Loading...
Item 8E~. CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Hurricane Protection for Commission Chambers (Update) SUBMITTED BY: Rick Carper, P.E., Director of Public Works~~~ DATE: June 5, 2006 AGENDA ITEM #3L JUNE 12, 2006 BACKGROUND: At the May 22 Commission meeting, Staff recommended procurement of the Windshield Hurricane Protection System for the City Commission Chamber Windows and doors. The Commission expressed concern about the type and rating for the fasteners for this system and directed Staff to get an updated quote for using aluminum and Lexan panels for the proposed protection. Staff obtained quotes for 1) all aluminum panels, 2) all Lexan panels, and 3) a mixture of Lexan on the upper windows and aluminum on lower windows. The top channel for mounting the panels would be permanently ~'' mounted, the bottom channel of r the lower windows would be removable with stainless steel sidewalk bolts. Staff was also requested to determine the wind load standards to which the Commission Chambers were constructed. From the 1989 construction plans, City Hall and the Commission Chambers were ~„ constructed to the Standard Building Code wind load requirement for Coastal Exposure - 110 mph (fastest mile wind). This is comparable to current building code requirements of 130 mph (V3S - 3 second gust wind speed). All window protection systems evaluated are rated to this same ~'" wind speed. RECOMMENDATION: Staff recommends procuring the Windshield HPS system with the dual lock fastener system. Because the Commission Chamber ~, window frames are inset inside cedar outer frames, the panels would be protected from wind shear behind pushing them cut. The dual lock system is available in a black or translucent color and would be the least noticeable. ATTACHMENTS: 1) Cost Comparison 2) Pictures of Installed Products BUDGET: There is $10,000 allocated in Account 131-0000-519-64-00 for Commission Chamber hurricane protection in FY 2006. REVIEWED BY CITY MANAGER: ~. June 12, 2006 Regular Meeting AGENDA ITEM #8E JUNE 12, 2006 S stem T e Cost Windshield HPS Translucent anel $8,700.00 Armor Screen Nettin $14,000.00 Aluminum Storm anels all -ACE O a ue anel $9.433.00 Lexan Storm aneis all -ACE Trans arent anel $15.933.00 Mixture Lexan hi h / AI. Vow - Rollawa Mixture $14,730.00 June 12, 2006 Regular Meeting AGENDA ITEM #8E JUNE 12, 2006 .. AGENDA ITEM #8E JUNE 12, 2006 ~~ . C7 mM 7,. ~..,. . ~~ =.,.~ '~; ~,. ~~, ~-'~I . f: s ~, ,.. ~:` .. 't ~~. :~' .:,yen AGENDA ITEM #8E JUNE 12, 2006