Loading...
Agenda Iem 9A AGENDA ITEM # 9A NOVEMBER 28, 20I 1 November 21, 11 MEMORANDUM TO: The Honorable Mayor and Members of the Commission FROM: Jim Hanso City Manager SUBJECT: City Mana is Report Change Order for Wastewater Plant Project; An emergency purchase order which resulted in a change order was approved on November 8 in the of $15,788.35. This is the cost to re -route a 24 -inch influent pipe because of a conflict that was discovered with an existing footer for an aeration tank. Essentially, the existing tank foundation was poured up to and around an existing aeration pipe which prevented the contractor from connecting to the 24 -inch influent piping line without having to remove portions of the foundation. A less expensive option of re- routing approximately 25 feet of the 24 -inch pipe was determined as the best course of action. This was approved on an emergency basis because any delay would have delayed the job and would probably have resulted in additional costs being due to the contractor. This job has a contingency amount established at $238,140. Previous change orders have totaled $38,766. Once this amount is added, there will be a remaining contingency of $183,585. Generally, the job is going very smoothly from a contingency standpoint when considering that the contractor is working around equipment that has been installed through several generations of plant upgrades. Workshops Scheduled Three workshops have been scheduled for the Commission as follows; • Tuesday, December 6 th at 6:00 p.m. Pension Reform This workshop will include an extensive review of the current pension plans, past amendments made, options to reduce City costs and related topics. It will provide the opportunity for public comments limited to three minutes per person at both the beginning and at the end of the workshop. • Monday, December 12 at 5:00 p.m. Marsh Master Plan Consultants will make a report of their status at 60% completion of the work. This workshop will be completed prior to the 6:00 p.m. start of the regular commission meeting. • Wednesday, December 14 at 6:00 p.m. Police Building This workshop will be to review the history and status of the police building project as well as to discuss possible next steps including the creation of a committee to study options.