28 17th St Plans for deck roof and stairs 2012 REVISIONS
zz
CODE COMPLIANT RAI SYSTEM ---AS SELECTED BY R — SIMPSON L «26 SLAIN E STEEL,
W/S-IOd x 1��aj��NAILS
1@"
EXISTING P.T.64 POST AT
EXISTING STAIR LANDING
M
EXISTING STUCCO EXTERIOR WALL _
P.T.2A2 STAIR STRINGER �y+�
6"xV2"0 LAG SCREW w/SPACER NEW S R TREADS ►
OF STACKED WASHERS.CAULK P.T.24,TYR
HOLE PRIOR TO INSTALLING, LAG 2
SCREW
NEW GROUND CONTACT P.T.44
t'0-3� 5TRINGER e L / L POSTS DIRECT BURY 36
DEEP
IN 124 CONC.
+ ' SCALE: 1/2"-1'-&'
C'�ROVIDE At 4 EQUALLY SPACED LOCATIONS
SURFACE APPLIED FLASHING
OVER EXISTING STUCCO Q
2
- -- — slMPsox A34 ANGLE w/8-10d 5T 15 CT I ON aW
x1 2"NAILS,TM EA RAFTER A-I SCALE: 1/2".1'-0" a
NEW STAIR AT EXIST%G STAIR LOCATION W w
12 "HIGH WIND" ASPHALT SHINGLD-6 ON 300 FELT ON V2"
y NOM.STRIr-TURAL SHEATHING ON qs"t1-11,FACE U
DOWN w/8d RINGINTERMEDIATE
SHANK NAZI. w 1t OG.At PANE CODE COMPLIANT "LNG SYSTEM
EDGES EN II�ND CLADDING
AND 4"O.C.At
COMPONENT AND CLADDING 1ap� ZONES 2 AND 3
AS SELECTED BY OWNER
NEW P.T.2.2x 1'-4" ATTACH RAFTERS TO NEW BEAM wJ EXISTING P.T.6xb"T
RAFTERS 244" O.C. 1-10" x V2"0 LAG SCREWS RECESSED EXISTING STAIR LANDING T
INTO RAFTER AS SHOWN. _ V
---METAL DRIP ON P.T.1x2 ON FIN.2x6 ----- -- ----- --- ---- --- -- --- ----------------- -------------- ------_---- ------------- QQ iii
FASCIA,TYR THREE SIDES. �- P.t.2x8 JO15T Q,
11 11
I
NEW 2-P.T.2x&BEAM,SET INTO NEW 1 1 _ _ __________________ A-1 Q;
6x6 POSTS AMC) ATTACH w/2-1/2"o i E NEW STAIR T EXISTING ST IR LOCATION P.T.2x8 JOIST
BOLTS AT EACH POST,TYP. i t 3
r I A
i � 11
�--- ------- ---`------------ -- --- ---- --------------
--- --------
-------- ----ll-------------
-^ -i-------EXISTING P.T.6xb POST BELOW
NEW P.T.6x6 POST ABOVE EXISTING AND EXTENDED TO ROOF BEAM,
EXISTING WALL,STUCCO ON POST,TYR at ( TYR
FRAME CONSTRUCTION,TO
REMAIN
CODE COMPLIANT RAILING SYSTEM
AS SELECTED BY OWNER / ACODE S SELECTEDCOMPLIANT AII�SYSTEM
BY CUT BACK EXISTING P.T.6x6 POST ( �'----NEW ROOF LINE ABOVE
EXISTING DECK,NEW FLUID 4" ABOVE EXISTING DECK AND
i
APPLIED MEMBRANE ON CONNECT NEW P.T.6x6 POST w! j NEW DECK EDGE BELOW
EXISTING MEMBRANE ON 314" SIMPSON BM w/24-16d NAILS.
PLYWOOD ON V2"PLYWOOD ' �C
EXISTING WALL LINE BELOW
EXISTING STRUCTURE TO REMAIN IF
1 EXISTING WALL j NEW RAILING
REMOVE EXISTING FASCIA AND j
8" INSTALL NEW 2x8 JOIST EXTENSION
AT EACH JOIST AS SHOWN. INSTALL j
NEW RIM,FASCIA AND DRIP j
NEW CEMENT FIBER SOFFIT f EXISTING P.T.6x6 POST BELOW .y
1 AND EXTENDED TO ROOF BEAM,
4 TYP.
EXISTING WALL,STUCCO ON EXISTING
FRAME CONSTRUCTION,TO
REMAIN EXISTING DECK,NEW FlLU1D
EXISTING 3/41, 5UILhINCGODS 6UMM r N
t a, PLYWOOD ON 2 PLYtWOOD
`A EXISTING P.T.6x6 POSTS
CONT TO FOOTING,TO REMAIN
j AFFLICA5LE CODE&
N
j FLORIDA RESIDENTIAL CODE 2010 EDIT104
' A-1 Z va
j 5GOEE OF WORK:
1.CONSTRUCT NEW ROOF ABOVE EXISTING SECOND
f
FLOOR DECK
' 2.APPLY NEW WATERPROOF MEMBRANE AND
GRADE1 FLASHING AT DECK.
1 �
3.RECONSTRUCT NEW STAIR AT EXISTING LOCATION
FROM GRADE TO EXISTING DECK DATE OF
a 4.NO CHANGE IN IMPERVIOUS SUWACE. ISSUE
1
EXISTING FOOTING TO REMAIN INEW RAILING
DRAWN BY:
1
EXISTING P.T.6x6 POST BELOW HGP
AND EXTENDED TO ROOF BEAM,
TVP.
IREVMWED FOR CODE COMPLIANCE S lHE st O,
j
WALL 5 CT I ON ,4 I �4N CIS O� ANTIC FFoRADDITIONALH `�i
-) SCALE: I/2"=,,_@°
REQUIREMENTS AND CONDITIONS. �
A- 1
REVIEWED BY- DATE