Loading...
Permit 65 Robert St (vault) Duval County Health Department DUVAL COUNTY COURT HOUSE D 3991 JACKSONVILLE, FLORIDA FEE $5.00 SEPTIC TANK PERMIT Mane of Owner:-. Charlie Wilson Address: Atlantic Beacht Fla* 1),Ite:-- 2113/62 Installation At: - Lgt 14m Blk. 39 Donner R/P Nstallation By:---- NOTE: This Permit does not guarantee the snec'e'ssful fune- tionin.- of this unit and the occupant will be responsi- ble for its satisfactory sanitary operation at all tinle's. SePtic- Tank Capacity: 2-63o Gallons. 1)"llin Field: 60 s ft ea 1211 x 301 beds with 6 li t ea Lu"s I'M," 0 1 DIRECTOR—DUVAL COUNTY HE DUVAL CONSTRUCTION TH DEPT. PERMIT —4&A- B. Cg-s��a San* TITLE VOID SIX MONTHS AFTER ABOVE DATE IF NOT STARTED FOR OFFICE USE ONLY Date_.-3—.�� -----------19 Permit #.).'I*A9 ......Fee$_._9_::g?......... CITY OF ATLANTIC BEACH Valuation $-3.P ...................................... FLORIDA House ---05.��t........ ............................................................................ APPLICATION FOR BUILDING PERMIT ............................................................................ Application is hereby made for the -approval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the City of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the City of Atlantic Beach and all rules and regulations of the Building Department of the City of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the City of Atlanfic Beach,Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub-contractors be submitted to this office so that licenses can be verified. ate............ ---------------------------------------------------1 19.......... Owner....OH_4_9.41�:...... .......... ---------------Address- ------------------Telephone No---------------------------- Architect---_------------- Address_---............/----------------------------------------Telephone No-------------............ Contractor Builder.//2­---*---------­---------------------------------------------------- e-1a-- ---------Telephone I ILI 4, LotNo...-Z-7----- ...............................Block No------3- -------_---__...Sub ------------- -----Zone---------------- --------46.6..........-Aher1k.----Street...--------------------Side Between.........._-----_-------------------------------and-----------------------------------------------......Sts. Valuation $.---30P A��----For what purpose will building be usedj.)&J�eZZ;V45�-----------Type of construction-, Dimensions of Building__24P_)(__0_9--_---------Dimensions of Lot---__.....................................------------Size of Footings___;�__X,.A0__..... Size of Piers.-.-a 0 T_­kgly---------.--Size of Sills.......�,Xl--------------Greatest Sill Span in ft-------------_----------Type Roof-----........---------------- How will Building be Heated?-....-------------------------------------_----------------Will Building be on Solid or FilledGround?---- .............. Size of Ceiling Joists-----AJ(k----------- ---.-., Distance on Centers-------;zlx'-0.el-------------------I Greatest Span--------- tt Size of Floor Joists.------VQ(_'9-----------............,Distance on Centers.....14.Y!l 06 1P ­­-----I---------------, Greatest Span--- ---------.........------ Size of Rafters....----------AIX-t-------------------------, Distance on Centers... ----------------- Greatest Span-------J J�`--------------------------- tf This rectangle is to represent the lot. Locate the building Or buildings in the right position. Give distance in feet from all lot-lines and existing buildings. REAR LOT LINE Two copies of plans and specifications shall be submitted with application. Inspections required. 1. When steel is in place and ready to pour footing. 2. When steel is in place and ready to pour columns and/or lintel. Z 3. When steel is in place and ready to pour beam. 4. When framing is completed. 5. When rough plumbing is completed,and ready to cover up. 6. When septic tank drain field or sewer is laid but before it is covered. 7. Electrical inspection by City of Jacksonville. 8. Final inspection. corrections are made. Note: In case of any rejection,re-inspection MUST be called for after FRONT OF LOT In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with the attached plans and specifications, which are a part hereof, and in accordance with the building regulations of the City of Atlantic Beach. Signatureof Builder............................................................................... Address............................ .......... ............................. Signatureof Owner............._................................................................. Address............................................................................._...........