Loading...
Item 4I'~ AGENDA ITEM #4I JUNE 12, 2006 ~. CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Clarifier Rehabilitation at Wastewater Treatment Plant #1 SUBMITTED BY: Donna Kaluzniak, Utility Director DATE: Apri121, 2006 ~" BACKGROUND: The existing sidestream clarifier at Wastewater Treatment Plant #1 (1100 Sandpiper Lane) dates from the 1960'x, and the entire mechanism for the unit is completely inoperable. ~. Staff has determined the most cost effective means of replacement is for the City to purchase the equipment directly and have it installed by our annual Point Repair Contractor, Gruhn May, Inc. This will avoid the cost of preparing detailed plans and specifications ($5,000) as well as avoid paying tax on the equipment ($5,700) and the costs that contractors add for their time in bidding ~„ the project. The equipment is the City's standard and is proprietary, manufactured by Walker Process and ~. distributed by their representative, MTS Environmental. This would be a sole source purchase, but in order to ensure prices were competitive, staff also obtained costs for the most similar brand of equipment available: MTS Environmental (Walker Process E ui ment TSC Jacobs (Eimco Equipment) $89,840 $90,000 Gnihn May, Inc., the, City's annual Point Repair contractor provided a cost to complete the ~"" clarifier rehabilitation. Again, to er_sure costs were competitive, staff obtained pricing from a second contractor. Gruhn Ma ,Ina Sawcross, Inc. $42,180 $75,000 BUDGET: A total of $100,000 was budgeted for the clarifier rehabilitation in the Sewer Fund under account number 410-550$-535-6300. Additional funds to cover the remaining $32,020 are available in the Sewer Fund from projects that came in under budget and unused professional services in account nos. 410-5506-535-6300, 410-5508-535-3100 and 410-5508-535-6300. ~. ~.. AGENDA ITEM #4I JUNE 12, 2006 REC®MI~IENDATI®N: Authorize staff to purchase the Walker Process clarifier equipment ~,. from MTS Environmental in the amount of $89,840. Authorize the City's annual Point Repair Contractor, Gruhn May, Inc. to complete the repair and rehabilitation of the clarifier in the amount of $42,180 and waive the formal bidding process. ATTACHMENTS: 1. Quote from MTS EnvironmentaUWalker Process 2. Quote from Gru.hn May, Inc. 3. Quote from TSC-Jacobs REVIEWED BY CITY MANAGER: 2 d. ;HU 15:31 FAX 904 273 1166 MTS Environmental AGENDA ITEM #dI JUNE 12, 2006 ~k~ 'P Walker Process Equipment 840 North Russell Avenue Aurora, Illinois 80506-2853 ~,QR~pM N~ E-Mail: walker.process@walker-process.com Website: www.walker-process.com Division of IAcWSh Corparallon Phone: 630-892-7921 ~, Dedicated to the Fax: 630-892-7951 ` Water and Wastewater Industry February 2, 2006 •~. TO: THE CITY OF ATLANTII~ BEACH, FLORIDA ATTN: TIM TOWNSEND~ `~'" SUBJECT: Clarifier Replacement BID DATE: Febrnaty 6, 2006 PROPOSAL NO.: 06-00185 Gentlemen: In response to the Bid Documents for the referenced project, we are pleased to submit ties proposal as our offer to sell and famish the following equipment: ~~ 50' Diameter "SWP" Clarifier ~. For your convenience. in evaluating tour offer, we have divided it into the following sections, which together form our complete proposal: Pricing Summary Pg. 2-3 Scope of Supply anal Clarifications Pg. 4-6 General Items Pg. 7-8 '"" Terms and Conditi~~ns of Sale Pg. 9-10 Mechanical Warranty Pg. l 1. ~. If we can furnish any clarifications or additional information, please contact our Representative, Bob Solomon of M"1'S Environmental, Inc., ?once Vedra Beach, Florida at 904-273-8600. We look forward to thg opportunity of working with ydu in ttie execution of this project. Sincerely, WALKER PROCESS EQUIPMENT' Division of McNish Corporation ' .. Randy Stevenson Regional Sales Manager ~'Hi1 15:31 FAX 904 273 1166 MTS Environmental AGENDA ITEM #4I - -.- ..- - -- _- ---._... _. - JUNE 12, 2006 City of Atlantic Beach, Florida Proposal No.: 06-00185 '"'~ February 2, 2006 Page 2 of 11 PRICING SUMMARY Listed below is a summary of prices for equipment as noted within this proposal. The prices are for equipment as described herein, F.O.B. shipping point with freight prepaid via truck, exclusive of any taxes. Prices quoted ""' herein are based upon the estimated sc}iedules shown, and receipt of approved submittal drawings in our factory within six (6) weeks from the date of our transmittal letter. ~. NOTE: Refer to pages 4-6 for clarific~~tions to our scope of supply with regards to the specification. . ~ One (1) Walker Pier-Supported Clarifier, Type "SWP", for installation (by others) in an ezisting 50'-0"diameter ~_, concrete tank; for the price of ... $ 6 8 , 5 8 0 \ ~ 89 $`~~ , Optional Adder Items _--~ / #1) One (1) set of/," Carbon Steel ESlnent Troughs, Weir Plates, Scum Baffles, E~upports and Fasteners; 21 260 ~~ $ , for the Optional Adder Price of .. . (See Page 6 for description) #2) Otuq (2) Electrical Control Panel in Nema IV stainless steel boz; for the O ti pal .,dder Price of ... $ 4 , 7 00 ' (See Page 6 for description) #3) Hot dip galvanized all Clarifier carbon steel components in lieu of prime paint for one (1) 50' Clarifier, for the ~• Optional Adder Price of ... $ 2 , 00 0 #4) Hot dip galvanized all EIDu~ent Troughs, Weirs, Baffles and Supports (Option #1 above) in lieu of prime paint; for ,~, the Optional Adder Price o1' ... $1, 4 0 0 EXISTING STRUCTURE NOTE: The. Contractor shall be solely responsible for measuring and providing ,. Walker Process Equipment (WPE) with accurate as built dimensions for all existing structures whe-e WPE is furnishing ecluipmer.!: This information must be made available to WPE in a timely manner to -avoid delaying the equipment delivery schedules outlined within this proposal. In the event that dimensions are not provided or the provided dimension,. are. in error, which results in modifications to either the equipment or '" the adjacent structures, the Contractor shall be solely responsible for all labor, materials and associated costs to correct the resulting situation. TIME OF ACCEPTANCE: This offer to sell is subject to receipt of your purchase order on or before March 6, 2006. This proposal number, 06-0418S;, must be referenced in the Purchaser's purchase order. The prices quoted in this proposal are based upon and subject to Purchaser's acceptance of the Terms and Conditions of Sale attached to this proposal. WPE reserves the right to change the prices quoted if the subsequent Purchase Order changes or modifies in any manner, the Scope of Supply or the attached Terms and Conditions of Sale, unless WPE's written consent is first obtained. In addition, any adjustments, corrections, amendments or exceptions to this proposal must be acknowledged in writing as acceptable to WPE before an order will be accepted. This proposal shrill become a binding contract for the scope of equipment supply and '""' mechanical warranty responsibility, upon acceptance by Purchaser and approval by WPE as provided for in the Terms and Conditions of Sale. -• Page 1 of I AGENDA ITEM #4I JUNE 12, 2006 Kaluzniak, Donna From: Gordon Gruhn [ggruhn@gruhnmay.com] Sent: Thursday, June 01, 2006 3:49 PM „~, To: Kaluzniak, Donna Subject: WWTP #1 Clarifier Drive Removal & Replacement Donna, ~,,,, The cost to remove and replace the complete clarifier drive assembly on the old clarifier and sludge transfer piping within the tank is $42,180.00. All material except misc. small fasteners are to be supplied by the City of Atlantic Beach. '~" Thank you, Gordon Gruhn This email and any files transmitted with it aze confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error please notify the system manager. This message contains confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. ~. ~. ~. ~, ~. ~. 6/1 /2006 w. 01/30/2006 10:45 8132422597 TSC-JACOBS NORTH AGEND:~ ITEM #~41 JUNE 13, 2006 24Y36 S.R, S4 • Sufte 3 • Lutz, FL 33SS9 • (8.~3) Z41-660 PHONE • (Sl3)1~2-2397 FAX FAX TRANSMITTAL COVER SHEET Date: ~- 3 ~~ 0~ No. Pages; 1 S FaX: O ~ - Z-`~7 - S ~ c1 S CC: From: John A.. Versckaren, ,P ,~ SUBJECT: F~ Co C ~C~•~it: Scz a-~~gC1...e~ a p/'4w.~a~. 4K~ ~ ` l (' .~ ~ ~ O DOO r ~ v, c~ T o.. L f ~ rr 1 ) T yQ.1 4.+t K^-~ a [.J T:O~~ D~C4Y Ca 1I INl•. ~w ew as