALED. CRACKS MUST BEAR LABEL INDICATING COMPLIANCE WITH ASHRAE STANDARD 90 OR COMPLY WITH EFFICIENCY AND WATER HEATERS 904.2 STANDBY LOSS REQUIREMENTS. SWITCH OR CLEARLY MARKED CIRCUIT BREAKER(ELECTRIC),OR CUT-OFF A NUST BE PROVIDED. AN EXTERNAL OR BUILT4N HEAT TRAP MUST BE PROVIDED. SWIMMING POOLS 904.3 SPAS&HEATED POOLS MUST HAVE COVERS(EXCEPT SOLAR HEATED). NON-COMMERCIAL POOLS MUST &SPAS HAVE A PUMP TIMER. GAS SPA&POOL HEATERS MUST HAVE MINIMUM THERMAL EFFICIENCY OF 75%. HOT WATER 904.4 INSULATION IS REQUIRED ONLY FOR RECIRCULATING SYSTEMS, IN SUCH CASES,PIPING HEAT LOSS SHALL Plegs BE LIMITED TO 17. T /H/LINEAR FOOT OF PIPE. SHOWER HEADS WATER FL W MUST BE RESTRICTED TO NO MOREAN 3 GALLONS PER MINUTE AT 20 TO80 PSIG. HVAC DUCT 903.2 CONSTRUCTED 1N ACCORDANCE WITH INDUSTRY STANDARDS&LOCAL MECHANICAL CODES. DUCTS IN CQNSTRUCTION 904.6 U—NCONDITIONED SPACE MUST BE INSULATED T - 4.2&JOINTST BE SEALED. I HVAC CONTROLS .7 1 SEPARATE READILY A E I A R AUTOMATIC THERMOSTAT FOR EACH SYSTEM. R-19. -1- qLASS BASE T GLASS SINGLE OR DOUBLE x SOF AS-BUILT AREA x SUMMER AREA X GLASS POINTS • . TOTAL BASE BASE ADJUSTED •• GLASS :,_ •; I —SUBTOT#L 134SE SP • BASE SUM.PT. COMPONENT AREA BASE SUM. SUMER AREA xCOMPONENT DESCRIPTION X PT.MULT. • . SUMMER • . COOLINGE WD USE FL(TffVA2Et-OF riviNDITMIED SPACE, TOTAL BASE TOTAL AS-BUILT UILT SYSTEM SUM,PTS, I •i,iPOIVTS NUMBER BASE NUMBER I AS-BUILT Assuiu AS-BUILT HOT BASE OF x HWM x HWCM HOT WATER WATER i : • . HorizontalSYSTEM Shadingroc 91 HEATING SYSTEM MULTIPLIERS(HSM) CLIMATE ZONES 1 2 3 SYSTEM TYPE HEATING SYSTEM MULTIPLIERS Heat Pump COP 2. -2.69 2.7-2.89 2,9-3.09 3.1 -3.29 3.3.3.49 3.5-3.69 3.7 Up - H .5 2 .4 .42 .40 .38 Electric ri HSM 1. Gas&Other Fuels HSM 1.0 Table 9J for Credit Multi tiers PTHP&Room'Units HSM HSM for COP 2.2-2.4 = .63. See above for COP>2.49. Minimums:Central Units 2.5 COP. PTHP&Room Units 2.2 COP. COP means Coefficient of Performance. 9J HEATING CREDIT MULTIPLIERS(HCM) STEM TYPE HEATING SYSTEM MULTIPLIERS Multizone HCM .90 Natural Gas AF .60-.64 .65-.69 .70-.74 .75-.79 .80-.84 .85-.89 90 Uo - H M 4 .46 .40 .38 .36 Other Fuels HCM .77 .72 7 9 .56 Where more than one credit is claimed,multiply HCM's together.Enter product on page 4. AFUE means Annual Fuel Utilization Efficiency. 9K COOLING SYSTEM MULTIPLIERS(CSM) SYSTEM TYPE COOL Y MULTIPIERS SEER 7.8- 8.0- 8.5 9.0- 9.5 10.0 10.5- 11.0- 11.5- 1 12.0. Central Units 7.9 8.4 8.9 9.4 9.9 10.4 10.9 11.4 11.9 1 &UD CSM .44 .4 38 .34 .32 .31 .30 28 PTAC&Room Unit CSIVI CSM for EER 7.5 .7 = .46. For EER's>7.7 use multi liers above. Minimums:Central Units 7.8 SEER. Room Units 7.5 EER. PTAC under 13,000 BTU/H 7.5 EER,and over 13,000 BTU/H 7.0 EER. SEER means Seasonal Energy Efficiency Ratio. EER means Energy Efficiency Ratio. 9L COOLING CREDIT MULTIPLIERS(CCM) SYSTEMTYPE COOLING C T MULTIPLIERS Ceilina Fans CCM 8 Multizone M 0 Cross Ventilation r Whole House Fan(Credit for o ly one) M .95 Where more than one credit is claimed multiply CCM's together. Enter product on page 2. 91M HOT WATER MULTIPLIERS(HWM) SYSTEM TYPE HOT WATER MULTIPLIERS Electric EF .80-.81 .82-.83 .84-.85 .86-.87 .88-.90 "'9J -.93 .94-.96 7&UP Resistance HWM 4183 4081 3984 3891 3803f 78 : 3560 3450 Natural Gas EF .48-.49 .50-.51 .52-.53 -.57 59 .60-.61 .62&Up HWM 2259 2169 2085 2008 1936 1870 1807 174 Other Fuels HWM 3494 3354 322,510 2891 2795 2705 Water heaters must comply with prescriptive measures of Table 9A. EF means Energy Factor. 9N HOT WATER CREDIT MULTIPLIERS(HWCM) SYSTEM TYPE T W TER CRE)IT MULTIPLIERS Solar Water Heater SF .1 .2 1 .3 1 .4 1 .5 .7 .8 .9 1.0 HWM .9 .7 .5 .4 .3 .2 .1 .0 Heat Recovery Unit With Air-conditioner H at Pump HWM 2 A8 Dedicated Heat Pump EF 2.0-2.49 2.5-2.99 3.0-3.49 3. W .44 2 F- A HWM must be used in conjunction with all HWCM.See Table 9M. SF means Solar Fraction. EF means Energy Factor. 9P INFILTRATION REDUCTION PRACTICE COMPLIANCE CHECKLIST(See Section 903.2(f)) COMPONENTS RER ENT R EACH PRACTICE CHECK PRACTICE#1 COMPLY WITH ALL INFILTRATION PRESCRIPTIVES ON TABLE 9A. PRACTICE#2 COMPLY WITH PRACTICE#1 AND THE FOLLOWING: Exterior Walls andFloors Top plateene i Ied. Infiltration barrier n I . Sole plate/floor' int caulked or sealed. v� Exterior Walls ilin -Pynetrations,ioints and cracksn interior urfa caulked, le and gasketed. Ductwork D ctw rk in unconditioned spacemust be sealed. Fireplaces FAulaped with outside combustion air,doors,and flue d m ers Exhaust Fans -Eaiuipwd.with dampers.Combustion vie s Combustion Appliances Provided with outside combustion air. PRACTICE#3 COMPLY WITH PRACTI ES#1 AND#2 AND THE FOLLOWING: Cellinas Infiltrationi installed. Interior W ll Top platen r t' l r 6oints&cracksn interior IIs caulked,sealed or gasketed. Recessecl i ht I fr m c Eclitioned sgace&insulated from ventilated tti spaces. ctw rkI uctwork located in conditionede. Combustion Appliances Be in unconditioned space(except direct vent),draw air from unconditioned space,exhaust by-products to outside.Stoves see 903.2(Q. -6- WINTER CALCULATIONS CLIMATE ZONES 1 2 3 BASE SINGLE DOUBLE AS-BUILT GLASSBASE GLASS x OR x WOF OR AREA x WPM = WINTER OR AREA WPM WPM (9B) = GLASS PIT EAR TINT* CLEAR TINT" I WIN.PTS. N 7.3 N 13.8 •13.6 7.3 8.1 NE 4.6 NE 10.710.5 6.0 r - .2 E - 3.6 - 9. - 5.7 0. .7 SE -18.1 -17.5 -17. -2 .4 S -24.0 -2 . -28.4 -22.3 W -22.7 W -18.1 -17. - .7 -17. W t - - W - 3.8 - 3.6 - 5.7 NW 4.6 NW 10.7 10.5 6.0 ' H' -Z8.4 H' -67.6 -59.1 -57.7 -45.0 • 5 c� t COND. TOTAL BASE I BASE ADJUSTED AS-BUILT .155 x FLOOR + GLASS = ADJ. x GLASS = GLASS GLASS AREA I AR96 PI FACTOR I PRITOTA4P SUBTOTAL .1 BASE WIN.PT. AS-BUILT COMPONENT AREA x BASE WIN. = WINTER COMPONENT AREA MOLT. = WINTER DESCRIPTION PT.MOLT. P DESCRIPTION 8C THRULT 9G p EXTERI R 2.2 ADJACENT 0 3 ' [.EXTERIOR 15.4 `?iA ]ADJACENT 13.3 1 UNDER ATTIC 1 1.2 Up OR SINGLE 1.2 ASSEMBLY 12 SLAB 8.9K ' RAISED .96 FOR SLAB ON GRADE USE PERIMET&R LENGTH ALONG CONDITIONED FLOOR IN PLACE OF AREA. INFILTRATION74 'USE FLOOR AREA OF CONDITIONED SPACE. TOTAL COMPONENT BASE WINTER POINTS q � 11,11, aia.rr TOTAL BASE TOTAL AS-BUILT I AS-BUILT I AS-BUILT AS-BUILT HEATING BASE HSM x BASE = HEATING AS-BUILT x DM x HSM x HCM = HEATING SYSTEM //ill 1 j�.P �r 9H 91 9J POINTS BASE BASE BASE TOTAL AS-BUILT AS-BUILT AS43UILT TOTAL COOLING + HEATING + HOT WATER = BASE COOLING + HEATING + HOT WATER a AS-BUILT POINTS POINTS POINTS POINTS POINTS POINTS POINTS POINTS ro„ F P.2 F P. n P From .2 From P. P.1 7�0 t-P 19,a.53A 5 1 H = Horizontal Glass(Skylights) " For Shading Coefficient less than 0.83.,see sec.9032(a).Tint Multipliers may be used for glass with solar screens,film,or tint. -4- SUMMER POINT MULTIPLIERS 9B SUMMER OVERHANG FACTORS(SOF) For single and double pane glass. CLIMATE ZONES 1 2 3 ORIEN- OVERHANG RATIO TATION 0.0 0.18• 0.27- 0.36- 0.47- 0.58- 0.71- 0.84- 1.19- 1.73- 2.74- 5.67- .17 0.26 0.35 0.46 0.57 0.70 0.83 1.18 1.72 2.73 5.66 UQ 1. 1 7 .7 .5 .4 NEINW 1. .91 .7 .71 67 .5 .48 .42 .37 1.0 7 7 .47 .39 .31 .2 2 1 .74 .4 2 .27 1 .77 1 4 1 OVERHANG RATIO = L/H T_�L H L H a� H 9C WALL SUMMER POINT MULTIPLIERS(SPM) FRAME CONCRETE BLOCK FACE BRICK LOG INTERIOR INL. EXT.INSUL. R• ALOE WOOD FR WOOD NORM WT. LT NETT .9 2.4 1N H E T A R- E 7- .6 R-V LUE EXT 6 2.2 - 2.9 2 1.1 2. 1.7 11 .1 . .4 0-2.9 1.7=10. 2.1 .8 3 4.9 1. .8 .7 19-25. .2 3.6.9 1.0 11 -12.9 1.7 .7 5. 6.9 1.0 .7 .8 .5 .4 1 26&U .1 7&U .8 13-189 1.5` 7-10.9 .7 .5 .6 .2 R.VALUE BLOCK 8 INCH 19-25.9 .4 11 -18.9 4 .4 .4 .1 2.g 1.0 R-VA E EXT .2 19-25.9 .2 .6 - 0-2. 1.0 STEEL 1 1 7-1.1 4 3-6.9 .7 R_-VALUE EXT ADJ 10&Up 0- 6.9 7.6 2.8 7-10.9 3. 1.3 9E CEILING SUMMER POINT MULTIPLIERS(SPM) 11 -12.9 2.7 -1.0 UNDER ATTIC SINGLE ASSEMBLY CONCRETE DECK ROOF 13-18.9 R- R- A UE SPM CEILIN4TYPE 19-25.9 •2 1 21.9 1.1 5- 6.9 5.8 R-VALUE DROPPED 1. 4 .9 .9 7- 8. 3.9 10.13.9 3.2 26-29.9 .8 9-10.9 3.1 14-20.9 2.-37. .6 11 -1 .9 2.6 21 &U 1.5 13-18.9 2.4 1 1. 9D DOOR SUMMER POINT MULTIPLIERS(SPM) 2 1.2 • IT MULTIPLIER F R TTI RADIANT BARRIER = .55 DOOR TYPE EXT ADJ 9F FLOOR SUMMER POINT MULTIPLIERS(SPM) WOOD 7.7 2.9 SLAB-ON-GRADE RAISED RAISED WOOD EDGE INSULATION CONCRETE (See 903.2(ep INSULATED 8.5 3.1 -V P R-V E PM R•VALUE PM 0-2.9 -41.2 •2.9 - .8 0. 6.9 -1.0 -37.2 3-4.9 -1.3 7-10.9 -1.1 -6. -36.2 -6.9 -1.3 11 -18.9 -1.0 7&U -35.7 7& -1.3 19&U 9G INFILTRATION SUMMER POINT MULTIPLIERS 9H DUCT MULTIPLIERS(DM) INFILTRATION PRACTICE SPM R-VALUE ffm turn (See Table 9P) 4.2-4.9 PRACTICE#1 10.2 5.0-6.6 PRACTICE#2 8.0 6.7&U PRACTICE#3 5.2 DUCTS IN CONDITIONED SPACE -3- WINTER POINT MULTIPLIERS ' �7 0 WINTER OVERHANG FACTORS(WOF) CLIMATE ZONES 1 2 3 OVERHANG RATIO ORIEN- 0.0 0.18- '02 0.36 0.47- 0.58• 0.71- 0.84- 1.19- 1.73- 2.74- 5.67 TATION 0.1 t 1. .7 SINGLE PANE GLASS N 1.0 1.08 1.12 1.16 1 4 1.27 1.31 1 1.45 1.51 1.571 NEINW 1.0 1.13 1.20 1.26 1.33 1 1.45 1.50 1.63 1.74 1.84 1. 93 1 - - - - - -2.51 -3.31 - - 4.64 1 - - .74 - .96 1. 4 - - - .67 - 73 DWO LE PANE C LASS 1.0 1. 1 1. 1 1 1.79 1.88 JWNW 1. 1. 1 1 1. 1. 2. 1 1, .1 - - - - -1. -1.56 .82 .72 1 - .1 - - .57 1. 7 .7 1 - - - 40 1 - .45 OVERHANG RATIO = L/H _ -L H L H a� H 9C WALL WINTER POINT MULTIPLIERS(WPM) FRAME CONCRETE BLOCK FACE 8 1ICK LOG INTERIOR IN L. EXT.INSUIL. R- ALE WOOD FR R R-VALUE EX AN R-VALUE 7-10.9 4.2 A-VALUE EXT 11.1 10.4 1 1 11 -1 •1 4.4 11 -12.9 .7 4 13-18.9 .4 7-10.9 4. 1 I NC 1 2 .2 11 -1 7. R- 1 1. 1 1. .7 STEEL1 1. 7 2.2 R- 7 1. 0 .9 15.1 13.1 7-10.9 7.3 6.6 9E CEILING WINTER POINT MULTIPLIERS(WPM) 11 -12.9 5.7 I i Y CON REE DE ROOF 1 •VA R-VA E WPM COLIN TYPE 19-25.9 4.6 4.4 19-21.9 6.5 R-VALUE DR PPED' EXP ED 22-2 .9 1.7, 7- 6.9 4.3 10-13.9 26 1.4 9 10.9 3.4 14.20.9 2.0 2.1 7.9 1.2 11 -12.9 2.9 21 &Uo. 1.3 1.3 .9 13-18.9 .6 1 2.0 9D DOOR WINTER POINT MULTIPLIERS(WPM) 1' R IT M LTIP I R FOR ATTIC RADIANT BARRIER = .65 DOOR TYPE. EXT ADJ 9F FLOOR WINTER POINT MULTIPLIERS(WPM) WOOD 15.4 13.3 SLAB-ON-GRADE RAISED RAISED WOOD EDGE INSULATIONCONCRETE See 903.2(o)) INSULATED 16.8 14.5 V R-VALUE WPM R-VALUE WPM 18.8 0 9.9 0 .3 3-4.9 5.1 7-10.9 3.0 5-6.9 7: .9 3.6 11 -18.9 2.2 7 7.0 7 2.9 19& 1.4 9G INFILTRATION WINTER POINT MULTIPLIERS 9H DUCT MULTIPLIERS(DM) INFILTRATION PRACTICE R•VALUE With Retum W/O Retum WPM Air Duct Air Duct (See Table 9P) 4.2-4.9 1.14 1.10 PRACTICE#1 10.9 5.0-6.6 1.12 1.08 PRACTICE#2 7.4 6.7&Up 1.09 1.06 PRACTICE#3 4.1 DUCTS IN CONDITIONED SPACE 1.00 1.00 -5- 1 Q,r 4 k , i-�� FLORIDA ENERGY EFFICIENCY CODE N FOR BUILDING CONSTRUCTION FORM 900-A-86 SECTION 9 —RESIDENTIAL POINT SYSTEM METHOD CLIMATE ZONES REVISED:1/87 DEPARTMENT OF COMMUNITY AFFAIRS NORTH 1 2 3 This form may be used to demonstrate compliance with the Energy Code for new single-family detached or multifamily attached dwellings under Section 9.An alternative to this method for single-family detached dwellings,and multifamily attached dwellings of three stories or less,is provided in Section 10.Multifamily attached dwellings greater than three stories must comply under Section 9 or 5.Additions to existing residential buildings must comply under Section 9 or 10.Additional information may be obtained from your local building department or the Department of Community Affairs,Energy Code Program,2571 Executive Center Circle East,Tallahassee,Florida 32399. PROJECT NAME BUILDER: AND ADDRESS: PERMITTING CLIMATE 1 2 3 OFFICE: ZONE: OWNER: V Q m t4e.1 �AT e Y NO.: NO ISDICTION NEW CONSTRUCTION IF MULTIFAMILY,NUMBER OF CONDITIONED GLASS SQ. GLASS AREA AND TYPE UNITS COVERED BY FLOOR AREA F7/_L FT. CLEAR TINT,FILM,SOLAR SCREEN ADDITION ❑ THIS SUBMITTAL: LENGTH FT SINGLE- FT SIPANE FO• .MULTIFAMILY ATTACHED CHECK IF THIS SUBMITTAL _ REPRESENTS A WORST CASE PORCH OVERHAN DOUBLE � Q. DOUBLE- SQ. SINGLE-FAMILY DETACHED❑ CONDITION: [E ryLENGTH FT. PANE LL_1!LLb�'!FQT PANE FT. NET WALL AREA AND INSULATION MASONRY R = FRAME R = STEEL STUD R = LOG R= FTm.❑ 0 m �FQ. I FQ. m CEILING AREA AND INSULATION FLOOR TYPE AND INSULATION UNDER ATTIC R = SGL ASSEMBLY R = SLAB PERIMETER R = RAISED:WD❑CON❑ R = so. O so. E40 O FT [I] FQ. E[1� DUCTS COOLING SYSTEM HEATING SYSTEM HOT WATER SYSTEM IN CENTRAL ❑ NONE ❑ ELECTRIC STRIP PUMP ELECTRIC I El SOLAR UNCONDITIONED SPACE R = ❑ ROOM ❑ NATURAL GAS ❑ OTHER FUELS ❑ NATURAL GAS I ❑ HEAT RECOVERY 1� ❑ PACKAGE TERMINAL ❑ ROOM UNIT OR ❑ NONE ❑ OTHER FUELS ❑ DEDICATED HEAT PUMP IN CONDITIONED AIR CONDITIONER PACKAGE TERMINAL HEAT PUMP SPACE R = EF = . � � SF/EF = ❑.m ELI.11 SEER/EER = ®, COP/AFUE _ �. ^� NUMBER OF BEDROOMS = INFILTRATION - -- PRACTICE USED 2 2 _ �� X l00 = ®. ❑ #1 K#2 ❑ #3 TOTAL AS-BUILT POINTS TOTAL BASE POINTS CALCULATED E.P.I. CALCULATED ENERGY PERFORMANCE INDEX MUST NOT EXCEED 100 POINTS. In accordance with Section 553.907 F.S., I hereby certify that the plans Review of the plans and specifications covered by this calculation indicates and specificationscovers by this ca�ulati are in compl'ance with the compliance with the Florida Energy Code..Before construction is completed,this Florida Energy Code. building will be inspected for m liance in acgordan h on 553.908 F.S. OWNER/AGENT: BUILDING OFFICIAL: -�`�- DATE: DATE: -2 9A I PRESCRIPTIVE MEASURES Must be met or exceeded by all residences. COMPONENTS SECTION REQUIREMENTS CHECK WINDOWS 904.1 MAXIMUM OF 0.5 CFM PER LINEAR FOOT OF OPERABLE SASH CRACK. EXTERIOR& 904.1 MAXIMUM OF 0.5 CFM PER SQ. FT.OF DOOR AREA. INCLUDES SLIDING GLASS DOORS,SOLID CORE, ADJACENT DOORS WOOD PANEL INSULATED OR GLASS DOORS ONLY. EXT.JOINTS& 904.1 TO BE CAULKED, GASKETED,WEATHERSTRIPPED OR OTHERWISE SEALED. CRACKS MUST BEAR LABEL INDICATING COMPLIANCE WITH ASHRAE STANDARD 90 OR COMPLY WITH EFFICIENCY AND WATER HEATERS 904,2 STANDBY LOSS REQUIREMENTS. SWITCH OR CLEARLY MARKED CIRCUIT BREAKER(ELECTRIC),OR CUT-OFF GAS MUT BE PROVIDED. AN EXTERNAL ORBUILT-IN HEAT TRAP MUST BE PROVIDED. SWIMMING POOLS 904.3 SPAS&HEATED POOLS MUST HAVE COVERS(EXCEPT SOLAR HEATED). NON-COMMERCIAL POOLS MUST &SPAS HAVE A PUMP TIMER. GAS SPA&POOL HEATERS MUST HAVE MINIMUM THERMAL EFFICIENCY OF 75%. HOT WATER 904.4 INSULATION IS REQUIRED ONLY FOR RECIRCULATING SYSTEMS INCLUDING HEAT RECOVERY UNITS.IN SUCH CASES,PIPING HEATLOSS �/' PIPES SHALL BE LIMITED TO 17:5 BTU/H/LINEAR FOOT OF PIPE. SHOWER HEADS 904.5 WATER FLOW MUT BE RESTRICTED TO NO MORE THAN 3 GALLONS PER MINUTE AT 20 TO 80 PSIG. HVAC DUCT 903.2 CONSTRUCTED IN ACCORDANCE WITH INDUSTRY STANDARDS&LOCAL MECHANICAL CODES. DUCTS IN CONSTRUCTION 904.6 UNCONDITIONED SPACE MUST BE INSULATED TO MINIMUM R 4.2&JOINTS MUST BE SEALED, HVAC CONTROLS 904.7 SEPARATE READILY ACCESSIBLE MANUAL OR AUTOMATIC THERMOSTAT FOR EACH SYSTEM. INSULATION CEILINGS-MIN.R-19. COMMON WALLS-FRAME R-11 OR CBS R-3, FRAME COMMON CEILINGS&FLOORS R-11. -1- SUMMER CALCULATIONS CLIMATE ZONES 1 2 3 BASE BASE W GLASS x SINGLE-PANE OR DOUBLE-PANE x SUMMER AS-BUILT W GLASS x SUMMER = SUMMER SUMMER POINT MOLT. SUMMER POINT MULT. OVERHANG= GLASS o AREA PT. MULT. 01 TS Cr AREAF CLEAR TINT' CLEAR TINT' FACTOR(9B)i SUM.PT N 38.3 N 40.7 41.5 34.9 NE 57.7 NE 61.5 61.6 57.7 5.1.0 E 79.7 . E 84.9 83.9 68.9` SE 7 .1 SE 85.4 84.3 79.1 68.8" 66.2 S 73.2 1 72.7 66.2 58.2 W 79.1 SW 85.4 84.3 7 68.8 W 79.7 W 4.9 83.9 79.7 68.9 NW 57.7 NW 61.5 61.6 51.0 H' 66.2 H' 290.2 250.1 267.0 195.3 N 17 N C7 r v COND. TOTAL BASE BASE ADJUSTED AS-BUILT .155 x FLOOR + GLASS = ADJUST. x GLASS = GLASS GLASS AR A FACTOR T TAL B E P SUBTOTAL e_ .1 . tG COMPONENT BASE SUMMER oBASE COMPONENT SUMMER AS-BUILT DESCRIPTION AREA x POINT MULT. SUMMER DESCRIPTION AREA x POINT MULT. = SUMMER POINT (9C THRU 9G) POINTS- EXTERIOR OI TEXTERIOR A Z --Fro ADJACENT aj .7 3 1 � EXTERI R7.7 g ADJAC NT 1 2.9 0 � 1 UNDER ATTIC 6 r LU OR SINGLE .6 0 ASSEMBLY BASE CEILING AREA EQUALS FLOOR AREA UNDER CEILING. AS-BUILT CEILING AREA EQUALS ACTUAL CEILING SQUARE FOOTAGE. cc SLAB 1 37.0r RAISED - 3.99 J 1771 F-= I I W FOR SLAB-ON-GRADE USE PERIMETER LENGTH AROUND CONDITIONED FLOOR.1 FOR RAISED FLOORS USE AREA OVER UNCONDITIONED SPACE. INFILTRATION 3 8.0 USE TOTAL FLOOR AREA OF CONDITIONED SPACE. TOTAL COMPONENT BASE SUMMER P INT TTLCOMPONENTA - I T SUMMER P= r- BASEICOOLING I TOTAL BASE BASE TOTAL AS-BUILT I AS-BUILT I AS-BUILT AS-BUILT COOLING SYSTEM x SUMMER = COOLING AS-BUILT x DM x CSM x CCM = COOLING SYSTEM MULTIPLIER POINTS POINTS U//M.PTS. 9H (9K). 9L PRINT; .46 ? • V /71W.lp� NUMBER BASE BASE AS-BUILT NUMBER AS-BUILT AS-BUILT AS-BUILT HOT OF x HOT WATER HOT WATER HOT WATER OF x HWM x HWCM = HOT WATER WATER BEDROOM MULTIPLIER i POINTS SYSTEMDESC. BEDROOMS 9M 9N POINT SYSTEM 3803 7 t0 1.02, 30 f 3 H = Horizontal Glass(Skylights) •• For glass with known Shading Coefficient, see sec.903.2(x).Tint Multipliers may be used for glass with solar screens,film,or tint. -2- $1 HEATING SYSTEM MULTIPLIERS(HSM) CLIMATE ZONES 1 2 3 SYSTEM TYPE HEATING SYSTEM MULTIPLIERS Heat Pump COP 2.5-2.69 2.7-2.89 2.9-3.09 3.1 -3.29 3.3-3.49 3.5-3.69 3.7-U HSM .56 .52 .48 .45 .42 .40 .38 Electric Strip HSM 1.0 Gas&Other Fuels HSM 1.0 See Table 9J for Credit Multipliers) PTHP&Room Units HSM HSM for COP 22-2.49 = .63. See above for COP 2.49, Minimums:Central Units 2.7 COP. PTHP&Room Units 2.2 COP. COP means Coefficient of Performance. 9J HEATING CREDIT MULTIPLIERS(HCM) SYSTEM TYPE HEATING SYSTEM MULTIPLIERS Attic Radiant Barrier HCM .98 Multizone HCM .90 Natural Gas AFUE .60- .64 .65-69.69 .70- .74 .75- .79 .80-.84 .85-.89 .90-U HCM .54 .50 .46 .43 .40 .38 .36 Other Fuels HCM .84 .77 .72 .67 .63 .59 .56 Where more than one credit is claimed, multiply HCM's together. Enter product on page 4. AFUE means Annual Fuel Utilization Efficiency. 9K COOLING SYSTEM MULTIPLIERS(CSM) SYSTEM TYPE COOLING SYSTEM MULTIPLIER SEER 7.8- 8.0- 8.5- 1 9.0- 9.5- 10:0- 10.5 11.0- 11.5- 12,0. Central Units 7.9 8.4 8.9 9:4 9.9 10.4 10.9 11.4 11.9 &U CSM .44 .43 .40 38 .36 34 32 .31 .30 .28 PTAC&Room Unit CSM -CSM for EER 7.5-7.7 = .46. For EER's>7.7 use multipliers above. Minimums:Central Units 7.8 SEER. Room Units 7.5 EER. PTAC under 13,000 BTU/H 7.5 EER,and over 13,000 BTU/H 7.0 EER. SEER means Seasonal Energy Efficiency Ratio. EER means Energy Efficiency Ratio. 9L COOLING CREDIT MULTIPLIERS(CCM) SYSTEM TYPE COOLING CREDITMULTIPLIERS ilin Fans .86 Multizone .90 Gross Ventilation Attic Radiant Barrier .95 Where more than one credit is claimed,multiply CCM's together. Enter product on page 2. 9M HOT WATER MULTIPLIERS(HWM) SYSTEM TYPE HOT WATER MULTIPLIERS Electric EF .80-81.81 .82-.83 .84-85.85 .86- .87 .88- .90 21--.93 .94-96.96 .97&UP Resistance HWM 4183 4081 3984 3891 3803 C 36703560 3450 Natural Gas EF .48-.49 .50-.51 .52-.53 .54-55.55 .56-.57 .58-.59 .60-61.61 .62&U HWM 2259 2169 2085 2008 1936 1870 1807 1749 Other Fuels HWM 3494 3354 3225 3105 2995 2891 2795 2705 Water heaters must comply with prescriptive measures of Table 9A. EF means Energy Factor. 9N HOT WATER CREDIT MULTIPLIERS(HWCM) SYSTEM TYPE T WATER CREDIT MULTIPLIERS Solar Water Heater F .1 .2 .3 .4 .5 .6 .7 .8 .9 1.0 HWCM .9 .8 .7 .6 .5 .4 .3 .2 .1 .0 Heat Recovery Unit* With Air-conditioner Heat Pum HWCM 2 8 Dedicated Heat Pump EF 2.0-2.49 2.5-w2. 3.0-3.491 3.5&U HWCM .44 .3 9 1 .25 ,A HWM must be used in conjunction with all HWCM. See Table 9M. SF means Solar Fraction. EF means Energy Factor. *Form 90OD-86 must be submitted to obtain credit for Heat Recovery Unit, 9P INFILTRATION REDUCTION PRACTICE COMPLIANCE CHECKLIST(See Section 903.2(f)) COMPONENTS REQUIREMENTS FOR EACH PRACTICE CHECK PRACTICE#1 COMPLY WITH ALL INFILTRATION PRESCRIPTIVE$ON TABLE 9A. Y- PRA TI E #2 C MPLY WITH PRACTICE #1 ANQ THE FOLLOWING: A,;7- Exterior Walls and Floors Tog plate pgnetrations sealed. Infiltration barrier installed. Sole plate/floor'dint caulked or sealed. 1•�'' Exterior Walls&Ceilinas Penetrations, 'dints and cracks on interior surface caulked,sealed or oasketed. Ductwork Ductwork in unconditioned space m st be sealed. Fireolaces EQuildoed with outside combustion air,doors,and flue dampers. Exhaust Fans -.-EQuipped with dampers. Combustion devices see 903.2ft Combustion Heating Combustion space&water heating systems provided with outside combustion air,except direct vent appliances. PRACTICE#3 COMPLY WITH PRACTICES#1 AND#2 AND THE FOLLOWING: Ceilings Infiltration rri r installed. Interior Wall To late-penetrationssealed r' in cracks on interior walls caulked,sealed or gasketed. Recessed Lights -Simled from conditioned space insulated from ventilated attic s Ductwork II ductwork located in conditioned sgace. Combustion Appliances Be in unconditioned space(except direct vent),draw air from unconditioned space,exhaust by-prpducts to outside.Stoves see 903. 6 WINTER CALCULATIONS CLIMATE ZONES 1 2 3 1BASENINTER1 BASE SINGLE-PANE DOUBLE-PANE WINTER AS-BUILT W GLASS x _ kNE GLASS x OR x POINT _ WINTER WINTER POINT MULT. WINTER POINT MULT. OVERHANG = GLASS c AREA MULTIPLIER PINT AREA CLEAR TINT'• CLEA TINT•• FACTOR(9B) WIN. PTS. N 7.3 . 13.8 13.6 8.1 NE 4.6 10.7 10.5 4. 6.0 E 9.2 - 3.8 - 3.6 --- 9.2.) - 5.7 SE -22.7 SE -18.1 -17.5 _72_7" -17.3 S -28.4 S -24.0 -23.0 -28.4 -22.3 SW -22.7 SW -18.1 -17.5 -17.3 W 5Z 2. - 9.2 W - 3.8 - 3.6 - 9.2 - 5.7 NW 4.6 NW 10.7 10.5 6- 6.0 H' -28.4 H' -67.6 -59.1 -57.7 -45.0 N J COND. TOTAL BASE BASE ADJUSTED AS-BUILT .15 x FLOOR - GLASS = ADJUST x GLASS = GLASS GLASS AREA I AR5A I (ACTOR I SUBTOYAL,, BASE WP SUBTOTA 1 •D3 W-5 BASE WINTER AS-BUILT COMPONENT AREA x BASE WINTER = WINTER COMPONENT AREA x POINT MULT. = WINTER DESCRIPTION POINT MULT. F01 DESCRIPTION 9C THRU 9G POINTS EXTERIOR 2.2 1 2 14 F ra a ADJACENT d 3.6 U A 3 ' � 1 EXTERIOR 1 2, 0 15.4 fl ADJACENT 1 13.3 0 1 � , UNDER ATTIC / 1.2 Aff.,C UAI OR SINGLE 1.2 ASSEMBLY 1.2 BASE CEILING AREA EQUALS FLOOR AREA UNDER CEILING. AS-BUILT CEILING AREA EQUALS ACTUAL CEILING SQUARE FOOTAGE. SLAB 8.9 C RAISED .96 J LL FOR SLAB-ON-GRADE USE PERIMETER LENGTH AROUND CONDITIONED FLOOR.I FOR RAISED FLOORS USE AREA OVER UNCONDITIONED SPACE. I � F INFILTRATION 'L, , 7.4 8 ' USE TOTAL FLOOR AREA OF CONDITIONED SPACE.- 1 TOTAL P NE T BASE WINTER POINTS TOTAL COMPONENT AS-BUILT WINTER POINTS BASEIHEATING 1 TOTAL BASE BASE TOTAL AS-BUILT I AS-BUILT I AS-BUILT AS-BUILT HEATING SYSTEM x WINTER = HEATING AS-BUILT x DM x HSM x HCM = HEATING SYSTEM MULTIPLIER POINTS POINTS 44 WIN. PT 9H 91 9J POINTS 17 .59 BASE BASE BASE TOTAL AS-BUILT AS-BUILT AS-BUILT TOTAL COOLING + HEATING + HOT WATER = BASE COOLING + HEATING + HOT WATER = AS-BUILT POINTS POINTS I POINTS POINTS POINTS POINTS POINTS POINTS c From P.2 From P.2 Enter on P.1 From P.2 From P.2 Enter on P.1 17 • H = Horizontal Glass(Skylights) For glass with known Shading Coefficient,see sec.903.2(a).Tint Multipliers may be used for glass with solar screens,film,or tint. -4- SUMMER POINT MULTIPLIERS (SPM) 9B SUMMER OVERHANG FACTORS(SOF)For single and double pane glass. CLIMATE ZONES 12 3 10- OH RATIO .0-.11 .12-.17 .18-.26 27-,35 .36-.46 .47-.57 .58-.70 .71-.83 .84-1.18 .19-1.72 1.73-2.73 2.74+ >� N 1.0 .94 .91 .87 .83 .79 .76 .72 .69 .63 .56 .50 M I NE/NW 1.0 .94 .91 .86 .80 .75 .71 .67 .63 .55 .48 .42 CC E/W 1.0 .95 .92 .86 .80 .73 .68 .63 .57 .47 .39 .31 SE/SW 1.0 .93 .90 .82 .74 .66 .60 .54 .47 .39 .32 .27 S 1.0 .91 .86 .77 .68 .60 .54 51 .45 .39 .35 .31 SOH LENGTH* 0 ft. I JT- 11/2 ff. 1 2 ft. 1 3 ft. I 3Y2 ft. 1 41/2 ft. 5'h ft. 61/2 ft. 9Y2 ft. 14 ft. 20 ft.+ *To select by Overhang Length,no part of glass shall be more than 8 It below the overhang. OVERHANG RATIO= OH LENGTH OH HEIGHT TH L H F] H 9C WALL SUMMER POINT MULTIPLIERS(SPM) FRAME CONCRETE BLOCK FACE BRICK LOG INTERIOR INSULATION EXT.INSULATION R-VALUE WOOD FR WOOD NORMAL WT LT. WT. NOR.WT. LT. WT. 0. 6.9 2.4 6 INCH R-VALUE EXT ADJ R-VALUEEXT ADJ EXT EXT EXT 7- 10.9 .6 R-VALUE EXT 0- 6.9 5.5 2.2 0- 2.9 2.2 1.1 1.7 2.2 1.7 11 - 18.9 .4 0-2.9 1.5 7-10.9 2.1 .8 3- 4.9 1.3 .8 1.0 .8 .7 19-25.9 .2 3-6.9 1.0 11 -12.9 1.7 .7 5- 6.9 1.0 .7 .8 .5 .4 26&U .1 7&tin 8 13-18.9 1.5 .6 7-10.9 .7 .5 .6 .3 .2 R-VALUE BLOCK 8 INCH 19-25.9 .9 .4 11 -18.9 .4 .4 .4 .0 .1 0-2.9 1.0 R-VALUE EXT 26&U .6 .2 19-25.9 2 .2 .2 3-6.9 .6 0.2.9 1.0 STEEL 26&LIR .1 .1 1 7-9.9 .4 3-6.9 .7 R-VA UE EXT ADJ ' ': ' 1 .2 7 0 6.9 7.6 2.8 7-10.9 3.5 1.3 11 -12.9 2.7 1.0 9E CEILING SUMMER POINT MULTIPLIERS(SPM) 13 18.9 2.5 0.9 UNDER ATTIC, SINGLE ASSEMBLY CON RETE DECK ROOF 19-25.9 2.2 0.8 R-VALUE S R-VALUE SPM CEILING TYPE 26&Uo 1.2 1 0.4 19-21.9 1,1 10-10.9 2.9 R-VALUE DROPPED EXPOSED 22.25.9 9 11 -12.9 2.6 10- 13.9 3.2 3.5 26-29.9 .8 13-18.9 2.4 14-20.9 2.2 2.4 30=37.9 6 19-25.9 1.8 21 &U 1.5 1.6 38&U 5 9D DOOR SUMMER POINT MULTIPLIERS(SPM) DOOR TYPE EXTERIOR ADJACENT 9F FLOOR SUMMER POINT MULTIPLIERS(SPM) SLAB-ON-GRADE RAISED RAISED WOOD WOOD 7.7 2.9 EDGE INSULATION CONCRETE (See 903.2(e)) R•VALUE SPM FR-VALUE SPM R-VALUE SPM INSULATED 8.5 3.1 0 .9 -41.2 2.9 - .8 0- 6.9 -1.0 3-4.9 -37.2 -4.9 -1.3 7-10.9 -1.1 5-6.9 -362 -6.9 -1.3 11 -18.9 -1.0 7&U -35.7 &U -1.3 19&U - .9 9G INFILTRATION SUMMER POINT MULTIPLIERS(SPM) 9H DUCT MULTIPLIERS(DM) INFILTRATION PRACTICE SPM R-VALUE With Return W/0 Return Air Duct Air Duct (See Table 9P) 4.2-4.9 1.14 1.10 PRACTICE-#1 10.2 5.0-6.6 1.12 1.08 P ICE#2 0 6.7&Up 1.09 1.06 PRACTICE #3 5.2 DUCTS IN CONDITIONED SPACE 1.00 1.00 -3- WINTER POINT MULTIPLIERS (WPM) 9B WINTER OVERHANG FACTORS(WOF) CLIMATE ZONES 12 3 10- OH RATIO .0-.11 .12-.17 .18-26 27-.35 .36-.46 1 .47-.57 .58-.70 1 .71-.83 1 .84-1.18 1 1.19-1.72 1.73-2.73 2.74+ 1 SINGLE PANEGLASS 1 1 N 1.0 1.05 1.08 1.12 1.16 1.20 1.24 1.27 1.31 1.38 1.45 1.51 1 NE/NW 1.0 1.09 1.13 1.20 1.26 1.33 1.39 1.45 1.50 1.63 1.74 1.84 E/W 1.0 .67 .50 .16 -.20 -.60 -.95 -1.32 -1.73 -2.51 -3.31 -4.05 m I SE/SW 1.0. .92 .88 .77 .66 .52 .39 .25 .10 -.21 -.48 -.74 S 1.0 .95 .92 .84 .74 .60 .46 .29 .13 -.24 -.54 -.67 DOUBLE PANE GLASS Uj N 1.0 1.09 1.13 1.19 1.25 1.31' 1.37 1.42 1.48 1.58 1.69 1.79 1 NE/NW 1.0 1.15 1.23 1.35 1.46 1.58 1.68 1.78 1.87 2.09 2.28 2.46 1 E/W 1.0 .85 .77 .62 .46 .28 .12 -.05 -24 -.59 -.96 -1.29 j SE/SW 1.0 .90 .82 .72 .61 .51 .40 .28 .03 -.19 d-.40 1 S 1. .96 .94 .87 .78 .67 .55 .41 .27 -.04 -.29 SOH LENGTHS 0 ft. 1 ft. 1Y2 ft. 2 ft. 3 ft. 3%ft. 4Y2 ft 5Y2 ft. 612 ft. 91h ft. 14 ft. 2 *To select by Overhang Length,no part of glass shall be more than 8!ft.'below the overhang. OVERHANG RATIO= OH LENGTH OH HEIGHT �..L H L H ❑� H 9C WALL WINTER POINT MULTIPLIERS(WPM) CONCRETE BLOCK FACE BRICK FRAME INTERIOR INSULATION EXT.INSULATION R-VALUE WOOD FR LOG. WOOD NORMAL WT T LT. WT. NOR. WT LT. WT. 0- 6.9 12.6 6 INCH R-VALUE ' EXT ADJ R-VALUE EXT ADJ EXT EXT EXT 7- 10.9 4.2 R-VALUE EXT 0- 6.9 11.1 10.4 0- 2.9 11.2 6.8 8.8 11.2 8.8 11 -18.9 3.5 0-2.9 4.5 7-10.9 4.4 4.4 3- 4.9 7.3 5.1 6.1 5.6 4.9 19-25.9 2.2 3-6.9 2.8 11 -12.9 3.7 3. 5- 6.9 5.7 4.2 4.8 4.3 3.9 26&Uo 1.4 7&Up 2.1 13-18.9 3.4 3.3 7-10.9 4.6 3.5 4.0 3.3 3.1 R•VALUE BLOCK 8 INCH 19-25.9 2.2 2.2 11 -18.9 3.0 2.6 2.8 2.2 2.2 0-2.9 7.9 R-VALUE EXT 26&Up 1.5 1.5 19-25.9 1.9 1.7 1.8 3-6.9 5.7 0-2.9 3.0 STEEL 26&UD 1.3 1.2 1'.3 7-9.9 3.8 3-6.9 2.2 R-VALUE EXT ADJ 10&U 3.0 7&U 1.7 0- 6.9 15.1 13.1 7-10.9 7.3 6.6 9E CEILING WINTER POINT MULTIPLIERS(WPM) 11 - 12.9 5.7 5.2 UNDER ATTIC SINGLE ASSEMBLY CONCRETE DECK ROOF 13-18.9 5.2 4.9 V-29.9 WPM R-VALUE WPM CEILING TYPE 19-25.9 4.6 4.4 2.0 10-10.9 3.2 R-VALUE DROPPED EXPOSED 26&U 2.7 2.6 1.7 11 - 12.9 2.9 10- 13.9 2.9 3.3 b• 1.4 13-18.9 2.6 14-20.9 2.0 2.1 9D DOOR WINTER POINT MULTIPLIERS(WPM) 12 19-25.9 2. 21 &U 1.3 1.3 9 DOOR TYPE EXTERIOR ADJACENT 9F FLOOR WINTER POINT MULTIPLIERS(WP WOOD 15.4 13.3 SLAB-ON-GRADE RAISED RAISED WOOD EDGE INSULATION CONCRETE See 903.2 e INSULATED 16.8 14.5 R-VALUE WPM R-VALUE WPM R-VALUE WPM 0-2.9 18.8 0-2.9 9.9 0- 6.9 8.3 3-4.9 9.3 3-4.9 5.1 7-10.9 3.0 5-6.9 7.6 5-69. 3.6 11 -18.9 2.2 7&U 7.0 7&U 2.9 19&Up 1.4 9G INFILTRATION WINTER POINT MULTIPLIERS(WPM) 9H DUCT MULTIPLIERS(DM) INFILTRATION PRACTICE R-VALUE With Return W/O Return (See Table 9P) WPM Air Duct Air Duct 4.2-4.9 1.14 1.10 PRACTICE x 1 10.9 5.0-6.6 1.12 1.08 PRACTICE a 2 7.4 6.7&Up 1.09 1.06 PRACTICE a 3 4.1 DUCTS IN CONDITIONED SPACE 1.00 1.00 -5- of too) #tCt golldxn9 SpE�ypN AEQVEgf F�µ,N pel"AtAo Q p%strict No' Date r ANG per.Cond & Received Gontracto p�,VMB O Hee<m9 0 ss Gp,1, Rough Fire Plaoe Job p,ddre BLSG�R, Tog out pre Fab A.M. s FIET� aou9h�±n9 SOW ppA. pwme LONG � TemP O �"�' Na G fm9 D Finai EC3101A _ Ft'Ov g�11.0►N y gtab c Y FGp*Sp burs Frarnin9 �,ntei p.M Ae Hoofing � p,M. F`nai insPa�ron 0 ancY Sues Gartlticate 0 SCUP MOn' pate 1nsPed('on Made CITY OF1�' � W!4- t&44 c &4d-*74 Office of Building Official REQUEST FOR INSPECTION Date Permit No. /�""✓ Time A.M. Received PM. District No. Job Address Locality Owner's Name Contractor _3r_t BUILDING / CONCRETE ELECTRICAL, / PLUMBING MECHANICAL Framing Ute' Footing ❑ Rough Wiring Et,, Rough u / Air.Cond.& Re Roofing 0 Slab El Temp Pole C Top Out it Heating Lintel 0 Final Sewer 0 Fire Place 0 READY FOR INSPECTION Pre Fab A,M. Mon. Tues ' Thurs. Friday RK A.M. Inspection Made P.M. Inspector Final inspection Ci Certificate of Occupancy Date CITY OF t0ka t &u4—9!ora Office of Building Official � } REQUEST FOR INSPECTION Date " Permit No. r Time A.M.. District No. Job Address Locality '} J Name Contractor BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing ❑ Footing ❑ Rough Wiring ❑ Rough Air.Cond.& ❑ Re Roofing ❑ Slab L7 Temp Pole ❑ Top Out ❑ beating Lintel ❑ Final ❑ Sewer ❑ Fire Place ❑ READY FOR INSPECTION Pre Fab Mon. Tues. Wed. Thurs. �iday Inspection Made 7 ,— '? r-' P M. 09. Inspector r Final Inspection❑ Certificate of Occupancy Date CITY OF Office of Building Official Z/ RE !LEST FOR INSPECTION Data Permit No. Time A.M. ReceivedP.M. District Na ff 77c—�— V c� C-/� Jab Address ality Owner's / Name Contractor hzcli BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing ❑ Footing ❑ Rough Wiring ❑ Rough ❑ Air.Cond.& C7 Re Roofing ❑ Slab ❑ Temp Pole ❑ / Top Out ❑ Heating Lintel ❑ Final Vit' Sewer ❑ Fire Place ❑ READY FOR INSPE N Pre Fab A.M. Mon. Tues. �y Wed. Thurs: Friday P.M. Inspection Made OL r Inspector Final Inspection Certificate of Occupancy Date CITY OF Office of Building Official REQUEST FOR INSPECTION Date t / " Permit No. Time A.M. Received PM. District No. l�� Job Address / Locality Owners j "t< Name Intract r BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL Framing ❑ Footing ❑ Rough Wiring ❑ Rough ❑ Air.Cond.& ❑ Re Roofing ❑ Slab ❑ Temp Pole ❑ Top Out ❑ Heating Lintel ❑ Final ❑ Sewer ❑ Fire Place ❑ READY FOR INSPECTION Pre Fab ( j A.M. Mon. l J'`;�` Tues. Wed. Thurs. Friday P.M. A.M. lnspectiPM. s� inspecto Final inspection PJB i Certificate of Occupancy" Date ADDRESS CONTRACTOR OWNER__ BUILDING__gL2,2__ MECHANICAL________ PLUMBING_______ ELECTRICALTEMP POLEMISC___-_______ ELECTRICIAN --------------------------- DATE FAILED DATE PASSED TEMP POLE JEA FOOTING ----------- ----------- ROUGH PLUMBING ----------- ----------- SLAB FRAMING MECHANICAL/FIREPLACE TOP OUT PLUMBING ROUGH ELECTRIC ----------- ----------- FINAL ELECTRIC FINAL BUILDING A::zL ELEVATION SUBMITTED CERTIFICATE OF OCCUPANCY DATE ORDERED DATE ISSUED