Agenda Item 8CAGENDA ITEM # 8C APRIL 9, 2012 CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: HVAC Retrofits for City Buildings SUBMITTED BY: Michael Griffin, CBO, CFM Building Official/ Interim Community Development Director DATE: April 2, 2012 BACKGROUND: We have been working with the City of Jacksonville (COJ) to gain their approval prior to issuing purchase orders for the HVAC retrofits. COJ is requiring that Atlantic Beach replace the existing HVAC units with minimum 18 SEER units. As of this date no purchase orders have been issued. In the recommendation that was approved by the City Commission on February 27 B &G was given the work at Jordan Park, Public Works Building, City Hall and Police Department. B &G was replacing existing units with 18 SEER units. Staff recommendation to award B &G these buildings will not change. However, at Adele Grage, Donner Park, and City Commission Chamber; Beehive Heating and Air was recommended for the award, but they were only replacing the existing units with 14.5 or 15 SEER units. At these buildings, B &G gave the lowest quote for 18 SEER units. Due to additional analysis we are recommending B &G for the HVAC retrofits at Adele Grage, Donner Park, and City Commission Chambers. The issues that have caused these adjustments are basically the different grant requirements. The State grant is asking for a thirty five percent (35 %) energy reduction (with a Buy American requirement) and the COJ grant is asking for a 10 year simple payback incentive. Staff made the lower proposed cost recommendation in February basically to balance the two grant requirements. However, COJ has recommended, after further analysis, that although the 18 SEER units have a higher purchase cost, should be installed to achieve the 10 year simple payback. Both grants will cover all HVAC installation cost to the City of Atlantic Beach. A chart is attached with revised recommendations and quotes. I have also included a chart detailing the funds that will be provided by the COJ and State grants along with the proposal list dated February 15, 2012.Atlantic Beach was awarded $234,798 from the State and $103,400 from COJ for these retrofits. BUDGET: No budget impact RECOMMENDATION: Motion to approve staff recommendation to accept proposal from B &G to install 18 SEER units in Adele Grage, Donner Park and City Commission Chamber buildings as approved by the City of Jacksonville grant based upon a higher energy cost savings than previous proposal from Beehive Heating and Air of 14.5 and 15 SEER units. AGENDA ITEM # 8C APRIL 9, 2012 ATTACHMENT: Attachment I chart of current and anticipated grant expenditures Attachment II chart of recommended changes for HVAC work. Attachment III February original proposal submittal REVIEWED BY CITY MANA WIN IN; I et iA IF III 1 11 1 It. � � � I 1 '� "� I �� � 1 K. •� l I ll �, �� �� i � I � _� �4 ts tT I II o it I x : �; 't �.; 1 ,I ✓S -Y !- � .� "� �:. �:.� ��" I I � �l �� �� , I�, f � I f �� �° :I f I I I . �. lid LL h 1P jr: AGENDA ITEM # 8C APRIL 9, 2012 ENERGY GRANT STATUS March 28, 2012 Project TaSk Funding Source TP #al Cost Basis for Cost Status StafeGrant Funds "CO J Grant ' Funds Energy Audits 0 $16,464.29 $16,464.29 Actual Cost Completed Ballfield Lighting Retrofit $53,000 0 $53,000 Actual Cost Completed Low Emission Vehicles $25,683.39 0 $25,683.39 Actual Cost Completed Building Retrofits Adele Gra a HVAC $10,575.00 $8,180.40 $18,755.40 Quote Awaiting P.O. Donner Park HVAC $5,400.00 $3,945.35 $9,345.35 Quote Awaiting P.O. Jordan Park HVAC $8,893.30 $1,490.35 $10,383.65 Quote Awaiting P.O. Public Works HVAC $7,663.61 $1,365.30 $9,028.90 Quote Awaiting P.O. City Commission Chamber $6,300.00 $2,911.35 $9,211.35 Quote Awaiting P.O. City Hall HVAC $33,346.56 0 $33,346.56 Quote Awaiting P.O. City Hall Unit Purchased $7,325.00 0 $7,325.00 Actual Cost Completed Police HVAC 0 $8,184.55 $8,184.55 Quote Awaiting P.O. Electrical Retrofits 0 $30,761 $30,761 CDM Estimate Solar Hot Water System at Fire Dept. $6,950 0 $6,950 Estimate in grant $165,136.86 $73,302.59 $238,439.44 AGENDA ITEM # 8C APRIL 9, 2012 Building Recommended Contractor Quote Reason for Recommendation Adele Grage Cultural Center B & G Refrigeration $18,755.40" Lowest Quote with 18 SEER rating Donner Park Community Center B & G Refrigeration $ 9,345.35 Lowest Quote with 18 SEER rating Lowest Quote with SEER ratings Jordan Park Community Center B & G Refrigeration $10,383.65 that can achieve 35% improvement in energy efficiency for the entire building 18 SEER rating provided Lowest Quote with SEER ratings Public Works Building B & G Refrigeration $ 9,028.90 that can achieve 35% improvement in energy efficiency for the entire building 18 SEER ratinq provided City Commission Chamber B & G Refrigeration $ 9,211.35 Lowest Quote with 18 SEER rating Lowest Quote with SEER ratings City Hall B & G Refrigeration $33,346.56 that can achieve 35% improvement in energy efficiency for the entire building 18 SEER rating provided Lowest Quote with SEER ratings Police Department B & G Refrigeration $ 8,184.55 that can achieve 35% improvement in energy efficiency for the entire building 18 SEER rating provided Total $98,255.76 * Price includes load calculations