Loading...
Permit 1661 Park Terrace E 2012 a It .t ii 'l--Or CITY OF ATLANTIC BEACH ` : S 800 SEMINOLE ROAD A ATLANTIC BEACH, FL 32233 INSPECTION PHONE LINE 247 -5826 J.H1 Application Number 04- 00029184 Date 10/22/04 Property Address 1661 E PARK TER Tenant nbr, name 1 FIXTURE Application description . . PLUMBING ONLY Property Zoning TO BE UPDATED Application valuation . . . 0 Owner Contractor KETTERINGHAM, JOHN TURNER PLUMBING CO. 1661 PARK TERRACE EAST 1903 HENDRICKS AVE. ATLANTIC BEACH FL 32233 JACKSONVILLE FL 32207 (904) 396 -7044 Permit PLUMBING PERMIT Additional desc . REPL EXISTING SEWER Permit Fee . . . 42.00 Plan Check Fee . . .00 Issue Date . . . Valuation . . . . 0 Fee summary Charged Paid Credited Due Permit Fee Total 42.00 42.00 .00 .00 Plan Check Total .00 .00 .00 .00 Grand Total 42.00 42.00 .00 .00 t PERMIT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF ATLANTIC BEACH ORDINANCES AND THE FLORIDA BUILDING CODES. 1 041K" , C . 1 164Allas BUILDING OFFICIAL uct e=U U4 0E1:12a City of Rtlentic Beach Bu 904 - 247 -5045 P.1 I ,•:' `ile i� , :\ 4eP ' � . CITY OF ATLANTIC BEACH f T,) 0 PL UMBING PERMIT APPLICATION , r--- Date: /0- 0 - Property Address: ((P Co \ ?0,..0 V., E?c e., Eck f.:0 4. Owner: \j \ \\ - -e„< ', Vi 1`'N , . S °r \ Telephone #: 9 0 9 - a' 6- I 2 G 1 Contractor: 71 w vr- �' ` W A.4� i ,)i t t/ 60 Telephone #: 9t /(!�- '70 y Contractor Address: °J 0 3 QCI ti °! F 4, Fax #: (4/ "3)( 70 In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said workn accordance with the attached plans and specifications which are a part hereof and in accordance with the City of Atlantic Beach ordinance and standards of good practice listed therein. Installation of plumbing and fixtures must be in accordance with the most recent edition of the Southern Standard Plumbing Code. Plumbing Type: If other construction is being done on this building or site, 0 New list the building permit number: v.ty \cv exesk -tor, 0 Re -Pipe Number of Fixtures: Bath Tubs Showers Closets Shower Pans Dishwashers Sinks Disposals Urinals Floor Drains Washing Machine Lavatory Water 1 Sewer Water Heaters _ Other Fees Permit Issuing Fee: $35.00 Total Fixtures: 1 X $7.00 + $35.00 = 2 00 800 Seminole Road . Atlantic Beach, Florida 32233 - 5445 Phone: (904) 2474800 . Fax: (904) 247 - 5845 • http :llwww.ciatlantic beach.fl.us Revised 1/04 PREPARED 10/20/04, 9:24:06 PAYMENTS DUE RECEIPT CITY OF ATLANTIC BEACH PROGRAM BP820L APPLICATION NUMBER: 04- 00029172 1661 E PARK TER FEE DESCRIPTION AMOUNT DUE PLUMBING PERMIT 42.00 TOTAL DUE 42.00 Please present this receipt to the cashier with full payment. - *AIT114 G FoR C l\tC IN t \1411 ° C-> ( t� �� • CITY OF ATLANTIC BEACH APPLICATION FOR PLUMBING PERMIT JOB LOCATION:.A;‘,4,1a441/7;i249e7-111, OWNER OF.PROPERTY: BUILDING CONTRACTOR: PLUMBiNG CONTRACTOR LARRY TEAGUE & SONS AND ADDRESS: • TELEPHONE NUMBER: ‘12 STATE LICENSE NO: CFCO56776 TYPE OF BUILDING: P d 7 -42-6 e SINKS SHOWERS LAVATORY WATER HEATERS • BATH TUBS DISHWASHERS URINALS DISPOSALS CLOSETS WASHING MACHINE FLOOR DRAINS SHOWER PANS OTHER TOTAL FIXTURE UNT: x $3.50 • $15.00 = $ INSTALLATION OF PLUMBING AND FIXTURES MUST BE IN ACCORDANCE WITH THE MOST RECENT EDITION OF THE SOUTHERN STANDARD PLUMBING CODE. CALL A DAY AHEAD TO SCHEDULE INSPECTIONS - (904) 247-5826 FOR OFFICE J` �7 USE ONLY Date....` / 19 -. / Permit #._../ , 57 Fee $...7/.:. CITY OF ATLANTIC BEACH -. - , Valuation $ 4, ' ' ' FLORIDA ... # d ' t �f y APPLICATION FOR BUILDING PERMIT Application is hereby made for the approval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the City of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the City of Atlantic Beach and all rules and regulations of the Building Department of the City of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner - Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub - contractors engaged by him are duly licensed in the City of Atlantic Beach, Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub- contractors be submitted to this office so that licenses can be verified. Date Oct. 29 , 19._71 Owner J.F. Aderh Address 311 17th St• Atl. Be a eJl ephone No 24 6-d070 Architect Frank Shwuer Address. West Ad441 9_..St Telephone No... Contractor Builder (sa#A@__AS__- owner) Address Telephone No. Lot No. 6 Block No. 13 Sub Division Selva Marina Zone_- .Resr.. /a/ Park Terrace East Street Side Between Park Terrace West and Sea Oats Dr, Sts, Valuation $_28_.00O.. For what purpose will building be used Res. Type of construction Brick veneer Dimensions of Building60 - - -- X_.31 t Dimensions of Lot n g6t x._13 - 7t Size of Footings x._S$ " Size of Piers --".... Size of Sills ............... Greatest Sill Span in ft. -- Type Rooflsphalt.._shing1es How will Building be Heated? Electric central heat Will Building be on Solid or Filled Ground? Solid Size of Ceiling Joists 2 X 8 , Distance on Centers 16n , Greatest Span 12!.1..8" Pt Size of Floor Joists 2..x.._8 , Distance on Centers....... 16 ►fi , Greatest Span 12/18 " Size of Rafters truss , Distance on Centers 2 , Greatest Span 12 18" ,, This rectangle is to represent the lot. Locate the building or buildings in the right position. Give distance in feet from all lot -lines and existing buildings. REAR LOT LINE 9' 6 Two copies of plans and specifications shall be submitted with application. Inspections required. Itj \h 1. When steel is in place and ready to pour footing. 2. When steel is in place and ready to pour columns and /or lintel. a Z 3 When steel is in place and ready to pour beam. �.,4, a 4. When framing is completed. F' 5. When rough plumbing is completed, and ready to cover up. . X 2 9 / =0 " . - 57 f 9" I 1-e" 1 S 6. When septic tank drain field or sewer is laid but before it is covered. q O A 7. Electrical inspection by City of Jacksonville. rn n 1 vs 8. Final inspection. Note: In case of any rejection, re- inspection MUST be called for after corrections are made. 96 FRONT OF LOT In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with the attached plans and specifications, which are a part hereof, and in accordance with the building regulations of the City of Atlantic Beach. Signature of Builder 7 Address Signature of Owner.. ' Address ■ 1: o'r 2 /.2./Y S:t /12 , ogo. r /4' , . ,')7- -� 8,6:::,X1 �.. .Cy Gt� /d`` J,r �-'�' � � " -- S //,`y' �f a ' , f 1 4 J ' � I ' . / 4 7 C 6 a g , ,5 / � + 7 f r 071 PLAN L` - ISR 4 Fr n'. E , CL. ;; cOIYG . DR +Y' Aii r S v h E i 1 3 f I • QC] Proposed Construction DESCRIPTION OF MATERIALS No (To be inserted by FHA or VA) 0 Under Construction Property address Lot' ( 31 tick 13 City `'- rr :i u ".:r :a; r, - x "o. State Mortgagor or Sponsor r'' p r(l H Me Oat, ": 1..1.1 5., °7r t i (Name) .► .._.fi.t3a..� .�Gi. (Address) Contractor or Builder J.F. AderAo1c' .; 11 1 h St . . _, a (Name) (Address) INSTRUCTIONS I. For additional information on how this form is to be submitted, number minimum requirements cannot be considered unless specifically described° of copies, etc., see the instructions applicable to the FHA Application for Mortgoge Insurance or VA Request for Determination of Reasonable Value, 4" Include no alternates, or equal" phrases, or contradictory items. (Con - as the cost may be" siderotion of a request for acceptance of substitute materials or equipment 2. Describe all materials and equipment to be used; whether or not shown is not thereby precluded.) on the showings, by marking an X in each appropriate check -box and entering 5. Include signatures required at the end of this form. At information collect for in each space. If space is inadequate, enter "See 6. The construction shall be completed in compliance with the related inlet." and describe under item 27 or on an attaches sheet. drawings and specifications, as amended during processing. The specifications 3. Work not specifically described or shown will not be considered unless include this Description of Materials and the applicable Minimum Construction required, when the minimum acceptable will be assumed. Work exceeding Requirements. 1. EXCAVATION: Bearing soil, type 2. FOUNDATIONS: Footings; Concrete rr Reinforcing.__d Foundation wall: Material Reinforcing Interior foundation v. all: Material -_�_ Party foundation wall Columns: Mate °i i and size Piers: Material and reinforcing .. . Girders: Material and sizes . ,__. Sills: Material Basement entrance areaway Window areaways waterproofing .. : Footing drains Termite j)rOtert.ion yS 9 xw $asernt:ntless spar, . ;: aund cover _.- .- __ Insulation Foundation vents Special foundati.ins - 3. CHIMNEYS: Material.. - _ Prefabricated (make r »,ri eize) Flue lining: Mate' 'al _ _ Beater flue size _ Fireplace flue size Vents (rnateria/ and size) Gas or oil heater _ ..... - Water heater 4. FIREPLACES: Type: fa rd; gas burning; circulator (mob-' and ;,izf) _ - - Ash dump and clean -out Fireplace: Facing - _... -_ ; lining - .. . ............. — _ _. ; hearth _ _.._ __.....--_- -- -_- -_ --.; mantel S. EXTERIOR WA'. hr. i `;i: ? , ai "@t I' Wood frame: Gra lc and species Colin!' bracing- Building paper or felt Sheathing P . ; thickness I ; width • ; I solid; C] spaced •• o. c.; 0 diagonal; Sidinr"?I' :a •'' - ; grade d. type r •, .) p .: f size t.e _ ; exposure .. - , ; fastening -14..1.1.-;.`i_ Shingles w f7_'a; t , grade .- ; type ; size exposure _- p -- - - " '; fastening Stucco .. ; thickness Lath ; weight lb. Masonry veneer y• y neer . _ g 1 • ;backup ' "' ' ! a- . .. thickness :_.. Bonding Lrntels , Masonry: Facing ,_ fit: �� • r' Ikor silly . .. '.............. __.. Window sills Lintels Interior surfaces: Dampproofing, coats of - - -_ . ; furring Exterior painting: Material ....31!.0 . °r "* r 4 ; number of coats Gable wall construction: 0 Same as main walls athe r es,' o ) l t r A4 1-1,7;4) .. [[ rno ._. �: s. , t ::, i t � '');1 6. FLOOR FRAMING: a 1 ? k Joists: Wood, grade and species ? * - " " -t<)+ot other • bridging .. _ • _ _ - ;anchors Concrete slab: f l Basement floor, ❑ first floor pp X ground supported, :] self . ,..f, , �: It n .... self-supporting; 1 portin gi nux r.?.; r thickness , • DESCRIPTION OF MATERIALS P. PARTITION FRAMING: Studs: Wood, grade and species _ (.;:tits .2 _ ?T ;;;,:,1.11 Size and spacing ....7-1-4.__I ( O., Other v ° " - � .t �s �,� ._fi : _ _ :ir7; xr;�.x>.�_ _j..�...t 1 10. CEILING FRAMING: Joists: Wood, grade and species - I?'tstat� t 4 <i _ Other — Bridging - i-« 11. ROOF FRAMING: Rafters: Wood, grade and species __. -.J..." -, t^.';;;_1� goof trusses (see detail) :Grade and species ...Ch.''' 12. ROOFING: Sheathing: Grade and species r, P ? : ;')‘ y 1 _ Roofing at l . S tcc.�. t, ..li r;.& ,' I^ ;' ,size ,type -. i�a• i ❑ solid; ❑ spaced _ ,• o °c. 1 i grade • weight or thickness ..-42 Jsisei ;:emu_,; fastening r ;y;(g Stain or paint Underlay y _ixIt- Built -up roofing ; number of plies ; surfacing material Flashing: Material gage or weight 2 6 ; ❑ gravel stops; ❑ snow guards 13. GUTTERS AND DOWNSPOUTS: Gutters Material ''.' • "' . ; ; gage or weight ,:... ; size . r ; shape Ch.i. Downspouts: Material 4.4,1..___.I .t,sia ; gage or weight .:t. ; size ; shape ; number Downspouts connected to ❑ Storm sewer; ❑ sanitary sewer; ❑ dry -well. ❑ Splash blocks: Material and size i >r►o.sa•..r. - 1t. LATH AND PLASTER: Lath ❑ walls, ❑ ceilings: Material ; weight or thickness Plaster: Coats ; finish Dry -wall ❑ walls, ❑ ceilings: Material r ..Ll.'_ `i ._.'.i.�. 1 '! =; thickness i_; finish'1 rz__ &__ C.�i ___ _; joint treatment - t ', 15. DECORATING: (Paint, wallpaper, etc.) T Rooms _ i WALL FINISH MATERIAL AND APPLICATION 1 CEIUNG FINISH MATERIAL AND APPLICATION # r I .W Kitchen s. 'w d'�'�i !i r t.__l" ..+7' J._ a,+s,.� t- nt_8�?` �3.�' :iy 31 Bath 1 t! nt � '2A . -- ..01 m►.._ � _. ct ., a -.._. .r4 ,?1 it n 1.4,_11$ i':ON.0.111iNf r00401 C. coitt,Iii 1 1 (... *.Fi qT4t :; 14. INTERIOR DOORS ,AND, TR4M: Doors: Type ` 'xc)c r' `''` _ • materia _ _ - -- : thickness _. !'_. ' Door trim: Type -_. t. v0; .. , material .? a Y.�s ^. _ _ Base: Type _; material __hii�_�_1. =ffie.., size x ._. Finish: Doors _ 3e 7. t,l_e; or 'f, f: l ; trim _ " fins: _ - Other trim (item, type and location) _ f 17. WINDOWS: Windows: Type s a f', t ' wag..; make ....11 ; material .:L.),rti g].rla -'.L ; sash thickness __C: Glass: Grade __. -.a.;` ; ❑ sash weights; ❑ balances, type _ head flashing Trim: Type _ material Paint ; number coats _ 1.11 . 1 ' 7 " sash, . Storm sash number 'Weatherstripping: Type > 4 .=.±. ; material .. Screens: ❑ Full; M half; type ° i.k.. I i‘,:..4 'r -y, {b .,:.1.1.,:.1.1..; ; number ..; screen cloth material 1. al- Basement windows: Type ; material ; ❑ screens, number ; ❑ Storm sash, number Special windows -_._... 111. ENTRANCES AND EXTERIOR DETAIL: _J Main entrance door: Material ____aii.r_d ul:(1.. ; width °Qt "_ thickness "�__ J/, Frame: Material C , thickness �4 3. Other entrance doors: Material -_. :ate °luau i ; width _. I .' t1 ; thickness r *t.: Frame: Material .i,, ' ; thickness �. " L `1 * i t' _4_ z 1 �i; --- - -._._ Weatherstripping: T e � t u � 1 ; saddles - - - -. Head flashing Type Screen doors: Thickness "; number ; screen cloth material Storm doors: Thickness "; number — Combination storm and screen doors: Thickness " number ; screen cloth material Shutters: ❑ Hinged; g fixed. Railings Louvers Exterior millwork: Grade and species Paint ; number coats 14. CABINETS AND INTERIOR DETAIL: S!!: III: S Kitchen cabinets, wall units: Material - 5.',51) :__i':. tt ; lineal feet of shelves ; shelf width - Base units: Material :.. ; counter top --)1_74:,. � :. ; edging -: = -:.i:a Back and end splash ' i "ti'- ' 4 Finish of cabinets _ ;2 :.; :w : i3t:_.__ :z :_. k;,.;,. «u: x; zrt - -; number costa — 111. SFIKIAL P1.001111 AND WAINSCOT: LOCATION , MAMMAL. COLON BOADIII, SIB'S. GAON ETC. _ ____ _ KAINL--YALC : " P q TIMIIHOLA BASIS M LT mammas* B cling/sic til..4 lacl :41 . ..,.....corr __Qatxxstit )(A•ONA• COLON BORDEN CAP. SION, GAON ETC. Bath __II CFTILNIC t I 1.N"....ti 1 10 . i. and fl ow,- 1 HEIGHT HEIGHT AT TUB HONK? AT IRON= j 1't co l:11(---f .11--,, 1 . - ,-ar , e, r.l.C2. rl - .or 4" i , --1, ---- --------- - Bathroom s ec e ig°riu: 0 Recessed; material -- ; number ; 0 attached; material _; number - .... 22. PLUNSIN• : _ Fs miss Nauss' LOCATION NARK -- --- MIR'S FIXTURE IDENTITICATION No. Brix Cows , - Sink L _klislotuL__Etillitir Lavatory 3 .i.2,714 Ki K=2 9M2 water ciostt...... ....... ...3 .....tattb. Y..ii.11ar fr - e" , Bathtub ...2..........1. .Ki.)411r Shower over tub* 1. h.-.2 :CA Stall showers' _ . Laundry trays 1 •0 Curtain rod •,CII Door 0 Curtain rod Water supply: OD Public; 0 community system; 0 individual (private) system.* Sewage disposal:I/ Public; 0 community system; 0 individual (private) system. * *Show and describe individual system in complete detail in separate drawings and specifications according to requirements. House drain (inside): 10 Cast iron; 0 tile; 0 other House sewer (outside) : r Cast iron; 0 tile; 0 other Witter piping: ID Galvanized steel; 0 copper tubing; D other Sill cocks, number 4 Domestic water heater:' Type --ii.Attalliktill.r=OltoiltiEtt make and model ...a..E. recovery gph. 100 rise. Storage tank: Material ___4:A.1..stial ; capacity 42.. gallons. Gas service: 0 Utility company; 0 liq. pet. gas; 0 other . Gas piping: 0 Cooking; 0 house heating. Footing drains connected to: 0 Storm sewer; 0 sanitary sewer; 0 dry well. Sump pump ........ 23. INIATINS: 0 Hot water. 0 Steam. 0 Vapor. 0 One-pipe system. 0 Two-pipe system. 0 Radiators. 0 Convectors. 0 Baseboard radiation. Make and model Radiant panel: 0 Floor; 0 wall; 0 ceiling. Panel coil: Material 0 Circulator. 0 Return pump. Make and model ; capacity 111)m- Boiler: Make and model _ Output Btuh.; net rating Btuh. Warm air: 0 Gravity. I Forced. Type of system Duct material: Supply - ,g..1,.......4 - 40,4.4,1_.; return (;' . s Insulation ;.....4:-Aliickness :i 0 Outside air intake. •-• T.' ' Furnace: Make and model ct.treA Input Btuh.; output Btuh. 0 space heater; 0 floor furnace; 0 wall heater. Input Btuh.; output Btuh.; number units _ Make, model Controls: Make and types .,.. VW: 0 Coal; 0 Oil; 0 Ps; 0 liq. pet. gas; 0 electric; 0 other ; storage capacity Firing equipment furnished separately: 0 Gas burner, conversion type. Stoker: 0 Hopper feed; 0 bin feed. Oil burner: 0 Pressure atomizing; 0 vaporizing _ Make and model Control Electric heating system: Type _ Input watts ; @ volts; output Btuh. .,- Ventilating equipment: Attic fan, make and model ; capacity dm. Kitchen exhaust fan, make and model _ — .