Agenda Item 8AAGENDA ITEM # 8A MAY 29, 2012 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Ocean Blvd., 12 and 15 St. Water Main Replacement Bid No. 1112 -04 SUBMITTED BY: Donna Kaluzniak, CEP, Utility Director a/ DATE: May 18, 2012 BACKGROUND: The City's Water Master Plan recommended an ongoing program to replace aging and undersized water mains throughout the service area. Old cast -iron and galvanized water mains can create water quality and pressure problems. The water mains on Ocean Blvd. between 14 and 16 St. and on 15 St. between East Coast Dr. and Beach Ave. are severely deteriorated and tuberculated and the main on 12 St. from Ocean Blvd. to Beach Ave. is undersized. These mains were programmed for replacement this fiscal year. Four contractors prequalified for the project, and bids were received by four contractors on May 2, 2012. Mathematical errors were found in two of the bids during the bid analysis, and Miranda Contracting, Inc. requested their bid be withdrawn due to the mathematical error. Results after correction were: Contractor Gruhn May, Inc. J.B. Coxwell T.B. Landmark Contracting, Inc. Construction, Inc. Total Base Bid (Ocean $139,882.16 $159,956.60 $140,660.00 Blvd. 14" —16 St.) Additive Alt. 1 (12' $45,245.37 $88,536.40 $66,000.00 St.) Additive Alt. 2 (15 St. $52,727.16 $90,072.90 $69,755.00 from East Coast to Ocean Blvd.) Additive Alt. 3 (15 1h St. $68,948.94 $99,927.00 $74,792.00 Ocean Blvd. to Beach Ave.) Total $306,803.63 $438,492.90 $351,207.00 The lowest responsive bid was from Gruhn May, Inc. in the amount of $306,803.63. BUDGET: A total of $183,182 is available in the Water Fund for this project in account number 400 - 5504 - 533- 63 -00. Because the previous year's project came in well under budget, this fiscal year's project was designed with the base bid of Ocean Blvd. and additive alternates for 12" St. (Add. Alt. 1) and 15 St. (Add. Alts. 2 and 3). , 0 ANA Ik W NY EL jp PK all If. A ry PI WE .. .... 1'r 0 IF 7,q AGENDA ITEM # 8A MAY 29, 2012 MIRANDA CONTRACTING, INC May 4, 2012 Donna Kaluzniak City of Atlantic Beach Atlantic Beach, FL RE: Ocean Blvd 12th & 15t" Streets Water Main Replacement Bid Dear Ms. Kaluznialq In reviewing our bid proposal we found we made a math error on the spreadsheet that we used to calculate the bid spread. This error is substantial and we would like to respectfully request that our bid be withdrawn. We regret the error and any inconvenience this may have caused. Sincerely, Marcia Tice Project Manager Miranda Contracting, Inc 2305 URBAN ROAD • JACKSONVILLE, FL • 32221 PHONE: 904 -388 -1121 • FAX: 904 - 388 -1146 LICENSE: CU- CO57069