Loading...
Dowling Construction Proposal 6-7-2000 . Construction Proposa l Dowling l for City of Atlantic Beach City Hall Alterations 8 June 2000 Proposal ` E Date: June 7, 2000 6 Submitted to: City of Atlantic Beach 4Sr iES€ � � . �' `' ��� � Att: Don Ford % i�ctio �� 800 Seminole Road Atlantic Beach, FL 32233 � �t � i o f # � 4 � 6'N \ 7 f�. ' . ° dav Iep�.eCG, 2 i 2 Proposal Good un til: June 21, 2000 P Q) E ,S * Unless extended by contractor PX 9 O4) 2 473 14 k ,, Project name: City Hall Reception Area E ,E,, 't �tlll� Approximate start: June 12, 2000 JJ I�ecep 3 E�a € ARE 3 Approximate end: June 30, 2000 Date of Plans: 5/2000 Architect: CRG Architects Scope o f Work: Construction of the above referenced work according to plans by CRG Architects dated 5/2000 inc be installed. luding - 1. Removal of floor tile where carpet is to 2. Framing of Reception Area walls to a height equal to the lowest adjacent wall. 3. All electrical work specifically noted on the plans. 4. Labor to install three mechanical (non - electronic) touch keypad locks. 5. Painting of disturbed areas to the nearest reasonable "cut -off' point. Project Exclus from this Base Proposal Amount are - 1. Building permits fees. 2. Providing all keypad loc 3. Restoration of wallpaper. 4. Removal of floor tile in reception counter area. 5. Any additional electrical work not noted on plans. 6. Providing du mpster or hauling for debris removal We propose to furnish material and labor in ac cordance with above specifications, for a Base Proposal sum of : Seventeen Thousand, Three Dollars: $ 17,372. Hundred Seventy -Two - 1 - 06/08/00 Proposal/Agreement - - Dowling Construction Alternate #1: Material supply of three US26D Simplex #1011 mechanical touch key pad locks (Labor to install locks incl. in Base Proposal). If this alternate is desired... ADD $ 998. Alternate #2: Conversion of Women #2 Bathroom to Expanded Computer Room. If this alternate is desired, ADD $ 8,053. Dowling Construction Company: • Assumes responsibility for directing all work and has control over construction means, methods, techniques, sequences, and procedures and for coordinating all work under this contract. • Requires all subcontractors working under this contract to perform work in a timely and workmanlike manner consistent with our company's standards. • Secures all building permits, when required, and coordinates all inspections. • Pledges to maintain job site in a safe, orderly fashion and takes responsibility for clean up during and upon conclusion of the job. • Holds regular meetings to confer with the client (or a representative) to facilitate clear communication regarding material choices, any work order changes or concerns. Contractor's Signature: • 3 Heywo id • . Dowling Datee Florida State License • CBC 006834 Acceptance of Proposal The above price, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified subject to Contract signing. Contract to be supplied by Contractor within 48 hrs. Owner's signatures: Date: /.pe%e or e i§ `• t antic : each NoT 7S I J 446,0d 19 ki 2 2 Jun.23. 2000 3:54PM No•2123 P. 1 Dowling Construction Company A DESIGN/BUILD COMPANY June 23, 2000 Jim Hansen, City Manager City of Atlantic Beach 800 Seminole Road Atlantic Beach, FL 32233 Dear Mr. Hansen, We will extend our proposal for the Renovation of City Hall 30 days from this day forward. Sine ly, . .. Cindy e y , Owne� / L.. 241 Atlantic Blvd. NE, Neptune Reach, FL 32255 245 - 1533 . fox 247.3147 JUN -23 -2000 FRI 04:14PM ID:247 -5845 PAGE:1