Loading...
Permit 254 Ocean Blvd (vault) CITY OF ATLANTIC BEACH r 800 SEMINOLE ROAD j r ATLANTIC BEACH, FLORIDA 32233 INSPECTION PHONE LINE 247-5826 Application Number . . . . 04-00028513 Date 6/21/04 Property Address . . . . . . 254 OCEAN BLVD Tenant nbr, name . . . . . . A/H & HEATSTRIP Application description . . . MECHANICAL ONLY Property Zoning . . . . . . . TO BE UPDATED Application valuation . . . . 0 Owner Contractor ------------------------ ------------------------ MARY WILEY, MRS . SNYDER HEATING & AIR 254 OCEAN BLVD. P.O. BOX 16826 ATLANTIC BEACH FL 32233 JACKSONVILLE FL 32245 (904) 641-0600 ---------------------------------------------------------------------------- Permit . . . . . . MECHANICAL PERMIT Additional desc . . Permit Fee . . . . 65 . 00 Plan Check Fee . 00 Issue Date . . . . Valuation . . . . 0 Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 65 . 00 65 . 00 . 00 . 00 Plan Check Total . 00 . 00 . 00 . 00 Grand Total 65 . 00 65 . 00 . 00 . 00 PERMIT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF ATLANTIC BEACH ORDINANCES AND THE FLORIDA BUILDING COD . a0jk-'--' t BUILDING OFFICIAL CITY OF ATLANTIC BEACH MECHANICAL PERMIT APPLICATION h Date: Property Address: gf ri Wy Owner: E/I e- rN W i le- y Telephone #: at/ -39' 6 Contractor: �T� C G u �ti / Telephone Contractor Address: P,L. Qnx &),R G, 51y . F& -3- aaV max#: , �/f- ? In consideration of permit given for doing the work as described in the above statement,we hereby agree to perform said work in accordance with the attached plans and specifications which are a part hereof and in accordance with the City of Atlantic Beach ordinances and standards of good practice listed therein. Type of H=Electric If other construction is being done on this building or site,list the building permit number: ❑ Gas: _LP Natural _Central Utility El /V A�O Oil ❑ her—Specify__ M"ECHCAL EQUIPMENT TO BE INST ED NATURE �'VORK Heat _Space _Recessed _Central ,Floor Residential ❑ Air Conditioning: _Room Central ❑ Duct System: Material Thickness ❑ Commercial Maximum capacitycfm ❑ Refrigeration ❑ Ne w1ding ❑ Cooling Tower:Capacity gpm ❑ Fire Sprinklers:Number of Heads Exis' ilding ❑ Elevator: _— Manlift Escalator (Number) I Replacement of Existing System ❑ Gasoline Pumps (Number) ❑ Tanks (Number) ❑ New Installation ❑ LPG Containers (Number) (No system previously installed) ❑ Unfired Pressure Vessel ❑ Ext ' a or Add-on to Existing System ❑ Boilers /n� ❑ Gas Piping Other-Specify /7i ; 11a&Ae�IP.� ply ❑ Other—Specify LIST ALL EQUIPMENT AIR CONDITIONING,REFRIGERATION EQUIPMENT&CONDENSOR'S Approving Number Units Description Model# Manufacturer Ton's Agency HEATING—FURNACES,BOILERS,FIREPLACES&AIR HANDLER'S Approving Number'Units Description Model# Manufacturer BTU's Agency IAM `G r l- TANKS Nominal Capacity I Type Liquid Serial Approving How Many &Dimensions Contained Manufacturer No. Agency 800 Seminole Road•Atlantic Beach, Florida 32233-5445 Phone: (904)247-5800. Fax: (904)247-5845 . http://www.cLatiantic-beach.fLus CITY OF ATLANTIC BEACH Is1 } 800 SEMINOLE ROAD ATLANTIC BEACH,FL 32233 INSPECTION PHONE LINE 247-5826 Application Number . . . . . 09-00001150 Date 8/12/09 Property Address . . . . . . 254 OCEAN BLVD Application type description MECHANICAL HVAC ONLY Property Zoning . . . . . . . TO BE UPDATED Application valuation . . . . 0 ---------------------------------------------------------------------------- Application desc 1 CU 1 AHU ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ MARY WILEY, MRS . SNYDER HEATING & AIR 254 OCEAN BLVD. P.O. BOX 16826 ATLANTIC BEACH FL 32233 JACKSONVILLE FL 32245 (904) 641-0600 ---------------------------------------------------------------------------- Permit . . . . . . MECHANICAL HVAC PERMIT Additional desc . . Permit Fee . . . . 75 . 00 Plan Check Fee . 00 Issue Date . . . . Valuation . . . . 0 Expiration Date . . 2/08/10 ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 75 . 00 75 . 00 . 00 . 00 Plan Check Total . 00 . 00 . 00 . 00 Grand Total 75 . 00 75 . 00 . 00 . 00 PERMIT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF ATLANTIC BEACH ORDINANCES AND THE FLORIDA BUILDING CODES. CITY OF ATLANTIC BEACH 07- I I I I 800 SEMINOLE ROAD,ATLANTIC BEACH,FL 32233 OFFICE:(904)2475826•FAX NO.:(904)247-5845 .NBUILDING-DEPT@COAB.US MECHANICAL PERMIT APPLICATION DUVAL COUNTY <- 1.JOBr(ADDRESS: 2.IS THIS A SUB PERMIT: 3.DATE: E3 NO Atlantic Beach FL 32233 13 YES PERMIT#: PROPERTY OWNER: 4.NAME 5.ADDRESS IF DIFFERENT FROM JOB ADDRESS: 6.PHONE: ZSy �kew01 lz\ c� Zy�.3(vqCo MECHANICAL CONTRACTOR: 7.NAME OF COMPANY: 8.ADDRESS.: 9.STATE OF1FLORIDA LICENSE NO. 10.CELL PH NE: 11.FAX NQ,: 12.EMAIL ADDRESS: 13.OFFICE P ONE: 14. ,gni S� � W� -O Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. This permit becomes null and void if work is not commenced within six(6) months,or if construction or work is suspended or abandoned for a period of six(6)months at any time aft work is ommenced. CONTRACTORS SIGNATURE: 15.CLASS OF WORK: 16.BUILDING: 17.SERVICE: 18.CURRENT CODE: ❑NEW INSTALLATION ❑NEW RESIDENTIAL ❑'06 FLORIDA BUILDING CODE- 4REPLACEMENT OF EXISTING SYSTEM PEXISTING ❑COMMERCIAL MECHANICAL ❑ALTERATION/ADDITION TO EXIST SYSTEM ❑REPAIR ❑OTHER MECHANICAL EQUIPMENT TO BE INSTALLED: 19. HEAT: ❑SPACE ❑ RECESSED 1ACENTRAL ❑ FLOOR BURNERS: 20.AIR CONDITIONING: ❑ ROOM 910ENTRAL 21. DUCT SYSTEM: MATERIAL: THICKNESS: MAX CAPACITY: Cfm 22. REFRIGERATION: MAX CAPACITY: Cfm 23.COOLING TOWER: CAPACITY: gpm 24. FIRE SPRINKLER: NUMBER OF HEADS: 25. LIFT SYSTEM: ELEVATOR: MANLIFT: ESCALATOR: AUTOLIFT: 26.COMMERCIAL HOOD NUMBER: 27.FIREPLACE: PREFABRICATED: MASONRY: 28.IRRIGATION: ❑ PUMP ❑WELL ❑ PIPING 29.GAS PIPING: #OF OUTLETS: ❑GAS AHU: ❑GAS WATER HEATER: 30.OTHER-SPECIFY: SOLAR HEATING, BOILERS,UNFIRED PRESSURE VESSEL,HEAT EXCHANGER OR COIL IN DUCTS ETC. VALUE FOR OTHER ITEMS: 31.COOLING EQUIPMENT: AIR CONDITIONING REFRIGERATION EQUIPMENT,CONDENSORS ETC. NUMBER APPROVING OF UNITS DESCRIPTION MODEL# MANUFACTURER TONS AGENCY COrtdC�SerAel 1`-1030 31.HEATING EQUIPMENT: NUMBER FURNACES BOILERS FIREPLACES AIR HANDLERS ETC. APPROVING OF UNITS DESCRIPTION MODEL# MANUFACTURER BTU AGENCY Elf1:40'4(-0 30000L4L- 33.TANKS: NUMBER GALLONS CONTAINED MANUFACTURER SERIAL# AGENCY COAB FORM BLDG03 REVISED:1/18/2008 CITY OF ATLANTIC BEACH i i 1 OF BUILDING �� ` _ i •gyp �uu VL V!l.�:'O"L!�t%AL)- ,LANTIV BF-AC 1,ISL J22JJ-TEL. 247-51826-FAX: 247-VV 71 I r_ T _�r•� frT larrl\n�OIT�AIL t'ra'A iTr/1lr-INFORAMI T;0N -_ —_R ii`i i'.V�*si�[H[[V#7:`.: --� a Permit Number: 19688 Address: 254 OCEAN BOULEVARD D....++:+T.._ ..• ! ITII 1TICC AT! AMT!(` PPArH C1 !'1D_InA '1T)' V + Classof Work: IRRIGATION/DRAINAGE Township: 0 Range: 0 L Book: Proposed I sze: I MISS: 8!ock: Section- n Square Feet: Subdivision: ATLANTIC BEACH Est. Value- Parcel Number: Improv. Cost: j yY,. _ OWNER"INFORMATION Date Issued: 3/08/2000 Name: MARY WILEY 1 Total Fees: 25.00 Address: 254 OCEAN BOULEVARD Amount Paid: 25.00 ATLANTIC BEACH, FLORIDA 32233 Date Paid: 3/08/2000 Phone: (904)768-6166 Work Desc: SPRINKLER SYSTEM Ct?NTI 4 OR S* =' ti APPLICATION FEES = a HULIHAN TERRITORY/SCOTT HULIHAN PERMIT 25.00 I j � f 777 t f I NOTICE- INSPECTIONS MUST BE REQUESTED AT LEAST 24 HOURS PRIOR TO INSPECTION BUILDING MATERIAL, RUBBISH AND DEBRIS FROM THIS WORK MUST NOT BE PLACED IN PUBLIC SPACE, AND CONTRACTOR —OR I�VtI.iJ t DC I,LCrt'[CL1 UP AND HAULED%?1rilAY BY EITHER LVIV!t�Al�!Vrc Vi"C 1J11vlvE7S FAILURE [0 COMPLY WITH THE E I ONS I RUCTION LIEN LA1I1► CAN RESULT IN THE PROPERTY OWNER PAYING TWICE FOR BUILDING IMPROVEMENTS" ISSUED ACCORDING TO APPROVED PLANS WHICH ARE PART OF THIS PERMIT AND SUBJECT TO REVOCATION TI1R 1� /'Rr Annf !/�Anl ^ nr1/�\Il t�lf\/�If� nr 1 AIA/ FOR VIOLA hI!iV1l Vr 11i'rLIL.FiDLC rf[V V IJIVlVJ VI' L!'1VV. $25.88 14. �— Date: 3/88/88 81 Receipt: 8839988 I CHECKS 2157 A L TIC_ BEACH ILDIN EPT. 88189883221888 CITY OF ATLANTIC BEACH APPLICATION FOR PLUMBING PERMIT JOB LOCATION: :� S L} OWNER OF PROPERTY: �VvL,� ,� .''�c1 , ls� TELEPHONE NO. PLUMBING CONTRACTOR SCS CONTRACTOR' S ADDRESS: STATE LICENSE NUMBER: (Q 1 D, TELEPHONE: --gSUS HOW MANY OF THE FOLLOWING FIXTURES INSTALLED SINKS SHOWERS LAVATORY WATER HEATERS BATH TUBS DISHWASHERS URINALS DISPOSALS CLOSETS WASHING MACHINE FLOOR DRAINS SHOWER PANS SEWER / WATER e REPIPE ✓ OTHER TOTAL FIXTURES : x $3 . 50 + $15 . 00 �' �I4-,o,/ less Tn44 MINIMUM PERMIT FEE - $25. 00 J SIGNATURE OF OWNER: SIGNATURE OF CONTRACTOR: ----------------------------------------------------------------- INSTALLATION OF PLUMBING AND FIXTURES MUST BE IN ACCORDANCE WITH THE MOST RECENT EDITION OF THE SOUTHERN STANDARD PLUMBING CODE. CALL A DAY AHEAD TO SCHEDULE INSPECTIONS - (904) 247-5826 SEWER CONNECTIONS MUST BE CALLED INTO PUBLIC WORKS FOR INSPECTION CITY OF ATLANTIC BEACH MECHANICAL PERMIT 800 SEMINOLE ROAD-ATLANTIC BEACH,FL 32233-TEL: 247-5826-FAX 247-5877 PERMIT INFORMATION LOCATION INFORMATION Permit Number: 18075 Address: 254 OCEAN BOULEVARD Permit Type: MECHANICAL ATLANTIC BEACH, FLORIDA 32233 Class of Work: ALTERATION Township: 0 Range: 0 Book: Proposed Use: Lot(s): Block: Section:0 Square Feet: Subdivision: ATLANTIC BEACH Est. Value: Parcel Number: Improv. Cost: OWNER INFORMAT10N� . . .. Date Issued: 4/12/1999 Name: MARY WILEY Total Fees: 33.00 Address: 254 OCEAN BOULEVARD Amount Paid: 33.00 ATLANTIC BEACH, FLORIDA 32233 Date Paid: 4/12/1999 Phone: (904)768-6166 Work Desc: REPLACE CONDENSER, AIR HANDLER AND HEAT STRIP CONTRA '1E' S _ kPPUCATION.EES SNYDER HEATING &AIR COND. CO. PERMIT 33.00 .:-. lr�s coos R aired FINAL . :.. ,:. ..._:: NOTICE- INSPECTIONS MUST BE REQUESTED AT LEAST 24 HOURS PRIOR TO INSPECTION BUILDING MATERIAL, RUBBISH AND DEBRIS FROM THIS WORK MUST NOT BE PLACED IN PUBLIC SPACE, AND MUST BE CLEARED UP AND HAULED AWAY BY EITHER CONTRACTOR OR OWNER "FAILURE TO COMPLY WITH THE CONSTRUCTION LIEN LAW CAN RESULT IN THE PROPERTY OWNER PAYING TWICE FOR BUILDING IMPROVEMENTS" ISSUED ACCORDING TO APPROVED PLANS WHICH ARE PART OF THIS PERMIT AND SUBJECT TO REVOCATION FOR VIOLATION OF APPLICABLE PROVISIONS OF LAW. ATLANTIC BEACH BUILDI DEPT. BUILDING AND ZONING INSPECTION DIVISION CITY OF ATLANTIC BEACH ATLANTIC •AACH. FLORIDA•ataa APPLICATION FOR MECHANICAL PERMIT cAL'CiN WumeEN IMPORTANT — Appkant to complete all items in section; I, Il, III, and IV, LOCATION Proof Aldrotls ass ocKc-Vl Itu leterwetiw$ 1�Meels: 1l.f.00t► }�r^'�t Ltl.� Aad _ K11t DING II. IDENTIFICATION To be completed by all applicants, 1. c*•sdera►iea aJ prswit iir*e tar dein/ the work as described in the abowt sletemoet v• haroby agra* to perform said work in accordance ..►e fee oNoctyd plea ead specNiertiea which are a part Aortal end in accordance with the City of Jacksonville ordinucos and Nandnds */ good ►racs-co Assad rher*4. Name d Neahoaisef CeaMNlera att9weerGi�� s.rosv" *t owaar SlarstlsiN of w A.cb+rbr/ Aye*/ Areh{tell or Eertl►eer I I I. bp4pAL **00 "T10" A Two oTN911 OOM511'WiCTION $[IMa DOM[QN Cil THIS Ou1LDINO 0n •IT[t O "-0 V O Nawrel O t;*W utf, 1I T[/• CIVe Mu"Of" o/ CONrTIWGTIQM O M[IWIT p O+b• — fr+eMr V. wwalwt" (qup"Off TO a OWAUNIla Of'WOM as t wa0lief of�k se bpA of PvoI Assic anuol or [� Commtrrclal 1 d fora Q C�altttlrl O PAW C3 sullono Cd A:►c+ ca*lw I+n,o rulk+ino p pec+ 1T�yctsrlr. cr Nipkaownent of exisuno system Wa_� w. �s-ir M�� w"j a a.p"by. Rlx o Naw Insiallatim(No sytlam pnNourFy►nsw4m. O ice* d Extension OF 0064)n to anlslA+C ayslam Q 01tW— t WAly p R.. ttP 4 W--I; 0094*w of o IHa•.a w p wrwl p - -- - ��Itultlbwl T"IS WAa rat Dena use air p Gea.tin.fttt,ga�.`{.tr111`.•I ip-«t�.+rl - --- l+ ! C) Vetoed rlarwe own Q q Ot�.a — y+�► htlw .�...�. urr A" -- Are. CONOCTaawo AM NMI" tourhow >,.�,.rr..v.N. >p..�.+Mfi.e, >wlt.at lfttat►rsr wr at`�.+�i y .� o'�r 74—e. U L- J Z:71 c • rt"ACM shpts, AL p�aka IWWW W Vai1N me"NtiwbWItaallt- Nt+rutt IiYV) A= v c t � O.Y++al► Ifr CflMT xXewrr Slow ft1e, PSR-3844 1.0048 DEPARTMENT OF BUILDING CITY OF ATLANTIC BEACH PERMIT INFORMATION LOCATION INFORMATION -------- T46rmit Number! 10048 :address : 254 OCEAN BOULEVARD Permit Type* RE-ROOF ATLANTIC BEACH , FLORIDA 322 ,--lass of Work . NEW ---------- LEGAL DESCRIPTION -------- t.'onstr . Type: WOOD FRAME ,ot : Block: Section: Proposed Use: SINGLE FAMILY Township: RNG: 0 0iellings : 1 Code : 0 3ubdivision, ATLANTIC BEACH Evtiffiated Value: $2700 .00 Improv. Cost : $0 . 00 Total F- , $22 . 50 y22 , 50 ' P !NFORMATION APPLICATION FEES ----- 'J 4WNE- Name* MARY W PERMIT $22 . 50 ,�ddre�,%,: '254 (310EAh, BOULEVARD WATER IMPACT FEE S0 ,00 ATANTIC BEACH , FLORTrl- SEWER IMPACT FEE S10 r()0 0hone: f400221-01059 WATER METER/TAP RADON (37AS-H .,R . S - ------- CONTRACTOR INFORMATION RADON CAB 5% 1110 . 00 Name, MONAHAN, .ROOFING CNFITAL IMPROVE . 4,e'' Address 13540-, _CRASHAW ROAL SEWER TAP AT L ANT I CONNECTION 50 BEACH , FL . 3223 , CROSS C Type, SEC 11 IMPACT FEE CONST SPRCHARG,E, NOTES: NOTICE-ALL CONCRETE FORMS AND FOOTINGS MUST BE INSPECTED BEFORE POURING PERMIT VOID SIX MONTHS AFTER DATE OF ISSUE BUILDING MATERIAL, RUBBISH AND DEBRIS FROM THIS WORK MUST NOT BE PLACED IN PUBLIC SPACE, AND MUST BE CLEARED UP AND HAULED AWAY BY EITHER CONTRACTOR OR OWNER PAID "FAILURE PROPERTYTO COMPLY WITH THE MECHANIC'S LIEN LDLAW " ULT IN IV THE OWNER PAYINGTWICE FORTHE BUIING IAIMENTS Gily W Atlactic Mg, ISSUED ACCORDING TO APPROVED PLANS WHICH ARE PART OF THIS PERMIT AND SUBJECT TO REVOCATION FOR VIOLATION OF APPLICABLE PROVISIONS OF LAW. ATLANTIC BEACH BUILDING DEPARTMENT By: CITY OF ALM?IC BEACH ROOFING PERMIT APPLICATION Owner(s) :_ Address: 531 d Phone: ?(Icl 325 `'1 Lot # Block or Unit # Subdivision: Contractor: Cy" NA mO (\J }200(--1 fJG- Address: �-)-)C, 5c-1 J f bush C t, City, State and Zip_ ,.hc 1 ! e FjrA-i d '-\ -Phone—L-2- 1 -00-S'\ State License #__ C Describe work to be performed: ReCC�yE' fla. r Valuation of Proposed Construction: Materials to be used: �Sh�r) Sic, GCI1E� e Qw +,A e Signature of Owner; Signature of Contractor: Liability Insurance Supplied Workers Compensation Insurance Supplied License Information PSR 3 4 9177 ' DOPAIMMENT OF BUILDING j CITY OF ATLANTIC BEACH PERMITINFO IATION -----� ----�-_ ---- INFORMATION I NFOI dAT I ON $ t NuAberr 9177 Address . 254 OCEAN BOULEVARD Mit T pELECTRICAL ATLANTIC BEACH, FLORIDA 32233 O. tcl~k* ALTRATTOI" --------- LEG", DESCRIPTION Ty WOOD FRAME cit : 81 cack: Section ' Posed flee, SINGLE PAMILY Township . f2At4: D n e :` Cade: I ubdl.v sign, ATL ANTIr BEACki E ted VA;lue; E?. 00 i mpro r. Capt : $4 a 00 Total $ • . $18 . 50 un $18150 T TION . $PLZi 't'Iti »: ,,.._... OPE IT 1 .5 Aid BOULEVARD � W TE �MPACT EE �o $0.00 RE "reto 00 x at RADON GAS It.It. S. $0 .00 T'IOA -- ---- RADON CAR S0 ,00 ame R & €' . C I nCu wOM. :P � - AL IPR �A .Mrt &{ . SEWER TAP t?�, $0.00 JACKS LE,FL. 32219 CROSS CONNECTION S0a0,4 � Lic :� 8' Type:• 2 (y'iE�'1CyT/w��H IMP{Ay'�Cy�T (�EE y��">°fy���lA?p sJin 4r fr � mt:kGarow.."`i+6ntrtE „040 WY NC_T S: a n k� NOTICE ALL CONCRETE FORMS AND FOOTINGS MUST`BE INSPEGTf©BEFORE POt�ttNG PERMIT VOID SIX MONTHS AFTER DATE OF ISSUE BU � DING MATERIAI„ R"UBBISH AND DEBRIS FROM THIS WORK MUST NOT BE PLACED IN PUBLIC SPACE,AND MUST SE CL BRED UP AND MAULED AWAY BYEITHER CONTRACTOR OR OWNER 1 ILURE TO COMPLY WITH' THE MECHANICS' LIEN LAV11f CAN :RESULT IN- , PROPERTY OWNER PAYING TWICE FOR BUILDING LMPROYE NTS,' f iS flACCC?R13IP Q TO APPROVED PLANS WHICH ARE PART OF THIS PERMIT AND SUSJEC7 TQ ItE CATION FOR tQN OFA#fN.1 A8#�E PROVISIONS OFLAW. �L" CITY OF ATLANTIC BEACH, FLORIDA Approvod by APPLICATION FOR ELECTRICAL PERMIT TO THE CHIEF ELECTRICAL INSPECTOR: DATE: 10-3 1q 94 IMPORTANT NOTICE: IN CONSIDERATION OF PERMIT GIVEN FOR DOING THE WORK AS DESCRIBED IN THE FOLLOWING, WE HEREBY AGREE TO PERFORM SAID WORK IN ACCORDANCE WI H THE ATTACHED PLANS AND SPECIFICATIONS, WHICH ARE A PART HEREOF, AND IN ACCORDA CE WITH THE LECTRICAL REGULATIONS, CODES AND CITY OF ATLANTIC BEACH ORDINANCES. R & R ELECTRIC OF NORTH FLORIDA,INC. P. 0: BOX 62238 y JACKSONVILLE FLORIDA 32219 ELECTRICAL FIRM: MASTER ELECTRICIAN SIGNATURE JOURNEYMAN NAME Mary Wiley ADDRESS: 254 Ocean Blvd. RFD BOX BLDG.SIZE BETWEEN: RES.(k) APT.( ) COMM.( ► PUBLIC( ► INDUS. ( 1 NEW( ) OLD ( 1 REW. ( ) ADDITION ( ) TRAILER ( ) TEMP. ( ) SIGNS ( ) SO. FT. SERVICE: NEW( ) INCREASE ( 1 REPAIR ( ) FEE _ CONDUCTOR SIZE AMPS COPPER 1 ALUM. ► SWITCH OR BREAKER AMPS PH W VOLT RACEWAY EXIST.SERV.SIZE AMPS PH W VOLT RACEWAY FEEDERS NO. SIZE IND. SIZE NO. SIZE LIGHTING OUTLETS CONCEALED OPEN TOTAL RECEPTACLES CONCEALED OPEN TOTAL 0.90 AMPS, 91.100 AMPS. SWITCHES INCANDESCENT FLUORESCENT&M.V. FIXED 0.100 AMPS. OVER APPLIANCES BELL TRANSF. AIR H.P. RATING H.P. RATING CONDITIONING COMP.MOTOR OTHER MOTORS AMPS ICEIL HEAT: KW-HEAT /• ad 0-1 OVER MOTORS H.P. VOLTAGE PHS NO. 1 H.P. VOLTAGE PHS MISCELLANEOUS TRANSFORMERS: UNDER 600 V. OVER 600 V. NO. KVA I NO. 1KVA NO.NEON TRANSF. NO. VA. MA.__j_ MOTOR SIZE SWITCH I FLASHER EACH SIGN FORWARDED TOTAL FEES /�' O pry 9165 vp DEPARTMENT OF BUILOtNti CITY OF ATLANTIC BEACH , s -- LOCAT I ON I NFOPMAfi I QN ��.:. I'ERI"�` INFO� ION - -" --------- T " Address _ 54 OCEAN- BOULEVARD #� Iu b+ r " 15 ATLA.N'TIC BEACH, FLORIDA 32231 emit Types MECHANICAL, aM LtOALDESCRIPTION ---------- work: work , ALTERATION Block.- Section: ristr . Ly WOOD FRAME Lot : NO> U� SIiLErA1LY oos'ed SubdiVianATLAtTIC BEACH Code* 0 . `IaspItav . Cosokt St� 00 Tota CIA q LAX) fiION � -= " 1�y'P}�•PLICATIt?N FEE$ PERM 1 M. 4F 'BOULEVARD WAfi IMPACTS EEE ea, FEE „ f TAY °` � .- ,� RADON GAS_R*R° R$. .. . O E OST N RADON CAB 5% �! . DO YD EA I`NO & A��� COLID �C . CAPITAL I PROVE. Nm .� , �" SEWER BAR .00 e °su � " SACC LLE-" FLORIDA s 3 4 CROSS CONNECTION "0 .00 �^ O1 Type: 3 SES` H IMPACT FEE ` CONST,SUR,CRA,RGE { s { NCt�'ES gIg 4 T i NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE INSPECTED BEFORE POURING PERMIT VOID SIX MONTHS AFTER DATE OF ISSUE o ltlLfliNG MATERIAL,RUBBISH AND DEBRIS FROM THIS WORK MUST NOT BE PLACED IN PUBLIC SPACE,AND MUST BE �LEARED UP AND HAULED AWAY B'YEITHER CONTRACTOR OR OWNER � �r.��ILURE;Y© COMPLY WITH THE MECHANICS' LIEN LAW ICAN RESULT IN HE PROOERTY OWNER PAYING TWICE FOR BUILDING IMPROVEMENTS." SUED ACCORDING TO APPROVED .FLANS WHICH ARE PART OF THIS PERMIT AND SUBJECT TO REVOCATION FOR t101:AT10AF OF APPLICABLE PRQVIBIONS OF LAW. ODOOODOOD 00000w $M56 14 Date 9/30/94bi Acpt> 0084997 A LANTIl4EACH BUILDING DEPARTMENT t Llt� f � s - PSR+ DERARTMENT OF BUILW Nt3 CITY OF ATLANTIC BEACH { PES! ....__ ,. LOCATION I N `ORMAT I ON ----- , pef,,Zit Numbet- 9152 Address , 254 OCEAN BOULEVARD I e ri►i t '" ELECTRICAL ATLANTIC BEACH, FLORIDA 1 9 0 Wort, ADDITION __�.------ LWAL DZSCRI TION _... ------- fi; Cha t r. T, Pe WOOD FRAME ot: B1bck; Section: SINGLE FAM Townshi t. RNC3: D ngs'. I Code: ► ubdivision. ATLANTIC BEACH E lmated V 1ue: 0.0 improv. dost: ' $0 , 00i Total Fees : Sms4 Amounk Date. 94 r. N Del AT AND AIR R yk ., i t n t . 'ION ------ APPLICATION FEES QIRRMIT r LEVARI WATER IMPACT FEE $0 .00 " C FLORIDA LORIIIA mvilk E ? , ��;f'� Vd ^� .TMi v a "'R`�`r .� NY° ,�y �. ��aXSJ�' � . : 0, R, FORMATION ------- RADON CAB % S0.00 IPA Y CAPITALIMPROVE. sC .Cly? Ad� P 8 2_1 g EWEX- TAS EO.00_ It'- ,32219 CROSS CONNECTION $0.00 L' 02 SEC R IMPACT FEE CONST.SOBCHAROR 'alk 60 . ro affil �r Y, NOTICE-ALL CONCRETE FORMS,AND FOOTINGS MUST BE INSPECTED BEFORE POURING PERMIT VOID SIX MONTHS AFTER DATE OF ISSUE BL�.4bING MATERIAL,RUBBISH AND DEBRIS FROM THIS WORK MUST NOT BE PLACED IN PUBLIC SPACE AND MUST BE _CL ABED UP AND HAULED AWAY BY EITHER CONTRACTOR OR OWNER `F AILURE 'I O COMPI Y WITH THE MECHANICS' LIEN LAW GAN RESULT 1N ` H's PROPERTY OWNER PAYING TWICE FOR SUILDI ING IMPROVEMENTS." IS 1ED ACCORDING TO APPROVED PLANS WHICH ARE PART OF THIS PERMIT AND SUBJECT TO REVOCATION FOR VIOLATION&.APPLICABLE PROVISIONS OF LAW. 1 16 f'' IC BEAC BUILDING E; RT NT BUILDING AND ZONING INSPECTION DIVISION CITY OF ATLANTIC BEACH ATLANTIC aEACN, FLORIDA 31233 APPLICATION FOR MECHANICAL PERMIT CALL-IN NUMBER IMPORTANT — Applicant to complete all items in sections I, II, III, and IV. 1. LOCATION Street Address: OF Intersecting Streets: Between And { WILDING Sub-division II. IDENTIFICATION — To be completed by all applicants. In consideration of permit given for doing the work as described in the above statement we hereby agree to perform said work in accordance with the attach9d plans and specifications which are a part hereof and in accordance with the City of Jacksonville ordinances and standards of good practice listed therein. Nome of Mechanical Contractors Comkocter (hint) �� e Master ma� of /Darty Owner Si'sbArre of Owner Signature of a Ao1b -.14 Agent ° Architect or Engiaeor 111. CrENEPtAI INFORMATION A. TY17/0 hooting W: IS OTHER CONSTRUCTION BEING t ON oochfc THIS BUILOING OR SITE f Q baa—❑ Ll C] Natural O Control Utility IF YES, Give NUMBER Or CONSTRUCTION O PERMIT Other — Soocify IV. MCMANICAL IOUIIMBNT TO M DWAUM NATI OtOF WORT( ( complete Met of cormpenab ON bad off this I Residential or ❑ Commercial scorn O Mmmw I)'Comhrl O Heor ❑ Building :zLwimLifts: Q Roams �CoMrol vaiplacement IIIing Building Q Duct System: Mator+.l Thick of existing system Meebmum comity 41011. ❑ New Installation(No system pwAou*Installed) O Wil—tion ❑ Extension or add-on to existing system ❑ Other— Specify C) Cooling towr. Grcity �.Nm. C] Fire sonklen: NwwAw of hods Q tilwotw O Momlih C] tncelle.__—._._.("N*W) DDH: !ACE !Ot ON=WO ONLY Q GaoCim.Iw--- (twmlb..1 heeeMe�l Q Took (mumtkor) 111406114 Q Uw&od'roswne ve" O M.B.re foam* Appose l by e... p Othw — Sw* Nersmit a.s ,— LIST ALL EQUIPMENT AR CON1"ONING AND REFRIGERATION LQUNWENT hhinaber Valk. DSMI%KMR Kadd NUMber >ttaatsls.alltrae (�sas) 1 TOW L 111EATING . FURNACES, BOILERS, FMEtLACES Ihmfer Valta Dasorl m= IhW 1rtllntse Yi1lAtliaib�3le /jr, 00,0 (,( TAKU liew many NeW1saa11 Cagdb IryM XA"" Nme ad Serial Old NO, CITY OF ATLANTIC BEACH, FLORIDA Approved by APPLICATION FOR ELECTRICAL. PERMIT TO THE CHIEF ELECTRICAL INSPECTOR: DATE: 19 IMPORTANT NOTICE: IN CONSIDERATION OF PERMIT GIVEN FOR DOING THE WORK AS DESCRIBED IN THE FOLLOWING, WE HEREBY AGREE TO PERFORM SAID WORK IN ACCORDANCE WI H THE ATTACHED PLANS AND SPECIFICATIONS, WHICH ARE A PART HEREOF, AND IN ACCORD NCE WITH'THE LECTRICAL REGULATIONS, CODES AND CITY OF ATLANTIC BEACH ORDINANCES. R & R ELECTRIC OF NORTH FLORIDA,INC. P. 0: BOX 62238 JACKSONVILLE FLORIDA 32219 JOURNEYMAN ELECTRICAL FIRM MASTER ELECTRICIAN SIGNATURE NAME mares/ Wiley- ADDRESS: 254 nr,Pan Blvd. RFD BOX BLDG.SIZE BETWEEN: RES. APT. ( ) COMM.( ) PUBLIC ( ) INDUS.( 1 NEW( 1 OLD f REW.( ) ADDITION ( 1 TRAILER ( 1 TEMP.( ) SIGNS ( ) SQ. FT. SERVICE: NEW( 1 INCREASE ( 1 REPAIR ( 1 FEE CONDUCTOR SIZE AMPS COPPER ( 1 ALUM. SWITCH OR BREAKER AMPS PH W VOLT RACEWAY EXIST.SERV.SIZE Zjl2d AMPS PH 3 W �27WOLT RACEWAY FEEDERS NO. SIZE NO. SIZE NO. SIZE LIGHTING OUTLETS CONCEALED OPEN TOTAL RECEPTACLES CONCEALED OPEN TOTAL 0.30 AMPS. 31.100 AMPS. SWITCHES INCANDESCENT FLUORESCENT&M.V. FIXED 0.100 AMPS' I OVER APPLIANCES i I I I BELL TRANSF. AIR H.P. RATING H.P. RATING CONDITIONING COMP. TOR OTHER MOTORS AMPS CEIL HEAT: KW-HEAT a;o0 0-1 OVER MOTORS H.P. VOLTAGE PHS NO. I H.P. VOLTAGE PHS MISCELLANEOUS Heat TRANSFORMERS: UNDER 600 V. OVER 600 V. NO. I KVA N0. IKVA NO.NEON TRANSF. NO. VA. MA. I MOTOR SIZE I SWITCH I FLASHER EACH SIGN FORWARDED $ l�J TOTAL FEES �- CITY OF 4&4^4-0 /SMCA- Office of Building Official REQUEST FOR INSPECTION Date ` r` Permit No. Time /x A.M. Received V P.M.' Job Address (� „ ) tContracto 4ocali Owner's Name _ BUILDING CONCRET ----"ELECTRICAL PLUMBING MECHANIICAC—, Framing F] Footing ❑ Rough Wiring ❑ Rough ❑ Ai Re Roofing ❑ Slab ❑ Temp Pole ❑ Top Out ❑ Heating Insulation ❑ Lintel ❑ Final ❑ Sewer ❑ Fire Place ❑ Pre Fab READY FOR INSPECTION Mon. Tues. Wed. Thurs. Friday P.M / A.M. Inspection Made d 7 r —� P.M. in or Final Inspectio Certificate of ccup y ❑ Date 001642 . DEPARTMENT OF 13UILDING w , CITY OF A'TLAN'TIC BEACH FERIrf1'i` 2dt"O> NA"l'T 9tN - LOCATION IPAPORMATXbN P is N x a1642A�ddreso 234 QGEA N BLVD. I r i Ty MECHANICAL ATLANTIC BEACH, FLORIDA32233 REPAIR: LaEUAL. OE CRTP't rON .. t✓ r x . .Typ4t' �t 'A .,cats 0) 6 1 S I~ir nr k' `opo d Oiw s SINGLE .I~AffTL Y R��t B Ic s Iw' t 4� ; O Cod ? R bd *t o a tCkoti.vated Values $0.00 .'. _ - OWNER INFORMATION oprov. Hca r O.C M s SART # I LEY, . � :: O.00 tr+ s 21OC AR BLVD., T r .. ��k ' ATLANTIC BEACH LORIVA 32,233 k Au ^ . '{ Wi � �'� .t 3 'y 6' � 7 1 'A"� 'A�Cf't..I C A►'i`I ON �tS`Ea"7. . ,�a.H.uw .L w j/+�ONPI /�*'�yry`� PERMIT $20.00 ��e tl!`,ATER IM+ `EE µr;m b ^p a " Rl4GC) OAS-ti. R. z RADON GAS:, 100- 9949 AA I I/nt1 9 „ 1A1l R -TAJl 4..00- •fI 1" � SEWER. TAP49 FA, 11,/01f 149 P� HYDRAULIC S14ARE *0.00 R -INSPECT FEE, ivNCLHiERNO { NOT s� u; P�. 4` NOTICE ALL CONCRETE FORMSAND FOOTINGS MUST BE INSPECTED BEFORE POURING t PERMIT VOID SIX MONTHS AFTER DATE OF ISSUE BU NG MATERIAL,RUBBISH AND DEBRIS`FROM THIS WORK MUST NOT BE PLACED IN PUBLIC,SPACE,AND MUST BE C )LDI UP AND HAULED AWAY'BY EITHER CONTRACTOR OR OWNED. F AILUR E TO COMPLY WITH THE MECHANICS' LIEN LAW CAN RESULT IN E PROPERTY RTY t'�WNEI PAYING TWICE FOR BUILDING 1MP,VEME`NTS"- t. UEO ACCORMNG TO APPROVED' PLANS WHICH ARE PART OF THIS PERMIT AND SUBJECT T4 REVOCATION FtOR LATION OF APP ICASLE PROVESIONS OF LAW. ATII4NTIC B Hs D PARTMIANT'� f BUILDING AND ZONING INSPECTION DIVISION CITY OF ATLANTIC BEACH ATLANTIC BEACH, FLORIDA 322$8 APPLICATION FOR MECHANICAL PERMIT CALL-IN NUMBER IMPORTANT -- Applicant to complete all items in sections 1, 11, 111, and 1V. 1. LOCATION Street Address: IRI,Ici OF Intersecting Streets: Between And BUILDING Subdivision 11. IDENTIFICATION - To be completed by all applicants. in consideration of permit given for doing the work as described in the abcve statement we hereby agree to perform said work in accordance with the attacked plans and specifications which are apart hereof and in accordance with the City of Jacksonville ordinances and standards of good:.practice listed therein. Nems of Mechanical ' Contractors Contractor (Print( Master Nano Of IsmPerty,Owner AC1 r 1j, r Signature of Owner Signature of or AyfMrind Agent Archi fact or Engineer 111. 6134LVAL IN K&ATION A' Type of Mating W: B. IS OTHER CONSTRUCTION BEING DONE Q" e THIS BUILOING OR SITE? 1 _ T t3 Cm—O LP ❑ Natural ❑ Central Utility IF YES, GIVE NUMBER OF CONSTRUCTION Q on PERMIT 00W. Specify , 0111CHAPIrAL 1OWNWENT TO K INSTALLED N AOF WORK ,'jhevide complete 1-rst of components on beck of this` I or ❑ Commercial r M t ❑ Space ❑ ReeessW Central O Hoon ❑ NN Building ilia Condrtiearusg: ❑ Room t E�Ing Building I"J Duof System: Material Thiekne■� Replacement of existing system Masfmum capacity a f.m. ❑ New installation(No system previously Instatled} ❑ Rsfrigeation O Extension or add-on to existing system ❑ Other— Specify ,d Cooling tower: Capacityg.p.m. Q Fire sprinklers: Number of head ❑ sevatft ❑ Monlift ❑ Escalator-(number) THIS SPACE pOR OFFICE USE ONLY Q,Gasoline pumps (number) (Ill"oked) Q To (number) Remarks 13 LPG centirnen ._ .(number) Q Urrfired pressure vesser O .sea Permit /Approved by 3 Other Specify Permit a.. UJIT ALL EQUIPMENT AIR CONDITIONING AND REFRIGERATION EQUIPMENT pVMVbg Number Valts Domptiat Model Number umutacturer (161111110� �^ slowy D_ EATING FURNACES, BOILERS, FIREPLACES pater 7n101119ba Yalta S[odal Number welludwhWer C j�[T): � ► O TANKS Stow X"y NPamlaal Cepwily TY'"Liquid Name at serial Sad Dlm01tdoos Contained ManutScturer N STATE OF FLORIDA DEPARTMENT OF PROFESSIONAL REGULATION CONSTRUCTION INDUSTRY LICENSING BOARD --N� LICENSE NO. NO. 09/06/89 RA 0024248 00364 THE CLASS 8 REG. `AI'Rr,COND. CONTRACTOR NAMED BELOW HAS REGISTERgqEp� DTTEERR gg RR yyEE YYEE EXPIRING HE JP �VI o,91 CH(!1 R MEET9ALL'teciZ LI�ENSIM6R REQUIREMENTS PRIORiTO CONTRACTING' INiAMY AREA) SNYDER• ROBERT D SNYDER'S HEATING A/C 8 REF CC 10415 BEACH -BLVD P O BOX 16826 JACKSONVILLE FL 32216 atfolNiZ �OO,N�OOVeDISPLAY IN A CONSPICUOUS PLACE SSCRKTARY, D.P.R. STATE OP FLORIDA DEPARTMENT OF PROFESSIONAL REGULATION CONSTRUCTION INDUSTR�Y' LICENSING BOARD LICENSE NO. • 05/31/89 eCA ,, CI0114642 . 11978 THE CLASS A CERTIFIED � AIR GOND. -CONTR NAMED BELOW IS CERTIFIED EXPIRING HE JP �VI �N2 CHAPTER• 489 F.S., FOR THE YEAR HATES* FREDERIC D SENDERS HEATING A/C $ RFRG CO P 0 BOX . 16826 JACKSONVILLE FL 32245--6826 BOB A INEZ <(GO� GOVERNOR DISPLAY IN A CONSPICUOUS PLACE smensTARY, D.P.R. FOR OFFICE UPE ONLY Date 101�71177---19 ...... bd Permit #........................Fee CITY OF ATLANTIC BEACH Valuation $...... FLORIDA House �rx vee-W'6'V4/. .................................................. ............................................................................ APPLICATION FOR BUILDING PERMIT .................... ------- ............................ L Application is hereby made for the -approval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the City of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the City of Atlantic Beach and all rules and regulations of the Building Department of the City of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the City of Atlantic Beach,Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub-contractors be submitted to this office so that licenses can be verified. ...October. . . . ...21 ,-......1.9.77 Date. ............... __- . -_._.__......... ................. 19............ Owner__.Mr.s_....Mary---Wiley----------------------------------------------------.-Address-2.5-4...Ocean---Blvd. 2 14 4- 3 la 5 ........ ----------- ------------ - ----------- .........Telephone No............................. Carl Burr Architect-........................................... ---------------------------------------------Address,4Z9..1-6-.Ay,..-.Np.....J.%X--RehTelephone No....2416_249.6---- Contractor Builder....Di -Xillex-----------_-----....... 123 16 Av No Jar Bch ug. .................Address----------***----------------------------------------------Telephone No........................... LotNo.------- ---3-----------------------_--------Block No-------1.q----------_---Sub Division--------------------------------------------------------------------------------Zone---_---------- Q.Q.fm4---Blvd-.---------_---------------Street_.W�eqt.--------._Side Between----------------------....................... and 16...........................Sta. 'tic Valuation $...6--a-V........For what purpose will building be used-. =Xz-&—x-,z-1X-Irwof con ction...---------_-----............ Dimensions of Building.........................._-_----.-..:Dimensions of Lot-.-.--------------_-------------......................Size of Footings------------------------------------ Size of Piers------------------------------------Size of Sills--------------_-_---------_Greatest Sill Span in ft..-.--_---------.--_-----Type Roof.....-------------------------------- How will Building be Heated?---------------------------------------------------------------Will Building be on Solid or Filled Ground?...........................-............ Size of Ceiling Joists---------------------------------------.1 Distance on Centers------..... -----•-----......---•••--•.---., Greatest Span........................................... pt Size of Floor Joists--------------------------------------------- Distance on Centers..._---- _--- _---------------_--- Greatest Span............................................ py Size of Rafters---------_--------------- -------------------.-, Distance on Centers....---- ----------_..................... Greatest Span............................................ ft Job consists of screening 3 sides of existing carport This rectangle is to represent the lot. Locate the building or buildings in the right position. Give distance in feet from all lot-lines and existing buildings. REAR LOT LINE Two copies of plans and specifications shall be submitted with application. Inspections required. 1. When steel is in place and ready to pour footing. 2. When steel is in place and ready to pour columns and/or lintel. z Z 3. When steel is in place and ready to pour beam. 4. When framing Is completed. 5. When rough plumbing is completed,and ready to cover up. 6. When septic tank drain field or sewer is laid but before it is covered. 7. Electrical inspection by City of Jacksonville. 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called for after corrections are made. FRONT OF LOT In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with the attached plans and specifications, which are a part hereof, and in accordance with the building re lations of the City of Atlantic Beach. 0 of Builder ........... Address....................................... ............................................ ---------V.,5�1�1- -............... Signatureof Owner..--------•---............................................... Address.................................................................................................... � 1 I "a DEPARTM NTi OF BUILDING 3518 CITY OF ATL/�NTIO BEACH, FLORIDA PERMIT NO PERMIT +O BUILD THIS PERMIT MUST BE POSTED ON JOB Date 10/21/ 1977 Valuation$ 500-00 Fee$ 5-00 - — This permit not valid until above fee has been paid to City Treasurer, and is subject to revocation for violation of applicable provisions of law. This is to certify that Doug Miller has permission to build_ enclose-part i on Of carnart Classification- residential ne Owned by m r s. A'a ry Wiley Lot Blo -S/D House No 254 ocean Blvd. According to approved plans which are part of this permit i NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. PERMIT VOID SIR MONTHS i AFTER DATE OF ISSUE it , �__� ► 0 Building material, rubbish and debris from this work must not be placed in s public space, and must be cleared up and hauled away by either contractor or owner. :i R. C. VOge:1 t S Building Official. i "FOR'-gFFICE PERMIT DATE CONTRACTOR USE DNLY NUMBER PLUMill4a ELECTRICAL SEWER WATER s 1`7 f iii ✓x 1 h 14 DEPARTMENT OF BUILDING 3074 CITY OF ATLANTIC BEACH, FLORIDA PERMIT NO.- PERMIT O.PERMIT TO BUILD THIS PERMIT MUST BE POSTED ON JOB Date 5/5/ 1976 Valuation$ 45, 000- 00 Fee S 105.00 This permit not valid until above fee has been paid to City Treasurer, and is subject to revocation for violation of applicable provisions of law. This is to certify that Laurie C o. . I n C. has permission to build Bingle family dwel1ing Classification residence Zone Ownedby Mrs. Mary Wiley Lot 3 Block 29 S/D A/B House No 254 Ocean Blvd. According to approved plans which are part of this permit NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. PERMIT VOID SIX MONTHS AFTER DATE OF ISSUE x ��. ► O Building inaterial, rubbish and debris from this work most not be placed in public space, and must be cleared up and hauled away by either contractor or owner. R. G. . Yex Vii'.. L _ •r r Building Official. FOR OFFICE PERMIT DATE CONTRACTOR USE ONLY NUMBER PLUMBING ELECTRICAL C SEWER WATER CITY OF ATLANTIC BEACH APPLICATION FOR SEWER CONNECTIONS PERMIT NO. LOCATION LOT NO. 3 BLOCK NO OWNER TYPE OF BUILDING ` MASTER PLUMBER INSPECTED _ BY BILLED ACCOUNT NO._Ja FOR OFFICE USE ONLY Date--- ;.--o........19 � D O CITY OF ATLANTIC BEACH Permit #........................ �. '-'Fee$.` ..-..-..... Valuation /Ub Q FLORIDA House #ez-6w Dc.e --------- .......................................................- APPLICATION FOR BUILDING PERMIT .............................. -....... Application is hereby made for the approval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the City of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the City of Atlantic Beach and all rules and regulations of the Building Department of the City of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the City of Atlantic Beach,Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub-contractors be submitted to this office so that licenses can be verified. „� Date , 19.. . f Owner ..... r/.._..... ......-- e ' i. Address.................................. - •--•--. -----..Telephone No............................. Architect ---------- -------r ---------- - / •-----------Address,-----------------------------------------------------------Telephone No....... -----• ------ Contractor Builder -, .-- : J. -�•''�T' Address...---- ---- --,�_s... :___Telephone No.- ...._.1 LotNo--------------------------------------------------Block No--------------------------------Sub Division-...-.--------------------------------------------------------------------------Zone................ . R . -----1Y ------------_--------Street-----4� 7'.--,Side Between..... rJ --------------------------and...----•-......Yom.:::.: .1......................Sts. Valuation $___ c '�: ...For what purpose will building be used 4. Te �-.' .........._Type of construction.-___. : .......... Dimensions of Buildin f a X._/..Z._._.-..__----Dimensions of Lot........ '...... ............... .............._Size of Footings Size of Piers...__...-------------------------_Size of Sills-............__...---.----------Greatest Sill Span in ft...........................Type Roof..... .......... . How will Building be Heated?_...............✓_=. . 1:r_'. .-.__-..-_._------------Will Building be on Solid or Filled Ground?......... Size of Ceiling Joists__.2._XA1--------__---------------- Distance on Centers.......... _* . C. , Greatest Span._._....__... _... .... ............ ” Size of Floor Joists----------------------------------------------- Distance on Centers----..... -----........................... Greatest Span............................................ Size of Raf rs ` 1/ ----------------------, Distan on Centers_ ... ....z= ' , Greatest Span ��.-f•_ ., This rectangle is to represent the lot. Locate the building or buildings in the right position. Give distance in feet from -all lot-lines and existing buildings. REAR LOT LINE Two copies of plans and specifications shall =.,, be submitted with application. Inspections required. 1. When steel is in place and ready to pour footing. 2. When steel is in place and ready to pour columns and/or lintel. z x 3. When steel is in place and ready to pour beam. 4. When framing is completed. F 5. When rough plumbing is completed,and ready to cover up. 6. When septic tank drain field or sewer is laid but before it is covered. 7. Electrical inspection by City of Jacksonville. 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called for after corrections are made. c FRONT OF LOT In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with the attached plans and specifications, which are a part hereof, and in accordance with the building regulations of the City Atlantic Beach Signature of Builder :?_+.1......:`.r . .....?. � �.: ....--•..............•--. Address_.. ....��. ... .1_...._.. ......................................... Signatureof Ownei-............................................................................................. Address..... E DEPAI�/ F_WDl OF BUILDING 3248 CITY 9 ATL/NTIC BEACH, FLORIDA PERMIT NO. � 111 PERMIT TO BUILD THIS PERMIT MUST BE POSTED ON JOB Date December 8 19 7 Valuation$ 1,000,00 Fee$ 3-0c) This permit not valid until above fee has been paid to City Treasurer, and is subject to revocation for violation of applicable provisions of La. This is to certify that J im White has permission to build accessary building _ ni-iI itz—Shed Classification 7�ne Owned by MANX Mrs M D Wiley Lot Block S/D House No 254 Ocean Blvd, According to approved plans which are part of this permit NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. PERMIT VOID SIR MONTHS AFTER DATE OF ISSUE x 4 0. ► 0 Building material, rubbish and debris Zfrom this work must not be placed in public space, and must be cleared up and hauled away by either contractor or owner. R. C. Vogel Building official. FOR OFFICE PERMIT DATE CONTRACTOR USE ONLY NUMBER PLUMBING ELECTRICAL SEWER WATER r .. APPLICATION FOR WATER CUT-IN TO THE CITY OF ATLANTIC BEACH: Application is hereby made for water cut-in at the following address for .8g6g..� units. Cut-In charge of " 62) � , c?-t� ° Street Ao. �" ,� aa Lot _ Block g' Subdivision Ordered by: OWNER: ti0 Mailing Address: DATE ACCOUNT NO.- METER O.METER NO. DATE I11STALL"ID 1 FOR OFFICE UE ONLY :/0 ------ Date- ......I...../.............19 JPermit *........................Fee$- .. CITY OF ATLANTIC BEACH Valuation $ D-------------*­...... ,!/-------------- FLORIDA House #..- ........ ........... .. ....... ..... ............ .............. APPLICATION FOR BUILDING PERMIT ............. ................ ........................................................................... Application is hereby made for the -approval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the City of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the City of Atlantic Beach and all rules and regulations of the Building Department of the City of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the City of Atlantic Beach,Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub-contractors be submitted to this office so that licenses can be verified. Date.............16. .............................................I 19_z--- Owner---- - -- -- -----•-----------.Address i� 3/..... ....Telephone Architect... O ---------------------------------Address-. Z _Y...Telephone No.-_------------_--•------ Contractor Builder.. 1r' j.:.X�4elephone ------- ---L.4-4 ------------_-----Address..., Lot No.------ ---------------------------...Block No.----- ----------Sub Division....<2... -- -- ...........Zone....-----•--- -------- - Sts---------Street------<-'-----------Side Between...........'971.V _=--------------•--------.and-------c. .........%----------------------- Valuation -----------For what purpose will building be --------__-__-_Type of constructionZ------------_---------- 9 Dimensions of Building--------------X--------............._,Dimensions of ....... .........................Size of Footing-s---- Size of Piers_..___.___..'-:.................Size of Sill's---- --------- ......Greatest Sill Span in ft..--.._.___._._...___....Type Roo ------- 0'q How will Building be Heated?-_-.._. ..............................Will Building be on Solid or Filled Ground?__ ....................... Size of Ceiling Joists...-t;2...... .------............. Distance on Centers ..... ......../6�_ ................... Greatest Span----------_/6­1..................... yo - ....I Size of Floor Joists..._-.-. ------------....... Distance on Centers.......... /.&........................ Greatest Span-----------/42-------------------------- Size of Rafters.--------_---------------------------- ------., Distance on Centers........ ........... .................. Greatest Span........................................... This rectangle is to represent the lot. Locate the building or buildings in the right position. Give distance in feet from all lot-lines and existing buildings. REAR LOT LINE Two copies of plans and specifications shall be submitted with application. Inspections required. 1. When steel is in place and ready to pour footing. 2. When steel is in place and ready to pour columns and/or lintel. Z Z 3. When steel is in place and ready to pour beam. 'i E-4 4. When framing is completed. 5. When rough plumbing is completed,and ready to cover up. 6. When septic tank drain field or sewer is laid but before it is covered. 7. Electrical inspection by City of Jacksonville. 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called for after corrections are made. FRONT OF LOT In consideration of permit given for d the work as described in the above statement, we hereby agree to perform said work in accordance witb-tK6 attF d 9 and specifications, which are a part hereof, and in accordance with the building regulations of the Cit of A ..... Address... ------------------- .....40 Signature of Builde ....... . .. .............. C....... Signatureof Owner---......................------.............................................. Address................................................................................................... FOR OFFIC U E ONLY C 44 < Date..... . ..-• .. .............19 ...... 6 Permit #---------------........Fee CITY OF ATLANTIC BEACH Valuation ....Y .... 0. . ................................ 1.o2 FLORIDA House ...... . . . . ........... d ..... ...... APPLICATION FOR BUILDING PERMIT .............. ----------------­----................. ....................................................................... Application is hereby made for the approval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the City of Atlantic Beach, Florida, and all pro-visions of the Laws of the State of Florida, all ordinances of the City of Atlantic Beach and all rules and regulations of the Building Department of the City of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the City of Atlantic Beach, Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub-contractors be submitted to this office so that licenses can be verified. Date....... dam-------------------------......................... 19. 4:--. --------—cc ------- �Y-------- ---------------_-Address-.:Z le Owner...1q1k ...... -Telephone No. ............................................Address,_Lf ..4 -,r.2....Telephone No. Contractor o-Contractor -------/Alt------------------- Lot No.--------2----•---•--•----------•--------------Block No..------ --------_---- Sub Division... -------------------_------Zone................. �3E24,a:1,1 ---------Street-------9�L ..-Side Between.,........ -----------------------------and------31-KI•.................................sts. Valuation $ 6f-'Q_0 C'4------For what purpose will building be used.._//` )/Xle.............---Type of construction.-.6-4-4- :n.hne'e!tAA1& Dimensions of __--:Dimensions of Lot,....... 1,10-------------------Size of Footings.--- ...... Size of Piers-....___---'__.-._— ---------------Size of Sills_------- --------Greatest Sill Span in ft...-.-_...............Type Roof How will Building be Heated?__ --------...................................Will Building be on Solid or Filled Ground?._.__ ................. it ................d� Size of Ceiling Joists--- Je(1_z-� ---------- Distance on Centers.......... ..................... Greatest Span. ................... Size of Floor Joists----. ------------------------ Distance on Centers....-._.... __J4---.__--.---..-----.-, Greatest Span------------------It.................... Size of Rafters_------------------------------------- ------------ Distance on Centers........ ................................. Greatest Span.-----------_--------------•••--•-------- " This __----------- This rectangle is to represent the lot. Locate the building or buildings in the right position. Give distance in feet from all lot-lines and existing buildings. REAR LOT LINE Two copies of plans and specifications shall be submitted with application. Inspections required. 1. When steel is in place and ready to pour footing. 2. When steel is in place and ready to pour columns and/or lintel. Z Z 3. When steel is in place and ready to pour beam. 4. When framing is completed. 5. When rough plumbing is completed,and ready to cover up. 6. When septic tank drain field or sewer is laid but before it is covered. 7. Electrical inspection by City of Jacksonville. 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called for after corrections are made. FRONT OF LOT In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance w1t4_1he attached ans and specifications, which are a part hereof, and in accordance with the building regulations of the Cit of AtI ea -------------_-_ Signature of Bui .. .... —------------ Address Signatureof Owner----- ----------------------------------------------------------------------- Address.....•................_-----_-----_-_------------------------_----_----_------------ 1 GAS`U�5 SPsr R E 5�D �A V� r y .N k 4 � i NDEX Instructions to Bidders Form of Proposal General Conditions SGC 1 Supplementary General. Conditions SGC - 1 DIVISION 2 - SITE WORK . �..:.�._ Section 2A Site Pre,Daration ` 2A - 1 2B Landscaping 2B - 1 DIVISION 3 - CONCRETE_.;. �,:...+.....�......w._...._......... j Section 3A - Concrete 3A, 1 I DIVISION 4. MASONRY Section 4A '- .Unit Masonry 4A - 1 DIVISION 5,,; METALS jI Section 5A - Miscellaneous Metals 5A - 1 j DIVISION 6 - CARPENTRY Section 6A - Carpentry: Rough & Finish 6A - 1 �B - Millwork 6B - i C -Staircase 6C- 1, DIVISION 7 - T�;OISTURE PROTECTION i. .. .....�._�..�.,.__ . ..._..........�.. ... Y.... ....- -.... Section 7A' - Roofing 7A - 1 7B - Dampproofing 7B - 1 7C - Insulation 7C - l DIVISION $' - DOORS WINDOWS GItASS Section $A - Wood Doors $A - 1 $B Glass, Glazing, Windows $B 1 JDIVISION 9 ,-..._.FINISHES ,,,...";..:.; �...r.... ....._....._.. Section 9A Ceramic Tile ' 9A - l 1 9B, - Composition 98 - l 9C - Drywall 9D - Painting`& Wallpaper 9D DIVISION 10�„ SPECIALITIES Section" 10A � Finish Hardware l0A l ;10B `'Miscellaneous Specialities lOB - 1 NOT USED�.:�._.........�,,.:.,..-•-----�•-�- w.....•- DIVISIONSl�-a--1- Air.CHNICAL ..... ..�...... ��_._ DIVISION 1 ..:...- ----- ..._._ .15A 1 15?�. Plumbing A•r; Conditioning 15g " 1 .,-section5g. r Heating andr. DIVISION 16 Electrical A 1 16A Section - 'Electrical yl.,r ! + q i. �� ! it: i t + f •I t � fl 1� ,• i ` f fly. t.,.t �' \ 1 a it r � y • i '. + i r Inetpuctions to Biders I - Instrucjaion to Biders : ATA Document A701, April 1970 Edition, Aryicled 1 . 1 through 9 .2 shall apply to and farm j a part of these aspecifications . Copies of the Instructions to Biders , AIA Document A701, may be seen at the office of i the Architect . i Bid Proposals : Shall be made in the form of the Formof ! ~' Proposals include in these Specifications . V Prposals shall be made and placed in an opaque envelope marked Residence for Mrs . Mary Wiley, and shall be delivered i or mailed to the office of the Architect . Before submitting a proposal , bidders shall carefully examine the drawings and Specifications, visit the side a.nd fully inform themselves as to all existing conditions and limitations and shall include in the proposal a sum to cover the cost of all items included in the Contfact. Any addenda issued during the time of bidding shall be covered in the proposal and shall become part of the ' Contract. f Bidders shall include a list of their major Subcontractors whwn submitting°proposal . Competency of the Subcontractors will be a consideration in the acceptance of proposals . j Soo (,nivdrs;�y 91v4. Bids shall be received in Suite # 44 ��` Jacksonville ,Florida at 2:00 p.m. on_t 975 1 a 1 j Form of Proposals Date: Residence fnr Mrs . Mary Wiley c/o Darwin Torres :aOQ Vn3-- fry,a I_Y[,, Jacksonville, Florida 32216 • Re: Residende for Mrs . Mary Wiley Gentlemen, After carefully examining the General Conditions of the Contract & Specifications and Drawings entitled"Residence for Mrs . Mary Wiley", as well as the premises and the conditions affecting the, work, the undersigned proposes to furnish all material, equipment and labor. called for by them for the sum of dollars, ($ If he be notified of the acceptance of this proposal witin fifteen days ( 15) of the time set for the opening of the bids, - he agrees to execute a contract for the above work, for the above stated compensation, in the form of the Standard Agreement of the American Institute of Architects . The undersigned, if awarded the contract, to execute and deliver to the Owner, within five days after signing the contract, a satisfactory bond in the form issued by, the American Institute of- Architects, and in the amount equal to the Contract Sum. Very •truly. yours, Alternatesa GENERAL CONDITIONS The "general Conditions" of the contra6t for Constriction, AIA Document A201, dated September 1967 . Articles 1 . 1 through 14.22 shall apply*iito and form a part of these Specifications . S1�NTARY CENTRAL CONDITIONS ._ 1 . Definitions 1 .1 Owner: Mrs . Mary Wiley 1 .2 Architect: Darwin Torges 2. Precedence of Documents 2 . 1 • Agreement 2.2 General Conditions 2.3 Specifications 2.4 Large and full Scale Drawings 2.5 Genral Drawings 2 .5 . 1 Figured Dimensions 2 .5 .2 Measurement by scale 3 . References Where standard specifications, such as Federal, ASTM, RISC, ACI, Underwriters, etc . , are mentioned, the same shall be the latest editions of revisions in effect on the date of this specification. The description of items and parts contained herein shall be made a part of the specifications . 4. Error or Ommissions An errors or ommissions shall be reported to the Architect y p who will approve any adjustments or corrections prior to . the beginning of the work affected'. 5 . Shop Drawings Shop Drawings shall be titled with the names of the Owner, Contractor and Subcontractor, 'dated and shall indicates i 5. 1 Working and erection dimenmions . 5.2 Arrangement and sectional views . 5.3 Necessary details and connections . 5 .4 Kinds of materials and finishes . 5 .5 Description of Equipment . 5 .6 Location at which materials will be installed. Submit four copied for approval, Approval of drawings does not make the Owner responsible for errors nor for any unauthorized deviation from the terms of the Contract.. Fabrication ny the Subcontractor prior to approval shall be at the Subcontractor"s own risk. 6 . Public L;Labiliti y- a.nd ,Proper ty--Damage Insurance Public Liability and property damage Insurance shall be taken out and maintained during the life of the Contract. Public Liability Insurance in the amount of not less than $109,)0001300, 000 and Property Damage Insurance not less than $25, 000 . 7 . Workman' s Compensation and Liability Insurance . Workman's Compensation and Liability Insurance shall be taken out and maintained by the Contractor in accordance with Article 11 . 1 of the General Conditions . 8. Fire Insurance with Extended Coverage The Contractor shall effect and maintain, at his expense such in- surance providing coverage against vandalism and malicious mischieg. 9 . Insurance Certificates Contractor shall furnish Owner certificates showing that all Workman's Compensation and Liability Insurance is in force before first requisition for progress payment is made. 10 . . Owner's Contingent Liability Insurance Subcontractors shall save- harmless and indemnity to the Owner for damages arising from operations under this Contract. 11 • Temporary Utiliies Temporary Utilities shall be provided by the Contractor. 12 . Bond At the Owner',s option, the Contractor shall provide a Performance and Labor Bond in the amount of the Contract. S .G .C. 2 13 . Climate Contr,,+.ctor shall sus�:�end ,any vmrk- subject to damaga fro:, . , clinatic conditions when such conditions exist. 1].. , Codes _ e i�L I ions .fees A11 local building codas and re& lat:ions shall be complied Frith. In absence of local cede, Southern Standard Building Code will govern. Contr=actor shall payor cause to -be paid all inspections, fees, , and permits. 15.. Taxes • Contractor and Subcontractors. shall pay all local, State, lyederal, Occupational Taxes, Excise Taxes, Federal Insurance : Contributions, State Sales Taxes and other applicable taxes.. 16. Substitutions No substitutions shall be mde without prior written arproval from the Architect. 17. Re.2l, cementof Dar ages, Defaced,_or Defective Iiaterials: end or 7Jorkmnshi n - ` All defective, damaged or dafeced materials and/or workmanship shall be replaced by the Contractor at no extra cost, to the I, Owner. 18. Protection„ of, S,lork ' ,All finished work shall :be protected.-from injury : or,defeoement. gas the work progresses. 19. Ike j_ection of; ids The Oi-mer reserves the right to reject any or all bids. 20. pli.cati on for Pe;,►: Pnt Ten days days before each progress paymcnt is due , the Contractor shall furnish to the Architect an application for payment ', I•, of the Contract along with the itemized breal;doWn of the J Contract price sho;�ing the amounts of each worm done; unit rices and amounts ..claimed. Seo articles,19,403 of the 'General :p lConditi.nns. 2l. Certificates ,of Payient The •Architeot. shot later than the 5th' day, of: the ;pre cesding ' +,' .GSC. 3 month, will issue a Certificate of Payment for 90 1,-�, of the value of the an roved work up the last of the month. The full amount shall be paid . in. the final paymant: after the conditions in articles 9.401'tfpough 9.5.2 of the"General :, Conditions have been met.. 22. Storage of� -MateKiAls All r,Laterials and supplies for the work shall be properly stored and protected against vandalismi theft and the elements at the job site . The Contractor spall be responsible, for. the ^rotectinn'of all Mems and materials against loss or dam :gQ whether"thc� have 'been, aid'for;' the Owner:;in paid requisition; or not. r 1 t .1. 11 � _L s L; L i i I I L .� I r 11 I r I I • .,; .,. � � 1 ! Y .,,I L f I L , ,f• i I •. I I r� I I 1 1 1 I �` �3.G C. J+ ' DIVISION .2 .-...SITE WORK' Section 2A Site Preparation + ` � �,.r,r. ...:.r.r.r..rr... - �.r.+..�.-. .r+.wr•+rr.rr...r.wr' x. :l. General The General Conditions and Su�.�;�1c:raentan., General .Co.nditions a;�ply to the work of thys section. 2. Cleaning Remove all vegetation, wood, debris , and necessary trees fr ori w tha 6.6 3. ' No pipes shall be allo ed'in the .footin-z. 2.1. Remove:only those trees in :designated building asaa. x111 others shall"romain and shall',be protected during construction. j . Lxcav_ation Excavate to a sound firm bottom for all footings as shown. i Footings shall bear on undisturbed soil. All excavations shall be wet thoroughly prior to placing concrete. •. All mulch or other un3uitablo. soil shall be removed from building' site and replaced with compacted fill.. r. 1'ill ,,Fill shall be clean free draining sand. :r',��ill shall, be placed .— in 'layers not exceeding eight inches and. shall, be compacted to W� Procter. Termite„ Treatment '.'Foundation walls and area under building shall be rendered termite proof be bonded a»plicator. 5.1 Provido a five (5) year service tirarranty guar::nteein r tre Omer protection from subterranean termite infestatian and I)rovidinror treatment again at no. cost to. the Owner -should ;,. ,such infestatinn occur. 6. C adin�, u.l . Grades, not otrcr:•rise sho:•m, shall ho uniL orm levels i, of 'sloe, .b3ti-man elsvati on points o bat�raen ,lavation points and the existinh finish grads sha ..ed to drain a��ra;r :rem building walls. ' ` ' 61.2 . ;:3terials shall be placed in - ,ren',,, ' distributed 1yers over entirs area: each layer 12 inches or lays in de 7th i be:�ore. coy- paction, spread and cop pacted as s��::cified; filling for ; areas to i be topsoil or to receive planting shall be graded to -” within 4inches o:4 the finish grade 6.3 Exi tin~ a +a a within the =tract not requiring., cutting bo lovoled. ` -I contraC. for C OL �,,zndsCu tion• N 1 Constr �'... r• ^ri t rl}` It r tt 1, \5 + 1• 1 1 )i' � � 4 � t l r 1 i veli r• 1'+ �t , 1 1 tl X1.1 v{ ' 1 Ivy• Il ` '• ,+ ' r a 1 '�, y ' 1 �. v, �Iv 1 1 • X11 .•1 •t v .6di DIVISION 3 CONCRETE Section JA, Con a Work 1. Scope The work under this section includes the furnishing of all plant, equipment, labor, and material necessary to perform all concrete construction as indicated on the drawings. Them General Conditions and Supplementary Conditions apply to' the ' work of this section. 2. Shov Drawings . Shop Drawings and schedules of reinforcement shall be submitted. to ,the Architect. - See Supplementary General Conditions. 3., Materials 3.1 Cement : Portland Cement, ASTM C-150, Type I. 3 .2 Fine__Agre ate : Coarse clean sand, free fron deleterious material conforming to ASTMC-33• y 3 .3 Coarse Aggregate : ' Crushed stone, rock or gravel conforming to AS C-33 • 3 .4 Reinforcement 3 .4.1 Deformed Bars: Intermediate grade new billet steel, ASTM A-15, A-16, or A-305. 3 .4.2 Wire Mesh:' Welded cold drawn wire fabric, ASTM A-185. 3 .5 Water: Shall be potable . 3.6 Form Lumber: No. 1 SYP. Sheathing shall be form grads plywood not Less than 5/8 inch thick. 3 .7 DaInppro f ing: Virgin Polyethylene plastic, six mills thick in accord nee with Fed. Spec. UTI-P-147. 3 .$ : Expansion Joint Filler: jj inch thick preformed Celotex. ti 3.9 Concrete ,from Ready-Mix Plants Shall conform to the Standard Specification for Ready-Mixed Concrete of AST14 C-94. 4. Mixins All concrete for use throughout the work shall attain the following minimum .compressive strengths per .square inch at'. the. :expiration of 2$ days after'.placement. 4. 1 , 000 PST Concretes Shall be used for all concrete for which bending- stresses have been calculatedsuch as beams, columns or suspended slabs . 4.2 2500 PST Concrete: Shall be used for all concrete footings, slabs on grade or fill, concrete pavement, sidewalks, etc . 5 . Anchors All. anchors, bolts and other items that must be set in concrete shall be set as work of this sect&on and supervised by the trades affected. 6 . Forms Forms shall be constructed accurately and erected true and shall be level, tight, and substantial to preserve their shape without undue leakage until the concrete has set. 6.1 Removal: Beam sides and other vertical forms may be removed after three days following placement of concrete. Slab forms shall remain in place for at least 14 days.. 7 . Placirg of Concrete All earth on which concrete is to be* placed shall be wet thoroughly immediately prior to placing concrete thereon. Concrete shall be placed before initial set has 'occured. Concrete shall be placed in sv.ch a manner as to prevent se- gregation or loss of ingredients . The concrete shall be cpmpacted and worked in an approved manner into all corners and around reinforcement in sach a manner as to prevent se- gregation or coarse aggregate. No retempered concrete shall be used. No concrete shall be placed when temperature, is 4.0 F or below , or when falling. 7. 1 All exterior slabs shall be pitched to drain. 8 . Curing After placing 'AND initial set, all concrete shall be kept comtinuously wet for a minimum of seven days . All curing concrete shall be protected from injury or the weather. J 9 • Finish All surfaces not covered by forms shall be carefully graded and screeded to the finishsurface floor 'elevations . After screeding s and tamping, the surface shall be floated to a true and uniform plane with no aggregate visible . The shower room (G . Floor) slab shall be floated and shall have a light broom finish with a"/Ft. fal to the exterior sand trap-drain. i 3A-2 110 Plumbing,, and Other Pipes All plumbing pipes to be encased in concrete, shall be tested to required pressures and approved prior to placing concrete. 11. Cleaning Before the project is accepted, ,,all 'excess. shall be cleaned . u,p •and removed from the site f DIVISION 4-MASONRY Section 4A- - Unit Masonry 1 . Scope Work under this section includes all plant, labor, and materials 'necessary for work as shown on the drawings . The General Conditions and suplementary General Conditions shall apply to this section. 1 .1 Related Work Under Other Sections : The setting of bolts, anchors, loose lintols and other metal work is included under this section. 2. Mortar Materials 2.1 Portland Cement: Shall comply to provisions of ASTM C-150, Type I . 2.2 Masonry--Cements Shall comply to provisions of ASTM C-91 . 2.3 Lime : Shall comply with ASTM C-207 - 2 .4 Quicklime: Shall comply with ASTM C-5- 2.5 Aggregates : Washed silica, free from clay, loam, dust or other organic matter complying with provisions of ASTM C-144. 2.6 Water: Shall be potable . 2 .7 Mortar for Brick or Concrete Blocks Shall comply with ASTM C-270- 1(R, Type 0 . i 3 . Masonry Units 3 . 1 Hollow-Concrete Block: All Concrete masonry units shall be square, true and have sharp edges and corners . Hollow masonry units shall comply with ASTM C-•90-•64T, Type 1. All 8" concrete block walls will have continuous metal ties every sixteen inches (every other. horizontal row) as per draeings. 3.2 Concrete _B, i�ck__ Shall comply With ASTM 0-•55-65T, Type 1. 4. Mortar Joints j 4.1 Vertical and horizontal joints for all blockwork shall be 3/8 inch wide . Hori"ontal joints for all blockwork shall be flush. All eight inches walls shall have horizontal continuous metal ties every sixteen inches . All blockwork shall be laid on a solid bed of mortar. 5 . Wall Ties Wall ties shall be corrosion resistant ties, 7/8 inch Wide, and shall be truss type. 6. • Anchors and Lintols All lintol angles, bolts, ties., plates andmasonry reinforcing shall be built into the work and shall be' set true and level. 7 . Cement Block Sills, Not applicable in this job. 8 . DAmpproofing Shall be Wasco Copper fabric dampprodfing with three ounce copper between layers of asphalt saturated cotton fabric . Dampproofing shall be set in asphalt mastic . 9. Pointing All masonry skall be carefully and thoroughly pointed after j all amsonry work is 'eompleted. Ow i I 4A-2 i 1 , DNISION ..:�MF'.TAZS Section 5A - Miscellaneous Metals : 1. Scone The work included under this section shall include all nein- forcement steel, wire mesh, pipe columns, bearing plates, structural steel, angles, anchors, and ties. 2. Materials 2.1' Reinforcinx Bars:, ASTM A-15 or ASTM A-160. 2.2 Wire_ Fabric Reinforcement: ASTM A-82 or AST14 A-185. 2.3 Pipe : Used as columns 'ASTM A-7 or ASTM A•120-54. 3 . Reinforcement 3.1 Cleaning and Bend�_ Reinforcement: Metal reinforce- ment, at the time concrete is placed, shall be free from rust, scale or other coatings that will weaken or destroy the bond. All bars shall be bent cold. Bars with kinks not shown on drawings shall not be used. 3 .2 Placing Reinforcement: Metal Reinforcement shall be accurately placed and secured in position by metal chairs. In ;` ono case shall the clear distance between the' bars be less than nor less than 1 1/3 times the maximum size of the coarse aggregate. Chairs for bars shall be placed at a maximum of 81011, o.co and where required to support bars. 3.3 Splices in Reinforcement: Shall be lapped 20 bar diameters .arid all be securely 'wired. Spliced in adjacent sh bars shall be staggered. Adjacent 'sheets of wire ,shall be lapped at -least 6" and •shall be securely wired. 4oStructurk:] Steel Shall comply with ASTM A-36 and provisions of AISC. .' 5. Termite Shields J ,Termite shields shall be 26' ga. G.I. Metal Shields, Carefully soldered and: installed ,with no pinholes or damages in the +, materials. 11 `/,, 11 I• + � .. Ate `�.f{ Y / DIV'ISTON 6 CARPENTRY Section 6A - Carpeptrvc RouQh and Finish r...w...,r .�.r.wr.w+ ..r...�.•�i.r....� r..�.w.�..•�.+�.�r.•.. .i e.•.+....•..rr►.iw..wrr........... 1. General' The General-.Conditions and Supplemetnary General Conditions shall apply to work of this section. 2. Lumber Unexposed interior and exterior lumber shall be structural ` grade fir or cedar having a moisture content not to exceed 12,. All lumber exposed to concrete or masonry shall be pressure treated. ' 3. Interior,frim Interior trim `shall'be stock size and .shall be C and better select fir or white pine. All lumber in contacts with Concrete. { or masonry shall be pressure treated, 4. Built-In-Furniture Plywood for cabinets and other built-in-furniture other than factory built, shall be interior AA, 3/4" thick plywood as manufactured by the Douglas Fir Plywood Association. Kitchen cabinets and vanities shall be plastic lamiriatie, dovered. See Section 6B. 5. 1 Measurements Measurements of all millwork and features which may be affected folk, by construction at the building shall be chekced in the field s and shall govern fabrication. Any serious discreppancies shall be reported to the Architect before ' proCeed3.ng with the work affected. 6. Hurri c ane C lips Hurrican Clips shall be of standard manufacturer placed as called for on the drawings. 7. Application of Hardware Location of hardware for wood doors it% as: follows: upper edge of ton hinge 511 below head of frame , ` lower 'edge. of bottom hinge l0" above .finish floor. �. ; Door .knobs shall be 36", above finish floor. �. Insulation , Ir�sulatior� :shall. be full-thick ,Ownes-Oorning fiberglass, batts with a foil face . Instillation in place shall give a rating of R-16 for walls and ceilings : and R-7 for reverse-flange insu- lation between floor joists(2411) . Insulation shall be in- stalled strictly according to manufacturer's printed instruc- tions, and as shown in the drawings . j 9 . Grounda and Furring A. Grounds shall be provided around-all openings, in back, of all fixtures and cabinets to be fastened to wall surface, and behind all trim. Grounds shall be plumb and true . B. All ,+Wood in contact with masonry shall be preA ,ai-xe treated pine and shall be fastened 'to wall surface at 16"o .co with galvani.z ed nails 10 . Pressure Laminated Plastic Pressure Laminated Plastic shall be 1/16 thick. Colorand pattern will be as per drawings and approved by Owner . Pressure laminated plastic shall be Formica, Micarta or Consoweld and shall be securely glued to backing with waterproof glue . 11 . Forms • Forms necessary for concrete shall be made under this section i 12 . Wood bucks I Wood bucks shall be erected true and shall be plumb. Wood bucks shall be well anchored to;j masonry. ' 'r . 13 . Weatherstripping � Weatherstripping shall be Chamberlain bronze. Threshod shall„ be Chamberlain No . 988 or similar. •14. Screens Screens shall be furnished by the window and door manufacturers . 15. Plywood 15 . 1 Roof Sheathings 3/4" thick Int-DFPA (with exterior k� glue) where not exposed. 3/4" thick C-C EXT-DFP ►. where exposed. 15.2 Exterior Stud walls . 5/8" thick rough sawn reverse board and batten C-C EXT-DFPH.. Exterior Plywood walls shall have horizontal aluminium trim over car-port and covered walk 15.3 Forms : 5/8" thick PLYFORM. 15.4 Paneling Shall be i" thick, as per drawings and approved 'by Owners under an allowance of $6.00 per 4'x8' sheet. 6A-2 16 . Workmanship 16 .1 Generals Layout work carefully as indicated and to accomodate the work of the other trades . Accurately cut and fit ; erect in proper position, true to dimension, aligned, square, plumb and secure permanently in place. 16 .2 Treated Lumbers Use for nailing blocks, plates and other wood against masonry or concrete, Brush coat freshly cut ends with approved preservative . 17 . Installation 17 . 1 Framing:. Erect true to dimensions, squared, plumb, aligned, level, well spiked and nailed, and adequately braced. Extend studs to structural framing above and securely anchor thereto as indicated on the drawings . 17 .2- Blockings Provide substantial blocking for support of- light fixtures, wall grilles and ductwork. Fasten at each bearing with two 10d nails . 17 .3 Nailing: Toenail studs to support members with two 8d nails on each wide face. Nail double studs together with 10d nails spaced 16 inches and staggered. Nail studs alongside opening into end of shoe with two 10d nails . Bridge between studs and secure at' each end with two 8d nails . Toenail block- ing studs with 10d (two) nails at each bearing. 17 .4 Finish HaPdware : Apply accurately and neatly to operate quietly and smoothly. After installation, replace wrapings on knobs, handles, ,pulls, etc . as pro,I:ection until completion of building. Upon completion doors shall operate smoothly and frEely. set thresholds in bed of caulking compound and remove excess material. Secure with cadmium plated screws into .lead shields . Adjust olosers for proper opration. t 6A-3 Se9, 9n_ bB -, Millwork - _...,. 1: General, The General Conditions and the Supplementary General ,Conditions apply to the work under this section. 2. Material i .; 2.1 Lumber: Trim, frames, sills, stops, and misc , ellaneous exposed trim shall be fir or white pine. 2,2 Plywood 2.2.1 Plvwood for Cabinets: A-D INT-DFPA ` fir plywood where exposed. 2.2.2 Plywood bother than cabinets) : A-D Douglas 'ir, or A=A-where both faces are exposed. 2.3 Plastic Laminate : Pressure laminated plastic, 1/16 inch thick, rough sanded back, satin finish, : NRMA Std. Spec. LP-2. Color selected by the Owner. 2.4 Contact Cement: Formica Corp. "Super Fast Dry". 2.5 Shelving: BSinimum 5/8 inch thick plywood, solid wood trim on edges. 26 Wines and Dowell,: Hardwood or Steel. 2.7 Fastenin s: Brass screws (wood) ; cadium or' a" zinc` coated steel. 2.$ ;, Cabinet_Hardware 2.8.1 Ad ustable„ Shelf Standards: Steel, zinc, plated,Knap, & Vogt 233 with 237 supports; Knape 1 ' & Vogt 255 with 256-R supports. +. . 2.$.2• Drawer Slides,: Steel, zinc plated, with. ' r nylon rollera`Kria e & Vogt No. 1100 or equal-: , P q 2.8.3 Pulls Owner's selection. 2.g.4 Hin es: Stanley or: equal, Owner'a selection concealed. 3 . Sealing All millwork items shall be completely sealed with one coat of sealer before storing .at job, site, unless factory finish .,has-been applied. r 1 6B•1 ! 3 .1 Wood Treatment : All softwood in millwork items in contact with masonry or concrete surfaces shall be , treated by immersion or brush application with a wood preservative in accordance with F. S. TT-W-57LG and AWFA to obtain a clean, paintable surface, free from odor. Job cut prices shall be treated along the cut at the ,job. 4. Measurements Dimensions which may effect and govern fabrication shall -be checked at ,job site. 5. Qv.. rawinus ,.. Submit to Architect for approval before commencing fabrication. ' Failure to do so will be considered sufficient cause for rejection. Refer to General Conditions. 6 Workmanship Cabinet work constructed by a shop specializing in first quality work. Fabricate to approved shop drawings, assemble . r. 'carefully and join properly. Sand exposed surface to an even, smooth surface without marcs ready for finishing. Protect all work from moisture. The actual spaces to ..receive the cabinet work shall be measured to assure proper fit. Only minor fitting will be permitted at the job. site. 7. Fabrication 7.1 General: Work shall be assembled at the mill insofar as practical and delivered ready for erection. When ` ' it is necessary to cut and fit on the Job, the material t` shall be made with ample allowance for cutting. Work shall be made in accordance with measurements taken at the Job. Check all dimensions of millwork against door openings into ' spaces to receive the same. If any pieces are of such size as to be impractical to pass through the opening, the Architect shall be notified before fabrication begins in order to determine how the piece will be divided and later joined to insure passage . Exposed surfaces shall be joined with concealed nails, screws, and dowells, and where practical, with mortise and tenons. All exposed nails shall be, countersunk. Scribing, mitering and joining shall be done accurately and neatly to conform to details. Flat members of:trim shall,be ploughed out .to :prevent warping11 . f t vhf r•ir� r f r IV, r� r' i41 f41 , ' ' (!+.•• It Ftj' �''tlt t ''' It I ( .. 7.2 Trim: Back out flat members, kerf saw back where against masonry. Furnish single pieces for items up to sixteen feet long. For longer items, prepare half-lap joints, for assembly at' job site. 7.3 Cabinets and•. Counters: Construct rigidly, en- close ends, ' bottoms and top and scribe edges to wall for tight fit. Rabbetted joints, blind-dowelled and glued, set in clamps. Apply plastic surfacing to top, front and ti,, exposed edges indicated. Frames shall be generally of 3,04 inch stock. Shelves: x: , 3/1r inch thick solid wood glued . ' up to size o plywood with hardwood edge strip. r 7.3 .2 Finish: Cabinets shall be shop finished with laminated plastic. Color to be selected 1 i ' by the Owner. 7.4 Miscella sous: Provide the necessary miscellaneous angles, slips,bolts$ anchors,. braokets and other accessories shown or required to complete the installation oe each item.. 8. DeliVery t , '` .. Do not deliver in damp weather, or into portion of building where masonry, plaster or mortar is not thoroughly dry, or where windows shall have not' been installed and glazed. All millwork .shall be stoned at the site in a -dry location. • 1 t "w; w7ta3,�Ce:se 1 ,Ir, f `Workund.e phi's ``, 4 j sectI.ion included all labor, material and equip dencet heSar�r o, in&t6Xj the staircase as per drawings . The treads ale 1 '10'. wood.;.'joists. cut to. measure . The risers, are 3/4 thzc larks' `cu.t to , measure .measure . ' p The Contractor will take all'- the 'pre oaut3.oris'.;iri, order to secure structurally the staircase . It is 'the, ,Coontraator's. ,r�,sponsibility ao cover, the staircase with carpet,. he ,a1'lowance for this 'carpet .is $890per sq. Yd in"- i'ng 'S ms tpc at=Q 2 •� :Han-----dr��= ' ` The handrail wir ll be' made of 13 4"x $" / planks following the Where ,the handrail is :curved this will be made , of timber, ,oi`; fhe aame kind ''and the pieces: 'will not ;be smaller than r, ent four inches) long measured alon the center. l'ine of their, .#; w ,17 :1e ;finished ;ecual,ly, t© the'. doors., r ` (183 DIVISION 7 - MOISTURE PROTECTION Section 7A, - Roofing 1 Scope Work under this section includes all labor, material and equipment necessary to install complete, roof. The General Conditions and Suplementary General Conditions. apply to work under this section. The roof consists of three systems : solar collectors, built- up and shingles . The solar collectors: The solar collectors are placed over a built-up surface, waterproofed with three layers of asphaltic felt, over 3/4 " plywood sheathing and over 1" thick rigid insulation. The Built-up Roofs: The roofs whose inclination is 9 .5% and 15 -Mo are built-up roofs . Over 3/4" plywood sheathing, three layers of asphaltic felt will be applied and protected by a final layer of clean gravel set over a fresh coat.i.ng of asphalt. I Shingled roof: The rest of the roof will be shingled' and as shown on the drawings, over three layers of asphaltic felt. 2 . Materials 2. 1 Felts Asphalt saturated felt of proper weights in accordance with ASTM D-226 or F.S . HH-F-191A. Shall be applied as per manufacturer's written instructions . 2. 2 Asphalt Shin les : Shall be 290# grade "A", thick- butt self sealing asphalt shingles as manufactured .by Bird, Frye, or Johns Manville as per Owner's selection. 3 . Inspection Roof deck shall be smooth, thoroughly dry and free from defects . Report defects found in surface prepared by' other trades , to the Architect . Do not proceed until defects have been corrected. 4. Delivery All roofing materials shall be delivered in original un- broken containers bearing the manufacturer's label. 5. Installation Roofing shall be installed in accordance with manufacturer's specifications . 6. Protection 7A-1 6 . Pro;1ection Remove splaterings from faced of surface not intended to beicovered. Leave roofs in a clean condition and job free from rubbish and debris. Areas shall be cleaned or reAoLced prior to acceptance. 7 . Guarantee - Roofing Contractor shall guarantee, in writing, to repair leaks that were due to defective workmanship or materials for a period of three years from date of completion. If a leak does appear within that time, due to the abovec,c ;.uses, the Contractor shall repair same without additional cost to t the owner { - 7A-2 Section 7B - _Flashes Dam,�,groo�f ng ' 1. General The General Conditions and the Supplementary General Conditions apply to the work of .this section. i 2. Materials 2.1 Sheet Metal: 26 gauge glavanized steel complying with ASTM -93 or :S. QQ-S-775A. Fabrication ` 3 .1 Metal Dri,g,Edge : Fabricate to shape indicated on drawings from 2Z gauge galvanized steel. 3 .2 Gutters and Downspouts: (Where indicated) Shall �,. be tabricatOTYFoi-12-6 gauge galvanized steel, type rrKrr gutters. Downspouts shall be retangular corrugated pipe. 4. Installation 1 .1 Metal_ Flashing: Secure flashing with galvanized at nails. Coflanges as required. Flashing shall. be installed only by experienced fabrication and installers. 5. Kitchen and Bath Exhaust Fan Ducts Ducts . shall be fabricated from 26 gauge galvanized steel. sized as required. Standard roof or wall caps as required. 6. DameLing ' . 6.1 . Sills and Open Heads: Three ounce copper or equal. 6.2 '° Under Concrete Slabs: .006 virgin polyethylene plastic 2 ply film similar to "Vis-Queen". 6.3 Under Sun Deck Roof: H-D, Gauge 20 mil. Nervastral membrane as manufactured y Rubber and Plastics Compound .;; Co. Membrane shall be installed ,in accordance .,with the f manufacturer's instructions. t7. Protection Finish surfaces shall be protected from damage by other trades. / $. Cleaning Up , In accordance with the General Conditions, remove splatterings from' the faceof surfaces not intended to be covered, free from defects, rubbish and debris,. n f � , , , }; ,t h ,y{$G ",(1 1� i �a, ft 4''. , _•a' t t , . . ' { rr '• • 1 , � '.t+1 til h ', i t' 7B-1 r1 t'4 � ' i I •. i 't ' Section 7C jLlat"o y 1. General {. The General Conditions and `the Supplementary Gener��. 'Conditions apply to the .work of th3,s section. 1, , 2. Materials 2.1 Batt Insulation}: Fiberglass wool batts or rolls, paper and aluminum oil backing,, width as required. Frame walls : 3 7/$"; �eil�.raRa: 5 r 7/ "; tinder :floor; Junior Foil or- equivalent. 3 . Installation Insulation shall be installed strictly• in accordance with ` r the manufacturer's instructions. k. Cleaning Un Upon completion of.' the work, remove all excess materials :,:,t,.-and insUl.ation. debris from the,. �job site i � r 1 rr 1• I �rV t � k I. 1 � r• ' I }' rl t r+,r + '+ II ,rl I� + f•"I t �I /r 1� , +d. 1 t I ;,I, t.. '(l + !r r � ti+ 1 r r ;.I ,•t r.y a,1 + i. I'r �,,1..' � t+ +:• 1 }I �+F,� 11 •t ..I 1 r + 1 + � Id r 4 �• 2r �y + it rR, �i{ ':• :.. +., r. +� ' � }� 1' ,�• � 1��rV I t{ t� rfr i I+ _ 1 , I ^ i 1 r I) '! /J .. i 1 r j'+ ` .I 1 r11 '{!i � tip II' � v't •� + � .. �. 1 I 1 + t I I rl +• 1.1 o f°3 1 � d .f.. r tl � I r11 I +V �iy 1 41 rt > r i" n r ;t. + " .•I � r ( I I t, ' + �1` i I ) + '•it,t ilfr 1 I. r` r �t,. 1. Y I' ,I ' ti •+ r', 1 •. f lil,rs� + 11 I' 1 f ;' r •ur r '1• I 1+ � t •` + + 1 R 1 I, d ,i r.• I + • 7C�� DIVISION 8 - DOORS,, WINDOWS, GLASS_ Soction• 8A--- Woo,d •Doora-, 1 . General The General Conditions and Suplementary General Conditions . apply to . the wor under this section. 2. Wood Doors ' 2.1 Exterior; Shall be 1" / thick panel doore, ponddero- sa pine, as selected by the Owner. 2.2 Interiors 2.2. 1 Flush Doors ; 1 3/8" thick, flush doors with Luan faces, hollow core 2.2:2 Bi-fold Louvered Doors ;_ Shall be 1 1/8" thick, constructed from Ponderosa pine. 3 . Installation Doors shall be installed so they swing easily and freely on their hinges and close accurately against the stops without binding. Doors shall remain stationary in parial apen potition without movement. Exterior doors shall have three butt hinges and threshold. Main and secondary doors shall be suitably keyed. 8A-1 Segpion 8B - Glase&. Glazing, Windows 1. :General The General Conditions and Supplementary General Conditions ' apply to the work under this section. 2: Glass 2.1 Plate: thick polished Plate as manufactured by PPG or equal. Tempered where required. 2.21 - Sheet : Clear, drawn, sheet glass, 1/811 thick, DSB. + 23 M_ir�: Clear, mirror quality polished plate glass, thick r • 2.4 ' Grading, and Labeling: Domestic glass only. Each light shad be labeled to indicate grade and quality name of manufacturer and designation. Retain labels on glass until final cleaning. 2.5 Screens: Weatherstripping, operators, and hardware . shall be furnished by window manufacturer. 3. Installatiori Glazing shall be done by experienced glazers. Glass shall be cut accurately to fit openings. All glass shall be set with . ': waves running- horizontally. All glass shall be set without springing or forcing. 4. Cleaning 1. .;' Uuon completion of the work, all glass shall be thoroughly 4 washed, cleaned and polished. Broken, chipped, scratched, r " or defective glass shall be replaced,• Work shall be left in perfect condition. ' 5. Windows Windows shall be anodized aluminum s windows of ' sized shown as manufactured by Kenco or' equal. Sc�creens Screens for screened doors and windows shall, be furnished .' and installed. by window manufacturer., � r.� R tr } � i , } r• tr � ` tr r 1r tea trr i � y1• . Y'`' } r "' ,r, r r r,• 3 ` } j !rt 1+, rtl�i~�`l1 Jpp�Fj. rl.Y�i} } Mr} {' ,f., r ••r r X .i ./ 'r •' - •a;�. , iy 1�� 1"+ r r. ! ;. r:i 't y +•• f r •.f r r t ' ' �i t 1 . „i r�i�r',�•• N ► t 1) �I�' , r� •! ,, rt t.• �, r t - DIVISION 9 - FINISHES 'SectionA - Cer is Ti e I . Ceramic Tile Ceramic Tile for tub and shower enclosures shall. be 1" x 1" unglazed .colored tile . Cove base and trim as manufaotured by American-Olean, Mosaic or equal. Floor the shall be same as for tub and shower enclosures . 2 . Color Color pattern shall be selected by the Owner. 3 . Setting Beds, - Lath and Plaster Metal lath shall be used behind all tile sills. Metal lath shall be installed according to specifications in Don graf's "Tile Handbook" . All scratch coats, leveling coats and mortar setting beds shall be mixed in accordance with the specifications for setting tile on vertical and horizontal surfaoes in the above manual . 4. Back-up Membrane Bituminous saturated felt weighing 13 .9# per 100 square foot shall be used behind tub and shower enclosures . 5. Installation Setting beds and oeramic tile shall be installed as per spedifioations in Don Graf's "Tile Handbook" , 1 Section 9B - Comvosition Flooring 1. ' General . The General Conditions and Supplementary General Gond�.tioras apply to the work under this section. 2. riaterials 2.1 Vinyl : Shall be seamless vinyl, minimum .0?5" gauge, .065" no wax, Armstrong solarian or equal. Color, and pattern will be selected by the Owner. 2.2 Cement: For vinyl shall be adhesive approved by manufacturer of vinyl, for installation for off.-grade construction. Installation 3.1 Preparation of Subfloors : Surfaces of subfloors { shall be dean, level and smo`ootY, prior to laying composition flooring. Contractor shall examine surfaces to receive finish flooring and shall report any defects to the Architect. Defects in subfloor shall be corrected prior to placing of finish surfaces. The starting of work of this section will constitute acceptance of subfloor. 3 .2 Installation: All composition flooring shall be ' installed in strict compliance with manufacturer's printed instructions. All finished surfaces shall be free from defects, blemished or stains. Surfaces shall be smooth. 4. Cleaning f Upon completion of all trades, finished surfaces shall be cleaned of' paint,, stains or other defacing marks, or imper- fections. ,:Areas -that, cannot be properly cleaned shall be replaced., r Iliitt '.Ir :l' 7 '1 I I♦ f' I 1. 1 7 1' 1. t ,• ' .. ., vlj 1 t ,t i �� - . r i >,♦ 'l r .1 ' r I it . ; B Framin e atraigt areplaced' lumber. shall er shall be framing warped All or , . 1 All crp°ked ,. ,. tapered edges ch thick 245 V',a_ tenial- 11 be inch S. GYPs'um or �4 2 1 Wallb g ,nuf actuxed by �r loa System* gypsum wad bd omm°n' ad taP® 3°�'nt c 1 2�2 iva„ ails t; pergorat er bead* ; y 4 Rein, fvr-semen" orated cow 55 2t,3 , Joint Galvanised "fie a erPs_- g' ,s 2.4 ..°- '--- man'; icati°= ccordance ihmFe e�tions Apel_---" in a ed ' �"`• ''3 • be applied be free fr°m der 7 oard shall faces shall it head8. '�?� Wallb Instructions* SurtY►..,3o �►ts and na „ 5 1�7 instru , 5 y t t ! ,•5 5 ,. , � JL b il' r .a "' '.�` y ��,,y i!1 # ' •! 1 1 r h i ,� rx .:1 t'` � Er � { .f �� Tl t ! `� ie r ' � y. 1•,� 11 1.r1 ( ry r } 1 •.r.e .+. J t, � L /t '�� a .;r � t r.'e t 1 b. t j r v, ... t ,}. � ! I ?f + tt.�' ti� 5(1 4.6 .i t , i•t /5 5 �', y � ;r t r 1 •+ t t t 5 r +1• i �' �'!Ot Pt •L � .r rl •'' t 1• ! �� �i� , ;,j jj 1 �: � i 1 11A.: 1 +� it ,•r ly .11 S.i 1 , If• 1 '1 t4 .1 �, i tri Y ! f rt,�k• � � rt � Ott t 5 , -, �..1. r s+ i .I '• N t i S � .(k 't. r�'.tf.r 5 1.1. 1.l r� � 1 v �' t r i r i" � � • r r �ltS At 15"t• r 1 5 t '4 I .� i•,i •t ,`E ` ,�. 'i r d f. ~ a t� t+ ri 90�1 e rt ♦ t ;l r$ 4 i t i . { � Tf well` r .M + 'r '.t� � ,.t � i•�� i p 'e�• �5„.. , �� ie a 4at�, tai+ � rr• }„�h�.ti 1 � .1' a< T 1 7, ' , ” r ire is 1+1 x.11 •Y t • i 1 "t t.p. Section 2D Painting ...,A4 WaljRgper F. l. ' General The General Conditions and Supplementary :General Conditions.. apply to the wak under this section. 2. Materials Painting or stain materials shall be equal to the top quality lined of Devoe, Sherwin-Williams, Pittsburg, Cabot, . or Olympic. 3 . Prepara ion of Surfgces Surfaces to be painted or stained shall be cleaned from all dirt, oil, foreign matter or blemishes. 1.. Surfaces to be Painted 1►.l 'Exterivr 4.1.1 Ferrous Piet 1€ : 1 coat primer, , 2 coats, exterior enamel.-� 4.1.2 Wood Trim: 2 coats stain. ..4.1.3.. Wood:, 2 coats stain. , ` r'4.1.4 C_o�c, 'e#c�...o '..M� .. � 2 coats masonry, paint. 4.2.1;, Wood 1 , � t 4.2.1.1 Exposed Beams and Panels: 2 coats stain, 1 coat satin varnish. jr - � .2.1.2 Wood_Trim: l coat primer, ,.2 coats a, t ' semi-gloss enamel. i 40 2,2 Wood Doors: 1 coat primer, 2 coats `semi- gloss enamel. � 2 4. 3 Gypsum I9allboard: 1 coat sealer, 2 coats interior latex. — '` 4.2.4 Ferrous Metals: 1 coat primer; 2 coats semi-gloss ename mit primer where ferrous metal is. factory primed. i 9D-Il ,1 1 5. Wallpaper ' Wallpaper shall be installed where shown on Finish .Schedule.,; '' ' Wallpaper shall be selected by,;the Owner under an- allowance of •$8.00 per roll. ' 6. Colors . Colors will be selected by the Owner. Each coat shall' differ from the succeeding coats •in order that the number '- of coats supplied may be readily determined. • � 7. Caulking Polysulfide compound shall be used for exterior cualking only. Oil base compound shall be � used on interior. Caulk around all door and window frames' and exterior openings. ! . Thresholds shall be set in bed ,of compound over entire N� 1' seat of threshold. Protection Finished Hardware, light fixtures, switch and receptacles 1pate, etc. shall be removed prior to painting , and protected*— . . 9. Cleaning { Upon completion of the work, all paint, caulking and pro— tective,materials shall be removed from finished surfaces and area thoroughly, cleaned,, Surfaces shall be left in perfect..condition. '• , I r � / ;4 _� + 1 i' rii +l 'Iti !�i_•rl /'1� ., ' r 1,•,, , ri, ) (,i.: 1 ,,, r ' . . ti f -•,T � �' it :Q)r I�' 1_ s!S y :, t ry. + r rt " , ➢ rel '., r , 4 � • i;.. 1 r ' t• � i ��tA �, t, fl�l��'f r t s� � i � 'II f, Z' t 1 Y�irt r r i •r .,,1 ,, t, ,: Il lr•Y j A' i N 't "fit r ' ' 1f '• •) i , ,�, r '� J l - DIVISION 10 SPECIALITIES Sec l Fins s,Hardw_are,�,_,,,,:�. 1. scope Work of this section includes the furnishing of all items of finish hardware as herein specified or as necessary to •. complete the building, except those items which are spe- cifically excluded from this section. The General Condi-' tions and Supplementary General Conditions apply to the ' work of this section, 2. General Should items of hardware not definitely specified be required for the completion of the work, such items of type and quality suitable for the service required and , comparable to adjacent hardware shall be provided. Con- tractor shall be responsible for checking all details, such as wall trim clearances, bevels, etc. , to assure the proper fitting of all items of finish hardware. 3 . Finish Hardware Finish hardware shall be Schledge, Yale or equal. ­ Sample ', shall be submitted to the Architect for approval.,'.;Knob. , and rose type shall be 'selected by the Owner. ' . . i�SwWS➢�wiwlwT. + ; Each item of finish hardware and each lockset shall be °> packaged separately in individual containers, complete ' with the necessary screws, keys, instructions, and in ur stallation templates for spotting and mortising tools, ; i 5. Installation Finish hardware shall fuction freely and smoothly. Finish hardware that becomes damaged, in operation or ,finish, shall . ' be replaced. The furnishing of rough hardware is included in the Carpentry Section. ' 6. Kpy"n All exterior. doors shall be master, keyed., Furnish" four (4) '., master keys. 7. Schedule Submit to the Architect: a complete ,typewritten.,until ' schedule is .approved. Section 10B - MI scellaneous Specialties ' 1 . ,General The General Conditions and Supplementary General Coildi=tions apply to the work of this section. 2 . Kitchen Appliances Kitchen appliances shall be selected by the Owner. . Appliances (not including refrigErator and wall oven) shall be furnished kAd installed by the Contractor under ez' allowanoe of $950.00 j . Carpet Carpet shall be furnished and installed by the Owner. The Contractor shall 17WWe—the floor shr ed"es clean and ready for the installation of the carpet. 10B-1 i 111 • , ail. ,� - . •�J„ DIVISION 15 - MCHANICAL „ ..• Section 15A -P1Lmj1Bgr,__,_.:....,......�..;. ._...::...... . _ _ - - ........:..� , 1. General 1.1 The General Conditions and Supplementary General iconditions apply to the work under this section. 1.2 The Plumbing Contractor shall be held to have examined the drawings, specifications and other docu- ments relative to the entire work, including all trades, and to have familiarized himself with the general type of construction and its relation to his work, as well as the relation of his wrok to that of all other trades. 1.3 This Contractor shall visit the site of the proposed work prior to submitting his bid, familiarize himself with the surrounding conditions and the manner in chick they will affect his work. 1.4 The drawings accompanying this specification are partly diagrammatic and only the general arrangement of the equipment and piping is shown on the drawings. They `. must be supplemented by this Contractor's knowledge and .' experienced work of this nature. All items which are required for the proper execution of the intent and meaning; of this specification and the accompanying drawings, even though not shown or specified, shall be furnished. 1.5 The entire installation shall be made in a neat and workmanlike manner by persons skilled in the trade, and shall be in strict compliance with the applicable plumbing codes. 1.6 Whenever manufacturer's names appear herein, or on the drawings relative to any equipment or materials such names are to extablish a certain standard ofualitY and the products of the other reputable manufacturers will be accepted for products of like quality. ' t 2. Permits, Inspections,. Fees , The plumbing contractor shall obtain and pay for all permits, liscenses and inspections. He shall arrange for inspections ' with the plumbing inspection department and shall pay any costs incident to inspections. 3. Certificate . of Inspec�tion {. ' Prior to -final acceptance of the installation, ,.the Plumbing 'Contractor, ;. shall submit sufficient evidence, of filial inspeo tion and approval of the installation. 4. Excayati on Excavation required for plumbing shall be' done by the. Plumbing Contractor. }' 5. Vents Through Rooms All vents shall be brought through roof and properly flashed with pound sheet lead. 6. .4aterials , . ' 6.1 All Plumbing_Fixtures and Materia .s: Shall be new and free from defects. `• 6.2 Cast Iron Soil Pipe and Fittins: Shall be coated p+ with asphaltum or coat tar pitch and shall conform to ' 'ASTM A 72-42. Cast iron pipe .shall be : standard weight. 6.3 " Galvanized Steel Pipe : Standard Weight conforming to ASTM'A-53-527; _. 6.4 � Coer Pipe : Shall be threadless copper pipe, Type L. . haid drawn, conforming to ASTM B-88. ' 6.5 Lead P Best Quality drawn pipe of not less .,,,.than standard. r 6.6 Vents and VentPipis&: Shall be soil pattern, ' serv .ce weight. } iPJ, 6.7 All Vents: Shall run as direct and free as { possible rrom bends and shall terminate minimum 12" above roof. WaterDistribution stem 7:1 Water Pi in : Galvanized steel with galvanized ,,,• malleable iron fittings for potable watersystem. ±: F 7.2 Water_Ili ping: Shall extend from well to fixtures and hone bibs shown on drawings. 7.3 Field Cuts: Where made in pi ing shall be well • reamed, and the i—nkde of the pipe shall be cleaned before erection. . ► 7.4 i Threaded Pie : Shall have the joints mads with a ' . , lubricant applied on the male threads. Threads shall , be well cut, and joints shall be pulled up to that not r ,, more than three threads shall be exposed. 7.5 Unions: Shall be provided where needed. They shall be. sta�dard weight malleable iron-with. ground ,Joints .'least-. one '.brass 'seal . t h''. �. • 1,f{ , , 1 Y ! ,ri 1 r r r 15A-2 7 . 6 Water Hamner: Shall be prevented by installation of air chambers . 7 .7 Brass Hose Coclks r With prevented by installation of' air chambers . 8 . Drainage System 8 .1 Soil, Waste, Vent . Stacks and their Branches % Shall be cast iron. All sewers shall have approved cleanouts plac- ed approximately every fifty feet ; at every cahange of disc- tions ; brought to floor level or made accessible by doors . Cleanouts shall be provided so they will be accessible for -use at the base stack, however, any floor or wall connection of a fixture trap, when bolted or screwed to the floor or wall, shall be regarded as a cleanout; except that this shall not include sink cleanouts . 8 .2 All Joints: Shall be sulked with oakum and lead. ` 8 .3 Cut Off: A cut off shall be provided in each toilet so units may be repaired without loss of supply to remain- ing systems . 8.4 Drain Hub: Shall be provided as close as possible to air conditioner evaporators to receive condensate lines . . 9 . Well and Pump Well and Pump shall be provided by Ownver. 10 . Plumbing Fixtures Furnish and install plumbing fixtures where shown onJ drawings, Plumbing Fixture Schedule, and in accordance with 0- manufacturer's instructions. I 11 . Testing All testing equipment shall be furnished by the Plumbing Sub- contractor who shall make the following tests: I 11 .1 Water piping shall be tested to the hydrostatic i pressure of 100 psig . 11 .2 Sanitary piping shall be tested before any of the j system is concealed for fixtures installed. The ends of the system shall be capped and all lines shall be filled with water to the tops of the vents above the roof and allowed to stand until a thorough inspection ha's been made . Should any leaks I • 15A-3 .1 A. ;. 1 , , • ,. � Q , �r. ,�,�' �.t ' ^ tie t�s0q# ,� t Y ;r iy, , g� ^", a ti r L'e-medi tea. 1,� t^ P°a ig 1' t , , . `e1i. + { 1ir ;. S {? \ % \� T t 1 t + t 4 mss.? , k.fit ' t v ` ' , ` t�„ fs. ` .i,•` a s ,ak s. tt�,i' L i n 1 � t '' ' t,'I ^ r t ti+, 4N I t r 4 r v , �t,� 3 t t i' "..' a s i :> ,'�s + v , ' L s ' s t '1 : vu{ r,' ��i . Y t r t u' 4 .. - e 4 t t ! ;. s ,,( R t.y :t y k s at L r t{ ri' tiv ,.y >> s 4 p a s ti< , t s ..t ,,,,s t •'� ,,1'4 s t �'a 't 1 ' 1 Y \. d ,% ,,., r ,�1 L �a� t� i v y , t ' , , _ a , . t ;t t t �'; at11 a , ,� r+. t ^,4 ! ' i:` ' tL y s:. t a „ t�, t iL YL3• s i 'yi 4 �" L 4 = r , ` i.Y s ,, 1 * k . y%,iv, %�s\rL --, '4412 ss °i'� l fit? t' ),., - �t� t11 by V' \ h I ` 7t ,,� t t , i M Yi bs , ) i t ' ,,,v i t �'s , , 4.,� ` l! 1r a •1 h I ?, i s v r t t 'y r i , ;' , `0 1 l'i t 1, ., Y , , 4 t( „ �Y Y 1, • , "% I A, ' v s 1 a. _ t t , s, �,,,i� �t I a 1 � t 1 � { t,i s ' < ,4 :s t 1. s + r w t s V L ;L I 1 ~ t 1 , ' J p + �, „i x' loc i , t s t . Atit 1 + w; r d?` + 5 s nt�t t t , w , i ;i .h y .�� a .�� t,t Z " 1-. tis. tt r (�, t s t 4 s i. Y 1 y L p i ,i- c ,, w l ,. ? _ +t {,4,..J+ _ ' th , t, s1 t it s\ s 1 ' f , N tsr a i t t, i' .h ut t . L Rt t y. ''x 's 47 v., s ai. , s .itt i . y �, .v ` n+ l t 1 ' , .1 �t ' t h� fil1.et :i 4 i i , i t ..l l k!`; 1 1'l�t. s`t� ,�, ;y, t a 1 % i `r s,.r ys, w., 1� 1,+ u i t., 1 * 1 f' t Y \A x S i �^ ,, + , sit r � , t , • . i _ r ytX.Yt u t `, F -t -� N 7 ,. a `. t+ ', , is �' '.`t , { s � t \t, +�h.�.0-,.+' va, s s r ..s° :l t y "L t>. '\', 'S t�1�,;•.tl { '.,rt its v, i �r,'L ° t int ,a c;Y' .v t r ' s' ! ' P , t• 'i"t t a c l '.,r• t S t t u, t ^i,' t 1 t ' i;. A0 �, �, :•. t t t, v,.u t ) ,?t . t .,' s .. �, . it t h t ^t , :� t t i* 4 � t ii 1 P� t h� )i t , ys i` to ,�, $ s A 1 ,k�' 4 '' 'a t ) t c I ',�S,t a 1 y s,y 14 I t t + A S' a , �„ s �i tA. ( t ^t�t t , ,, t t s , 'i ? ! 1 4 s , t 1, t 1 4 t �: L j L r..'y, ., t= +l �t t i " .. I. • -, i , j t .t 1 t t t t v) t },. t t ? 't a t t' • t s s % o. 1. t�•' , Ah 1. S.} -'.1 ti i.� u A _� s i i , 1 t 4i� t < -� t, +• 9 It i t . l v a t ' Ih s"i si , s r , 1 �. } ` n ) . i— ` 4 ;�7 +• ' , �j7�•�r tett ,& � +,+ ' trt s si. t` 11 , :a t 1.+ .:�, t t t •I`," ,,,, n i h to•' 1 arra,; t) ,t t t s s Y4 .,< ^'i .'1, ,, `.t. �� i i rtt t * y r r n 1.eY� tit 4 .`'' = t-,i �,1. s ta,i' 1 ,' k, s , s fit,'`+ 'i:�. ,f, l 1. L , s , n s �, y S t` :. ^ tea a.i t{ +t° �- 4 .,t r ,f J t t i" .t' t t •� thl Gln Y s f,I v s . , E. 1. ,. i ' t r i t.. 1 t,•t�Yi0, ,, , t,' " t 4,,•' �h .. } I ��;, �i �� '"� tiry VLkt1 "''�r�,A" �,h * ,l n y • ,, i L't' t' h .'� v, V41 r` 1 w t a ti �^ tr +,, ' * , 11 11 `�ti i DIVISION 16 - ELECTRICAL Section 16A - Electrical _ 1 . Electrical Materials Electrical materials shall be new and shall conform with the �ktandards of the Undrewriters Laboratories, Inc . and shall bear the U.L. seal of approval. 2 . Codes, Permits, Inspections Entire electrical installation shall comply with the local electrical code and with the National Electrical Code on those items not covered by the local Code. Electrical Sub- contractor shall take out and pay for all permits for installation, inspection and connections. 3 . Cutting and Patching Electrical contractor shall furnidh and set all sleeves, inserts and hangers required by him and shall be responsible for their correctness . He shall predetermine Location of chases and openings required by him and shall have them provided by the General Contractor . 4 . Panals and Disconnect Switches Electrical Subcontractor shall provide and install all necessary lighting and power panels and disconnect switches . Panels shall be sized as required in accordance with JEA. Panels shall be equal to Square "D" Circuit Breaker Panels. Disconnect shall be fused knife swithh with solid neutral.. 5. Branch Circuits Branch Circuits shall be not less than #12 AWG . 6 . Equipment Furnished by thers Electrical Contractor shall wire all motors and equipment furnished by others . 7 . Light Fixtures Light fixtures shall be selected by the Owner under an allowance of $ 900 .00 and shall be installed and OOnnected by the Electrical Subcontractor. 16A-1 �. Outlets Outlets shall be located as shown. All outlets shall be metal grounding type. 9. Switches and Recut les 9.1 Lit Switches: 15 Amp quiet type switches located + 4811 above finish Floor. 9.2 Wall Receptacles : Grounded type rated 15 AIM'S, 125 volts, 10 (baps, 230 volts. 10. Exhaust Fan (Bathroom) • Exhaust fan for baths, where abown, shall be ceiling mounted Nutone Model 8832 and shall be switches shown. 11. Kitchen ARRUances Kitched appliances shall beselected by the Owner and shall be connected by the Electrical Contractor. 12, Testing and tl►arking + All wiring and equipment shall be thoroughly tested and marked. Installation shall be left in perfect working order.' Typewritten markers shall be installed in die- tribution •panel showni location of branch circuits. Polk ,�,j., 11 ,' + A , C+/ '• it ,i, + � ', + 16A-2 1.. SO LAR f+� ENERGY CONTRACTORS. Inc. i 3156 LEON ROAD JACKSONVILLE, FLORIDA 32216 PHONE, (904) 641.5611 0 M•385 f SPECIFICATIONS G RE: 144ry Vn iley, Residence Equipment: First Floor: Model 180 Florida Heat Pump 20,000 BTU Cooling 21,000 BTU Heating with heat '- cool thermostat Upper Level: i Model 300 Florida Heat Pump 32,000 BTU Cooling -` 29,000 BTU Heating - with Heat,.- Cool Thermostat I Ductwork; 1" giberglas dutctboard on main trunk lines.. Take-offs to be 30 gauge galvanized round pipe insulated with 2" foil back insulation. Air Distribution: Grilles shall be, extruded aluminum with opposed blade dampers. Well and Pump: To be supplied by General Contractor, Solar Collectors: Install 12 PPG Collectors complete with circulating pumps and storage tanks.