Loading...
Item 8A v AGENDA ITEM # 8A OCTOBER 23, 2006 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: New Sidewalk Construction for FY 2007 SUBMITTED BY: Rick Carper, P.E., Public Works Director~~ DATE: October 13, 2006 BACKGROUND: During Budget Workshops in August, Public Works proposed construction of new sidewalks on West 1~t Street, from Vet Park to Main Street - $35,600, West 10th Street from Mayport Rd to Orchid Street - $36,300 and West 6th Street - Mayport Rd to Main Street - $45,100. The Commission was concerned that the traffic levels (auto and pedestrian) did not justify a sidewalk on West 1~ ~" Street. Based on a comment made at one of the Mayor's Neighborhood Meetings, ~. interest was expressed toward replacing existing sidewalk on Orchid Street (between W 5th and W. 6th) and Rose Street (between the W. Plaza Ditch and W. 14th) that has excessive cross-slope. Staff investigated and found a total of ,~,, approximately 700 LF of sidewalk and driveways that exceed the standard 2% cross-slope. The cross slope varies from approximately 5% up to a maximum of 13.5%. Because replacement would include up to 12 driveways (more SF than sidewalk), installation of knee walls at back of sidewalk and some water service '" adjustments, cost to replace this sidewalk is estimated to be in excess of $50,000. The sidewalk in question was installed using CDBG funds in 2002; and is in good condition. BUDGET: New sidewalk construction is funded using the Half Cent Sales Tax Fund, 131- 5002-541-6300, Project PW0707, Initial Balance $120,000. ~"" RECOMMENDATION: Staff recommends construction of sidewalks on W. 10th Street and W. 6~' Street with remaining project funds held pending a constructability analysis of Aquatic Drive (survey required to determine if room to place sidewalk in right of ~" way along western side of street). Staff recommends against removal and replacement of existing sidewalk while streets where residents have requested initial sidewalk construction still exist. ~. ATTACHMENTS: 1. Sidewalk Evaluation Summary REVIEWED BY CITY October 23, 2006 Regular Meeting «~ AGENDA ITEM # 8A OCTOBER 23.2006 air ~. SIDEWALK EVALUATION SUMMARY Ranking Location Score Estimated Cost 1 Main Street -West 1st to Levy Road 70 $165,888 2 West 9th St. -Mayport Road to Main Street 60 $82,800 3 West 1st St. -Vet Park turnaround to Main Street 58 $35,606 4 West 10th St. - Ma port Road to Orchid Street 55 $36,338 5 Aquatic Drive -Atlantic Blvd to Aquatic Garden 55 $87,469 6 West 6th St. -Mayport Road to Main Street 50 $40,888 7 West 11th St. -Mayport Road to Orchid Street 50 $7,400 8 Selva Marina Drive - Saturiba to 20th Street ~ 45 9 Ardella Road - Ma port Road to Richardson Lane 43 10 Mandalay Park -Seminole Road to 16th Street along Ocean 38 11 Seminole Road -Garden Court to 20th Street 30 12 West 1st St. -Main Street to Jasmine Street 30 13 Simmons Road -Mayport Road to Francis Avenue 28 14 Dutton Island Road -Donner Park to Paradise Oaks 25 Sidewalks Completed Year Seminole Road -Vicinity Seaspray Avenue 2005 Sandpiper Lane -Plaza Road to Donners Road 2006 West 3rd St. -Mayport Road to Main Street 2006 Francis Avenue -Walter Road to Simmons Road 2006 Ro al Palms Drive -Atlantic Blvd to Cavalla Road 2006 Sailfish Drive -Atlantic Blvd to Ti'uana Flats 2006 Jordan Road -Donner Road to End 2006 NOTES: 1 Main Street deferred for Bicycle path decision - if sidewalk chosen, Propose Main Street be done in two parts -the north section (W. 9th St to Levy Road - $75,000) this year, the southern section (W. 1 st St to W. 9th St. - $91,000) next year. 2 Recommend W. 10th rather than W. 9th due to Mayport Road turn lane location. 4 Aquatic Drive sidewalk level of difficulty high -must be constructed on Hopkins Creek bank. 4 West 11th Street has 1/2 block sidewalk, needs remaining half block. 5 Jordan Road completed this year with CDBG funds. """ FY07 Sidewalk Recommendations.xls 10/16/2006