Loading...
Permit 373 Royal Palm (vault) FOR OFFICE USE ONLY .....................197.0.. DateR P?_1r..Fee Permit #-------- ........ CITY OF ATLANTIC BEACH Valuation $----- ..................... FLORIDA House ...I)r ............................................................................ APPLICATION FOR BUILDING PERMIT ............................................................................ ............................................................................ Application is hereby made for the -approval of the detailed statement of the plans and specifications herewith submitted for the pplication is made in compliance and conformity with the Building Ordinance of building or other structure described. This a h ate of Florida, all ordinances of the City of Atlantic the City of Atlantic Beach, Florida, and all provisions of the Laws of t e St Beach and all rules and regulations of the Building Department of the City of Atlantic Beach, shall be complied with, whether herein specified or not. eeu issued a Building Permit is automatically responsible to ascertain that all sub- The Contractor or Owner-Builder who has b contractors engaged by him are duly licensed in the City of Atlanfic Beach,Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that -a list of sub-contractors be submitted to this office so that licenses can beverified. Date------------------------------------------------------------------------1 19............ J. F. Aderhold ----------------------Address---1444.4----Be.a_c.h1__B_1_vd......ITeWA-Pach....2.46-.0070 Owner.--------------------------------------------------------------------------- ........ .... --- --------------­------Address.----_---------------------------------------------------Telephone No-----------_--------------- Architect..---------------------------------------------------------------- J. F. Aderhold Sa4ie,............. --------............Telephone No-------............ --------------Address.----- Contractor Builder--------------------------------------------------_--------- -------Zone.-Ras----- Lot No.-.....2-0__-------------------------------Block No-------la------------------Sub Division Roy- al---Palms---Unit---2A-------- . . .. to Royal Palms....DK-Street....---------------------Side Between... --------__------------------------------------and-------------------------------------------------- S - ......------ ­---------­ ReS- 10,000.0 -----_........Type of construction----------__-------_­------- Valuation $.............. ...... -----4or what purpose will building be used..-------------------- Dimensions of Building.-----------------------------------...Dimensions of Lot--------------------_-................................Size of Footings------ -----------------_----- Size of Piers-------------------------------�Size of Sills----- ---------------------...Greatest Sill Span in ft-------___-------------Type Roof----------_------------------------ How will Building be Heated?----------------_-----..........----------------_--------Will Building be on Solid or Filled Ground?---------------------------------------- Size of Ceiling joists---------------------- ---_----...., Distance on Centers---------- ___........................... Greatest Span-----------------_------------------------- PP Size of Floor joists........-----------------------------------., Distance on Centers.......­ --------------------........... Greatest Span-----------_----------------------------- it Size of Rafters---------------------------------------------- Distance on Centers ------ ---------------------------------- Greatest Span_------_-------------------------------- This rectangle is to represent the lot. Locate the building or buildings in the right position. Give distance in feet from all lot-lines and existing buildings. REAR LOT LINE Two copies of plans and specifications shall be submitted with application. Inspections required. 1. When steel is in place and ready to pour footing. Z IZ 2. When steel is in place and ready to pour columns and/or lintel. 3. Whensteel is in place and ready to pour beam. H E-4 4. When framing is completed. 3 5. When rough plumbing is completed,and ready to cover up. P4 6. When septic tank drain field or sewer is laid but before it is covered. P 7. Electrical inspection by City of Jacksonville. 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called for after corrections are made. FRONT OF LOT In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with the attached plans and specifications, which are a part hereof, and in accordance with the building regulations of the Ci of t t Address------------------------ ---_--------_--- ....................................... . . . .... Signature of Builder. Signatureof Owner.l. _--------------------------------------------....... -----------_--- Address.................................................................................................... PLOT PLAN Royal Palms REPLAT OF PART OF ROYAL PALMS LOT 20 BL 0 C K UNIT - 2A PLAT BOOK 31 PAGE(S) 16, 16AvI68916cq &---1609 CURRENT RECORDS , DUVAL COUNTY, FLORIDA SCALE: I" = 20' 10' UTILITY EASEMENT 80.65f LINE Of SWALEJ E- 10.8 E— 9.8 10 110-�3 161+ 39- 10 121 11 j 21430 . � PLAN — A-9A Fitt . rL - ELEV. C.p. 11 .6 -,--PROPERTY LINE E. 10.3 5 10-3 r. 10-3 NOTE: VERIFY cv ! I- SEVER LOCATION AND ELEVATION- 9.8 80-65, SANITARY SEWER L9--8 INV# ELEV* 5*5