Agenda Item 8CAGENDA ITEM # 8C SEPTEMBER 24, 2012 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Beach Cleaning Contract Renewal vs. Performing Services In -House SUBMITTED BY: Rick Carper, P.E. Public Works Director DATE: September 17, 2012 BACKGROUND: At the last Commission meeting, a request was made for a comparison between contract costs and performing beach cleaning using City forces. In attachment 1, Staff provides the scope of work currently executed by Beachcombers, as well as an estimate of costs for in -house operations. Including both operating (manpower and supplies) and equipment (truck, tractor, rake and trailer) costs, it would cost the City approximately $51,000 per year to do the tasks currently being done by Beachcombers for approximately $33,000. As shown in Staff's cost estimate, in order to maintain the current level of service for cleanliness of the beach, contracting is the most cost effective method. To perform at this level and not impact maintenance in other City Parks would require additional manpower. RECOMMENDATION: Extend the contract for one year at the current prices. ATTACHMENTS: 1) Staff cost estimate for Beach Cleaning using City Forces 2) Staff report from 9/10 Commission meeting 3) Letter signed by Arturo Cordova, President of Beachcombers North, Inc. agreeing to the extension at the current prices, and 4) Bid 0910 -17 Tab BUDGET: Budgeted in Parks Maintenance Account 001 - 6020 - 572 -34.00 for FY 13. REVIEWED BY CITY MANAGER: AGENDA ITEM # 8C SEPTEMBER 24, 2012 Attachment 1 Scope of Work for Contract Beach Cleaning Beach cleaning will consist of once per week mechanical cleaning, four (4) days per week garbage and litter pickup, and refuse container emptying as follows: Mechanical Cleaning Filtering or turning soft sand from the high tide line to the frontal dune. The cleaning shall extend to a minimum depth of six (6) inches and be capable of picking up glass, can tops, crushed aluminum cans, buried litter, etc. This cleaning shall be performed once per week from the Neptune Beach City Limit north to Hanna Park. Manual Cleaning of Litter This work shall include the emptying of all trash containers along the oceanfront and picking up all visible litter and garbage from the water's edge to the frontal dune, and all "street ends" open for public use. This cleaning shall be performed four (4) days per week, October through September, and will be a "once through" cleaning from Neptune Beach City Limit north to Hanna Park. There is no requirement for cleaning during the day after the "once through" cleaning has been made. From April through November, the four (4) days of pickup will usually occur on Friday, Saturday, Sunday and Monday. From December through March the four (4) days of pickup will usually occur on Monday, Wednesday, Friday and Sunday. The selected bidder will be responsible for the disposing of all collected debris at an authorized landfill. Estimated Beach Cleaning Costs if City Forces were to assume all duties. Operating Costs: 1) Manpower: A. Trash Collection: 3 workers x 2.5 hrs (non Holiday and non - slammed weekend) = 7.5 worker hrs /day 7.5 worker hrs /day x $18 /worker hrs (average loaded hourly rate) = $135 /day $135 /day x 4 days /week = $540 /week $540/ week x 52 weeks/ year = $28,080 /year Manpower cost would be for 4 days a week (Thursday, Friday, Saturday, and Sunday April through November; Monday, Wednesday, Friday and Sunday December through March). B. Mechanical Beach Cleaning (Dragging the Beach): 3 work hrs/ week x 52 weeks/ year = 156 work hrs/ year 156 work hrs/ year X $18/ work hr = $2808 /year 2) Supplies: There will be other added costs like bags for trash, fuel for vehicles, etc. Other supplies that would come up once we get back in the trash collecting business and determine what they are. Conservative estimate - $4000.00 /yr. 3) Trash Disposal Fees: The extra waste brought off the beach would have to be handled by PW. This would require at least one more 8 CY dumpster to be hauled three times per week by Advanced Disposal - -$134 /week x 52 weeks = $6968 /year. Note: This does not include cost for Tipping Fees if / when imposed by COJ. Total Operating Cost (excluding equipment purchases and replacements) - $41,856 /year vs. $32,916/year for Beachcombers Contract. Capital Costs: 1) Vehicle and Equipment Costs: AGENDA ITEM # 8C SEPTEMBER 24, 2012 Assume initial use will be existing City 4x4 vehicle and trailer. The vehicle being used on the beach to get trash will have a much shorter life due to working on the beach. Expect to replace the beach vehicle 2 to 3 times faster. Anticipate $20,000 every 4 -5 years for vehicle and trailer instead of normal 10 -12 year service life. Would want to purchase a dedicated, designed to purpose trash trailer in the future — estimated cost - $10,000. (Service cost for the beach vehicle will also increase. Animal Control vehicle wear and tear is significantly higher than similar City vehicles and their time on the beach will be a fraction of the time the beach trash vehicle will be on the beach). 2) Tractor and rake for dragging the beach: There may be a tractor already available for raking if the tractor currently used by Public Utilities for sludge loading functions. If not, PW would have to purchase a four wheel drive tractor that can get on the beach to drag. Estimated cost - $20,000.00. In any event the City must purchase a rake, estimated cost - $4000). Because of weekly beach use, life will be shorter than most PW heavy equipment. Assuming 5 year life for equipment above, average annual cost: $10,8001 year. Total estimated cost to conduct beach cleaning at current contracted levels: $52,656 /year. Staffing Issue: 3 men out of current positions at the time they are now picking up trash. Normal duties ignored. The scheduling will become a nightmare since the contractor does the work on the weekend. This will require extra bodies to come in on the weekend or overtime. Less man power for the week and we are already getting loaded with extra parks and work with no new bodies. Would require at least one extra (new) Ranger, to avoid impact on existing park maintenance. AGENDA ITEM # 8C SEPTEMBER 24, 2012 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Beach Cleaning Annual Contract Renewal SUBMITTED BY: Rick Carper, P.E. Public Works Director DATE: August 31, 2012 BACKGROUND: The City's annual contract for beach cleaning with Beachcombers North, Inc. expires on September 30, 2012. Beachcombers has worked for the city for numerous years and annually prove they are a quality contractor and a good partner. We have contacted Mr. Arturo Cordova, President of Beachcombers North, Inc., who has agreed to extend the contract for another year at the current price of $32,916.00 annually. The total monthly cost for 4 days per week cleaning will be $2743.00 per month. The City has the option of extending the current contract for two (2) one (1) year periods. This is the second of two possible renewals of this annual contract. Beachcombers was the only contractor to submit a response to Bid 0910 -17 since this is a specialty service. RECOMMENDATION: Extend the contract for one year at the current prices. ATTACHMENTS: 1) Letter signed by Arturo Cordova, President of Beachcombers North, Inc. agreeing to the extension at the current prices and 2) Bid 0910 -17 Tab BUDGET: Budgeted in Parks Maintenance Account 001 -6020- 572 -34.00 for FY13. REVIEWED BY CITY MANAGER: AGENDA ITEM # 8C SEPTEMBER 24, 2012 August 30, 2012 Beachcombers North Inc. Attn: Arturo Cordova, President 1810 Rambling Ridge Lane Jacksonville, FL 32225 RE: Bid No. 0910 -17: Annual Contract for Beach Cleaning Dear Mr. Cordova: As you are aware, the annual contract with the City of Atlantic Beach for Beach Cleaning expires September 30, 2012. We would like to extend the contract for another year at the current price of $32,916.00 annually for 4 day per week cleaning from October 1, 2012 thru September 30, 2013. This is the second of two possible renewals of the original contract. If acceptable, please sign below and return to me within one week, so I can prepare a staff report to present to the City Commission. We look forward to recommending that we continue our contract with your company. Sincerely, t Tim Gilboy Deputy Public Works D BEACHCOMBERS NORTH, INC, FOR ONE YEAR AT THE -GURRE Arturo THE CONTRACT WITH THE CITY OF ATLANTIC BEACH \BOVE, EFFECTIVE OCTOBER 1, 2012. Date c �o m V t 10 d m L C V 10 c c a t m m V w � C a Q V 0 0 N Y9 r L I e z� VJ AGENDA ITEM # 8C SEPTEMBER 24, 2012 [+i; �o m 0 m Q ti 0 r 0 0 rl