Loading...
Agenda Item 8BAGENDA ITEM # 813 MARCH 12, 2012 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Change Order #7 for TMDL WWTP #1 Improvements for Clarifier #1 Repairs SUBMITTED BY: Donna Kaluzniak, CEP, Utility Director DATE: March 5, 2012 BACKGROUND: The City's Wastewater Treatment Plant #1 has two existing clarifiers. Clarifiers are large tanks that allow the microorganisms used for wastewater treatment to separate from the clean effluent. The clarifiers contain equipment (rake -arms, stilling well, draft tubes, etc.) to transport the microorganisms to other tanks. Problems with deteriorated, leaking slide gates prevented staff from being able to isolate and drain the clarifiers until those gates were replaced as part of the TMDL project. After the gates were replaced, staff was able to isolate one of the clarifiers (Clarifier #2) and the City Commission authorized a change order for repairs. Additional work was needed for the steel beams supporting the Clarifier #2 walkway, as reported by the City Manager at the February 27, 2012 meeting. Repairs on Clarifier #2 are proceeding and will be completed shortly, at which time staff will place that tank on line and empty Clarifier #1. Staff and engineers believe that similar repairs will be needed in Clarifier #1, along with replacement of a broken skimmer arm. In order to minimize delay of the construction project, staff is requesting approval of Change Order #7 for repairs on Clarifier #2 in the amount of 47,745. After sandblasting, the actual amount of steel repair will be defined and approved by the City and Engineer. BUDGET: Funds for the repairs are available in the contingency for the TMDL Project, which has $110,940 remaining. RECOMMENDATION: Authorize WPC Industrial Contractors, LLC to complete repairs to Clarifier #1 in the amount of $47,745 as Change Order No. 7, and authorize the City Manager to sign the Change Order. ATTACHMENTS: 1. Change Order No. 7 with Exhibit A REVIEWED BY CITY AGENDA ITEM # 813 MARCH 12, 2012 WWTP# Improvements for TMDL Compliance Contingency Budget Set Up for Misc. Items City of Atlantic Beach, FL Bid No. 1011 -01 CHANGE ORDER NUMBER 7 Contractor: WPC Industrial Contractors, LLC 11651 Philips HW Jacksonville, FL 32256 (904) 268 -0099 Fax (904) 268 -2922 Engineer: J. Collins Engineering Associates, LLC 11516 -3 San Jose Blvd. Jacksonville, Florida 32223 (904) 262-4121 (904) 2624122 FAX Date: March 1, 2012 Owner: City of Atlantic Beach 800 Seminole Road Atlantic Beach, FL (904) 247 -5800 ITEM DESCRIPTION OF CHANGE(S) Complete Scope of Work is attached as Exhibit A Total Cost/Price INCREASE OR DECREASEIN CONTRACT PRICE 1 Clarifier#1(WWTP #1) - Sand Blast & Paint $ 28,025.00 $ 28,025.00 2 Allowance for Repair of Deteriorated Steel at Clarifier#1 $ 16,500.00 $ 16,500.00 3 Replace Exisitng Skimmer Arm $ 3,220.00 $ 3,220.00 Subtotal $ 47,745.00 CONTINGENCY AMOUNT $ 238,140.00 PREVIOUS SPENT $ 127,200.03 CO #7 AMOUNT $ 47,745.00 CONTINGENCY AMOUNT REMAINING $ 63,194.97 TOTAL DECREASE $ - TOTAL INCREASE $ 47,745.00 CONTRACT PRICE PRIOR TO CHANGE ORDER $ 5,264,000.03 CURRENT CONTRACT PRICE INCLUDING THIS CHANGE ORDER 5 CONTRACT TIME INCREASE DUE TO CHANGE ORDER 12 weeks CONTRACT TIME DECREASE This document shall become an amendment to the contract and all provisions of the contract will apply hereto. Accepted by: Contractor Accepted by: Engineer Accepted by: Owner Date: Date: Date: