Loading...
Item 4G v CITY OF ATLANTIC BEACH ~„ CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM # 4G NOVEMBER ]3, 2006 AGENDA ITEM: Oaks of Atlantic Beach Extension -Acceptance of Water and Sewer Infrastructure far City Ownership and Maintenance SUBMITTED BY: Donna Kaluzniak, Utility Director DATE: October 30, 2006 BACKGROUND: Construction on the infrastructure for an extension of the Oaks of Atlantic Beach Mobile Home Park has been completed by the owner's contractor. This subdivision consists `~"' of 31 mobile home lots located in the City of Jacksonville off Pioneer Drive. The contractor completed construction in accordance with approved plans. City staff completed a final inspection, and the Department of Environmental Protection has cleared the water and sewer systems for service. BUDGET: No immediate impact to operating budget. The attached estimated schedule of values will be added to the City's assets. RECOMMENDATION: Accept the water and sewer infrastructure in the Oaks of Atlantic Beach extension for ownership and maintenance by the City of Atlantic Beach. ATTACHMENTS: 1. Schedule of Values for Oaks of Atlantic Beach extension. REVIEWED BY CITY MANAGER: .. ~. AGENDA ITEM # 4 G NOVEMBER 13, 2006 ss ~~ j j~~J J~j~jry~~/t ~~~ILJLi1~~VC-1~i1 :Vlikc Vallen~ourt frank Vallencaurt F. E. Vallencourt president Vice-President 5eniar Vice~presidcnr Cdtritniotloti Cep. Its. fifty Y~ctrs of 5tn~ic~t• to ~~rtheu.,t I`luriclu ~. City of Atlantic Beach Thursday, August 24, 2006 ~. 1200 Sandpiper Lane Atlantic Beach, FL 32233 Phone: 904-247-5834 _ Fax:904-247-5843 Re: Schedule of Values for the Oaks of Atlantic MHP project Watermain Quantity unit Unit Cost Total Cost ~. 8" DR25 PVC Water Main 1226 LF $ 14.75 $ 18,083.50 6" DR25 PVC Water Main 40 LF $ 13.00 $ 520.00 8" Joint Restraints 36 EA $ 120.00 $ 4,320.00 8"x8" Tap Slv. and Valve 2 EA $ 3,198.95 $ 6,397.90 8" Gate Valve 2 EA $ 862.00 $ 1,724.00 6" Gate Valve 3 EA $ 580.51 $ 1,741.53 Sample Point 4 EA $ 201.00 $ 804.00 '~" Valve Box 5 EA $ 160.00 $ 800.00 Flushing Hydrant 2 EA $ 508.00 $ 1,016.00 Fire Hydrant 3 F~ $ 1,527.00 $ 4,581.00 8 x 6" Tee 3 EA $ 375.00 $ 1,125.00 8" 45 Bend 2 EA $ 286.00 $ 572.00 8" Cap 2 F~4 $ 160.00 $ 320.00 1" Single Water Service 32 EA $ 373.83 $ 11,962.56 '"~` Punch Out Water 1 LS $ 3,852.00 $ 3,852.00 Pressure Test 2366 LF $ 1.53 $ 3,619.98 Water Main Total $ 61,439.47 Sanitary Sewer Main Tie in to existing sewer system 1 ea $ 850.00 $ 850.00 Type A Manhole 6-8' deep 9 EA $ 2,451.00 $ 22,059.00 8" SDR 26 Sewer Main 4-6' Deep 387 LF 22.03 $ 8,525.61 10" SDR 26 Sewer Main 4-6' Deep 834 LF 26.75 $ 22,309.50 6" Cleanouts 32 FA 170.48 $ 5,455.36 Sewer Services 32 EA 550.18 ~ 17,605.76 N Test Sewer Main 1221 LF $ 3.33 $ 4,065.93 Sanitary Sewer Main Total $ 80,871.16 ~ Prepared By: ~. /~a~us /~e~aaraa~ Marcus Mclnarnay -Project Manager „s