Loading...
Item 4F n~. CITY OF ATLANTIC BEACH ! CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM #4F AUGUST 23, 2004 """' AGENDA ITEM: Lift Station SCADA, Bid No. 0304-21 SUBMITTED BY: Donna Kaluzniak, Utility Directo DATE: August 13, 2004 BACKGROUND: The central SCADA system has been installed at the water and wastewater plants. This project is to extend the-SCADA system to lift stations on a phased approach. The ~„ first phase is to install SCADA equipment at 12 of the 29 lift stations. Bids were advertised and invitations sent to 6 firms. Two firms submitted prequalification packages that met requirements and attended the mandatory Pre-Bid Meeting. Bids were opened on August 11, 2004. Both bidders submitted all required documents: Control Desi n, Inc. En ineer Services Co Total Base Bid $82,555.00 $122,950.00 Ten Percent Contin enc $8,255.50 $12,295.00 '"" Total Base Bid lus Contin enc $90,810.50 $135,245.00 BUDGET: A total of $105,593 is left in the budget for Lift Station SCADA in the Sewer Fund in account number 410-5506-535-6300. RECOMMENDATION: Awazd the contract for Lift Station SCADA to Control Design, Inc. in the amount of $90,810.50. ~,. ATTACHMENTS: 1. Bid tabulation form REVIEWED BY CITY MANAGER: 1 a~• W H U ~ ~ m p N ~ U ccn~ ~Zin QO rn ~, ~ Q U ~ J N 0 M m N m •~ o d R y `p ~ O. C O "p~ U C W X X X X K ~ X X 0 O O N eN- is 00 ~ N N r ~ °o• ~ N O ~ is C •y d O O O O t!) ~ O X X X >C X X X !C ~ '~ oro O ~ ~! r O C V N ~ O 6F? O ~ O C V ~_ ~L C ~ .. ~ ~.. t ~ ~ U ~ N ~ r Z W ~ c a~ U ~ ~ C7 Z ~ E ~ a~ ~ a~ N w H ~ ~ N ~ - ~ L O o '~ ~ Y U ~ v U ~ N Q O = r d N t0 ~ ~ O ~ y + C r ~ O v _ O _ c N W to ~'' ~ v '~ C ~ ~ " ~ V a ~j o ~ o ~ a' ~ L ~ o ~ o m O m ~ ~ O ~ ~ O rn O ~I O p ' ~ ~ rn '"' c ~ .o ~ c+a O U N m ~.+ _ N m -a •N ~ -o ~j a; c U v ` ' `~ `~ C `~ ° ~° ~ ~ -° a a a ~ ~ m ~ E v ~ ~ !- = F- ~ (A O m (~ U p ~ z° ~ FO- ~ AGENDA ITEDI #4F AUGUST 23, 2004