2008 Selva Madera Ct (vault) CITY OF ATLANTIC BEACH
APPLICATION FOR PLUMBING...PERMIT
JOB LOCATION 20og SET.VA MADERA CT TOT 72 (SELVA MARINA)
PLUMBING CONTRACTOR EAGERTON PLUMBING COMPANY INC
LICENSE NUMBERS CFCO21544
OWNER wHF.ATLEY
BUILDING CONTRACTOR GREENFIELD BUILDEkS
TYPE OF BUILDING RESIDENTIAL
SINKS 1 SHOWERS
_LAVATORY 1 WATER HEATERS
_BATH TUBS 1 DISHWASHERS
URINALS 1 DISPOSALS
_CLOSETS 1 WASHING MACHINE
FLOOR DRAINS OTHER
14 TOTAL FIXTURE COUNT .
INSTALLATION OF PLUMBING AND FIXTURES MUST BE IN ACCORDANCE WITH
THE MOST RECENT EDITION OF THE SOUTHERN STANDARD PLUMBING CODE.
MAP SHOWING SURVEY OF
DoT 72
��-4 V_ oar- �r 7Wo
AS RECORDED IN PLAT BOOK 40 PAGES OF THE CURRENT PUBLIC RECORDS OF
�cJ✓A COUNTY, FLORIDA.
FOR
G O T
7,4-
oc
h.
IZII
o
�..1
97.93,IeW-)
a
Thi
CRNfR►L NOTES
T4
1) Bearings shorn hereon are Eased
on the Record Plat ae recorded in
Plat Roo: -40 , Pages --:-7
throuyn -;7A inclusively of
.rid Puhllc Mecords.
2) fsrrwnta shown hereon are for
err lneyr, utllltler and sreete�
unless otherwise voted hereon.
3) NOTICE: There say he additional
reetrlCtleA4 that are not re-
corded on tnls Plat that say be
found In the Public :ecorde of
.rid County )ylorida Strtutee
I HEREBY CERTIFY THAT THE LANDS SHOWN HEREON LIE WITHIN ZONr A' AS SHOWN ON F.I i..FLOOD HAZARD BOUNDARY MAP 0001 -B
COMMUNITY NO.'Z0072' DATED r4A6rcN,15. 7-1 'r— G Ro HAN1
NOT VALID UNLESS EMBOSSED WITH A SURVEYOR'S SEAL � C--71 r`1 I GHOLh
CLARY, FAILLER b ASSCC3ATES, INC. LEGEND
I HEREBY CERTIFY THAT THE ABOVE LANDS WERE SURVEYED UNDER PROFESSIONA.i LAND SURVLVI-Aft
MY RESPONSIBLE SUPERVISION AND DIRECTION,THAT THERE ARE NO ■ CONCRETE MONUMENT
ENCROACHMENTS EXCEPT AS SHOWN AND THAT THE SURVEY SHOWN 3830 POINT ROAD
HEREON MEETS THE MINIMUM TECHNICAL STANDARDS SET FORTH BY JAC VILLE, FLORIDA x-x FENCE
THE FLORIDA BOARD OF LAND SURVEYORS,PURSUANT TO SECTION (904 -2703
412.021, FLORIDA STATUTES/ O IRON PIPE SET
SIGNED � '1 19 BS • IRON PIPE FOUND
SCALE GREGO CLARY, P.L.S. RT. NO. 3377 x CROSS cur
JOB No. /���¢ CHK. By J l F.B. P.G.
ADDRESS
CONTRACTOR_________
------------ ---------------------------------
OWNER__
BUILDING_-qY-3s;�- MECHANICAL_ 9q33 _ PLUMBING_§
_
ELECTRICAL-596D TEMP POLE�gf��1 Tjai-
� MISC____---____
ELECTRICIAN
DATE FAILED DATE PASSED
TEMP POLE JEA_o ����( _
FOOTING
----------- -----------
ROUGH PLUMBING ____--_____
SLAB
----------- -----------
FRAMING -----------
MECHANICAL/FIREPLACE
----------- -- --------
TOP OUT PLUMBING
----------- ------
ROUGH ELECTRIC ----___--__
FINAL ELECTRICv �
----------- --------
FINAL BUILDING 5- a
----------- -----------
ELEVATION SUBMITTED
----------- -----------
CERTIFICATE OF OCCUPANCY
----------- -----------
DATE ORDERED
DATE ISSUED
Tprtifiratr of mrrupanrg
CITY OF
oataM& -
���tt�tmrnt n# ��xilding Jris�rr�in�tt �
This Certificate issued pursuant to the requirements of Section 0giva ihein c Southern
Standwithar e
Building Code certifying that at the time of issuance this structure
various ordinances regulating building construction or use. For the following-
Bldg.Permit No.�—
New Residential Beach
use Clwifiation Brick \fePnr At l ant i c --
-rConstruction—_ sre istrict..
Group--
r --�—
OtvnecofBuilding TamesSusan �'d}leA.tlA�dress_— SelVa Orte
X008 Selva Mader—l�liry— --
Building Address`
By`=== 1j'c
Rene' Airsf -
--Building Olficisl
rLAC[
10ST IN A CONSPICUOUS
BUILDING, PLANNING AND ZONING INSPECTION DEPARTMENT
CITY OF ATLANTIC BEACH, FLORIDA
CERTIFICATE OF OCCUPANCY
WORK SHEET
Date Requested:
Building Contractor: Greenfield Builders
Building Permit Number: 9432
Address: -. 2008 Selva Madera Court
Legal Description: Lot 72 Unit II Selva Norte
Improvements to the above described property have been completed
in accordance with the terms of the permit and is certified to be
ready for occupancy as
Single Family
-----------------------
Lowest Floor Elevation: 10. 10,
---------- D��Ht
----------
required an/a
Sales Tax Certificate:
-----------------------
date submitted
BEFORE ISSUING CERTIFICATE OF OCCUPANCY THE FOLLOWING MUST BE COMPLETE
DEPARTMENT DATE NOTIFIED: DATE APPROVED: BY:
Fire Chief
--------------- --------------- ---------
Public Works - � /
--------------- - ------------ -- -----
r
Planning Director
Building Inspector ---------------
C> (3
--------------C>$
MAP SHOWING SURVEY OF
_ o r 7Z _
SEC ✓A /ORT E - U�j/T ThIO _.
AS RECORDED IN PLAT BOOK 40 PAGES 37 #374 OF THE CURRENT PUBLIC HECUr+DS GF Du✓A� Gu ;i�lY' FLONiDA
CERTIFIED TO 6RE45A/F/EL0 BU/COE,Fs
73
-74 T 4
0
s' S. -M 0' 4 2 o
�1
^ `1til 35.0 9
'o.o 4•L
`V a
c� Q'
45.7' 2T.
1 C, N � •' � _ v Q
�� ' N � OI '• 4'S � 1�
e(� 0
S V�° V W
h O (( ^^
lo.o o Q s �9
� Q o
N 54.2 `�.� 222• ��
7.4
3'x 3'4fG�
Y `:�.cyFhE9
F
901090
9l sty Fts
?� 2O �G6p9 tyF
9�
tea' I
I
�--- 943 I
DEPARTMENT OF BUILDING PERMIT NO.-943 2--
CITY OF ATLANTIC BEACH,FLORIDA
PERMIT TO BUILD 3990 s
THIS PERMIT MUST BE POSTED ON JOB 399, 75CK.T
19 $ 3670 1/20/9
Date 9432 ,00CA
I I
107623 20 Fee$ 39g 'S 3670 i A
I Valuation$
above fee has been paid to City Treasurer,an is
This permit not valid until
subject to revocation for violation of applicable provisions of law.
IThis is to certify that
has permission to build Single F ami 1 I
i
Classification New Residential
Zone
I
Owned by James
`` 72 Block—Unit-11—
` I Lot 2008 Selva dera Court
House No. t of this Per �� I
According to approved plans which are parNOTICE—ALL CONCRETE FORMS
I AND FOOTINGS MUST BE IN-
SPECTED BEFORE POURING.
i PERMIT VOID SIX MONTHS
'I AFTER DATE OF ISSUE
o Building material, rubbish and debris
4--♦ from this work must not be placed
1 in public space, and must be cleared
I up and hauled away by either con
Itractor R= owner.. J�^
` Buil ' Offici l-
I CONTRACTOR
PERMIT DATE
FOR OFFICE NUMBER
USE ONLY i
PLUMBING I
ELECTRICAL
SEWER
I
I WATER
PLANS REVIEW CHECK LIST
,
----- --- ----------- - ---
Legal Description �� Contractor
License Number_ a*2� —
License on File ES NO
Section 24_101 * Zoning Regulations
Zoning District_ya)- -------- Proposed Use `
Required Lot Size__ 7.6 / Actual Lot Size 1/� y9 1,� p.`� g7,
Setbacks Required Provided Section 24_17
front _ 0 �� CORNER LOT INTERIOR LOT
rear --- 0-- --- 0- _ C.V
Flood Zone_
side-1 ---- -- --- Cq6-- l
��
/ Required Elevation__Ll -
side-2
-------- --------
Max. Height Allowed ____ Proposed HeightI__-__
Section 24-82 * Minimum Lot Coverage
Required Heated Area _1(JC� -_' Proposed Area c�
Section 24_161 * Offstreet Parking
-�
Number Spaces Required-- �� Spaces Provided____o�_____
Section 24-82 * Duplicate Buildings
Is there a similar building within 500' of proposed building?YES NO
Utilities
Water and sewer service is to be provided by:
/ Buccaneer Utilities
City of Atlantic Beach Utilities
Private Sourc SEPTIC TANK WELL
Plans Reviewed by. __-- _-vaw f `te,-4 ------Date-------= =--- -OSVI�XL9-----
Building Permit #_ � __ SSU DENIED
Address L o T 5€ L,/A, L�Q A T F, ' �J i' I G� r —
Heated Square Footage �� �-� per s ft = $ 7 y D DO
q g � 3 �1d @ $ ,��—P q
Garage/Shed 30 @ $ 1 er sq ft = $
Carport/Porch @ $ �•0,� per sq ft = $
Deck @ $ per sq ft = $
Patio @ $ per sq ft = $
TOTAL VALUATION: $
a36. $ o� a
Tot�valuation lst $ 106
4,000, CO
$
Re a nder Valuation J per thousand or
portion thereof
-------------------------------- -----------, Total Building Fee $
ADDITIONAL PERMITS and/or FEES REQUIRED + 2 Filing Fee $
Mechanical ; Fireplaces @ 15.00 $ �. O
Plumbing �
BUILDING'PERMIT FEE $
i
Electric/New
-------------------------------------------------
Electric/Temp
Septic Tank BUILDING PERMIT $ , 7
WATER METER CHARGE $
Well DO J
b,dmTing Pool SEWER IMPACT FEE $
Sign WATER IMPACT FEE $
Water Connection MISCELLANEOUS $
Sewer Connection $
Water Meter $
Elevation Certificate
GRAND TOTAL DUE $
----------------------------------------------------------------------------------------------
CALCULATIONS and/or NOTES
City of Atlantic Beach
Fixture; Unit Worksheet for Water •Impact Fee
OF
ER
MAND
FIXTURE UNITS ARE ESTA6LISHED STALLEDAS THEMANDUREMENT CONNECTEDTOTTHEDECITY
FOR EACH WATER FIXTURE UNIT IN
WATER SYSTEM. THE
EUWAE
R SUPPLY
DOLLARS PER FIXTUR TCONNECTEDCTORTHEGE ICITYRWATEREBY ISYSTEMXED T TEN
-2OM GROUP CONSISTING OF _ _SERVICE SINK TRAP STAND
HATHRO
WATER CLOSET, LAVATORY & BATH (8)
TUB OR SHOWER STALL (6) _WATER CLOSET VALVE
/� VALVE OPERATED (8)
_ V _WATER CLOSET, TANK OPERATED (4)
__Q _BATHTUB/SHOWER ' (2) _ ___URINAL WALL LIP (4) ••
r
__-l-_SHOWER GROUP PER HEAD (3) _-- -FLOOR DRAIN ( 1)
_SHOWER STALL DOMESTIC (2)
__ __LAUNDRY TRAY (2)
I LAVATORY ( 1 ) ___COMBINATION SINK AND TRAY (3)
POT, SCULLERY SINK (4)
WASHING MACHINE (3)
DISHWASHER (2) __WASH
SINK EACH
SET OF
__1 __DISHWASHER (2)
_ 0 __KITCHEN SINK (2) DENTAL LAVATORY ( 1)
__L__KITCHEN SINK WITH WASTE DENTAL UNIT OR CUSPIDOR (1)
GRINDER (3) - --
V URINAL STALL, WASHOUT (4)
BIDGET (3)
~^ _ COMBINATION SINK AND TRAY WIT
- '__FLUSHING RIM SINK (8) - ---FOOD DISPOS. (4)
_ 4_URINAL, PEDESTAL, SYPHON JET DRINKING FOUNTAIN (1/2)
//�� BLOWOUT (8)
-0--LAVATORY, BARBER/BEAUTY LAVATORY, SURGEONS (2)
-- SHOP (2) -----
__SURGEONS SINK (3)
• __ ,__ICE MAKER ( 1/2)
L y� -------------
a -- @ $10. 00 EAC}} ---- -- ----
TOTAL FIXTURE UHITS________
JOB INFORMATION__1Q1___� -
CITY OF ATLANTIC BEACH
APPLICATION FOR BUILDING PERMIT
Owners��,,�d��_�s•_ -E,La� Address ...................zip......phone
_______
ArchitectLs�s_��,y��__ Address_pQ �_ ` zip 1 ;.�.6 phone_____ _
Contractort«« `�-sfS 6,,� , �lddress_�&,�_ (!5,,_y�( __zip 32125_phone_Zz /_/ SZ
- - ------ --- --
Contractor's License number C L(_B Z AL1 9______expiration_6 T_ Sr�_____
Lot 2 Block or Section 1 Subdivision S 1. 7 E� Zoning
C i
ree - e :- M . 0 an 1
-- ---------bt wee
-- - d-----------------side-----------
Stt
Type Construction /0;171-/,- No. Units_________No. Fireplaces Z
Purpose of Building_ Si„ i�_��M �rs� �."�rjE/st. Valuation $__lo��yy�_`�,�
Utility Method - Water �u�J14h1iG Sewer_- //c_____
Dimensions - Building_ 3t f________Lot-/3" 3V,i°�____Size Footings_ 1-ri,�_Zr� ri
---
Sz. Piers ------------
Sz. Sills _Greatest Span Sills_______________
Sz. Ceiling Joists_ _ ---
Distance on Centers Greatest Span
Sz. Floor Joists _ � Distance on Centers Greatest Span ____
-- ---------
Sz. Rafters Distance on Centers Greatest Span_______
Method of Heating_a&, ,� __Solid or Filled Ground-----------Roof__________
Flood Zone If located within a FLOOD HAZARD ZONE complete page 3
In consideration of permit given for doing the work as described
in the above statement, we hereby agree to "perform said work in
accordance with the attached plans and specifications, which are
a part hereof, and in accordance with the building regulations of
Atlantic Beach. The contractor agrees at its expense to provide
the necessary access to the properties being developed over
dedicated City rights-of-way and to clear, clean, grade, and
drain said right-of-way to City
specifications.
Signature -Owner------------------------------Date
-----------------
Signature Contractor C"� s _Date
page 2
119 6
jail 12 1989
Building and Zoning
FLOODPLAIN DEVELOPMENT INFORMATION
Type of Development :
---------------------------------
Flood Zone:
Required Lowest Floor Elevation: 'f
...............
If building " is located within a flood hazard zone (Zone A), a
survey must be made AFTER THE SLAB HAS BEEN POURED, certifying
that the LOWEST FLOOR ELEVATION is equal to or above the base
flood elevation established for that zone.
No final inspection will be made and no certificate of occupancy
will be issued until the survey is on file with the Building
Department.
COMMENTS:
Applicant Acknowledgement : I understand that the issuance of
this permit is contingent upon the above information being
correct and that the plans and supporting data have been or shall
be provided as required. I agree to comply with all applicable
Provisions of Ordinance No. 25-7-11 and all other laws or
ordinances effecting the proposed development.
Date--------------Applicant 's Signature
--------------------------------
Department Use
Required Lowest Floor Elevation
As Built Lowest Floor Elevation ____________
____________
Survey Filed with Building Department
Building Department Representative
page 3
27937 METRO GRAPHICS-JACKSONVILLE,FL
CITY OF
ATLANTIC BEACH No. 0304
FLORIDA
January 20 19 88
NAME Greenfield Builders
ADDRESS S83 N.San Pablo Road
CITY Jacksonville 32225
P A I. D I X80.00 TL
Water Impact Fee #40-343-3700 $21 �8Q000CKTO
Sewer Impact Fee #41-343-S200 JAN 2 0 1988 3671 $1,0 .0 20/80
304 .000ACG
3671 $1,2".00/20/80
Lot 72 Unit II Selva Norte 10001
2008 Selva Madera Court
CITY OF ATLANTIC BEACH PAI p
ATLANTIC BEACH, FLORIDA 32233
TELEPHONE: 249-2395
JAN 2 0 198J
UTILITY BILL
DATE WATER LETERS WATER SEWER GARBAGE OTHER TOTAL
DUE
THIS RECLFIPT SEi VLS NS A ►.�,,.� SUS o�
ORDER. TAKE RECEIPT TO PUBLIC
WORKS EPT. TO SCHED LE WORK. es an Official Receipt
1200 SAI IHIPER LAME. fed Payment
RETAIN THIS STUB TREASURER
PAYABLE IN ADVANCE SERVICE DISCONTINUED
NO REFUNDS IF NOT PAID WITHIN
JO DAYS OF DATE SHOWN
UTILITY SERVICE'• AGREEMENT
(Water and Sewer)
THIS AGREEMENT entered into this 20th day of January ,
198 8 , between the City of Atlantic Beach , a
Municipal corporation, hereinafter called "City", and
Greenfield Builders
, a ,
corporation, its successors and assigns, hereinafter called "Developer".
W I T N E S S E T 11
WHEREAS, Developer owns land in Duval County, Florida,
more particularly described as Lot 72 Unit II Selva Norte
refer to acreage, plat engineering
415 Twentieth Street
drawings, or legal description as Exhibit A
and
WHEREAS, Developer plans to develop said land by constructing '
1 buildings,' 1 residences and/or other improvements
thereon consisting of— -Single Family
and
WHEREAS, City is the owner of water and sewage treatment plants and
water distribution and sewage collection systems in the vicinity of the
property described above; and
WHEREAS, Developer desires that City provide water and sewage
collection service to said property and City desires to furnish same;
and
WHEREAS, City is willing to operate such water and sewage
collection and treatment systems so that all buildings constructed on
Developer's property by developer or by any person, firm, joint venture
or corporation holding by, through or under Developer may have furnished
to them and to their occupants water and sewer service subject to all
terms and conditions of this Agreement; and
WHEREAS, in order to provide water and sewer services to Developer
it has been or will be necessary for City to enlarge and expand its ,
offsite water and sewer plants and facilities and it is the desire and
intent of Developer to contribute financially to the costs of building
such additional offsite water and sewer plants and facilities and to
reserve capacity in City's water and sewage treatment plants so that
City can provide service to the Development without imposing a burden on
its existing customers;
NOW, THEREFORE, in consideration of the premises and other good and •
valuable considerations and in consideration of the mutual covenants and
conditions hereinafter contained, subject to any necessary approval by
other governmental agencies having jurisdiction, it is .agreed by the
parties hereto as follows:
1. Developer agrees that City shall have. the exclusive right to
furnish water and sewer service to the real property described above and
hereby grants to City . this exclusive right-to provide water and sewer
service for all uses within all structures now or hereafter constructed
on the real property described above.
2. City agrees that after Developer has connected to the systems
of City, City will provide at its own cost and expense, water and sewer
service to Developer's property in a manner conforming to the reasonable
requirements of public or governmental agencies or parties having
jurisdiction over City's water and sewer operations; provided, however,
that such service shall be in accordance with other provisions of this
Agreement, including City's rules and regulations and rate schedules.
3. In the event that Developer or assigns fails to complete
construction of all improvements required to be built by Developer and
fails to pay all plant and service availability and other fees listed in
this Agreement within ' six " ' months from date of execution of this
Agreement, for any reason whatsoever, but through no act or fault of
City, this Agreement shall terminate and City shall be relieved of its
obligation to perform under this Agreement. Upon termination of this
-2-
Agreement under this provision, City reserves the right to negotiate
with Developer a new agreement for any additional sums to be paid by
Developer to City as plant capacity and service availability charges,
fees or other charges based upon increases in the cost of living and/or
such other factors as relate to the cost of supplying water and sewer
service.
4. All taxes or charges imposed upon the property described above
by any governmental entity or agency shall be paid by Developer except
such part thereof that has been deeded to the City in accordance' with
tl►o teems Of tills agreement.
5. The rates charged by City for water and sewer service shall be
In accordance with its rate schedule which shall be subject to change •
from time to time.
City shall have the right to determine reasonable meter size
and location.
G. Developer will grant to the City, at Developer's expense,
adequate easements for water and sewer lines, for access to lift
stations and water stations and related appurtenances. Said easements '
shall be transferable. Developer will also furnish title evidence
satisfactory to the City that said easements are superior to mortgages
or other interest in the land, and Developer shall cause any such
mortgages to be released or subordinated to said easements. Easements
will also be furnished to provide for onsite water distribution lines,
including meters and sewage collection lines. Sites for lift stations
and water stations alid related appurtenances shall be conveyed by
warranty deed in fee simple by Developer . to City. Developer will
furnish City a warranty deed, title evidence satisfactory to City and
any releases from lien holders £or any sewage pumping station and water
station sites as required by City. Developer hereby grants to City the
right to utilize any onsite water and sewage lines and systems to
provide services to properties other than Developer's property, provided
this does not unreasonably interfere with , service to. Developer's
project.' Where Developer's property is adjacent to any state road
right-of-way, City will be granted a 25-foot easement, along and adjacent
to said state road right-of-way. Developer shall further grant to the
City, its successors and assigns, the exclusive, perpetual right,
privilege and easement to construct, reconstruct, operate, maintain,,
repair, replace, improve, alter, remove, relocate and inspect water
transmissions and distribution mains, sewer collection mains, sewer lift
stations, pipe lines, lateral lines, valves, connections and appurtenant
equipment over, across and under the Developer's property, including the
right to ingress and egress to each of the building sites on Developer's
property which are served* by City. All such easements shall have a
.width which is acceptable to the City.
7. City does not guarantee an uninterrupted supply of water,
or water at any particular pressure, and reserves the right to shut off
the water in its main at any time for the purpose of making repairs or
extensions of for providing temporary or emergency water supply. City
will not be responsible for any damage caused by low pressure or
interruption- of service. Neither Developer nor any of its successors or
purchasers shall discharge into the sanitary sewer system water from
"non-domestic" drains including without limitation swimming pools, air
conditioning condensation lines, cooling lines or other discharge from
any type of equipment. City shall not be obligated to furnish any water
or sewer service to any building wllicil is built on Developer's property
to which the City does not have access. The Developer hereby agrees and
warrants that the City will not be held responsible for flooding
problems which may result from the failure of sewer line back flow
preventor valves on Developer's property. The Developer hereby agrees
to hold harmless and indemnify City for all costs and damages resulting
from flooding due to .back flow preventor valve failure.
B. The construction and design of all facilities to be
transferred to and to be owned and operated by the City shall at all
times be subject to prior approval by the City and its engineers. City
Will provide assistance to Developer's engineers as to design and
construction requirements and must approve all plans, documents, and
construction requirements in writing prior to any construction being
commenced. Construction of all facilities will be ,performed by
Developer or its contractor. Developer will pay the cost of all such
construction. The Developer's engineer shall incorporate into, tile '
Developer's engineering design, plans and specifications the applicable
standards and specifications of the City.
9. A. 1£ the Developer modifies his development plans for
Developer's property which would require greater water usage, greater
fire flows, additional water facilities, greater sewage flows, or
additional sewage facilities, than the water and sewer demands previously
approved by the City, then the Developer must obtain approval by the
City for the construction of such additional water or sewer facilities
which shall meet all City and governmental design requirements. The
Developer shall pay all additional contributions and fees as may be
authorized by the City's- service availability policy wl►icll is in effect
on the date said new agreement is executed.
B. In addition to paragraph 9A above, any other change order
between Developer and 'its utility contractor issued after City approval
of original plans must be approved by the City before the change order
is put into effect.
C. City shall have the right to review the systems design
drawing and specifications to ensure that they meet the requirements of
the City. The systems design drawing and specifications are to be in
accordance with the City of Atlantic Beach requirements unless otherwise
•specified by City or its engineer.
D. The City also reserves the right to approve the utility
contractors to which construction bids are sent by Developer as well as
the contractor to which the award is made.
C. A representative of City or its engineers will be the
.inspector of the project along with the Developer's engineer, but City
reserves the right to final acceptance of the work and materials.
Heither the City or its engineers shall be deemed the agent of any other
person in making such inspections.
10. After installation of the water distribution and sewage
collection systems serving the property described above and acceptance
thereof by the City, the City or its assigns shall then be the sole,
absolute and exclusive owner of the facilities of said water and sewer
systems whether located on, under, above or outside of the property
described and regardless of who may have installed or constructed same
to the extent described below:
A. All water mains, pipes, valves and fittings and
appurtenances up to and including all meters shall be dedicated to and
will be owned, operated and maintained by City,. All water pipes' o» the
customer's side of the meter shall be owned, operated and maintained by
the customer or its assigns.
B. All sewer mains, manholes, pumping stations, force mains
and appurtenances, including service pipes in public right of ways and
dedicated easements, shall be owned, operated and maintained by the
City. Except as provided in paragraph 9C, all sewer lines on the
customer's side of the property line shall be owned, operated and
maintained by tl►e customer or its assigns.
G.. With reference to any blanket easements for multi-family
projects such as apartments, mobile home developments, condominiums and
PUD's or for commercial developments, all water mains to and including
the water meter, all sewer mains, force mains and manholes in such
blanket easements over private property allowing utility operations
shall be dedicated to and shall be owned, operated and maintained by the
City except that the full length of sewer services from the sewer main
or manhole shall be owned and maintained by the customer. All such City
lines shall terminate with a manhole.
U. By these presents, Developer hereby transfers to the
City, the title to the water distribution and sewer collection systems
to be installed pursuant to this Agreement; such . conveyance to take
effect without further action upon the completion and acceptance by City
of said installation. As further evidence of said transfer of title,
upon completion of the installation and acceptance by the City,
Developer will provide City 'with . a Bill of Sale or Warranty Deed
describing all properties transferred and dedicated to the City by the
Agreement.
11. Developer shall pay the City upon. execution of this Agreement
the sum of 10� per water connection per
equivalent residential connection (ERC) as an advanced deposit to cover
engineering, plan review, inspection, test, legal and administrative
expenses of City in connection with this Agreement. Developer shall
also pay to City upon execution of this Agreement the sum of
10 per sewer connection per ERC as an advanced
deposit to cover engineering, plan review, inspection, tests, legal and
administrative expenses of City in connection with this Agreement. The
charges for engineering and legal expenses and for engineer's inspection
and plan review fee for non-residential units shall be based upon
estimated cost to City: Actual cost will be determined and a refund or
additional charge will be made for the difference between the advanced
deposit as calculated above and actual costs.
City agrees to . provide water and sewer service to the
Developer's property in consideration for plant capacity charges, fees
and other charges to be paid by Developer as follows:
A. A water plant capacity charge at the rate of
$10.00 per fixture unit. Such charges shall be due and payable as
provided in paragraph 12.
B. A sewer plant capacity charge at the rate of
onethousand thirty .five dollars ($ 1,035.00 ) per single
family unit. Such charges shall be due and payable as provided in
paragraph 12.
C. A sewer plant capacity charge for any commercial
customers on the land as described above at. the rate of
Such charges shall be due and payable as provided in paragraph 12.
—7—
D. A meter installation fee to cover meter cost and meter
-installation, (but 'lot including curb stop or meter box) according to. the
City's service availability policy at the time of installation which
currently is $85.00 per 3/4" x 5/8" meter
F. If available, construction .water will be charged to
building based o„ metered usage in accordance witli current rates.
F. Hydraulic share of main extensions - payment or refund.
I. Developer recognizes that water or sewerutility
service to the Developer's property.. is provided by the use of a mail,
extension and other improvements constructed by a prior developer and
that Developer is obligated to refund a said prior developer'Developer's
share of the cost of said main extension or other, improvements.
Accordingly, Developer shall pay its pro rata share of the cost of said'
main extension or other improvements to City. Said pro• rata share shall
be based o„ Developer's percentage of the hydraulic capacity of said
extension or other improvements. For the purpose of this Agreement, the
cost of Developer's said hydraulic share shall be $
payable upon execution• of this Agreement.
2. With respect to utility facilities installed by
Developer to which future developers connect directly, and .in
consideration for monies expended by Developer toward said facilities,
City shall refund to Developer, or Developer's successors or assigns,
solely from monies collected from said future developers, said future
developer's pro rata share of the cost of said facilities. Said refunds
shall be calculated o„ the basis of the hydraulic capacity and demand of
said future developer whenever feasible. The refund obligation of City
hereunder and the benefits to Developer related thereto shall expire
five (5) years from the date of execution of this Agreement. Said
refund shall be made to Developer within sixty (60) days of the receipt
of payment by City from .a future developer. Defer to addendum if
applicable.
G. Payment of service availability charges and other
additional aids in construction for" •
at a cost of $
12. All charges to Developer shall be paid by Developer to the
City in accordance with the following formula and procedures:
A. The advance deposit for engineering, administrative and
legal fees and the inspection and plan review fee upon the execution of
this Agreement, a total of
and
B. Water plant capacity charge upon the execution of this
Agreement, a total of X245 00
and
C. Sewer plant capacity charge upon the execution of this ,
Agreement, a total of . . . '$1,035.00
and
D. Meter installation fee according to the City's service
availability .policy .ai time of installation which currently is
0145.00' ner 1" meter
upon
application for hook-up of individual lots, apartments, multi-family
lots or units; and
E. Construction water based on meter readings in accorda►ice
with City's rate schedule; and
F. Hydraulic share payment, in . accordance with paragraph
111:-1 of this Agreement upon execution of this Agreement, in a total
amount of'$ and
G. Service availability charges and other additional aids in
construction in accordance with, paragraph 11G of this Agreement in it
total amount of $
payable . . . . . . . .
11. Any plant capacity charges, fees, or other charges due to
City are intended to assist a in defraying costs as to offsite facilities
and in no way are to be considered a payment toward the cost of onsite
water distribution and onsite sewage collection systems which costs are
to be borne by Developer.
13. City agrees to connect individual buildings and structures on
the developed property upon application by the builders, plumbersor
individual owners subject to the operating rules and regulations of tl.ie
City and payment of all fees and charges in effect on date of
application and compliance by Developer with all provisions of this
Agreement.
14. The charges, costs and fees for any separate emergency fire
protection water systems. for subject project will be subject to
negotiations between City and Developer. if buildings of more than two
stories are a part of the project, Developer sl►all furnish at its
expense water pumps and other appurtenances as necessary for pumping
water above.
15. All plant capacity and service availability charges, fees and
other charges as outlined above are based on normal domestic sewage
defined lierein as containing not more than three hundred (300) parts per
million biochemical oxygen demand or three hundred (300) parts per
million suspended solids. Whenever water which contains more than these
amounts is to be admitted to the sewers, both the City and the pollution
control agencies must specifically agree to the connection. An
additional charge will be calculated in direct proportion to strength at
seventy-five cents ($0.75) for each part per million of either
biochemical oxygen demand or suspended solids over three hundred (300)
parts per million. All sucli connections shall provide for a suitable
Point for the waste to be sampled by the City or tl►e regulatory
agencies. An additional charge equal to the pro rata share of any
additional sewage treatment plant costs above ninety percent (90%)
treatment, and of the cost of any additional required outfall pipes to
may be required by City.
Developer shall have the right at all reasonable times to inspect the
invoices of the City in order to determine that said funds have been
properly expended by City pursuant to this paragraph.
16. Developer warrants that it is the owner of or the holder of a
binding contract to purchase the fee simple title of the real estate
described herein and further agrees to have all mortgages or other liens
subordinated to the terms of the Agreement and easements required herein
prior to any acceptance of the facilities by the City.
17. Upon► application by owners, builders or their authorized
representatives, the City agrees to connect the requested dwellings or
structures oil the said property at no additional connection fee (i.e. ,
in addition to those provided for above in this Agreement) , but subject
to tl►e continuing operating rules and regulations of the City including,
without limitation, the periodic payment of the water usage and sewer
usage charges ill effect oil the date of such application or thereafter
reflected in the City's rate schedule.
18. This Agreement shall be binding upon and shall inure to the
benefit of the developer, City and their successors and assigns.
}lowever, in the event tine Developer has not paid and delivered to the
City tine plant capacity and service availability charges, fees and other
charges provided to be paid to the City by Developer ruder the terms of
, this Agreement, and all easement and conveyances required by this
Agreement, then this Agreement shall not inure to the benefit of the
successors or assigns of the Developer.
19. It shall be .'tl►e responsibility of Developer to locate for
builders any water and sewer taps or lines necessary in conjunction with
residential or conunercial construction.
20. Unless the damage to any onsite improvements are the result of
the negligence or willful act of tine City, its officers, or employees or
authorized agents, the owner or Developer .of such property upon which
the damage occurs shall be responsible for the payment to til
e City of
such damage to City's property including all necessary and reasonable
repairs which must be. made by the City or independent contractors
engaged by the City to effect such repairs. If the owner or developer
of the real property shall fail or refuse to pay costs of Such necessary
and reasonable repairs to cure said damage within thirty (30) days from
tine submission to the owner of a stateme►►t' for such charges, the City
shall . I►ave a lien against Such owner's or Developer's property
subordinate to those liens created by or under agreements of record
prior hereto, for the payment of such necessary and reasonable costs and
expenses for effecting such repairs and restoration to such o►tsite
facilities located upon the owner's or Developer's property. Notice of
such lien or claim on lien describing the real property and the amount
owed may be filed within ninety (9U) days of the date from the last date
upon which any such repairs or restoration were made by tile' City or its
authorized representatives. Thereafter, the City shall be entitled to
bring all action for the foreclosed under the laws of Florida.
21. Prior to final acceptance of the utility and other public
facilities improvements by the City the following requirements must be
met at Developer's expense:
A. if the property is platted, one copy of the recorded plat
Shall be furnished to the City.
D. "As built" drawings of utility improvement shall be
furnished one week prior to final inspection. "As built" drawings shall
be certified by a registered engiI neer with the cost being borne by the
Developer. Two mylar and three printed copies of said drawing shall be
furnished to City,
C. All lot corners shall be properly marked so that utility
company or its engineer cart, upon receipt of "as built" drawings, verify
the marked water and/or sewer services as to location and depth. III
addition, for purposes of locating and protecting installed service
I
litres and valves Developer or his contractor shall mark each service
litre and all valves with all eight (8) foot pressure treated wooden post
in the manner as shown on the design drawings and specifications,
Developer's contractor is required to install curb stop, meter box and
valve box on each water service and valve as shown on design drawings.
D. All water and sever services and valves shall be marked
Oil t)te street curb by etching into the concrete or if no curbing is
available, a two (2) inch square metal tag is to be nailed to the
street's pavement and painted as. specified on design drawings,
G. Developer's contractor shall furnish a one (1) year
maintenance bond in the amount of 100% of the cost of the facilities
I
installed. The bond may be in the form of cash, surety bond, or
1
irrevocable letter of credit, the terms of which will indemnify and save
harmless the City from any loss, damages, costs, claims, suits, debts or
demands by reason of defects in the workmanship or materials used in the
facilities discovered Within a period of one year from and after the
date of acceptance by the City of the facilities.
F. A Dill of Sale for facilities from the Developer to City. ,
G. Conveyance of easements as required under this Agreement.
11. A deed for .any and all land on which lift stations or
water stations or other improvements if required by City.
I. The title evidence, mortgage releases and mortgage
subordinations as required in this Agreement. .
J. For onsite and offsite construction provide City an '
accounting of the actual costs (schedule of values) and releases of
liens from utility contractors ill such detail as the City requires.
K. City shall have the right to refuse to accept title to
Uevelol)er's coil
structiorl until Developer's construction has passed
certain tests, including, without limitation, closed circuit television
inspection of the gravity sewer lines, witnessed by a City
representative, to determine whether the Developer's construction is
constructed in accordance with the approved engineering plans and
specifications. Said tests may be performed at -least three (3) times:
the first test upon completion of the system.; the second test upon
completion of all building, roads, paving, drainage, and all
corlstructiorr within the right-of-way easement area of adjacent areas. A
third test shall be required if the City deems it necessary within a one
(1) year period after acceptance.
L. Letters of acceptance from the appropriate regulatory
agency for the water and/or sewer system• are required prior to final
inspection.
61. A copy of the certified water pressure test and force
main test as applicable.
N. The certification by the design engineer that the system
was constructed as designed is required prior to final acceptance.
D• Pump performance test on pumping stations if applicable.
22. All notices that may or must be given under this Agreement
shall 'be in writing and shall be valid if mailed by United ,States
registered or certified mail, postage and charges prepaid from addressed
as follows:
To Developer,:
To City of Atlantic Beach
City Manager
716 Ocean Boulevard
Post Office Box-25
Atlantic Beach, Florida 32233
IN WITNESS WHEREOF, the parties hereto have executed this Utility
Agreement the day and year first written above.
Signed, sealed and delivered
in the presence of:
�t17
Developer h itness
Ale �u �
City -of Atlantic a ch Witness
- 14-
� _, y
CITY OF
716 OCEAN BOULEVARD
------ P.O.BOX 25
ATLANTIC BEACH,FLORIDA 32233
TELEPHONE(904)249-2395
MAY 20, 1988
JEA PRE-SERVICE
233 {VEST DUVAL STREET
JACKSONVILLE, FLORIDA 32201
THE FOLLOWING FINAL INSPECTIONS HAVE BEEN MADE AND ARE SATISFACTORY:
#5793 - 401 STEWART STREET BILL THOMPSON ELECTRIC
#5794 403 STEWART STREET BILL THOMPSON ELECTRIC
#5960 - 2008 SELVA MADERA COURT BIVINS ELECTRIC
6S1 ERE ,
BENE' ANG S
COMMUNTTY' ELOPMENT DIRECTOR
cc:file
/ACITY OF
fY sKC B. ,,,4-
Office of Building Official
REQUEST FOR INSPECTION
Date /0 [5—. 4 S
Time Permit No. 2
Received p1 3 A.M.
P.M. CE — C)
Job Address
Locality
Owner's
Name C
Contractor V
BUILDING CONCRETE ELECTRICAL
Tem
PLU BING E� HANIC�A
Re Roofing ❑ Slab ng ElemRoug Pole WirIng ❑ Rough ❑ Air Cond. & ❑
Insulation ❑ Lintel ❑ Final Ll Top Out ❑ Heating
❑ Sewer ❑ Fire Place ❑
READY FOR INSPECTION Pre Ffb QTY
Mon, Tues. Wed. Thurs. FA
M
Friday PM
Inspection Made r A.M.
P.M.
Inspector Final Inspection
Certificate of Occupancy ❑
Date
CITY OF
A&0tid Vead-7
Office of Building Official
REQUEST FOR INSPECTION
Date '"��
Time Permit No.Received A MPM
District No.
lef— Cc�G�La
Job Address
Owner's Locality
Name
Contractor �.Q a�
BUILDING CONCRETE ELECTRICAL PLUMBIN
ilf Framing Footin . MECHANICAL
❑ Rough Wiring ❑ Rough Air.Cond.&
Re Roofing Slab Tem Pole ❑
P Top Out Heating
Lintel Final ❑ Sewer
- Fire Place
READY FOR INSPECTION Pre Fab
Mon. Tu We hurs. CrdayA.M.
Inspection Made �— A.M.
P.M.
Inspector
Final Inspection
Certificate of Occupancy
D to
q� a
DEPARTMENT OF BUILDING 9434
CITY OF ATLANTIC BEACH,FLORIDA PERMIT NO.
PERMIT TO BUILD
THIS PERMIT MUST BE POSTED ON JOB
Date .January 20 19 88
Valuation$ '5990t1 T
Fee$__ 59 00 59"MICKTI
This permit not valid until above fee has been paid to City Treasurer,and is 5 ( A" 51.1/CQ/C
subject to revocation for violation of applicable provisions of law. 9434 000CAC
n unpiw
This is to certify that EAGERTON PLW.fBING COMPANY 000
has permission toXXU install plumbinP
Classification New Residential Zone RS-1
Owned by James & Susan Wheatly
Lot_ 22 BlockUnit TT S/D Selva Norte
House No. 20!78 S
According to approved plans which are part of this permit
= NOTICE—ALL CONCRETE FORMS
AND FOOTINGS MUST BE IN-
SPECTED BEFORE POURING.
PERMIT VOID SIX MONTHS
--------------0, X„ AFTER DATE OF ISSUE
� 0 Building material, rubbish and debris
i from this work must not be placed
in public space, and must be cleared
= up and.-hauled away by either con-
tr tai "r owner.
Bui n Official.
---------------------------
FOR OFFICE PERMIT J
USE ONLY NUMBER DATE CONTRACTOR
PLUMBING II
ELECTRICAL
SEWER
WATER
I
I
CITY OF
*�, 6,4d-9&,4&
Office of Building Official
REQUEST FOR INSPECTION
Date
Time Permit No. r /
Received A.M.
PM' District PO.
Job dress �OD" t
Owner'sr� Locality
Name lJ2F_EAuf1E
Contractor 4.0
BUILDING CONCRETE ELECTRICAL
Framing ❑ Footing 'elf I:�� PLUMBING MECHANICAL
Re Roofing Slab ou9h Wiring Rough ❑
❑ Temp Pole Air.Cond.&
Lintel ❑ Final Top Out ❑ Heating
Sewer ❑ Fire Place
FOR INSPECTION Pre Fab
Mon. Tues
Th u rs. Friday A.M.
Inspection Made — 6- P.M.
M.
Inspector _
Final Inspection❑
Certificate of Occupancy
Date
CITY OF
,*4aoat- Ve d-��icda
Office of Building Official
!7 REQUEST FOR INSPECTION
Date /(�J Q (3
Time Permit No.
Received A.M.
P.M. District No.
a
Job Address
Owner's Locality
Name
Contractor
BUILDING ONCRETE ELECTRICAL
Framing tin PLUMBING MECHANICAL
Re Roofing �/ Rough Wiring =_ Rough
9 Slab Temp Pole To Out Air. &
Lintel _ p 7 Heating
Final _ Sewer
— Fire Place `.
�tpn, READY FOR INSPECTION Pre Fab
Mon. Tues Wed. _
Thurs.
Inspection Made — A.M.
P.
Inspector
Final Inspection❑
Certificate of Occupancy
Date
CITY OF
.l rvv A�, Fead-
Office of Building Official
Q yREQUEST FOR INSPECTION
Date �C� 0 Permit No.
Time A.19.
Received pin
. District No.
Job Address focality
Owner's
Name Contractor
BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL
Framing ❑ Footing _ Rough Wiring ❑ Rough ❑ Air.Cond.& C
Re Roofing ❑ Slab _ Temp Pole Top Out ❑ Heating
Lintel = Final Sewer L Fire Place
IDY FOR INSPECTION Pre Fab
A.M.
Mon. Tues. hurs. qday P.M.
Inspection Made M.
Inspector Final Inspection❑
Certificate of Occupancy
Date
/ CITY OF
Office of Building Official
REQUEST FOR INSPECTION (�
/
Date 3 S-�J SS Permit No.
Time A.M.
Received P.M. District No.
Job Address F Locality
Owner's
Name ctor
BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL
Framing ❑ Footing ough Wiring C / Rough - Air.Cond.& C
Re Roofing ❑ Slab Temp Pole (J/ Top Out Heating
Lintel Final j Sewer - Fire Place
READY FOR INSPECTION Pre Fab
A.M.
Mon. Tues Wed. Thur�M riday P.M.
Inspection Made — L
Inspector < Final Inspection
Certificate of Occupancy
Date
90 � �
�� ���
� Q� �
���
9/� `3U�s9��
9/�
CITY OF
r 4�, &464-5; 1614 a
Office of Building Official
QUEST FOR INSPECTION /Jr
Date Permit No. ` v
Time A.M.
Received P.M. District No.
Job Address Locality
Owner's
Name Contractor
BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL
Framing D Footing Rough Wiring - Rough - Air.Cond.& ❑
Re Roofing Slab Temp Pole t;' Top Out Heating
Lintel - Final - Sewer - Fire Place ❑
READY FOR INSPECTION Pre Fab
M.
Mon. Tues Wed. Thurs.
�M ridgy P.
Inspection Made
Inspector _ Final Inspection
Certificate of Occupancy
Date
JCITY OF
,-h&44C Ve4d-57&14&
Office of Building Official
REQUEST FOR INSPECTION
Date —
Permit No.
Time A.M.
Received P.M. District No.
D CS S� /`'1dt D cry �7-
Job Address Locality
Owner's
Name Contractor
BUILDING CONCRETE ELECTRICALPLUMBIN /MECHANICAL
Framing El Footing 171 Rough Wiring - g / Air.C.
&
Re Roofing C Slab - Temp Pole F Top Out C Heating
Lintel Final L: Sewer ❑ Fire Place
READY FOR INSPECTION Pre Fab
Mon. Tues yyed. ID=ad A.M.
\�� *,,t Thurs. Friday P.M.M.
Inspection Made
Inspector _ter "Final Inspection-i
Certificate of Occupancy
Date
CITY OF
Az&aac ve4d-
Office of Building Official
REQUEST FOR INSPECTION
Date v Permit No. /
Time A.M
Received P. District No.
o D0
Job Address Locality,
Owner's
Name Contractor
BUILDING CONCRETE ELECTRICAL PLUMBING MECHANICAL
Framing 7 Footing Rough Wiring ❑ Rough ❑ Air.Cond.& �:i
Re Roofing C Slab - Temp Pole F1 Top Out ❑ Heating
Lintel Final Sewer ❑ Fire Place
READY FOR INSPECTION Pre Fab
�fn
Tues. Wed. Thurs. Friday .M
Inspection Made i �r;�;�, A.M.
P.M.
Inspector Final Inspection n
Certificate of Occupancy
1
zO x" Date
CITY OF c� Day
r�asttic �eac�i-�lcvtida �--���
Office of Building Official
Date REQUEST FOR INSPECTION /y���////
— �/ / // /
Time A.M.
Permit No._ C..o
Received P.M. District No.
Job Address Locality
Owner's .
Name Contractor
BUILDING CONCRETE ELECTRICAL PLUMB NG MECHANICAL /
Framing � Footing = Rough Wiring � Rough i
Re Roofing ❑ Slab g — Air.Cond.&
Temp Pole ❑ Top Out Heating
Lintel - Final Sewer Fire Place
READY FOR INSPECTION Pre Fab
Mon. Tues. Wed. A.M.
hur 4r3 j Friday pM.
Inspection Made /A.M.
Inspector Final Inspection
Certificate of Occupancy
ate
J(J
5
.v
. ' r
1
CITY OF ATLANTIC BEACH, FLORIDA J
Apps by APPLICATION FOR ELECTRICAL PERMIT
7
TO THE CHIEF ELECTRICAL INSPECTOR: DATE: y 19
IMPORTANT NOTICE:
IN CONSIDERATION OF PERMIT GIVEN FOR DOING THE WORK AS DESCRIBED IN THE FOLLOWING, WE
HEREBY AGREE TO PERFORM SAID WORK IN ACCORDANCE WITH THE ATTACHED PLANS AND SPECIFICATIONS,
WHICH ARE A PART HEREOF, AND IN ACCOR WITH THE ELECTRICAL REGULATIONS, CODES AND CITY OF
f ATLANTIC BEACH ORDINANCES.
ELECTRICAL FIRM - TE ELECTRICIAN SIGNATURE3JOURNEYM
c
NAM dDDRES3: a � ✓Q RFD BOX
BLDG.SIZE - 7� a r°` B21�Q BETWEEN:
oks.RI AFT. COMM.( 1 PUBLIC( 1 INDUS. ( 1 NEW( OLD ( 1 REW.( )
ADDITION ( ) TRAILER ( 1 TEMP.f,`) SIGNS ( 1 ( SO. FT.
FEE
SERVICE: NEW( 1 INCREASE ( 1 REPAIR ( 1
CONDUCTOR 312k � AMPS An COPPER f ALUM.
SWITCH OR BREAKER 6,0 AMPS PH %3 W --< VOLf -4,66 RACEWAY a0�
EXIST.SERV.SIZE AMPS PH W VOLT RACEWAY
remeRS NO. SIZE NO. SIZE NO. SIZE
LIGHTING OUTLETS CONCEALED OPEN TOTAL
RECEPTACLES CONCEALED OPEN TOTAL
0.30 AMPS. 31.100 AMPS. '
SWITCHEq
L?
INCANDESCENT
FLUORESCENT&M.V.
• FIXED
0.100 AMPS. OVER
APPLIANCES BELL TRANSF.
k AIR H.P. RATING H.P. RATING
CONDITIONING COMP.MOTOR OTHER MOTORS AMPS ICEIL HEAT: KW-HEAT fi
n
Q1 OVER
Mb1OR>>Z H.P. VOLTAGE PHS NO. 1 H.P. VOLTAGE PHS
4MISCELLANEOUS _ t
-ji
i•�
I 'f RANSFORMEpS: UNDER 600 V. OVER 600 V.
NO. KVANO. lKVA
NO.NEON TRANSF. NO. VA. MA. MOTOR SIZE SWITCH FLASHER
EACH SIGN
FORWARDED
S
TOTAL FEES -
t
i
i
CITY OF ATLANTIC BEACH, FLORIDA ��✓/J
Approved by APPLICATION FOR ELECTRICAL PERMIT )6*
TO THE CHIEF ELECTRICAL INSPECTOR: DATE:
cp 19
j IMPORTANT NOTICE:
f.
IN CONSIDERATION OF PERMIT GIVEN FOR DOING THE WORK AS DESCRIBED IN THE FOLLOWING, WE
HEREBY AGREE TO PERFORM SAID WORK IN ACCORDANCE WITH THE ATTACHED PLANS AND SPECIFICATIONS,
WHICH ARE A PART HEREOF, AND IN ACCORDANCE WITH THE ELECTRICAL REGULATIONS, CODES AND CITY OF
ATLANTIC BEACH ORDINANCES.
p
ELECTRICAL FIRM: RICIAN IGNATUR 3JOURNEYMA
NAM ADDRESS: C�Wd 1.1ato /fRFD____,_BOX
BLDG.SIZE 7/ 727 Jul c-2/sdr 7�ctie - BETWEEN:
RES.( APT.( 1 comm. ( 1 PUBLIC ( 1 INDUS. ( 1 NEW/14,
EW/� OLD ( 1 REW. ( 1
ADDITION ( 1 TRAILER ( 1 TEMP,( 1 SIGNS ( 1 SQ. FT.
SERVICE: NEW ) INCREASE ( 1 REPAIR ( 1 ��1' / FEE
CONDUC?OR SIZE 21AMPS COPPER ALUM. r �b �
SWITCH OR BREAKER 9DD AMPS PH 3W r VOLT �� RACEWAY
t EXIST.SERV.SIZE AMPS PH W VOLT RACEWAY
FEEDERS NO. SIZE NO. SIZE NO. SIZE
LIGHTING OUTLETS CONCEALED OPEN TOTAL
RECEPTACLES CONCEALED OPEN TOTAL
- 0.30 AMPS. 31.100 AMPS. ,
SWITCHES
INCANDESCENT
pp FLUORESCENT&M.V.
-77 FIXED 0100 AMPS. OVER
APPLIANCES BELL TRANSF.
AIR H.P. RATING H.P. RATING
CONDITIONING COMP.MOTOR OTHER MOTORS AMPS CEIL HEAT: KW-HEAT
O.1 OVER
MOTORS H.P. VOLTAGE PHS NO. 1 H.P. VOLTAGE PHS
MISCELLANEOUS 1l
'TRANSFORMERS: UNDER 600 V. OVER 600 V.
NO. KVA ] IND. lKVA
NO.NEON TRANSF. NO. VA. MA. MOTOR SIZE SWITCH FLASHER
EACH SIGN
7-1
FORWARDED
. .. . � TOTAL FEES
BUILDING AND ZONING INSPECTION DIVISION
CITY OF ATLANTIC BEACH
ATLANTIC BEACH, FLORIDA 32233
APPLICATION FOR MECHANICAL PERMIT CALL-IN NUMBER
IMPORTANT — Applicant to complete all items in sections I, II, III, and IV.
I. 200$ 5t1 Va a � Lfi o`>' 72,
LOCATION Street Address: {–�
OF Intersecting Streets: Between 2.0t ��f e ` And
BUILDING -!5-n 1 voc r
Sub-division
II. IDENTIFICATION — To be completed by all applicants
In consideration of permit given for doing the work as described in the above statement we hereby agree to perform said work in accordance
with the attacllLed plans and specifications which are a part hereof and in accordance with the City of Jacksonville ordinances and standards
of good practice listed therein.
Name of Mechanicalr Contractors Q+
Contractor (Print( n S4c.Q eR A Master ✓ end V1 �5 .
Name of
Property Owner n
Signature of Owner Signature of
or Authorized Ag;;'t" Architect or Engineer
III. GENERAL IN RMATION
A' Type of heating fuel: B.
IS OTHER CONSTRUCTION BEING DONE ON
Electric THIS BUILDING OR SITE?
❑ Gat—❑ LP ❑ Natural ❑ Central Utility
IF YES, GIVE NUMBER OF CONSTRUCTION
❑ Oil PERMIT 3 Z
❑ Other — Specify
IV. MECHANICAL EQUIPMENT TO /E INSTALLED NATURE OF WORK
(Provide complete list of components on back of this form( Residential or ❑ Commercial
Heat [3 Spec* ❑ Recessed W Central O Root )< New Building
Air Conditioning: ❑ Room Central ❑ Existing Building
it
Duct System: Material 0 c Thickness ❑ Replacement of existing system
Maximum capacity 1(.4,�� c.f.m. �• New installation(No system previously installed)
❑ Extension or add-on to existing system
❑ Refrigeration
❑ Other — Specify
❑ Cooling tower: Capacity g.p.ns•
❑ Fire sprinklers: Number of heads
❑ Elevator ❑ Manlift ❑ Escalator (number) THIS SPACE FOR OFFICE USE ONLY
❑ Gasoline pump■ (number) (Received)
❑ Tank: (number) Remarks
❑ LPG contain*M (number)
❑ Unfired pressure vessel
Q biles
Permit Approved by Data
❑ Other — Specify Permit Fee
LIST ALL EQUIPMENT
AIR CONDITIONING AND REFRIGERATION EQUIPMENT
Capacity Approv!>ts�
Number Unit, Description Model Number Manufacturer (Tose) /►react'
�.-I (Cil f -TL00-74'9 A c`r)-e- Lf Cx-- L.
HEATING FURNACES, BOILERS, FIREPLACES
AppralliFft
Number Units Description Mopal Number Manufactures (BTU) AXIMW
eoP 25- Ay ; 4k- le-- -lOVa3BA -TramFf000 2XL_
j c a e r r`O vcc Ct �_
TANKS
now Many Nominal Capacity Type Ljuid Name of Serial Ap=
and DinUM8101111e Contained Manufacttaer No.
i
DEPARTMENT OF BUILDING 9 4 3 3
CITY OF ATLANTIC BEACH,FLORIDA PERMIT NO.
PERMIT TO BUILD
THIS PERMIT MUST BE POSTED ON JOB 4 .t1fi
4�,QfIt'KT
Date January 20 19 88 9421 1A 2/15/0
9433 .C nuc
Valuation$ Fee$ 46-00 9421 1A P/15/0;
This permit not valid until above fee has been paid to City Treasurer,and is lnon
subject to revocation for violation of applicable provisions of law.
This is to certify that Ocean State Ileat%Air
has permission to l6 install heat/air
Classification New Residential Zone RS-1
I
Owned by James & Susan Wheatly
Lot 72 B1ockUnit II S/D Selva Norte
House No. 2008 Selva Madera Court
According to approved plans which are part of this permit
= NOTICE—ALL CONCRETE FORMS
AND FOOTINGS MUST BE IN-
SPECTED BEFORE POURING.
PERMIT VOID SIX MONTHS
„ AFTER DATE OF ISSUE
1111 �--� O Building material, rubbish and debris
zi from this work must not be placed
in public space, and must be cleared
= up and hauled away by either con-
tractor or owner. s
i
Bui 0 O al.
FOR OFFICE PERMIT DATE CONTRACTOR
USE ONLY NUMBER
PLUMBING
ELECTRICAL
SEWER
WATER
PSR-3844 172 76
DEPARTMENT OF BUILDING
CITY OF ATLANTIC BEACH
--- PERMIT INFORMATION ------- LOCATION INFORMATION ---------
=rmit Number : 17276 "dress : 2008 SELVA MADERA COURT
Permit Type:MECHANICAL ATLANTIC BEACH, FLORIDA 32233
i: ass of Work:ALTERATION LEGAL DESCRIPTION
,�'onstr. Type.WOCD FRAME Block * Lot , Twp: 0
..'roposed Use: Section: 0 Subd:O Rng: f)
Dwellinas ; 0 Subdivision:SELVA NORTE
Est . Value: 0 .00
T-mprov . Cost : 0100
Total Fees : 25 . 00
Amount Paid , 25 .00
Date Pa-Ld: 10/08/1998
-.rk DeEc : REPLACE c%-INDENSEF
------- OWNER INFORMATION APPLICATION FEES -----------
me: JAMES WHEATLEY ERMIT 25 .00
Ar: ' 200? 12ELlIA MADERA COURT
ATLANTIC* FEF.,—H . FLORIDA 3221-
-Ione: (904)249-59,-:',21
CONTRACTOR TNFORMATION
.,me: SNYDER HEATING & AIR COND. CO .
.--Idr: P.O. BOX ';.582F.
JACKSONVILLE, FLORIDA 321245
Lic : CACO14642 Exp ,
T y p e :, J
NOTES:
NOTICE - INSPECTIONS MUST BE REQUESTED AT LEAST 24 HOURS PRIOR TO INSPECTION
BUILDING MATERIAL, RUBBISH AND DEBRIS FROM THIS WORK MUST NOT BE PLACED IN PUBLIC SPACE, AND MUST BE
CLEARED UP AND HAULED AWAY BY EITHER CONTRACTOR OR OWNER
"FAILURE TO COMPLY WITH THE MECHANICS' LIEN LAW CAN RESULT IN
THE PROPERTY OWNER PAYING TWICE FOR BUILDING IMPROVEMENTS."
- --nm^%Lr-rv-Df"S-"ICH ARE PART OF THIS PERMIT AND SUBJECT TO REVOCATION FOR
BUILDING; AND ZONING INSPECTION DWISION
CITY OF ATi.AtN T IC BEACH
ATLANTIC SIACN. FLORIDA /1280
APPLICATION FOR MECHANICAL PERMIT cAL'UiN NUMBEH
I
IMPORTANT — Applicant to complete all items in sections 1, Il, Ill, and IV,
I' ftrNt AIIr►M: rcv crt
LIOCAT ION
OF hhrwetir,� tMtats: 6at.ttl, .d _
WlU>lN6
Ii. IDENTIFICATION --- To be completed by all applicants.
1. cs•4441AC&A of Mrmit 'iw.w la {.inv tht w.ri as dtscribad in tho •bows stahmsnt v• h.,sby •grim• to pat(o,m s.id work in atcordsncs
.,n, t" sNac4d p40ts *ad specifications which a,t a part htrr.of and in accardsnce with the City of Jac}sonwiHt ordin.mcss and stsndrrdt
J ♦ood ►racr•cs 4tse{ rhara:e.
►ram+ as ►Iaahseissl rC C.tsMtsHrs / I C-0Y/ v"� 7
G..wss« (hies) �, q" /Astlsrr
"'G.001 y—
l.�ttrh J
19
s.,..rw. .f •+war ilse.tstr• .r
w A.siWW4 Ayaal Arshilttf at Earftetr
I11. G@�p1/11 11CN •
A. 16 OTNtst CON&TWUCTION OCINO OON[ON
TNI• WILDING ON WE 11 , G
p "-0 V C Nstrnd 0 Celt"Uwft
if TED, Give Humes" or COH&TttucTtON
Q OJ h[Rt,tIT
V. .wGw. ff 10 M 111RII�Lt� NAT11 wrrlrlft
( of es+w.e•l.ss beak d heNdenUttl or C] Commercial
LO d So"* Q •=ma Ce111a1 O Rea Q ItGU14Air dash gl Q sl.e+. Cett>tw! 0OMIO
Q "= l"101111—., IR''nipisownent of existing OYGIWi
wei sw s.'+eMir. 4.6% O New Nlettuistion(Fro system pteowitly instaiwo.
❑ ti.O »..ew. d extension a so$."to euisthq sr•torn
0 C0046019 *-W- Q Other- gW.4ty
❑ I4st Wrc.if.n: heft"
❑ w..r.. p wawe o 1"IS VA44 PM oewaE 1►![ a y
p t«.1rrr. ,... ... It.�►u! R.re1A.
p Lro
p u01444 mere ire....
urr ALL sQUT?Sd l f
AS CO DMOM AND VjWn Nt KATWN tQtJf SWM
x�l.w..tAM. De...lrNsl� N"d N* Mw >1r.�.s.eM.w ' ' AppmAW
qtKt t
}rLA;; • FU MACM 60"o ERS, F=BftMc 13
lA1�N�tr Li:*,ea � >1[eM If1�.t1<►.R x � ��'�
.. Nalrp >wmiat1G m x tltT� fro,
NW-
PSR-3844
11416
DEPARTMENT OF BUILDING
CITY OF ATLANTIC BEACH
PERMIT INFORMATION ---_ - LOCATION INFORMATION -
Permit Number : 11416 Ads : 2 -
Permit Type: PLUMBING s � 006 SELVA .MADERS COURT
Class of Work : ALTERATION ATLANTIC BEACH . FLORIDA 3223 '
Constr . Type : NIA -----'- LEGAL DESCRIPTION --------
Proposed Ltse : UTILITY Lot : Black : Section:
Dwellings : 1 Cade: Township : RNG: 0
Estimated Value : 80 .0(1
Subdivision: SELVA NORTE
Improv_ Cast : $0 . 00
Total Fees - $25 ,001
Amount ;?sai.d $25 : 00
SPRTNRLEF SY OTEM
- --- _ QW14ZR INFORMATION
Name �_ RE TLZY. ---- APPLICATION FEES -----
dd r4t . . $ LVA MADERS COU PEP-MIT $25 .00
A
EACH, FLORIDA ?�� WATER IMPACT FEE $0 .00
90 SE4ER IMPACT FEE 0. %74$0 .00
2 "+ 5 WA'rIPb MXT
JtR
/TAP
RADON GAS w H . R . S $0
CC�` TRACTM . INFORMATION --- RADON CAB 5% $0 .00 0
Nary. IKMEAN ALL & ?R1IG'�.'r`T ^' CAPITAL IMPROVE .
yddress : 215? .,TSE WOODS DRIVE $0 . 00
SEXIER TAP,
v.
_- , CROSS CONNECTION $0 .00
T � - SEC H IMPACT FEE $0 .00
CONST. SURCHARGE .00
SCHARGE/ATL.BCH $0 , 0
NOTES:
NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE INSPECTED BEFORE POURING
PERMIT VOID SIX MONTHS AFTER DATE OF ISSUE
BUILDING MATERIAL, RUBBISH AND DEBRIS FROM THIS WORK MUST NOT BE PLACED IN PUBLIC SPACE, AND MUST BE
CLEARED UP AND HAULED AWAY BY EITHER CONTRACTOR OR OWNER
"FAILURE TO COMPLY WITH THE MECHANIC'S LIEN LAW CAN RESULT IN
THE PROPERTY OWNER PAYING TWICE FOR THE BUILDING IMPROVEMENTS"
ISSUED ACCORDING TO APPROVED PLANS WHICH ARE PART OF THIS PERMIT AND SUBJECT TO REVOCATION FOR
VIOLATION OF APPLICABLE PROVISIONS OF LAW.
i
Date: 21011% 01 �atc 0029905ATLANTIC BEACH BUILDING DEPARTMENT CHECKS 2123
00100003221004
By:
C
CITY OF ATLANTIC BEACH
APPLICATION FOR
PLUMBING PERMIT
JOB LOCATION : �G d �' S .W�` ?-4&eZa;! C
OWNER OF PROPERTY:
PLUMBING CONTRACTOR f
CONTRACTOR' S ADDRESS :
STATE LICENSE NUMBER: ( TELEPHONE'
HOW MANY OF THE FOLLOWING FIXTURES INSTALLED
SINKS SHOWERS
LAVATORY WATER HEATERS
BATH TUBS DISHWASHERS
URINALS DISPOSALS
CLOSETS WASHING MACHINE
FLOOR DRAINS SHOWER PANS
�� lv
OTHER
TOTAL FIXTURES : x $3 . 50 + $15 .00
MINIMUM PERMIT FEE - $25 .00
SIGNATURE OF OWNER:
SIGNATURE OF CONTRACTOR:
----------------------- ---------------------------------------
INSTALLATION OF PLUMBING AND FIXTURES MUST BE IN ACCORDANCE WITH
THE MOST RECENT EDITION OF THE SOUTHERN STANDARD PLUMBING CODE.
CALL A DAY AHEAD TO SCHEDULE INSPECTIONS - ( 904) 247-5826
SEWER CONNECTIONS MUST BE CALLED INTO PUBLIC WORKS FOR INSPECTION
PRIOR TO COVERING UP - ( 904) 247-5834
000762
• DEPARTMENT OF BUILDING
CITY OF ATLANTIC BEACH
It A T1, 11nU rUEnRNAXTnU
Mit Number : -/6--j 11 1 SELVA MADERA COURT
-j-rmit Type: BUILDING ATLANTIC BEACH, Fl..ORIDA 32232
As (-kf Work: ADDITION ----- - LEGAL DESCRIPTION
listv, Type: WOOD FRAME Blocks Section:
,posed Use: REMODEL/ALTERATN Plat Book: Page: 0
Code 1 0 fivision- SELVA NORTE
Lmated Values OWNER INFORMATION
Improv. CoBt -. $0. 00 Name; JAMES WHEATLEY
Tatil Fees: $0. 00 AdIress: 2008 SELVA MADERA COURT
Amoi t Paid-. $0. 00 ATLANTIC BEACH, FLORIDA 322-'�4,J
Date Paidi "/tones (904)249-5962
2 ' , MENTtE 111f::0IPT%10 ft - WfDR) 8&RIJ
i1f,fr'ATT011 FEES
'1FPT,fr nw,,
TIT $0. 00
e'R THPACT FEE $0. 00
:R IMPACT FEE $0. 00
!:'R METER $0. 00-
ON OAS-H. R. S. $0. 00-
)N GAS - 5% so. od
w R TAP $0. 00
1:'R TAP $0. 00
11 ,?AULIC SHARE $0. 00
F' rNSPECT FEE $0. 00
(NEERING $0. 00
C 'PR ;90. 00
NOTES:
MAINTAIN ALL DRATHAGE RUNOFF.
NOTICE —ALL CONCRETE FORMS AND FOOTINGS MUST BE INSPECTED BEFORE POURING
PERMIT VOID SIX MONTHS AFTER DATE OF ISSUE
BUILDING MATERIAL, RUBBISH AND DEBRIS FROM THIS WORK MUST NOT BE PLACED IN PUBLIC SPACE,AND MUST BE
CLEARED UP AND HAULED AWAY BY EITHER CONTRACTOR OR OWNER.
"FAILURE TO COMPLY WITH THE MECHANICS' LIEN LAW CAN RESULT IN
THE PROPERTY OWNER PAYING TWICE FOR BUILDING IMPROVEMENTS.55
ISSUED ACCORDING TO APPROVED PLANS WHICH ARE PART OF THIS PERMIT AND SUBJECT TO REVOCATION FOR
VIOLATION OF APPLICABLE PROVISIONS OF LAW.
ATLANTIC BEACH,-BIJF DING DEPARTMENT
By,`�
/ •
APPLICATION FOR FENCE PERMIT
Owners -A- ____phone Z
Job address__Z G O
------- v- -- --�----- a-----------------
Lot 2__Z __block and/or unit # subdivisions_ 0
Contractor if different from
-----------------------------------------
i
Valuation of fence S___Z_ l SCorner or interior lot--(
Type construction�J ,::21�c �✓_ �o
--------------
Show location and height of fence as well as location of street(s) .
____
a
Owner signature _____ ________________Date_ 9/
Contractor signature - Date_________________
t J
l
w
I
Lor 74 /
t
f'NO LUT 73
RG.S. NQS e�P
"SWEErGUMs) 9 ��
0 - z"93"sWEETGUMs
Q -5 S EEroums `� �i,?"PALM fey .
D,
R.
ALM 339& 44.
�ry ` :cusTER g �
l o /4"sWEErcu.w p ti �1
jU 36"vAK.
/O"PA LM `_ � •�&
"9WEE- /M
CO
2 SWEErGUM
/2"PALM � I
/2 'PALM W"SWEE� e� c �\ / ,ti ✓�.
i
el
Q Ty FNo
4
No 3398 �1!
vr'rE�. AF
dF4R/NCS AS PtR PLAr. '94ke
> Nc B.R L. AS PER PLA r
v.
CITY OF
716 OCEAN BOULEVARD
P.O.BOX 25
ATLANTIC BEACH,FLORIDA 32233
TELEPHONE(904)249-2395
May 31, 1989 DELIVERED BY HAND
ATLANTIC BEACH POLICE DEPARTMENT
Mr. James Wheatley NOTICE OF VIOLATION
2008 Selva Madera Court
Atlantic Beach, Florida 32233
Dear Mr. Wheatley,
Upon investigation we determined that you constructed an 8' fence
along the rear of your property without the benefit of the proper
permits from the City of Atlantic Beach. You were notified
verbally by the City Building Inspector and Community Development
Director that the fence was illegal in that 1 ) the proper permit
was not obtained prior to construction and 2) the height of the
fence exceeds the maximum height allowed by the Atlantic Beach
Zoning Code.
On April 4, 1989 you made application for a permit to allow the
construction of the 8' fence to remain in place. Said
application was denied.
On May 4, 1989 you applied for and were granted a building permit
to "erect 6' shadow-box fence on 2', gentle sloping (6' wide)
berm", "2-3' offset from property line", maintaining all drainage
runoff.
On May 18, 1989 we determined that the illegal fence was still in
place. On May 19, 1989 you agreed to have the illegal fence
removed from your premises by 8:00 a. m. Monday, May 21, 1989.
The illegal fence is still in place as of this date. Therefore
you are hereby notified to have the fence removed by 5:00 p. m.
Wednesday, June 7, 1989. Should you choose not to remove the
illegal fence, the City of Atlantic Beactl_ i�r—re ence
at your expence and levy a fine of 0. 00 p day that e
violation has and continues to exis ,� as provided by Chapter 1,
Part II, Section 1-11 of the Atl tic Beach Code of Ordinances.
Sincerel
CIT ANTIC BEACH
/REHE' A N rCENT
DE ENFFFICER
cc: Secretary, Code Enforcement Board
City Manager
file
M]M) ES OF THE REGULAR NI!=U OF THE ATLANTIC BEACH CITY C014- V V
NIISSION HELD AT CITY HAIL ON MAY 22, 1989, AT 7:15 PM O O
T T
PRESENT: William I. Gulliford, Jr. , Mayor/Commissioner E E
Robert B. Cook, Sr. D D
Glenn A. Edwards
Alan C. Jensen, and M S
Adelaide R. Tucker, Commissioners O E
AND: Richard C. Fellows, City Manager T C
Claude L. Mullis, City Attorney I O Y
NAME OF O N E N
Maureen King, City Clerk COMMRS. N D S O
The meeting was called to order by Mayor Gulliford. The
invocation, offered by Commissioner Cook, was followed by the
pledge to the flag.
1. Approval of the minutes of the regular meeting of May 8, 1989.
Cook x
Notion: Approve minutes of the regular meeting of May 8, Edwards x x
1989. Jensen x
Tucker x x
No discussion before the vote. The motion carried unanimously. Gulliford x
2. Recognition of Visitors
Joanne Morrisseau and Roxanne Curry, representatives of the firm of
Curry, Pappas, Morrisseau, which had been contracted to promote the
mandatory recycling program to become effective July 4, 1989,
presented a brief program stressing the importance of education.
Ricky Raccoon, the program mascot, was introduced and a brief
outline of the program was presented. Caroline Mansfield sang a
jingle about recycling and invited the audience to join in.
* * * * * * * * * *
Ray Schaubell, 423 20th Street, addressed the commission relative to
a fence which had recently been constructed by a neighbor and which
he felt was not in keeping with the intent of the recently passed
ordinance establishing a method for measuring the height of fences
and walls. He explained at some length his contacts with city
employees relative to the issuance of the permit and the
construction of the fence. The City Manager said he felt the
intent of the ordinance was that no fence should be higher than six
feet. The construction of a six foot fence on top of a burro would
be an apparent attempt to circumvent the requirement of the
ordinance and Ms. Angers had indicated she would contact the
property owner when she returned from vacation and request that the
fence be removed.
Mayor Gulliford said the commission may wish to review the
ordinance to see if the intent of the Commission could be
clarified.
Wheatiel t
Mr O$hel a rlader FL o 32233
. . 2A lantic Beach►
D C��
June 5, 1989 1jj1 ri I�U�
Rene' Angers officer
f or ZQn�ng
Ren cement and
code EnQ u�lang
716 ocean Blvd. 32233 V
Atlantic Beach, FL
our letter dated May 31 1989•
Dear Rene ►
response to
y fence was constructed on
This is in 4, 1989 a within the terms
obtained May have been exactly
a ermit would h of $2p0 was paid to the contractor
pursuant to
when Completed spec ific
roperty, that considerat I was veryof the
My p An advance of the permit. on the berm,
of the permit- under the terms offset,
We spoke about the time the fence was to be I
for construction the permit. AccordinglYr
you in obtaining was my understanding lri the
the berm.
the property arently it was your
I
fence structure offset from fence. APp
constructed 2-3 diagram of the from the property liner
noted 2-3' offset in the
understanding the berm itself wasto
nainfdrainage rUn-off.
In any event your concern was tO
During construction of the fence, which was designed to be partially
subterranean, you contacted me regarding the fence. During our conversations
I noted both I had given consideration in the form of $200 and had d load Of
dirt delivered, based on my permit. You contended the fence 1
the terms of the permit both by setback and by height. Was not within
since able to tell me how the finished height of the You Were not
subterranean portion. e f e then or
enc is effected by its
I stopped by your office the
the setback distance was next day to exa�ne
line, vs. berm from p mute on the point of the
P erty line) , �, meareme Permit•
Your recent visit to the fence the point of ` nt
drainage problem, in question J1 in S p f
urE,Ou e
During the f "�Ot
llkevel 61 5 p
the groundStthef MaY 20th I 1 "fit h ��� dQ
the ground evel on ny ground. owered ��e ��1: PetInfact th level under AroAety On Your the �
e gr°und the fe unduld reoen �
lege nce tes t �
Beach 2 r°ted they l Surround IS Still r but b l0 Qle 4
n 1 're h
my compl hl h well e are d 1 9 t OWe Y t
drastica a1ning eXcee numb hE? FL
Z11' at the ghb r d 6 fee r Of hoer
AroAert PZOAer A ehoe,9 2Ses t
4p 1
y 1ihe ty� good e oohs
TS of kdm� 2'yc�
e �'
the d, fro �' ZS � G�r�'� � 0 0
1FFe
,�lo0 -e6 QI1
thehcS
berm during construction? Another fence, which is constructed along Plaza
Blvd, across from the park, at Selva Lakes, both exceeds the height restriction
and is built on a man made berm. This fence runs for hundreds of feet and has -
been in place for over 5 years.
There are also a number of fences which exceed 6 feet. Many of these are
in plain sight. The conclusXion is that this ordinance is antiquated by the
new, higher ground levels required by your office on new construction. The
ordinance is also regularly ignored both by property owners and the town,
judging from the proliferation of 6' plus fences. I can then only conclude
the City of Atlantic Beach does not regularly enforce the ordinance. I would
note that by the principle of estoppel a six foot limit is no longer valid.
I believe that I have shown good faith by constructing an attractive
fence (even the complaining neighbor agrees to this) . The fence is of a
shadow box design, to be least offensive. have also lopped off a good bit
of my fence as a gesture of goodwill.
I hope this will be the end of the matter, which has gotten all out of
portions. Should you have any questions please call me at 631-4897, 791-3849,
636-0213 or 249-5962.
Sincerely yours,
Jim
CITY OF ATLANTIC BEACH
RECEIPT OF NOTIFICATION
served notification to:
/�/";, /'Jarmo�h r oss6er9 l /►/lo��Crr ` , �t rs w `� .-
at
o24dX ����/� d�'�Clo�/a Cpur7 Atlantic Beach, Florida 32233
i//
this 3/ S� day of X,Ila 19
at (< !J
A.M.t)L
This notification was in reference to VIOLATION OF THE CODE OF
ORDINANCES: ILLEGAL FENCE
SIGNATURE OF SERVER: * �v
SIGNATURE OF RECEIVER:
DATED:
IRRIGATION METER MR. WHEATLEY
2008 SELVA MADERA CT.
249- 962
)O COST RECORD
DESCRIPTION QTY. h1ATERIALS LABOR TOTAL
8" X 1" PVC T.S 1 $17 .00
II COR12 STOP 1 `18.48
" ADAPTER PVC 2 1 .54
1" PVC 45 L 1 .40
1" URB STOP 1 2 .36
IIMETER 1 14 .00
" 2 .30
1" RUBBER WASHERS 2 $ ,72
1" DBL CHECK BACKFLO 1 $8 .00
PREVENTOR
CONCRETE METER BOX/L D 1 2 .00
H GALY UNION 2 .56
X 12" GALV. NIPPL 4 .84
1" GALV. L 4 $ .72
SUB TOTAL $333 92
10% O.H. $33 39
TOTAL $367 31
2 rrrN ($27 .45/11R) For 4 IIR '. $10( .8
30% 3 .9
TOTAL
• MATERIALS $1
LABOR7 -TOTAL
TOTAL $367. 31 $14 .7
$51 .0
MISC. JOB EXPENSES AMOUNT OTHER 108 EXPENSES $4C 0
TRUCK, ($10-00/11R) 'OR IRS. TOTAL COST 55 .0'
$40.01) TOTAL SELLING PRICE
LESS TOTAL COST
GROSS PROFIT
LESS OVERHEAD COST
o OF SELLING PRICE
TOTAL 4 .0 NET PROFIT 55d.01
APPROVED
JUL 3 1991 d
CITY OF ATLANTIC BEACH v
PUBLIC WORKS DEPARTMENT
AzIeF. Cza0mom
APPLICATION FOR WATER AND/OR SEWER TAP
APPLICANT NAME
MAILING ADDRESS_-p�IDOg :&,__ _ �_ -------
PHONE NUMBER= 9Q' DATE--6--/ T -------
SERVICE REQUESTED-_--___
1
SERVICE LOCATION21
__ U --- ------ ---- -���__=-----
DATE SENT TODATE RETURNED
PUBLIC WORKS �/ II
__- _-_ TO BUILD. DPT. 31 1_l------
DATE OWNER � /
NOTIFIED---------------------
f3 f'/��✓�cion
.JUN 19 '1991
RECEIVED Building and Zoning
JUN I � 199, g
P-ua41C vuQRhs