Loading...
Item 4E'~ AGENDA ITEM #4E MARCH 13, 2006 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Repair and Painting of Elevated Tank at Water Plant # 1 Bid No. 0506-5 SUBMITTED BY: Donna Kaluzniak, Utility Directo DATE: March 6, 2006 BACKGROUND: The elevated tank at Water Plant No. 1 (469 11 `~' Street) is due for scheduled repairs and painting both inside and outside of the tank to ensure the tank's continuing ~"" integrity and safety. The tank at this location is the most vulnerable due to its proximity to the ocean. Bids were advertised and invitations sent to 8 contractors. Four contractors attended the Mandatory Pre-Bid Meeting and 2 contractors submitted bids: Contractor Utili Services Worth Contractin Total Base Bid $96,000.00 $77,900.00 10% Contin enc $9,600.00 $7,790.00 Total with Contin enc $105,600.00 $85,690.00 The low bidder meeting all requirements was Worth Contracting in the amount of $85,690.00. BUDGET: A total of $65,000 was budgeted for this work in the Water Fund under account ~" number 400-5502-533-3400. The additional amount of $20,690 is available in the Water Fund from various accounts (400-5502-533-4900 and 3400, 400-5504-533-3100 and 6401) that aze currently under budget. as well as the genset replacement that came in under budget. (Note: ""~ Revenues of $37,004,~yeaz from renting tank space for cell phone antennas help to offset maintenance costs). RECOMMENDATION: Award the contract for Repair and Painting of Elevated Tank at Water Plant #1 to Worth Contracting in the amount of $85,690 and authorize the City Manager to sign the contract. ATTACHMENTS: 1. Bid tabulation form 2. Bid analysis REVIEWED BY CITY MANAGER: a 0 0 M Y Z H W U ¢O W W ~p U ¢ N F- W Z '"~ N Q ~ ~ LL. ~ .n` p Z ~ H ~ Z U~ Z ¢ Q a w w ~. tw 0 p m ~° ~° °o °o o° : °o °o o°O' c n a o ° ~ U ~ o ~ ~ r~ m ti ~ ~ >O R > c X X X X X )C X X X X X ~ f A ~ ~ ~ ~ ~ ~ O U °o °o o° °o °o °o °o °o °o o° °o .°n e°n °o °o °o °o °o 0 0 0 0 0 ~o m ~' U X X X X X X X X X X X O ~ OD ~ O ~ CD ~ tp Qf iA 1q o ~ eA Y C Fes- d ~ ° o c ~ O ~d N Z ~ U c ~ L ~ ~ v Z w N M Z N v Z v U U o c ~ 'o } o ~ ~ c U ~ ~' a a E ~ ~ w Z a ~ a; o ~ U . o a c + F= Z ~ ~ o ~ c o , c y ~ u ~ :-, °~ ~t O c) fq ~ ~ U ~ o V f y ~ . ~ i ~ c V y ~ a 'O N e f" 'a c c`o o o co a ~ o ~ ~ g o O . o v c - ~ ~ V N ~ o c ~ p U c W ~ c W d ~ c - W a ~' V Q y am ° c M ~, c ~, ° c N ~ U ~° o _ m c `° ~ ~ ce ~ ~ cd .Q ~ ~ a m E m m ~ . ~ Q c~ m Oi - w a U O in v~ ¢ m ~ ~i ri N ~ ~ AGENDA ITEM #4E MARCH 13, 2006 f6 O d a C O .~ y .~ E 0 U c N .~ >, m c C N f6 a m c 0 v m y f6 f6 3 m a m AGENDA ITEM #4E MARCH 13, 2006 BID ANALYSIS -- REPAIR AND PAINTING OF ELEVATED WATE R TANK NO. 1 BID NO. 0506-5 opened 2122106 BASE BID ITEMS Utili Service Co., Inc. Worth Contractin ,Inc. Q 1 Tank Cleanin a. Interior b. Exterior LS LS $10,000.00 $8,000.00 $19,525.50 $18,574.50 2 Tank Repair a. Interior b. Exterior LS LS $0.00 $0.00 $0.00 $10,900.00 3 Tank Sealin and Paintin a. Interior b. Exterior ~ LS LS $10,000.00 $68,000.00 $15,400.00 $13, 500.00 BASE BID (ITEMS 1-3): $96,000.00 $77,900.00 TEN PERCENT 10% CONTINGENCY OF SUBTOTAL: $9,600.00 $7,790.00 TOTAL BASE BID PLUS 10% CONTINGENCY: $105,600.00 $85,690.00