Loading...
1636 Sea Oats Dr (vault) s CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLAN'T'IC BEACH,FL 32233 INSPECTION PHONE LINE 247-5826 Application Number . . . . . 06-00633089 Date 6/02/06 Property Address . . . . . . 1636 SEA OATS DR Tenant nbr, name . . . . . . WINDOWS/DOORS REPLACEMENT Application description . . . RESI,DENTIAL ADD/RENOVATE/ALTER Property Zoning . . . . . . . TO BE UPDATED Application valuation . . . . 3532 Owner Contractor ------------------ ------ ------------------------ BRADY, MICHAEL KJ HOMES OF FLORIDA, LLC 1636 SEA OATS DRIVE 422 3RD STREET SOUTH ATLANTIC BEACH FL 32233 JAX BEACH FL 32250 (904) 339-0232 ------------------ ---------------------- - -- ------- ----------- --------------- Permit . . . . . . BUILDING PERMIT Additional desc Permit Fee . . . . 50 . 00 Plan Check Fee 25 . 00 Issue Date . . . . Valuation . . . . 3532 Fee summary Charged ?aid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 50 . 00 50 . 00 . 00 . 00 Plan Check Total 25 . 00 25 . 00 . 00 . 00 Grand Total 75 . 00 75 . 00 . 00 . 00 PERMIT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF'ATLANTIC BEACH ORDINANCES AND THE FLORIDA BOLDING CODES. BUILDING OFFICIAL CITY OF ATLANTIC BEACH Cc: BUILDING / ZONING DEPARTMENT D. Fordns 800 Seminole Road oerr Atlantic Beach,Florida 32233 (904)247-5800 (904)247-5845 Fax www.coab.us PLAN REVIEW COMMENTS Permit Application # Property Address: Applicant: K. `L z-G �r Project: %'� �dW - �1�±55 01604 This ermit application has been: Approved Reviewed and the following items need attention: `r Please re-submitour application when these items have been completed. Y PPf Reviewed By: Date: Date Contractor Notified: CITY OF ATLANTIC BEACH r WINDOWS, SKYLIGHTS,GARAGE DOORS,HURRICANE SHUTTERS Date: 5 f L3/0 f. o--1- — -i--1 a r4i c g-•e—�4 F-(- 3"32 Job Address. n 31 �(03(o SPA C7 I A- Owner: R c ljr e�A.W 11� Address: (931 ��� C7aT1 — 4�1---6, df-1 .11"P-hone: Zyb— gZZo Legal Description: Block Number: Lot Number: / Zoning District: 4131� -- f Contractor: q ora€1 of F Latter dA- LLQ- State License Number: C 9c, t LS 355P Address: qL1- 5 34 Strom f Phone: 9o�f— 339 -o-z32 city: State: FL Zip: 32-7-SO Fax: 70 Y - 232— - d work to be done: o, ��1 �� e- Describe proposed use an � 1 w � r-� q �aCl CYWr ��lac t.� Present use of land or building(s): n Valuation of proposed construction: $3.0532, Is approval of Homeowner's Association or other private entity required? /V0 If yes, please submit with this application. >- Required Building Data: Mean Roof Height 10 106�+ (ft) Building Width (ft) Building Length (ft) Cap Roof SlopeLWindow Height_ (ft) Window Width SeyLr/ (ft) Window Elevation from Grade L , 2 i` (ft) — 644,61-, of Measurement from corner of building to window Src dpi ah1 (ft) Number of windows being installed _ Mean Roof Height 800 Seminole Road Atlantic Beach,Florida 32233-5445 Phone: (904)247-5800 - Fax: (904)247-5845 - http://www.ei.atiantic-beach.fl.us Page 1 Revised 1/27/03 l , Procedure: In order to expedite issuance of permits provide all information as appropriate. Incomplete applications may result in delay in issuance of permit. In addition to the building data,the following information is required: Manufacturer's Test Report with Uniform Structural Load'1004 X Installation Procedures\/ Window Description/Type -4 Car-age War.Ikescript-w"ff�pe Hurricane Shutter Description/Type > Elevation View of Window Locations-./ I hereby certify that all information provided with this application is correc Signature of Owner: Q? tfv' Date: 5 I hereby certify that I have read and examined this application and knob the same to be true and correct. All provisions of the laws and ordinances governing this type of work will be complied with,whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any federal,state or loci rules,regulations,ordinances,or laws in any manner,including the governing of construction or the performance of construction of the prope4. I understand that the issuance of this permit is contingent upon the above information being true and torr t and that the plans and supporting ata have been or shall be provided as required. _ i Signature of Contractor: t7-t:=� '; Date: Address and contact information of person to receive all correspondence regarding this application(please print). Name: fit HOVI.1 0& FL09_10p L4-6 Li4, ,J Mailing Address: q t S 3A _5+ry e 4- __JA_k gel{. Pr- 37-2_,:;D Telephone: roq- 3 31—0,1,3-L- Fax: ROK- 339 -o If l— E-Mail: k e!@4j"• (o..� AS TO OWNER: Sworn to and subscribed before me this day of �t _ 20 State of Florida,County of Duval Kristen Lisa Conover Notary's Signature: : ..-Commission#DD516740 �°•• A Expires February 9,2010 Personally known ��`' Bonded T Fain � Ce'""°00a6S•7019 Produce&identification Type of i4entification produced AS TO CONTRACTOR: ^� Sworn to and subscribed before me this day of N' A ,20 State of Florida, County of Duval ,.•1' 4., Kristen Lisa Conover Notary's Signture: \ , %,Commission#DD616740 . „•' 'Expires February er_1aryy 9,2010 �Personally" known �ie�` le.wTM a Producedidentification Type of iq�entification produced 800 Seminole Road •Atlantis Beach,Florida 32233-5445 Phone: (904)247-5800 • Fax: (904)241-5845 • http://www.ci.atiantic-beach.R.us Page 2 Revised 1/27/03 lzhi- LA0 ' 2tib - 2zv NOTICE OF COMMENCEMENT Tax Folio No. i-72—L)24 d Z°fo State of Lo(L t o k County of by v A- - To Whom It May Concern: The undersigned hereby informs you that improvements will be made to certain real property, and in accordance with Section 713 of the Florida Statutes,the following information is stated in this NOTICE OV CO NCEMENT. Legal Description of property being improved: Jk( Sl O Z9 A411121- Q- 13 '"t3 A 9K L1500- Address of property being improved: �(a3G, S cam, ()a+f "' 4+(.,.-6c Qe.-L General description of improvements: !:e4 o�c_�F a,4 A" (Q a c/n�c, n Owner: {fat 8Address: - I( � �e�� CO.Af 64(o,,�6- Qj �w Owner's interest in site of th improvement: Fe Fee Simple Titleholder(if other than owner): "VA Name: Contractor: F LL Address: 47-i $ . 3:te r �- J X), ee N r-L 3 Z.t 5� Telephone No.: clog J331- 0 0 Fax No: 2- Surety(if any) Address: Amount of Bond$ Telephone No: Fax No: Name and address of any person making a loan for the construction of the improvements Name: /JIA Address: Phone No: Fax No: — Name of person within the State of Florida, other than himself, designated by owner upon whom notices or other documents may be served: Name: Address: Telephone No: Fax No: In addition to himself, owner designates the following person to receive a copy of the Lienor's Notice as provided in Section 713.06(2)(b),Florida Statues. (Fill in at Owner's option) Name: K1 HumiJ of FLait-,AA L-c Address: N Z L 5. 3r Skr��+ — �Ak &�A-c M Fi 3 L 2-Su Telephone No: �10-339- 07-3L Fax No: elay- 337 -a-232- Expiration date of Notice of Commencement(the expiration date is one (1)year from the date of recording unless a different date` e o e �o specified): oC THIS SPACE FOR RECORDER'S USE ONLY OWNER V % C ,- � �. � .C.0 Signed: � Date: u� Before me this day of in the Co of Du � al,State Of Florida,has personally ppeared ,h F� Notary Public at 1, ge,State f Florida, ounty o uval. U My commission exires: �^.� c17-�'lb Personally Known: " Produced IdentificaFion: r�a r--, ` Kim Cerrato -From: Fred Pacacha [csad_fpacacha@bel I south.net] Sent: Monday, May 22, 2006 5:45 PM To: kjhomes@fdn.com Subject: Brady Residence Window & Door Information Follow Up Flag: Follow up Flag Status: Red Attachments: Brady-Contractor Permitting Proposal.pdf; Marvin Clad Sliding Patio Door InstallationInstructions. df; Marvin Window Installation Instructions.pdf Kim, Included on this page and attached please find the information foi the Brady Residence. Also attached are installation instructions for these products. The product approval numbers are as follows: Master Bedroom Door: FL4939.5 Master Bedroom, Laundry Room & Kitchen Windows: FL4765.1 Hailey's Room: FL4737.7 Please call or email if you have any questions. Thanks, Fred Pacacha Sales Representative Coastal Sash & Door, Inc. 3653 Regent Boulevard •Suite 205 Jacksonville, FL 32224 (Office) 904.641.0346 (Fax) 904.641.0347 Your First Coast Distributor of MARWHI adrlor yov 5/25/2006 Florida32233 904-242-30022-3002-3002 Authorized dealer for ARNP_-. ',R SCRE N-� Mr. &Mrs. Brady 1636 Sea Oats Atlantic Beach, Fl. 32233 April 15, 2005 ASI 50/50 Storm Panel Thank you for the opportunity to propose the use of ASI Storm Panels for the following windows. �--3 - four front windows - two side windows - patio door x - back window - .SV bay window 1 l L � propo 1 entails the following: / � ) i) Material & Labor for the installation of ASI Anchor Safe 50150 panels on window ii) H header track and L sill track removable iii) Demonstration of final installation and removal on bottom tracks � ,. iv) Installatio video or CD v) Wing nut hand driver vi) Installation warranty 1 year I; Kim Cerrato From: Fred Pacacha [csad_fpacacha@bell south.net] Sent: Monday, May 22, 2006 5:45 PM To: kjhomes@fdn.com Subject: Brady Residence Window & Door Information Follow Up Flag: Follow up i Flag Status: Red Attachments: Brady-Contractor Permitting Proposal.pdf; Marvin Clad Aiding Patio Door Installation Instructions.pdf; Marvin Window Installation Instructions.pdf Kim, Included on this page and attached please find the information for the Brady Residence. Also attached are installation instructions for these products. The product approval numbers are as follows: Master Bedroom Door: FL4939.5 Master Bedroom, Laundry Room & Kitchen Windows: FL4765.1 Hailey's Room: FL4737.7 Please call or email if you have any questions. Thanks, Fred Pacacha Sales Representative Coastal Sash & Door, Inc. 3653 Regent Boulevard •Suite 205 Jacksonville,, FL 32224 (Office) 904.641.0346 (Fax)904.641.0347 Your First Coast Distributor of W ,u.y , Ntadetaryou; I i APPROV ED CITY OF ATLANTIC BEACH BUILDING OFFICE MAY 31 2006 By: 5/25/2006 Florida 32233 904-242_3002 Authorized dealer for ARM.-.',R SCREPEN, Mr. &Mrs. Brady 1636 Sea Oats Atlantic Beach, Fl. 32233 April 15, 2005 C, C ASI 50/50 Storm P"el ° Thank you for the opportunity to propose the use of ASI Storm Panels for the following windows: �L our front wirdows S two side windows patio door Y - back window S z bay window l V .���T'he propo entails the following: /ter c v i) Material & Labor for the installation of ASI Anchor Safe 50150 panels on window 0 � (� �OY ii) H header track and L sill track rempvabe G iii) Demonstration of final installation and removal on bottom tracks iv) Installatio video or CD v) Wing nut hand driver vi) Installation warranty 1 year 7777777777 ARir Ommunit'V' BCIS Home Log In i Hot Topics Submit Surcharge? stats & Facts f, Publications FBC Staff !:' BCIS Site Map Lin i, j&,, Product Approval (001 USER: Public User Affairs Product_Approval Menu. > Product...... piicat on Search > A..pp.lication_List > Application Detail FL # FL240 Application Type New Code Version 001 ® Application Status Approved g Comments Archived Product Manufacturer Madden Mfg. Address/Phone/Email 1889 NW 22 St. Emma Pompano Beach, FL 33069 (800) 272-2071 Madden4Mo@aol.com Authorized Signature ,Frank Bennardo fYl clangley@flbengineering.com Technical Representative ive Michael Madden Address/Phone/Email1889 Nw 22nd St. ,Pompano Beach, FL 33069 Madden4Mo@aol.com Quality Assurance Representative Address/Phone/Email Category Shutters Subcategory Storm Panels Compliance Method Evaluation Report from a Product Evaluation Entity Evaluation Entity SBCCI PST and ESI Quality Assurance Entity `PFS Corporation Validated By frank L. Bennardo, P.E. Certificate of Independence Referenced Standard and Year (ofStandard Yei Standard) SSTD 12 19� TAS 201, 202, 203 20( TAS 201, 202, 203 20( TAS 201, 202, 203 20( Equivalence of Product Standards Certified By Sections from the Code X606.1.4 1606.1.4 1625 1626 Product Approval Method Method 2 Option A Date Submitted 09/24/2003 Date Validated 09/24/2003 Date Pending FBC Approval 10/07/2003 Date Approved �0/1'S/2003 Summary of Products FL # IlModel, Number Or Name IlDescription 240.10.022" Alum Panes 0.022" Aluminum Storm Panels Limits of Use (See Other) Installation Instructions Approved for use in HVHZ: Verified By: Approved for use outside HVHZ: Evaluation Reports Impact Resistant: PTID 240 T Madden - .024 Alum Pane Design Pressure: +/- (SBCCI #2056A).pdf Other: PTID 240_T_Madden.- .0375 to .063 A Panels_(SBCCI #20.56A)_.pdf PTID 240 T Madden - .050 Alum Pane PTID 240 T_Madden - ._0_6.3Alum Pane #01-0313.21).pdf PTLD 240 T Madden - 0.10 Clear Poly( Panel...s_._(NOA__#_02-0315...13).Of PTID 240 T Madden - 20ga (.038in) C Panels._(NOA._#01-0313_.22�df PTID 240 T Madden - 24ga to_18ga S' Panels (SBCCI #2056A).pdf PTID 240 T Madden - 28ga_(_.019) Ga PanelgjSBCCI #2056A).pdf PTID 240 T Madden - SBCCI_Eval Rep Steel, Alum, & Polycarb Stoi Panels.pdf 240.2 rPolycarb 0375" Alum Pan Is + 0.0375 Aluminum Storm Panels with 0.( :11Clear Polycarbonate Panels Limits of Use (See Other) Installation Instructions Approved for use in HVHZ: Verified By: Approved for use outside HVHZ: Evaluation Reports Impact Resistant: Design Pressure: +/- Other: 240.3 0.050" Alum Panels (Miami- 0.050" Aluminum Storm Panels Dade 11 Limits of Use (See Other) Installation Instructions Approved for use in HVHZ: Verified By: Approved for use outside HVHZ: Evaluation Reports Impact Resistant: Design Pressure: +/- Other: 240.4 0.050" Alum Panes + 0.050" Aluminum Storm Panels with 0.0 Polycarb Clear Polycarbonate Panels Limits of Use (See Other) Installation Instructions Approved for use in HVHZ: Verified By: Approved for use outside HVHZ: Evaluation Reports Impact Resistant: Design Pressure: +/- Other: i- 3 Aluminum Storm Panels 240.5 F�a 063 Alum Panels (Miam 0 06 de Limits of Use (See Other) Installation Instructions Approved for use in HVHZ: Verified By: Approved for use outside HVHZ: Evaluation Reports Impact Resistant: Design Pressure: +/- Other: 240.6 0.063" Alum Pane�s + 0.063" Aluminum Storm Panels with 0.0 Polycarb Clear Polycarbonate Panels Limits of Use (See Other) Installation Instructions Approved for use in HVHZ: Verified By: Approved for use outside HVHZ: Evaluation Reports Impact Resistant: Design Pressure: +/- Other: 240.7 0.085" Polycarb Panels 0.085" Clear Polycarbonate Storm Panel with 18-24ga Steel Panels or 0.0375"-0. Alum Panels Limits of Use (See Other) Installation Instructions Approved for use in HVHZ: Verified By: Approved for use outside HVHZ: Evaluation Reports Impact Resistant: Design Pressure: +/- Other: 240.8 0.10" Polycarb Pa 'els 0.010" Clear Polycarbonate Storm Panel (Miami-D with 20ga Steel or 0.050"/0.063" Alum Limits of Use (See Other) Installation Instructions Approved for use in HVHZ: Verified By: Approved for use outside HVHZ: Evaluation Reports Impact Resistant: Design Pressure: +/- Other: 240.9 18ga Steel Panels Polycarb 0.0478" Galv Steel Storm Panels with 0. Clear Polycarbonate Panels Limits of Use (See Other) Installation Instructions Approved for use in HVHZ: Verified By: Approved for use outside HVHZ: Evaluation Reports Impact Resistant: Design Pressure: +/- Other: 240.10 20ga IlDade)Steel Panels,:(Miami- 0.038" Galv Steel Storm Panels Limits of Use (See Other) Installation Instructions Approved for use in HVHZ: Verified By: Approved for use outside HVHZ: '! Evaluation Reports Impact Resistant: Design Pressure: +/- Other: 240.11 20ga Steel Panels',' + P'olycarb 0.0374" Galv Steel Storm Panels with 0. Clear Polycarbonate Panels Limits of Use (See Other) Installation Instructions Approved for use in HVHZ: Verified By: Approved for use outside HVHZ: Evaluation Reports Impact Resistant: Design Pressure: +/- Other: 240.12 24ga Steel Panels) + Polycarb 0.0292" Galv Steel Storm Panels with 0, Clear Polycarbonate Panels Limits of Use (See Other) Installation Instructions Approved for use in HVHZ: Verified By: Approved for use outside HVHZ: Evaluation Reports Impact Resistant: Design Pressure: +/- Other: 240.13 1128ga Steel Panel: 0.0190" Galv Steel Storm Panels Limits of Use (See Other) Installation Instructions Approved for use in HVHZ: Verified By: Approved for use outside HVHZ: Evaluation Reports Impact Resistant: Design Pressure: +/- Other: Back Next OCA Administration Department of Community Affairs Florida Building Code Online Codes and Standards L2555 Shumard Oak Boulevard 'Tallahassee, Florida 32399-2100 (850)487-1624, Su,ncom 277-1824, Fax(850)414-8436 © 2000-2005 The State!of Florida. All rights reserved. Copyright and Disclaimer Prodgct Approval Accepts: eClrecli Coastal Sash & Door, Inc. 3653 Regent Boulevard W in do w e and D Do r s Suite 205 Made for you Jacksonville,FL 32246 (904)641-0346 Brady- Egress Option:BRADY Provide replacement windows and door for residence. Bill To: Ship To: COASTAL SASH & DOOR COASTAL SASH & DOOR 8422 FERGUSON AVENUE 8422 FERGUSON AVENUE SAVANNAH,GA 31406 SAVANNAH,GA 31406 Req.Ship Date: Contact: Ship Via: OUR TRUCK Phone: ( ) P.O.: BRADY/JAX/FP Provide replacement windows and door for residence. Sold By, Fred Pacacha Purchaser: Mr.& Mrs.Michael Brady 1636 Sea Oats Drive Atlantic Beach,FL 32233 (904) 246-8220 'i Coastal Sash & Donor, Inc. Brady- Egress Option;.BRADY Version 6.052 05/22/06 PAGE 1 PROJECT COMMENTS: Price does not include installation. QUOTE:00000001 VER.6.03 03/27/06 QTY:1 MARK UNIT- Master Bedroom Door CLAD SLIDING PATIO DOOR-OX CALL NUMBER 6065 ROUGH OPENING 70 5/8"X 791/4" INSULATED GLASS-1 LITE TEMPERED CLEAR 2 POINT MULTI-POINT LOCK SATIN TAUPE HANDLE-NON-KEYED COASTAL ROLLERS BEIGE ULTREX SILL WITH BEIGE WEATHER STRIP NAILING FIN i 4 9/16"JAMBS BARE PINE INTERIOR SIERRA WHITE CLAD EXTERIOR NO CASING a, AS VIEWED FROM THS EXTERIOR c QUOTE:00000002 VER.6.03 03/27/06 QTY:1 MARK UNIT- Master Bedroom Windows ROUGH OPENING 75"X 38 5/8"-2-WIDE 1-HIGH **Al CLAD ULTIMATE DOUBLE HUNG ROUGH OPENING 371/2"X 38 5/8" INSULATED GLASS-1 LITE #ADD FOR STORM PLUS IZ3 CLEAR CLEAR SATIN TAUPE SASH LOCK HALF SCREEN SIERRA WHITE SURROUND CHARCOAL FIBERGLASS MESH CONTINUED ON NEXT PAGE Coastal Sash & Door, Inc. Brady- Egress Option;BRADY Version 6.052 05/22/06 PAGE 2 **A2 CLAD ULTIMATE DOUBLE HUNG ROUGH OPENING 371/2"X 38 5/8" INSULATED GLASS-1 LITE #ADD FOR STORM PLUS IZ 3 CLEAR CLEAR SATIN TAUPE SASH LOCK HALF SCREEN SIERRA WHITE SURROUND CHARCOAL FIBERGLASS MESH **VERTICAL MULL 1"VERTICAL SPACE MULL NAILING FIN 4 9/16"JAMBS #ADD 1"STRUCTURAL MULL BARE PINE INTERIOR SIERRA WHITE CLAD EXTERIOR NO CASING #NON SYSTEMGENERATED PRICING QUOTE:00000003 VER,6.03 03/27/06 QTY:1 MARK UNIT-Haileys-Egress Compliant CLAD CASEMASTER-OPERATES LEFT HAND STORMPLUS IMPACT ZONE 3 CALL NUMBER 36 X ROUGH OPENING 38 5/8" ROUGH OPENING 37"X 38 5/8" INSULATED GLASS-1 LITE STORMPLUS CLEAR SATIN TAUPE FOLDING HANDLE AND LOCK(S) WITH COASTAL HARDWARE 20 DEGREE SASH LIMITER INTERIOR WOOD SCREEN BARE PINE FINISH CHARCOAL FIBERGLASS MESH 4 9/16"JAMBS BARE PINE INTERIOR SIERRA WHITE CLAD EXTERIOR NO CASING AS VIEWED FROMTHE EXTERIOR QUOTE:00000004 VER.6.03 03/27/06 QTY:1 MARK UNIT-Kitchen CONTINUED ON NEXT PAGE Coastal Sash & Door, Inc. Brady- Egress Option:BRADY Version 6.052 05/22/06 PAGE 3 CLAD ULTIMATE DOUBLE HUNG ROUGH OPENING 38"X 38 5/8" INSULATED GLASS-1 LITE CLEAR SATIN TAUPE SASH LOCK HALF SCREEN SIERRA WHITE SURROUND CHARCOAL FIBERGLASS MESH NAILING FIN 4 9/16"JAMBS BARE PINE INTERIOR SIERRA WHITE CLAD EXTERIOR F, NO CASING 0 AS VIEWED FROM THE EXTERIOR QUOTE:00000005 VER.6.03 03/27/06 QTY:1 MARK UNIT-Laundry Room CLAD ULTIMATE DOUBLE HUNG ROUGH OPENING 38"X 38 5/8" INSULATED GLASS-1 LITE CLEAR WHITE SASH LOCK WHITE JAMB HARDWARE HALF SCREEN SIERRA WHITE SURROUND CHARCOAL FIBERGLASS MESH NAILING FIN 4 9/16"JAMBS PRIMED PINE INTERIOR SIERRA WHITE CLAD EXTERIOR NO CASING v 0 AS VIEWED FROM I H4 EXTERIOR CONTINUED ON NEXT PAGE Coastal Sash & Door, Inc. Brady- Egress Option:BRADY Version 6.052 05/22/06 PAGE 4 SIGN OFF COMMENTS: Please carefully review this proposal. Selections including,but not limited to product type,size,configuration,design pressure rating,egress compliance,glazing tempering,hardware,materials and handing have been made based on information provided by customer. Customer assumes responsibility to ensure all Selections are appropriate for project. Proposal pricing is valid for 30 days from date of quote. After this peri pd,prices may vary. To place this order,please sign,date and return proposal with a check for Project Total Price made payable to Coastal Sash& Door. Once order is placed, it cannot be cancelled or changed, responsible for removin I` material from truck to j All Jobs are tailgate delivery. End user will be resp g Jobsite. If you have any questions,please feel free to contact your Coastal Sash`& Door Sales Representative at(904)641-0346. SUBMITTED BY DATE ACCEPTED BY DATE Clad Sliding Patio Door Installation and Finishing Instr4iuctions MARVINILAL Windows and Doors Made for your" 3/27/2006 19970039 IY o) u) (n 0 (n `n (o <° (o (o (o (o to (o (o co (g co (o 0 0 0 0 0 0 0 0 0 ti 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 A o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O o 0 0 0 0 0 0 0 0 0 o a- N N N N N N N N N N N N N N N N N ` N N n Q M M M M M 4 V' V 4 Lo 0 i0 (0 .-- ^ r .- r- .- r N N N N O O) N N M M M M M M M M M M M M M M m M c) (`M M M M CO M M 0) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 s �a N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Its O O O O O O O O O O O o iD O O O O O O O O O O O O O O O O O O qe O O O O O O O O O O O O ID O O O O O O O O O O O O O O O O O O A N N N " N N N N N N N N N N N N N N N N N N N N N N N N O M M M M M 0 0 0 0 0 m 0 0 0 0 0 0 0 0 0 0 0) a) O a m m O O O OA N N N N N N N N N N N N N N N N N N Un n n n n n t- 0 n n n n n n n n n n n n n n n n n 0 0 0 0 0 0 0 0 0 0 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 A O `� U Q q C C C C C C C C C C C C C C C C 8 ty vvwmOD QN � N E � E � E E � EQ EooEo- 22 E22 Ew ESQ " "' r) M M (n o .- �:E E E c E E E E E E 00 to O CO iN co', N fVovo N N 0 NO v co Lo Lo (0 N tf) (D n n n n n N n N n N n N n N n N LO (M ti a Q CS C NN C C C C M (0 (0 " oo Oo bo 00 c N c E E .c E 9 E E E E E E M Ln L? C N M n :'E OE .�- E E C Cl) E C C_ C_ N C E C r r i i s ._ ._ ._ , N � 0 ; iLo-N N (D D = N M N v .= a0 = N 4 ^�•e:•. g t17 N (Mf) 00 00 W � � O � v .-- � 0 '- M r- M m N � at N M 1 � (0 O O O O 0 b L 4-0 var er v O 'oO O O o N N 0 0 0 0 0 0 0 U U U 0 U .t :� co M � et U U v � M co p O O tO Lo Lo Lo M M f0 O O O J J J J J U[0 U U U U J J U U U U f0 d. a7 a3 U U O U U U v v a0 O p O p p p 'p D O p p p p p p U U U U U U J chch -� U U U C7 0 0 0 0 C9 C7 0 0 0 0 0 0 0 0 0 0 J J J J J J a a 2 2 2 LL LL LL 0 0 w w 0 2 i2 2 2 2 2 2 2 2 2 = 2 U U LL LL LL LL Q Q iiN 0 04 o O O O O O O NO O I U- LL LL LL LL LL LL LL W 0 m W 0 m m W Z Z Z Z Oni Z Z 0 � 0 Z m N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N U) U) (n U) U) U) U) U) U) U) U) U) U) U) U) U) U) U) V) U) to V) U) U> U) U) U) U) U) U) U) 2, *may o o O o o O o 0 0 o O o p O o o O o 0 o O o 0 0 0 0 o O O O O o 00 00U ® o o N N O O c0 c0 Vi v N N rn rn oOop O L L o 0 0 0p op p 0 00 co co co o 00m co O O O LL N C 00 OD O U" U U U L L L L Nm yO O OLL LL LO wO 00 O 0 CC Mjr 0) m m ILL LL m 7 7 N7 N7 U U U U p p C C L C C 0) O) O m O 2 2 L L L S S U U S C C C C L L a a L a C > SS sg (n 0) U U o C C C U U N" N O O N c S 0 C C C C C C C C O L .0 H 2 C C C" C C C N N m N C LL LL LLd N LL LL — C C C C O O O O m O 3 CS O O C m m m LL LL 4);:: m m .2 :? °? °3 LL LL O O a) O a) O C co) p p O (U- f0 C C N M m O N N m (n N N E p C C C m m (C (C (C m C C (0 m (0 m (0 m $ e p u 0 E y 4 n E E w E E E E E E '� '� U U U U U U Q Q R p Q co ,� c c ,� fn In 2 c c p 5 > > � c .� Z � , - .- .1 .� `o (o o a a a a a a a a a �N n M O m m a a a m o 0 o a a o 0 0 0 0 o a a a a a a y y y a? o 0 o m m o 0 0 0 0 o m m m m m (o qu 0 Z 0.( 5 5 U U U S U U 3 U U U U L) U c c c c c c c c L. a- co M O o OON M t O O N MtO O O NO O O O ? 3 Q +.� O 0 a- N N M of 4 V to Lo (0 c0 (0 G0 (0 (0 n n n n I- n w w O O O O N N 9� Z p O „`")� O (o co cD (D c0 (fr F.:. b J m S S 2 S 2 S 2 2 2 2 2 2 2 2 2 S 2 2 S S S 2 2 = S 2 = = 2 2 2 § y v v v v v v v v v v v vv vvvvvvvavvvvvvvvva v ti 0 0 0 O 0 � Ct o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 A (O 4 (O v O 00 u') O 0) ` O s O O O O O Q \ N N N N Wo 0 0 o Ifr atj O O O a, N N N N N N N N N N N N N N N N N O O O O A O O O O O O O O O O O O O O O O O N N N N N N N N N N N N N N \ N O O O O O O O O O - ryO OO N N N N N N N N N N N N M M M A V O O a N a a N a N a a N a N N N a — — .- — e- — — e- — — — — r $O /VWN O CRI. J Q s M C EpCp oo C 00 00 C N N N E2 C M M a I L? C ei LO � .- V' O PV' ap M CO (O N (D (D (D In (O co LO N (0(O i� I- f- 110 X �4Iti 00 00 W `0 Do 00 00 00 00 Cl) M M C M yr C M C C M C C r r r r O) r N M Cl) (D l0 (O Cl) KV N t0 Cl) Cl) (D (D (D (O (D (0 �y U U U U U U U U U U U U U U U �IUo U� U n Uo Uo Uo CJoo Uo Uo Uo Uo Uo Uo Uo Uo Uo Uo ? 0 � � Lo � � � m m m' a� m a� a� a�\ a�\ d m > > > > > > > E> > > > > > > > > > > C}y q! yo m(o a(n yo �o Wo yin €ago �o yo yo yo CD 2, J � JM JM Jv JJit JM ;J d' JItJam' Jam! J� J '�t JT JV JSP JV JV t t t t t t t t t t t t t t t t t t N N N N N N N .N N N N N N N N N N N 'N N N N <n N N M co N N N N N ;N (1) N O) N N co N N N 0) N y N N N N N h N N N � O 0) N V) N D 2 M0) w 2 o N W y N y N N o N (N y o N W N N N N N o N ) N a C Vi(L ALL` a �a a a n a a Via` o a a Via` 2a` O N N N N N IN N N N N N N N N N N O O O O O O O 'O O O O O O O O O O O (D (0 o o to 0 (D �(D w o (D (0 (D o (D (0 (D (0 0) rn m 0) 0) M rn 0) rn rn 0) rn 0) 0, 0, rn rn rn m rn rn rn rn rn rn rn 0) F! rn rn rn rn rn rn rn rn Lb w w w w w w [w w w w w w w w w w w U) U) U) U) U) F) V) U) U) U) (n cn cn (n cn cn (n �(n cn (n cn cn cn cn cn U) cn (n N 04N co N W O N ce)N ' N 04 00 cn M PN N O N N N E LL M FCOM N O N d O N N N o E`W U) o M N N 00 LL ^ E C14ao W E W O O p O O N ® 7 7 7 E (n M y E N N O N Cl) O � O N r:.. a a a N in v N E n (D r� E E E � ` N a °a N y v, N N (� o m E in in cn H a a a E � w (L a d CD c c c c m jrn o S) o` rn � O E z > > > > > E c c c E c d t- S O in = E U) `o o € n r•�l m m a� m iNn cu in aa) O `o N in in :,O N O O CL) zO O N Q O OQ LQ m Q Q U L Q U w 0 is io m m m C9 P U Q in a E E E E E `° w `° w LL Q E j E yr E w LL N Z U- Q m o o o v CO a v E E E cS y °'o (n h co Q O O O O O O O co O 'D D N N N N N > 'O N O O N w,l4 f0 O O N (0 (0 00 Nrj N N 0 o Z 4 �N9(D3 v s� U C5(DU U ow o rn U Z CO O N O O O C) O N M O O O O O O O O O O O O O O O O O O O O O O O 3 CJ Q W wa N N N M d' (f) O �N N N N�(O n n n r- 00 00 O O N X Q V N Cl Cl Cl N N N N N N N Cl) M M Z O N. +1 19 19 1919 T 19 o i19 19 19 19 19 19 19 '? '9 19 '9 O m S 2 2 S 2 2 S `2 2 T- 0 0 v v v v v v �v v v v v a v v v v v ;[•� Y h I€ i f ti 0 O o o o O o 0 " ,v 0 0 0 0 0 0 `-�, O W 00 W w W cD m O M M V PV V 'C "t V V 0 0 0 0 0 0 0 0 0 OO O OO O O O O O y M O e- N N N N N1.64 N N N N N N N N N N N N M M N N N N g C) � W — — r r O O O O O O O O O O O O O O O O O O O '•, to a M M M M M M M M M M M M �dM M M M M M M M M M M M M M M M M M M O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O PO O O O O O O O O O O O O O O O O O O A co m m 0 m (D m n n n N iN N N N N N N N N N N N N N N N N N N O _N N (, V N N N N N N N N N V try Lo Lo Lo m Lo Lo Lo lC7 In 0 0 0 l0 to � 5 O O O O O O O O O O O O ',O O O O O O O O O O O O O O O O O O O C Z "'MON U tj a ti q EFo E � E � =E E E E E00 E22 E Ec2 E22 E 7 E v (:, (n `? M c c c c �E c E c E c E c E E E c E E E 00 co O M 00 M h in c5 O) O 6N O N O N O N O O O O O M o m N V- O 4= Lo = O W 00 00 W N m 00 C n to N In e- to N (n O n (D (O (D — (D — (D '- a — Lo •- 0 .- n N M M C E C E 'pC'0 C E co E Eo- E E N E EE E E E E E E E E c? (n c, (n (n �- c c c c E c E c E c E c E c E c E c E c E c E W m m r 00 O O c0 'N N m O v N Cl) O O) r 00 r r Q1R V 00 N V N y'➢ ^y M M N M Lo M V V V (D Cl) O N n V '- co V Lo Lo Lo 0 0 0 C) v o 0 0 0 0 0 0 0 0 O („) M M V V V V M M 0 0 0 `v 0 0 0 O O O Lo U U (� (� J J J U U U U U U (� U ("> V V E V O (D (n (n (n (D J J ((� ((� V V V V J J U U qj J J J J J J ,J J U U U �U U U U U U U C a U U U U U U a d a n. H S S S 2 2 2 LL 2 2 S U U LL LL 0 0 0 U Q Q U U U U LL LL Q Q Q Q N N N N �N N N N N N N N N N O O O O t0 O O O O O O O O O 14 U) (n (n v) V) d) U) v) c1> (n V) U) (n a LL LL LL LL {LL LL LL LL LL LL LL LL LL LL Q n Q n Q n Q n n n n nkQ n Q n Q n Q n Q n Q n Q n Q n Q n Q +• Z m Z m m q) b) b) a) =Z Z m Z o, Z 0 Z D, Z D, Z D, Z m Z m Z o) Z o, Z ' N N N N N N N N N N N iN N N N N N N N N N N N N N N N N N N U) U) (n (n U) (n m 0 w 0 w w w 0 (n w U) U) U) U) U) U) U) U) N G C C C - C C C C C C_ C O O O O O O O O O O FO O O O O O O O O O O O O O O O O O O O F N 04U r. E N N N N N C C O O) n n n n N N N N 0 0 0 0 0 cloo 0 (p O N N N N O O O O O M N 00 W W o n fi n ch n M M N N �} (D O H v V v V M M V V fD O N N 0O 00 (O (D m m m m m 7 m 01 (O iLo n n N N N N V V C C U V X11 } > > > > > > > c c cLi d E E E E c c °) a� L = � .1 m m m m ^M S S S S S S S a 2 2 y R y �, -, N N N N E E 0 y r � vro co c c c c .O a d d Cc j LL LL N N Q Q Q Q (n 0) 7 7 7 7 7 7 2 2 O O N Y Y Y 4? N 3 O p O p p p p p a) a) p p N w y N N M H M N H 0 0 0 0Bch «) 0 0) N f(6 f9 @ N f6 f0 f0 fC (0 m N N w N N N N D Z R m m m m 'o 'o > > aE) j m m w aE) w aE) m aE) aE) E E E E °? °) E E E E p V E ,E E E ,E E E O p o, cm j m m m m m m m m m . . . u0i p p (0n am) w v0) N A c6 N N 03 CO OS (C c0 h Q Q Cl) 1 a+ 5 5 5 5 1 � C U �,U U U U U U U U U U U U U U U U U Il. l, n oCl) # C -0 -0 v v a -0 0 m v "o0 0 0 0 0 0 0 0 0 0 -0 v v 0 v v v N v t m m m m (a 0 m .2 4? m m 0 !0 0 0 0 0 0 0 0 0 m m m m 4? m m m m p 00 _ _ _ _ Z M O O N Cl) V Lo 0 0 0 0 0 E O O O OO r, O O O O O O O O O O O O ;O O O O O O O O O O O O O O O O O O O 3 Z X Q co CM v V V V l[') (D n W D) Oi O ON N M M V' � (A (D (D rl M ,: 00 (O v C,1 M M Cl)M Cl)( M M cM M M M Cl)M V V V V S V V V V V V V V V V V O O (D 0 co cD (D (D (D (9 CD cD (D cD (D (� (D (D cD (D (D (D cD (p (9 T (D CD cD uJ (D p y m 2 2 2 2 2 2 2 2 2 2 2 5 2 2 S 2 2 2 S 2 Q O Q W i 0 0 0 0 0 0 0 0 0 Cl 0 0 �0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 n [r a v v v v v V v V v It v It v v v v V v IT v v v v v v v v v v V v [• i f t f 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 v Q o 0 0 o O o O o 0 0 0 0 0 o O o 0 0 0 o O o O 0 s l Ln U) to In M M M M N N NPfV N I� n n n O O O O O O O O CM M O O C:-' N z Cl) Cl) M t} N N M M CD CO cD CO CO CD (D R Ir- 0 a0 O) 6) O1 m W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O -�. C Co Co M M M Co M Co Co m M M �o m M m M CO C 1 m M v O O O O O O O O O O O O n 0 0 0 0 0 0 O O O O Cl O O O O O O O O O O O O l 0 0 0 0 0 0 O O O O O N N N N N N N N N N O ryN N O O O O O O O O O O O N N N N O O N N N N A V V) V) w w W CO OD o0 00 a0 00 00 40 O O O O O O O O O O O O i0 0 0 0 0 0 O O O k� a Q �4 FO E 'pC-p E E E E E E 00 E N E E C E c� E c E c E C E c E f c E 7 E 7 E E c E E `O •�-- fD OD N O v O v O O M ' E� O) n .- CD Lo O u) r- 0 O v N N N 0 to `�' O N C N Q LoW O = to = Lo 00 M V- 00 V' to It v L69 tO r CD N to LO '- CO •- CO ,n N 0 — n N 00 N m N N O E � E E E E E E E `� E E C V v E °' cD 00 v O a) mN O N O ao ,o °' c °' ^ M C rn E E n r n O ao au i 00 N = 00 CO N N Ov) M CA N n to r- 00 N CD '- M iv n a s i N N C) N � N N tt bQ Nd Na r O M T M T F & ~ O O O O CO CCOU to COU OOtO 4 M M M M LO LO to lO O O D U N p LO to LO N p to g Q 7 Lo Lo O O D U U U O O ;N N LO to LO LO CQ Q' d' CO O J J J M M EU U U U p p LOC_ j to r ` U U U U VJ Cn (n fn -� J J J J J Ur Ur d' Q' y O� J J O LO V U U u- LL 2 S 2 S LL LL 2 S != 2 LL LL 2 2 LL LL y J + In U) J + �. s� NO N N N N N '. N N N N N N O O O O O O O O O N O O Cy Q u� Ch Ch 0 ch ` do vn (h Ch O (h Ch o u- LL LL LL LL LL r LL LL LL LL CO LL LL Ct n a n a n a n a n a rn a 'n a n a n a n a °' a a F) < G� w rn ? rn z rn z rn z rn z rn z grn z rn z rn z a) z °' z z g` N N N N N N N N N N N N °�N N N N N N N N LLJ N N u1 Cn Cn fn Cn 4U Cn m Cn Cn Cn Cn U) Cn Cn _ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C,2 o Q o o Q Cu > > j 3 0. a CL E� va c IS, o u, O=? € N 01) ao 0 0 = N m U) (n m vay (C) N o CL mMa7E oo oo Z CC 0 CU a o J C C N N C C O V O 0-0 O- 02 �yL^^ E E 3 3 3 3 r- r p W W2 LL LL 0 E 'D a rn OO.a 0 7 0 0 0 7 ,c N 0 2 2 5 U v v gCO CO 3 3 0) O C C E T� v C N c O c N y.. ■� N N (O (U Cl d v v {a V U C C C 3 O) 3 O Cp 2 C 2 3 2.s r .� CD OJ U U 0 > N c c c c) d a .c D m N rn 3 O 3 0 y Q o o ._ .� 2 2 S S : : 3 U c c n? c m c m Co @ ~ ~ E a� a� a o m m p m c N 75 a) 3 3 H a N E N N v p Z H H E E a a m m 0 0 30 30 !o o m N H 3 y 3 rn o �� cm �� to Z m m w C7 C7 C7 3 a a O p p p Cu m N N cc Ca 3 C p u� °o a; Om m M O � � 5 5ooL � z � � UU � � UoUo '�QNm m—vm o a Co c c 'c c c c c c c c 'o 'o a 'o 'o a a 0 N o N E E a `° E N i� @ lC /O CCI 4= w 4= t:. tf. w tr- w w w N N N (0 N C m C - m =Co =Co Cl r M Z m U U U U c c c c c c c c c c U U U U U� Uri 0 5 5N E 5tj Z 0 MCR O O O O O O �o O O O O O C14 C O O O O O O O O O O O O f0 0 0 0 0 0 0 O O O O O 3 S O il w, CA C7i O O N N CO M e� �6 uj I, n 00 co Oi O) C) Z X O V V V v tO CO iO to tO tO tO to [0 to CO LO LO LO LO LO CD CD Co cD O CO CO co cD CD CO Co Co Co COQ CD CD °cp CD CD LD CO CO Co Co 19 CD Co Cq c m 2 2 2 2 2 2 2 2 m 2 S S F± S 2 2 2 S = S 2 2 = S y Ct p Q a p r r; r4. IlL r�- rIL r�- P� n n r` "L r� r� r Z. r� "L fv yam. 0 0 0 o O O o 0 0 0 o O �o O o 0 o O o O o 0 0 0 v v v v v v v v v v v ,[•� i �k ? m n n n n n n n n n n n n n n n n n n n n +� 0 0 0 0 0 0 0 0 O o 0 0 0 o O o O o 0 0 A o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N O6) m Cl) M0 0 M O O� CO N N N N 00 00 O ` O k M O O O O M M -, .- .- Z .-- r O O 0) 0) N N r- n r¢ n a D) N N N N N N O O O u a i aa t o O O O O O 0 0 0 0 O O O O O O O y O O O O O O O O O O C) O O O O O } A N N N N N N N ( N N N N N N N N N N N N O M Q) 0) O O n n n' n co M M M M M Cl) M M M O N O O N N N N N N N N N N A N N N N N N N N N N N N N N N O O O O O O O O O O A VI g E �° E E pp E `= E E E E E E E p E E E E E E E E E E rn n Cl) M 0 M E E n cn E E E A' N. C O 0) O ei, 00 N v a f0_M C n V O N M N M co N V/ Q to N a0 O r- V O (D M in CC} N n N N co n n N N n n n c E E E E E E E E E E bo c E E c E E c E N E E E E E E E (D i5 E o a) 0o rn to uO E E Lo �n r M m bo N CC,� r- 00 N .- v •- 'V' v O C6% 0 �.I o U V) o o coo coo U v v LO cn LO LO c`$ m cn i.l N p cQ v v U U cn cn J U U o o - - w w U U cn 'O y U U fD co p p p 0o a0 J J O yyc >cn � U U C7 C7 C� OfJ J Uy J+ Q Q Q Q U U 2 0 0 LL LL F- F- 0 In ►- F- 4-004 N N N N N N N N N N N N t Lft N O O O O O O O O O O O O O Q O ch U) w v) U) U) cn U) (n U) co v> cn W LL LL LL LL LL LL LL LL LL LL LL LL U- W W n Q n Q n Q n Q n Q Q n Q Q Q Q Q Q Q rn Z rn Z rn Z Z rn Z Z m Z Z Z Z Z Z Z g W N N N N N N N N N N N N N (n fn fn w In (n 'r'�LG fn (n (n In !n fn (/j C6 0 0 0 0 0 o 4 0 0 0 0 0 0 0 0 0 0 0 0 C( 1A�,1 7 C C ( C G O 'C W LLSSC 0 C S O 5 m aD a� T > ° O o ® N� , � m � d o E °o - °0 3 1� • .� c E vE Z' Z' c3 � 0 E E 00 O O 00 7 0 p O O C C O N O O O O y ° O Qo Qo ao o ° 3 03 OF' p °;° p m c a °) m �a c �a c o o CO 00m o o p.D -00 t ;7z t 0 o c 'c m y� ca y� ° `o o BSc �yyc o� c ° ° c °1 ~ p U U 7 c U 7 C O O O N ) , C N c 0 - 7 C L ro Q Q En. E Ea E 0 0 °v moi, iim LL E �i� LL 2 = c �� O>O C C 7 € 0 7 E 0 U L t V N V N m O O) O N r� LL n a o ° c ° m C ° N a) 0 c aii CL mU m �U o a LL x rnm a o. N 0�U �fnU LL N d �� � '- y § y o ° 0) c— O O y y cC 0) LL LL O O 0 C c H y E C p O C y � Q 3 @ m or rn m ° � ° _ :�� c c_ : G; p E 4 E u)E E o Uo S c 0 c: 0 b o a E� E� «? � ca °o 4 E m m m � N C N C C fC N y.O '"" y 0"' C y a y n' O Q E 0 7 E E C p v O•-- m m _> m ° m m <� N@ o ° o E2 Ea w > U O m ti Z a? EO m ° U U c(n ct� U� U~ ' E > > > Q cc''o o m ° c a o o aan 'c �� �� u°, ° D:? a,;? ° o o (a-0o m v t Mam m m m 000 € 00 a��i a�oi a°1i 00 0om2 o2m� °oa oo E E0 N ti 0 z 5N 2 n inU� �U� 3� �W �F- 9F- -2:2 5 D� N � O .�' Z O 2 M M O O C) O O O O O O O 0 0 of., M v v 0 cn cD n n a)w co o X Q fD n N M v ui C,1 lD CO CD a) (p (D (0 (D (D (D (D Co n n n n n Z O O cD cD co ca cD ca c4 cQ co c0 cD cD co cD cp co cfl co cD 2 = 2 = 2 2 2 2 2 2 = 2 2 2 = 2 2 2 y Q r; r; I'L rl� rL r= r= r r; r; r; r= r; v v v v v v v v v v v a v a v v v 0 [r r i 4 E f f i G o) n n n nn n n a n n n n n m O n n n n n n n 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 M LO M 00 W 0 0 0 0 0 0 0 0 0 0 0 0 NO O O O O O O N bq ts O O O O O O O O O O O O O O O O O O O ^ O O O O O O O O OO O O O O O O O O O O 0 N ` N N N N N N N N N O Cl) M Cl) co M M M co M M Cl) Cl) M M Cl) M M Cl) M Cl) U) O ryN N N NN N N N N N N N O O O O OO O O OO O ,,Q �.I N N iz� N N N N N M Cl) M M co M M M M 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O x<A E E E E E SME E E E c E E E c c c ,c c C LE N N N 0 N r N r N O r in in co r O C N V n n N n N n N n N n N n ^N O (O (O N (O (O N E E 9 E .5 E E .E E °') E ro EO- E E `' E E E E =E c C M m M c c E �✓ N oo N N N N �' M .� M r r a C LO00 ? •7 c (b (0 M N M N N M N In 00 t 00 '.N N N Cl) M (O (0 N V U U U U U ILI ❑Ln ❑LO ❑Ln ❑ LO ❑ LON O ff (9 y(D y(O y CO (O M U 0 0 0 0 0 LO o 0 0 0 o O > >1 > ' > > a) > M M N N v v M M v a)LO a)LO a)LO a)LO 0 LO C U O �1 (o U U U U U U U U U U U -i� J(+ J+ -�(+ -�` O Ln Ln to J J J J J J J J J J J `J to LO a) y a) y (D y N y N y N❑_ O ❑ ❑ ❑ ❑ ❑ O ❑ ❑ ❑ O r❑ LO LO y y y y y y y y y 0) N ❑ C� C� U' U' C� U' U' U' U' U' U' f U' Qi d' y LO 2 y N y N _y N N N CC a)LO V F- 2 5 2 2 2 2 2 2 2 2 2 :S U U d n d a d > J + 2 O O O O 04 O O kCV 04 N 0 N N N N N N O 0 rn U) U) Cl) (n w 0 0 0 0 0 0 V) LL LL LL LL LL LL kLL (D (O (D cD cD (b LL C3 Q n Q n Q n Q n Q n Q n :Q n n m m m m m m Q a z m z m z rn z rn Z m Z m ?z rn m m m rn m m m z (� N N N N N N N N N N N rN N N Lit LLJ Lu L 1 LL LL N C/) (n w In U) In U) V) (n (n (q (n F0? Un V) C C C C C C C C CZZ 1- o 0112 0 0 0 0 0 0 0 0 o Eo 0 o <C Q Q Q F- U) o C� EC e> O N p m 0 0 0 0 0 0 OX OX °n m M N 0 (co 3 O X X X X X X X X X FX O a N y d .O p N C y 5 X X X X X XF- 0 0 0 0 0 0 0 0 0 i0 d E cc f- y XO XO o o O O 3 ow 0m X X o 0 0 f$o o € ^~�yy d ❑La) 0 0 0 0r 0r or p p a 0OpaNo 2 nN ym C 6: c) .°o o Cl) F- �O NO O E (Lp U) OwptN0rrr OOOO �O7O O O O O O O c > CO O O O O O ❑ ❑ ❑ ❑O :O EO ca ❑ ❑ ❑ ❑ ❑ ❑ aE S CL L 3ULc Lc Lc Lc Lcc m mUUUcLc Lc N Uy 0 ° Li EN c a in (y C 2 N d N d T LL LL LL L. N [d N O O O Oo U7 , M ❑ O O 0 C LL LL LL LL LL LL m m m m LL LL y d O ❑ 4) N A N ,C E a Q o �`.' 0) m m m m m c C c c m 0) (0 (n ❑ wN, L ❑ ❑ y c c c c c c ctc En 10 c4 �) m C7 UN °00 c�+ N a ❑ V 00 00 E o .y. y y 4 .4 � 7 7 7 7 y I y O N y N E ❑ N y j 'C LL C LL O(� Z a; o 5 > > > > > ; Q m o m 0 0 0 0 0 0 p po po OKO 0U �� o m aEi E m my �RE ate) o n M p E o d v 0 o a 0 0 0 o F m o > 'o >.-o o E a 'v :, m Cs (v m m (o 0 0 0 o m ;m o o m o (v o w m o m o- y o c o, o z �( 5 5 5 5 5 5 5 3 9 -5 CS) fin. 8COL v 5 5 Lm)co C)0'3 =2_ ZM O O N M v LO O N M O L O O O O O O O O O ai 0 0 0 0 0 0 0 0 0 0 0 0 ;0 0 0 0 0 0 0 0 0 C) Is X Q w, r- r- r � Co 0 00 Co m Fm o N M Ln CO n 00 z n n n n n n n n n n n n ,n 00 00 00 00 0o Co Co Co G7 1?Q 0 CO 10 (O (O (O (O T (D OJ (fl ;.(0 19 CO (q (O T (O T (0 3 m = 2 2 2 2 2 5 2 2 2 2 2 2 = = 2 2 2 S 2 2 = y a (� a � vvvvvvvvvvv"vvvv v v vvvvv [• f 4 01 r oo co r r r r r 0 0 r r r r r r r r r •. AN N N N N N N Nr N N N N N N N N N N N 00 N N CF) O O O O�. O Q) (O 00 00 V �. N N N N 6) D7 O Q)i O r r 00 N N Iz r O M ➢ d 0 0 0 010 0 0 0 O O �- O O O O ' a w a S) 8 8 a a' V g v v v 8 c v $ v J Q o 0 0 0 0{ o 0 0 0 0 0 0 0 O O O O O O O O€ O O O O O O O O O O O N N N N N N N N N N N N N N N N N N N O Lf) s In to (O T tT O W O) MQ ry O O OO O _ N N N N N N N C-4 N V M M M M Vim' 'C �! '7 o 0 0 0 0 0 0 0 cs 0 0 0 0 0 0 0 0 0 o wq p..l v O VI E N E E N E r f0 a\ O E C E P r M C M C O t� C M N r N: r N r O r W r O r O I1 O O) N O r N r N r N N (D (D (O (O Lr) (D Cl) I 0 PEA n c c E c E c c c E c E M m E °� N E M N E N ~ C C C ('� ('0 C C C C W y CO C N fD C N V O T � O 6 O O q V' a :. n r 00 � .N- M N � 00 e- N N CO N Lf) O (D M M r" '•�vj N y N N N d N N N N N sIt y N a(D U (.)LU 0UyU 0U <0y..)LO U00? M ( LDLO � 0Ln �LOUyL UO CD L a) >1 >� >� Lo �nuLo U) Ln Ln Ln Ln o o Lo J ) 6 in 5a)Ln JnO O LO (O Ln J LO NN'g N y NN N N N N NNNyy a S U) U) yJ + (n cf) U) USE U) U ma 20- ma 2d 2C 2a 2a nLL �a 04 O N O d O Cl Cl Cl N N N N N N U) O 9 O Z.i U� O O O O O O O O O y" LL CD - (D (D (D co (D CO co (O O ( O O O) m C) O O 0) 0) m (A Z m 9) Z tT rn Z o O D7 O O O W (A O N N N Lh N a CVN N W Lb LL LLl Ll1 di Lb Lu Lu t o 0 0 o o a co Q Q Q Q co Q Q opm m rn E Cl) C C N Cl) N N N y O U) U) > 0 7 v oo zo a ` N E ' E O y N@ 0 p 00 c0 003 m 0 O M� p p O x x E U m o a� Cl) N g co o C7 X N m X X X o o a () y y N N y0 o 0 - - 0 0 o E N .5CL > > y y .� (n N(°° ° a00 co mi N o 3 a rn E E d a o co U N o o E �' - O 0 E Fj m m a c' `o p.y mac O D inxm 0 0O o `o E o x m P-A C 3 L L - 03 O O O LL LL U >- � N Z = Y � o (Dm � 'o co E rlo t5 m o o LL i a o 63 d c aM C5 o a� N is Oo m c o rn o o o c c c coo 000 y D LL w 20 O O LL O.m ;O O O y (� O E y y y y ~O Z co � � o`�� <np ino 0o m U) U5 4 cD 0 m map Q O co O C '� tT O N O y -O C O O 'a 2 N N E '0 O 'O O N N N N N v oV) � 'C1' i� y O C O m O m y m- O O m m m m m 0 0 m O m m m m z (o a• =fix 3c� �� =v'3 3 �� v 3 L Z M C - O O O O O O O O O O O O O O O O O O 3 5 K vu 00 O Oi O N M M 0 LO LD co r- r 00 00 r v � o X Q v co 00 co C3) F) m rn 0) rn 0) m 0) rn m 0) 0) 0) O .N.. O O O O CO (D CD (D O O T 9 T 14 CO T 19 T > m z x x x x x = r x S x x x x x S S x x o 0. C) o 0 0 0 0 0 0 0 0 0 v 0 0 0 0 0 0 [: V p E s' A o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 fD (O O O m m o0 00 m O O m Cl) R m O O r r M M O O O O N N N N N N N N N 00 ro k nizzm m a a a a m m m m m m o m m y W o 0 0 0 0 0 0 0 0 0 o o r wv v v v v v v v v v a v v v v v v rcol 4 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O o o ' 0 0 0 0 0 0 0 0 0 0 0 I N N N N N\ N N N N N N N N N N O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O h� U r� °z f0 W C C C C E E E o c E L. O .' C �" C r C tvOj C trOj C M to O M p o 0 o d � to i0 v i0 v 0 v tri v I] co t0 Co M M M O tT m N m M m N tT CO N E E E c E c c co i`v �o v ao E E E c E 'o o to n to c c C M c U 4= N N N N m 6 v v N � M Cl) n n n n oD N N 00 N n n N N N N w N V) N N N N !� N to a V U s_ Na N LL Na N N Q. y0. Na 3 �. tU N e Q V 5� � � ri Sc ai �S M� c� ri c'S ri c� M c"S >; > C}�yy ry! ytn mtn i� a) + Q + NOS NOtn co NOS N 'n N�� NOS 0 to to to N0 C) OL � coD r O .N N 0 ai 'O 'O y 'O y 'O 'O a7 'o U U M M M M T \ N y C >In yyC_ >In yyC_ >In SSC_ to yyC_ >In yyC_ >l0 2 S U U U U yyC > 2 2 V fin. 2a �J+ �i J+ yJ+ 7 1+ yJ+ SJ t LL LL LL LL LL LL yJ+ LL LL it N N N N O 'L Om m tf m co m O Oi O O LLOO O O O O O O O 0ofOi LL co0) 0) oi rn m 0) Oi O) r-- ZnZ � < C c CC CC C CC CCr ui L Q Q Q Q Q Q ' Q Q 0 0 0 0 0 o Q o 0 C C > > y w 0 0 cm ca m 0 0 € € a a N ; o o .� a N N p p ,i E E C C � � m 7 m m E E E E f N in E o m m o c M Cl) y N EO o '� .C. m m A = C c 0 3 In N ` c c a) a� .0 L m ri o ^Ty > > m p p m c c mcN FL o ` o = L c c E O N O p�OrU o o � cn "n m � m O O r � m 112 co U c0 c0 L r s0 �O a> (_DLL O m LL ED L,) � ; �� ym tin a) z z z z � c C C Q d y O. d i i i C C 0 y o, 0 0 rnE m E LL N u E LLE aD d m m m o a� o o� N N I�iTyl 0 C C m!� O7 O— m— N N N N N' N' C l0 f0 O � in in o �v cc U Sc gc 0 CC"o m m m m m io mia v w U .4 .2 '7 .7 .S N .S w 5 5 5� 5 N V m w >N = fd fn N N N m N H C U co U U 0 H N O 0 O 0 c m c c c o v 6 c u c d m I� Z G m m c to c to E a? y c c d � LL U z to � Q m o m aEi m m3 m3 m t°3 m3 � � O 6 'o -,0_, O O o U) n Cl) O to (n E E E E E E o 0 0 0 a 0 E m o 0 N L «.M -M :.M Ch '=�M '=�M m m m m m m m N 7 C• O O s y0 (6 m m O0., U U 5N 5N 5N f 5 5 U U U U L)Co Uro (na E i Z 00 Z O O O O O N M v LO O O V C Q O O O O O O O O O O O O O O O O O 3 Q O 'ti m O O O N N Cl) co M Cl) M M v LO to X v V m m O O O O O O O O O O O O O O O O > yam. 0 0 0 0 0 0 ` 0 0 0 0 0 0 0 0 0 0 0 CL 4 Z v v v v v v v v v v v v It v IT F E i G G i o, n n n n o o ao w o ao 0 o qo o w C o 0 o C o 0 0 0 0 00 o co 0 0 3 w 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 O 'er nO O O O O O O O O O O O O O O O O O O O O O O O O O O O ^V N N N N N N N NN N N N �V N N N N N N N N N N N N N N N rn rn rn rn o o c0 0 o co 0 o 0 o o m m r- r- u-) 9 Lo � m 0 0 n N N N N OO O O `O O 00 O O O O N N N O 0 0 O O O N N CT k W O O O) v v V o v v v V v v V R v N a N N a N m W 0 0 0 0 0 0 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 O O O O O ea v v v v v v v v a v v v v v v v 0 0 0 0 0 v 0 0 0 �. 0 0 0 0 0 0 0 o 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 l0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N p��I N N N N N N N N N N N N N N N O 0 N N N N v a V v V ry N N N N O O OO O O O O O 66660000 O O O N N N N N N N N N N N N 4 CO 0 CD co NfD c0 co 0 0 co 0 0 c0 CO CO t0 f0 c0 (D <D O O O O O O O O O O O O !O 0 0 0 0 0 0 0 0 0 0 O O J CIS E E E E E E E E E `� E N E E �° E `D E E c E c E c E E c c E f C E c E c E E c E E E �I o m o CO o rn o rn rn o o M ,0 rn o °' iz E .- M o rn o M Al � C M M N N Cl f N M N O N V/ O V' 00 N 00 co ; _ N 00 O t� Cn e� V tK 00 a'K a0 tC N I 1 co N 00 N CD �"' CD to '- I..7 �" CO v n V n N N 9 C N C E E E E E E bo E E c E 00 E c E c E c E c E E c c E 5 E c E �n E E E c E c E M E C A O cA �_ 5 N N O O �_ O N N CO O E CA cn U Cn 00 o co 4= O r- w 00 n cD M (A f U) e- (D O N Cp In — N n N n M � O O In CD M M LO M co LO M O M MU U r d' O O D U 0 0 0 0 U U O O D U U J J CD Ln CD Cn M M 0 C) LO 6A CD CD U U d d o LL LL LL LL U U Q Q LL LL U U k Q Q LL LL S F- 2 2 2 2 0 U U U 2 2 40 N N N N N N N N N N N N N N o 0 0 0 0 ok o 0 0 4 0 0 0 0 Q v) (n d) U): v) (n (n Cl) (n v> (n U)LL LL LL LL LL LL LL LL LL LL LL LL LL U- < Q n Q n Q n Q a n n Q44 n Q n Q n Q n Q n Q n Q n Q n Q rn Z rn Z 9) Z 91Z Z rn rn Z I� Z rn Z rn Z rn Z rn Z rn Z rn Z a.) Z N a N a N N N N N N N N IN N N N N N N N N N N N N N N N y /rRV (n (n (n fn fn (n fn (n fn Ul In W�po In Cn Cn fn Cn Cn (n Cn cn fn (n cQ (Q In Cn C C C C =r.y o 0 0 0 0 0 0 0 0 0 0 o eo 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �./ N Na L nD c c N Ndf w co CL CL 0 0 CL CL R m ® Fm. vc c o> o o a -0 c c c c c .� E d m m m o 0 N N 3 m HCL CL m co 00co 00U c O E E ~ a a) a) a v > ^+ N N 7 7 C C r C C 2 U V cn 0 c c 2 2 g ^I U U = tm of N c c U U C 0 g$ fn Ol N N N NNt� co M (1 CO D_ a 0 o! F CF FC_F N N 7 LL LL 7 7 m m _m CO C C CO 0 C C m m� 3 3 m m � O C Q N N CU Nc C m m 0 w h O O O O O E E E E U U f Q Q U U SS qS N Nm m m U U V y N EE N N (U CU 4 N CU N N N m In V, 00 CD 00 E E m m N d N N m m 3 m m C C"C C C C '� D C C N N Co N N N E E I'- Z p p p p U U Q Q U U (� '-' .�• U C U Q o C o a a 2 ,� rn 'o 0 U U o cn m v p 0 0 0 0 c c c c c c c c c c c c o 'a 'o y o > o > o 0 010 a� ,N w w w w w v o m m m o 0 00 m m mo mo O o ?� c c c c c c c c c c c U U U 5 d 4 U U U v U v Z Z co k N M to O R 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 X ..� to U-) LOn LO Cn C0 C0 00 co W m i O O .- r N cM a �' Cn Cn CO O n 0D C70 C,1 0 0 0 0 0 0 0 0 0 0 0 0 O � n n r n n n n n' '7 n n � r� � n n � n n y > m S S 2 2 2 2 S S S 2 2 2ES 2 2 = 2 2 2 2 = 2 2 2 2 2 2 S y Q O Q Ltd C 0 0 0 0 0 C) 0 0 rIL0 C 0 0 i.0 rIL0 0 0 fl�0 0 is 0 x 0 0 C) 0 n 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0�0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � m o �• a �Y � vvvvvvvvavvvvvvvvvvvvvv v vav v ti ii h 4 r i y 00 00 00 00 00 co co to n n 00 w n n n n n n n n n n r- 0 0 0 0 0 0 0 0 0 0 0 0 "Rt A o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0y N Q N Q N N QN N N ` N C c0 00 M Cl) M M OD 00 (o (n ITO 0 O O) O C) m a O O 0 0 OOO OO Oa- 0) 0 0 0 0 0 O a a aa0) C) mma) m � mmD� m W o 0 0 0 0 0 o Io 0 0 0000000000000 t Q X 0 0 0 0 0 0 00 0000000000 �� 0 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 FC A N N N N N N NV N N N N N N N N N N N N N N N V o o (D o O a0 (DD O u O A A V/ J Q C C C v E E F5 E a E �° E `� E E E N E E i:- E c E (h E E E E c_ E c E � E _c E c E c tY n M � (,bv Lh o M c6E o o' o N o V C n O ON (V oo O O (o = N x c0 x a (D N E n X (o V n N (D N O N N W v 0 (D oQ � J a Fo E Z E Z E a E E E E E E E E A, m E M E M E ro !E c E S E c E c E c E c E c E c �rW O> N O) N > N %C2p N - O � O � fz N a N 0 � 0 � Lo 'o V n .aD V c0 N'" �V N 9 M � (o r to .- (D � '' tt7 � r (o r (n M Cl) O O Lo �tqU U 0 0 0 0 0 0 0 0 0 Q V V (o (o (o (o (o (o O O J J V a a V o oO U U 0 Lo (n (o U U p p U U U U rn 2 2 (i I ti LL. LL LL U U 2 2 2 2 2 2 LL LL Q Q 0 N N N ^N N N N N N N N �i 4 O O i4 O O O O O O O Q Zs (D U) U) <n U) (n cn (n U) cn co L" LL LL LL LL LL LL U. LL U- LL CS n Q n Qn Q n Q n Q n Q n Q n Q n Q n a n Q n G� rn z rn z rn z rn fz rn z rn z CPz T z T z T z rn z rn N N a N �N N N N a N N N N N a N N N N N ui ui vi ui ui 0 0 vi ui vi 0 (6 vi ui ui uS vi ui 0 vi ui ui W, sr.1 0 0 0 0 0 0 0 €0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o O� 01 c r C C rel o o E E M M E E V H o c c N y y N U U O m m (o a N N c c z r f-0 H y U) w C c c F c > > 00 0 V U U U U EiU N N a a d a. a id (no � om rn rn o> o 0 0 m c c c c c c c c c c p p > d N y m c c o Poo a) a) .n Q) a) a) Q) N m C C .0 .0 a d j w > > a m wo CC.0 E E �' �_ ° 0 0 C. 0 (uy x Ol 7 7 O O O O O C k 0 C (mp N LL u) u) O 0 H F- 2 2 r r M- T O m w � N 0 y 0 y R 0 'U U c c > > > > c :S > > E E 5 p Z E E ° � 2 Ew E° E(L ECL 2 5 5 5 m (o'o (a m0 0 m m rn rn m ~O z w �•iaiiaamwm =10=IDU `oU `o y Q m o 5 5 o w v 0 2 0 50 5 &5 m .c (� m c c -o •0 •o -0 c o v o >� n co p 'ato •o 0 0-0 0-0 'o o 'o E0 n t-0 a Z a� Z a� ami ami o o o o 0 y oo 0Dm 0 (a oo N t > (D 4' L m NO m 0 0 0 0 o m o m o m O m O m O. m CL ►: ° z Z C M p N M O O cc,) t. O O C O O O O O O O t0 O O O O O O O O O O O O O O O U $ �-• 00 +� 00 00 O) Qi O O N N M M v v 0 to n n w co m m O Z X Q v V N N N N N N N N N N N N N N N N N N M O O n n n n r n qn n r n n n n n n n r r� n I m 0: ZS 2 2 S 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 y Q O Q Gy w O ti r= !0 0 0 CD r a 0 a 0 0 0 0 0 0 0 0 �v v v v a v v v v v v v v a v v [•� 4 1 6 f, i F 4 4 BEFORE YOU BEGIN • Read these instructions thoroughly BEFORE beginning to install • It is the responsibility of the builder,installer and subcontractors your Marvin window or door product, to ;protect the interior and exterior of windows/doors from ex�essive contact with harsh chemical washes, construction • Regional standard practices, environmental conditions and material contamination and moisture. Damage to glazing, codes may vary. Identify and follow local regulations and hardware, weatherstrip and cladding/wood can occur. Protect standard practices when they exceed the enclosed procedures. with painters tape and/or protective sheathing as required. The responsibility for compliance is yours;the installer,inspector Follow all guidelines regarding material use, preparation, and owner(s). personal safety and disposal. • Plan sizing of rough opening and clearance from exterior Alterations to Marvin products including windowfilms,insulating finishing systems to allow for normal materials shrinkage or or;reflective interior window treatments or additional glazings shifting. (e.g.wood structure with brick veneer; allow adequate can cause excessive heat buildup and/or condensation. This clearance at sill.) Failure to do so can void the Marvin warranty may lead to premature failures not covered under warranty by coverage. Marvin Windows and Doors. • All windows and doors must be properly flashed and/or sealed Wlien preparing to finish the exteriorof wood windows and doors at exterior perimeter. Materials used must meet all codes and be fill all nail holes and staple holes with wood filler. Follow all compatible with building exterior and window/door surfaces. gu delines enclosed (after warranty) and by others (from CAUTION: Marvin Windows and Doors recommends spe- materials used)to prepare and finish. cial care be taken when mulling a transom(s) above the WARNING: Practice safety! Wear safety glasses or Sliding Patio Door. Transom installation may require addi- goggles and appropriate hearing protection when instal- tional support that allows unaffected door operation. Con- lint or performing adjustments to a Marvin window or door tactyour Marvin distributoror dealerfor additional informa- product. tion. WARNING: This door is glazed with safety glass(tempered CAUTION: Vertical sidelites that are directly mulled to the or laminated) and if broken must be replaced with safety Marvin Sliding Patio Door may require additional support glass. This is in accordance with state and federal laws. disit ibutorallows unaffected dooradditional operation.inf rmaContion.act your Marvin disltrlbutor or dealer for additional information. NOTE TO THE INSTALLER AND SUBCONTRACTORS. Always provide a copy of these instructions to the current(or future) building owner. Failure to follow the above recommendations and any other specific warnings,procedures for use,safety recommendations and stan- dard construction practices can result in personal injury,poor product performance, premature failure and unnecessary call backs. Contact your Marvin supplier if you have any questions regarding produ�t and materials used in manufacturing. Before purchasing or applying any product that may affect the installation or performance pf Marvin windows and doors contact the manufacturer of aftermarket product/glazings that are not supplied by Marvin and requ `st written product use, associated warranties and damage coverage. Provide this information and warranties to the end user andr building owner for future reference. Thank you for your time and attention to detail. Questions? Contact your Marvin dealer or visit us at www.marvin.com. INDEX Page YOU WILL NEED TO SUPPLY � Note to the Installer . . . . . . . . . . . . . . . . . . . . . . . . .. . . 1 Safety glasses Drill with 3/16"bit Rough and Masonry Opening Requirements . . . . . . 2 Hearing protection Level 4' - 6' Rough Opening Preparation- Air Barrier . . . . . . . . . 2 Tae measure Hammer Rough Opening Preparation - Building Paper . . . . . 3 S uare Wood shims FJerglass insulation 2' roofing nails Installing the Door .. . . . . . . . . . . .. .. .. . . . . . . . . .. . 4 Inrior trim as desired 16d Casing nails Permanently Securing Door .. . . .. . . . . .. . . . . . . . . . 4 Pl fillips and flat screwdrivers Sealing the Installation- Air Barrier . . . . . . . . . . .. .. 5 #1.D x 3" Phillips flat head sheet metal screws Sealing the Installation- Building Paper . . . . . . .. . . 6 #10 Flat head screw countersink bit Final Sealing Procedures . . . . . . . . . . . . . . . . . . . . . . . 7 APA AFG-01 spec. (or equivalent)sealant/adhesive w/gun Flushing and sealant or adhesive backed flashing tape Installing Operator Panel . . . . . . . . . . . . . . . . . . . . . . . 7 Grede NS Class 25 sealant per ASTM C920.Sealant Adjusting Door Panel . . . . . . . . . . . . . . . . . . . . . . . . . . 7 mast be compatible with building exterior and window/door Installing Jamb Strike Screws . . . . . . . . . . . . . . ... . . 8 surfaces. Adjusting Multi-Point Hooks .. .. .. . . . . .. . . . . .. .. 8 Installing Optional Interior Jamb Extensions . . . ... . 8 N01E: Numbers listed in parentheses()are metric equivalents in m1limeters rounded to the nearest whole number. REPLACEMENT PARTS ATTENTION: Specifications and technical data are subject If replacement parts are needed,please contact your local Marvin to c ange without notice. Windows and Doors dealer IMPORTANT Field applied jamb extensions should be applied before the unit is installed into the rough or masonry opening. OPTIONAL OPERATING PANEL REMOVAL See page 8. ATTENTION:If the operating panel is installed when shipped JAIIIB EXTENSION SHIPMENT from the factory,the installer may find it more convenient to remove prior to Installation, allowing for easier movement If your unit was ordered with optional jamb extensions,they may and placement of the door. be ghipped loose. E Sealant must be Grade NS Class 25 per ASTM C920 and compatible with door priduct and the finished exteriors of the building. 2 Must be APA AFG-01 spec adhesive 1 i 6 f t ArrENTIOA !f cite llcalffy atec"/u1 tber 1t i sed!br buck• IMI DRTANTI The j revlou;3 pt bs 4Wcruclal to abtajrt f0fMUM"'10` tra ble-free installation. It'previous'cdnditi6h9 i4" not rtiat,the t�" '✓ ►+«° + f 4d4 14614o+ r f fuse a '► ins allor must take corrective actions to alter the opening(s) bel re proceeding, For typical wood frame construction it is also esc,ential that the wail sheathing be.a solid surface to ensure that f STANDARD PARTS SHIPPED the unit can be secured firmly to the wall. ILLUSTRATION DESCRIPTION PART/PRO- FILES follUlutng procedures outlFne th® recommended (not to scale) AND COLOR NUMBER Jprepare,;tfine ;�rugiT• penin, 4ty8tJtIG{pJ?'. P icaiiotts using a contiriur�us :fir barrier system. . F'or Nailing fin corner gaskets 11869519 Cil truction app/icatirins using bulOng paperskifr to the section, with instructions. Package of 4 OR gh Opening Preparation-Building Paper", ROUGH OPENING PREPARATION - AIR BARRIER Clad Sliding Patio Door 10830093* 3. When trimming away the air barrier at openings, first cut non-keyed component set horizontally across the entire width ofthe rough opening atthe consisting of interior and E exterior handles with ; head jamb and sill. Then cut vertically in the center of the -I-, escutcheon plates and two opening from sill to head jamb. Finally cut the head jamb #10-32x2" Phillips ovalhead corners diagonally away from the opening.The complete cut machine screws. should be in an "I" fashion. DO NOT cut air barrier diagonally from corner to corner in an "X"fashion.See Satin Taupe illustration 1. 4-1/2"(13)roller adjustment 01060619 and bumper block hole plugs 1 Unfinished71 4-#8 x 3 Panhead screws 11882355 •: iK 4-Bumper Blocks 75151605 `ti► Included with OXXO Door Only 4-Rubber Bumpers 02101000 , Included with OXXO Door Only ' #7 x 5/8"Self Tapping Screw 11830005 Included with OXXO Door Only Package of 25 ; i +!r *Contact your dealer regarding part numbers for specific handle 1 replacement parts 4 Wrap barrier at the sides to the interior and tack in place.Do IMPORTANTI Depending on the door configuration,the oiler- I not tack barrier at head jamb.Fold the head jamb flap up and at"irtig pnel(s nlay ke installed shipped loose. If the panel(s) tack in place or tuck beneath.This will allow the top flap to fit is instafled;tt Isshipped itt file locked position to prevent dam- over the head jamb flashing after installation of the door,See age during shlpp ng andandlfng panels}may be unlocked illustration 2. by,inssrting s� lord sl r l�drl r into t40 actuator slat and rd#ate slat m Izant kb a r rtrcal..urtiockad. 6sition. CheGk8porattng Men ll(s3 forahil7ping btock foCatc d rztthe bat- y<, �sheath ng 'torn,of eachiperstiCl pitej.This mlust be removed before th ,,,,,.. panels)is opened or dosed. Adjust panel by inserting screw driver into roller adjustment doles and rotate until panel rises f *� off the shipping block, ROUGH AND MASONRY OPENING REQUIREMENTS 1. Rough openings (RO) should be 1" (25) wider than the outside measurement of the frame and 1/2" (13) higher. Masonry openings (MO) should be 1/2" wider than the E outside measurement of the frame or casing and 1/4" (6) higher than the outside measurement of the frame or casing. 3 When framing rough opening,care should be taken to ensure the sill plate is level and the opening is square, straight and plumb. 2. Checkthe bottom surface of the opening to ensure it is flat and 2 level. 2 i e V e 5. Apply a continuous bead of sealant'3/4"(19)from the top and sides of the door opening.See illustration 3. 1110 T 11 iVl S 1Ti# i S#N :For units with casing,apply the sealant where, the'casing �r ca ing Mange will contact the; sheathiing, {k , O 9. Apply a continuous bead of silicone sealant 3/4 (19)from the top and sides of the door opening.See illustration 6. NTE ON UNITS WITH CASING:For units with casing,apply thi P sealant where the casing or casing flange will contact the 3 shgathing, 6. Apply a 3/8" (1o) bead of adhesive on the subfloor at the interior and exterior edges of the door opening. Then lay ' another bead approximately 2 1/4"(57)from the interior bead I in a slight wiggle pattern. See illustration 4. Sealant beads should contact the interior and exterior flat portions of the sill as well as the center rib. Proceed to the"Installing the Door" section. s � YV �� 3 3 I�, l�'i�il� I •9'ta •4;' 6 V 10. Apply a 3/8" (10) bead of adhesive on the subfloor at the ! interior and exterior edges of the door opening. Then lay another bead approximately 21/4"(57) from the interior bead 77, in a slight wiggle pattern. See illustration 7. Sealant beads should contact the interior and exterior flat portions of the sill as well as the center rib. Proceed to the "Installing the 4 Door"section. , i ROUGH OPENING PREPARATION - BUILDING PAPER W'Tw,ON Btlll.DlAlC,PAPE?APPLIGA7"IC?NS Apply the main cvrseserriding gaper ei t tl�r hit"s been rr/sta#Ietl: 7. Cut two 13" (330)pieces of Grade"D"building paper 8 1/2" (216) longer than the rough opening height. (Adjust material width for wall thickness. Add 9" (229) to the wall thickness to determine width.) 8. Position the pieces in place overlapping the rough opening by as much as the jamb depth. The wrap should extend above the rough opening by 8 1/2" (216). Tack in place around the edge of the rough opening. Use a utility knife to cut the paper even at the head jamb. Fold to the interior and tack in place. See illustration 5. s 3 f i i p f r INSTALLING THE DOOR IMPIORTANT: The matrix listed below shows the installation 11. Position the factory applied nailing fin upright for installation methods that are recommended for the Clad Sliding Patio Door following the instructions provided. Do not apply nailing fin (CSPD)products.Choose the one that best fits your application corner gaskets at this time. andfollow the steps provided. NOTE: Cornergaskets are shipped in the installation pouch with Product Type Jamb Screw Masonry Clip these instructions. CSPD x x NOTE:If installing utilizing structural masonry clips,install prior to 15. For units utilizing jamb screw installation:Once the unit unit installation.Apply clips to the jambs and head jamb of unit, has been properly shimmed, plumbed and squared fasten minimum oft perside attached with#7X5/8"screws 6"(152)from unit to wood buck/rough opening with #8 wood screws a each corner with all others evenly spaceda maximum of 12'(305) ; minimum of 3" (76) long and have a minimum of 1 1/4" (32) on center(lock leg masonry clip into the nail fin kerf on the unit). penetration into the buck.Screws must be placed a minimum Instructions included with the clips provide further detail. of 1"(25)from each edge of the buck. Place the screws 12. Tip door frame into opening and center it. Temporarily nail 6"(152)from each corner,maximum 12"(305)on center,with upper comers of the nailing fin with a2"roofing nail. Do not drive a minimum of 2 per side. See illustration 11. the nail all the way in. See illustration 8. is - Head jamb nailing Exterior sheathing fin/drip cap € ; I. Jamb nailing fin 2"roofing ` nails 1"Min 1"Min Shims Shims #8X3" #8X3" / Screw Screw 8 EXTERIOR VIEW i 13. Before the sealant/adhesive is allowed to set up,ensure the jambs are straight and plumb(interior/exterior and left/right). The sill must be level and straight,correct as needed. Check diagonal measurements for the entire frame. Adjust as necessary by applying shims to the corners 6"(152)from the sill and head jamb. See illustration 9. NOTE.Proper shimming is extremely important. Undershimming can cause the unit to sag out of square, over shimming will result in bowed jambs and/orhead jamb. Both conditions can contribute �:---i. '#8 Wood screw to improper operation of door panels. 1 M n Shims 11 IlIOTE.'Masonry opening shown. Wood frame construction also applies. Shims 16. ' For units utilizing masonry clip installation: Once the unit Exterior Interiorhas been properly shimmed, plumbed and squared wrap clip to the interior around wood buck and predrill 2,5/32"(4)holes oExterior f Frame. I into masonry clip for screws and fasten with 1 5/8" (41)sheet / Doo and Well rock screws,2 per clip.The screws must be placed no greater / LevelMust be Plumb 6 than 1/4" (s) from the edge of the wood buck with the rough Shims opening a maximum of 1/2" (13) gap at point of attachment. Angle the screws a minimum of 15 degrees towards the thicker / NOTE: Studwall ; part of the buck.See illustration 12. Door and Wall Must be Plumb. Sealant Level Check Diagonal g Measurements INTERIOR VIEW I #7X5/8^ Screw PERMANENTLY SECURING DOOR Masonry Clip 14. Place shims at or near jamb a strike on units with a side jamb Shims lock. Additional shims must be 1 5/Fplaced between those already sheet rock installed,space 12" (305)apart screw (maximum)around side and ough opening head jambs. Recheck to ensure .250 Max the unit is square and jambs are straight.See illustration 10. ,5/8"sheet E _ rock screw Diagonal measurements should i be equal INTERIOR VIEW 250 Max 10 Sealant Shims Rou h #7X5/8" Masonry opening 12 Screw Clip 4 i i i 4 I ,4 t 17. Install a sill nose support block under sill if the existing opening does not extend far enough to support the door sill. Fabricate r!, ,'liP ca Drip, P from treated lumber and attach to underside of sill with construction adhesive. Nail the block to the sheathing to hold it in place.Apply generous amount of sealant along the underside of the sill as shown in illustration 13. i Sealant Sill Carpet Sill Nosing ° Support Block Carpet Corner gasket Treated Plywood Padding 13 18, Locate the center of the oak sill, and, with a 3/16" drill bit, 15 E Sealant ., predrill a hole vertically through the oak sill liner and sill. Countersink hole for the flat head screw. Do not predrill into 22. I Lap vertical strips of self sealing adhesive flashing onto the subfloor. Secure the oak sill liner to the subfloor with a unit or casing and out over the air barrier. Make small cuts at #10 X 3"sheet metal screw. In masonry applications,predrill the head jamb to allow the flashing to fold back onto the a3/16"X3 1/2"deep hole through oak liner and into concrete. € exterior. See illustration 16. Fasten with a 3/16"X 3"concrete anchor.See illustration 14. 3/16X3" #10X3' FH Masonry Sheet metal :anchor screw (` i,iio4� r oaklu 4ed'll9�ii,614 ill Concrete P 9 oak plug tl'' 1/4" 1/4" Counter ink Counter in rr ,ryidyV t1Y5Y�i,, Y�•, `r 1/2"deeper than Subfloor Lap onto' screw penetration unit exterior *S► , Masonry application Wood Frame Construction ' 14 CAl 7°ibN Ubut'100*iil Whip using mG sir rinSIIidi tard'" rlo fll painning. f you ark irWaiting a doorin a rough 16 opening#hatuses SiltGuard to pan the sill,you mustsecure' th4 sill llnet tC the subflo6t at every meeting stile. Follow23. I Install another layer of horizontal adhesive flashing lapping the instructions above for details, onto head jamb of unit and over exterior sheathing. Horizontal flashing at head jamb must extend and cover 19. Finish fastening nailing fin. vertical flashing previously installed at the jambs. NOTE:Shim adjustments are easier if screws are installed just See illustration 17. below the shim stack,not above or through them. p onto IMPORTANT: If the door unit has a transom directly mulled above dap cap DO NOT install screws through the head jamb of the door,fasten the head jamb of the transom. SEALING THE INSTALLATION - AIR BARRIER 20. Finish fastening the nailing fin and apply nailing fin corner gaskets to each corner. Follow instructions on back of gasket. (Units with clad flat casing do not use corner gaskets.) > " IMPORtANT: Nailing fin is not designed to be a A& weatherproof flashing. f 21. If not done already, install a drip cap along the head jamb or head jamb casing. Be sure to apply a bead of sealant'along I the back sides of both vertical and horizontal surfaces of the cap that come in contact with the door, door casing, and/or 17 sheathing.See illustration 15. I f I 5 r t i r '4 24. Fold head jamb air barrier down over the head jamb flashing. 27. i Lap vertical strips of self sealing adhesive flashing onto the Apply seam seal tape over the diagonal cut in air barrier. unit or casing and out over the building paper. Make small Make sure the tape laps onto the unit or casing. Cut 3" (76) cuts at the head jamb to allow the flashing to fold back onto lengths of tape and install every 12"(305)along the head jamb the exterior, See illustration 20. to help keep the flap in place until exterior finish is applied. Tape and seal any seams and fasteners directly above the unit. See illustration 18. Proceed to the "Final Sealing Procedures"section, Seam sill tape r cI: \ 3F ti onto unit exterior z ay' 20 28. Install another layer of adhesive flashing lapping onto head jamb of unit and over sheathing. Horizontal flashing at head 18 E jamb must extend and cover vertical flashing previously Installed at jambs. See illustration 21. SEALING THE INSTALLATION - BUILDING PAPER Lap onto 25. Apply nailing fin corner gaskets to each corner of the nailing drip cap fin. Follow instructions on back of gasket. (Units with clad flat casing do not use corner gaskets.) IMPORTANT: Nailing fin is not designed to be a g<; ..weatherproof flashing, 26. If not done already,install a drip cap along the head jamb or head jamb casing. Be sure to apply a bead of sealant'along the back sides of both vertical and horizontal surfaces of the cap that come in contact with the door, door casing, and/or sheathing. See illustration 19. 21 29 Tuck a double ply layer of building paper beneath previous layers of building paper and adhesive flashing at jambs and staple in place. Overlap the previous course by at least 2"(51). i'Continue installing courses beyond the height of the door unit as shown. See illustration 22. I Corner gasket " Sealant i 19 i z 22 V, 6 E i I 30. Size and cut a double roll of building paper to bridge the N07`E: As required by some building codes,foam type insulation opening between the paper courses atthe sides. This course maybe used to form an infiltration seal. Important,a low expansion should extend past the paper previously installed by at least type foam should be used in combination with fiberglass insulation. 6"(152). See illustration 23. Proceed to the "Final Sealing App from interior against casing/nailing fin back side 1 2" Procedures"section. (25� "-- 1)thick(oras required by code). Follow all instructions and warnings from foam manufacturer. i CAUTION: When using expanding foam insulation it is very Important not to bow the head jamb and/or side jambs of the unit; INSTALLING OPERATING PANELS NOPE: Steps 34 and 35 do not apply for Knocked-Down (KD) dooirs.If installing a 4 panel door,skip to step 38. 34. Remove top bumper. 35. Remove#8 x 1"screws holding operator panel guide.See illustration 25. 36. On all doors:Working from interior,set active panel onto sill track and tilt toward frame.Make sure rollers are on the track. 37. i Install operator panel guide with#8 x 1"screws. Install top bumper. See illustration 25.Proceed to the"Adjusting Door Panel"section. 23 FINAL SEALING PROCEDURES Head Jamb 31. After exterior finish or siding is installed, apply sealant' around the exterior perimeter of the unit frame or casing. As x needed,insert backing material between the frame or casing ae#8 x and the structure to provide a proper sealant joint. Sealant Gpedr for Panel depth must be equal to width between unit and exterior finish Top Bumper material (brick and masonry apply). Always refer to the Block manufacturer's recommendations for proper surface se x t 1/2"screw preparation and application. See illustration 24. Sit rary u { a Sealant 25 ` Operator Panel Tho following steps are for 4 panel Doors f CAUTION: Urge door units may be very heavy and L4 k awkward to handle._It Is important to obtain adequate assistance to avoid Injury when handling the unit. NOBe sure rollers are to the lowest setting. 38. 1 For 4 panel doors:Working from interior,set inactive panel onto sill and tilt toward frame. Make sure rollers are on the r,; l track.Close panel and temporarily engage the flush bolt. 39. F Set active panel into place, making sure rollers are on the track. 24 40. While supporting both panels, disengage the flush bolt on j the inactive panel,and set panel guide into place.Ifthe panel k guide is difficult to insert,the panel rollers may need to be IMi PRTANT:Using improper sealant could result F lowered. »selao ntfailur+3 caust a+r and water lnfylkreiCr, 41 ' Install one#8x 1"screw(package"A"if installing a KD door) y through the predrilled holes in the panel guide and into the head jamb on each side of the operating panels.Open the IMPORTANT. Perimeter sealant must be Grade NS Class 25 per active and inactive panels and install two #8 x 1" screws ASTM C920 and compatible with both the window/door product through the predrilled holes in the panel guide and into head and the finished exterior(s)ofthe building or water and air infiltration jamb. resulting from sealant failure will occur. 42. Install top bumpers with #8 x 1 1/2" pan head screws (package "F" if installing a KD door). See illustration 25. 32. Trim all shim material even with the interior of the structure. Proceed to the"Adjusting Door Panel"section. 33. Fill gaps between frame and rough opening members on interior with fiberglass insulation. Do not pack tightly. F 7 i i I r ADJUSTING DOOR PANEL ADJUSTING MULTI-POINT HOOKS 43. Adjust panel roller assemblies by rotating adjustment screws 47. Adjustthe hooks in or out as needed to engage the lock easily until operator panel is in the lowest position.Then adjust roller and minimize the amount the operator door will move in the assemblies up until door slides easily. See illustration 26. locked position. 1/4 turn clockwise will extend the hooks, 44. Open door 1/4" (s)from the jamb and adjust one roller until counterclockwise will bring the hooks in. See illustration 28. operating panel is parallel to the jamb. Insert wood adjustment hole plugs in bottom rail of panel after all roller Adjustment Screws adjustments are complete. See illustration 26. each hook adjusts individually INTERIOR VIEW Operator panel Jamb 0 1 1/4"Opening i 0 O 0 26 28 f I i INSTALLING OPTIONAL INTERIOR JAMB INSTALLING JAMB STRIKE SCREWS Ekf ENSIONS The following installation procedures are for field applied interior Illji �fAF1''.,[JCS NOT repl I jamb strikesicrew jaml$extensions. =city OXQ'Or O)ft door. 45. Ensure that shims have been properly placed behind the Y4 WILL NEED TO SUPPLY jamb strike between the door jamb and stud wall. See Safety glasses Hammer illustration 27. Philips screwdriver Electric drill 46. Replace the 4 short shipping screws in the jamb strike with Finishing nails or screws of the appropriate length the supplied #8 x 3" panhead screws. See illustration 27. Drill bit of the appropriate dimension for drilling pilot Adjustjamb strike,if necessary,up or down to ensure smooth holes for nails or screws engagement of the jamb lock into the jamb strike. NOTE:Formulled units,jamb extension should be applied around the Perimeter of the assembly (i.e. around door and transom) unlel5s specified otherwise. Shims 48. Attach the flush mounted jamb extensions with either finishing nails or screws of the appropriate length. Be sure Framing Jamb Jamb strike to pilot drill first. Space nails or screws 8" (203)to 10" (254) apart along the length of the head jamb and side jambs. Nail - a8 x 3"screw or screw the corners together using 2"(51)finishing nails or screws. See illustration 29. __J -- -- � Shipping i screw i 27 Heed Jamb/ Head JambJamb Extension I Extension Finishing Nails or Side Jamb Appropriate Length Wood Screws Predrilled Holes 2"Finishing Nai 29 i G 8 E E 4 t E I Window Installation i Structural Installations h 5 i These instructions are applicable for the following Structural installations: Clad Ultimate Double Hung Magnum Wood Ultimate Double Hung Magnum i These instructions are applicable for the following Sltormmus products: Clad Casemasterl Wood Casemasterl Clad Ultimate Double Hung (CUDH)2 Wood Ultimate Double Hung (WUDH)2 Clad Direct Glaze Polygon/Round Top Wood Direct Glaze Polygon/Round Top xz AIiTRAI These instructions advise the Window installer/carpenter/contracto on the recommended way to install Marvin windows where structtara it stal[atio is necessary,including those rated for L se in Impact Zones 2 and 3. Exact installation meth- ods,fQr Irnpact no -'windows are NOT included. Instead, refer 1 o the Notice of Acceptance (see details inside). In addition to sto..psfor Installing.your window,included withinaw.-Rc ugh oponing,(RO)preparation for recessed masonry appiicatioris, prep and ealing devils for standard wood frame construction,detailed fastening method end more The procedul1"11le�rithir►the Ills.rVcion, s Aro consistent with those used,rt.testtng tb achieue the*uertised DP rating. Corita A'ybur fdi Marvin dealer if your cdnstr action scenario differsfrom'tl nse'detailed within. Regional standard practidesi environmentalconditions and coi Jos may vary and supersede the procedures con- talhed within.The responsibility for compliance is yours:the III istaller,inspector,and owner(s). See the Techni- , cal Instalior5,leuiramrrts inside for more details Includes Awning,Operator,Picture 1",Stationary 3/4",Round Top Operator,and Round Top Stationary. 21ncludes Picture,Transom,Round Tops and Polygon MARVIIN Zs i Windows znd Doors 12/21/2005 Made for you:' 19970019 E r I I i Table of Contents Page Technical Installation Requirements ........ .......... ............... ...... ................. 1 BeforeYou Begin ........ ...... .. ............. ....... ...... ... . .. .. . .. . .. .... .... ......... . 2 Installer and Builder Information, Homeowner Information,``;and Aftermarket Products Step One- Rough Opening and Framing Requirements ............. ......................... . 3 Concrete Block with Plywood Buck, Concrete Block with 2�' Buck or Standard Wood Framing Step Two - Unit Preparation ........................... ...................................... 5 Packaging, Shipping Blocks, Jamb Extension, Nailing Fin and Wood Brick Mould Casing Step Three - Installing the Window ..... ..................... ..... .... . .. .. .... ............... 6 Shimming, Plumbing and Squaring i Installation Methods and Fastener Spacing Chart .......i............. ... ............ ......... .. 7 FasteningMethods ..... .......................................... ... ... ..................... 8 Wood Screws/Concrete Anchors, Structural Masonry Clip, Installation Brackets Special Fastening Systems .................................................................. 10 i StormPlus Ultimate Double Hung IZ3 Storm Brackets Step Four- Final Sealing Procedures ................. ......... ... .. . ...... .. ....... ...... 11 .i.. Standard Frame Construction and Recessed Masonry Applications. Continuous Air Barrier Systems ........ .............. ............ .. . . 12 Installation, Integration, and window installation tips for horse wrap and building paper applications Removing Interior Stops, Liners, and Fillers ............................. ..................... 17 Removing Casemaster interior stops, Removing Ultimate Double Hung jamb carriers R RemovingSash ........ ............................. .................... ....... .......... 18 Ultimate Double Hung and Casemaster Operators StormPlus IZ4 Notice of Acceptance Information ....... .. ... ... . .. .. ... . ... ... . .. ... ... ..... 19 Warranty Painting and Staining Information Technical • Requirements The following details are required for proper installation and for the unit to meet the advertised design pressure (DP)rating. • Rough openings must be no more than 1"(25)wider than • All fasteners penetrating chemically treated lumber must the outside measurement of the frame and 1/2" (13) be a minimum of 0.90 oz./ft2 zinc hot dipped galvanized or higher at all points of attachment. stainless steel type 304 or 316. • If using less than a nominal 2" x buck in masonry • The window frame must not come into direct contact with openings; the rough opening must be no more than chemically treated lumber or plywood. Marvin 1/2"(13) wider and 1/4"(6) taller than the outside recommends the use of a rigid panning, self sealing measurement of the frame. Installation methods are membrane, or galvanized metal pan flashing at the sill to limited to Jamb Screw method using 3/16" concrete aht as a barrier between the window and masonry or screws. tr@ated lumber/plywood buck or framing. i • All openings must be at least 1/4"(6)minimum wider and Ail windows and doors must be properly flashed and/or 1/8"(3)minimum higher than the outside measurement of s4aled at the exterior perimeter. Flashing and sealing the frame or casing to provide a proper shim space materials must meet all building codes and be compatible between framing and window. with the building exterior and window surfaces. • Be aware that use of rigid sill pans and other barriers Fpr installations in typical wood frame construction (with will decrease the rough opening height clearance. sheathing and building paper or air barrier material)where Adjust opening dimensions accordingly. a[continuous air barrier system is used, refer to ASTM EP112-01 or reference the "Continuous Air Barrier • Marvin recommends the use of sloped sills on all concrete Systems" section for details on preparing the rough openings (either pre-cast or poured). o0ening and sealing the installation. • Regarding recessed masonry openings: the window Fpr installations in concrete block, or masonry frame must not come in direct contact with construction,etc.,follow local codes for sealing and water masonry/concrete/concrete block. Construct framing management details. from treated lumber or plywood and fasten tothe masonry opening jambs, header, and sill. This framing must be S imsare required between the window frame and framing designed (and anchored to the opening) properly to members at all locking points and at every point of withstand certified and advertised DP ratings for your attachment (excluding nailing fin and brick mould casing) particular unit. as well as at all points detailed within these instructions. • DO not use chemically treated products for shim material. 1 k I i i If r Before YouBegin Installer and Builder Information i • Read these instructions thoroughly BEFORE beginning to It G is the responsibility of the builder, installer and install your Marvin window product. subcontractors to protect the interior and exterior of Always provide a copy of these instructions for the current wl dows or doors from excessive contact with harsh • Al futureprovide owner, chemical washes,construction material contamination and building moisture. Damage to glazing, hardware,weatherstrip and • Plan sizing of rough opening and clearance from exterior cladding/wood can occur.Protect with painters tape and/or finishing systems to allow for normal materials shrinkage or protective sheathing as required. Follow all guidelines shifting (e.g. wood structure with brick veneer, allow retarding material use, preparation, personal safety and adequate clearance at sill). Failure to do so can void the disposal. Marvin warranty coverage. Rifer to the enclosed painting and staining instructions on • Refer to the Technical Installation Requirements section thi last page for exterior and interior finish instructions. for technical specifications regarding the installation of this Contact T your Marvin supplier if you have any questions product. These installation requirements as well as the rearding product and materials used in manufacturing or details in this section must be followed to achieve the q estions on replacement parts. advertised design pressure(DP) rating of this product. I Aftermarket Products Alterations to Marvin products including window films, insulating or reflective interior window treatments or additional glazings can cause excessive heat buildup and/or condensation.They may lead to premature failures not covered under warranty by Marvin Windows and Doors. Before purchasing or applying any product that may affect the installation or performance of Marvin windows contact the manufacturer of aftermarket prod uct/glazings that are not supplied by-Marvin and request written product use, associated warranties and damage coverage. Provide this information and warranties to the end user and/or building owner for future reference. Hazard Notations Please familiarize yourself with the following hazard notations used throughout this instruction. Icon Description Usage Caution Mistakes or mipuse could cause damage to the window or result in faulty installation and unit performance. Warning Mistakes or misuse could result in personal injury and/or severe damagle to unit, equipment, and/or structure. Seek Help from anolther individual is necessary to perform this task Assistance safely and correctly. Tips/Hints Information on alternative procedures,definitions,helpful hints. You Will Need to Supply Standard Parts Shipped Safety glasses Hearing protection U+s are sent with hardware; clad units are sent with Level Square four (4) nailing fin corner gaskets. Follow installation Hammer Wood shims instructions included with part if applicable. UDHM Fiberglass insulation Tape measure unfits are sent with a fastening package and supple- Perimeter sealants m 'ntal installation instructions. Backing material (foam backing rod) NOTE: Depending on the installation method, other Low expansion foam insulation2 makrial may be needed to properly prepare and seal Appropriate fastener (see fastener chart) the installation such as self sealing adhesive mem- Construction adhesive3 braJe, building paper, and seam seal tape, etc. NOTE: Numbers listed in parentheses O are metric WARNING: Always practice safetyl equivalents in millimeters rounded to the nearest whole Wear the appropriate eye,ear and hand number. protection, especially when working ith p ►wer tpois - 1Sealant must be Grade NS Class 25 per ASTM C920 and compatible with building exterior and window surface. 20ptional,use low expansion foam insulation only.Foam and foam application must comply with ASTM 2112,section 5.9.2. 3APA rated AFG-01 spec 2 i f i I f Step 1 : Rough Opening and Framing Requirements This section gives requirements for framing and rough openind clearances. Masonry or concrete openings must be lined with a treated wood product(wood buck).You must fast n the buck to the masonry opening in a fashion that will withstand conditions which would be encountered under the certified and advertised DP ratings for this window. The structural integrity of this installation is only as good as ire bond between the wood buck and the masonry opening. For more details, contact your Marvin representativ4. NOTE. Wood buck material thickness may vary. Illustrations show a 1/2"plywood and 2 x 4 buck. Installations using materialless than 2"nominal material must use the jamb screw method of attachment and use 3/16"concrete anchors. i Construction adhesive (a) Adhesive flashing Masonry anchor 1/2"treated plywood (b) (C) k t Figure 1: Preparing openings for concrete block openings. 1. On concrete block,masonry,or similar situations,line NOTE. If your installation requires screwing through the sides, head jamb, and sill with treated lumber. th$sill for structural purposes,place a bead of sealant Attach the lumber to the masonry opening with where the screws will penetrate the rigid sill panning. construction adhesive and masonry anchors which should penetrate the masonry opening by at least 4. The window frame must not come in contact with 1"-1 1/2" (25-38). See figurel a and 1 b. treated lumber. If you will not be using rigid panning for shimming at the sill, apply a barrier such as a self 2. For standard wood frame construction, prepare the Esealing adhesive flashing to the rough opening sill. opening following local codes,ASTM E2112-1,orfol- See figure 1 c. low the steps in the "Continuous Air Barrier Sys- tems" section. 3. If rigid panning is used, place a bead of silicone or construction adhesive over any fasteners used to hold the panning to the sill. i i 3 i i F i i E i i f t s i 6 u�jj`a'yam I i Step 1 : Rough Opening and Framing Requirements (cont.) f Rough Opening Masonry Opening Figure 2: Preparing openings for concrete block openings. 5. Rough openingsl (RO)should be 1"(25)wider than the outside measurement of the frame and 1/2" (13) Na higher. Masonry openings(MO)should be 1/2"(13) wider than the outside measurement of the frame or casing and 1/4,,(6)higher than the outside measure- ment of the frame or casing. When framing rough opening,care should be taken to ensure the sill plate 1i2„ is level and the opening is square,straight and plumb. See figure 2. " ATTENTION: Be aware that use of rigid sill pans and other barriers will decrease the rough opening height clearance.Adjust opening dimensions accordingly. G`t1T10N1 if the Orevious conditions are n t milt,tlot must take corrective �i' he Vista,in$tci:ait�r tib o alliin, before �r edi� tt oA100 � n is .# a the s e lthini ; Iehd thw�i(i �Q alfe�td srlsiire`trit: MOTE:On standard wood frame construction with the unit cs�t t�e, ectred>P,Arm to wall. Prick veneer, make sure there is at least 1/2"II3i between bottom of window sill (or eventual placement of the window) and the top row of brick to avoid"brick bind". i 4 r 'Rough opening gap must be no more than 1/4"for products certified for use in IZ4 regions. 4 w i t II t v r f E , Step 2: Unit Preparation 1. Remove the protective packaging from the unit and dispose/recycle properly. Inspect unit for any hidden damage and report immediately to Custamersru your Marvin representative. Provide the cus- tomer service number etched on one of the top . corners of the glass. See figure 3. 2. Remove any shipping clips unless noted other- wise. NOTE: For units not installed with jamb screws, it is not recommended that you remove the vinyl shipping blocks from jambs or shipping tube as- semblyon Ultimate Double Hung units until instal- lation is complete. 3. If used on clad units,position the factory applied nailing fin/drip cap in the upright position. See figure 4. 4. On wood units with brick mould casing, apply Figure a: sealant at the casing to frame joint along the jambs and head jamb, at the sill horn to casing joint,and at the miter corners of the casing,See I figure 5. 5. If you are installing a window with installation r brackets or structural masonry clips, fasten to the window now.Follow the fastener spacing in the "Installation Methods and Fastener k m Spacing Chart". Follow the instructions pro- vided with the brackets for details on how to fas- ten to unit. Ultimate Double Hung Magnum units are sent with supplemental instructions which detail how to remove the sash and jamb fillers. Figure 4: OAend nailing fin. 6. If you will be fastening with screws through the jambs, head jambs, and sill, remove your sash and covers or liners at this time. Refer to the section, "Removing Interior Stops, Liners, and Fillers"and"Removing Sash"for details. �. 7. Install jamb extension before installing the win- dow in the rough or masonry opening.Follow in- structions provided with the jamb extension. tt:. a Figure 5: Apply back-caulking to BMC. i 5 i i E f f 4 Step 3: • • the Window The following steps provide details for structural fastening oft the window to the opening.When installing windows with nailing fin or wood brick mould casing, it may be desirable to first attach the window using these fastening methods in conjunction with steps 1-5. Then complete the in tallation by fastening with structural masonry clips, installation brackets,or screws.Always follow fastener spacing and allowable methods outlined in the"Installation Methods" and "Fastener Spacing Chart" sections. On applicable construction using a continuous air barrier system,prepare the opening before installing the window.Refel to the"Continuous Air Barrier Systems"section for details. r 3 Measure f �,,,,= r diagonally `, for square (a) (b) f (c) r Figure 6: Plumb and square unit.(Illustration shows both masonry clip and jamb screw installation.) i Sok "A' Iot�nce: Some urge, windows 5. Ij asten and shim about 4"(102)from the top to square e" the unit in the opening.Take diagonal measurements end/er assemblres are very heavy. Avoid P 9 9 Injury by gettlrig liejp'to lift and position the f the window. When equal, the window is square in window into the rough opening, a opening.Adjust the shims and fasteners until the Onit is square in the opening. See figure 6b. 1. If rigid sill pan is not used,pan sill with alternate meth- CAUTION. Proper shimming is extremely) ods or shim under window sill to ensure it does not important Under sh)lxttliing: or over- come in direct contact with treated lumber. h1tIrniinrili result Inowed�almbslnd 2. On some larger units such as the Ultimate Double �? headamb.=i3cl(th::,cnoitions;can �anfbie to Hung Magnum, it may be necessary to remove the i rope7,WInc,, Woperation and performance. sash prior to installation. See the sash removal sec- tion for details. Installation Tip: On operating units, one method to ensure that the unit is installed 3. Center the window in the opening. Level at the sill square is to check the reveal(gap)between the and plumb the frame (interior/exterior) to desired operating sash and the frame.An even reveal around depth. the entire sash generally indicates a correctly 4. Fasten and shim the jambs at the bottom with the ap- intalled unit and will ensure smooth operation. propriate fastener(follow instructions in the"Fasten- I ing Methods" section). See figure 6a. Ultimate 6. Complete shimming and fastening at locations and Double Hung Magnum are sent with supplemental spacing specified in the"Installation Methods and instructions that explain how to fasten through the Fastener Spacing Chart". See figure 6c. jamb and head jamb. 7. Recheck the diagonals one more time to make sure NOTE: Some units such as the Ultimate Double Hung the unit is square in the opening.Adjust fasteners as Magnum and 123 Ultimate Double Hung,feature unique ecessary to bring to square. fastening systems.Forthese windows referto the`Spe- cial Fastening Systems"section for details. 8• Once the unit is installed square and plumb,operate the sash(on operable units)to make sure it is operat- ng properly.If not,you may have to make some addi- ional adjustments to the shims and fasteners. 9. If removed, replace your stops, covers, and liners. 6 f i f t r Installation • • • • Fastener • • • Chart I stallatfon Method Wood BMC/Flat Product Casing 3 Screws StormPlus Fastener StormPlus pastener Jamb SIII Impact Impact Fastener Fastener Zones Method Zones Method Length Length CCM Awning „ a' 2,3 E,F 3" 2" P CCMO orator3 F 2,3 E,F 3" 2" CCM Round Top Operator CCM Picture 1" x ( +2,3 E,F 3" 2" CCM Picture Round Top 1' 1 `' g 3 E,F 3" 2" CCM Stationary 3/4" 2,3 E,F 3" 2" CCM Round Top Stationary 3/4" 3 E,F 3" 2" CDG Polygon 2,3 E,F* 3" 3" CDG Round Top2,3 E,F* 3" 3" CUDH ; 3" 2,3 E 21/2" N/A CUDH Picture 2' w £ j zs 2,3 E.H 21/2" N/A CUDH Transom 1 5/8" Y�e ,, „4 ,� 2,3 E,H 2 1/2" N/A /,.. CUDH RT/PolygonNUNN 3 E 21/2' N/A CUDH Magnum N/A I Supplied N/A CUDH Magnum Picture/Transom N/A I Supplied N/A WCM Awning NAM 2,3 B,C,F , 2,3 E,F 3" 3 1/2" WCM Operator 2,3 B,C,F f 2,3 E,F 3" 31/2- WCM 1/2"WCM Round Top Operator3 B,0 F 2,3 E,F 3" 31/2' WCM Picture 1' 2,3 B,C,F t t ',!: 2,3 E,F 3" 3 1/2" WCM Stationary 314' >? �E "':2,3 B,C,F ( F =1!. 2.3 E,F !3" 3 1/2" WCM Round Top Stationary 1" 3 B,C,F A k r,.. 2,3 E,F WDG Polygon/Round Top 2,3 B,C,G WUDH 2,3 B.C WUDH Picture/Transom 2,3 B.C WUDH Picture/Transom RT(Polygon WUDH MagnumA n k N/A Supplied N/A WUDH Magnum Picture ,c'3 Nn t1 �. : N/A I Supplied N/A NOTE.Units with clad brick mould casing or clad flat casing must be installed using woor screws or masonry clips. *Sill screws required on all sizes.Use appropriate fastener length from table above and requirements in detail"F". **StormPlus UDH IM products have two storm brackets attached to each jamb.Installations using masonry brackets must have the storm brackets fastened to the RO with two#8x2 1/2"screws. N/A:Not applicable. IMPORTANT: Shims must be placed behind or above all fasteners between the window frame and rough opening. Fastener Methods A. Attach nailing fin with 2"roofing nails no more than 8"from eagh corner and spaced no more than 8"on center around the entire perimeter. i B. Attach BMC with 16d casing nails 2"from each corner on all Sides and spaced no more than 10"on center around the entire perimeter. C. Attach installation brackets to rough opening framing with one 1 5/8"sheetrock screw 6"from each corner and 12" apart on center at head jambs and jambs. D. Attach masonry clips to rough opening framing with two 1 5/8"{sheetrock screws 5"from each corner on all sides and 12"apart on center around the entire perimeter.Angle screws 15 degrees toward the center thickness of the wood buck, E. Attach to rough opening framing with#8 wood screws 6"fro k each corner and spaced 12"on center. Screws must penetrate at least 1"from each edge of wood framing at a dePth of no less than 1 1/4". F. On units 28"or wider,attach frame sill to rough opening fram' g with a#8 wood screw 5"from each corner and 15" apart on center.Screws must penetrate at least 1"from each edge of wood framing at a depth of no less than 1 1/4" G. Attach sills to rough opening framing with a#8 wood screw 6"from each corner and 12"apart on center.Screws must penetrate at least 1"from each edge of wood framing at a depth° of no less than 1 1/4". H. Attach three masonry clips on both jambs within 6"of the bom corner. I. Attach through all pre-drilled holes in jamb and head jamb. 7 I i i 4 f i k k I l I FasteningMethods Although structural installations may involve fastening with nailing fin or wood brick mould casing, there are three ways to fasten your jambs to the opening for structural purposes. #8 Wood screws (or 3/16" concrete anchors), installation brackets,or structural masonry clips.Refertothe"Installation Methods and Fastener Spacing Chart" for proper fastening requirements for your particular product. Illustrations show a concrete block opening but apply to typical wood frame construction as well. Nailing Fin or Wood BMC 1. Fasten units using nailing fin to buck or rough open- ing framing using 2" (51) galvanized roofing nails. Use the pre-punched holes in the fin and space at the range specified in the "Installation Methods and Fastener Spacing Chart". See figure 7. rpt E � s sS w r FigNre 8 Masonry Clips/Installation Brackets 1. Pepending on construction method or wall type,you imay need to modify the structural masonry clip to fit the opening.Once bent around the framing or open- ing, drill two 5/32" (5) holes in the bracket no more than 1/4" (6)from the edge of the framing. See 'figure 9. Shim Vis. Figure 7 5/32"holes 2. Fasten units using wood brick mould casing with 16d casing nails spaced at the range specified in the Screws "Installation Methods and Fastener Spacing Chart". See figure 8. r Figure 9 2. Similar to masonry clips, you may need to modify ,your installation brackets for proper fastening. 3.:Once your brackets or clips have been wrapped around the framing/buck/opening,fasten with two #8 x 1 5/8"screws.Angle the screws approximately i15 degrees away from the window. Always shim „above or behind installation brackets. 8 i i i F �4 i I i Fastening Methods (cont.) Jamb/Sill Screws t 1. After removing covers or liners, fasten units to the 3. On Ultimate Double Hung units,locate the screw in framing with #8 wood screws or 3/16" concrete an- the jamb carrier kerf Qambs) and in the kerf used to chorsl. Adjust length of fastener so that it penetrates hold the parting stop (head jamb). Make sure to no less than 1 1/4" (32) into framing/opening.When countersink the screw so that it doesn't interfere with fastening through the sill, always pre-drill and fill Installation of the jamb liner and/or parting stop.See hole with sealant before driving the screw. Always figure 11. place a shim behind or above the screw location on jambs and head jambs. NOTE: When using masonry anchors, be sure to follow manufacturer's guidelines for proper installation. Some types require pre-drilling. I F " 2. On Casemaster units, position the screw so that it misses any operating hardware (if applicable). With typical installations,you should be able to locate the screw in the center groove in the frame and just to the exterior of the kerfthat holds the head jamb stop,See I figure 10. " a I� Fast ner Figure 11:Exterior View,fastening through UDH frames. 4. On IZ3 Ultimate Double Hung units, fasten through ' - - tle"Storm Brackets"on the jambs with two#8x21/2" (04) wood screws through the top bracket and one `crew through the bottom bracket.See the"Special astening Systems" section for more details. fkf f Fastene I i i I i Figure 10: Exterior view,fastening through Casemaster frames. 'Use concrete anchors when wood buck material is less than 2"nominal thi4ness. 9 i i k i 'r i (l i " E I f 4 Special Fastening Systems StormPlus Ultimate Double Hung IM Storm Brackets sin (a) (d) (e) i Er f, III � �9I (b) (c) (f) Figure 12: Fastening UDH Storm Brackets, 1. Ultimate Double Hung IM units have two storm 5. extend storm brackets attached to each jamb. If you are using brackets during the jamb screw method for installation you will no- Inclement tice these when you remove the clad and wood fill- Weather by fin- ers. If you are using the masonry bracket method, Serting a stick you must first remove the check rail dust block and pin, nail, or pen pull out the bottom part of the top jamb weather hrough the hole strip as well as remove the bottom sash stay. See n the bracket, figures 12a and 12b Then slide the 2. Push the clad jamb filler up as far as it will go to re- bracket away veal the predrilled hole in the jamb carrier. Fasten from the window the jambs through the storm bracket by driving one frame as shown of the #8 x 2 1/2" screws through the pre-drilled In figure 13. hole in the jamb. See figure 12c. Figure 13: Using storm brackets 3. Press the top jamb weatherstrip back into place. Slide the bottom jamb filler down as far as it will go. WARNING: IM storm protection for ` Fasten the jamb through the storm bracket by driv- CUDH operators requires that storm ing two of the#8 x 2 1/2" screws through the pre- brackets be put In the extended position. drilled holes in the jamb. See figure 12d. tif, heho�meowner'will be away from homefor'any 4. Slide the bottom jamb filler backup until it touches d of time in which strong winds are pos- the jamb weatherstrip.Replace the check rail dust It is t ecor tih ended that the stoc ets; block and the bottom sash stay. See figures 12e lled pt ttfte ex#+ nded dorm rand 12f. eforteavn home. i 10 i I b I� �i StepFinalInstallation E This section does not include details on sealing installations thiat incorporate a continuous air barrier system such as house wrap or building paper in standard wood frame construction. For flashing details in this application refer to the section, "Continuous Air Barrier Systems - Flashino the Installation". Backer rod Sealant 44tk I k (a) (b) (o) Figure 14: Sealing recessed masonry openings 1. Place a bead of sealant at the wood buck to masonry 3'i In some situations such as recessed masonry joint. See figure 14a. E openings, you can use frame expander or other 2. For recessed masonry applications, Marvin recom- clad accessories to finish the exterior. If this is the mends sealing at the buck to frame joint with ap- case,apply a bead of sealant between the acces- propriate width backer rod and sealant around the en- € sory and the masonry at the head jamb and jamb tire perimeter. Finish as applicable local code dic- sections. Leave the sill portion unsealed to allow tates. See figure 14b. water to escape. See figure 14c. E I 6 Low "i I s R I� expansion foam f Z !Fiberglass dinsulation Figure 15: Insulating the rough opening i 4. Apply a 1"-2" (25-51) thick bead of low expansion 5 Interior and mullion trim:Install mullion trim after foam insulation on the back side of the nailing fin, interior trim or casing is applied. On Ultimate brick mould casing or other trim. Do not apply too Double Hung units, be sure to use nails and sta- much as itis possible to bowthejambs.Now insulate ples that are no longer than 3/4"(19).Place fasten- loosely around the window with fiberglass insula- I ers at least 1" (25) from the edge of interior jamb tion. See figure 15. liner. 11 i I K E Ik 4 f t l i Continuous Barrier Opening The following section shows the recommended rough opening preparation for both air barrier and building paper scenarios where a flanged, rigid sill pan is used. Refer to the,'Rough Opening Preparation-Alternative Method" section if you do not use a rigid sill pan.Refer to ASTM E2112-1 lot the other situations not covered in this document. Air Barrier Applications r' s v. ' 1 D r &k ; . a.. r 7 sam Sealant type, ; 6" V ¢ i si kM :20",P (a) (b) (c) (d) Figure 16: Rough opening preparation for construction methods usingpa continuous air barrier system and rigid sill panning. 1. Trim air barrier across top of head jamb. Trim up 3. un a bead of sealant approximately 3/4" (19) from from the bottom corners about 2" (51) (or half the t ie edge of the opening.Start the bead about 6"(152) height of the panning flange)and then make an addi- L ip from the sill (or the height of the sill panning).See tional horizontal cut about 2 1/2" (64) wide (or the f gure 16b. width of the panning flange).From the horizontal cut, 4. 11ostall rigid sill panning following manufacturer's in- make two 45 degree cuts toward the center.Cut ver- Otructions. Wrap side flaps to the interior and tack in tically from the head jamb to where the two 45s lace. Seal the horizontal cut in the air barrier with meet. See figure 16a. eam seal tape. See figure 16c. 2. Flip top flap up and tack in place temporarily.Fold sill 5. Apply a continuous bead of sealant 3/4"(19)from top portion to the interior and tack in place. The side and sides of window opening(or where casing or cas- flaps should be loose until rigid panning is installed. See figure 16b. iog flange will contact the structure). Do not apply sealant to RO bottom. See figure 16d. ATTENTION: Be aware that use of rigid sill pans and other barriers will decrease the rough opening height clearance.Adjust opening dimensions accordingly. r 12 i i i I 'y BuildingPaper Applications ! p pp Perimeter sealant sI E 12„ E I i k I 1 (a) (b) (c) (d) (e) 6 Figure 17: Rough opening preparation for construction methods using Building paper and rigid sill panning. I 1. Cut a 9" (229) wide strip of Grade D building paper 4. ut a 13" (330) piece of Grade D building paper approximately 24" (610) longer than the window 4" (610) longer than the RO height (adjust width for rough opening width. Center the strip even with the j mb depth).Tack the pieces in place,overlapping the bottom of the RO and staple along the top edge only. O by as much as the jamb depth. Use a utility knife See figure 17a. t cut the paper even at the head jamb and sill. Fold 2. Run a bead of sealant approximately 3/4" (19) from j mb flaps to the interior and tack in place.See figure the edge of the opening.Start the bead about 6"(152) 17d. up from the sill (or the height of the sill panning).See 5. �pply a continuous bead of sealant 3/4" (19)from the figure 17b. top and sides of window opening. Do not apply seal- 3. Install rigid sill panning following manufacturer's in- Pning to RO bottom. Seal any fasteners used to attach structions. See figure 17c. to the sill. See figure 17e. i i i i k t 4 x i i i 6 r t t i i 4 f 4 13 f x i 4 r t S i I s I i p€ i r I I tF 4 (I I Continuous Barrier Systems - Preparing Opening, Alternate Method This section is intended for use when a rigid sill pan will not be used. If your construction scenario is not represented here, refer to local building codes for the appropriate method. Air Barrier Applications flexible membrane Staple corners 0,1110 33 4„ q pp ,f 4a i Jr � h.•y � � E � S E r Apply Iry f sealant 3/4" I from edge of RO corners. (a) (b) (c) Figure 18: Rough opening preparation for construction methods using q continuous air barrier system. 1. Trim air barrier across top of head jamb and make 45 3.IPan the sill with flexible membrane. The piece degree cuts up from the sill.Connect the two vertical- should ride up the sides about 4" (102)on each side. ly. Make cuts away from top corners at 45 degrees. ,See figure 18c. See Figure 18a. 4. Apply a continuous bead of sealant 3/4"(19)from top 2. Wrap barrier to interior and tack in place. Flip top flap and sides of window opening (or where the casing up and tack in place temporarily. See figure 18b, !or casing flange will contact the structure). Do not japply sealant to RO bottom. See figure 18c. Building Paper Applications Apply a continuous bead of sealant at the to and sides of window I before installation of window. C Wall Jamb sheathing E depth a 01 ne 4 !to Staple only at interior, top edge. I iz I Flexible (a) (b) (c) membrane (d) Figure 19: Rough opening preparation for construction methods using Juiiding paper. I t 1. Cut a 9" (229) wide strip of Grade D building paper 3. 'Cut a 13" (330) piece of Grade D building paper 24" approximately 24" (610) longer than the window ,longer than the RO height (adjust width for jamb rough opening width. Center the strip even with the depth).Tack the pieces in place,overlapping the RO bottom of the RO and staple along the top edge only, 1by as much as the jamb depth. Use a utility knife to See figure 19a. scut the paper even at the head jamb and sill, then 2. Pan the sill with flexible membrane. The piece hack in place. See figure 19c. should ride up the sides about 4"on each side. See 4. 'Apply a continuous bead of sealant 3/4"from the top figure 19b. land sides of window opening. Do not apply sealant ,lo RO bottom. See figure 19d. i i 14 E [k[ E i I i t s f 4� E g� {E{ t w t t Continuous BarrierFlashingthe Installation Air Barrier Applications I Seam #r seal tape g i Corner 3 € gasket Fold air Install adhesive barrier membrane at down over head jamb to membrane. cover drip cap and membrane ' ' I at jambs. l Install adhesive f membrane to cover paper and t ( I lap onto windowr Iamb. Dy us c � @t$di (a) (b) (c) i Figure 20:Sealing the installation In air barrier applications. i E s �1ft !l111S` ! fh1`s aeCtiad refer to 3.i Lap vertical strips of self sealing adhesive mem- lttlt3 �mvttl car"flat casing brane onto the unit or casing and out over the air bar- { l an� l iRd if 1� un- ner. Make small cuts at the head jamb to allow the lestrle i membrane to fold back onto the exterior. See figure 20b. 4.1 Install another layer of adhesive membrane lapping IMPORTANT- Nailing fin Is not designed to be a onto head jamb of unit and over sheathing. Mem- weath roof flashing. I brane flashing at head jamb should extend and cov- er flashing membrane previously installed at jambs. !See figure 20b. 1. Apply nailing fin corner gaskets to each corner of the nailing fin. Follow instructions on back of gasket. 5,1 Fold head jamb air barrier down over the head jamb (Units with clad flat casing do not use corner gas- flashing.Apply seam seal tape over the diagonal cut kets.) In air barrier. Make sure the tape laps onto the unit or casing. Tape and seal any seams and fasteners 2. If not completed, install a drip cap along the head directly above the unit. See figure 20c. Proceed to jamb or head jamb casing. Be sure to apply a bead the "Final Sealing Procedures" section. of sealant along the back sides of both vertical and horizontal surfaces of the cap that come in contact E with the window, window casing, and/or sheathing. See figure 20a. 4 I i 15 i i i E I i E Y t I t i I Building Paper Applications Overlap subsequent i I'll �l,�il courses behind paper Pi previously installed at i jamb. j I a $ Tuck bottom double ply layer of building paper under paper at sill. Corner gasket (c) Ih Install a4esive membra at head jamb to c ver drip Install building cap and i iembrane paper over at jambs. window head. Install ad iesive membrar a to cover a "" paper an I lap onto Extend 6"past window j;mb. paper at jambs on either side. (a) (b) (d) Figure 21:Sealing the Installation in building paper applications t stra ions4e; text in this,section refer to' 3. I ap vertical strips of self sealing adhesive membrane ttttt q t tlt Yi% l7c�t,tfbAof'k i�'t+atald casing"tar flat casing, onto the unit or casing and out over the air barrier or f tCCedt res ireiden0calforwindowswithtasingun- building paper. Make small cuts at the head jamb to less where noted. qiIlow the membrane to fold back onto the exterior, $ee figure 21 b. I 4. linstall another layer of adhesive membrane lapping IMPORTANT Nailing fin is not ,designed to be a $nto head jamb of unit and over sheathing. Mem- Weatte tcaof flashi x crane flashing at head jamb should extend and cover ashing membrane previously installed at jambs. 1. Apply nailing fin corner gaskets to each corner of the I ee figure 21 b. nailing fin. Follow instructions on back of gasket. 5. ruck a double ply layer of building paper under the sill (Units with clad flat casing do not use corner gas- lashing.At the jambs,install a double ply roll beneath kets.) tpe jamb flashing overlapping the previous course by 2. If not done already, install a drip cap along the head *t least 2" (51). Continue installing courses beyond jamb or head jamb casing. Be sure to apply a bead iie height of the window unit as shown. See of sealant along the back sides of both vertical and figure 21 c. horizontal surfaces of the cap that come in contact 6. Size and cut a double roll of building paper to bridge with the window, window casing, and/or sheathing. I ie opening between the paper courses at the sides. See figure 21 a. his course should extend past the paper previously installed by at least 6"(152). See figure 21 d. Proceed to the "Final Sealing Procedures" section. i E i i i 1 i t6 I i i r l I i I f i I f f j P E E RemovingInterior • • • Fillers Some structural installations that use the"jamb pinning"method equire the removal of interior stops before installing the window.This section details the removal of Ultimate Double,Hung (UDH)jamb liners and Casemaster operator and stationary stops. More detailed information can be found ih the Marvin Service Manual. Details for UDHM windows can be found in the supplemental instruction sent with the unit. Removing Casemaster Stops and Covers � v h �1k14 I 5 Figure 22:Removing Casemaster stops and covers. 1. Sill and head jamb covers and stops are held in place 2. Operator jamb covers are held in place by two barbs: with avinyl barb and can be easily removed by simply One on the interior side and one on the exterior side and carefully prying up on the stop with a sharp putty phared by the frame weather strip, With the sash knife.Be careful notto damagethe stop orframe.Oc- Opened or removed,first pull the frame weather strip casionally the barb will stay in the frame when you re- ut of the kerf and set aside for reuse later. move the stop. Remove the barb with a pair of pliers 3. �emove the sill and head jamb stops. and reinsert into the kerf on the stop/cover. See fig- ure 22a. 4. With a sharp putty knife, carefully pry on the interior NOTE. Stationaryjamb stops are removed in the same Pide between the stop and the frame.Start at one end fashion. You will need to remove the head jamb and sill end work your way down until stop loosens. See fig- covers first. Nre 22b. i Removing UDH Jamb Liners show ¢ . 4i OCT,� t 4ra� p: (a) (b) (o) ,. (d) (e) Figure 23 1. Remove the head jamb parting stop with use of a pry 3. =From the exterior, pry out the jamb hardware assem- bar. See figure 23a. Ibly using a pry bar by placing it into the bottom filler 2. Use a flatheaded tool with a 90 degree elbow to re- jchannel, hooking it into the notches on the side, and move the lower fillers from the jamb hardware assem- levering it out. See figure 23c. t bly.This is best done by placing the tool into the space 4. When installation of the unit is complete, seat the opened by the removed checkrail pad. Loosen both jamb assembly facing towards the exterior first, and corners of the jamb fillers from the notches before try- lease the remainder of the assembly into the jamb ing to remove them,to reduce the possibility of damage 1pocket. See figures 23d and 23e. Use of a rubber to the fillers.See figure 23b.Be sure to take care when imallet may be required. If so, take the mallet and, doing so,as there is a possibility of the fillers breaking. Istarting at one end, work your way up the filler, until Ifully seated. (Use of a cloth to protect the wood and !keep it clear from direct impact while hammering is i suggested.) 5. IlReinstall the checkrail pads and head jamb part stop. 17 l r i l i i I , i I : l i { i ,' Removing Sash Si i i€A sista 06,Some�aslron large Windows are ry l7ea�ry Avoid Irilury by getti help to lift And pds it�n t i wihdow Into l raugki opening Fo of r,products riot ri0wr ierta re r t AM ri S�rtcrJrivalr donut your Malvin tapr+ sentti Ultimate Double Hung Operator Sash f wr: £'\ 'Jill'1111 (a) (b) (c) (d) Figure 24: Tilting and removing Ultimate Double Hung Sash 's 1. Raise the bottom sash approximately 4" (102). See 3. 4ift both sides of the sash upward 2"-3"(51-76)(rais- figure 24a. i(ig the pivot pins out of each clutch). See figure 24c. 2. Pull the tilt lever (nested in the sash lock base) until 4. Rotate the sash until the pivot pins clear the jambs it clicks. Hold the lever until latches clear the unit and remove the bottom sash from the frame. See fig- frame when tilting. Ease top edge of bottom sash out Ure 24d. toward you to a horizontal position. See figure 24b. 5. lilt and remove the top sash using the same tech- nique used on the bottom sash. (The top sash uses t(It latches located on both sides of the top rail.) Casemaster Operator Sash Hinge Operator tracktrack Pivot shoe a extension (a) Butterfly (b) Hi ge (C) (d) arm clip art Figure 25: Removing Casemaster Operator Sash I NOTE. Sash with daylight openings of less than 141/2" 2. Iiisconnect the butterfly clip on the short extension (368) will use hinged single arm operator gear. Skip to 4m from the stud on the sash bracket.See figure 25b. step 2 for these units. 3. Kush the sash open to 90 degrees.With a screwdriver 1. Crank open sash until the nylon roller on the long ex- oi similar tool, pry the bottom hinge off from the stud tension arm lines up with the arrow on the operator the hinge track. Repeat this on the top hinge. See track. Disconnect the extension arm from the opera- fl ure 25c. tortrack by pushing the roller down through the open- 4. gemove the sash by sliding the entire sash on its ing in line with the arrow. See figure 25a. hinge pivot shoes toward the hinge track studs. The shoes will disengage from the track when they hit the stud. Carefully remove the sash and set aside. See fiOure 25d. R 18 i f i t i 4 { ii { y i i i 4 Ft 4 t I giltormPlusm Notice of - • Exact instructions for installing windows certified for use in Im ct Zone 4 are not included in this publication.The installer/contractor MUST install the window(s) according to d tailed drawings found in the Notice of Acceptance (NOA)to the Product Control Division of the Miami-Dade Couhty Building Code Compliance Office (BCCO).You will be able to find the NOA drawings for each certified product on the Miami-Dade County website (exact URLs listed below), at www.marvin.com, or you may obtain a hard copy by contacting your Marvin representative. f NOA, -URL 01-1031.11 Clad Casemaster Picture http://www.miami ade.gov/buildingcode/library/productcontrol(noa/01103111.pdf 02-0607.01 Clad Casemaster Operating http://www.miami ade.gov/buildingcode/library/producteontrol/noal02060701.pdf 02-0607.03 Clad Awning http://www,miami ade,goy/buildingcode/library,,productcontrol/noa/02060703.pdf 02-0607.04 Clad Casemaster Polygon/RT Picture http:,/www.miami ade,govilbuildingcode;libraryiproductcontrolJnoa/02060704.pdf 054207.04 Clad Casemaster Operator http'!/www,miami ade.gov!buildingcode/library;"productcontrollnoa/05020704.pdf 02-1205.01 Clad Direct Glaze Polygon/Round Top http:ilwww.miami ade.govrbuildingcode'library?producteontrol/noa/02120501.pdf i ti t t t 4 G E j� 6 f k l i4 k f f i k E 7 4 t i (t f M1 I f t 19 4 t t i { t I Z {pi t Cpk F p(t K 1 {4t t E G per R.h? 973 Manufacturer: Marvin Windows&Doors Hwy I I West, PO Box 100 Y`''dl lUt3lr, IVINJU/U.?'"V ilJli Statement of Compliance: The product described below meets section 1714.5.4(Exterior Wit1dow and Door Assernblies: Anchorage Methods) of the 2004 Florida Building Code. k Product Description: Use of drawings 00038421 and 00038563 with FL4939.1,4939.2939.3,4939.4.4939 5,4939.11,4939.12, 4939.13,4939. 4,4939.1.5 E Use of drawing 00038569 with FL4939.6,4939.7,4939.1`1,4939.9,4939.10 Modifications from tested installations. g i Drawings 0003842/ and 00038563: Set all screws fot attaching 14sonry clips to the buck to 1 5/8"sheet rock screws or#8 x 1 '/`z"sheet metal screws, Changed installation to jimb screw and nrasoory clip installation methods for products tested with nail fin and installation brackets. Drawing 00038569:Added fastener for installing directly onto concrete. Technical Documentation: See John Sopkowiak analysis's 4 pages dated 3/8/04. Conformance steps: (1)Review of lab report and installation drawings from third-party testing?. (2) Anchor performance as domonstrated by accepted engineering practices. (3)Designed to transfer desigh loads to rough opening. Installation Requirements: Products must be installed per the drawing specified in 4e'limitations and conditions of use. 4 Limitations and Conditions of Use; r The use of the above drawings is limited to the followin products,sizes and design pressures: Installation Drawing Frame "ire: Design Panel Product Description Number(s) Width x 4eight Pressure Width FFI4939.1 —CSFD 16080 38421 167.000 x 95,500 +30/-30 49.219 Configurations:0,OXXO 38563 1`1_4939 2-- CSFD 9080 421 s Configurations: 0.OX XO, Y838563 421 1 l 1.188 > 95.500 y 40/40 37.219 X00, 0X0,0OX FL4939.3-CSFD SPI?2 6080 38421 r Configurations: 0,OX,XO 38563 72.625 x[95.50(1 +401-10 3`7.219 FL4939.4-CSFD SPIT3 6060 38421 7-2, )25 x95,500 +,55'-65] 37.219 Configurations: 0,OX,XO 38563 i F EWIluation Report IF L4939 l il!xc I of 4 i s i i i i C 6 k 4 yEd 4 f (`t E 4t 4 FL 1931.5-(,SP � 120811 4,? Configurations:O,OX,XO,XOO, 261563 140.750 x 05.500 +35/-35 48.406 FL4939,6-ISFI)8080 OX 38569 06.000 x 9K.500 }40.!-40 47.625 Configurations: OX.,XC) FL4939.7-ISFD 9080 OXO xxst a 109 000 Y ",00 {401-46 ; 67 C:ontgurations: OXO FI.,4939:8-ISFD 9080 X.00 38569 108.000 x 05.500 +40/40 35.625 Configurations:XOO,OOX` FL49399-ISPT)9068 OOX Configurations: OX, XO,XOO, 38569 106.500 x 82.000 +30.'-30 35.625 OOX FL4939.10-ISPI3 9068 OXO 38569 106.500 x 2.000 +30l-30 35.625 Configurations: OXO FL4939,11-WSFD 12080 0X0 38421 Configurations:0,OX,XO,OXO, 38563 146.719 x 15.500 +401-40 49.219 00X,X00 ' FL4939.12-WSFD 12080 OXXO 38421 143.000 x?5.500 -+•401-40 37.219 Configurations:0,OXXO 38563 FL4939.13-WSFD SPI72 6080 38421 72.625 x 5.500 +40(-50 37.219 Configurations:0,OX,XO 38563 FL4939.14-WSFD SPID 6080 38421 Configurations:0,OX,XO 38563 72.625 x 5.500 +551-65 37.219 FL4939.15-WSPI) 12080 I 38421 Configurations:0,OX,XO,OXO, 1.46.750 x V5.500 +35/-35 48.406 OOX,X00 38563 i G i Product Evaluation Report Expiration Date: September 2007 d Certification of Indegendente- I,Stephen D.Fisher,the Professional Engineer performing this e aluation,, have not now nor will l acquire a direct financial interest in manufacturing,distribution,or sale of this prc duct(s)for whichthis report is issued. 1 am an employee of Marvin Lumber and Cedar the parent company of Marvin Windows&Doors. I do not now,nor will I acquire,a financial interest in any other entity involved in the approval process of this product(s). 1 4 € Signed: - Ltau: 1 -1— Evaluated by: d Stephen 1). Fisher.P.E. Advanced Research!ream Leader Marvin Windows&11.)oors t'L-047489 a M a l*Iit# E�@ittrt3t -- 1r1r{t,:wlr�rri�s:a�i� a�r�i G 'rfF#'d `Sr6 '11 + i���altt<tt.ian Report L4c�,�) Nag 2 of i 4 j 2 t4 i t e t € i t t 4 G € f �a f Q xy �, /,4 1 180 I, 02- IA r 4 I« i x d U VI J 3 1 n a4,� roQ x.�u.Q tll� `�' oOmm�OpNM� V �C m4 Nn.�p4Of_1Np [' 1 gac�ac°�aa�bv�^'uai4v,= I a.L..! 1111 . . I . . . . i O iY.tr.(A d�Or tT Of tl+tl�O> �` rnmrna mmmmrnrn ro— �rcvvaaava+-ta wnxWs j �KQ} tt 22 O i�-a � �2iVLJ Y-pJ 'a 23W � � n b{(Kr• V;Y 4.W� w a ' u i i Irl, LIS V; d ia1 F i,7 i-. 3 '0 W im~ a c'zi s ow. n� � . N ,.Z'j W W LJ W Z r' ��.y � S S`�:C 1 1 daau,a hl rnoa� LLL IA /i g E rS n v r. w r it.. — k s d E c w r I t f {d t I 1 d m we ; poC° nv�zv A 1,T ,p ll n I y<� moyo '\ �. hip!! T, 'an nc. rs P MST ,6 _ # r Y i � f f j t 1 i i 7 9 � mumru rcieroeae �"3 �wwuuwuwuw �i i Iewp u.Fmio.ou� t I 11 I t I Op I I o gj' cz ~nSOWr �t�i L �� ! ' !t F�x� � W� A 2� 4l p� '•Wl P W 44i' i Q� 09 YpZ ri r A !'0 6 {n� lLnwi;Lt ��-slnnt r'o n 4 j m Vin r ! I Y 7 �. nn O 2 ZYr ' !Q It �-i f Sm l o iF I I ' ` ► 1 t t I E p� t t E pG t I E G C 1 f W�ItO Vt r� x; f�f �ry E •tT!---tea. .. N f �P E 4 fwd iw� I PRIME 80142885 SM28 PMI B* SSPMSWIAM, OSIN F � H a }AA�Apr �O tS O M Q O t7) 1 Ott OI tT �1 'V T 6# i 3 I a z Q N iE �'.N'^o Jzi D voc7ac�F �"OooaF�' HERE aU A ivm A Qa xI,W r„C� m QNtD NmL A� INN N ZW �. o t� py CAry-.,>y n If n_ . in w c�? Ara re OCZi k�Tr"��'4 2 ' OAR tCj i ry,rii r m a � 1_ ;11'jj ozfR�M � ror=nr p+v'n � y y D, HOW � J n dCgom O n llk moi' tJ g NRYYZM yr.��"I fCff nfDD r f i i h p( 1 1 4 1 l F( t yt F k C I k I Product Evaluation Report per Rule 9B-72, Florida Bt ldiitg Commission Manufacturer: Marvin.Windows&Doors Hwy I I West,:PO Box 100 Warroad,MN 56763-0100 G e Statement of Com_,pllance The product described below meets section 1714.5.4(Exterior*indow and Door Assemblies: Anchorage Methods) of the 2004 Florida Building;Code. Product Description:: Use of drawing 00038120 with FL4765.1,4765,2,4765.3,476 .4,4765.5,4765.6,4765.7,4765.8 Use of drawing 000381`39 with FL4765.9, FL4765.10,FL4765 l 1,FL4765.12,FL4765.13,FL4765.14 Modifications from tested installations: Drawing 00038120:Increased size of roofing nails to 2"for na ling fin installation. Set all screws for attaching masonry clips to the buck to 15/8"sheet rock screws or#8 x 1 2"sheet metal screws. Added jamb screw and masonry clip installation methods to products tested with nail fi only. Drawing 000381393: Set all screws for attaching masonry clip to the buck to 1 5/8"sheet rock screws or#8 x 1 " sheet metal screws. Added jamb screw and masonry clip install '/z installation methods to products tested with BMC nailing only. Technical Documentation- See John Sopkowiak analysis's 4 pages dated 3/8/04. Conformance Steps: (1)Review of lab report an installation drawings from third party testing. (2) Anchor perfonnance asil demonstrated by accepted engineering practices. (3)Designed to transfer deign loads to rougl�.opening. Installation Requirements: Products must be installed per the drawing specified iiI the limitations and conditions of use. Limitations and Conditions of Use: The use of the above drawings is limited to the following products,sizes and design pressures: Installation Frame Size: Design Product Description Drawing Number Width x Height Pressure FIA765.1 -CUDH 3036 00038120 33.375 x 80.375 +40/-40 FL4765,2-CUDH 4026 00038120 45.375 x 60.375 +40/40 FL4765.3-CUDH 4036 00038120 45.375 x 80.375 +30/-30 FL4765.4_-CUDH 1 VPOLY 4026 00038120 45.375 x 67.4375 +40/40 FL4765.5 CUDH RT/POLY 4036 00038120 145.375 x 87.7375 +30/-30 FL4765.6-CUDH SPIZ2 3028 00038120 i 33.375 x 64.375 +40/-50 FL4765.7-CUDH SPIZ2 3232 00038120 ( 37.375 x 72.375 +35/40 FL4765.8-CUDH SPIZ3 3234 00038120 37.375 x 77.375 +551-65 FL4765.9-WUDH 403600038139 45.375 x 81.000 +40/40 FL4765.10-WUDH SPIZ2 3028 00038139_ !"33.375 x 65.000 +40/-50 FL4765.11 -WUDH SPIZ2 3232 00038139 37.375 x 73.000 +35/45 FL4765.12-WUDII SPIZ3 3434 00038139 39.375 x 77.000 +55/-65 Evaluation Repot.F1.,4765 Page I of 12 i i i k K ]F r Y C t Cf f k V F [tF f Product Evaluation Report Expiration Data:September 2007 Certification of Independence: 1,Stephen D.Fisher;the Professional Engineer Performing,this ev'Ouation, have not now nor will I acquire a direct financial interest in mararfacturing,distribution,or sale of this pro(uct('s) for which this report is issued. I am an employee of Marvin Lumber and Cedar the parent company of M-,rvin Windows&Doors. I do not now,nor will I acquire,a financial interest in any other entity involved in the approval process of this product(s). Signed: Date- f Evaluated by: Stephen D.Fisher,P. Advanced Research T.-ain Leader Marvin Windows&E oors FL-047489 rt milon b< Da" 74 MarOf,,'WIqddWIIs and qozr,,Z P V I-V , 0.- i,,1106,,,� pt Evaluation Report F 4765 Pa ge 2 of 2 ! k c w a ra w< h N C� WW ZCai vt.S zz F Z rn E t i ❑Da /,':Vii y L YSNVI Itf i[5 N t %~ ✓ri�i J to h V lK X M t.... N _. . y 0aM. s zvi Jcnornn r�nw ry Hilli .p h VM Vw� G tV J: x 'C?gtQ it1 Q ; i C LL k -"! olff ywS fJ i uiNv o S r ;R a a.M z"Mn.aa w •-. na � yt qp jjj {.221�2 1-249 ,t.dam d" 4 t 1 p�,� Y�Bw TjdQ�Y Rt � 4J��J[ ^. C[(��© �in .�. -..'� N .•-. ��++X 2 Q aWn t d'1 `� 'im' i ..�r e � i � aivi :x a✓i vi vi v, ¢a cta ww -•y C � Asi2�i-fG w. 0..C]Y NHOr 'AV MDdOS :A9 Wei bS 192 !11 002/01/8 G31NI8d d I i i i r I i r l s 4 i 3� I : .r • ; �. 0LJU3 O ¢ � i0 z Y}I D n TvJu � c� G zar r>! c CAi� J_.1 N z <S c'kCL z �?.IsU C-1 94 __ cnx�_.Jr �cn 0 da.`. U :DC''7 C:MMMM N N N rJ N l'V a.(1 d a- -Cl c.. z Yi FTJ 7 C N {,,. CL k t "-- '� L j i O CQ Z C7 �..d 1f: cLt 4J o H i((. o T W F:: k LLl 0C]' O '". �61 . .- 1 z n ; o m �(D 3c Nx L7' Eu <, iza f4 x r; l A5ul �a3 . z W .a d ttZ 7- CY.7 w w L.- CD 0 pq Z r€ q T. El W Ll 21 LJ U M Li W cz u- n J r O D W rD ` nWIL p CJ .5 J M W tt7 W 4� oC. <... .._. ( 11 W C) 4 y i--w z CD W Li. C,I a, .v. Wil' o O �!� 1 �3 (eu i JrJ L- i—z w n N z 0 <c �` n- ( N r -n C'o Cl- (_) N U')f)" < w r l.J z: ' Cn f-) M.CL ., �C,C5 < S yWr <[ c f� U Cn z� �. uj �vaaWw r x o l,7d < d ' 3 «. 3Mr viG� " p fa U W J W CL wif.,z n — J rJ sT as T CL Q ti IJ c, T C V— 4 C1. O laJ z"Nk{� z S z 'i U7 p p C� u N O Cr �g WV 81;c2-11 S002/01/8 f:(DlNIdd z E I I 1 i f i i i • W C1 Wx K i Ina OR T {�x4q C1�0y}0ejej� q 3� ��49 p 3 yy! ps y S I.µ ..f..__ � � .Nl � WOI_Q-.Z-S Qt1UA 3' C:ONtN•rM y�y}} UU' i4�•..•_ al 3 O� IdN�S.itQd-W Q N J XQ z W t Ql WY�x.~Za �ta p�00a\.pN..�...p�.. .... JFY 1�Agtl SaiWd`• t-1-Mf 0[C�NN41 V? .... ynt . .Ji ijWVJ�^ 7`/.j I � ppZZ 4YJy�24,yyVt'N �JFoo Vi VY Y'11li Yi in' r�1s�J ZNi.�/:rf N rY'1 N ON O~M +Wi2J��JVJh YP hJJ Q Q ! aNJ nN i JASQ ]L' SO4W WwW 4wLLL W �y0 Uj< ♦♦' II( a ' "d� 41 mas�am •. a vui si 5ajiz wY a99� u I ti 45 tib` N h IW yq� q X 1 sit 664 tlSc-,--- 9 J r ynr w�iam t- Q � P JN(W����••j F• � 9�NNt� J-NW cA F1.4.W¢JJ..ZY'W N -ir (.Or;\•�-rw.pE p g °El" K`ep iQ-© q TIK N F�qs INf �+ V 4N,J JdJ W47� I i N YY \N �J .....m,....,, i N � tr�>.f-���}ZW O.p N•O.NO.NDFFh i �iJ N' lryj� ': �•••J�V.J td lai.¢¢.:Ci JJJ t-lJJ- (p� a tD to ; t xw a S y z le �Dmm W41 'Q- QS �Iry S"' x i� iV C.1G 4aj � �� �� �p alp, J� •p pgJY�Y � t�A� ptlC. S(t�. •"!p'. NW 7t mIZ- ZS~$p�'(�M1 tllCl` aN l�"N•ppuuO Cy\ M.N-. 4`(M(/�-� W1pa-,TT~T���W QQ•lJ WfA.p� f-y MK:M.I�SS]Y KSSS W 4�K[~YNN Z1. N W Z 2 r-••+ � �t.S��Ft a. u (,i�� c�J N ''8 •`0G J^ !!qq 4U� WW UVVVV YY Vi Yi _ J. QVyN C) �: a� ZzVlS.l •D�•DJq JSh�nfP Nh CZ UC4 SZ.JN Z 1-:.:Ya-Fa- ZF-L.1x444 ZZJL44 L1.4 ail J•TIy-. ZQQ W SF-U �WpNZS 46 S/.p y" �k Y Q ''•'., s y \,.J � •j N� -'t � A � C V� T.(Ul � N N N W N E y!b'.tt. Q � - h � #✓r.' � ��a�,dd r-UMQ C iW. x w �.. e yy Y JJ 46M t7 NZ_pCJ ui os 1inu. a a3 A(FJ(l(' 1H T Xiwafic fig WH T i07:IT nna/h T!Q trT7 I h!T NA - ! 3 i ! tt f 4 1 G i t w� �s g o .. .....3 r ^.i . i 7777 O' IS �. C M t cost I� MS 11 QR Zy JI 7 A oil, i t t r r J f'` !•i�I"V ti � Zs n. •� F�tFi �. o n .1 v _ MI like. E i i i 1 E i n A i r U _ I WE � � f ro Ow rqItslei w.am`tia 1* $ x n y " Im c 3 u a a' "' c es I-14 i E La too .y � > � . � y r1: il J � G �wa^ ax r� :.4• ,n ✓� `" c C � c " aJ � ;.✓. (Jw p ,'T3.^. Cc•v4 em - s 3 u ? m '° - i .. ` .i xE Of vullG.M i i F i i 1 t i pt t f i k f kE r 7 2 i t t V � W ♦,� + = x k � { t p Ems.... 'l� i d w. 4O z s n tray i ::! € r>n 3 + + 1.. u�£Jt3'�R�w its' � .r•ua� m �i.i-� �u r N i re '. ra E � k c �.yG7 a : 'J 12 IIRI m X Y X.S Z � C w zc3 c CL r� 4-4 14 V �Vp�.�I J���,,// (`++(•tpTrM MMM 4 (� {re i'C� 'd X t / 2u4l�GM M ar t, v'o ✓ltl. C✓ .a!'p-^1. �f -'-"n�•�••Y Put NNv{Z S a n k X x d u Al gr ry g7.1Lid ILJ ._.`.... t. i y2 p. Yat zs P Sn N i _ 7+7 1 Nimes X54"ta,, �z gt{t{JJCC,.rmra ', LCC]aa z 3:ca t NH]r ')idIMOAdDS J,a Wd zC :90 ;2 11 9002 F,2 3 aJ NIJd Y F { f t { kt€ 4t t f 4 t t f k x Y I 1i�1'(�iUAki:fiCr'iplfi fiWA t N N �[ Y Nil g �.. moil. ......-. ",L :..n � 444 AM NJ(y7 'ML nF fN! i Ffl CTF ' ls i,\ !1 � �y,`y I kG,t�! � WXS�. Y L S '� � E2 .f_. •< . i'' i1 X �Y 'A y Si F � / M14t�F�G1�J rzM Nil l C'.; Y r Vi � Cl]r rWira as aNK�.s x +ivv ocT � 4I Q'�N/ ..,✓ S �' Z � i � ! !. ! �11.y9W 1.`f.s.J. W4J.tJ._r.J. W U a � i '1 [[ N JJJ l S 4IN '.� Z Q S e I q ��� t i M`'Z/ppy'K r- s 6j 6 ............ I�di `�Sxxco 4-' MR esti $ila, t65NMr N F.�h ati 6.6?t W I r YiJ �iw � Na)xoxvr � '. # �_ a s ,� Y i- ?d N VP W r•.RV w-0 C1 r...G r { : : ! s __ Ga C Z 4 i P� O Jtn CL �h• L r n ; t•t l� N3 W; I i,i 1<Ii:i ry W aG "Y yfe Cq�t ,(�4 S p U7 . tIIrtJ � ^J�: t q GJ w p JJJ W..lots FmM4m n r<>M mna i.i MAN ' !QW, `v7} aj i,pe ¢y NH(�! 11bIMONd©S AS Wd 02 150 01 i 58009 Qhy d i C i i I t r t i 1 iN1 l !- Yu IFF2 K d < t W �ypr u .y+-y ...-►-• (ah�-• �+F.,. A„ � If7W 41 w ..a }p51`�� aO A' 74 G1 E� i-Tf�C�]�dOChO �: itn W i Iz MM 3 i � 1,6 E( J b (( 2 -1 it F t I y� 4 h fa 4 �Zr YI T� VAN N jgz cu CCC J c >w I i 3t�tasr.. o ex- { 4 \ (U cc p.q ti W V1 1D t/�S W D a •it t,^�^i i\,.-i. �` �� W ���3 Z�JtO pp�S f } ......... ....____.............. �........._ _ ............. �..,......... __.,....,.._._...�__...,........«�.. "............................._...__ 1 t 1 1 E f F E t 1 11 d 11107E TO FRAMER: 2XD RIDGE 1/2"PLYWOOD DIMING WHERE CEILING JOIST FRAME AT RIGHT ANGLES TO COMR_SHINNH.Es RAFTER MdVIDE 2X4 TIES 48" O.C. FOR FOUR isx O.CAFTERB ISM`FELY JOIi T BAYS. PROVIDE SOLID BRIDGING UNDER. ROOF BRACING MAX. C. 48" f SULATIGN-� 2X6 C.J.I6' C. w i INT. HEADERS 4 X 9 X6 RAFTERS UNLESS NOTED 6" C —.------ .- _.-- OTHERWISE ON PLANS. STORM ANCH011 INSUlAT10N EA. RAFTER X6 C.J. 6"C. 2X6 P.T. PLATE WITH 1/2"X 16" BOLTS 72" C. IN 6X 12 CONC. PE ,f METER fN j MET.DRIP BEAM WITH 2 4 CONT A SCR.VENT IX2 P. T. FIRRING INT. FINISH B" MAS. WALL 2X4 STUDS 16" C. — -- .�.---- EXT.-WOOD-SIDING 1/2"BOLTS 72" C. 4" CONC. SLAB THRU 2X4 P.T. SHOE tIO 6X6 W.M. ON VAP. BAR.-1 1 . .MIN-- � , ._ • JOLT E ARTH ,.--- CLEAN SAND FILL 6X16 CONC. FTG. BX 20 CONC.FTG, 2x4 CONT. ,O 0• UNDISTURBED SOIL SECTION: FLOOR SLAB AT. 2x4 SHOE FRAME WALL @ UTILITY RM. VA BAR. ' 8X16 CONC. FTG. UN BAR_. 501E 2 `4 4 CONT. 2 X 4 STUDS 16"C. EXT. WO. SIDING $" MAS. WALL SECTION INT. FINISH " BD. WITH RIDGE SECTION ¢ "MET. FLASHING BEARING FOOTING / ri If CALKING BRICK ROLOCK MAS. WALL BRICK VEN. NT. FINISH 1/2 P.T. FIRRING TUDS 16" C. 1 Co ) .. j INTERSECTION r..'INTERSECTION BRICK FRAME EXT. WALL �Ipfr'�.� ••• :••••.,,,x,,:,:::::: •I ,,,+QME 0 MAS. WALL �'• wFMIj7TJ.. ...ua.N�rrN BUILDER S PLAN SERVICE =7414S � RO N S . 40 O WOODCOCK DRIVEJA KSONVILLE,FLORIDA kit t O' ii 410 k4. { y I s 4Y e . .,, 4sld94 V4 /1,111 . "S4 4 or AllA � � z l � 13 oposed Construction DESCRIPTION OF MATERIALS No. !sr tie utm runt hs f}I nr VA 0 Vnde Construction t Pmperty address _. � __ ._:_ _: ... _, __,..:�T_ . City Moftogor or Sponsor .__-_._ riVerrtr) . iAtk#rrsrii. Contractor or Buildor - - i.ttkitcss) INSTRUCTIC NS I. For, additional information on haw this farm is to be submitted, number re iced, then the minimum acceptable will be assumed. Work exceeding of ctap6es, eta., see the ptstryrtGcos applicable to the FtfA Application for m" imum requirements cannot be considered unless specifically distvtbed, fNortgage:inswonce or VA fequest for Determination of Reasonable Value, *5 4. Include no alternates, ''or equal" phrases, or contradictory items, lCon- the case may bs. writrotion of a request for acceptance of substitute materials or equipment is 2, .Describe all materials and egvipmont to be used, whether or not shown on no,thereby precluded.) the drewin s,by marking on X in each appropriate check box and entering the 3. include signatures required at the end of this form. inforrtustian called for in each space; If space is inadequate,enter "See mise" 6. The construction shalt be completed in compliance with the related drawings orad describe under item 27at on an attached sheet, an i specifications,as amended during processing. Th* giecifications include this 3. Work not specifically described or shown will not be considered unless Dt icription of Materials and the applicable Minimum Construction Regv,rements I. EXCCAVATK?N Itearng soil, type, , 8 ._loan 2. " ATIONS: tatytings: .tinc rete rti x ! sti Co_ li ie,i Reinforcing raunclattpn w ill, rtaatrtral _ b10k Reinforcing tritetiol. "InclAtton 'wall. mlatcrial _. w..__. _. � Part foundation tall t;ar'litmns ruatcrial and sizes _.__ rPi. , material and rcinforcing �.,_.-_.--_____.__.___ .:inlets. rnatcriai .t."d sizes :._ _. �_ ------___. :__ SAlx material av er *nt critrarwr- art'away'w_ _ Win low areaways Piot lig drains 54�. R l ertstite protection t ?xnrtttiesslratrXrtrunx# cover _.. n,irl:,itl,i� ._ . _.__ - ti,atnd<+txh1 "its lyacial lot,ridatitms t"�cta'hnctna# i Pr.•t.abrlr c ed tr a Fr1 sr .a ltie Untnlg: material .. ______ licit`€ Htrc Fireplace Our ,tae �iCuts Fa77Ri+'t tr7f``earl rr<e gas or tail hc.ate` _ : -. .. _ _.. .__; ^.cater heater d4itional IrptCrr'1T1at1GNt: .... _ .__ REPIAC t Type, 0 solid fuel; [? gas-burning. [j circulator mfiAe uni st.-r� _: __ Ash dump and i lean-otn _ _.---_ —- Fireplace: facing ___. __.__.. ___; lining __:__.______. hearth___. Additional mfairrmaOon ,_ ___.__._._- _ _. _.._.__._--_ S. IIXMK* W AUt Ytitxxl fr,amca vwtxxl'gradc, and spec les._ Caner bracing. Building paper or thickness_ __.__: _,; width _— l� solid: [] spaewd _._ ___..__.." c,. c.; diagonal. Siding _ _ _._,. : _ - grads __ ,,__._. q _ - _ _,_ circ _-_; expostire ______ __ tasit.i 1. Shingles grade tvPt' . lR _. _ -_„ g 51C,f � _.,��; Cx )S'ir'e 3itSlt'ntrt l,intvis ma rs'. asofd faced 0 stuccoed; total wall thickness_ f:as,ing thukne,ss_.__— .", lacing materW f Backup inaterial thickness_ _.. ___._ bonding Door sale brick.,,_ Window sills ,inteic nt+ tau sttrfacte' ttYa iteesfing.,— _ coats of _.� ,__.._ _ w furrtn{; f __. _Atud.,416 l,_ 1 $xterxrr pair}Crng• material _.__ , _..___.. :.. .__ .__._.:_ _ _._,. _ .._...__ _._----. _:.._. __..a= iturnl,t•s of c<hats , athlr wail c<insrcu4non: }carne as main walls, [I+attic•+ construt tion Frame. wall__abavv,_p <.+zm... t 6. *0W FRAWNG r joistq wcxxl,grade and species .,_.._._. ..... . _._ r_ , tither __ _. _ ___ . bridging _.._,__.._. .. _..:.__. , anchors C,oncfew 4aly. [] kkiscmentffas,rr: 1 first fl00r;;E] ground suppovted:'[, sr# Supp)sting. mix a re..infrxrmg Mz__6 _... { m•u#abrin _____, inernhrane ...,.__. Fill`unclier stats. mair.rraf�� �. ._: thickness _$} Additional information: 7. Sii t,#pC3RiNCp: (Describe uttder%orr'ng for special floors under item 2 1.) Material.:grade and species.�_ ....... sire Laid: D first flcor 0 second floor; ❑ attic :_.set ft:; Lj dings iai, } right angles, Additional initrrmation _ __. : .__._...w, $. FINiSH FLOORING.{Wood only. Describe outer finish flooring on item 21.} FF t.tu...fwN Rorms C a.atr gas it Cttr vfr t i Bine., lrnrtR trrvt r r. titer,` tic fluor. sq. .........., ..,......... n.•••....t ......... nr d`tl f:1<3tt f in ` .,.. ..«...� ...».:..,. ••i+t.••+nor ,` � J"iit� 4 R. t.' MrEtL3 !'LYOr �i..r All CITY OF ATLANTIC BEACH S 800 SEMINOLE ROAD U J ATLANTIC BEACH FLORIDA 32233 INSPECTION PHONE LINE 247-5826 �Js31 �� I Application Number . . . . . 04- ' 0028772 Date 8/02/04 Property Address . . . . . . 163$ SEA OATS DR Tenant nbr, name REPL GARAGE DOOR Application description . . . RESIDENTIAL ADD/RENOVATE/ALTER Property Zoning . . . . . . . TO $E UPDATED Application valuation . . . . 1050 Owner Contractor ------------------------ BRADY, MICHAEL OWNER 1636 SEA OATS DRIVE ATLANTIC BEACH FL 32233 ------ --- ------ Permit . . . . BUILDING PERMT Additional desc Permit Fee . . . . 40 . 00 Plan Check Fee 20 . 00 Issue Date Valuation . . . . 1050 Fee summary Charged Paid Credited Due ------ ---------- ---------- Permit Fee Total 40 . 00 40 . 00 . 00 . 00 Plan Check Total 20. 00 20 . 00 . 00 . 00 Grand Total 60 . 00 60 . 00 . 00 . 00 x t i (i W E i PERMIT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF ATLAN�IC BEACH ORDINANCES AND THE FLORIDA BUILDING CODES. �GFICIAIJ Cc: CITY OF ATLANTIC BEACH D. Ford BUILDING / ZONING DEPARTMENT ' if 800 Seminole load S. Doerr J r� Atlantic Beach,Florida 32233 (904)247-5800 (904)247-5845 i Fax t d PLAN REVIEW C MMENTS Permit Application # - za-77127 Property Address: Applicant: Project: This permit application has been: Approved x Reviewed and the following items need attention: f 4 4 C I k l t Please re-submit your application when these ite+ have been completed. i Reviewed By: Date: q (301 y t y 7 �J rlrr �f', f City ot•Atlantic Beach • 800 Seminole Road • Atl ntic Beach, Florida 32233.544: Phone: (904)247-5800 • FAX(904)247-5345 t.vlantic-bcach.ilm PERMIT A.PPLICATtOt`i FOR RFYLACENrF,-;I' OF `V ROWS,SKYLIGRTS AND GARACE DOORS OF SLNGLE-FANaLY OR TWO-F�tilILV(DUPLEX) CONSTRUCTIO\ i > /Date l 7 z < Address where work is to be performed �o Applicant Address 4y e� /lIl//J P /'� 1�}i �-' r Photlt: - Lcgul.Description: Block dumber Lot Numbcr I Zoning District Contractpi � C//L State I.�icenst Number Addre' �(1 1X 111i p f PKton t, �z/ 7� Phone �0� 26�P Z� �� City �CJ, O1Jt�,�I� Stutc�L— Zip T 7 Fax �� Z —�1' ULA/ Describe Proposed Use and Work to be Done C Prcacnt Use of Land or 8uilding(s) Z& C C` V31u•Ition of Proposed Construction Buildir�r Date: Mean RaoEHei St { (ft) Building width (ftp Building Length w Width /Co (ft) Measurement from corner of building to window i r f 'C h r O � 5 { 'Window Eley,From Grade i In addition to the Building Data the following information is req�ircd: - Manufacture Test Report - Inatallution Procedures - Window DescriptionfT'ypc - Garage Door Descripcion/Type - Skylights Description/Type - Elevation View of Window Locations I HEREBY CERTIFY THAT L INFORMATION PROVIDED WITH THIS APPLICATION IS CORREC"r. Signature of Ow r Date U� I HEREBY CERTIFY T AT 1 HAVE READ D EXAIdrN , THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVIS S OF TI IE LAWS AND ORDINANCE. GOVERNING THIS TYPE OF WORK WILL BE COMPLE Eli WITH, W14ETHF.R SPECIFIED HEREIN OR NOT. THE; GRANTING OF A PEP—MIT DOES N T PRESUME TO GIVE AUTHORITY TO VIOLATE OI: CANCEf.THE PROVISIONS OF ANY FEDERAL, STATE OR LOCAL RULES, REGULATIONS, ORDINANCES, OR LAWS IN ANY MANNER, INCLUDING THE GOVERNING OF CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION OF THE PROPERTY. I UNDERSTAND THAT THE ISSUANCE OF THUS PERMIT ISONTINGF.NT UPON THE ABOVE At INFOKNIATION BEING TRUE AND CORRECT AND THAT THE PLANS AND SUPPORTING DATA HAVE BEEN OR SHALL BE PROVIDED AS REQUIRE D. Signature of Contractor Date x Address and contact information of Person to receive all correspondence regarding this application (Please Print) Name Mailin "�' g Addre, cv G /, 7 Ph 16 0/6Z7 FAX -Z-r, -'? , Z.c- E-mail Sworn and Subscribed Before me this Dhy of State of Florida. County ot'Duval Notary's Signature � As to Owner.- personally kno n �. �Catherin ey L Produced identif kation ��, ��12�6 c`F' Doc, U.2004 Type of idcmitioation produced '• o ��� Banded'J(� t y„'�r►1—m,tk Bonding GD.,Ina i A, to Contractor f9l"Personally known I' Produced identillieation Type of identitic�tton produced F i r z D � n C% p _ x➢iN oOF 'Om m .rm in me n, _ ,J < m 30 m m `\ O;Ay An 00 _ m z✓r A_A O 2 a A m m ;m n 9 f N i rFi1 N 2 F s Z?9 NO W O m m O �f➢t _ �OSm Amnm O-+yQ n�- Cm 665, T. "' -1 '-' 'np F `i.•m n -,_ommn mm m[i'`D. m no mz EN�nnN oz�o o'a'�z�vrzN�m_n�� i �fx mm zo yiD SioAIm`m'mF` '.,mDomin^moD n p -_ oaF��i>o�zo�ni -ions= noo��o i mo ono�n A`'o+O o�➢° mAm°Nz�nim 'z II n �^- OZn. A FfZm <Om Ou xi➢ x f n i:r ��A Ti �A� A\Fx12 xAm✓I Ao z> oo .z -� pf p j m m m�No a➢ �' os N'ak �m>r mo a $r ( n oo< o?z ma �'m"\mS" Q?gmox ammo o i x mo l 9pv 'z A �n �> m o zoo oHo ti `~nm�> - oz"-Jin �> nn NNn zim F r - -- n� y�� o m° _ A o _ _u m nom z zz am zos I Z F_O o0 / L mH i�m \ p O Alm v O _ v'^imo FF m S o ro OZxkXF \ R It fhhwh HH� mos LJ i,Uoo,m 3 pp3 s pO D D °n m�09 F3 Anda $ N m r O P n QI °m NF�G3ig zF Z •. a o @< mA o ,° oo D O o _ XO m Cm V{ CO n D Cp n r� uo \ c o LnO r o o a o I ip I J OLo J !_ x O f Wco ° U A CO) I O m 00 - - o0o m X _ f mI x --1 rc:,: o c� m xx ; oz ¢ I O O % 4�, � O o O o O0 coJJ CD 0 O o o � J I a O O O O O iz p, N ti ,� Ol o o i Q1 N OJ CU C 'o p� D o W m O .p L� I O in N O U, (i o O s= xV — zl T om O C', r7t m o p m z n - ? z D � g m z a_o ✓I 'Mi o aU-IT4 �, CD — ooA -�— 0 m o o x ClW a OD 0 0 00 0 `"3Rp is A, o O s p MwµMi+�r 5 m 0 A O r ? W ti S O O ( mO nN�c u soF "O x C O O O Ae.m r. CD o� moo O o I ci ? O W m oqo°$mon t A O ua o c g O O { p o a m a mo gO [ oN 1 �n o O° 1�=n .O LOA i O m oN oho O Io VNf-A=g 07 N m D H O m O o XTo $oma m C rn _ R Qo£ 4 6 t 4 r� D � � sssi NbUVaodao3 aaOOV9 Sb8S-LtZ :XVd (80/006 9Z aaoOV ze 'wn HOS/III ` JJad y asOC V ��SS 3AUVINMUclM 03ZR10H1nv 4:)E09 J Llue Lid JO AID 'S3AllV1N3S3Nd3H NO S1N30V Sll`N321nSNl 3H1 NOdn ONIN ANV d0 A11118VII NO NOUV'JII80 ON 3SOdWl IIVHS 331ION HOnS IIVW 01 3an11Vd ins '1d31 3H1 Ol a3WVN N3a'1OH 31V31311830 3Hl Ol 30110N N3111NM SAVO OT IIVW 01 HOAV3aN3 IIIM N3NnSNl'JNInSSI 3Hl'd03N3H131Va NOI1V8ldX3 314138Od38 a31133NV3 38 S310110d 0381HOS3a 3A08V 3H1 d0 ANV aInOHS NOIlV1130NVO M30-10H 31701d11H33 4 E E r SNOISIAONd 1V103dS/1N3W3S(d0aN3 A8 a3aav SNOISn10X3 l S3101H3A I SNOIIVOOI I SNOI1VN3dO d0 NOLWWOSM N3HIL 000,005 $ llWll A0110d 3SV3SI0'13 molaq SNOISIAONd 1V103dS japun aqu0sap'W 11 OO OOT $ 33AOIdW3 V3 3SV3SI0'I'3 6030n10X3 838W3W/H3013d0 UO`OOT $ IN30100V HOV3 13 [ 3AI1n03X3/N3N1NVd/N01318dONd ANV 8 AlII18V11.Sa3AOIdW3 -H10 -n1V1S0AOA X tOOZ/ST/80 £OOZ/ST/80 kZ9£SBLOOM ONVNOIIVSN3dWOOSN3NaOM $ W N $ NOUN3l3N X 318110n030 000,000's $ 3avA swlvlo E] Nn000 EX 000`000`5 $ 30N3NNn000H0v3 tOOZ/Si/80 £OOZ/ST/80 £VS9ZZLZOf1O All'118VIIVI13N8Wn/SS30X3 $ 99v :AINO olnv $ 00V V3 NVHl H31-110 Olnv ANV $ IN30100V V3-AINO olnv f A11I18VIl 3OV21V0 $ (luapi00e gad) 39VWVO AlN3dO8d — $ (IuappOe gad) SOlnv 03NMO-NON X ANnfNI A11008 SOlnv 0381H X $ (umed gad) SOlnv a3lna3HOS ANnfNI AIIa08 solnv 03NMO]IV 000`000`T $ (luappoe e3) Olnv ANV X lIWIl3l0NISa3N18W00 tOOZ/ST/80 £OOZ/ST/80 Z T60680TVJ A1118VII31180WO1nv OOl load A0110d X 000'000'T $ JJV d0/dW00-S10naONd :H3d 931lddV llAll 31V03899V I.N30 000,000,z $ MV`J3H`J`JV IVNAN30 000`000`i $ Aanrw-nova lvNosa3d Pao ad OS Z$ X d 000's $ (umad auo AAV)dX3 03W Nn000 a 30VW SAIVID 00010S $ 031N3N Ol 3JVWVa AllllGVII WHEIN39 IVI0N3AW00 X 00`000`I $ 30N3NNn000H0V3 bOOZ/Si/80 £OOZ/ST/80 £TF8£LLLZ0ddJ AlIl18VIlIVN3N3'J S11Wll N01191dX3 A01IOd I 3AIloG3Cl A0110d N38WnN A01lOd 30NVNnSNI AO 3dAl AO NSNI SWIV10 OI A8 030nCI38 N338 3AVH AVW NMOHS S11WIl 31V03H99V'S310110d HOnS d0 SN01110N00 aNV SNOISnIOX3'SWN31 3Hl llV Ol 103f8nS SI N13H3H O 381HOS30 S310110d 3Hl A8 03ONOddV 30NvHnSNI 3Hl'NIVla3d AVw NO 03nSSl 38 AVW 31VOIAU830 SIHl HOIHM Ol 103dS3N H11M 1N3Wn000 2f 1-110 HO iW811400 ANV d0 NOI110N00 NO W831'lN3w2HmD38 ANV INIONV1SH11M10N'031VOIONI 00183d A0110d 31-11 UOd 3A08V a3WVN 0324nSNl 3 1 o mnSSl N338 3AVH M0138 a3lS11 30NvdnSNI d0 S310110d 3H1 S30VU3AOO :3 N3HnSNl :a N3HnSNl p 0N3NnSNl 9SZZ£ ld `aLLLAuoSj3eC saLuedwo:) aJnSLJawd :GH3HnSNl4IJON aALJQ AEMIJEd sdLlLLyd b889 88060 AuedwoO aDuEJnsul aJns LJawV :v 838nsNl 4 auI 'a MAuoSj3RC Jo Aued=3 Jooa pe94JOA0 a3NnSNI #OWN 30VH3AO3 JNIallOd3V su3unSNI C 'M0138 S310I10d 3H1 AS a3a210ddV 3�JV2l3AOO 3H1 U31-1v ld `aLLSlDRCV HO aN31X3`aN3WV ION S300 31V01311?J3O SIHI'M3a10H peda LJoX Zti££ 31VOIAIIN33 3Hl NOdn S1HDlH ON SM33NO3 ONV AINO 'DUI `aaueJnsul AJJad WC C NOI1VWa03NI 30 21311VW V SV a3f1SSl SI 31VOIzIlIN30 SIHI ° T08Z-99Z (t06) XV3 OI£L-89Z (V06) N30nooad t00Z/S Z/90 (AAAA/aa/WW)31Va 33NvHnSNl A1111 , V11 :1N1O 31VOIJUM3� oH )OV CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD a ATLANTIC BEACH,FL 32233 INSPECTION PHONE LINE 247-5826 D; >> INSPECTION EMAIL REQUEST: Building-de tncoab.us Application Number . . . . . 07- 0000529 Date 4/19/07 Property Address . . . . . . 163 SEA OATS DR Application type description ELECTRIC ONLY Property Zoning . . . . . . . TO tE UPDATED Application valuation . . . . 0 ---------------------------------------} ----------------------------------- Application desc { change exisiting electrical panel ! -------------------------------------- ----------------------------------- Owner Contractor ------------------------ ------------------------ BRADY, MICHAEL EARLY ELECTRIC CO INC 1636 SEA OATS DRIVE P.O. BOX 50678 ATLANTIC BEACH FL 32233 JAX BEACH FL 32240 i i Permit . . . . . . ELECTRICAL PE"IT Additional desc . . . Permit Fee . . . . 105 . 00 Plan Check Fee . 00 Issue Date Valuation . . . . 0 Expiration Date 10/16/07 --------------------------------------- ------------------------------------ Fee summary Charged Laid Credited Due ----------------- ---------- --- ------ ---------- ---------- Permit Fee Total 105 . 00 1105 . 00 . 00 . 00 Plan Check Total . 00 . 00 . 00 . 00 Grand Total 105 . 00 ; 105 . 00 . 00 . 00 E F E Y r { y(t f t�t k PERMIT IS APPROVED ONLY IN ACCORDANCE WITH ALL CITY OF A' LANTIC BEACH ORDINANCES AND THE FLORIDA BUILDING CODES. ! f f� i7 CITY OF ATLANTIC BEACH SA J p ELECTRICAL PERMIT APPLICATION Date: Property Address: hl? Owner: _ l G' ' � / Telephone#b �Y�6 Contractor: .�� ,��� ��'!G C/t" G Telephone#: Contractor Address: -1a,00 Z 2%� d6e Fax#: Contractor Signature: --,4/1/ :41 In consideration of permit given fo ing the work a, described in bove statement, we hereby agree to perform said work in accordance with the attached pl d specifications which are hereof and in accordance with the City of Atlantic Beach ordinance and standards of ood actice listed therein. Building Buili g Type: ❑ Trailer Service: If other construction is ❑ New g Residence L3 Temp. Ll New done on this building Or site,list the building Gr Old ❑ Commercial ❑ Signs ❑ Increase permit number: ❑ Re-wire ❑ Addition Sq.Ft. ❑ Repair Conductor Size: AMPS: COPPER D 1ALUMMUM Switch or RACE Breaker AMPS PH W VOLT WAY Existing Service RACE Size AMPS 0 0 PH W VOLT4O WA G Meter Number Feeders: NO. SIZE NO SIZE NO SIZE Lighting Outlets CONCEALED OPEN Receptacles CONCEALED OPEN A 3()AMPS 31 100 AMPS Switches Incandescent Fluorescent & M.V. E Fixed 0.100 AMPS OVER BELL Appliances TRANSFER. Air H.P.RATING H.P.RATING CEILING KW-HEAT conditioning COMP.MOTOR OTHER MOTOR AMPS HEAT E Motors 0-1 H.P. IVOLTAGE PH NO. OVER 1 H.P. PHS i UNDER600V OVER600V Transformers NO. KVA NO. KVA No.Neonf. _Trans Ea. Si Miscellaneous G' I 800 Seminole Road.Atlantic Bach,Florida 32233-5445 Phone: (904)247-5800• Fax: (904)247-584 . htti)://www.ci.atlantic-beach.fl.us Revised 1/04 6 S s E F CW OAAwdc Beach Pennit To: JEA.Electric Order Fulffllment, (Fax No.: 66-7372) Attention:. Carol Schweizer/L.orie Craven,21 West Church St T-4 (665-6521) i Subject: City of Atlantic Beach Permit# Date: i { r Service Address: ,e, Owner: 1� �/. U( -Li- Owner Phone: Electrician: Electrician Phone: Type of Work: { New Service [ I M home Subfeed Increase Service 4 Heat & AC Li Repair Service k Other Rewire —� Other Description: Temp Pole bpx Service Type: [Overhead (Repair/Replace Underground(blew Services) Building Use: WResidential {Church L_]Ertvironmental LJM-Dome "Coinm rcial "Other Other Use Description: R Service Size.- New ize.New Services Amps: Volts: , �{q{�shas • i Phase: Existing Service.—Amps:-1900 Volts: 4p Phase:--7L-- E-mail*cravli(@.lea.com or se13.y✓c1n:aTea.c0M or resom jea.com { E HP OfficeJet 7410 Log for Personal Printer/Fax/Copier/Scanner Information Systems 904-247-5845 Apr 19 2007 11:02AM s Last Transaction Date Time Type Identification Duration Pages Result Apr 19 11:01 AM Fax Sent 96657372 1:26 3 OK t i E E E 3 t 4 f E t F l pt f k I f E f` Ct } i t E P €f� S [S f F E t f t FOR OFFICE USE ONLY Date..- . . ..................19 7/ Permit #...1. .. Fee$.. .3:. CITY OF ATLANTIC BEACH ,.) Valuation $...VZrx. FLORIDA �1...` ......... ! House # ..................................... ---------- ------- •....... ------ *............. .... APPLICATION FOR BUILDING PERMIT .......-.................................................................... Application is hereby made for the approval of the detailed statement�f the plans and specifications herewith submitted for the building or other structure described. This application is made in mpliance and conformity with the Building Ordinance of the City of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the City of Atlantic Beach and all rules and regulations of the Building Department of the City of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the City of Atlanfic Beach,Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub-ontractors be submitted to this office so that licenses can be verified. Date.---......f•=_;Z------ ...1--,--------------•---.-.-, .. ,am (Owner- P0,xv./o_._.__---T1141S_0A1---•---------------Address--- A ,,PRAephne Architect._-..---WAke...... w­o�l........................Address... ----......._.............-•-----------•-------•y-----.Telephone NNoo---------------_-_--_---- Contractor -------•-•-----_-----•-Contractor Builder..P_ ........ Tel�ephone No.-Zz1;2Y`r Lot No----------/-------------------------------------Block No------- Sub EZone... '' . { - ._... r'.....Street�T..-1 1. .K-Side Between...... -----.------------------------•----•--------and------••-------......................................Sts. Valuation .. _ __. �� f $ �� ._For what purpose will building be uaed....`�'..�.f`�F--.�"�-/��p-Size of Footings .�.J�. _p ����G� Dimensions of Building. 5724 0 Dimensions of Lot.... _ x / of conatructi .- tT :v b . �V ---------- D Size of Piers....................................Size of Sills------.-----------.---.----.-Greatestitulding ill Span in ft.__-----.------------------Type Roof...�iJ-----.�77�&5----------_- How will Building be Heated?------OIL-----, ., -G ........Will be on Solid or Filled Ground?--_-_f ,r„?............... Size of Ceiling Joists------------------•--------•--------•----, Distance on Centers...........I------.......................... Greatest Span........................................... Size of Floor Joists--------------------------_-----------------Distance on Centers...... --------------------------------- Greatest Span............................................ " Size of Rafters. ,Distance on Centers._-- -------------•-- , Greatest Span �. i This rectangle is to represent the lot. e Locate the building or buildings in the j right position. Give distance in feet from II all lot-lines and existing buildings. pp REAR LOT LINE Two copies of plana ane specifications shall f be submitted with application. '\ `36.0 Inspections required. �+ 1. When steel is in place and ready to pour footing. F W W 2. When steel is in place and ready to pour columns and/or lintel. x x 3. When steel is in place and ready to pour beam. I 'a1 Yt 'a 4. When framing is completed. 5. When rough plumbing is completed,and ready to cover up. 6. When septic tank drain field or sewer is laid but before it is coveted. 7. Electrical inspection by City of Jacksonville. 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called for after corrections are made. 57` 1 FRONT OF LOT In consideration of permit given for doing the work as described 'n the above statement, we hereby agree to perform said work in accordance with the attached plans and specifications, a* are a part hereof, and in accordance with the building regulations of the City of Atlantic Beach. A QQ Signature of Builder..-Pa.-I., �t � cidreae.....Q- ,....A Signatureof Owner.----•-•-----•---------------------------------------------....................._ Address.....----.......... DEPARTMENT OF BUILDING (� �` CITY OF ATLANTIC BEACH.FLORIDA PERMIT NO. V V PERMIT TO BUILD THIS PERMIT MUST BE POSTED ON JOB II 7.50 T. Date 2/1/ 19 88 7,511CRIT 4,000.00 Fee$ 7.50 P f 0 11P Valuation$. t46-1, "IncAG This permit not valid until above fee has been paid to City Treasurer,and is 4 9 0 3 I A /0 I Ms subject to revocation for violation of applicable provisions of law. I non This is to certify that Schultz Roofing Co =0369119 has permission tcX X re roof r i Classification Residential Zone Owned by Resat Bra y Lot Block S/D House No. 1616 Sea (lata Drive According to approved plans which are part of this permit NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. } PERMIT VOID SIX MONTHS AFTER DATE OF ISSUE li 4 10 O Building material, rubbish and debris - from this work must'not be placed 1 in public space, and must be cleared ! up and.hauled away by either con- tra or owner, i Buildin f&tial. i PERMIT � 1 FOR OFFICE DATE CONTRACTOR USE ONLY NUMBER I PLUMBING 11111 ELECTRICAL SEWER WATER j 1 F • CI'T'Y Or (TLANTIC BEACH APPLICATION 17 Olt ROOCING PERMIT BUILDING 0{YNEI1 /, 1n � PIIONE JOB ADDRESS lla 36 S LOI'llBLOCK Olt UNIT It SUBDIVISION CON I•RACI'O R PHONE b ADDU-ss s LICENSE- NUMBL'It JOB VALUM'JON MATERIALS: N- be r5lam,ss 5In / v ieS t4-u? Eata itl F I j F I SI GNATUM OWNER ' DATE SIGNATURE CON'I'RACTOlt , k E .1 CITY OF Office of Building Official REQUEST FOR; INSPECTION 03 - Date A O Permit No, Time A.M. Received P- S S Job Address Locality Owner's Co�itractor /BUILDING CONCRETE ELECTRI.CAL PLUMBING MECHANICAL ❑ Footing ❑ Rough Wi ing ❑ Rough ❑ Air Cond. & ❑ Re Roofing ❑ Slab ❑ Temp Poll ❑ Top Out ❑ Heating Insulation ❑ Lintel ❑ Final ❑ Sewer ❑ Fire Place ❑ Pre Fab READY FOR I SPECTION A.M. Mon. Tues. Wed. Thurs. Friday P.M. ( A.M. Inspection Made 44 i PM. Inspector L Final Inspection ❑ !' Certificate of Occupancy ❑ GulDate L d CITY OF ATLANTIC BEACH 800 SEMINO :E ROAD ATLANTIC BEACH,FLORIDA 32233 t INSPECTION PHONE LINE 247-5826 Application Number . . . . . 03-06025797 Date 4/07/03 Property Address . . . . . . 1636 ! SEA OATS DR Tenant nbr, name . . . . . . RE-ROOF Application description ROOFi Property Zoning . . . . . . . TO B$ UPDATED Application valuation . . . . i10910 Owner Contractor ------------------------ ------------------------ BRADY, MICHAEL OLIVER CONSTRUCTION SERVICES 1636 SEA OATS DRIVE P.O. BOX 208 ATLANTIC BEACH FL 32233 PONTE VEDRA BCH FL 32004 (904) 285-0826 ---------------------------------------- - Permit . . . . . . ROOF PERMIT Additional desc . Permit Fee 128 . 00 Plan Check Fee . 00 Issue Date . . . . E Valuation . . . . 10910 r Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 128 . 00 ]28 . 00 . 00 . 00 Plan Check Total . 00 1 . 00 . 00 . 00 Grand Total 128 . 00 1,28 . 00 . 00 . 00 t 4 BUILDING MATERIAL,RUBBISH AND DEBRIS FROM THIS WORK MUST NOTPLACED IN PUBLIC SPACE,AND MUST BE CLEARED UP AND HAULED AWAY BY EITHER CONTRACTOR OR OWNER. "FAILURE T COMPLY WITH THE CONSTRUCTION LIEN LAW CAN RESULT IN THE PROPERTY OWNER PAYING TWICE FOR BUILDING IMPRO MENTS"ISSUED ACCORDING TO APPROVED PLANS WHICH ARE PART OF THIS PERMIT AND SUBJECT TO REVOCATION FOR VIOL TION OF APPLICABLE PROVISIONS OF LAW. BUILDING OFFICIAL f z . 7 City of Atlantic Beach• 800 Seminole Road •4tlantic Beach,Florida 32233-5445 Phone: (904)247-5800•FAX(904)247-58051.http://www/ci.atlantic-beach.fl.us E PERMIT APPLICATION FOR ROOFING JOB LOCATION (1030 Qq-rs L OWNER OF PROPERTY s ..� PHONE t 4 CONTRACTOR 0"vQa-- oxx�s'cYtuec Cw, �Jtc ES 'n1C. CONTRACTOR ADDRESS ZIP &Zzz)4 E �K CONTRACTORS LICENSE NO. e 02-0 S Ca CoCu PHONE# S X082- Cl; ; SCOPE OF WORK DECK SLOPE GREATER THAN 2 : 12 LES THAN 2 : 12 ACTUAL VALUATION OF WORK $ r PRODUCT NAME&MATERIAL TO BE USED �aQ� Qu,,)+r 7 ASTM DESIGNATION(S)_ — 30l REQUIRED INSPECTIONS SHEATHING FINAL J F LIBILITY INSURANCE POLICY SUPPLIED YES _ NO WORKERS COMP.POLICY SUPPLIED YES 1_NO }y vJ CONTRACTOR LICENSE SUPPLIED YES NO OCCUPATIONAL LICENSE SUPPLIED YES NO By. SIGNATURE OF OWNER SIGNATURE OF CONTRACTOR SWORN TO&SUBSFRIBffI�pffAq tE ME THIS .-_3 I_DA pF M ✓LG(� _200 Notary Public, State of Floriol, AS TO OWNEMY comm. exp. Sept. 24, 20*, = NOTARY e Comm. No. DD 153038 PUBLIC _ -- AS TO CONTRACTOR NOTARY PUBLIC I CITY OF ATLANTIC BEACH PERMIT -CALCULATION-SHEET Address 14 3G go5 Date Heated Square Footage $ s er sq Garage/ Shed $ -per .sq ft = $ Carport/Porch $ E per sq ft .= $ Deck O id @ $ - • per sq ft - $ Patio @ $ aer sq ft = $ TOTAL VALUATION: To al v nation 1st Remaining Value $ Per thousand or :portion thereof r TOTAL BUILDI G FEE $ + 1/2 Filing€ Fee $ C ) Firepla.cos @, $15 . 00 $ . BUILDING PER1tIT FEE $ cc) WATER IMPACT FEE $ SEWER IMPACV FEE $ WATER METER/ AP $ CAPITAL .IMPRiVEMENT, $ . SEWER TAP $ ) .RADON CHRS) . 0050: $ SECTION H PAVING ( ) $ HYDRAULIC SH 'RES $ CROSS CONNEC ION $ ( ) SURCHARGE . 0050 $ OTHER $_ GRAND .TOTAL DUE ADDITIONAL PERMITS OR FEES : :Mechani.c l Electric/New Electric Tem % -Plumbing Septic Tank / p �%SwzmmingPool Survey Other Well Sign � - Finish Floor Elevation d CALCULATIONS and/or NOTES : CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH,FLORIDA 32233-5445 ` S TELEPHONE: (904)247-5800 FAX:(904)247-5805 SUNCOM: 852-5800 http://ci.atlantic-beach.fl.us PLAN REVIEW (COMMENTS r Permit Application # Applicant: Address: Project: re Your application is approved t o Your permit application has been reviewed�and the following items need attention: r f s f t Please re-submit your application when these item have been completed. Reviewed b ,�{• ' o Signed Date' Contractor Notified Date i i P S i 6 i f e CITY OF ATLANTIC BEACH DEPARTMENT OF BUILDING 800 SEMINOLE ROAD-ATLANTIC BEACH,FL 322,33-TEL: 247-5826-FAX: 247-5877 . PERMIT INFORMATION LOCATION INFORMATION Permit Number: 18328 Ad ress: 1636 SEA OATS DRIVE Permit Type: WELL I ATLANTIC BEACH, FL 32233 Class of Work: NEW Toi vnship: Range: Book: Proposed Use: SINGLE FAMILY Lo (s): Block: Section: Square Feet: Su division: Est. Value: Pa cel Number: Improv. Cost: OWNER INFORMATION Date Issued: 6/04/1999Name: BRADY, RAY Total Fees: 10.00 Address: 1636 SEA OATS DRIVE Amount Paid: 10.00 1 ATLANTIC BEACH, FL 32233 Date Paid: 6/04/1999 hone: (000)000-0000 Work Desc: SHALLOW WELL FOR IRRIGATION PURPOSES CONTRACTORAPPLICATION FEIrS PARTRIDGE WELL DRILLING CO., INC PERMIT 10.00 t I C 4 4 Ins . ia►ns R fired: s k E NOTICE- INSPECTIONS MUST BE REQUESTED AT EAST 24 HOURS PRIOR TO INSPECTION i G BUILDING MATERIAL, RUBBISH AND DEBRIS FROM THIS WOOK MUST NOT BE PLACED IN PUBLIC SPACE, AND MUST BE CLEARED UP AND HAULED AWAY BY EITHER CON RACTOR OR OWNER I "FAILURE TO COMPLY WITH THE CONSTRUCTION LIEN LAW CAN RESULT IN THE PROPERTY OWNER PAYING TWICE FOR BUILDING IMPROVEMENTS" ISSUED ACCORDING TO APPROVED PLANS WHICH ARE PART OF THIS PERMIT AND SUBJECT TO REVOCATION FOR VIOLATION OF APPLICABLE PROVISIONS OF LAW. 1 I d E (18.88 14 Date: 6187/99 81 Receipt: 8861989 CHECKS 31486 ATLANTIC BEACH BUIL EPT. 88188883221888 P . O1 FEM $to.no A--PPLICATICU FD tiAUL pFld`SIT CTIY OF C MAC; PROPSlay (XIE R � Mame: ACL rA Day Phone of 4(�-2 22.0 Address c RP310 OOl DY. Zip J��33 APPLICANT IF Omit TgAN owNER F Name: tri i Zne. Day Phone 2�q-1333 Address: � � �► Zip 32073 JOB Address or Location: (p3 Legal Description: G Is well to be used for drinking purposes? p rrl n Arty person, individual, corporation or Oth(W entity receiving a permit as provided in Section 22-40 of the Atlantic water from the permitted well for Code' ando P1 to use bacteriological test r dr�g uses. Bust first obtain a rnishing a certified copy frORz the State of Florida Health Department, Atlantic Beach, A certificate of oeof to the wilding departt of the City of report is on file with the building �tin will not be issued until said Department Notes: E • � I t f f } . k I agree to corm- ly with ' regulations stated herein: lgnature — o-3- 1q ° . Date rne, &/3 i