Loading...
28 17th St Plans for deck roof and stairs 2012 REVISIONS zz CODE COMPLIANT RAI SYSTEM ---AS SELECTED BY R — SIMPSON L «26 SLAIN E STEEL, W/S-IOd x 1��aj��NAILS 1@" EXISTING P.T.64 POST AT EXISTING STAIR LANDING M EXISTING STUCCO EXTERIOR WALL _ P.T.2A2 STAIR STRINGER �y+� 6"xV2"0 LAG SCREW w/SPACER NEW S R TREADS ► OF STACKED WASHERS.CAULK P.T.24,TYR HOLE PRIOR TO INSTALLING, LAG 2 SCREW NEW GROUND CONTACT P.T.44 t'0-3� 5TRINGER e L / L POSTS DIRECT BURY 36 DEEP IN 124 CONC. + ' SCALE: 1/2"-1'-&' C'�ROVIDE At 4 EQUALLY SPACED LOCATIONS SURFACE APPLIED FLASHING OVER EXISTING STUCCO Q 2 - -- — slMPsox A34 ANGLE w/8-10d 5T 15 CT I ON aW x1 2"NAILS,TM EA RAFTER A-I SCALE: 1/2".1'-0" a NEW STAIR AT EXIST%G STAIR LOCATION W w 12 "HIGH WIND" ASPHALT SHINGLD-6 ON 300 FELT ON V2" y NOM.STRIr-TURAL SHEATHING ON qs"t1-11,FACE U DOWN w/8d RINGINTERMEDIATE SHANK NAZI. w 1t OG.At PANE CODE COMPLIANT "LNG SYSTEM EDGES EN II�ND CLADDING AND 4"O.C.At COMPONENT AND CLADDING 1ap� ZONES 2 AND 3 AS SELECTED BY OWNER NEW P.T.2.2x 1'-4" ATTACH RAFTERS TO NEW BEAM wJ EXISTING P.T.6xb"T RAFTERS 244" O.C. 1-10" x V2"0 LAG SCREWS RECESSED EXISTING STAIR LANDING T INTO RAFTER AS SHOWN. _ V ---METAL DRIP ON P.T.1x2 ON FIN.2x6 ----- -- ----- --- ---- --- -- --- ----------------- -------------- ------_---- ------------- QQ iii FASCIA,TYR THREE SIDES. �- P.t.2x8 JO15T Q, 11 11 I NEW 2-P.T.2x&BEAM,SET INTO NEW 1 1 _ _ __________________ A-1 Q; 6x6 POSTS AMC) ATTACH w/2-1/2"o i E NEW STAIR T EXISTING ST IR LOCATION P.T.2x8 JOIST BOLTS AT EACH POST,TYP. i t 3 r I A i � 11 �--- ------- ---`------------ -- --- ---- -------------- --- -------- -------- ----ll------------- -^ -i-------EXISTING P.T.6xb POST BELOW NEW P.T.6x6 POST ABOVE EXISTING AND EXTENDED TO ROOF BEAM, EXISTING WALL,STUCCO ON POST,TYR at ( TYR FRAME CONSTRUCTION,TO REMAIN CODE COMPLIANT RAILING SYSTEM AS SELECTED BY OWNER / ACODE S SELECTEDCOMPLIANT AII�SYSTEM BY CUT BACK EXISTING P.T.6x6 POST ( �'----NEW ROOF LINE ABOVE EXISTING DECK,NEW FLUID 4" ABOVE EXISTING DECK AND i APPLIED MEMBRANE ON CONNECT NEW P.T.6x6 POST w! j NEW DECK EDGE BELOW EXISTING MEMBRANE ON 314" SIMPSON BM w/24-16d NAILS. PLYWOOD ON V2"PLYWOOD ' �C EXISTING WALL LINE BELOW EXISTING STRUCTURE TO REMAIN IF 1 EXISTING WALL j NEW RAILING REMOVE EXISTING FASCIA AND j 8" INSTALL NEW 2x8 JOIST EXTENSION AT EACH JOIST AS SHOWN. INSTALL j NEW RIM,FASCIA AND DRIP j NEW CEMENT FIBER SOFFIT f EXISTING P.T.6x6 POST BELOW .y 1 AND EXTENDED TO ROOF BEAM, 4 TYP. EXISTING WALL,STUCCO ON EXISTING FRAME CONSTRUCTION,TO REMAIN EXISTING DECK,NEW FlLU1D EXISTING 3/41, 5UILhINCGODS 6UMM r N t a, PLYWOOD ON 2 PLYtWOOD `A EXISTING P.T.6x6 POSTS CONT TO FOOTING,TO REMAIN j AFFLICA5LE CODE& N j FLORIDA RESIDENTIAL CODE 2010 EDIT104 ' A-1 Z va j 5GOEE OF WORK: 1.CONSTRUCT NEW ROOF ABOVE EXISTING SECOND f FLOOR DECK ' 2.APPLY NEW WATERPROOF MEMBRANE AND GRADE1 FLASHING AT DECK. 1 � 3.RECONSTRUCT NEW STAIR AT EXISTING LOCATION FROM GRADE TO EXISTING DECK DATE OF a 4.NO CHANGE IN IMPERVIOUS SUWACE. ISSUE 1 EXISTING FOOTING TO REMAIN INEW RAILING DRAWN BY: 1 EXISTING P.T.6x6 POST BELOW HGP AND EXTENDED TO ROOF BEAM, TVP. IREVMWED FOR CODE COMPLIANCE S lHE st O, j WALL 5 CT I ON ,4 I �4N CIS O� ANTIC FFoRADDITIONALH `�i -) SCALE: I/2"=,,_@° REQUIREMENTS AND CONDITIONS. � A- 1 REVIEWED BY- DATE