Permit Mech 2072 George St 2012 `I A CITY OF ATLANTIC BEACH
ra
-. ) 800 SEMINOLE ROAD
, ='x ATLANTIC BEACH, FL 32233
m.\ \ , INSPECTION PHONE LINE 247 -5814
� Ii
Application Number 12- 00000634 Date 5/23/12
Property Address 2072 GEORGE ST
Application type description MECHANICAL HVAC ONLY
Property Zoning TO BE UPDATED
Application valuation . . . 0
Application desc
2 cu 2 ahu
Owner Contractor
CITY OF ATLANTIC BEACH B & G REFRIGERATION
800 SEMINOLE RD 3230 KLINE RD.
ATLANTIC BEACH FL 322335428 JACKSONVILLE FL 32246
(904) 620 -0081
Permit MECHANICAL HVAC PERMIT
Additional desc .
Permit Fee . . . 143.00 Plan Check Fee . . .00
Issue Date . . . Valuation . . . . 0
Expiration Date . 11/19/12
Other Fees STATE MECH DCA SURCHARGE 2.15
STATE MECH DBPR SURCHARGE 2.15
Fee summary Charged Paid Credited Due
Permit Fee Total 143.00 143.00 .00 .00
Plan Check Total .00 .00 .00 .00
Other Fee Total 4.30 4.30 .00 .00
Grand Total 147.30 147.30 .00 .00
PERMIT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF ATLANTIC BEACH ORDINANCES AND THE FLORIDA
BUILDING CODES.
MECHANICAL PERMIT APPLICATION
CITY OF ATLANTIC BEACH
800 Seminole Rd Atlantic Beach, FL 32233
Ph (904) 247 -5826 Fax (904) 247 -5845
JOB ADDRESS: Q KVSIPJ, pi,;rk sa,19, l , Pf P S;. PERMIT #
PROJECT VALUE $
NEW AIR CONDITIONING & HEATING SYSTEM INSTALLATION
Air Conditioning: Unit Quantity Tons Per Unit
Heat: Unit Quantity BTU's Per Unit Seer Rating
Duct Systems: Total CFM REQUIRED
REPLACEMENT AIR CONDITIONING & HEATING SYSTEM INSTALLATION
ARI# yLA "5 \30'1
Air Conditioning: Unit Quantity a Tons Per Unit 3 REQUIRED
Heat: Unit Quantity BTU's Per Unit Seer Rating
Duct Systems: Total CFM REQUIRED
FIRE PREVENTION
Fire Sprinkler System Quantity (Requires 3 sets of plans)
Fire Standpipe Quantity (Requires 3 sets of plans)
Underground Fire Main Value (Requires 3 sets of plans)
Fire Hose Cabinets Quantity (Requires 3 sets of plans)
Commercial Hoods Quantity (Requires 3 sets of plans)
Fire Suppression Systems Quantity (Requires 3 sets of plans)
FIRE PLACES MISCELLANEOUS:
Prefabricated Fireplace Qty Automobile Lifts
Gas Piping Outlets Boilers BTU's
Elevators /Escalators
ALL OTHER GAS PIPING Heat Exchanger
Quantity of Outlets Pumps
# Vented Wall Furnaces Refrigerator Condenser BTU's
# Water Heaters Solar Collection Systems
Tanks (gallons)
Wells
OTHER:
'ermit becomes void if work does not commence within a six month period or work is suspended or abandoned for six months. I hereby certify that I have read
his application and know the same to be true and correct. All provisions of laws and ordinances governing this work will be complied with whether specified
rr not. The permit does not give authority to violate the provisions of NOLO') other state or local law regulation construction or the performance of construction.
'roperty Owners Name Q� V � tO .I'1\'% C `� Q;U Phone Number Q .D1.0 • c
vlechanical Company 1 fie- 9 P,t (�*11C eb ) \ \t Office Phonegba.19ap •OCt Faxgt �tOau•W5
J
i o. Address: 3.97 o y me City i al State F'1 Zip i3 L o
.icense Holder (Print): le \ 11 I. 1 " , State Certification/Registration # C►�C l R l )1 035
Votarized Signature of License Holder' r � � ` ' / J P � G 7c ecll. t.4
i
■ ':'''' STEPHANEY STRANAN S orn an. ubscribed befor t� day of ,�t 20�2--
4 • 1 c . Notary Public - State of Flotilla /�
w r y comm Expires Apr 12.20.S nature of Notary Publi 1✓/ i / ,i _� A
I •;; ' - Commission 1 EE 72055 i�
COMtERCIAL LOAD CALCULATIONS
Manual N
Air Conditioning Contractors of America
For: Name Donner Park Phone
Address 2072 George St.
City Atlantic Beach State & Zip FL
By: Contractor Energy Design Systems, Inc. Phone (904)268 -3670
Address 12132 Weatherwood Estates Dr. W.
City Jacksonville State & Zip FL, 32223
COOLING LOAD
1. DESIGN CONDITIONS Time of Day 3 PM Dly Range 19
Latitude 30 a.Inside db 72 RH 50
b.Outside db 94 wb 77 Grains 49
Otsid db @ 3pm 94 - TOD corr - inside db 72
Equals 22 T.D. Daily Range Factor= M
2. SOLAR RADIATION HEAT GAIN THROUGH GLASS COOLING LOAD
Exposure Shading / NOTES
Sq. Ft. SolrFactr GlasFactr Sensible
N 60 X 19 X 0.7 = 798
NE X 38 X 0.7 =
E 56 X !.DD X u./ = 2195
SE X 57 X 0.7 =
6 60 X 43 X u./ = 2016
SW X 88 X 0.7 =
W 15 X tai X U.7 = 851
NW X 39 X 0.7 =
3. TRANSMISSION GAINS
Equiv or
Exposure db
Sq. Ft. U Factor Temp Diff
Glass 191 X 0.8 X 22 = 3362
N 700 X 0.09 X 22 = 1386
NE X 0.09 X 26 =
? . 370 X 0.09 X 31 = 1032
Walls SE X 0.09 X 33 =
S 700 X 0.09 X 41 = 2583
SW X 0.09 X 47 =
W 370 X 0.09 X 43 = 1432
NW X 0.09 X 28 =
Doors 62 X 0.58 X 18 = 642
Partition X 0.05 X 1.z =
RA Clng X 0.09 X 22 =
Roof/Clng 2142 X U.Un X 5) = 6105
Floors 214 X X 22 =
X X =
Use Table 9a to Determine the Temp. Dif. Across an RA Ceiling
PAGE TWO
4. INTERNAL HEAT GAIN
Latent
a. OCCUPANTS Number Sensible Latent
20 X 230 = 4600
X
20 X 170 = 3400
X =
b. Lights & Others
NOTE:Use 60% of installed
watts for lights in
RETURN AIR CEILING
Watts
Incandescnt X 3.4 =
Flourescent 2500 X 4.1 = 10250
HP
Motors Btuh Usg Ftr
X =
X=
Appliances
Other
5. INFILTRATION
Ft3 /Min db Temp Dif
70 X 22 X 1.1 = 1694
Grains Diff
70 X 49 X 0.68 = 2332
6. SUBTOTALS LOADS & SPACE LOADS 38945 5732
7. DUCT HEAT GAIN
Gain Line 6
Factor Sensible
0.1 X 38945 =
8. ROOM, SPACE OR DESIGN LOAD
Add Duct gain (7) to Subtotal (6) 38945
9. VENTILATION
Ft3 /Min db Temp Dif
400 X 22 X 1.1 = 9680
Grains Diff
400 X 49 X 0.68 = 13328
PAGE THREE
10. RETURN AIR LOAD FROM LIGHTING AND ROOF
NOTE: Use 40% of watts for lights recessed
in a return air ceiling
Incandescent X 3.4 =
Flourescent X 4.1 =
NOTE: Use 100% fo the roof load
for return air ceilings
(Roof Load)
Sq. Ft. U Factor ETD*
X 0.09X =
*(ETD correction based on plenum temp.)
11. TOTAL SENSIBLE LOAD ON EQUIPMENT (Btuh) = 48625
TOTAL LATENT LOAD ON EQUIPMENT (Btuh) 19060
12. TOTAL COOLING LOAD ON EQUIPMENT (Btuh) 1 67685 1
(Tons) 5.64
PAGE FOUR
HEATING LOAD
13. DESIGN LOADS
Inside db Outside db b Difference
/2 - 32 = 40
14. TRANSMISSION LOSSES HEATING LOAD
db
Exp. Sq. Ft. Factor Temp Diff Heating Load
Windows 891 x 1.13 x 40 = 40273
x x =
370 x 0.09 x 40 = 1332
Walls 700 x 0.09 x 40 = 2520
x 0.09 x =
370 x 0.09 x 40 = 1332
x 0.09 x =
Roof/ 2142 x 0.05 x 40 = 4284
Ceiling x u.uJ x =
x x =
Floor 214 x u.81 x 40 = 6934
Other x x =
x x =
15. INFILTRATION
db
Ft3 /Min Temp Diff
105 X 40 X 1.1 = 4620
16. SUBTOTAL HEATING LOAD FOR SPACE 61295
17. DUCT HEATING LOSS
Loss Line 14
Factor Subtotal
0.15 X 56675 = 8501
18. VENTILATION
db
Ft3 /Min Temp Diff
400 X 40 X 1.1 = 17600
19. HUMIDIFICATION LOAD
Inside RH Desired ( ) Max ( )
Ft3 /Min Btu /Hr
/ 100 X =
(water) (air)
gal /day Ft3 /Min
X / 100 =
20. TOTAL HEATING LOAD ON EQUIPMENT (Btuh) 1 87396 I
(Tons) 7.28
Energy Design Systems, Inc.
12132 Weatherwood Estates Dr. W.
Jacksonville, FL 32223
(904) 268 -3670