Loading...
Plans 176 16th St SFD (vault) LL I(o 0 �,f m 0) 0 0) j P 't izo — 50) P w 6 N 0 z 00 0) w 4 9 2(q z 0 C) o LU LLJ > > 5Z7, >0 >, 0 0 , > b-/ LU 0 N 0) 0 uj < 1: 0 no > U-1 0 1 LU z LU LLJ z I- lu T- N01103S SIHI ON18V38 ina oi ino lu C) Ln >, w in u- Z—,6 L 11 E: El 0 z 0 z i 0 IL F- C) wLLI U) >- Lu Z IL El L I W C\j W W El L---A L4 AINO [- M x I z NOU39G GWi V) U '00 FX IC ------C=N- F i� m F- 0 El (L IT . (R z o w/ N ov F- Ij - T� D z u 1� mom El L 0 0 w uj < p 0 z 1/6 w z 0 IL 0 E=T 2 IIG /0NO (L C\j NOIID;IG El GIPI >- LU -------- 0 w L o o z 00 Lm z 0 N01i:D3S SlHi DNN�G ino oi ino 00 '\ r- V Z Z T- < 5:: 5:, 0 > Li I>u Y< I rL-j N Lu i� Ir _j > j > Uj U-i -j o U-i Lu n/- LU 0 LU 2 LL- (S) 0 w .3 < 0 0 w m z 0 z IL 0 0 CIA Clay Masonry(Brkek): 12. Fasten plies of 1 %"wide engineered lumber as followfi: WINDOW,DOOR AND SOFFIT PRESSURES: 2-ply beams with(3)rows of 0.131"x3 1/4"nails @ 12"&.,c- 9 1. Brick shall con%rm to ASTM C62, C216,or C652 for Building Brick, Facing Brick,and 1. All window,door and soffit assemblies shall be designed to withstand the design 3-ply beams with(3)rows of 0.131"x3 V4"nails @ 8"o.& (each side) Hollow BFick,re%pectively- Grade SW shall be used, 4-ply beams with(2)rows of Simpson 6%"long SDW Ocrews @ 12"o-c- pressures indicated below and shall be installed in accordance with the manufacturer's 2� Brick veneer shmil be anchored with approved ties spaced no more than 16"o.c. STRUCTURAL STEEL: requirements. 9. vertical and 16"'o.c. horizontal. Additional ties shall be provided around all wall openings greater than 16"in either direction,and shall be spa J U. ced no more than 36" 1. Structural steel shall conform to AISC Specifications foir Design and Fabrication and o-c.and placed,within 12"of the openings. Erection of Structural Steel for Buildings(latest edition!!0- a.Welded connections: AWS D1.1 3. Strand wire verYeer ties shall not be less in thickness than No.9 gage wire and shall b-Structural steel shapes, plates: ASTM A36 WIND PRESSURES ON WINDOWS, DOORS & LL have a hook embedded in the mortar joint. Sheet metal ties shall not be less than No. 0 I= c.Structural steel pipe- ASTM A53 or 001 SOFFITS (psf) Z 22 gage by 7/8",corrugated and fastened with 1 3/4"galvanized roofing nails. d.Structural steel tubing: ASTM A500 Adjustable or strand wire veneer ties shall be used at CMU walls. AREA OF OPENING 2. All structural steel connections and fabrications shall c(9mply with AISC specifications. EDGE S RIP(5) INTERIO ZONE(4) 1 0 LU 4. Unless otherwi$he noted on the plans,a steel angle L4x4xl/4 shall be used for Pos Neg Pos Neg g Z UJ .. 1 _J supporting brick veneer over openings. This angle will not be required for arched 3. Steel shop drawings shall be provided to the Engineer or approval prior to fabrication. - windows where brick is self-supporting. If the length of the opening exceeds 6'-()"then 0 U) 0 to 20 sf 25.3 -33.8 25.3 -27.4 Ix X the steel angle Fshall be attached to the wood framing with 3/8"x 3"lag screws CED, 12" 4. Holes required for bolted connections may be drilled or pun hed- 20.1 to 50 sf 24.2--31.5- '2 UJ W O.C. C Flame-cut holes 24.2 -26.3 Z I- 50.1 to 100 sf LLJ :] j-: shall not be used. 22.7 28.5 22.7 -24.8 UJ 100.1 to 200 sf 21.41 -26.31 21.41 -23 001111111111 WOOD FRAMING: lid I 5. Bolts shall be installed to the"snug-tight"condition-u.6)-n- 200.1 to 500 sf .......20.31 -24.01 20.31 �,gff.5 Soffit Design PFe-ssure 25.31 -33.81 25.31 1. All wood framin@ has been designed in accordance with"National Design Specification 6. All structural steel shall be shop-painted with SSPC Paiint 15(red oxide)primer. Prior Base Design Pressure 21.40 GCpi ±0.18 (NDS)for wood(Construction,"2005 edition. to painting,steelwork shall be cleaned per SSPC SP-6 "Commercial Blast Cleaning". (5) 2. All wood membi?jrs exposed to weather or in contact with masonry,concrete or soil 7. SSPC Paint 36(polyurethane)shall be applied as the fitpal coat to all structural steel 16 shall be treated With an appropriate preservative suitable for the exposure conditions. too, surfaces exposed and visible to the exterior of the struotture- 0 1 3. If ACQ treatmeN is used on any wood member,then all nailing shall require 8. Field touch-up after installation where required to restor-OP final finish. (P Al hot-dipped galvainized nails meeting ASTM A153, Class C,or ASTM B695,Class 50. If borate treatmefnt is used then galvanizing is not required. > HARDWARE AND ANCHORS: TYPICAL EDGE STRIP(5) Z a=35 *%11111111JAH111 0, W Z 4. Pfrefabricated wo 00 jod trusses shall comply with NDS and"National Design Standard for 1. All framing anchors and connectors noted on the struct0tral drawings shall be .3 LU Z Metal Plate Conrftlected Wood Truss Construction(ANSIITPI 1-07)." manufactured by Simpson Strong-Tie or Engineer apprdkved equal- TY ICAL INTERIOR ZONE(4) a U_ Z 0 UJ 5. All trusses shall The designed by the Truss Manufacturer's registered Engineer. 2. All anchor bolts and threaded rods shall be in accordan(ge with ASTM A307 or ASTM Z F1554,Grade 36. 6. The Truss Manuffacturer shall submit shop drawings and design notes with a -U1 registered Engirv1Z*r`s seal for approval. Design notes shall include the rated load 3. All metal connectors and hardware which are exposed td)the exterior or in contact capacity of the tnuss to truss connectors,and the manufacturer's license to fabricate with ACQ pressure treated lumber shall be Type 316 stjlinless steel or galvanized per 0M U_ trusses utilizing t1he connector system proposed.The contractor shall approve ASTM Al 53,Class C,or ASTM B695,Class 50. X fabrication and installation drawings showing size,shape and layout. LU 7 Jobsite handling iand erection, including temporary bracing,during installation of 4- Anchor adhesives shall be either Epoxy-Tie SET or Acr%lic-Tie AT by Simpson Strong-Tie(with Florida Product Approval)and installed According to the trusses shall cormply with TPI/WTCA BCSI 1. manufacturers instructions. Holes shall be cleaned of aill debris and brushed out prior to installation of anchor adhesive. 8. All prefabricated Wood trusses subjected to uplift conditions shall be securely fasiened R W Z to their supportiN walls or beams with metal connectors as noted in the Truss ROOF COVERING: Connection Sch%dule. D Z I. The contractor shall be responsible for the design and in0allation of the roof covering < 2 9. All gable ends sNall be balloon framed or braced in accordance with the applicable system. detail as shown irm the structural drawings. 10. Guardrails, handrmils 2. Asphalt shingles shall comply with ASTM D3161 and be.ilinstalled according to the SCALE and guard in-fill components(Balusters and Panel Fillers)shall Y4'=1'-%4(U.O.N.) be provided by 04hers. manufacturers requirements. DO NOT1%CALE __LHIS_D%MNG 3. Clay and tile roofs shall be installed per the"Concrete an-0 Clay Roof Tile Installation RELEASE OFTE Engineered lumbfer(LVL, Parallam or LSQ shall meet the following minimum matDrial 05-le8-12 specifications: Manual,"and the manufacturers requirements. 9 REVISION LVL or Parallani4 LSL .9 E=1,900,000 p*i E=1,550,000 psi 4. Standing seam metal roofs shall comply with ASTM E 1514 and be installed according .1 Fb=2,600 psi Fb=2,325 psi to the manufacturer's requirements. I Fc=750 psi Fe=800 psi 5. The contractor shall be responsible for the design and ingitallation of all metal flashing Fv=285 psi Fv=31 0 psi j� DRAWN Bye and valley material. CHECKED E�f- �as SHEET 01 .2 S,-2 P8 LEDGER WITH(4) NOTES: 9 (9.131'x 3Y4'NAILS 16-O.C.INTO STUDS 1) ALL FIRST FLOOR EXTERIOR WALLS SHALL BE CONSTRUCTED WITH2x6SPF No.2 _R�OOF SHEATHING STUDS @ 16'0.C�FOR PLATE HEIGHT OF 10--1 ye'-U�O�N. (#AS NOTED) _j 2) ALL FIRST FLOOR INTERIOR BEARING WALLS SHALL BE CONSTRUCTED WITH2x4 LA. 1,3'"x 3 6"0 R�OOF SI_ No rl - RAI 2x6 RAFTER SPF No.2 STUDS @ 16"O.C.FOR PLATE HEIGHTS UP TO IVA y8' U.O.N_ 0 0 3) THE FIRST FLOOR EXTERIOR WALL FINISH IS FLEXIBLE'(SIDING)-U.O.N. CD Lt 2X4 LEDGER WITH(2) --------- NOTIFY ENGINEER OF ANY VARIATIONS. 0.131'x 3 Y4'NAILS V) z @ 16-O.C.INTO STUDS w NAIL JOIST TO RAFER WITH (5)0.131"x 3 Y4'NAILS(TYPICAL) U'l ui ui 2 o �A BRACKET DETAIL ,e UJ w z E .9 PSE7 EACH FRONT EXTERIOR POST ............................ ........ �/ !I ................ ....... SHALL BE TREATED 44 POST ON . ......................... ............................................. .......................... .......... . .............. % ABU44-Z POST BASE.STRAP POST TO EACH BEAM ABOVE WITH H&Z CLIP. C? -o SEE DETAIL"F"ON SHEET SD-7 NOTE: Lu THIS OPEN PORCH CEILING (p cli S: REQUIRES A MINIMUM Lu co 0; cn co Y8'SHEATHING.FASTEN E .—J: 6: (4)2x4 BUILT-UP 0 E. WITH 6d COM OR BOX NAILS SHEARWALL LEGdJ'ff--*'-o 6 POST(MIN.)TO AT 6"O.C.ON EDGES r(3)1 x 16'LV MATCH ABOVE AND 12"O.C.IN THE FIELD- 0 NOWBEARINGWAA,�o z &,Lu 3J lK Lu BEARING WAI I 1-1, (3)2X6 BUILT-VP' NOTE'— ALTERNATE: rSOLID STUDS TO 0 i2 E SOLID POST(MIN.)TO' SW-6 p ui EACH fREAR EXTE HUCII I or MATCH CORNER ABOVE CORNER MATCH ABOVE E SD-7 RIORrOr (p \: , 1A PS57 SHALL BE flRENATED 6XI6 POST ON EQUIVAI ENT SHEARWALLS FASTENED WITH /-SOLID M TC A ........——-—-—-—- SW U- ABU66-Z POST EAASE,STRAP POST TO SW-3'CSDBS 'x 2 Y)NAILS @ CO 12 M ........ Iv- 8d COM(0.131 2 uj 'C'S cl� 6"O.C�ON EDGES AND 12"O-C. Lu EACH BEAM NBOVE WITH H6-Z CLIP. ON INTERMEDIATE SUPPORTS. cl) U, SEE DE NL"I'"ON SHEET SD CD 3: -7 UP-, ...... (n col: cn (2)2X6 BUILT_ Lu POST(MIN.) \-ROOF OVERHANG :3-- 10 HEADER 'A'ON S4) (2) glWtdllE6'LVL". 2) 2x SEE DETAIL U- =:9 ...W- I ( .... ..., I ---, w SW-3 Lu A 2x6 FRAMED"---- ....... �IK SHEARWALLS FASTENED WITH cli WALL ....... EE Lu 8d COM(0.131'x 2 Y2')NAILS @ 04 3"0-C-ON EDGES AND 12"O�C. u cj clj L< ON INTERMEDIATE SUPPORTS- '0Y'LVL (2)2X6 BUILT-UP AT EANDING c'j POST(MIN.) SHEATH BOTH SIDES OF WALL (2)2x6 WILT-UP AT INDICATED SHEARWALL ic? PO cn m S3T(M I IN m cn.. ............ ........................................ ............. ........ . ................. 'K ON S4) f4-viR_ .................. I z ..............avy-.�­-.,.. @ . ....... .................:, I s I �4 - — — — — — — .......... -ROOF OVERHANG NOTE:ALL EXTERIOR WALLS SHALL BE"SW-6"U.O.N. ............................ (SEE DETAIL WOOD FRAMED HEADER LEGEND: (2)2X6 BUILT-UP 04CALE: POST(MIN.)TO *'=I'-0'(U.0X) ALTERNATE: MATCH ABOVE OF HEADE r4 DO NOT SCALE HUC41 0 or THIS DRAWING Kt�LEASE DATE: EQUIVALENT NOTE: GARAGE DOOR NOTES r(2-)2 x 7H 7RE��R 05-18-12 BLOCK SOLID BETWEEN I—ISION& FLOORS AT ALL STUD POSfS I INSTALL(ij MSTA30 STRAP AT EACH END OF GARAGE DOOR HEADER.NAIL STRAP QUANTITY QUANTITY INTO HEADER AND JACKS BELOW. OF JACKS OF KING STUDS 2. EMBEDDED STRAP AT EACH END OF GARAGE DOOR OPENING SEE DETAIL"F*ON SD-1 NOTE: . DFRAWN BY: ALL WOOD FRAMED LOAD BEARING HEADERS CIVIF 3. GARAGE DOOR SHALL BE RATED FOR A I RkECKED BY: MINIMUM DESIGN PRESSURE OF 25.2 pSf SHALL BE MINIMUM(2)2x6 N0.2 OR BETTER SYP,INSTALL MINIMUM(1)JACK AND ET: WALL LAYOUT-FIRST FLOOR (1)KING STUD AT EACH HEADER(U.O.N.) 4 Ll I 9 LA. 0 0 LL ca z 0 F-:, w Lu w UJI ui 0 U) w UJI E Lu Lu EACH FRONT EXTERIOR POST 0 ..... ................. ......... SHALL BE TREATED 44 POST ON ABU44-Z POST BASE.STRAP POST TO EACH BEAM ABOVE WITH H6-Z CLIP. "HDQ8 HOLDOWN USE Ze SEE DETAIL"F"ON SHEET SD-7 ANCHOR BOLT W/15" EMBED.(SET EPDXY) Jul 3 C$) 7/. :01: HDQ8 HOLDOWN USE U5 I z ANCHOR'BOLT w/15" WN USE 8 BOLT W/15. XY EMBED.(SET EPDXY) c 0 (> HDQ8 HOLDOWN USE 0 0 4� ANCHOR BOLT w/15" EMBED-(SET EPDXY)<N: NOTE' FEACH REAR EXTERIOR POST SHAI&BE TREATED 6X6 POST ON ABU66-Z FOOST BASE.STRAP POST TO ........... ... ...... -HDQ8 HOLDOWN USE Ze -Z CLIP- ANCHOR BOLT w/15" HOLDO .......... ........ .. . ..... . EACH WAM ABOVE WITH H6 * *. HTT5 7 ON SHEET SD-7 Sa DETAIL EMBED.(SET EPDXY) HDQ8 HOLDOWN USE Y8 GARAGE DOOR NOTES P4 a ANCHOR BOLT w/15- 1. INSTALL(j -,HTT5 co EMBED.(SET EPDXY) MSTA30 STRAP AT EACH END HOLDOWN x OF GARAGE DOOR HEADER-NAIL STRAP > 0- INTO HEADER AND JACKS BELOW- W- cr -j 2. EMBEDDED STRAP AT EACH END OF GARAGE 0 0 0 m 0 DOOR OPENING SEE DETAIL"F"ONSD-1 0 :�2):j'�410&LVL w C) AT LMDING —;-HDQ8 HOLDOWN USE z ANCHOR BOLT Wl 15" "-HTT5-, t; EMBED-(SET��NY) a HOLDOWN - § < ............ "----HDQ8 HOLDOWN USE ANCHOR BOLT W/15" ...................... .. ... ...... ..... EMBED.(SET EPDXY) THREADED ROD LEGEND: RODS EXTEND X8-THREADED ROD FROM FOUNDATION TO DOUBLE TO TOP OF PLATE.(4-MINIMUM EMBEDMENT REQUIRED) SCALE: DO NOT SCALE LANDING DOUBLE THREADED ROD FROM FOUNDATION TO UPPER FLOOR THIS DRAWING PLATE DOUBLE PLATE.(4-MINIMUM EMBEDMENT REQUIRED) RELEASE DATE: 05-18-12 13 = HOLDOWN(AS NOTED)INSTALLED AT SILL PLATE REVIMNS: = HOLDOWN(AS NOTED)INSTALLED AT SILL PLATE.COUPLE ic MINIMUM Y2-0 ROD TO HOLDOWN ANCHOR AND CONTINUE TO DOUBLE PLATE ABOVE. .9 DRAWN BY: HOLDOWN(AS NOTED)INSTALLED AT SILL PLATE.COUPLE CIVIF MINIMUM Y2-0 ROD TO HOLDOWN ANCHOR AND CONTINUE CHECKED BY, TO UPPER FLOOR DOUBLE PLATE ABOVE. FSS THREADED ROD LAYOUT FIRST FLOQ—R SHEET: S-61, NOTE: ROOF SHEATHING BRACE OVERFRAMING TO TRUSSES OR RAFTERS AS REQUIRED TO MAINTAIN MAXIMUM 64r SPANS- 2x6 OVERFRAMING J (4).131"x3Y4' LL: TOENAILS(TYP) ­SIMPSON H3 CLIP S2 0 ---.--.----2x8 No.2 SYP NAILED --------------- TO TRUSS CHORD wl (5).131"x3Y4'NAILS --TRUSS TOP CHORD OR RAFTER U) W Lu Ix 0 UL = U. uj ,MIN.2x6 RAFTERS MIN.2X6 RAFTERS (2)2x6 BUILT-UP (E�MTIQN-TYPICAL OVERFRAMING AT EXISTING ROOF 0 1= _j @ 24"O.C. @ 24'O.C. POST(MIN.) Fit, Lu TO HEADER allow 0- 9 7-1 r�44 0101_1;� 1* g 0 CONVENTIONAL FRAME ROOF AREAS-SHINGLE ROJQEBjfjPj0) 0)� P_': Span Tables for No.2 SYP Rafters v__ (4)12x4 BU LT-U x4 Bl.ILT-U uj 12., No Ceiling Load-20 psf LL, Opsf DIL a-�-. POST(MIN POST (MIN.) 0 BEA� u_ SIZE 12"o.c. 16"o.c. 19.2z"O.CA- 2x4 91-1" T-10" 7' (2)2x6 8 UILT-UP 2 sfo > -Sir 'czi POST(MIN.) )I Y4"x 14"1 LVL TRUCTUI L RIDGE 2x6 15'-6" 14'-1" 13'-3' 1 MIN.2x6 RAFTE TO HEADER IRS 2x8 20'-5" 18'-6" _W7�-5' z > Lu @ 24'O.C. 200 26'-0" 21'-2" 21 1 Z Span Tables for No.2 SYP Rafters-No Ceiling Joist- Z LU with Drywall Ceiling-20 psf LL,15 psf DL ;Z OV RFRAME U) (2)2x6 BUILT-UP,, Lu SIZE 12'0.G. 16"o.c. 19.2"o.c. 24'o.c- z U- 0 POST(MIN.)AT 0 2x6 15'-6' 13-111" 12'-9" 5' !E L4 iZ_Z u- 2x8 20'-5' 181-0 16'-5" RIDGE . .... .... 114 8 .... .... .... .. (4)2x4 BUILT-UP ___26 7_ POST(MIN.) 200 24'-10* 21'-6" 1 7'6 -71 _j 2x1 2 Fir oul E 6 PURLIN BRArC.FAFTEF S_f0 Span Tables for No.2 SYP Ceiling Joist _uj 20 psf LL,10 psf DIL iLmu M ........ Nz S .......... SIZE 12"o.c. 16o-c. 19.2"o.c. 24'o.c. u ............. F=2j 2x4 91-1" T-10* T-2" 6'-5" 2x6 151-61 13'-6" 12'-3' 11 1-0" 0 0.- 2x6 RAFTERS F- ILI of @ 24'O.C. ....... ......... 2x10 24'-0' 20'-9" 181-11" 171-0" cn ......... 202 __76FV____24q�_22�-3" --- Span Tables for No.2 SYP Floor Joist j1p 0 40 psf LL,10 psf DL Pt Lu x SIZE 12"o-c. 16"o-c. 19.2'o.c. 24*o.c. CD, 2x6 91-81 81-10" 8'-4" 71-8" 2xl 0 164" _1�4-10 14'-0' IT-O" 2x8 IZ-101 111-8* 111-0" 10*-2" ___T xT2___-7997—---fT-T*— ___TT4 14"TJI 230 2T-10" 21'-9" 191-11 (2)2x6 BUILT-UP-// '-(2)2x6 BUILT-Up 16"TJI 230 SCALE: POST(MIN.) Roof Framing Notes: X=l-(r(U.O.N.) POST(MIN.)AT TO HEADER DO NOT SCALE NOTE: 1 ALL CONVENTIONAL FRAMING SHALL BE No.2 or BT.SYP THIS DRAWING RIDGE Y12 PITCH RAFTERS OVERFRAME ONTO 2. ALL RAFTERS SHALL BE MIN.2x8's @ 24"oc.(I.I.O.N.) RELEASE DATE: Y12 PITCH ROOF PLANES(TYP.) 3. FASTEN ALL RAFTERS TO PLATES WITH SIMPSON H8 CLIPS 05-18-12 NOTE: WITH(5)10d x IY2�NAILS EACH END. REVISIONS: STRAP STRUCTURAL RIDGES 4. FASTEN ALL RAFTERS AT RIDGES WITH COLLAR TIES.FACE-NAIL COLLAR TIES TO RAFTERS WITH(5).131"x 3 Y4'NAILS. TO POST SUPPORTS W/HTS24 5. FASTEN ALL JACK RAFTERS TO HIPS AND VALLEYS WITH(4) STRAPS AND POSTS TO WALL BEAM .1 31*x 3Y4'TOE-NAILS. BELOW W/CS16(TYP.) 6. ALL RIDGES,HIPS,AND VALLEYS SHALL BE(1)NOMINAL SIZE LARGER THAN ADJOINING RAFTERS.(U.O.N.) 7" DRAWN BY: 7. FASTEN RAFTERS TO CEILING JOISTS WITH(4).131'x 3 Y4*NAILS. 9 CMF 8. FASTEN RAFTERS AND CEILING JOISTS TO TOP PLATES WITH(3) CHECKED BY, .131-x 3)/,'TOENAILS. FSS 9. FASTEN ALL HIPS AND VALLEYS TO PLATES WITH(2)SIMPSON MTS12 SHEET: ROOF FRAMING LAYOUT TWIST STRAPS WITH(7)10d x 1 Y2"NAILS EACH END OF STRAP. S-10 ROOF COVERING(BY OTHERS) 9 RAFTER AS NOTED ON LAYOUT CEILING JOIST AS NOTED ON LAYOUT-\ Xe OR'Y3Z RATED SHEATHING.EXPOSURE I-SHINGLE ROOF 7 CORNICE DETAIL 'Y32-RATED PLYWOOD SHEATHING,EXPOSURE I-TILE ROOF DOUBLE PLATE (BY OTHERS) '%2'RATED SHEATHING,EXPOSURE I-METAL ROOF NUT WITH 3"x 3"x X"WASHER FASTEN WITH 0.1 13"x 2*RING SHANK 0 ALTERNATE:SIMPSON LBPS Y2 SLOTTED 0 NAILS @ 6-O.C.ON EDGES AND INTERMEDIATE SUPPORTS. Lu WASHER WIT14 1"CUT WASHER- M ly LL V0 THREADED ROD lk 0 IJI --,-,-----GYPSUM BOARD 'X -HURRICANE ANCHOR AT EACH RAFTER(SEE 31A WITH x Y813 x 6 Y4'TITEN HD ROD COUPLER 2x-SYP#2 SUBFASu ROOF FRAMING NOTES) �,—SIMPSON (2)(�.131-x 3 Y4-ENDNAILS AT TRUSS WITH l"CUT'NASHER -MINIMUM 1 Yf BEARING AT SEAT CUT uj LIJ UJI TOENAIL RAFTER TO PLATE WITH(3)0.131'x 3 Y4'NAILS X o \ \-NAILCEILING JOISTS TO RAFTERWITH(4)0131"x 3"NAILS. Z X RS) (U-0,N.) \-(2)2x SYP#2 DOUBLE PLATE(I.I.O.N.) :3 I DETAIL-THREADED ROD ASSEMBLY GYPSUM BOARD SD-3 V16'RATED SHEATHING,EXPOSURE 1. FASTEN WITH 0.131"x 2 YY NAILS @ 6-O.C_ON Ilk u_ EDGES AND ITO.C.ON INTERMEDIATE SUPPORTS. 9 (U.O.N.)(BLOCK ALL EDGES) coo �6 z 2x-SPF#2 STUDS @ 16-0-C.-U.O.N.(SEE WALL LAYOUT) Z ROOF COVERING(BY OTHERS) NUT WITH l"CUT WASHER RAFTER AS NOTED 2x SPF#2 SOLE PLATE(U.O.N.)NAIL TO RIM ON LAYOUT BOARD WITH 0.131'x 3 Ye NAILS @ 6"O.C. z CEILINGJOISTAS - V 10 NOTED ON LAYOUT RATED STURD-1-FLOOR(T&G)SHEATHING CORNICE DETAIL Xle OR' f RATED SHEATHING,EXPOSURE I-SHINGLE ROOF GLUED AND NAILED.FASTEN WITH 0.131-x 2 YY RING lY32-RATED PLYWOOD SHEATHING,EXPOSURE I-TILE ROOF 0 SHANK @ 6-O.C,ON EDGES AND 12-O.C.IN THE (BY OTHERS) 'Y32-RATED SHEATHING,EXPOSURE I-METAL ROOF rIrLU. C.D a z FASTEN WITH 0.113-x 2%"RING SHANK FLOOR JOIST(WOIST SHOWN,SAWN 505 NAILS @ 6-O.C.ON EDGES AND INTERMEDIATE SUPPORTS. JOIST SIMILAR-SEE SECTION'C"ON u� co SD-4 FOR OPEN WEB TRUSS) 0 w Lu x z UT 3 JOIST AS ON LAYOUT ICE DETAIL 3THERS) -----,-,------GYPSUM BOARD '-,-HURRICANE ANCHOR AT EACH RAFTER(SEE GYPSUM BOARD X ROOF FRAMING NOTES) RIM BOARD MINIMUM I Y2'BEARING AT SEAT CUT 'x 3 Y4'TOENAILS 2x SYFP#2 SUBFASCIA WITH TOENAIL RAFTER TO PLAtE WITH(3)0.131'x 3 A'NAILS NAIL JOIST TO PLATE WITH(2)0.131 (2)O�131�lx 3 44"ENDNAILS AT TRUSS X4 (2)2x SYP#2 DOUBLE PLATE(U.O.N.) tu NAIL CEILING JOISTS TO RAFTER WITH(4)0.131"x 3"NAILS. (U.0-N.) TOENAIL RIM BOARD TO PLATE WITH 0.131-x 3 Y4'NAILS @ 8-O.C. '-(2)2x SYP#2 DOUBLE PLATE(U.O.N.) THREADED COUPLING AS REQUIRED ci 7Li GYPSUM BOARD z GYPSUM BOARD 2x SPF#2 STUDS @ 16-O.C--U.O.N.(SEE WALL LAYOUT) tz __-2x SPF#2 STUDS@ 16*0.C.-U.O.N.(SEE WALL LAYOUT) m A 0 > Xe RATED SHEATHING,EXPOSUF E 1. Via"RATED SHEATHING,EXPOSURE 1. FASTEN WITH 0-131-x 2 Y2'NAILS�iD 6-0-C.ON FASTEN WITH 0.131"x 2 Y2'NAILS @ 6-0-C.ON EDGES AND 12"O.C.ON INTERMEEITATE SUPPORTS. EDGES AND 12'0.C.ON INTERMEDIATE SUPPORTS. (U.O.N.)(BLOCK ALL EDGES) (U.O.N.)(BLOCK ALL EDGES) SCALE: )r=V-0'(U.O.N.) THREADED ROD ASSEMBLY AT DO NOT SCALE THREADED ROD ASSEMBLY AT THIS DRAWING NOTED SPACING(SEE DETAIL-C' NOTED SPACING(SEE DETAIL'C' ELEASE DATE: THIS SHEET) THIS SHEET) 05-18-12 9 REVISIONS: 2x-TREATED SYP#2 SILL PLATE WITH INSET WALL YY FOR STUCCO 2x-TREATED SYP#2 SILL PLATE WITH 1 INSETWAALLY SIMPSON Yex 6-TITEN HD(OR TITEN HD ROD COUPLER) APPLICATIONS SIMPSON X'x 6-TITEN HD(OR TITEN HD ROD COUPLER) .1 2-FOR STUCCO WITH 1-CUT WASHER @ 24'O_C_ APPLICATIONS WITH 1-CUT WASHER@ 24-O.C. 9 ------.---SEE FOUNDATION DETAILS RAWN BY: -"-------SEE FOUNDATION DETAILS CMF SECTION-TYPICAL EXTERIOR TWO STORY WALL CHECKED BY: SECTION-TYPICAL EXTERIOR ONE STORY WALL SD-3 HEET: FSS SD-3 D-31 Ll TYPICAL HEADER TO KING STUD CONNECTION(SEE TABLE) (2)2)�_SYP#2 DOUBLE PLATE(U.O.N.)NAIL (TYPICAL DOUBLE PLATE SPLICE) K STUDS TOGETHER PLATES WITH 0.131*x 3"NAILS @ 8-O.C. 9 JOINT IN[LOWER PLATE 48*MINIMUM SPLICE LENGTH -JOINT IN UPPER PLATE NAIL EACH PLY OF KING AND Ji1C STAGGERED v MINIMUM NAILING OF WITH 0 131'x 3Y4'NAILS @6'0.(9-STAGGERED 7__TYPICAL STUD TO STUD TO PLATE NAILING (16)0.131'x 3'NAILS IN THIS ZONE. THREADED ROD ASSEMBLY CENTERED (TYPIdAL) DOUBLE PLATE TYPICAL FRAMING AT CHANGE IN PLATE HEIGHT STUD SIZE END NAIL TOENAIL ON SPLICE IN PLATE OR THREADED ROD ONNECTION ------- 8"MAX. ASSEMBLYWITHIN 12"ON EACH SIDE OF /-JACK STUD)AND KING 11C JOINT. 6'MAX. STUD REQ(VIREMENTS 11\ I 2x4 (2) (3) (SEE WALL LLAYOU ----T--MSTA36 STRAP CENTERED ON CHANGE IN a LL. PLATE HEIGHT 2x6 (3) (4) 2x8 (4) (5) U. o EA D ROD.1 EMBLY WITHIN 20 0 (5) (6) 6'OF SPLICE IN LOWER PLATE _�� 2x4l BLOCKING BETWEEN STUDS TOENAIL I I I I z ALTERNATE:IF ROD IS GREATER OR ENDNAIL EACH END TO ADJACENT 15 -NAILEACHI iCK STUD *ALL NAILS NOTED ARE 0.131'x 3 Y4' THAN 6"FROM SPLICE-ADD STUD WITH(3)0.131"x 3 Yr NAILS _j WITH(3)0.131'x 3 A'NAILS-TOENAIL ... SSP AT SPLICE. R EN AIL(TYPI L Lu all Lu uj cl a cz 2x SPF#2 STUDS@ 16"O.C.(U.O.N.) o o Z < (SEE WALL LAYOUT) HEADER NAILING REQUIREMENTS 40 6OUBLE'kLREQ Ri�b WHERE OPENING 2x6 (3)NAILS PER PLY LL #6 7, WIDTH E CEEDS 6 N.) i THREADED ROD ASSEMBLY AT 2x8 (4)NAILS PER PLY NOTED SPACING 0, 2A 0 NAILS PER PLY (5) A: v, OINT SILL PLAT 2x12 (6)NAILS PER PLY 2x TREATED SYP SILL PLATE I lim 11 9 Y2-LVL (5)NAILS PER PLY z S" 11%'LVL (6)NAILS PER PLY z P-4 14"LVL (7)NAILS PER PLY 4"MIN.; SIMPSON X'x 6'TITEN HD TYPICAL STUD TO SILL PLATE 4e THIREADED ROD ASSEMBLY CONNECTION 55 V 12"MAX. 16"LVL (8)NAILS PER PLY (WYOND) 0, BUILT-UP POST(WHEN NOTED ON WALL LAYOUT) 0 w)9 BUJILT-UP CORNER POST SIMPSON X'x 6 Y4'TITEN HD ROD COUPLER 00 z Lu NA:LEACH PLYWITHO.131"x3 X" NA LS @ 6-O.C.STAGGERED z LL 02 L DETAIL-TYPICAL WALL FRAMING CONDITIONS 0 SD-5 U- 12"MAX. u, --mm- u. ------- -f----INSTALL MSTA24 STRAP LOOPED OVER DOUBLE INSTALL DSP CLIP@ 32"O.C. PLATE.NAIL TO CRIPPLE ON MAXIMUM SPACING (U.O.N.) EACH SIDE WITH(6) .131"x I X2'NAILS. DOUBLE PLATE STRAP CRIPPLE JACKS AND KING STUDS TO HEADER WITH w z (AS NOTED) LSTA18 STRAP L3 tj > HEADER(AS NOTED) < ---------------- 2x-BLOCKING(TYPICAL) --------- ------- (3)0131'x 3 Y4-TOENAILS AT EACH END THREADED _::::::-----_-_-_�7-1--- ----7 F_ F 7 T1---TT---TI---T� _F r- F THREADED WSCALE�- _T T---- -- 7 1 ____---kAyJLp'ECAA&SILL PLY TO KING STUD ROD ASSEMBLY ROD ASSEMBLY V-0'(LI.O.N.) DO NOT SCALE WITH(3)0.131'x 3 Y4'NAILS-TOENAIL NOTE: THIS DRANNG OR ENDNAIL(TYPICAL) NOTE: THREADED ROD ASSEMBLY RELEASE DATE: BEVEL BLOCKING AS REQUIRED FOR MINIMUM I THREADED ROD ASSEMBLY NOT REQUIRED AT GARAGE 05-18.-12 Do NI THIS I LR7, 0 NOT REQUIRED AT GARAGE R VIS IW Y2 NAIL PENETRATION INTO MAIN FPAMING DOOR OPENINGS(U.0-N-) DOOR OPENINGS(U.O.N.) MMERS.ffYPICAL) (2)2)(-SILL SHEATHING MAY CANTILEVER UP TO 2' ANCHOR BOLT AS REQUIRED ANCHOR BOLT AS REQUIRED MAXIMUM PAST SUPPORTS.ALL WINDOW FLUSH HF:ADER coNDITION DROPPED HEADER CONDITION DRAWN BY: ATTACHMENTS MUST BE ANCHORED INTO 2x- CMF MEMBERS. CHECKED BY: DETAIL-TYPICAL ARCH TOP OPENING DETAIL-DOUBLE PLATE',,6TRAPPING OVER WIDE OPENINGS SHEET: FSS THIS DETAIL ONLY APP I LIES WH�N SPECIFICALLY REFERENCED ISD-51i --INSTALL SPH_CUPS AT 32-O.C.AT DOUBLE NOTE: PLATE ATTACH DOUBLE PLATE TO STUD PER ALTERNATE:MSTA24 STRAP LOOPED OVER DETAIL"G"ON SD-7 DOUBLE PLATE NAILED WITH(6)10d x I Y2'NAILS UPPER LEVEL STUD EXTERIOR BEAM(AS NOTED) INTO EACH SIDE OF STUD DOUBLE PLATE UPPER LEVEL STUD U.: CS16 STRAP(CUT TO LENGTH)FROM UPPER x STUD TO BEAM BELOW @ 32'0.C.(U.O.N-). CS1 6 STRAP(CUT TO LENGTH)FROM UPPER _j !i NOTCH BEAM AS REQUIRED TO STUD TO HEADER BELOW @ 32-O.C.(I.I.O.N.). NAIL INTO UPPER STUD WITH(11)10d AND NAIL FIT BENEATH DOUBLE PLATE NAIL INTO UPPER STUD WITH(11)10d AND NAIL Lu INTO BEAM WITH(11)10d NAILS. INTO HEADER WITH(11)1 Od NAILS- z -----BEGIN NAILING I'MINIMUM ABOVE SOLE PLATE BEAM BEARS ON(2)2x JACKS BEGIN NAILING 1-MINIMUM ABOVE SOLE PLATE 0 — ----- -----BEGIN NAILING 1"MINIMUM BELOW TOP OF (TYPICAL-U.0-N.) NAILING NOT REQUIRED BETWEEN UPPER SILL BEAM CONDITION: 1 ------- Z w PLATE AND LOWER DOUBLE PLATE. z U) U.11 Z W LU BEAM(AS NOTED) (NOTCHED BEAM) FLOOR SYSTEM(AS NOTED) 0 M MIN 0 0 j X BEGIN NAILING V MINIMUM BELOW DOUBLE 4 lu DETAIL-CONNECTION OF UPPER LEVEL STUD OVER BEAM PLATE Lu THIS DETAk ONLY APPLIES WHEN SPECIFICALLY REFERENCED LU DOUBLE PLATE NAIL SHEATHING TO DOUBLE PLATE WITH & (2)ROWS OF 0.1 % MONOLITHIC FOUNDATION-EXTERIOR 31'x 2Y2'NAILS @6'0-C. R @ 3-O.C. LOWER LEVEL HEADER(AS NOTED) Y8'x 8'TITEN HD SCREW ANCHOR NAIL SHEATHING ALONG BOTTOM OF HEAPE 0 Al.; or Ye"x 6'SCREW ANCHOR BY HURRI-BOLT,INC. INSTALL DSP CLIPS @ 24"0-C.OR H_@ 32-O.C- or Ye THREADED ROD SET 4 Y2'INTO ADHESIVE SP HEADER BELO �G DETAIL-CONNECTION OF UPPER LEVEL STUD TO to Ir kip EXTERIOR BEAM(AS NOTED) tv. '\�7 THIS DETAIL ONLY APPLIES WHEN SPECIFICALLY REFERENCED STEMWALL FOUNDATION-EXTERIOR DOUBLE PLATE I * . C_ Y2�THREADED ROD SET 7"INTO ADHESIVE BEAM INSTALLED BENEATH DOUBLE PLATLE INTERIOR APPLICATIONS- BEAM BEARS ON(2)2x—JACKS 10 (TYPICAL-U.O.N.) Metal Connector Fastening Schedule I , IF EDGE DISTANCE EXCEEDS 5* SlnVson M LISP ID UIPAIMC acity(lbs) Fasteners Anchorage CU. 5 Z 0 USE MONOLITHIC CONDITION N.) Ln 9 CONDITION: 2 A35 MPA1 (12)0 13 1"x 1 V n/a 4 0 162'x 3%' .3 ABL;44-Z PAU44-TZ 2200(SYP) (12)0 162"x 2%'o (112 50 wl 7'embed Z (DROPPED BEAM) 0 ABU66-7 PAU66-TZ 2300(SYP) (12)0 162"x 2%'nr(12)0 162'x 3%' 5/8"w/7'embed 0) U. CS16 RS150 1705�SY P or SPi (11)0 148"x 3"in each end-(22)total n/a z 0 I In DETAIL TYPICAL DTT2-Z INSTALLATION 7"� DETAIL-EXTERIOR BEAM TO WALL CONNECTION DSP RSPT6-2 775ISY P or SPF) (8)0.148'x 11/Vinto studs YC z .1 W U, (6)0 148'x 1%"into double plate SD-7 DTT2Z DTi 2145(SYP)1835(SPl:) (8)Y,"x 1'/2'SDS 1/2*w/4Y2"embed�mono)and Tembed(stem) (USP DT%-TZ SIMILAR) GBC HC520 n/a (5)0 131'x 11/.'into gable brace n1a (7)0 131'x 21/2'tnto double plate Lou MONOLITHIC FOUNDATION-EXTERIOR H2.5A n/a.use i 600�SYP) (5�0 131'x 21/.*in each end.(10)total n/a < HZ5T n/a.use i 545�SYP or SPF) (5)0 131*x 11/2"in each end-(10)total nia Q Y2'x 12"TITEN HD SCREW ANCHOR '13 RT3A 455(SY P) (4)0.131'x 21/2'm each end-(8)total nia '0 ALTERNATE ANCHOR: H6 Li 950(SYP)820(SPF) (8)0,131'x 21/2"m each end-(16)total ri�a Co or Ye THREADED ROD SET 7"INTO ADHESIVE U_ - We D 2"x Ye#ASHER HIS RT8A 745(SYP) (5)0 148'x IVin each end-(10)total x X2'x 6'TITEN HD w/ HDO8 rife.use LPHD8 7630(SYP)5495�SPF) (20) x 3"SDS 7/8"wl 16'oml)ed(SET epoxy only) EXTERIOR BEAM 1 1 5. EL STEMWALL FOUNDATION-EXTERIOR 5845(SYP)4065�SPF) (14)Y4"x 2%"SDS 518"wl 7' mbad�mono)-1 12'embed(starn) HDJ5 PHD5 (AS NOTED) HDU8 PHD6 6970(SYP)5020(SPF) 718"wl 15'embed(SET epoxy only) (20)Y,"x 3"SIDS Y8'THREADED ROD SET 12'INTO ADHESIVE HTA16 H6 CLIP FROM HETA16 — 1810(SYP)_(10)0 148"x 1V 4'embed a POST TO BEAM HTS20,HTS24 or HTS30 HTW20,HTW24 or HTW30 1450(SYP)1245(SPF) (10)0 148"x 3"in each end-(20)total We INTERIOR A"UCATIONS- HTSM16 ori HTWM 16 or HTWM20 1175(SYP) (8)0 148'x,3'into wood Na . .......... �LAP BEAM PLIES AND .......... into dku IF EDGE DISTANCE EXCEEDS 5"USE (4)Y. .1. Titan into concrete Y2'X 12'TITEN HD SCREW ANCHOR NAIL AS SHOWN-(5) HTT4 HTT4 4235(SYP) 36410�Si (18)0.162"x,21/2' 5�8'wt 7"embed(mono)and 12"embed(stem or Ye x 8"TITEN HD SCREW ANCHOR 0.131'x 3 X'NAILS PER PLY HTT5 HTT5 5090(SY P) 4375(SPF) (26)0,162"x 2Y2' 58"wl 7'embed(mono)and 12"embed�stom� w _TP4 P4_F (12)0.131"x 1 V 40 "JI 1235(SY P)111 0SPF) (7�0 148"x 3"in eac h end-(14)tot al n1a 0 or/e THREADED ROD SET 6'INTO ADHESIVE \_ LSTA 18 LSTA18 PT POST(AS NOTED) I LTS 12 LTW 12 775(SYP)665(SPF) (5)0 148'x 3'in each end-(12)total n/a < MSTA24 MSTA24 1640(SYP)1455(SPF) (9)0 148'x 3'in each and-(18)total We o DETAIL TYPICAL HTT5 INSTALLATION '\—H6 CLIP FROM POST k 2 MSTAM24 MSTAM24 1500(SY P or SPi (9)0 148'x 3'into wood SD-7 (USP PHQ)5 SIMILAR) TO BEAM PT posflAS NOTED) IS)Y."x 21V Titan into CMU (5)X.,x 11% Titan into concrete 7 ME— \­EXTERIOR BEAM ABU po§T BASE MSTA30 MSTA30 2050(SYP)1820(SPF) (11)0 148"x 3"in each end-(22)total rVa 1'-�O'(LI.O.N.) MONOLITHIC FOUNDATION-EXTEMOR (AS NOTED) (AS NOT-EM) MSTA36 V STA36 2050(SY P or SPi (13)0 148"x 3"in each end-(26)total rua DO N93T SCALE MSTAM36 MSTAM36 18 70(SY P or SPIF) (13)0 148 3"into wood n/a A THIS 16RAWNG Ye THREADED ROD SET'15'INTO ADHESIVE Ve THR&NDED ROD (8�Y"x 2,1/,,",Titan into CMU RELEASEF PLAN VIEW AT TOP OF POST ............ 0. i WITH NOT SET IN x 1 w.Titan mi�con �ATE I �ITsu or MTS20 M TW 12 or MTW20 1000(SYP)860(SPF) (7)0.148'x 3'in each end-(14)total n/a 05-116-12 STEMWALL FOUNDATION-EXTERM .0 ADHESIO MTSM 16 or MTSM 20 HTVVM 16 or HTWM20 860(SYP) (7)0.148'x 3"intoNood n1a REVISIOW: (7-EMBPMENT) (4)X"x 21/4"Titan into CMU Ye THREADED ROD SET 15'INTO ADHESIVE ............. ............. 11 4 1 1 1.X 1 11 x-1 11%-tit.9,n.,into co,n.crate f PA51 TA51 3685(SY P or SPi (21)0 162"x 21,�'or 1)0 162'x 3%' 4'embed INTERIOR APPLICATIONS- SPH4 or SPH& SPTH4orSPTH6 680(SYP)585SPF) (12)0 148"x I%' ri�a IF EDGE DISTANCE EXCEEDS 5"USE SSP RSPT6 350(SYP or SPF) (4)0 148'x 11/.'into studs Na 4 STHD14 __�44_30(SY P ��LO,141'x lVinto double plate THREADED ROD SET 8'INTO ADHESIVE STAD14 or SPi 148 x 3 V 114"embed 9 DRAWN Notes: MF SIDE VIEW AT BASE OF POST 1.All connectors are manufactured by Simpson Strong-Tie of USP Structural Connectors(L1 O�N.)"___ CHECM BY: 2 SYP=Southern Pine,SPF-,Spruce-Pine-,ir -—--------- DETAIL TYPICAL HDU8 INSTALLATION 7'� DETAIL TYPICAL CONNECTIONS AT EXTERIOR POST SHEET: 3.Mono�monolithic concrete.stem=masonry sternwall or bond beam SD-7 (USP PHft SMILAR) SD-7 4.An chorage refers to threaded anchors vvith noted diameters and embedment depths "ilk �12512012 10:02:49 AM,AI?LH V(2-4,00 06,00 1m+er,) 1:120,Jim 611ar 0 LL 0) .10 1 I0 Ot W ID 0) _0 0) j pf izo —�0) 0 W WN 90 43'—11 6 —1 1`111 SIDE YARD HOUSE WIDTH &DE z 00 Y�kRD 0- 10 W 0) 6' WOOD FENCE It 10.9 f I< —x '11 .4 zo LOT COVERAGE: � N't ' 7ftWS DRIP THRU WOOD DECK 5' 9 ,-0 `115"PALM \ W MAIN hOU5E (porche,5 included)—2 100 a NO) U-) 0 N11 JACUZZI DRIVE * WAL 355 14"PAI-M POOL COPING (bowl not included) —37 0 A)C PAD5 18 > 6"HOLLY POOL TOTAL COVERAGE 25G4 U I\ - INDEX TO DRAWINGS IU ITI LOT 5000 VERED P H (7) < 0 r-r' 1.4 IT! PERCENT COVERED — 50.02% F- 0 rri I W 11.0 X ARCHITECTURAL — z 114 t it _C14 M 0 1 .4 W m 0 m _j X +. A-0 N E LL rn COVER 5HEET 51TE V) r_ A-TWO fIR5T fLOOR PLAN r 0 11 "TALLOW i i I — z < verify LEGAL: A-TH RE E SIECOND I'LOOK PLAN WW with W 0) 2 5TORY HOU5E: : A.15. I-- LOT 1 5 , BLOCK G3 , tA-FOUR ROOf PLAN x 14111 E OAK U) 0 0 MANDALAY, A5 RECOPOED IN -A-FIVE z 20 0 ELEVATION5 (0 _171 PLAT E300K 10, PAGE 1 19 A-SIX 0) rri OF THE CURRENT ELEVATION5 to z 11.6 X W 0 A, 11.5 ' PUBLIC RECORD5 Off m >, -A-S EVE N 0 ,, PUVAL COUNTY, I'LORIDA. fOUNDATION PLAN 0 (for reference Only - 5CC 5tructural) ­ I 9"TALLO'W(3) 17" :)ALM *k-E I E3 HT flg5l'-�`LOOR ELECTRIC 15"PALM 6"CRAPE MYRTLE OD. W C1 4:1, A-N I N E ND fLOOR ELECTRIC L L W T`R?y01 RE INLET PROTECTION x r- if ANY f 4A-TE N 0 it GARAGE 0 0 k,* JNLET5 "LL 5ECTION F- 0 (for 11C.-ference only - 5CC 5tructural) V) F 0 0 00 0 W a- rri 0 C'4 + z z 0 M 0 1"HOLLY(2' 11 .6 0 N 0 T E 5 : 2:x rri 0 — 10"PALM AkTTA C H M E N`TS z 0 1-)ELECTRICAL WIRING PER NEC 2008 W 17- 2.)&L BRANCH CIRCUIT5 THAT 5UPPLY 125-VOLT. r- z DRIVE 5INGI F PHA5E, 15-AND 20-AMPERE OUTLET5 A , 7"HIDLLY 1"HOLLY(2) IN5TALLED IN BEDROOM5 5HALL BE PROTECTED IVE M I fOp1m GOOC-01 0 ID 0 15Y AN ARC-FAULT CIRCUIT-INTERRUPTER L15TED fLORIDA ENERGY Ef FICIENCY CODE 1 10 -n : 7"HOILY TO PROVIDE PROTECTION OF THE ENTIRE CIRCUIT. b r" 13"PALM Ir`TE M 2 C4 z 3.)UNU5ED 51$ALED 5URVEY- m 0 rn 0 1 1 F_TEM 3 TP155 ENGINEERING C14 3" x 19 1 .3 ITEM 4 5TRUCTURAL ENGINEERING 0 n7 Y, 10 NOTES: 16"PALM W 1 ) OCCUPANCY CLA55 15 GROUP R-3 10.66 10.41 10.1 2) CON5TRUCTION TYPE 15 TYPE 513 EDGE OF PAVEMENT W S 3) APPLICABLE CODE5: b N 3 m E51DENTIAL N r- 10.79 )( 2010 I'LORIDA BUILDING CODE, P 0 10.49 10.20 )( 2008 NATIONAL ELECTRIC, CODE N I N 2010 I'LORIDA IFIRE PREVENTION CODE 0 \ 40' RIGHT—(OF—WAY PAVED PUBLIC ROAD b N 51 )( TEENTH 5TREFT CURRENT ATLANTIC 13EACH LAND DEVELOPMENT CODE 0 5 1 T L A N 0 0 0 A W z 0 z FILE CC!Y 0 0 1�11111 �J 1 1:! Hl�iAd IT�l �hkil, LL .10 1(0 0 6,t (00) 0 0) F-4 jzO It N 0 z —00 w a 9 2 N cm .0 "Z—,6z Z "z—,6L .9—,S; z 0 It 110 jZ 0 NO) cm Q 's, lz >1 u q 2 Lu CD co 09 ca 0909 09 r- Ot, Ot7 09.0c F i I I + - --t�- -1 1 L I LL4i r............................. 4f— CL 80-0 Z LU 1`4 Z lu Ln z U) co 01.19dall 10 0 z > LO UaJ- Llul/- 0 uj 4, z IL z LL. z 'Cl4 D- z w z 0 LO Li z V) w 0 LU LO 10 Z a z m r% � 2 1 F OD 0 CL —A "0 Cn- Z w (n 0 L u m 1 "00 00 w z CC) / 0 LO %-/- I u (f) Q LLJ 0 Lu m 0 "0 L --T"ot-,z Z 0 V- /01 LO CD � -1 z O < to 00 Lr) CL V)w LL- -u-) CIO co z uj z w < LLJ uj IT 0 0 t Z > COCL Af CD n C) CLI C*4 Lki N-1 V- > co U-) LU !;E 04 LLJ LLJ M LU w CV/ o uj I-- - It 0 t� U =UC) 0 C) UJ a-/ U 0 1- 0 :ZZ) rl lu 4) 0- C14 T) Q LLJ 0 < =QL- 9 %�-. I I __j F >U < z IL-< 0 JU 0 z '-'/8 w T- a/ up u < Noe ui Lij < 2 < U- LLJ z LL- CD 0 z (,D U-j 0 OZ - ----- cr) 1 0 F- LLJ 0 C\j 0 LL/ Z) ui > 0 LLJ r LO Z Z IZ (D 4004 jq-' g/I ui D 0 N � 8 - - u 2 ---C=D- LO uj r- 0 (0 IT M 2 z Q� U-i 9JOIG z > uj z 0 04 z C, �- L z 0 0 N -j LLJ IL cq 5 tr) > ED u 'N rl 4� LU ui 0 F�l 0 4) -1 >< Z.. lw LO 6 w 7�— W E ad Ot7 50 RM 90 Oe w Oe LLJ D C.) > F3 0 L 00 V� c o- CD < an Ida cm Z 6 'OD N .0 L 'N\ T- Ir- o 'LZ .9—,g L " N 0 L L "Ot aq z 0 C) w 3 0 VkN 9) 0 w z 0 0 z IL 0 0 L L 1(0 0 0) jzO 0�N 0 .Z—,gg —00 C: -4 ----------to 0) Z—,6Z Z—,6t "OL—,z .9-7 It cm 92(4 .9—,q t "g—,g w z Ot jZ N —--------- 10 L—,6 I 0 NO) Ito ku 0902 09 ipe 02! 00 > 09 9? 09 9? I T IN .......... El cz 00 0 0 CD 0 0" L -JL -J to C\l z w LU (,) ff < CY) 0 0 z —7— r----i V) >- Lu 0 Lu El (y) lz C) C) IC14 (f) I E2 LO 0 ILJ I �2 1-1 1 tu C) (n C) LL CC) LU U-1 �Y) CO 0 z 0 99CIN JOMI [411M]SICIN DMIQ3 XIIN20 LLJ C\l U-i a lc� w IN u u (D I tu w 0 (S) N 0 -W I z �Z- .9 x El --4 CM LO U) 119 it' 119 go co 9 C\j CL zz z Ln z 9 C14 C) U-) 4 to lu rC 00 z LO 0 i '-�\ Lu to ry 0 uj uj U-J 0 EZ 62 0 LU U- Q) 0 < cc) OZ 8m (Y) 0 VIM uj 01, 0 loz 4* r z LU >- U-1 u C\l -qE)Q 1�1 :JOO,,� Plim C) 0 L S, - (0 u (D 00 1 L 0 / 0 1 (1) -j 0 0 Q 0 (ID L ---A / \ ;19C]1'6q 9N11123�GLLNDO 10 0 _j 0 W- r- 0 C) ILJ 0 lu CL/ - I I u n u a 0 11 n I m u LU uj CD U 00 u I - L OD 0) 0 to z "to Z: Es Lf) .................... GGg 0909 0!) 0-4e -ve trz! V?l t7a -v3 trz Igtoe 4 foz—,gz L—,6 C3 -tog—,z ,*—,6Z 6 L goo L=�Z' OD N 0 N 0 0 0 Log SE z 0 IL 0 0 :z Q) I',- SN C:\t2raftlnoj\PWll0N2�\cuAm Lot I�,M.�U\Fini5kcddrawirlq5\�levabion5.�wq, �12112012�:06:02PM,AkL-HP(24,00x�6,001n&e5),1:46-0008,Jwnc4�liern LL .0 I(D ROOf VENT 0 WHERE 5HOWN 6t 0) - - - - - - - - - - - - - - - - - - - - - - - - - - - - -0 KY LIGHT j Ft izo 12 TYPICAL U.O.N. 12 19, 19 < of IN zz- Ito -00 xo) z 0 10 0 NO) 12 50 Ir 12 19 C) < z L I C-4 LL- 1- 0 0 owl V) w c>, 8" 5QUARE L I 0 ZQ COLUMN5 (L 10 Z 0 w < 0 V) w x V) 0 z FRONT PORCH 13PICK APRON BACK PORCH R I G H T I D If ELEVATION (WC5t) 0 12 19 0 AT FRONT IL 0 GABLE ONLY PLATE HEIGHT AT FM1 P-6 5 FRONT BEOROOM U.O.N. um u u u u u 0 --.Cw - - 1 v I \TYPICAL. 0 �E GABLE F ENDS 1 1 4AI 0 C) w 0 Z z oca 0 0 z w w JL— W TYP. FLOOR '-�M FLOOR 'o w DEPTH 12 9-1 0 co 0 El El N u 04 r I FE-11 FEI I ELI I FE-11 0 \ �E'or 0 0 !M —1 El F-1 El F-1 I m F '00 El El 1-1 F-1 El El oj 00 1:1 El El El F1 LIVING FLOOR El El 14 0 El El El ---" :��GARAGE CURB R x APROX. GRADE FRONT 8" 9QUARE Ln PORCH COLUMN5 IF R (ONT L I- V A T 10 N (nidh) I 0 z 0 IL 0 0 c�\praftjN\PWWN2�\custorn Lot 1�,M.Dc�\�jni5kcd jrawjrq5\ElcvAion52.Jwcj, 21/2012�:O�:24 FM,A"t9(24,00 X�6-00 ln��),IAB-0008,JIM CA"IM -J(D LL 10 ROOf VENT 6,t Mo) WHERE 5HOWN 0) 1 izo ,,----5KY LIGHT 12 19 0< 12 \AREA Of w 6 19 3/12 PITCH ROOF 40 z —00 u u -u— a I u u u u u u u �0-0) u w �It 9 2N z Ot 10 cy) 41 E11LIE EIL w 12 12 BUMP OUT @ 5TAIR, LANDING < w D w d WOOD 0 BRACKET5 V) J < LL L I . �- I Z 0 W W < W W x c 9 U) 0 7 BRICK APRON 5ACK PORCH L f T 5,, IDE ELEVATION (ca5t) w 0 < 0 F 0 12 w u z n3 12 0 0 5KY LIGHT 9 W- u 0 0 -i 0 loo cl Z 00 -j co a. *01 0. w PROf ILE Of 04 w x 9 x 5TAIR IN51DE IN. J fOR REfERENCE 0-3 ONLY It IN u u r, J1 0 r N 0 0 IN 04 -0 0 0 0 w r J w ko 13ACK 8" 5QUARE z PORCH COLUMN5 0 0 z A T 1 0 N (5outh) K E A E L E v IL LL o) .10 1 -00)1 ]ZO 50) P 10�N 0 z —00 11 w �0) Z—,6Z ca M3 Z—,6 L z 0 jZ IN V-0 0 NO) V)06-Fni V)LL LLI CD of M CL w W :5 L'S OV)M> (0 to -F' T- CL z r 1- 0 z U) J 0 n rr-- IL S- Z �z LLI D I Ld < 0 u0jO 3dO-lS z LLI Z 0 LLJ F- C.) UL-- -.1 < U) > Ld 0 z 01 , cn 3-mz W W of Z 0 -j Z 'w U') x m t- M y oo C3 I UJ 0 12 :3 F- %0 ,3 31 V) tl- LL, 00 z-j x 30 00 ED 0 ou z 0 ��) (ch '00 00 ZO Z—oz V) 0 M Lj- C) LL. Mrs 0 cw-) 2'v-) zz 000 3 Oo w z 11 a. �q a- 2: 111 o -03 r z -j M(.) I L -i m 0 z 0< 31 w v)V)of (n' L-1 ri Ld Ir- I It m I I I 0 Q 3- 0 w Ica Z > 000- L "S X w I C) m> V) In V) r Cf) 0 L J 9r 4004 w ry z 0: V) Fj C% 0 -J C4 0 If 0 < 0 < A FO m m LU =Si- w w z 0 V) LLJ 0 z 0- 1100 0: 0 Lo 0 I z '0 ui 0 8 to 4004 1 0 UZ 3c�OIS EE 10 T- z z co 0 -03 > in LU 0 D- C4!� cq ZUD'- 0 0 L 0 Z W W 0) @ RM z 1 0 w 0 z w 2 M 0:00 2SO S, z w W Lr- z m 8 U) Pub o N Z 0 0 C) w 0 kEN hl 92 vi W 0 6 651 1 LLI L.Li. w Lm z Cl? z 0 T- E!< IL ER 0 0 i(D LL I(o 0 0)1 izo 50) o cr- mmo It N :3 C5 r\ a �-0 �E 0 W It 0 z M LY3 �E w 0 CL w ?,WWRW !E =01 Ir ow WX 0 CL CL M 0) w V) (n Id S C2 0 5z CL �E m z 0 LL. [:; (4!Rx 0 z 8 C zi t vo) :0 w �E in 0 �E 0 w z a. LF.E. M T Li, (nt=O SO 0 z LLJ X 0 -j z 0 m �E 0 2 2 �z 0 :) L) 'm D 0 :3 Z It w o ZI 0 a. C4 �? w 0 xov)=)Z z Ot Zn "N w z LLI a V) U) 0 m t; w x w m Moo v N w Ll Cal X 5 w ir 0 0 0 0 S w z 0 xw C) m 0 3 w X I Z Z z 0 z x u 0 w 0. I�c �o LO OW .2 o C-4 LL. z R LL. V) 9 a. 04 (f) ir W) m Wo rx E5 M<w L. 3E w LC M 41 -7 CL WP V r\ Ma a (a rw9 @ E:-� IE=4) V) 0 C) 0 Ld z< 0- 05 0 L) LL: 0 0 K x W-Z tD 10- z 04 w na- _0 0 o (IPT. ....... z 0 w 4- �>L V) U/ u — I > 4 ce L R El q W Uo Itu w 0 ov) w a- F- x 0 0 x o 0 < F— —J Vp 0 w D LLJ 0/ > a VA, 0 0 9 Ub 0 CL > x 0 IL 0 a- LLI W 3c !;� LLJ 0 _0 (D C) Z 0 w LL- 0 cr- .............. D UJ El -J in Ld C) LZI 0 z C) Z N3dO -10 E LL- Q 00 V4 LL 0 N IN Ul N All, LL < 0 (4 0 co z vc b. 0 0 Ono az LL 0) (0 0) j 0 Q w 0 C.) > 0 0 C400 w 0 a: 0 WE 9 3 —00 cr �E U) ->i L a on: 40 (3 C) CLCLMM L- w LLI 0 z !E m !E C) z =1 (3 C04 o W w :3 Lr3 Ix 0 a. Cl T 0 a- 0 0 x m T C-4(n 0 �E =3 Ix r� 0 �E (n m Oz '0 Ix 0, o z :L-, z 0 0 z w !E 0 0 0 w w �E 0(/) Ot Ld 0 z 0 m �E 0 M'WL)0 N 12 0 E 0 0 12 . 005 w o :3 a CL w C3 0 x It a z 0 0 C-4 W C14 0 w L) .2 0 0) w D Rh g � CL a z z D-IC x 0 0 X w M x 0: Ir Ir In C) E 8 Y- 0 w z 3: Ix z 3 C.) LZ U) M<O: W) Z Ir X LOL. UO) CL 0 IN LOL. Z CWL w wo- LLI a. CN W Ir 6 :r�29 1 L'i WP 3: 0 U) 409. )609� 0 - c -j E KEA LLI @ �0- 50, 0 -J*Z 1� mLi zir 0 F- 0 <a. 0 ci L<L. z 0 anz8p 1,71 C'4 w L -JL -J WW CK F-- Lj 0< w 0 0 c) z -j 0 U- -j 0 x-7- 3@ L---J ........... JL (n co El V) w 0 a no c(n) 0 Ix LL. El r -i El 0 z 0: 0 IL 0 ,V� Ll I rf CO W W .................... Q dth 8 LL "OD N C) w 0 0 0 I w z z :z Q) 27 OF (0 LL 0) 0 0 0) izo 0) 0 0 00 0 0 4-j 0 0 C) Q) fy — E 0 z Ot V) a- C- *- a) 0 CL 0 Lli cn C) O) E c- = M 7' :D V) 0) cn < 0 4- .C: < I C) Q) n 0 C- I :2 cn 0 UJ cy or n*, E Cy- Li 0 Ld w D� 0 U) 0 �- ff 4-j U) 0 Q) .- O (j) 6) < 3-1 CD -C C 0 Q:f QK 0 7r C) (L) 4--1 0 -C C: LLJ LL -4-) 4-j LLJ z P 4- 00 0 E c- SNOUVA3�3 33S SlINVA ZO Lij 0 LLJ Lj SNOUVA3�3 33S SlINVA W n a- i-- u --C=:. ---I w w Q) 0) C: r) (D -C:3— P m 0) C: V) Of LLI CIO m x 4-J .— L- C: LLJ 6 to L C: CY)4- q- (L) V) C: 0 0 a) LLI LLJ V) a) 0 r- = r ) m &I CO C) CD Ld cr- z 0 Z W cl�- CN ct� LLJ LLJ + + + 0 + + + >j 0 Ld 0 C) a- n + n LL. u .0 w C) w 4 + + 4 4++ ++ + + ++ 00 + +* *+ # + # xl� 0-) .*++++0 ++ * ++ + + + 0 < 0 . . . . . . . . . . . . . . . . . . . . . . + + + + + + *+++4+ w + + .. . . . . . . . .4++*+*+*#++4+*++++ 4 4 + + +1 + + ++ + + + + +4#*+**++4 + + 4 + + . . . . . . # + 44 0 z + 4 +-* f 4 4 + v7v*v�* + *:+:+:+- + + 0 a A�O HIM111111 If + 0 4 -#:*:*:+:4:+ � - . 0 0 0. LLJ LLJ Li LLJ COO z 0 @ 6 0 0 0 U) z V) Li w w 0 1 9) Ld LLJ F- k ::) n it -I cD q < a- 0 f- Cf) Ld Of LLJ >- U) Ld ' m LLJ Q� -1 3;: ry 0 Li w Q 0 ry _j 0 -J cj:� Lli 0 CL < 0 CD 3: 8 z 0 >- rr- V) C) 0 < < 116 < m a- 0 Lli Q0 < < Cf) n 00 jl� 8 —J F-- C) V) LL- C) 0 0 LLJ LLJ LLJ Ld, Li (D LLJ LL- LLJ x LLJ m m 0 0 LLJ V) LL- < N V) W > L.Li ry LLJ Of C5 Ld LLJ 7r Lj z 0 Ld w , 3: :2;- 0 w LLJ 01-1 C) < 0 It w 0 m z 0 IL 0 GENERAL NOTES: 13ESIGN SPEtIFICATIONS: ra 1, The scope of these plans is limited to the structurall requirements of this project. 8, All concrete slabs on grade shall be the thickness as indicated on the d wings over bing and HVAC),waterproofing, minimum 6 mil.polyethylene(visqueen)vapor bamer.Slabs shall be reinforced with Project has bftn designed in accordance with the 2010 Florida Building Code, Architectural,civil(site),electrical,mechanical(plufm 6x6 W1Ax1.4 WWF lapped 8"at edges and ends in conformance with ASTM-A 185, Residential,armd the Florida Building Code, Existing Building(as applicable). and flashing requirements are not addressed in thLase plans. or fibermesh reinforcement shall be used with minimum 2"fiber length at 1 LB/CY rformed in complying with ASTIVI C1 116(u.o.n.). J that this work be pe it DESIGN CRITERIA: 2. It is the intent of the Engineer of Record(Enginee 0 having jurisdiction over this type f conformance with all requirements of the authoriti Slabs on grade shall bear on structural fill which shall be clean sand free of debris and Wind Design IMethod ASCE 7-10 of construction and occupancy. other deleterious material.Structural fill shall be compacted to a density of at least LU treated C4 M I Basic Wind Speed: 130 mph nstruction. It is the 95%of the Modified Proctor Maximum Dry Density(ASTM D1557).Fill shall be LL 0 Building Category: 1] 3. The contractor is responsible for the means and Trilethods of co I= with termite poison before slab is placed. 0 Z Wind Importalftce Factor: 1.0 contractor's sole responsibility to determine the pr(9cedure,sequence,and temporary nent parts during Wind Exposurre: C(Enclosed Structure) bracing as to insure the safety of the building and iOs cOmPO 10. Footings may bear upon undisturbed soil or upon structural fill- Structural fill shall be UJ Residential dified Proctor Maximum Dry Density Building Clas%ification construction. compacted to a density of at least 95%of the Mo 0 Building Type,,: Type V Construction (ASTM DI 557)for a depth of at least two feet(Z-0")below the bottom of the footing. Z LU UJI a Wind-Bome D NOT located in the wind-borne debris region e contractor shall verify all conditions and dimet9sions at the job site prior to _J 0 )ebris: 4. Th 4 nsiderations shall be the responsibility of the commencing work. 11. The following minimum concrete cover shall be provided for reinforcement: 0: W UJ Unless otherwise noted,project site co lude,but shall not be limited to, tlihe work all inserts,anchors,angles, 3" Concrete cast against and permanently exposed to earth Z '9wner and/or(contractor. Examples of such items inc 53 a W 5. The contractor shall supply,locate,and build into ncrete exposed to earth or weather UJ -s mponents as may be 2" Co determinatioR of grade elevations,drainage features,and special requirement plates,openings,sleeves,hangers,slab depressi(gns,or other co 1 1/2"Concrete not exposed to earth or weather ted wilth FEMA flood hazard and/or DEP zones. associa required to attach and accommodate other work. n concrete shall be lap-spliced with t WiD@-- 0- N DESIGN DEAD LOADS: 6. All details and sections shown on the structural d(Awings are intended to be typical 12. All continuous reinforcing steel i 11@tion elsewhere in the work except minimum lengths: I co and shall be construed to apply to any similar situ #4 bars: 21"minimum Floors: wood decking or where indicated otherwise. #5 bars: 26"minimum UJ The design f1loor dead load of 12 psf assumes a floor system utilizing :C/) wood subflo(�Jring over wood truss,wood I-joist,or solid sawn lumber framing. The floor fer to the structural drawings for all structural cpetails and sections. The contractor #6 bars: 3Z'minimurn Z yl,wood or ceramic tile. The Engineer shall be 7. Re of conflict between the structural Co E covering is a;%sumed to be carpet,vin shall contact the Engineer for clarification in case§ 13. Reinforcement in footings shall be bent around comers or comer bik pe u5)d- Z W-0 til pfrlior to commencing work. notified if theifloor coverings differ from the noted assump ons drawings and any drawings prepared by others 14. The contractor shall provide spa it....... >LU cers,chairs,bolsters,etc.,nec tto obtain a soils exploration report. ' V% F �2 'Roofs: inforcing steel.Support items which bear on exposed concrete surfa ave A Z 0 8. It is the owner's and/or contractors responsibility Capacity of re 6! U)9 Metal(br Shingle: 10 psf(Rafters)7 psf(Wood Truss) The design of the project structure assumes an aillowable soil bearing 0 (90 ditions encountered differ from the ends which are plastic tipped or stainless steel, z LU Z �te or Clay Tile: 15 psf 2000 psf. The Engineer shall be notified if soil cc4n Concrit oil compaction Refer to Architectural Plans for Roof Covering System noted assumptions. All requirements for site preparation and s 6ass more stringent requirements are MASONRY: 0 specified in the soils report shall be followed unl LU DESIGN LIVAE LOADS: specified in these plans. General: Floors: CONCRETE: 1, All masonry work shall be in accordance with"Building Code Requirements for U01 -L Extenibr Balconies: 60 psf Lgilding Code Requirements for Masonry Structures,"ACI 530-08,and Specifications for Masonry Structures,"ACI - UJ Exteriibr Decks: 40 psf 1 All concrete work shall be in accordance with"B 01 .9 j� "ACI 301. 530.1-08 J Stairs;: 40 psf(or 300 lb point load) at U Structural Concrete,"ACI 318-08,and"Specific lion for Structural Concrete, Garages- 60 psf(or 2000 lb point load) th of 40 psf -impressive strength at 28 days: 2. Grout shall conform to ASTIVI C476 with minimum 28 day compressive streng All Other Areas: 2. All concrete shall have the following minimum co 2000 psi per ASTM C101 9. Grout shall be mixed to provide a slump between 8"to 11 Slabs on grade,footings,and misc.concrette: fc=2500psi Attics: Structural slabs,walls, beams and columnv.- fc=3000psi 3. Mortar shall conform to ASTM C270 and be Type M or S. Type N mortar may be used .s fc=3000psi Withftt Storage: 10 psf Designated radon zones only-all concrete. in brick veneer. With Limited Storage: 20 psf STM C1 50) With Storage: 30 psf(fixed stair access) 3. Cement shall conform to"Specification for portlaInd Cement"(A 4- The contractor shall be responsible for the design and installation of all flashing. 0 s, 5� 9 1 ates"(ASTM C33) 12 Roofs: 4� Aggregate shall conform to"Specification for Cooicrete Aggreg Concrete Masonry(CMU): .2 Less ban 4:12 slope: 20 psf 4:12%lope or greater: 16 psf 5. Water shall be clean and free of injurious amouh4s of oil,acids,alkalis,salts,organic sonry units(CMU)shall be A ann aterial or other substances that are deleteriou§to concrete or steel reinforcement. 1. Concrete ma m Concrete Masonry Units,normal weight,wi SCALE: X,=V-V(U.OX) DEFLECTI(ON CRITERIA: 1 goo psi(fm=l 500 psi). DO NOT SCALE 6. Reinforcing steel shall be ASTIVI A615 Grade 40)!unless otherwise noted on the THIS DRAWING Walls: structural drawings.All reinforcing details shall dpriform to"Details and Detailing of All continuous reinforcing steel in masonry life ILI led Carfollw RELEASE DATE: jiled otherwise on the structural 2. 05-18-12 Brittl%Finish(wind load): U240 Concrete Reinforcement,"ACI 315, unless deta-. minimum lengths: RMIONS: Flexible Finish(wind load): U120 drawings. #4 bars: 2 -Floors: ment of reinforcement #5 bars: 2:: Live Load: U480* MCE 7� Tolerances for foundation and slab alignment a§well as place #6 bars: 3 D FOR CODE COMPLUNCE m� Tatail Load: U240* shall be in accordance with"Standard Toleranc,@.s for Concrete Construction and CITY OFATUNT IC Increas6chfloor stiffness may be required by floor covering manufacturer Materials,"ACI 117. Footing or slab edges ma�y-be up to 1/2"inside of the sill plate. WqMffltft Mk%ftCH DRAWN BY; 3. Grout all cells contai g vertical roo CMF REQUMEMENTS AND CONDW dn the wall Roolrzs�- 4. Provide cleanouts ACI 530-1-08 in the bottom course af masonpPL CHECKED BY: Live Load: L/240 height exceeds 6-0" REVZWEDBY.- DAM SHEET: FL-,_ *Otail Load: U180 4 S-1 5. Beam reinforcement shall be continuous across control joints. cv ul z z Z 0 uj 0 Lu Lu 2 o 65-2" X z w 19'-2" 6-6" :) I-- 7 29'-2- 24"x 24"x 12"PAD FOOTING o M LL ul 0 WITH(2)#5 EACH WAY(TYP.) SEE DETAIL"E"ON SD-1 z OR��j 30'x 30'x 12-pe FOOTING rB O_ WITH(3)#5 EA6H WAY SD-1.f"NV2 co ri -*uj (5)) - '(ON SD-2 Nv T-7- V. C) SEE DETAIL"P� E a i u) 0 CONCRETE SLAB WITH 'S 6x6 WlAxl.4 WWF OR jXSD-2 S 0: 44 A �FIBERMESH OVER 6 MIL VIAPOR BARRIER COVERING ci cn CL N,COMPACT,TREATED FILL- co "N", iz E 0 IT-8" 4'-6- 24'-8" -0. 0 X 4 w to 0 '7 —— —— —— cl) a r-———— —— cl) cm H U') 7 0- < 0- Z rB F-- 0 0 ( K 'kSD-1.F 0 t= ci Lo 0 uj 1&6" Lu 0 17 21'-0" Q uj Lu Lu < 1) SD-2 CD co LL_ C14 2 - -— — — —— '--BRICK APRON .1 SCALE: 24*x 24"x 12"PAD FO;)TING ALL AROUND V=1��(U.O.N.) -2- DO NOT SCALE WITH(2)#5 EACH WAY(TYP.) 11'4" 48'-4" SEE ELEVATIONS THIS DRAWING SEE DETAIL"E"ON SDA 65'-2- RELEASE DATE: CJ SUGGESTED CONTROL JOINTS 05-18-12 LOCATIONS(SEE DETAIL"T'ON SD-2) REVISIONS: DENOTES TWO STORY FOOTING CONDITION DRAWN BY: CNIF CON RACTOR SHALL VERIFY All DIMENSIONS CHECKED BY: USING FINAL APPROVED FLOOR PLAN PRIOFR FSS TO CONSTRUCTION- SHEET: FOUNDATION PLAN S-3 NOTES: 9 V 1) ALL SECOND FLOOR EXTERIOR WALLS SHALL BE CONSTRUCTED wiTH2x6 spF N0.2 STUDS @ 16-O.C.FOR PLATE HEIGHT OF 9#-1 y8--U.0-N. 2) ALL SECOND FLOOR INTERIOR BEARING WALLS SHALL BE CONSTRUCTED WITH2x4 0 SPF No-2 STUDS @ 16"O.C.FOR PLATE HEIGHTS UP TO 9-1 U,O.N� 0 u. ui 3) THE SECOND FLOOR EXTERIOR WALL FINISH IS-FLEXIBLE'(SIDING)-U.O.N. a co NOTIFY ENGINEER OF ANY VARIATIONS. z 2 0 t- o z w T Lu 0 w ui 2 o _j uj _5 II.- CON 2 SPANS :1 9 :-:W (2)2X8 HEADER 2J 2K Ka 0 (4)2x4 BUILT-UP-,, -j. z 4L Lu POST(MIN.) c- AT RIDGE SHEARWALL LEGEW ;�-%.�> o ..................... % z 3 CEILING LEVEL) NON-BEARING WALL 0 BEARING WALL SOLID z (2)2xlO HEADER--,," -6 uj iE z /-CORNER —SW . . ..................... SHEARWALLS FASTENED WITH ................... (3)1 Y4*x 14 LVE -x2Y a2xl2 8d COM(OA31 f)NAILS @ 6"O-C-ON EDGES AND 12"O.C. -� ---� .�:,— — — — .. -- U., cl) n, 3'.BEARING FOR LVL ID CORNER ON INTERMEDIATE SUPPORTS. VL =77 L (WIN.14)STUDS) �(4)2: (2)2X6 BUILT-U 2.5-BEARING FOR(2)2x4-2 il BUILT-UP POST(MIN.) U. =3:9 POST(MIN.)AT ........ cn AT FgDGE SW-3 cr RIDGE [*** *. . > < uj 2x6 FRAMED ....... z I w- a- 0 Cj (BRkEAT..' SHEARWALLS FASTENED WITH �D cn < ........ -1 Lo WALL CEILING LEVEL) ' ...... 8d COM(0.131'x 2 Y2-)NAILS @ 99 ....... ....... co 3"O.C.ON EDGES AND 12"0-C- co z ......... ...... X !1� C4 Z Z 0 ON INTERMEDIATE SUPPORTS. —�SD4 H (2)2x6 BUILT-UP-, (2)218 HEADER SHEATH BOTH SIDES OF WALL D LL 2J lK g POST(MIN.) z < El I NOTE:ALL EXTERIOR WALLS SHALL BE"SW-6"U.O.N. .2 EXTEND SHEARWALL TO�/ \�fEXTEND SHEARWALL TO WOOD FRAMED HEADER LEGEND:� r(2)2X8 HEADER 'UNDERSIDE OF ROOF SHEATHING SCALE: (2)2x6 BUILT-UP UNDERSIDE OF ROOF SHEATHING POST(MIN.)AT NAIL SHEATHING TO DOUBLE NAIL SHEATHING TO DOUBLE SIZE l-T(U.O.N-) OF HEADER DO NOT SCALE RIDGE PLATE w/0.131"x 2Y2*@ 6"O.C. CONT.(3)SPANS PLATE wl 0.131"x 2Y2"@ 6"O.C. THIS DRAWNG (PENETRATIONS ALLOWED .(PENETRATIONS ALLOWED RELEASE DATE- FOR HVAC ELECTRICAL) (2)2x—HEADER 05-18-12 FOR HVAC I ELECTRICAL) J REVISIONS: QUANTITYJ \%-QUANTITY OF JACKS OF KING STUDS 3� NOTE: 9. DRAWN BY: ALL WOOD FRAMED LOAD BEARING HEADERS CMF SHALL BE MINIMUM(2)2x6 N0.2 OR BETTER CHECKED BY: SYP.INSTALL MINIMUM(1)JACK AND SHEET: FSS WALL LAYOUT-SECO&a FLO—OR (1)KING STUD AT EACH HEADER(U.O.N.) s 9 C14 0 J 0 ul _j LL Im 0 Lu z T f 0 U) Lu UJI Lu a ui 0 U) Lu ui UJ z ............ _5 f _�_�'-_HTS24 AT e BEAM A� Cr� z ts C, 0 00 z 0 . .................................. .............. 0. #12 0R, LL ui z Lu Lu Till cn cn /-HTS24 AT HTS 16 AT..\ BEAM SPH AT TOP SEE DETAIL"A"or' BEAM �,,-HTS24 AT .............. .... ... PLATE&CS1 6 ON SD-7 ................. BEA D TO BEAM BELOWN ..M 4 Lu CL __SPH AT TOP PLATE < 0 AND(2)CS16 TO Lu 0 Imo W ....... ....... WALL BEAM BELOW z (2)OSA BETWEEN-/ ........::... FLOORS ALIGNED wl HOLDOWNS BELOW ........ ............. 7� ........... .......... ......... . ............. 2)CS16 B�TWEEN ........................ FLOORS A�IGNED (2)CS16 BE TWEEN w/HOLDOWNS BELOW g HTS24 AT,\ ORS ALIGNED FLO :j BEAM SPH A w/HOLDOWNS BELOW T TOP PLATE s 8 AND(2)CS16 TO WALL BEAM BELOW THREADED ROD LEGEND: X8'THREADED ROD FROM FOUNDATION TO DOUBLFE ON SD-7 I — PLATE.(4-MINIMUM EMBEDMENT REQUIRED) SCALE \--SPH AT TOP– X"=VZ(U.O.N-) DO NOT SCALE PLATE&CS16 THIS DRAWING TO BAND BOARD THREADED ROD FROM FOUNDATION TO UPPERFpi OOR DOUBLE PLATE.(4-MINIMUM EMBEDMENT REQUIR(4D") FEL ASE DATE: 05-18-12 c3 = HOLDOWN(AS NOTED)INSTALLED AT SILL PLATE REVISIONS: = HOLDOWN(AS NOTED)INSTALLED AT SILL PLATE.ftUPLE MINIMUM Y2'0 ROD TO HOLDOWN ANCHOR AND CONTINUE TO DOUBLE PLATE ABOVE. A DRAWN BY: 4) HOLDOWN(AS NOTED)INSTALLED AT SILL PLATE.(�OUPLE 9 CMF MINIMUM Y2'0 ROD TO HOLDOWN ANCHOR AND CONTINUE I CHECKED BY: TO UPPER FLOOR DOUBLE PLATE ABOVE. THREADED ROD LAYOUT-SECOND FLOOR SHEET 'SS S-7 9 0 z ru Lu L" 0 Ul uj i- _3 f.Z 2 U, ............. ....................................... ......................................................... . .......... Z 0*lir z Ez' -ui m Z W 0 �-- ;Z NOTEi: 0 _�x BLOCK<BETWEEN cli 'c' FLOOW TRUSSES UNDER ui z ROG LLS ABOVE(TY ....................... L i.. 04 LL WA IF8 Mllrli%'LVL'-. mm > uj LL (3) F20 LV �2).l 4 X9 4 L AT LANDING _j 0) 0 > S @ I O.0 z r 9 2 L L ....k il: LL ............../ ..........*............ . .................. . .............. NOTE: SCALE: INSTALL H8 CLIP AT EACH H8 CLIP AT EACH X'=V-G'(U.0.N.) FLOOR TRUSS BEARING OVER CANTILEVERED JOIST DO NOT SCALE REAR COVERED PORCH THIS DRAWING RELEASE DATE: 05-18-12 REWSIONS: DRAWN BY, CMF -CHECKED BY, FSS SHEET: LOWER TRUSS LAYOUT 8 9 cli 0 0 U. -i U. z rn 0 tu z 0 w FL-U: Lu uj a ix o z uj W ..0 �-:w ui z 2X6 CEILING JOISTS 24-O.C-(U.O.N.) Lu "oval Z Slo Lu: co Lu Lu: /VAULTED 0 VAULTED\ 7 : �Z- 0 x Lu. 13 w z U-: z . ................................................. LLJ Z 31111 71� : Z!y S2 U- 0 cn L4 ............. . z .......... A3LI�Lx L1�18'LVL El (212x12 VAULTED\ Lu 0- .............. LLI LL ........... /VAULTED VAULTEE > cr co co ...................... /VAULTED cl) ................... U-- Ci g Z: w /VAULTED > Z A 2 SCALE: E X'=1*-(r(I.I.O.N.) DO NOT SCALE THIS DRAWING ELEASE DATE: 05-18-12 EWSIONS: DRAWN BY: CMF CHECKED BY: FSS CEILING LAYOUT-SECOND FLOOR HEET-. S-9 co BRICK VENEER WITH V AIR SPACE A 9 AND WALL TIES BRICK VENEER WITH V AIR (1)#5 CONT, Cli CONT.FLASHING;PROVIDE WEEP HOLES SPACE AND WALL TIES —FILL JOINT WITH ELASTOMERIC /—SILL PLATE @ 33"O.C. CONT.FLASHING;PROVIDE SILL PLATE JOINT FILLER SILL PLATE GROUT AIR SPACE BELOW FLASHING WEEP HOLES @ 33-O.C. CONCRETE SLAB Z //--HEIGHT OF CUR B VARIES(8" 2 6"MIN. MAX-) CONCRETE SLAB GROUT AIR SPACE BELOW SILL--\— cli FLASHING GRADE--\ CONCRETE SLAB "I z PLATE X LL CONCRETE SLAB DE-, (1)#5 CONT. F co 7724 '�7, I GRADE-, IN, CMU STEMWALL WITH(1)#4 @ 48-O.C. GFwi AND IN EACH CORNER. S:2 8'CMU STEMWALL WITH(1)#4 @ 48-O.C. FILL CELL SOLID AT EACH#4 REBAR. u IN EACH CORNER. FILL CELL SOLID AT EACH#4 REBAR. 0 HOOK REBAR 12"INTO UPPER COURSE 0 O�BLOCKS AND 6"INTO FOOTING. a - ...EBAR 12"INTO SLAB AND 6"INT 6 V-0- ONE STORY-(2)#5 CONT. 175 FOOTING. -4- 0 UJI 1 TWO STORY-(3)#5 CONT. V-8- ONE STORY-(2)#5 CONT. lz 0 ONE STORY-(2)#5 CONT. ONE STORY-(3)#5 CO T. V-8- TWO STORY-(3)#5 CONT. V-8- TWO STORY-(3)#5 CONT. TORY-(3)#5 CONT� z w �A SEVION-STEMWALL WITH BRICK SECTION-MONOLITHIC WITH BRICK SECTION-STEMWALL AT GARAGE SECTION-MONOLITHIC AT GARAGE N IF STEMWALL HEIGHT EXCEEDS 48"CONTACT NOTE: IF STEMWALL HEIGHT EXCEEDS 48"CONTACT ENGINEER FOR ADDITIONAL REQUIREMENTS. ENGINEER FOR ADDITIONAL REQUIREMENTS- P F /—CONCRETE SLAB SILL PLATE— CONCRETE SLAB SILL--� cwo z PLATE CONCRETE SLAB (> ;o GRADE—, CONCRETE SLAB GRADE--,, I" GRADE N'x\\/ll>�'_l\\\/'- (1)IF5 CONT. 8'CMU STEMWALL WITH(1)#4 48"O.C. GR�ADE ,0 \11�/ INFORCEMENT(AS NOTED) OZ X AND IN EACH CORNER- < MU STEMWALL WITH(1)#4 FILL CELL SOLID AT EACH#4 REBAR. L4 z @48'0-C-AND IN EACH CORNER. Lu HOOK REBAR 12"INTO SLAB AND 6"INTO FOOTING. FILL CELL SOLID AT EACH#4 REBAR. 6' HOOK REBAR 12"INTO SLAB AND 6" S NOTED) REINFORCEMENT(AS NOTED) U- ONE STORY-(2)#5 CONT. V-8" ONE STORY-(2)#5 CONT. TWO STORY-(3)#5 CONT. 1-9 (2)#5 CONT- INTO FOOTING. V-8' TWO STORY-(3)#5 CONT. uu, SECTION-STEMWALL SECTION-MONOLITHIC SECTION-PAD FOOTING AT PORCH STEMWALL SECTION-PAD FOOTING AT PORCH THICKENED EDGE B rE t2 ��Dl NO W: IF STEMWALL HEIGHT EXCEEDS 48"CONTACT �Dl NOTE: IF STEMWALL HEIGHT EXCEEDS 48"CONTACT U) RD;9 [ENGINEER FOR ADDITIONAL REQUIREMENTS. ENGINEER FOR ADDITIONAL REQUIREMENTS. �D BRICK VENEER WITH VAIR SPACE ALTERNATE:MSTAM36 STRAPS IN LIEU OF EMBEDDED STRAPS(SEE DETAIL R ON SHEET SD-2) AND WALL TIES —CONT.FLASHING,'PROVIDE WEEP HOLES —STHD14 STRAP NAILED TO @ 33'0.C� BRICK VENEER WITH V AIR SPACE AND GARAGE DOOR POST- ta x PA51 STRAP NAILED TO GARAGE I GROUT AIRSPACE BELOW FLASHING WALL TIES EMBED STRAP INTO FOOTING DOOR POST.BEND STRAP INTO H AS SHOWN. /—(1)#5 CONT- CONT.FLASHING,PROVIDE WEEP 2 U- FOOTING AS SHOWN. SILL PLATE— 0 z HOLES @ 33-0-C. 0 C-4 0 Lu Z FILL JOINT WITH ELASTOMERIC 6"MIN. GROUT AIR SPACE BELOW FLASHING ;s W < cf) JOINT FILLER z M cn 2 6ILL —HEIGHT OF CURB VARIES(8-MAX.) cwn Lu LL = le 9 PL z ATE _#4 WITH 6"HOOK INTO FOOTING 0 SCALE: V5 < RETE SLAB Z Z/—CONC RETE SLAB GRA) Lu < Y4.=P-0-N 0 N.) WNG AND BENT 12"MINIMUM INTO GRADE—., THICKENED EDGE. DO NOT SCALE THIS DRAWNG NIA"el r--GRADE RELEASE DATE: CMU STEMWALL WITH(1)#4 @ 48*0�C, 05-18-12 Cl AND IN EACH CORNER. REVISION$: FILL CELL SOLID AT EACH#4 REBAR_ 7/, GURA—DEE HOOK REBAR 12',INTO UPPER COURSE \�A\ OF BLOCKS AND 6'INTO FOOTING. 6- ONE STORY-(3)#5 C T. INI�1\�l I ,�,\,)>X X>/\ x ONE STORY-(2)#5 CONT. #5 CONT. DRAWN BY: CMF CHECKED BY: SEVION-STEMWALL AT GARAGE WITH BRICK SECTION-MONOLITHIC AT GARAGE WITH BRICK rF­--� DETAIL-PA51 INSTALLATION(STEMWALL) DETAIL-STHD14 INSTALLATION(MONOLITHICL FSS �,�Dl NOTfE: IF STEMWALL HEIGHT EXCEEDS 48'CONTACT �Dl NOTE: IF STEMWALL HEIGHT EXCEEDS 48"CONTACT SHEET: FENGINEER FOR ADDITIONAL REQUIREMENTS. ENGINEER FOR ADDITION&REQUIREMENTS. SD_1__Nj SHOWER AREA (2)MSTAM36-Z STRAPS FOOTING 9 ,,,—MONOLITHIC v SHOWER AREA --NAIL EACH STRAP TO CRIPPLE STUD WITH(13)10d COM NAILS 8"CMU STEMWALL 3"MAXIMUM OVERHANG FASTEN STRAP TO FOUNDATION FORM EDGE (OPTIONAL) 9 x 2y'CONCRETE PLAN VIEW —CONCRETE SLAB WALL WITH(8)X 4 LL SCREWS INTO MASONRY OR PLAN VIEW C4 LL (8)Y4'x 1 X"CONCRETE 0 SCREWS INTO CONCRETE. 04 CONCRETE SCREWS SHALL BE SEAL POWERS"TAPPER"WITH PERMA- z /(l)#5 CONT. (1)#4 CONT. GRADE— FINISH OR EQUAL. 6'MiN. STEMWALL WITH(1)#4 @ HEIGHT OF CURB VARIES < --STRAP SHALL BE COVERED WITH w '.4t$'O.C.AND IN EACH CORNER. SILL—\ /,-Il)#4 CONT. SILL— a SIDING OR STUCCO FILL CELL SOLID AT EACH#4 z M Lu PLATE ONCRETE SLAB c"I /—HEIGHT OF CURB VARIES(8"MAX.) —C Lu uj PLATE z. AR.HOOK REBAR 16"INTO NOTE- 0 a 6"MINA PORCH SLAB AND 6"INTO o GRADE-\ THIS DETAIL MAY BE SUBSTITUTED FOR FOOTING. EITHER THE PA51 STRAP(STEMWALL) /--CONCRETE SLAB GRADFr_ OR (2)#5 CONT. X/1\1 THE STHD14 STRAP(MONOLITHIC). U. Ili z 8'CMU STEMWALL WITH(1)#4 @ 48-O.C. D AND IN EACH CORNER. r ILL UFLL SOLID AT EACH#4 REBAR. SECTION-PORCH STEMWALL rR ETAIL- EMBEDDED STRAP ALTER Z HOOK REBAR 12'INTO SLAB AND 6*INTO §D-2,) NOTE: IF STEMWALL HEIGHT EXC-EDS 48"CONTACT SD-2 FOOTING. ENGINEER FOR ADDITIONAL REQUIREMENTS- 6' VP ,, -1 -0. -0" ONE STORY-(2)#5 CO T. -8. ONE STORY-(2)#5 CONT- 1'-4"-' TWO STORY-(3)#5 CONT- NOTE: Z�j #5 CONT. __"�'-e SAW-CUT CONTRACTION JOINTS(i.e.CONTROL JOINTS) AS SOON AS THE CONCRETE HAS HARDENED ENOUGH vo S<r- Z-4 SEC NOT TO BE DAMAGED DURING THE CUTTING PROCESS. =21 * rG TION-STEMWALL AT EXTERIOR WALL SHOWER SECTION-MONOLITHIC AT EXTERIOR WALL SHOWER (TYPICALLY I-4 HOURS IN WARM WEATHER) "'k, z - I z CONCRETE SLAB ��D-2 NOAFE- IF STEMWALL HEIGHT EXCEEDS 48'CONTACT ENGINEER FOR ADDITIONAL REQUIREMENTS. Z FILL CUT WITH V DEEP XY8"WIDE SAW ELA STOMERIC CUT AT DENOTED FILLER z GRADE--, ki)#5 CONT. LOCATIONS. —CONCRETE SLAB w CMU STEMWALL WITH(1)#4 @ SILL --CONCRETE SLAB 18 LL PLATE 48"O.C.AND IN EACH CORNER. —LID AT EACH#4 41 Lo N REBAR.HOOK REBAR W INTO PORCH SLAB AND 6"INTO 6 FOOTING. CONCRETE SLAB V-8' (2)#5 CONT. '(1)#5 CONT. tu re 1'47 ONE STORY-(2)#5 C NT. l'-8' TWO STORY-(3)#5 CONT. �H S�VION INTERIOR BEARING CK) SECTION THICKENED EDGE SECTION PORCH STEMWALL WITH BRICK K­T-� SECTION-TYPICAL SAW-CUT CONTROL JOINT NOTE: IF STEMWALL HEIGHT EXCEEDS 48'CONTACT �D2 sD �D2 ENGINEER FOR ADDITIONAL REQUIREMENTS. CURB HEIGHT VARIES BEARING POST(AS NOTED) SCALE: CONCRETE SLAB CONCRETE SLAB X'=V-0'(U.0,N.) SILL—, Ag DO NOT SCALE CONCRETE SLAB THIS DRAWNG PLATE CURB HEIGHT VARIES RELEASE DATE: LL Xll A (AS NOTED) REINFORCEMENT(AS NOTED) STORY-(2)#5 CONT. DRAWN BY: STORY-(3)#5 CONT. CMF SECTION NON-BEARING STEPDOWN CHECKEDFBY, SECTION-BEARING STEPDOWN EP) SECTION-INTERIOR BEARING PAD FOOTING 7OD-2,/ SS \LD-,2,/ sD.v SHEET: SD-2_� —SILL PLATEIQELOW) /-2X CORNER FRAMING FULL 9 El— cli H GHT STUDS(TYPICAL) 2x SPF#2 SOLE PLATE(U.O.N.)NAIL TO BAND ,,,--(2)ROWS OF 0.131"x 3 X" NAILS @ 12-O.C. Z BOARD WITH 0.131-x 3 Y4'NAILS @ 6-O.C. STAGGERED(TYPICAL) BAND BOARD U. x" E L2 UJI 2x6 OR 2x8 FRAMED WALL LL im —SILL PLATE(BELOW) 0 C4 —2X4 CORNER FRAMING FULL HEIGHT STUDS OPEN WEB TRUSS U) MINIMUM OF(3)2X4 BLOCKS 12'LONG NAILED M SHEATHING CONTINUOUS FROM BAND BOARD T uj TO UPPER PLY OF DOUBLE PLATE. FASTEN WITH WITH(4)0.131'x 3 Y4'NAILS TO EACH ADJACENT uj STU S C3 ui EDGE NAILING REQUIREMENTS OF UPPER WALL ALTERNATE:INSTALL SOLID STUD IN THIS TOENAIL TRUSS TO PLATE WITH SPACE Z (2)0.131'x 3 Y47 NAILS 2X4 CORNER FRAMING FULL HEIGHT STUD to to DOUBLE PLATE(U.O.N.) ....... ROWS OF 0131'x 3 Y4' 4u. NAILS @ 12-0-C. 2A FRAMED WALL % SECTION-TYPICAL OPEN WEB FLOOR TRUSS K7'1� SECTION-TYPICAL FRAMING AT 900 CORNERS �4 0� -"-"—NAIL SCAB TO TOP CHORD WITH (4)0.131'X 3 A'NAILS i=-o ROOF OR FLOOR FRAMING(AS NOTED) ---ADD 2X4 VERTICAL SCAB IN EACH N-K 11 (> TRUSS IF NO WEB IS PRESENT —CONNECTOR IF NOTED Z 0 /-UPLIFT CONNECTOR(AS NOTED) (3)0.131"X 3 Y4' NAILS TYPICAL AT X (SEE CONNECTION SCHEDULE).---,__ % EACH TRUSS 41 2X4 SPF BLOCKING-NAIL WITH(2) zi 2X4 X-BRACE ACROSS LENGTH OF 'x 3 Y4'NAILS AT EACH END SHEARWALL 0.131 Z LU (END NAIL OR TOENAIL) :ft sp U) i z NAIL SCAB TO PLATE WITH(3) z-0 0131'X 3y4'TOENAILS z —GYPSUM BOARD TRUSS(AS NOTED) TRUSS BOTTOM CHORD 2x4 BLOCKING BETWEEN TRUSSES \\--(2)2x SYP#2 DOUBLE PLATE(U.O.N.) U., \-NAIL PORCH SHEATHING AS NOTED TOENAILED TO DOUBLE PLATE WITH 8-1, 0.131'X 3y4'NAILS @ 4-O.C. 01 EXTERIOR FRAMED WALL DOUBLE PLATE 2X SPF#2 STUDS@ 16-O.C.-U.O.N. ui (SEE WALL LAYOUT) a. '—MINIMUM Y16'RATED SHEATHING, EXPOSURE I FASTEN AS NOTED ON WALL LAYOUT(BLOCK ALL EDGES) SECTION EXTERIOR WALL PERPENDICULAR TO TRUSS K-G SECTION INTERIOR SHEARWALL PERPENDICULAR TO IRUSS ------—GYPSUM BOARD ��4 SECTION ONLY APPLIES WHEN REFERENCED r. 2 w -, . E; —THREADED ROD ASSEMBLY(IF NOTED) * a I W g t �-,t g > INTERIOR SHEARWALL(IF NOTED)SHALL z USE'/1e RATED SHEATHING FASTENED f —NAIL EACH END OF BLOCKING TO AS NOTED. TRUSS(AS NOTED) BOTTOM CHORDS WITH(3)0.131'X 3 Y4' //—INSTALL 2X4 BLOCKING BETWEEN /-2x TREATED SYP#2 SILL PLATE WITH SCALE: 2X4 SPF NAILER-NAIL TO TOP PLATE WITH TRUSS BOTTOM CHORDS @ 12-O.C. W=1'-O'(�J 0 N 'x A SIMPSON YeX 6'TITEN HD @ 48-O.C.MAX- DO NOT S!.�A�E 0.131 4-NAILS @ 6-O.C. THIS NG BOTTOM CHORD OF TRUSS 2x—SPF#2 SOLE PLATE RELEASE DA, : 0 &E �L,-O2 'j NG Y2 ....... NAIL EACH BLOCK TO DOUBLE PLATE WITH(3) NAILS WITH 0.131)(3 X 0.131'X 3 Y4'NAILS t/ @ 8-O.C.-U.O.N. REVISIONS: NAIL PORCH SHEATHING AS NOTED �17 DOUBLE PLATE FLOOR BEAM(AS NOTED) EXTERIOR FRAMED WALL ----------—MINIMUM Y16'RATED SHEATHING, EXPOSURE I FASTEN AS NOTED SLAB ON GRADE CONDITION RAISED FLOOR CONDITION 9 DRAWN BY: ON WALL LAYOUT(BLOCK ALL EDGES) 9 CMkF SECTION-TYPICAL INTERIOR BEARING AND/OR SHEARWALL I CHECKED B� SECTION EXTERIOR WALL PARALLEL TO TRUSS LH:) SECTION-INTERIOR SHEARWALL PARALLEL TO TRUSS K-K ji SHEET: �D4 THIS SECTION ONLY APPLIES WHEN REFERENCED =1 Ll ------ S Q:4j ./—LAST TRUSS IN ROW REQUIRING BRACING go END VERTICAL BRACING REQUIREMENTS . -­ -1 A —NAIL DIAGONAL BRACE TO BLOCKING WITH(3)NAILS < BRITTLE FINISH FLEXIBLE FINISH 2X4 BLOCKING-TOENAIL OR ENDNAIL //-EACH END TO ADJACENT TRUSS WITH x—RATED ROOF SHEATHING BRACING 16"O.C. 24"O.C. 16*0.C. 24*0.C. (3)NAILS 2 /X_—NAIL DIAGONAL BRACE TO INTERMEDIATE NONE REQUIRED O"TO 53' 0'TO 47" 0"TO 67" 0"TO 59* J I — ROOF SHEATHING WEBS WITH(2)NAILS Z_ j 2A L-BRACE 54*TO 114' 48"TO 99" 68"TO 145' 60*TO 126* —2X4 SPF NO.2 DIAGONAL BRACE uj ROOF TRUSS(BY OTHERS)WITH (TYPICAL AT EACH END OF a E 2x6 L-BRACE [115*TO 182" 1WTOIW 127"TO 201' -e Uj BRACE(IF REQUIRED) CONTINUOUS LATERAL BRACING) NOTE: I I ._—TO REPLACE(1)ROW 0 BRITTLE FINISHES ARE STUCCO OR ADHERED VENEER F LATEERAL BRACING --NAIL DIAGONAL BRACE TO TRUSS WEB WITH(3)NAILS a INSTALL 2X4 NO-2 SYP T-BRAdE NAILED TO z FLEXIBLE FINISHES ARE WOOD SIDING,HARDI-PANEL, EACH PLY OF TRUSS W BRICK VENEER,ETC. EB AT eO�C-WITH i —CONTINUOUS LATERAL BRACE(QUANTITY ----RATED ROOF SHEATHING <�, 0131"x 3"NAILS TO REPLACP((2)ROWS OF AND LOCATION DEFINED BY TRUSS SHOP Z 2X L-BRACE NAILED TO LATERALBRACING INSTALL 24 No.2 SYP DRAWING.) CL T-BRACE NAILED TO EACH pLLvY OF TRUSS < w VERTICAL WEB WITH W UJ 0.13 1"x 3"N)ULS @ 6"O.C. -------L--- WEB WITH 0.131"x 3"NAILS Cdi6"O.C. -------------- NAIL CONTINUOUS LATERAL BRACE TO EACH TRUSS WEB WITH(2)NAILS ca 1 0 U) ------- --- ------ VERTICALWEB IN GABLE —ROOF TRUSSES(BY OTHERS) I w ENDTRUSS < NOTES: 2x—LOOKCUTS AT 48"O.C. (3)TRUSSES Ml 41MUM 1 1) CONTINUOUS LATERAL BRACES SHALL BE NOTE: FOR CONTINUOUS LATERAL B E No.3 SYP OR 2A No-2 SPF OR BETTER > 16 R 24"O.C. fF. T-BRACING TO BE USED WHO CONTINUOUS 3(SEE ABLE) LATERAL BRACING IS IMPRAG�TICAL_ % 'I. 2) ALL NAILS SHOWN SHALL BE 0.131"x 1 - 1�, .4 A:p� (U.O.N-) 4 SECTION JYPICAL T-BRACE DETAIL-TYPICAL LATERAL TRUSS 9RACING DETAIL-TYPICAL VERTICAL BRACING AT GABLE END SD-6 4ING BETWEEN 2X6 BLOCKING AT EACH DIAGONAL —ENDNAIL(2)0.131"x 3Y4" 2X4 SYP BLOCK BRAGLE LOOKOUTS NAILS AT EACH LOOKOUT NUT& H2 5A AT EACH LOOKOUT ",D "i I 3"x 3"x X"WASHER 2X4 LOOKOUTS @ 48"O.C.FOR 2X6 DIAGONAL BRACE @ 48"O.CWITH Z'(SEE THREADED ROD ASSEMBLY DETAILS.) EXTERIOR SHEATHING��SHALL Z,-RAFTER(AS NOTED) OVERHANG BE NAILED TO BOTTOM Q�HORD (5)0131'x 3y4'NAILS AT EACH END(U.0 --12'LONG2x SCAB(MATCH BOTTOM CHORD)WITH Y2' z 0 OF TRUSSS WI ---ROOF SHEATHING(AS NOTED) 2X4 FLATWISE LOOKOUT @ 48-O.C. SPACERS-0AIL wl(3)0.131"x 3'NAILS TH FASTEN SHEATHING TO LOOKOUT WITH z 0-131"y:2Yi"NAILS gD�6"O �__ROOF SHEATHING(AS NOTED) I .C. SHEATHING END NAILING REQUIREMENTS. T (U.O.N.ON WALL LXyouT) BOTTOM CHORD OF GABLE END TRUSS t co IT) _____H3 CLIP @ z L4 ",,—BALLOON FRAMED STUDS W ': LOOKOUT(TYPICAL) THREADED ROD ASSEMBLY Z (AS NOTED) SECTION A-A 2X4 LOOKOUTS @ 48-O.C. SINGLE PLATE NAIL 10 TRUSS 2X4 L-BRACE AT EACH BOTTOM CHORDWITH 0.131"x 3 Y4' LOOKOUT NAIL WITH(3) FOR OVERHANG NAILS @ 6-O.C. 0.13 1'X 3 Y4'NAIL SPF H2.5A AT EACH LOOKOUT NOTE: \111oxMAX. MATERIAL ACCEPTABLE ?�. �!_�! MAXIMUM 12'OVERHMNG 2x—SUBFASCIA NAIL TO LW 25;g K X: LOOKOUT WITH(2) 0.13 1'x 3 Y4'NAILS ROOF SHEATHING(AS NOTED) �D '--ENDWALL RAFTER \ NOTCHED FOR FLAT LOOKOUT DETAIL-BALLOON FRAMED GABLE END(LOW CEILING VAULT) \—NAIL SHEATHING@ 6'0-C- TOP CHORD OF GABLE END TO RAFTER WITHO-1 31"x 2 Y2" TRUSS INTERIQ)R CEILING PITCH IS EQUAL TO OR LESS THANY2 OF EXTERIOR ROOF PITCH NAILS VERTICAL WEB OF GABLE END ui \—NAIL PLATE TO RAFTER TRUSS H2_5A AT EACH LOOKOUT 451 \ WITH 0.131'x 3Y4"NAILS @6'0.C. 0 IX4 LATERAL BRACE @ 48-O.C.NAILED 7i < 2X4 LOOKOUTS @ 4 8-O.C.FOR TO EACH JOIST WITH(2)0-131"x 3"NAILS TE(AS NOTED) NUT&3"x 3"x Y4'WASHER 1� 9 . I OVERHANG k INTO(4)CEILING JOISTS-OVERHANG SOLID BLOCKING AT EACH ROOF SHEATHING I AS NOTED) MINIMUM 2"TO AVOID SPLITTI NG. 2X4 SYP BLOCKING BETWEEN LOOKOUT LOCATION WITH 12"LONG SCAB 7`777% 'x 3y'NAILS INTO (MATCH BOTTOM CHORD) LOOKOUTS (4)0.131 4 je IKO'(LI.O.N.) LOOKOUT 'SPACER DON% WITH Y2 S T SCALE ------BALLOON FRAMED STUDS \—MINIMUM Y16-RATED THIStbRAWING RELEASE7t—)ATE (AS NOTED) SHEATHING CONTINUOUS TO 0!�,Iifl-12 DOUBLE PLATE BOTTOM OF LOOKOUTS. BOTTOM CHORD OF GABLE R7VIS NAIL JOIST TO GABLE END TRUSS INTERIOR VAULT Lil STUDS WITH(4) -------EXTERIOR SHEATHING SHALL BE NOTE: —(2)2X—DOUBLE PLATE NAILED TO UPPER 13LY OF 8'-O'SOLID DEMNG MAY BE INSTALLED IN LIEU OF 0-131'X 3Y4'NAILS @ 16-O.C. DOUBLE PLATE WITH LATERAL BRACING AND DIAGONAL BRACING. TOENAIL GABLE STUDS ----—THREADED ROD ASSEMBLY 0.131'x 2Y:r NAILS(it 6-O.C. TO DOUBLE PLATE WITH 2x—STUDS DRAWN E§y. (U.O.N.ON WALL Lfi�OUT) (3)O�131'X 3 Y4'NAILS CHECKB'CMF LSTA18 STRAP @48"O.C. �G SECTION-PLATFORM FRAMED GABLE END _b BY: rE DETAL-BALLOON FRAMED GABLE END(HIGH CEILING VAULT) ��F SECTION-GABLE END DIAGONAL BRAQ!�G_ CEILING JOIST SHEET INTERIM CEILING PITCH EXCEEDS Y2 OF EXTERIOR ROOF PITCH THREADED ROD NOT SHOWN FOR CLARITY (AS NOTED) S