Loading...
495 Royal Palms Dr (vault) _NT 31 -F-Rs, INC. AIR ENGIIsIr- rnNOITIONING HEATING AND AIR S E ALE:8 AND SERVIrE -4112 3730 BEACH 13L'ID- NE 359 JACKSONVILLE, FLA. 37-216 t_e Heating and air conditioning specifications for residence to be built by: Ions are for complete heating Attached layout and specificat and air condition system. are run fro,,n unit as shown. (2) 3/411 Condensate drains 5 to he ins"lated and with (3) insulation- Ali ducts and fitting 11 with vapor barrier backing. I fiberglass or equivale"It, The BTU/HR heat loss t4) (includes allowance for latent heat) The BTU/HR gain Is winter summer dry bulb- F (5) Design temperature is y bulb F 25 Degrees outside. . . . . . . . . . . 95 Degrees dr bulb F 75 Degrees dry bulb F inside . . . . . . . . . . . 80 Degrees dry (6) �Duct work to be Installed 1,4ill be designed, fabricated and in- ing and Vent- stalled in accordance with American Society Of Heat ithin the limits of existing Ilating Engineer's Standards, w installation conditions. estimated for both heating and cooling (7) Annual operating cost t estimated to be $ (8) Annual maintenace cos tallation herein described and prescribed (9) The equipment and ins tinder normal operating by the plans and specifications k�Jill , conditions maintain the specified designed conditions when the il . utside design conditions preva specified o factory personel (10) Service warranted by cement of Parts (11) One year warranty for all repla found to be defective in material and workmanship. Four additional , nt of parts found to be defective in warranty for replacems ip in the refrigeration compressor. material and workinansh rmal labor, parts and freight. The above warranty includes no R'K, (12) Equipment to be used- work and equipment (13 installation including duct cost of t4 Cb to C) '94:2� IN. q I 7�-tlk ��Wo 0/ ui FOR OFFICE USE ONLY Date--------Feb. 26 970 ............................ ...... 939 30.00 Permit #........................Fee$........................ CITY OF ATLANTIC BEACH Valuation $.....1-0.,.00.0....00..................... .............. ....... FLORIDAHouse #......ARkX........................................ 495 Royal Palms Dr. ...................................................... .................... AFTLICATION f LDING PERMIT :�� �I /QR�#U ....................... 14 ............ Application is hereby made for the approval of the detailed statement of the npela an'd specifications herewith submitted for the building or other structure described. This application is made in complial 9-nd 'onformity with the Building Ordinance of the City of Atlantic Beach, Florida, and all provisions of the Laws of the Stat& Florida, all ordinances of the City of Atlantic Beach and all rules and regulations of the Building Department of the City o Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permi is autom9tically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the City of Atlanfic Bea ,Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub-con actors be submitted to this office so that licenses caniqe� beverified. 'Date.................2----—---19—-7-0--------------------------- 19---------_ Owner---------RiQ----V...... is _.Q.QMP....... ----------------_Address...... ..... ... --------------Telephone No-353:m7-70-9... ------------------ n h g e City 0 P/e rmi is tl le Bea 'I ub-con act( Da ss...7 _�3..F_ Architect------------ -------_---------------- ---------------------.................Addres&._ -----------------------------------------------------Telephone No--_-_--------------------- R. W. Howard San Marco 5 ......... ........Telephone No3_95-3.777- ContractorBuilder---------------------------------------------------------------------....-.Address-7.... ....................... No----14 Block No--------13 b D, sio Q -----------------Su ....RQX.al ---------------------Zone.......------ ------------- m --------------- --------- Trit n---Rd__------------and.-Aabala----Dri-v-e............Sts. . ...... ------------Street-------e--;9.-S.t------Side Between J ...:......... ...... Valuation $.1.01.000---------_For what purpose will building be u d....,Res ...Type of constructioArick Veneer -------------- - -----.............-....... Dimensions of Building----26_X ------8..x_20------ ---��Q-----------Dimensions of Lot/------_80...X---93--------_---........Size of Footings Size of Piers--------------------------------Size of Sills_-------------�-­-------#eatest Sill Span in ft------_-----------------.-Type Roof------A,9hp...Shg... How will Building be Heated?.---Gentral....G es--------------- -------Will Building be on Solid or FilledGround?-----S,011--d------------------- Size of Ceiling Joists-----Tx�qq��q------_...... Distance on C 'Lrs---- ---- --------------------------------, Greatest Span-------------_--------------------------- ff Size of Floor Joists------------ --_---------..... Distance on Tnters ­.......I....................... Greatest Span---_------------------------------------- it Size of Rafters2---x---4----Trusse-s.----_..... Distance on enters........ ...2-4------------------- Greatest Span-------------_---------_---------------- 99 This rectangle is to represent the lot. Locate the building Or buildings in the right position. Give distance in feet from all lot-lines and existing buildings. r ,- LJ pi REAR LOT LINE Two copies of plans and specifications shall be submitted with application. TIJE CITY OF ATLANTIC BEAC;l Inspections required. 1. When steel is in place and ready to pour footing. 2. When steel is in place and ready to pour columns and&r lintel. Z Z 3. When steel is in place and ready to pour beam. 4. When framing is completed. 5. When rough plumbing is completed,-and ready to cov+up. 6. When septic tank drain field or sewer is laid i"but Oefore it is covered. 7. Electrical inspection by City of Jacksonville. 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called for after corrections are made. I FRONT OF LOT In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with the attached plans and specifications, which are a part hereof, and in accordance with the building regulations of the City Atl!�Mt* each. ............. ........... dr ------------------------------------------------------------------------------------------ ------- Signature of Bu ........... ---------........................................................ ....... ................. Signature of Owner./ -------.... ........ ...... FOR OFFICE USE ONLY Date---------- __/�......19 Z?� CITY OF ATLANTIC BEACH Permit ...Fee$...3 ..!�v Valuation e-6 2FA - --- - -------------*...... FLORIDA e # ...... .....I . ....... Hous ... ...............X.....P ........................................................................... APPLICATION FOR BUILDING PERMIT ............................................................................ Application is hereby made for the -approval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the City of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the City of Atlantic Beach and all rules and regulations of the Building Department of the City of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the City of Atlanfic Beach, Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that -a list of sub-contractors he submitted to this office so that licenses can be verified. Dat.......... ...................................................... .......... Owner---------- ---- .... ...;-1.�:: 2, _� , 'f, / ' z �' _--------Address.... .. ��ay Z?Telephone No.. Architect............... ............ --_-_---Address,.........................................................Telephone No............................. r --------------------------------- ' 'Z e'- �'- f Contractor Builder. ................. ----------- ... . Telephone No...................... ---- ----------------Block No.........Z.��....... ...Sub Division.. / z ZO------------_-------------Zone.......... _-Lot No------------ I.Street........................Side Between...,.­)..4.�.4... ...... Sts. ez' Valuat $... -----------------For what purpose will building be used................ ............Type of construction..................................... Dimensions of Building.__4'6'*�` .......Dimensions of Lot....... X-5.............Size of Footings....... ------------- ----- Size of Piers------___--------_--_----------Size of Sills._,_�------- -------Greatest Sill Span in ft-__-------------------Type Roof...... ..................... How will Building be Heated?........... ---------- -----------------_--_Will Building be on Solid or Filled,Ground?....... ei Size of Ceiling Joists..........................---------------I Distance on Centers............................................I Greatest Span............................................ of Size of Floor Joists.-------------------------------------------.,Distance on Centers.......... ................................, Greatest Span............................................ IV Size of Rafters......-----------------------------------------------I Distance on Centers....... ....................... Greatest Span............................................ IV This rectangle is to represent the lot. Locate the building or buildings in the right position. Give distance in feet from all lot-lines and existing buildings. REAR LOT LINE Two copies of plans and specifications shall be submitted with application. Inspections required. 1. When steel is in place and ready to pour footing. 2. When steel is in place and ready to pour columns and/or lintel. Z 3. When steel is in place and ready to pour beam. �1 4. When framing Is completed. H 5. When rough plumbing is completed,and ready to cover up. 6. When septic tank drain field or sewer is laid but before it is covered. 7. Electrical inspection by City of Jacksonville. 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called for after corrections are made. FRONT OF LOT In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with the ttached p�ans and specifications, which are a part hereof, and mi accord ce with the bouildin regulations of the City �AOanliq,Nbqch Signature of Builder. .............. Address---_---- ----------- Signature of Owner.... ................................... ................ Address........................................._-----_-----__--_--